List of all PPP Projects
This Report provides information on infrastructure projects implemented by the Government on PPP basis across pre-defined set of parameters and following coverage criteria:
Export to Excel
Projects that were either under 'Pre-construction Stage', 'Under Construction' or 'Operation and Maintenance Stage' as on April 1, 2011 or 'Awarded' thereafter and with Project Cost >INR 5 crore.
Please click on project name for more details of the project.
- No. of Projects in this Report: 1883
- Total Project Cost(in Rs Crore): 2,495,568.44
Sr No. | Project Name | Project Capacity | Total Project Cost (In Rs.Crore) | Sector | Sub-Sector | Status | Project Authority | Location | Update Date |
---|---|---|---|---|---|---|---|---|---|
1 | Community Shopping Facilities at Jharpada, Bhubaneswar on DBFOT mode | 3 to 4 acres have been identified in each of the BMC zones i.e in the North, South-East and South-West zone of BMC | 350 | Social and Commercial Infrastructure | Tourism | Pre-construction stage | Bhubaneswar Development Authority | Odisha | |
2 | Development of Bio-CNG Plants in Bhubaneswar in DBFOT mode | 4 numbers of 50TPD | 120 | Water Sanitation | Solid Waste Management | Pre-construction stage | Housing and Urban Development - Bhubaneswar Muncipal Corporation | Odisha | |
3 | Captive Jetty at Jatadhar Muhana in Jagatsinghpur District on BOOST basis | Not Available | 2104 | Transport | Ports | Pre-construction stage | Directorate of Ports & I.W.T, Odisha | Odisha | |
4 | Setting up of Intra State Connectivity (8 airstrips) of Airports within the state of Odisha under Regional Connectivity Scheme (RCS) in PPP mode | category 1A < 9 passenger seating capacity Category 1: 9 - 20 | - | Transport | Airports | Pre-construction stage | Commerce and Transport Department | Odisha | |
5 | Setting up of Electric Vehicle Charging Stations (EVCS) on PPP Mode at Various Locations in Bhubaneswar & Puri | 83 locations across Odisha | 25 | Transport | Urban public transport | Pre-construction stage | Commerce and Transport Department | Odisha | |
6 | Automated Driving Testing System (ADTS) @ 30 locations | 30 locations across Odisha | 167 | Transport | Urban public transport | Pre-construction stage | Commerce and Transport Department | Odisha | |
7 | Automated Testing Stations (ATS) | 38 locations across Odisha | 42 | Transport | Urban public transport | Pre-construction stage | Commerce and Transport Department | Odisha | |
8 | Development of Truck Terminals in various Districts of Odisha | 25 locations across Odisha | 396 | Transport | Urban public transport | Pre-construction stage | Commerce and Transport Department | Odisha | |
9 | Development, Operation and Maintenance of Shri Jagannath International Airport on PPP mode at Puri | Not Available | 2230 | Transport | Airports | Pre-construction stage | Commerce and Transport Department | Odisha | |
10 | Development of Silk (Ahimsa) Spinning mill in PPP mode | 3000 Spindles | 400 | Social and Commercial Infrastructure | Handlooms & Textiles | Pre-construction stage | Handlooms, Textiles and Handicrafts Department | Odisha | |
11 | Upgradation of Toy Train Service at Nandankanan Zoological Park into an engaging, educative, and attractive package through PPP mode | 1.6 kilometers | 15 | Social and Commercial Infrastructure | Tourism | Pre-construction stage | Forests, Environment and Climate Change Department | Odisha | |
12 | Selection of Operator for Operating, Maintaining & Managing - six State Government Testing Laboratories (at Cuttack, Angul, Berhampur, Rourkela, Bolangir and Balasore) on Public Private Partnership (PPP) Mode | Cuttack- 42120 sq ft plot Angul - 19776 sq ft plot Berhampur - 15899 sq ft plot Rourkela - 68400sq ft plot Bolangir - 11979 sq ft plot Balasore - 15000 sq ft plot | - | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Pre-construction stage | MSME Department | Odisha | |
13 | Construction of Godowns ( 10000MT each) through Private Entrepreneurs Guarantee (PEG) Scheme | 4,00,000 MT (40 locations of 10,000MT each) | 400 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Pre-construction stage | Odisha State Civil Supply Corporation Ltd. | Odisha | |
14 | Government Industrial Training Institutes (ITIs) at Patnagarh in Bolangir and Athamalik in Angul for running in Private Training Partner (PTP) mode | Bolangir - 208 seats Angul - 248 seats | Social and Commercial Infrastructure | Education | Pre-construction stage | Skill Development and Technical Education Department | Odisha | ||
15 | Farmer Skill and Agri-Incubation Centre | Not Available | 150 | Social and Commercial Infrastructure | Education | Pre-construction stage | Department of Agriculture and Farmer's Empowerment | Odisha | |
16 | Agri-Tech Smart Farm (ATSF) at Puri, Sukinda, Similiguda under PPP mode | Not Available | 200 | Social and Commercial Infrastructure | Agriculture and horticulture | Pre-construction stage | Department of Agriculture and Farmer's Empowerment | Odisha | |
17 | Production of non-paddy seeds by the Seed Producing Agencies in selected Government Agricultural Farms of Directorate of Agriculture through PPP mode | 42 farms in 4 clusters Cluster 1 : 120.44 ha Cluster 2: 194.8 ha Cluster 3: 284.95 ha Cluster 4: 101.5 ha | - | Social and Commercial Infrastructure | Agriculture and horticulture | Pre-construction stage | Department of Agriculture and Farmer's Empowerment | Odisha | |
18 | Joda - Bamberi Road Corridor | Not Available | 221.87 | Transport | Roads and bridges | Under Construction | Works Department | Odisha | |
19 | Angul- Duburi- Sukinda- Rail Link | 95 kilometer | 3602 | Transport | Railway track, tunnel, viaducts, bridges | Under Construction | Works Department | Odisha | |
20 | Subarnarekha Port | Not Available | 5000 | Transport | Ports (excluding captive) | Under Construction | Directorate of Ports & I.W.T, Odisha | Odisha | |
21 | Astaranga Port | Not Available | 7417 | Transport | Ports (excluding captive) | Under Construction | Directorate of Ports & I.W.T, Odisha | Odisha | |
22 | Development of Integrated Residential Complex at Paikarapur, Bhubaneswar by BDA | 9.775 Acres | =153.9 | Social and Commercial Infrastructure | Housing | Under Construction | Housing and Urban Development Department and Bhubaneswar Development Authority | Odisha | |
23 | Affordable housing project under model 3 of "Policy on Housing for All in Urban Areas" 2015 (at Chhend, Rourkela) | 500 EWS units over 3.30 acres | 45 | Social and Commercial Infrastructure | Housing | Under Construction | Housing and Urban Development Department | Odisha | |
24 | Affordable Housing Project (AHP) as per provisions of Model-Ill under Policy on Housing for all in Urban Areas, Odisha-2015 (at Naranpur Cuttack) | 550 EWS unit 320 LIG units over 8 acres | 88.31 | Social and Commercial Infrastructure | Housing | Under Construction | Housing and Urban Development Department | Odisha | |
25 | Slum rehabilitation and redevelopment housing project under model 4 of the “Policy on Housing for All in Urban Areas” 2015 (Mahavir Awas Yojana) | 3.82 acres | 20 | Social and Commercial Infrastructure | Housing | Under Construction | Housing and Urban Development Department | Odisha | |
26 | Slum rehabilitation and redevelopment housing project under model 4 of the “Policy on Housing for All in Urban Areas” 2015 (at Nilamadhav slum in Chandrasekharpur) | 5.32 acres for 1170 SRRH units 2.86 acres for developer | 194 | Social and Commercial Infrastructure | Housing | Under Construction | Housing and Urban Development Department | Odisha | |
27 | Berhampur Solid Waste Management | 150 TPD (Tonne per day) | 80 | Water Sanitation | Solid waste management | Under Construction | Berhampur Municipal Corporation | Odisha | |
28 | Commissioning, Operation, Maintenance and Management of Cancer Hospital at Jharsuguda on PPP mode | 120 beds | 168.72 | Social and Commercial Infrastructure | Healthcare | Under Construction | Health and Family Welfare Department | Odisha | |
29 | Commissioning, Operation, Maintenance and Management of Cardiac Care Hospital at Jharsuguda on PPP mode | 100 beds | 110 | Social and Commercial Infrastructure | Healthcare | Under Construction | Health and Family Welfare Department | Odisha | |
30 | Establishment of affordable healthcare projects State-wide - Bidding of Angul. Barbil, Bhadrak & Jharsuguda under the revamped VGF Scheme of Government of India | Angul and Barbil- 200 beds each Bhadrak and Jharsuguda - 100 beds each | =(116.72+113.78)*(100/80) | Social and Commercial Infrastructure | Healthcare | Under Construction | Health and Family Welfare Department | Odisha | |
31 | Automated Driving Testing System (ADTS) | 6 locations across Odisha | 30 | Transport | Urban public transport | Completed | Commerce and Transport Department | Odisha | |
32 | Institute of Driving Training and Research (IDTR) | Bonai - 2880 students Keonjhar - 24000 students Berhampur - 1680 students | 120 ( Rs. 30 Cr per location) | Transport | Urban public transport | Completed | Commerce and Transport Department | Odisha | |
33 | Selection of Bus Operator for Cluster 1 - V under LAccMl scheme (integrated public transport connecting Gram panchayats, Block, & districts) in PPP mode | 1000 buses in 5 clusters | 669.7 (Total Cost of Procured Buses) | Transport | Urban public transport | Completed | Commerce and Transport Department | Odisha | |
34 | City bus service in Bhubaneswar (Bhubaneswar – Puri – Khurda - Cuttack urban cluster & Choudwar) | • Package I - 100 new midi-buses • Package II - 100 new standard buses (of which 50 are A.C. & 50 non-A.C.) • Package III - 110 existing buses (refurbish, operate & maintain) | 605 | Transport | Urban public transport | Completed | Commerce and Transport Department | Odisha | |
35 | City bus service in Rourkela (Jhirpani,Bonaigarh,Rajgangpur,Lathikata ,Bisra & Rourkela city) | Not Available | 100 | Transport | Urban public transport | Completed | Commerce and Transport Department | Odisha | |
36 | City Bus Service at Sambalpur | 4 intra - city routes; 5 inter city routes; through 32 buses each of 28 seats capacity | - | Transport | Urban public transport | Completed | Commerce and Transport Department | Odisha | |
37 | City Bus Service at Berhampur (Berhampur- Gopalpur - Chatrapur - Hinjlicut urban cluster) | 4 intra - city routes; 3 inter city routes; through 32 buses each of 28 seats capacit | - | Transport | Urban public transport | Completed | Commerce and Transport Department | Odisha | |
38 | Sambalpur Rourkela Expressway | Section of SH 10 from Km 4.900 to 167.900km, 4 lane paved shoulders | 1481.7 | Transport | Roads and bridges | Completed | Commerce and Transport Department | Odisha | |
39 | Dhamra Port - Phase 1 | 25.0 MTPA (Metric Tonne Per Annum) | 10016 | Transport | Ports (excluding captive) | Completed | Commerce and Transport Department | Odisha | |
40 | Gopalpur Port | Not Available | 1500 | Transport | Ports (excluding captive) | Completed | Commerce and Transport Department | Odisha | |
41 | Development of storage and warehousing infrastructure for rice (as per State PEG Scheme 2013) | 2500 MT each | 20.5 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Completed | Odisha State Civil Supply Corporation Ltd. | Odisha | |
42 | Ropeway at Nandankanan Zoological Park | 618 meter long monocable ( 12 cabins at 6 persons each) | 15 | Social and Commercial Infrastructure | Tourism | Completed | Forests, Environment and Climate Change Department | Odisha | |
43 | Long term lease of Hockey World Cup Village, Rourkela for Operation and Management | 225 rooms | 182.45 | Social and Commercial Infrastructure | Tourism | Completed | Sports and Youth Services Department | Odisha | |
44 | Rooftop solar project in Bhubaneswar and Cuttack | 4 MW for 199 government buildings | 32 | Energy | Renewable enrgy | Completed | Energy Department/ (GEDCOL) | Odisha | |
45 | Programmatic Street Lighting in different Urban Local Bodies (ULBs) | Not Available | 29.1 | Energy | Renewable enrgy | Completed | Housing and Urban Development Department | Odisha | |
46 | Greenfield energy efficient street lighting project in different Urban Local Bodies (ULBs) | 113 ULBS in 30 districts | 227 | Energy | Renewable enrgy | Completed | Housing and Urban Development Department | Odisha | |
47 | Affordable housing project under model 3 of the “Policy on Housing for All in Urban Areas” 2015 (at Chandrasekharpur) | 2960 EWS units over 22.746 acres | 320 | Social and Commercial Infrastructure | Housing | Completed | Housing and Urban Development Department | Odisha | |
48 | Slum rehabilitation and redevelopment housing project (Shanti Nagar Awas Yoiana) under model 4 of the "Policy on Housing for All in Urban Areas" 2015 Phase II | 1300 EWS units over 10 acres | 120 | Social and Commercial Infrastructure | Housing | Completed | Housing and Urban Development Department | Odisha | |
49 | Development of intregated residential complex over 12 acres at Shankarpur, Bhubaneswar by BDA (TATA Ariana project) | 12 Acres | 210 | Social and Commercial Infrastructure | Housing | Completed | Housing and Urban Development Department | Odisha | |
50 | Integrated Residential & Commercial Complex at Gadakana | 5.05 Acres | 95 | Social and Commercial Infrastructure | Housing | Completed | Housing and Urban Development Department | Odisha | |
51 | Mahodadhi Nivas Hotel in Puri | 25 rooms over 2.49 acres | 10 | Social and Commercial Infrastructure | Tourism | Completed | Odisha Tourism Development Corporation | Odisha | |
52 | Eco-resort, Ramachandi | 5 acres | 30 | Social and Commercial Infrastructure | Tourism | Completed | Odisha Tourism Development Corporation | Odisha | |
53 | Development and operation of existing tourism accomodation units (Bid Process for Lease - cum - Development of DoT properties ) | Not Available | _ | Social and Commercial Infrastructure | Tourism | Completed | Department of Tourism | Odisha | |
54 | MITS Mega food park at Rayagada | 50.5 acres | 80.17 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Completed | IDCO | Odisha | |
55 | NOCCi Plastic and Polymer Park, Balasore | Not Available | 80.76 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Completed | IDCO | Odisha | |
56 | Bulk water supply for various Institutions and adjoining Industries of Bhubaneswar | 70.0 MLD (Millons Liter per day) | 188 | Water Sanitation | Water supply pipeline | Completed | Industries Department | Odisha | |
57 | Establishment of Institute for Training of Trainers (IToTs) in PPP | 200 trainees annually | 10 | Social and Commercial Infrastructure | Education | Completed | Skill Development and Technical Education Department | Odisha | |
58 | Establishment & Operation of laboratories for testing and quality monitoring of water and waste water | Not Available | 66.21 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Completed | MSME | Odisha | |
59 | Construction of Hemodialysis unit at Zonal Hospital, Dharamshala | 6.0 Machines | 0 | Social and Commercial Infrastructure | Health Care | Operation and Maintenance Stage | Department of Health and Family Welfare, Government of Himachal Pradesh | Himachal Pradesh | 05-Dec-2019 |
60 | Teesta IV Project - 520 MW | 520.0 MW (Mega Watt) | 5878 | Energy | Renewable energy (grid) | Under Construction | NHPC Limited | Sikkim | 05-Dec-2019 |
61 | 2 laning with PSS of Salasar to Haryana border section of NH65 and capacity augmentation in 2021 for 4 laning on BOT(Toll) basis | 154.1 KM (Kilometer) | 530.07 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 04-Dec-2019 |
62 | 4 laning of Patna-Muzaffarpur stretch of NH77 from 0-46.3 km and construction of Muzzafarpur bypass on BOT(Annuity) Basis | 46.3 KM (Kilometer) | 570.06 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Bihar | 04-Dec-2019 |
63 | 6 laning of Chenagapjalli to Start of Coimbatore bypass & 4 laning of end of Coimbatore bypass to TN/Kerala Boarder of NH 47 | 54.8 KM (Kilometer) | 852.74 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 04-Dec-2019 |
64 | Berth No. 15 of New Western Dock for handling coal # | 3.0 MTPA (Metric Tonne Per Annum) | 376.52 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | New Mangalore Port Trust | Karnataka | 04-Dec-2019 |
65 | Biomass power project at Sattenapalli | 6.0 MW (Mega Watt) | 26 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Andhra Pradesh Electricity Regulatory Commission | Andhra Pradesh | 04-Dec-2019 |
66 | Bus Terminal (Vadnagar) Project | Not Available | 10.53 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Gujarat State Road Development Corporation (GSRDC) | Gujarat | 04-Dec-2019 |
67 | Construction of Dhola-Sadia Ghats bridges in length of 9.15 km | 9.1 KM (Kilometer) | 945.96 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Assam | 04-Dec-2019 |
68 | Construction of multi chamber cold storage with a capacity of 4000 MT in Barmer# | 4000.0 MT (Metric Tonne ) | 7.38 | Social and Commercial Infrastructure | Cold Chain | Operation and Maintenance Stage | Rajasthan State Agriculture Marketing Board | Rajasthan | 04-Dec-2019 |
69 | Development of 1000 TPD solid waste management in Ahmedabad # | 1000.0 TPD (Tonne per day) | 240 | Water Sanitation | Solid waste management | Under Construction | Ahmedabad Municipal Corporation | Gujarat | 04-Dec-2019 |
70 | Development of integrated multi level automatic car parking at Khilwat in Hyderabad district #* | 1.2 Acres | 73 | Transport | Urban public transport (except rolling stock) | Pre-construction Stage | Greater Hyderabad Municipal Corporation | Telangana | 04-Dec-2019 |
71 | Development of Offshore Multipurpose Cargo Berth at Mumbai Port in the State of Maharashtra on DBFOT basis* | Not Available | 696.27 | Transport | Ports (excluding captive) | Pre-construction Stage | Ministry of Shipping | Maharashtra | 04-Dec-2019 |
72 | Eco Tourism (Sabujdweep Island) Project | 75.0 Acres | 54 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Department of Tourism, West Bengal | West Bengal | 04-Dec-2019 |
73 | Four laning of Chikhali-Tarsod section in length of 62.7 km in Buldana | 62.7 KM (Kilometer) | 1071.61 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 04-Dec-2019 |
74 | International Cricket Stadium (Lucknow) Project # | Not Available | 360 | Social and Commercial Infrastructure | Tourism | Under Construction | Lucknow Development Authority | Uttar Pradesh | 04-Dec-2019 |
75 | Machilipatnam Port Development * # | 17.0 MTPA (Metric Tonne Per Annum) | 1860 | Transport | Ports (excluding captive) | Under Construction | Department of Ports, Andhra Pradesh | Andhra Pradesh | 04-Dec-2019 |
76 | Mechanism of Coal Handling facilities and upgradation of General Cargo Berth at Outer Harbour of Visakhapatnam Port | 10.18 MMTPA (million metric tonnes per annum) | 640.4 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Ministry of Shipping | Andhra Pradesh | 04-Dec-2019 |
77 | Multipurpose Cargo Port (Redi) Project | 53.0 MMTPA (million metric tonnes per annum) | 4413.7 | Transport | Ports (excluding captive) | Pre-construction Stage | Maharashtra Maritime Board (MMB) | Maharashtra | 04-Dec-2019 |
78 | Operation and Maintenance of North East Tribal Museum and Cultural Centre at Nazirakhat, Sonapur, Kamrup (M), Assam * | 90.0 Acres | 50 | Social and Commercial Infrastructure | Tourism | Under Construction | Cultural Affairs Department, Government of Assam | Assam | 04-Dec-2019 |
79 | Parule Airport Project | 400.0 Passengers | 520 | Transport | Airports | Operation and Maintenance Stage | Maharashtra Industrial Development Corporation | Maharashtra | 04-Dec-2019 |
80 | Setting up 20 MW hydel based power unit at Telbeila in Pune | 20.0 MW (Mega Watt) | 115.44 | Energy | Renewable energy (grid) | Pre-construction Stage | Water Resources Department, Maharashtra | Maharashtra | 04-Dec-2019 |
81 | Setting up of 10 TPD solid waste management unit at Pernem # | 10.0 TPD (Tonne per day) | 15 | Water Sanitation | Solid waste management | Under Construction | State Urban Development Agency, Goa | Goa | 04-Dec-2019 |
82 | Setting up of 9 MW Fozal hydel power unit in Kullu district | 9.0 MW (Mega Watt) | 49.16 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 04-Dec-2019 |
83 | Setting up of Iron ore handling facilities on BOT basis at New Mangalore Port * | 9.0 MMTPA (million metric tonnes per annum) | 277.11 | Transport | Ports (excluding captive) | Pre-construction Stage | New Mangalore Port Trust | Karnataka | 04-Dec-2019 |
84 | Water Supply Scheme (Nanjangud) * | 10.7 MLD (Millons Liter per day) | 28.55 | Water Sanitation | Water supply pipeline | Under Construction | Town Municipal Council, Nanjangud | Karnataka | 04-Dec-2019 |
85 | Dhamra Port # | 25.0 MTPA (Metric Tonne Per Annum) | 10016 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Department of Commerce and Transport, Odisha | Odisha | 03-Dec-2019 |
86 | Angre Port - Jaigad | Not Available | 431 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Maharashtra Maritime Board (MMB) | Maharashtra | 25-Nov-2019 |
87 | Construction of central bus terminal on 6.3 acres at Makarpura in Vadodara | 6.30 Acres | 60.28 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Gujarat State Road Transport Corporation | Gujarat | 25-Nov-2019 |
88 | Construction of Deep draught coal berth on BOT basis by Paradip Port Trust | 10.0 MMTPA (million metric tonnes per annum) | 656 | Transport | Ports (excluding captive) | Under Construction | Paradip Port Trust | Odisha | 25-Nov-2019 |
89 | Production of CNG from Raw biogas at Delawas STP Unit-II | Not Available | 0 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Jaipur Municipal Corporation | Rajasthan | 25-Nov-2019 |
90 | Setting up of Liquid Cargo Handling Jetty at Shalukkhali, Haldia Dock-II through PPP mode | 2.43 MTPA (Metric Tonne Per Annum) | 172.52 | Transport | Ports (excluding captive) | Under Construction | Kolkata Port Trust | West Bengal | 25-Nov-2019 |
91 | Setting up of MSW Processing plant adopting Waste to Energy Technology with Sanitary landfill at Langdiyawas for jaipur | 0 | 214 | Water Sanitation | Solid waste management | Pre-construction Stage | Jaipur Municipal Corporation | Rajasthan | 25-Nov-2019 |
92 | Modernization of Delhi International Airport | 119.0 MPPA (Million Passenger Per Annum) | 12508.94 | Transport | Airports | Operation and Maintenance Stage | Airports Authority of India (AAI) | Delhi (UT) | 24-Nov-2019 |
93 | Conversion of Delhi-Gurgaon section of NH-8 into an access controlled eight/six lane highway | 28.0 KM (Kilometer) | 800 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 21-Nov-2019 |
94 | Electricity Distribution Nagpur City | Not Available | 652.29 | Energy | Electricity Distribution | Operation and Maintenance Stage | Maharashtra State Electricity Distribution Company Limited | Maharashtra | 20-Nov-2019 |
95 | Four laning of Narketpally-Addanki-Medarametla Road Project | 212.5 KM (Kilometer) | 1760.53 | Transport | Roads and bridges | Operation and Maintenance Stage | Andhra Pradesh Road Development Corporation | Andhra Pradesh | 20-Nov-2019 |
96 | Six laning of Kishangarh -Udaipur- Ahmedabad section of NH 79A, NH79, NH 76 and NH 8 under NHDP Phase V, length 555.50 km | 555.0 KM (Kilometer) | 5387.3 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Rajasthan | 20-Nov-2019 |
97 | Ambala - Zirakpur | 35.09 KM (Kilometer) | 298 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 15-Nov-2019 |
98 | City side development of Udaipur Airport through PPP * | Not Available | 0 | Transport | Airports | Pre-construction Stage | Ministry of Civil Aviation | Rajasthan | 15-Nov-2019 |
99 | Design, Construction, Development, Finance,O&M (Salem)Start of proposed flyover on Namakkal Bypass | 41.5 KM (Kilometer) | 253.55 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 15-Nov-2019 |
100 | Development of Triangle portion of the Lakota lake | 1.8 1.8 Km periphery 45,000 Sq.m paved area | 45 | Social and Commercial Infrastructure | Tourism | Operation and Maintenance Stage | Jamnagar Municipal Corporation | Gujarat | 15-Nov-2019 |
101 | Four laning of Chapra - Hazipur section on NH 19 in Bihar * | 64.0 KM (Kilometer) | 691 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Bihar | 15-Nov-2019 |
102 | Four/Six lanning of Patna - Bakhtiyarpur section from Km 176.60 to Km 230 of NH 30 in the State of Bihar | 50.6 KM (Kilometer) | 600.54 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Bihar | 15-Nov-2019 |
103 | Khambatki Ghat Project | 8.0 KM (Kilometer) | 45 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 15-Nov-2019 |
104 | Operation and Maintenance of Bargawan-Waidhan road in length of 27.3 Km | 28.0 KM (Kilometer) | 39.41 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 15-Nov-2019 |
105 | Road Upgradation (Farukhnagar - Kottakata) Project-Package-II | 46.1 KM (Kilometer) | 471 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Andhra Pradesh | 15-Nov-2019 |
106 | Road Upgradation Project (Raipuriya-Paitalvad-Bamaniya) Project | 18.18 KM (Kilometer) | 25.73 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 15-Nov-2019 |
107 | Road Upgradation Project (Tikamgarh-Orchha & Orchha Bypass) Project | 10.0 KM (Kilometer) | 58 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 15-Nov-2019 |
108 | Upgradation of existing facility & creation of new facility at Visakhapatnam Port Trust, for Iron Ore Handling | 23.0 MMTPA (million metric tonnes per annum) | 845.41 | Transport | Ports (excluding captive) | Under Construction | Visakhapatnam Port Trust | Andhra Pradesh | 15-Nov-2019 |
109 | Basin Bridge Diesel-Fired Power Plant * | 200.0 MW (Mega Watt) | 490.23 | Energy | Electricity generation (grid) | Under Construction | Tamil Nadu State Electricity Board | Tamil Nadu | 14-Nov-2019 |
110 | Bulk Cargo Berth No.12 (New Mangalore Port) Project | 6.73 MTPA (Metric Tonne Per Annum) | 469.46 | Transport | Ports (excluding captive) | Under Construction | New Mangalore Port Trust | Karnataka | 14-Nov-2019 |
111 | Development of Amusement park, Swimming pool, Water sports complex and Conventional hall at Wadeghar | 14.0 Acres | 7 | Social and Commercial Infrastructure | Tourism | Under Construction | Kalyan Dombivli Municipal Corporation | Maharashtra | 14-Nov-2019 |
112 | Development of passenger ropeway from Bypass (TIC)-Lift Mall Road in length of 3.6 Km in Shimla district # | 3.6 KM (Kilometer) | 296.67 | Social and Commercial Infrastructure | Tourism | Pre-construction Stage | Shimla Municipal Corporation | Himachal Pradesh | 14-Nov-2019 |
113 | Multilevel Parking (Vikasnagar) Project | 174.0 ECS | 15 | Transport | Urban public transport (except rolling stock) | Under Construction | Shimla Municipal Corporation | Himachal Pradesh | 14-Nov-2019 |
114 | Multipurpose Cargo Port (Mankhurd) Project - Phase I | 4.5 MMTPA (million metric tonnes per annum) | 75 | Transport | Ports (excluding captive) | Under Construction | Maharashtra Maritime Board (MMB) | Maharashtra | 14-Nov-2019 |
115 | Truck Terminal (First Avenue Business Park & Parking Plaza) (Kalyan) Project | Not Available | 10.16 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Kalyan Dombivli Municipal Corporation | Maharashtra | 14-Nov-2019 |
116 | Approval for VGF Support for Construction of Silos by FCI at Sahnewal, Punjab - roposed by FPD | 50000.0 MT (Metric Tonne ) | 42.37 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Pre-construction Stage | Food Corporation of India | Punjab | 13-Nov-2019 |
117 | Construction of 4 laned ROB including its approach on Delhi Agra Railway Line near Bata Chowk | Not Available | 15.62 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Haryana | Haryana | 13-Nov-2019 |
118 | Development of community centre and shopping complex at Kalyan | 1.30 Acres | 6.24 | Social and Commercial Infrastructure | Tourism | Under Construction | Kalyan Dombivli Municipal Corporation | Maharashtra | 13-Nov-2019 |
119 | Development of Ganga Driveway and Riverfront Development from Digha to Didarganj at Patna on BOT (Toll) basis. | 21.50 KM (Kilometer) | 2234.46 | Transport | Roads and bridges | Under Construction | Bihar State Road Development Corporation Limited | Bihar | 13-Nov-2019 |
120 | Development of modern food silo for storage of wheat on DBFOT at Katihar (Bihar) - Proposed by FPD | 50000.0 MT (Metric Tonne ) | 44.62 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Under Construction | Food Corporation of India | Bihar | 13-Nov-2019 |
121 | Development of passenger ropeway of 2 Km from Kullu bypass to Bijili Mahadev Temple in kullu district | 600.0 Passengers | 94.19 | Social and Commercial Infrastructure | Tourism | Under Construction | Department of Tourism and Civil Aviation, Himachal Pradesh | Himachal Pradesh | 13-Nov-2019 |
122 | Development of ropeway between Dharamshala to Mcleod Ganj with a capacity of 600 Passenger in Kangra district | 600.0 Passengers | 150 | Social and Commercial Infrastructure | Tourism | Under Construction | Department of Tourism and Civil Aviation, Himachal Pradesh | Himachal Pradesh | 13-Nov-2019 |
123 | Electricity distribution Bharatpur City (BESL) | Not Available | 33.35 | Energy | Electricity Distribution | Operation and Maintenance Stage | Jaipur Vidyut Vitran Nigam Limited | Rajasthan | 13-Nov-2019 |
124 | Electricity distribution Kota City (KEDL) | Not Available | 252.83 | Energy | Electricity Distribution | Operation and Maintenance Stage | Jaipur Vidyut Vitran Nigam Limited | Rajasthan | 13-Nov-2019 |
125 | Gurgaon Metro South Extension (RMGSL) project | 12.0 KM (Kilometer) | 2150 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Haryana Urban Development Authority | Haryana | 13-Nov-2019 |
126 | Laying of ropeway at Hemkund in Chamoli district * | 150000.0 Passengers | 50.7 | Social and Commercial Infrastructure | Tourism | Under Construction | Uttarakhand Tourism Development Board | Uttarakhand | 13-Nov-2019 |
127 | Laying of ropeway from Palchan to Gulaba, Gulaba to Marhi and Marhi to Rohtang in Kangra district | 1500.0 Passengers | 340 | Social and Commercial Infrastructure | Tourism | Under Construction | Department of Tourism and Civil Aviation, Himachal Pradesh | Himachal Pradesh | 13-Nov-2019 |
128 | Passenger Ropeway (Solang Valley-Kullu) Project | 1200.0 Passengers | 36.57 | Social and Commercial Infrastructure | Tourism | Operation and Maintenance Stage | Department of Tourism and Civil Aviation, Himachal Pradesh | Himachal Pradesh | 13-Nov-2019 |
129 | Re-development of Berth 8, 9 and Barge Berth at Port of Marmugao, Goa | 19.2 MMTPA (million metric tonnes per annum) | 1145 | Transport | Ports (excluding captive) | Pre-construction Stage | Mormugao Port Trust | Goa | 13-Nov-2019 |
130 | Ropeway (Himani-Chamunda) Project | 1000.0 Passengers | 289.24 | Social and Commercial Infrastructure | Tourism | Under Construction | Department of Tourism and Civil Aviation, Himachal Pradesh | Himachal Pradesh | 13-Nov-2019 |
131 | Waste to Power Plant, 1000 TPD, Surat | 1000.0 TPD (Tonne per day) | 209 | Energy | Electricity generation (grid) | Under Construction | Surat Municipal Corporation | Gujarat | 13-Nov-2019 |
132 | Delhi-Meerut Expressway Project [Package-III] | 22.2 KM (Kilometer) | 1058 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 11-Nov-2019 |
133 | Development of Delhi-Meerut Expressway in length of 8.7 Km in Delhi | 8.7 KM (Kilometer) | 841.5 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Delhi (UT) | 11-Nov-2019 |
134 | Development, O & M of Hanumangarh to Abohar section of SH-7A (up to Punjab border) on DBFOT Toll basis.* | 42.6 KM (Kilometer) | 61.67 | Transport | Roads and bridges | Under Construction | Public Works Department, Rajasthan | Rajasthan | 11-Nov-2019 |
135 | Four laning Indore-Ujjain Road Project | 48.9 KM (Kilometer) | 298 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 11-Nov-2019 |
136 | Four Laning Nashik � Niphad � Vaijapur - Aurangabad Road | 40.0 KM (Kilometer) | 174.58 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Maharashtra | Maharashtra | 11-Nov-2019 |
137 | Four laning of Bareilly-Sitapur section of NH 24 in the State of Uttar Pradesh on BOT basis under NHDP III | 151.2 KM (Kilometer) | 1046 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 11-Nov-2019 |
138 | Four laning of Hadapsar- Saswad- Belsar-Phata (SH-64) to Belha-Pabal-Uralikanchan-Jejuri-Nira (SH-61) road | 41.1 KM (Kilometer) | 358.4 | Transport | Roads and bridges | Under Construction | Public Works Department, Maharashtra | Maharashtra | 11-Nov-2019 |
139 | Four Laning of Mahuva to Kagavadar section in 39.8 Km under NHDP-IV | 40.02 KM (Kilometer) | 763.23 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Gujarat | 11-Nov-2019 |
140 | Four Laning of Stand Alone Ring Road/Bypass for Nagpur City | 61.5 KM (Kilometer) | 1170 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 11-Nov-2019 |
141 | Road Upgradation (Kodinar-Veraval) Project | 41.74 KM (Kilometer) | 829.97 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Gujarat | 11-Nov-2019 |
142 | Six laning of Varanasi-Aurangabad section of NH 2from Km 786.00 to km 978.40 in the State of UP/Bihar under NHDP V on BOT basis | 192.4 KM (Kilometer) | 2588.38 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 11-Nov-2019 |
143 | Two laning of Chittorgarh-Neemach section of NH 79 and Nimbahera-Pratapgarh section of NH 113 under VGF Scheme | 113.0 KM (Kilometer) | 511.21 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 11-Nov-2019 |
144 | Two laning of Shirur Tajband-Mukhed-Narsi & 2 laning with paved shoulder of Narsi-Biloli to State Border, sections of SH-225 | 105.0 KM (Kilometer) | 318 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Maharashtra | Maharashtra | 11-Nov-2019 |
145 | Two/Four laning of Nanded-Narsi Road sector of SH-6 | 77.7 KM (Kilometer) | 238.79 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Maharashtra | Maharashtra | 11-Nov-2019 |
146 | "DBFOMT" of existing state highway (SH-3 & 33) from Malavalli to Pavagada (Approx Length 193.344 Km) in Karnataka | 193.34 KM (Kilometer) | 559.75 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works, Ports and Inland Water Transport Department, Karnataka | Karnataka | 09-Nov-2019 |
147 | "DBFOMT" of SH18 from Mudhol - Nippani - MH Border (Approx Length 107.937) in Karnataka | 107.9 KM (Kilometer) | 317.6 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works, Ports and Inland Water Transport Department, Karnataka | Karnataka | 09-Nov-2019 |
148 | 2 lane with paved shoulders of Bhopal Sanchi section under NHDP phase III* | 53.77 KM (Kilometer) | 305 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Madhya Pradesh | 09-Nov-2019 |
149 | 2 laning with paved shoulder�of Jabalpur-Mandala-Chilpi section�from 3.4 to 192.4 km under NHDP - IV | 177.75 KM (Kilometer) | 811.74 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Madhya Pradesh | 09-Nov-2019 |
150 | 2 laning with paved shoulders of Nagaur-Bikaner section of NH89 from km 171 to km 267.325 of NH 89 (including bypass at Nagaur) | 108.3 KM (Kilometer) | 378.07 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
151 | 2 laning with Paved Side Shoulders of Nagaur-Jodhpur of NH-65 from km 166.26 to km 296.07 on DBFOT (Toll) basis.* | 134.64 KM (Kilometer) | 439.96 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Rajasthan | 09-Nov-2019 |
152 | 2/4 laning of NH 12 from km 256.55 to km 346.539(Kota-Jhalwar section) on BOT(Toll) basis basis�* | Not Available | 530.01 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Rajasthan | 09-Nov-2019 |
153 | 2/4 laning of section between Madurai to Ramanathapuram and 2 lane with paved shoulders from 79.34 - 118.795 km of NH 49 | 115.11 KM (Kilometer) | 683 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Tamil Nadu | 09-Nov-2019 |
154 | 24x7 Nagpur Water Supply Scheme * | Not Available | 387.86 | Water Sanitation | Water supply pipeline | Under Construction | Nagpur Municipal Corporation | Maharashtra | 09-Nov-2019 |
155 | 3 Star Hotel at Amritsar * | Not Available | 175 | Social and Commercial Infrastructure | Tourism | Under Construction | Punjab Urban Development Authority | Punjab | 09-Nov-2019 |
156 | 4 Laning of Rimuli Roxy Rajamunda Section of NH 215 from 163 -269 km in Orissa under NHDP Phase IIIA on BOT Basis. | 106.0 KM (Kilometer) | 654 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Odisha | 09-Nov-2019 |
157 | 4 laning of Sahajahanpur-Hardoi-Lucknow Road (SH-25) on DBFOT toll basis* | 162.4 KM (Kilometer) | 1161.62 | Transport | Roads and bridges | Under Construction | Public Works Department, Government of Uttar Pradesh | Uttar Pradesh | 09-Nov-2019 |
158 | 4 laning of Tirupati-Tiruthani-Chennai section of NH 205 from 274.8-341.6 km in AP and km 0 to 59.60 in Tamil Nadu on BOT Basis | 124.7 KM (Kilometer) | 801.8 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 09-Nov-2019 |
159 | 4 laning of Trichy Karaikkudi section of NH-210 (10-94 km) and Trichy Bypass (ch 109.558-ch 135.39) in Tamil Nadu on BOT basis. | 110.9 KM (Kilometer) | 374 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 09-Nov-2019 |
160 | 4-laning of Etah Sikohabad Road (SH-85) from km 0.000 to km 51.415 on DBFOT toll basis* | 51.41 KM (Kilometer) | 344.61 | Transport | Roads and bridges | Under Construction | Public Works Department, Government of Uttar Pradesh | Uttar Pradesh | 09-Nov-2019 |
161 | 4/6 laning of Dewas Bypass from Km 0/00 on sH-18 to km. to 19/800 on NH-3 on DBFOT basis. | 19.8 KM (Kilometer) | 267.3 | Transport | Roads and bridges | Pre-construction Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
162 | 4/6 laning of Maharashtra/Goa Border to Panaji-Goa/Karnataka Border to be executed as BOT(Toll) on DBFO pattern* | Not Available | 2078 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Goa | 09-Nov-2019 |
163 | 5 Star Hotel at Amritsar * | Not Available | 250 | Social and Commercial Infrastructure | Tourism | Under Construction | Punjab Urban Development Authority | Punjab | 09-Nov-2019 |
164 | 5 Star Hotel at Bhatinda * | Not Available | 200 | Social and Commercial Infrastructure | Tourism | Under Construction | Not Available | Punjab | 09-Nov-2019 |
165 | 5 Star Hotel-cum-Convention Centre, Amritsar * | Not Available | 175 | Social and Commercial Infrastructure | Tourism | Under Construction | Punjab Urban Development Authority | Punjab | 09-Nov-2019 |
166 | 5 Star Hotel-cum-Convention Centre, Ludhiana * | Not Available | 175 | Social and Commercial Infrastructure | Tourism | Under Construction | Greater Ludhiana Area Development Authority | Punjab | 09-Nov-2019 |
167 | 5 Star Hotel-cum-Convention Centre, Mohali * | Not Available | 350 | Social and Commercial Infrastructure | Tourism | Under Construction | Greater Mohali Area Development Authority | Punjab | 09-Nov-2019 |
168 | 6 laning of Ahmedabad Vadodara Section of NH 8 and improvement of Ahmedabad Vadodara Expressway in Gujarat under NHDP Phase V | 102.3 KM (Kilometer) | 4880 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Gujarat | 09-Nov-2019 |
169 | 6 laning(and Construction of additional 4 lane Bridge across River Narmada) of Vadodara-Surat Section of NH-8 on BOT(Toll) basis | Not Available | 473.24 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Gujarat | 09-Nov-2019 |
170 | 6-laning of Indore-Dewas section of NH-3 Madhya Pradesh NHDP-V to be executed as BOT (Toll) project on"DBFOT" pattern | 45.0 KM (Kilometer) | 325 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Madhya Pradesh | 09-Nov-2019 |
171 | 6-Laning(Chengapalli &4-Laning on end of TNKerala Border Sec.of NH47 Tamil Nadu under NHDP-11 on DBFOT(Toll)basi | 54.80 KM (Kilometer) | 852 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 09-Nov-2019 |
172 | 6/8 laning of JNPT Port Road Project at NH 4B (A1 - E section), NH-4B (D-G section), SH-54 and on Amra Marg | 43.912 KM (Kilometer) | 1822 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Maharashtra | 09-Nov-2019 |
173 | 8/6 Laning of Delhi Meerut Expressway from Km. 8.36- Km. 27.74 (UP Border to Dasna) oh NH-24 on HAM(Package II)* | Not Available | 1989 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Uttar Pradesh | 09-Nov-2019 |
174 | Adityapur Water Supply Phase I * | Not Available | 150 | Water Sanitation | Water supply pipeline | Not Available | Department of Industries, Jharkhand | Jharkhand | 09-Nov-2019 |
175 | Amusement Park at Gurgaon * | 17.0 Acres | 100 | Social and Commercial Infrastructure | Tourism | Under Construction | Haryana Urban Development Authority | Haryana | 09-Nov-2019 |
176 | Augmentation of Parallel Water Supply Scheme in length of 1200.0 km in Aurangabad district * | 1200.0 KM (Kilometer) | 720 | Water Sanitation | Water supply pipeline | Under Construction | Aurangabad Municipal Corporation | Maharashtra | 09-Nov-2019 |
177 | Badnagar - Sundarawad - Kharsodkalan - Unhel* | 51.31 KM (Kilometer) | 141 | Transport | Roads and bridges | Not Available | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
178 | Baretha - Ghoradongri | 15.1 KM (Kilometer) | 39.53 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
179 | Batala - Beas (MDR-66)* | Not Available | 87 | Transport | Roads and bridges | Under Construction | Public Works Department, Punjab | Punjab | 09-Nov-2019 |
180 | Berth (EQ 1A & EQ 1) Project * | 7.3 MMTPA (million metric tonnes per annum) | 313.39 | Transport | Ports (excluding captive) | Under Construction | Visakhapatnam Port Trust | Andhra Pradesh | 09-Nov-2019 |
181 | Biotech Park (Andharua) * | 64.0 Acres | 100 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Odisha Industrial Infrastructure Development Corporation | Odisha | 09-Nov-2019 |
182 | Border Check Posts (Madhya Pradesh) Project* | 24.0 Numbers | 1350 | Transport | Roads and bridges | Under Construction | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
183 | Bridge (Haldwani-Ramnagar) Project* | 1.075 KM (Kilometer) | 26 | Transport | Roads and bridges | Under Construction | Public Works Department, Uttarakhand | Uttarakhand | 09-Nov-2019 |
184 | Chandikole - Paradeep Section, km 0.000 to 76.618� of NH - 5A� under NHDP V on BOT (Toll)* | 76.618 KM (Kilometer) | 1014.36 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Odisha | 09-Nov-2019 |
185 | City Development (Mankapur) Project * | Not Available | 48 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Nagpur Municipal Corporation | Maharashtra | 09-Nov-2019 |
186 | Cold chain project for Fruit and vegetables * | 512.0 MT (Metric Tonne ) | 50.41 | Social and Commercial Infrastructure | Cold Chain | Under Construction | Ministry of Food Processing Industries | Maharashtra | 09-Nov-2019 |
187 | Commercial Centre at Chinchwad * | Not Available | 20.94 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Pimpri Chinchwad Municipal Corporation | Maharashtra | 09-Nov-2019 |
188 | Commercial development of Animal Husbandry and Veterinery Science land on Hebbal road * | Not Available | 250 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Not Available | Department of Agriculture, Horticulture, Animal Husbandry and Fisheries, Karnataka | Karnataka | 09-Nov-2019 |
189 | Common Effluent Treatment (Adityapur) Project * | Not Available | 12 | Water Sanitation | Sewage collection, treatment and disposal system | Under Construction | Adityapur Municipal Council | Jharkhand | 09-Nov-2019 |
190 | Construction and area development under GMDA at Borsajal, Guwahati, Assam * | Not Available | 0 | Social and Commercial Infrastructure | Tourism | Not Available | Guwahati Metropolitan Development Authority | Assam | 09-Nov-2019 |
191 | Construction of bus terminal on 6.5 acres at Adajan in Surat * | 6.5 Acres | 155.09 | Transport | Urban public transport (except rolling stock) | Under Construction | Gujarat State Road Transport Corporation | Gujarat | 09-Nov-2019 |
192 | Construction of funicular railway at Haji Malang Gad in Thane district * | 60.0 Passengers | 45.91 | Social and Commercial Infrastructure | Tourism | Under Construction | Public Works Department, Maharashtra | Maharashtra | 09-Nov-2019 |
193 | Construction of Gavanphata Interchange road | 18.3 KM (Kilometer) | 593.26 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
194 | Construction of Gurgaon Recreation Park * | Not Available | 71 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Haryana State Industrial and Infrastructure Development Corporation | Haryana | 09-Nov-2019 |
195 | Construction of KSRTC offices guest house and commercial complex on KSRTC Site at Mangaluru district * | 1.10 Acres | 20.7 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Karnataka State Road Transport Corporation (KSRTC) | Karnataka | 09-Nov-2019 |
196 | Construction of NH-4B from km.21.200 to Km.27.270 and from km.0.000 to Km.4.492 of JNPT Phase-II (PKG-IV)* | 10.60 KM (Kilometer) | 590 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
197 | Construction of Nimbahera bye-pass # | 13.50 KM (Kilometer) | 31.48 | Transport | Roads and bridges | Completed | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
198 | Construction of Pali Bye pass on Jodhpur - Sumerpur Road # | 11.50 KM (Kilometer) | 30 | Transport | Roads and bridges | Completed | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
199 | Construction of railway over bridge on Vadodara-Savli-Timba road in length of 60.0 Km in Vadodara district* | 60.0 KM (Kilometer) | 21.98 | Transport | Roads and bridges | Pre-construction Stage | Roads and Buildings Department, Gujarat | Gujarat | 09-Nov-2019 |
200 | Container Terminal at Diamond Harbour (Kolkata Port) * | Not Available | 705.88 | Transport | Ports (excluding captive) | Not Available | Kolkata Port Trust | West Bengal | 09-Nov-2019 |
201 | Delhi-Meerut Expressway and other connecting roads including 6/8 laning of NH24, NH58,NH235 on DBFOT(Toll) basis* | 150.147 KM (Kilometer) | 10000 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Multi State/ Centre | 09-Nov-2019 |
202 | Design Construction finance O&M of 2 lane bridge across Musi river of Miryalguda Kodad Road including approa* | 0.54 | 14.5 | Transport | Roads and bridges | Under Construction | Andhra Pradesh Road Development Corporation | Andhra Pradesh | 09-Nov-2019 |
203 | Design Construction Finance Operation and Maintenance of Four Laning of Khammam Tallada Devarapalli Road under PPP* | Not Available | 660 | Transport | Roads and bridges | Not Available | Andhra Pradesh Road Development Corporation | Andhra Pradesh | 09-Nov-2019 |
204 | Design Construction Finance Operation and Maintenance of Four Laning of Perecherla Thokapalli Road under PPP* | Not Available | 522 | Transport | Roads and bridges | Not Available | Andhra Pradesh Road Development Corporation | Andhra Pradesh | 09-Nov-2019 |
205 | Design Construction Finance Operation and Maintenance of Four Laning of Warangal Khammam Road under PPP* | Not Available | 476 | Transport | Roads and bridges | Not Available | Andhra Pradesh Road Development Corporation | Andhra Pradesh | 09-Nov-2019 |
206 | Development of 7 MLD water supply project at Bekal Kasargod Dist * | 7.0 MLD (Millons Liter per day) | 17 | Water Sanitation | Water supply pipeline | Under Construction | Bekal Resorts Development Corporation Limited | Kerala | 09-Nov-2019 |
207 | Development of Adiquate Road Connectivity to Chennai -Ennore Port Connectivity* | 29.0 KM (Kilometer) | 600 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Tamil Nadu | 09-Nov-2019 |
208 | Development of CBD in South TT Nagar Bhopal * | Not Available | 1500 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Not Available | Madhya Pradesh Housing Board | Madhya Pradesh | 09-Nov-2019 |
209 | Development of existing 4-lane road from Bangalore to Hunsur via Mysore and other Connecting roads into 6-lane roads* | 201.12 KM (Kilometer) | 621.46 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
210 | Development of Four lane of Mangwan to MP/UP border section (km 98/2 to km 46/6) of NH 27 on DBFOT (Toll) basis | 52.1 KM (Kilometer) | 410.7 | Transport | Roads and bridges | Under Construction | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
211 | Development of Hoshiarpur - Phagwara Road Project* | 35.5 KM (Kilometer) | 32.53 | Transport | Roads and bridges | Under Construction | Public Works Department, Punjab | Punjab | 09-Nov-2019 |
212 | Development of Integrated Solid Waste Treatment (100 TPD) and Landfill Facilities at Belgaum * | 100.0 TPD (Tonne per day) | 5.12 | Water Sanitation | Solid waste management | Under Construction | Belagavi City Corporation | Karnataka | 09-Nov-2019 |
213 | Development of International Convention Centre at Devanahalli * | Not Available | 1050 | Social and Commercial Infrastructure | Tourism | Under Construction | Department of Tourism, Karnataka | Karnataka | 09-Nov-2019 |
214 | Development of logistic park at Batasingaram on 40 acres * | 40.0 Acres | 20 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Pre-construction Stage | Hyderabad Metropolitan Development Authority | Telangana | 09-Nov-2019 |
215 | Development of logistic park at Mangalpalli on 22 acres * | 22.0 Acres | 20 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Hyderabad Metropolitan Development Authority | Telangana | 09-Nov-2019 |
216 | Development of minor sea port at vizhinjam on DBFOT basis * | 600,000.0 TEU (Twenty-foot Equivalent Units) | 4089 | Transport | Ports (excluding captive) | Under Construction | Vizhinjam International Sea Port Limited | Kerala | 09-Nov-2019 |
217 | Development of multi-cargo berth no. 13 at Deendayal Port * | 100,000.0 TEU (Twenty-foot Equivalent Units) | 0 | Transport | Ports (excluding captive) | Not Available | Deendayal Port Trust | Gujarat | 09-Nov-2019 |
218 | Development of Navlakhi Port with a capacity of 4.5 MMTPA in Rajkot district * | 4.5 MMTPA (million metric tonnes per annum) | 450 | Transport | Ports (excluding captive) | Under Construction | Gujarat Maritime Board (GMB) | Gujarat | 09-Nov-2019 |
219 | Development of Railway Over Bridges in Gujarat* | Not Available | 198 | Transport | Roads and bridges | Pre-construction Stage | Roads and Buildings Department, Gujarat | Gujarat | 09-Nov-2019 |
220 | Development of resorts at Bekal in Kasaragod District * | 9999 | 55 | Social and Commercial Infrastructure | Tourism | Under Construction | Bekal Resorts Development Corporation Limited | Kerala | 09-Nov-2019 |
221 | Development of road from Afzalpur-Ghattarga Sarasamba with Ribbanapalli and other connecting roads* | 253.69 KM (Kilometer) | 530.09 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
222 | Development of road from Annigere-Navalgund-Datnal-Ron and other connecting roads* | 241.95 KM (Kilometer) | 505.65 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
223 | Development of road from Arsikere-Gandasi-Channarayapatna-Kikkeri-K R Pet-Chinakurali-Pandavapur SH-07 * | 159.72 KM (Kilometer) | 334.62 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
224 | Development of road from Badravathi-Shimoga-Honalli-Shikaripura SH-57 and other connecting roads* | 312.61 KM (Kilometer) | 653.17 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
225 | Development of road from Bangalore-Magadi-Huliyuru Durga and other connecting roads* | 177.54 KM (Kilometer) | 732.92 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
226 | Development of road from Bidar to Humnabad SH-105 and other connecting roads* | 112.74 KM (Kilometer) | 235.59 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
227 | Development of road from Channagiri-Davanagere-Jaglur SH-65 and other connecting road SH-45* | 154.8 KM (Kilometer) | 320.34 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
228 | Development of road from Chikkaballapur NH-7 Vijipur-Vemagal-Kolar-Nandi cross and other connecting roads* | 152.91 KM (Kilometer) | 319.64 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
229 | Development of road from Chikkaballapura-Nandi-Doddaballapur-Maduray-Nelamangala-Taverekere-Kengeri-Jigani-Ane* | 194.23 KM (Kilometer) | 406.13 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
230 | Development of road from Devangaon bridge-Afzalpur-Gulbarga and other connecting roads* | 246.08 KM (Kilometer) | 514.6 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
231 | Development of road from Devangaon-Vibuthihal-Indi-Atharga-Bijapur SH-34 and other connecting roads* | 145.0 KM (Kilometer) | 302.51 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
232 | Development of road from Gangavathi -NH-63 at Koppal-Mundargi and other connecting roads* | 180.31 KM (Kilometer) | 735.97 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
233 | Development of road from Gangavathi-Karatgi-Sindanoor-Kalmali joining SH-20 SH-23 and other connecting roads* | 229.49 KM (Kilometer) | 480.58 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
234 | Development of road from Gorabal on SH-23-Dhadesugur-Desanur-Sindegeri-Bellary and other connecting roads* | 171.44 KM (Kilometer) | 697.46 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
235 | Development of road from Haveri-Hirekeruru-Thalagundi-Soraba-Sagar road and other connecting road* | 185.05 KM (Kilometer) | 387.11 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
236 | Development of road from Hoskote-Mallur-Tekal-Bangarpet-Baythmangal-AP Border SH-95 and connecting roads* | 143.1 KM (Kilometer) | 585.33 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
237 | Development of road from Huliyur-Tiptur-Nuggenahalli-Shravanabelagola road SH-47 and other connecting roads* | 107.36 KM (Kilometer) | 227.89 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
238 | Development of road from Hunsur-Verajpet Madakeri-Somavarpet road and other connecting roads* | 273.24 KM (Kilometer) | 572.1 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
239 | Development of road from Kadur-Chikkamangalur-Mudigere-Belthangadi-Bantwal road SH-64* | 161.94 KM (Kilometer) | 338.13 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
240 | Development of road from Katak-Chincholi-Jalasangi from Maharashtra border near Kamlanagar-Sangam-AP Border ne* | 214.15 KM (Kilometer) | 447.83 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
241 | Development of road from Kushalnagara-Madikere-Sampaji-Sulya-Puttur joining NH-48 SH-88 and other connecting roads* | 174.67 KM (Kilometer) | 365.09 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
242 | Development of road from Lokapur to Mudhol SH-34 Mudhol-Sidapur-Kanakawadi-Nipani SH-18 and other connecting roads* | 181.80 KM (Kilometer) | 380.22 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
243 | Development of road from Lokapura-Halki-Mallapur to join NH-4 near Gotur and other connecting roads* | 164.11 KM (Kilometer) | 340.55 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
244 | Development of road from Lokapura-Varchagal-Govanakop and other connecting roads* | 283.10 KM (Kilometer) | 576.97 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
245 | Development of road from Maharashtra border to Sankeshwara - Navalihal SH-12 and other connecting roads, Belgaum* | 161.50 KM (Kilometer) | 335.6 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
246 | Development of road from Mandya-Dudda-Melukote-Santhebachalli-Sravanabelagola-Channarayapatha SH-47* | 284.87 KM (Kilometer) | 595.56 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
247 | Development of road from Mangalore-Shimoga NH-13 to NH-48 via Belthangadi-Kokkada SH-37 and other connecting roads* | 175.22 KM (Kilometer) | 366.87 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
248 | Development of road from Mysore-Bannur-Mallavali-Maddur-Huliyuru durga-Kunigal-Tumkur-Koratagere SH-33* | 313.92 KM (Kilometer) | 656.6 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
249 | Development of road from Mysore-Manadwadi SH-33 road and other connecting roads* | 114.10 KM (Kilometer) | 238.25 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
250 | Development of road from Nanjangud-Chamarajnagar and other connecting roads* | 250.10 KM (Kilometer) | 522.45 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
251 | Development of road from NH-13 near Hungund-Mudagal SH-20 Sindhanur-Lingasugur-Maski-Chikmudbal to NH-218 at Jewargi* | 224.46 KM (Kilometer) | 469.02 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
252 | Development of road from NH-17 Kundapura-Thirthhalli road SH-52* | 81.81 KM (Kilometer) | 171.27 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
253 | Development of road from NH-218 to Mulawad- Babaleshwar-Mudhol and other connecting roads* | 222.41 KM (Kilometer) | 464.23 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
254 | Development of road from Raichur to Bachi Bachi to Hungund SH-20* | 199.37 KM (Kilometer) | 416.71 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
255 | Development of road from Ramdurga-Chunchur-Manoli-Sogal-Bailhongal-Chikkabagewadi-Bagewai and other connecting roads* | 211.78 KM (Kilometer) | 442.67 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
256 | Development of road from SH-53 near Kudachi-Raibag-Bagewadi-Zangathaal SH-73 and other connecting roads, Belgaum* | 130.52 KM (Kilometer) | 272.89 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
257 | Development of road from Shiraguppi-Molwad-Ainapur SH-72 and other connecting roads* | 201.0 KM (Kilometer) | 410.91 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
258 | Development of road from Tadas-Mundgod-Sirsi-Sampakhand-Kumta road SH-69* | 136.74 KM (Kilometer) | 285.78 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
259 | Development of road from Tawargere - Hulihyder-Kanakgeri-Gonal-Chikka Jantakal - Kuditheni SH-29* | 146.26 KM (Kilometer) | 598.09 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
260 | Development of road from TN Border-Kodihalli-Kanakpura-Ramnagar-Magadi-Solur-Davaspet-Kottigere SH-03* | 223.73 KM (Kilometer) | 467.92 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
261 | Development of road from Yaragatti-Thavalgeri-Maldinni near SH-31 Nesargi to AP Border near Ananthapur SH-31* | 212.55 KM (Kilometer) | 869.25 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
262 | Development of road Hassan-Arakalgud-Ramnathpura-Piriyapatna and other connecting roads* | 91.63 KM (Kilometer) | 377.29 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
263 | Development of road Shimoga-Honnalli-Harapanahalli-Kudligi-Sandur-Thoranagal and other connecting roads* | 216.85 KM (Kilometer) | 887.05 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
264 | Development of road Sira-Madugiri-Gowribidanur-Chikkaballapura-Shidalgatta-Chithamani-Srinivasapur-Mulbagal SH-58* | 358.1 KM (Kilometer) | 1464.82 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
265 | Development of road Thamilnadu border to Attibele-Sarjapur-Hoskote-Jangamakote-Shidlgatta join SH-58 * | 89.12 KM (Kilometer) | 364.64 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
266 | Development of Sirhind - Morinda - Ropar* | 55.42 KM (Kilometer) | 70.25 | Transport | Roads and bridges | Under Construction | Public Works Department, Punjab | Punjab | 09-Nov-2019 |
267 | Development of Tourism Infrastructure Projects at Belur * | 7.0 Acres | 28 | Social and Commercial Infrastructure | Tourism | Pre-construction Stage | Department of Tourism, Karnataka | Karnataka | 09-Nov-2019 |
268 | Development of Tourism Infrastructure Projects at Bijapur * | 5.0 Acres | 21 | Social and Commercial Infrastructure | Tourism | Not Available | Department of Tourism, Karnataka | Karnataka | 09-Nov-2019 |
269 | Development of two lane carriageway to Dabadeh to Bhawan Mandi* | Not Available | 96 | Transport | Roads and bridges | Under Construction | Rajasthan State Road Development and Construction Corporation Limited | Rajasthan | 09-Nov-2019 |
270 | Development of Various Tourism Facilities in Pilikula * | Not Available | 80 | Social and Commercial Infrastructure | Tourism | Pre-construction Stage | Department of Tourism, Karnataka | Karnataka | 09-Nov-2019 |
271 | Development, Construction, Operation and Maintenance of An Integrated Municipal Waste Processing and Disposal Facility At Okhla* | 950.0 TPD (Tonne per day) | 65 | Water Sanitation | Solid waste management | Under Construction | New Delhi Municipal Council | Delhi (UT) | 09-Nov-2019 |
272 | Development, O&M of Gadoj-Majri to Haryana/ Rajasthan Border and Majri to Neemrana under DBFOT (Toll) Basis* | 46.4 KM (Kilometer) | 88.01 | Transport | Roads and bridges | Pre-construction Stage | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
273 | District Central Library at Visakapatnam * | Not Available | 25 | Social and Commercial Infrastructure | Education | Under Construction | Andhra Pradesh Industrial Infrastructure Corporation Limited (APIIC) | Andhra Pradesh | 09-Nov-2019 |
274 | Door to Door Collection of Solid waste Composting and Landfill at Dehradun * | Not Available | 24.56 | Water Sanitation | Solid waste management | Under Construction | Dehradun Nagar Nigam | Uttarakhand | 09-Nov-2019 |
275 | Door to Door Collection of Solid waste Composting and Landfill at Nainital * | Not Available | 9.83 | Water Sanitation | Solid waste management | Under Construction | Nainital Municipality | Uttarakhand | 09-Nov-2019 |
276 | Drama Theatre Complex Majiwada * | 1.40 Acres | 30 | Social and Commercial Infrastructure | Tourism | Under Construction | Thane Municipal Corporation | Maharashtra | 09-Nov-2019 |
277 | Eastern Peripheral Expressway (NH No. NE-II) | 134.95 KM (Kilometer) | 6588.9 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Haryana | 09-Nov-2019 |
278 | Eco Tourism Park - Rewa * | 5.78 | 15.68 | Social and Commercial Infrastructure | Tourism | Under Construction | Madhya Pradesh Ecotourism Development Board | Madhya Pradesh | 09-Nov-2019 |
279 | Establishment of 2 x 10 MWp SPV power plant at Atam Pahad, South Andaman * | 20.0 MW (Mega Watt) | 130.76 | Energy | Renewable energy (grid) | Pre-construction Stage | Andaman and Nicobar Administration | Andaman & Nicobar Islands (UT) | 09-Nov-2019 |
280 | Four laining with PSS of Kaithal to Rajasthan Border section of NH 152/65 from km 33.250 to km 243.58 under NHDP IV | 166.25 KM (Kilometer) | 2290 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Multi State/ Centre | 09-Nov-2019 |
281 | Four laning elevated road from Chennai Port gate No. 10 to Maduravoyal (NH 4) in the state of Tamil nadu | 18.0 KM (Kilometer) | 1345 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 09-Nov-2019 |
282 | Four laning of Ambala - Kaithal section of NH-65 including Ambala Bypass inHaryana on BOT (Toll) project on DBFOT (Toll) basis | 95.383 KM (Kilometer) | 878 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Haryana | 09-Nov-2019 |
283 | Four laning of Amravati to Chikhli Section of NH-6 from Km 166.00 to Km 360.00 in the state of Maharashtra under NHDP Phase IV | 194.0 KM (Kilometer) | 2288.18 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
284 | Four laning of Balance connectivity road from Visakhapatnam Port to NH5 | 4.2 KM (Kilometer) | 100.32 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Andhra Pradesh | 09-Nov-2019 |
285 | Four laning of Barasat-Krishnagar section of NH 34 in West Bengal under NHDP Phase III on BOT (Annuity) basis* | 84.0 KM (Kilometer) | 886.73 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | West Bengal | 09-Nov-2019 |
286 | Four laning of Barhi to Hazaribagh section of NH 33 in Jharkhand� | 40.5 KM (Kilometer) | 562.34 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Jharkhand | 09-Nov-2019 |
287 | Four laning of Bhavnagar-Talaja road in length of 46.5 km in Bhavnagar under NHDP-IV | 48.04 KM (Kilometer) | 998.18 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Gujarat | 09-Nov-2019 |
288 | Four laning of Bhubaneshwar - Puri section of NH 203 in Orissa� | 67.25 KM (Kilometer) | 500.29 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Odisha | 09-Nov-2019 |
289 | Four laning of BRT Tiger Reserve Boundary-Bengaluru section in 174.1 Km in Bengaluru district | 170.9 KM (Kilometer) | 1008 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Karnataka | 09-Nov-2019 |
290 | Four laning of fagne to Gujarat-Maharashtra Border section of NH 6 from Km 510 to Km 650.79 in Maharashtra under NHDP Phase IV | 140.79 KM (Kilometer) | 1885.74 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
291 | Four laning of Farakka-Raiganj section of NH 34 from km 295 to km 398 inWest Bengal on DBFOT basis unde+B218r NHDP III | 103.0 KM (Kilometer) | 1056.56 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | West Bengal | 09-Nov-2019 |
292 | Four laning of Goa/Karnataka Border-Kundapur road in length of 189.6 km under NHDP-IV | 189.6 KM (Kilometer) | 1655.01 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 09-Nov-2019 |
293 | Four laning of Goa/Karnataka border-Panaji, Goa stretch of NH 4A of Goa* | Not Available | 382.46 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Goa | 09-Nov-2019 |
294 | Four laning of Godhara to Gujarat/MP border section of NH 59 in the State of Gujarat under NHDP Phase III on DBFOT pattern | Not Available | 855.55 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Gujarat | 09-Nov-2019 |
295 | Four laning of Guna to Biaora section of NH 3 from Km 332.100 to Km 426.100 in the state of Madhya Pradesh under NHDP phase IV | 93.5 KM (Kilometer) | 1081.9 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Madhya Pradesh | 09-Nov-2019 |
296 | Four laning of Gwalior - Shivpuri section of NH 3 from km 15.600 to NH 75 to km 236 inMadhya Pradesh on BOT (Toll) basis. | 220.40 KM (Kilometer) | 1500 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Madhya Pradesh | 09-Nov-2019 |
297 | Four laning of Haridwar-Dehradun Section of NH 58 & 72 in the state of Uttarakhand-BOT(Annuity) basis | 39.0 KM (Kilometer) | 1021 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttarakhand | 09-Nov-2019 |
298 | Four laning of Indore-Jhabua-Gujarat/MP border section of NH 59 in Madhya Pradesh on BOT (Toll) basis under NHDP III | 155.15 KM (Kilometer) | 1297 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 09-Nov-2019 |
299 | Four laning of Jalna-Deoulgaonraja-Berala Phata including Deoulgaonraja bypass* | 77.41 KM (Kilometer) | 125.8 | Transport | Roads and bridges | Under Construction | Public Works Department, Maharashtra | Maharashtra | 09-Nov-2019 |
300 | Four laning of Jhansi-Khajuraho section in length of 85.4 km Package-II | 85.40 KM (Kilometer) | 1184.71 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 09-Nov-2019 |
301 | Four Laning of Jorabat-Barapani section from km 0 to 61.8 of NH 40 under SARDP NE Phase A on BOT Annuity basis.* | 61.80 KM (Kilometer) | 536 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Meghalaya | 09-Nov-2019 |
302 | Four laning of Kagavadar-Una section in length of 40.6 km in Bhavnagar district | 40.98 KM (Kilometer) | 723.64 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Gujarat | 09-Nov-2019 |
303 | Four laning of Kalmath-Zarap section in length of 44.2 km in Sindhudurg district | 44.20 KM (Kilometer) | 914 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Maharashtra | 09-Nov-2019 |
304 | Four laning of Karaikkudi-Ramanathapuram section of NH-210 (101 kms)inTamil Nadu under NHDP Phase III on BOT basis. | 100.0 KM (Kilometer) | 599.41 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Tamil Nadu | 09-Nov-2019 |
305 | Four laning of Kashedi-Khavati to Parshuram Ghat in length in Ratnagiri district # * | 43.8 KM (Kilometer) | 579.5 | Transport | Roads and bridges | Pre-construction Stage | Ministry of Road Transport and Highways | Maharashtra | 09-Nov-2019 |
306 | Four Laning of Kerala/ Tamil Nadu border, Kanyakumari section of NH 47 (Package II) | 56.0 KM (Kilometer) | 851.05 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 09-Nov-2019 |
307 | Four laning of Khagaria-Bhaktiarpur section of NH31 in the state of Bihar* | Not Available | 1703.82 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Bihar | 09-Nov-2019 |
308 | Four laning of Krishnanagar-Baharampur section of NH 34 from Km 115 to km 193 in the State of West Bengal�+B235 | 78.0 KM (Kilometer) | 708.26 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | West Bengal | 09-Nov-2019 |
309 | Four Laning of Lucknow Sultanpur Section of NH-56 on Hybrid Annuity Mode | Not Available | 1638.44 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Uttar Pradesh | 09-Nov-2019 |
310 | Four laning of Lucknow-Sultanpur Section of NH 56 from KM 11.5 to KM 135 under NHDP IV | 125.90 KM (Kilometer) | 1276 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Uttar Pradesh | 09-Nov-2019 |
311 | Four laning of Ludhiana-Talwandi section of NH 95 from km 92 to km 170 inPunjab under BOT (Toll) NHDP III on DBFOT� | 78.0 KM (Kilometer) | 479 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Punjab | 09-Nov-2019 |
312 | Four laning of Mahagaon-Yavatmal section in length of 80 km under NHDP-IV | 80.19 KM (Kilometer) | 1098 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
313 | Four Laning of Maharashtra/Karnataka Border-Sangareddy Section from 348.0 km to 423.8 km on BOT (Toll) | 145.0 KM (Kilometer) | 1544.18 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 09-Nov-2019 |
314 | Four laning of Meerut-Karnal Road in SH 82 in the State of Uttar Pradesh* | 87.15 KM (Kilometer) | 583.23 | Transport | Roads and bridges | Under Construction | Uttar Pradesh State Highways Authority | Uttar Pradesh | 09-Nov-2019 |
315 | Four laning of MP/Maharashtra border-Nagpur section of NH7 including Kamptee-Kahnan and Nagpur bypass in Maharashtra | 34.0 KM (Kilometer) | 1133.84 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
316 | Four laning of Muzaffarnagar-Haridwar section of NH 58 from km 131 to 211 of NH 58 in the state of UP and Uttarakhand | 80.0 KM (Kilometer) | 1563.55 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 09-Nov-2019 |
317 | Four laning of Nagapatnam-Thanjavur section of NH 67 from km 1.600 to km 80.00 in Tamil Nadu on BOT (Toll) basis | 78.40 KM (Kilometer) | 619 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Tamil Nadu | 09-Nov-2019 |
318 | Four laning of Nagina Kashipur Section of NH 74 from KM 71.614 to KM 170.407 under NHDP IV | 98.793 KM (Kilometer) | 2536 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Multi State/ Centre | 09-Nov-2019 |
319 | Four laning of Orissa/Chhattisgarh Border - Aurang of NH-6 in length of 150.4 Km under NHDP-IV | 150.4 KM (Kilometer) | 1232 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 09-Nov-2019 |
320 | Four Laning of Osmanabad (Yedshi)- Latur- Nanded Road* | Not Available | 300.19 | Transport | Roads and bridges | Under Construction | Public Works Department, Maharashtra | Maharashtra | 09-Nov-2019 |
321 | Four laning of Pandoh bypass to Takoli section in length of 20.7 km | 20.7 KM (Kilometer) | 2600 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Himachal Pradesh | 09-Nov-2019 |
322 | Four laning of Parshuram Ghat-Arawali section in length of 35.9 km in Ratnagiri district # * | 35.90 KM (Kilometer) | 670 | Transport | Roads and bridges | Pre-construction Stage | Ministry of Road Transport and Highways | Maharashtra | 09-Nov-2019 |
323 | Four laning of Ranchi Jamshedpur section of NH33 in the State of Bihar on BoT (Annuity) under NHDP Phase III | 163.5 KM (Kilometer) | 1479 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Jharkhand | 09-Nov-2019 |
324 | Four laning of Sambalpur - Rourkela section of SH-10 from km 4.900 to to km 167.900 (Rourkela) under DBFOT* | 163.0 KM (Kilometer) | 1564.94 | Transport | Roads and bridges | Under Construction | Public Works Department, Odisha | Odisha | 09-Nov-2019 |
325 | Four laning of Shiroli-Sangli-Kolhapur Project in length of 40.11 KM in Kolhapur District* | 40.1 KM (Kilometer) | 330 | Transport | Roads and bridges | Under Construction | Public Works Department, Maharashtra | Maharashtra | 09-Nov-2019 |
326 | Four laning of Shivpuri - Dewas section of NH3 from km 15.623 to km 566.45 in Madhya Pradesh on BOT (Toll) basis. | Not Available | 2815 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Madhya Pradesh | 09-Nov-2019 |
327 | Four laning of Singhara-Bhinjhabal Section of NH6 from KM 310.806 to KM 414.982 under NHDP IV | 103.79 KM (Kilometer) | 1288.07 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Odisha | 09-Nov-2019 |
328 | Four laning of Solapur-Bijapur section of� NH 13 under NHDP Phase III from 0 110.542km in Maharashtra and Karnataka | 111.0 KM (Kilometer) | 1377.54 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
329 | Four Laning of Solapur-Maharashtra/Karnataka border section in length of 99.8 km in Solapur under NHDP-III | 100.06 KM (Kilometer) | 923.04 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
330 | Four laning of Sultanpur-Varanasi Section of NH-56 from km 134.700 to km 271.300 in Uttar Pradesh on DBFOT (Toll) basis. | 146.225 KM (Kilometer) | 1778 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Uttar Pradesh | 09-Nov-2019 |
331 | Four laning of Tarsod-Fagne section of NH-6 in length of 87.3 Km in Jalgaon district | 87.3 KM (Kilometer) | 1064.88 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
332 | Four laning of Thanjavur-Trichy road in length of 56 km on NH-67 in Tiruchirappalli under NHDP -III | 56.4 KM (Kilometer) | 390 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 09-Nov-2019 |
333 | Four Laning of Trichy city Junction with NH-45 B on NH-67 to Karur on NH-67 in Tamil Nadu under NHDP Phase III A on BOT basis | 79.7 KM (Kilometer) | 516 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 09-Nov-2019 |
334 | Four laning of Tuljapur-Ausa road in length of 67 km under NHDP-IV | 67.4 KM (Kilometer) | 904.16 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
335 | Four laning of Una-Kodinar road in length of 41.1 Km in Junagadh district | 41.1 KM (Kilometer) | 763.08 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Gujarat | 09-Nov-2019 |
336 | Four Laning of Vijaywada-Machilipatnam section of NH 9 under NHDP Phase III, length 64.611 km | Not Available | 1462.32 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Andhra Pradesh | 09-Nov-2019 |
337 | Four laning of Waranga-Mahagaon section in length of 66.9 km | 66.90 KM (Kilometer) | 1059.73 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
338 | Four laning of Wardha-Butibori section in length of 59.2 km | 59.20 KM (Kilometer) | 800 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
339 | Four laning of Yavatmal-Wardha section in length of 64.9 km under NHDP-IV | 64.9 KM (Kilometer) | 988.34 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
340 | Four laning of Zirakpur to Patiala section of NH 64 under VGF Scheme, length 50.70 km | 50.70 KM (Kilometer) | 536.25 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Punjab | 09-Nov-2019 |
341 | Four laning with paved shoulders of Bhopal to Biaora section in the state of Madhya Pradesh* | 105.60 KM (Kilometer) | 954.43 | Transport | Roads and bridges | Under Construction | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
342 | Four laning with paved side shoulders of a section betwwen Jharpokharia Baleshwar | 80.60 KM (Kilometer) | 705.88 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Odisha | 09-Nov-2019 |
343 | Four laning with PSS of Amritsar to Bathinda section� of NH - 15 from km 103 to km 287.5 in Punjab under NHDP - IV� | 174.64 KM (Kilometer) | 1899 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Punjab | 09-Nov-2019 |
344 | Four laning with PSS of Aurangabad to Yedshi section on NH 211� from km 100 to km 290.2 in Maharashtra on DBFOT pattern | 190.20 KM (Kilometer) | 2429 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
345 | Four laning with PSS of Solapur to Yedshi section on NH 211� from km 0 to km 100 inMaharashtra on DBFOT pattern | 100.0 KM (Kilometer) | 972.5 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
346 | Four lanning of Binjhabahal-Telebani section in length of 78.3 km in Keonjhar district | 78.31 KM (Kilometer) | 1008.96 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Odisha | 09-Nov-2019 |
347 | Four-laning a section between Khed-Sinnar section of NH 50 from km 42 to km 177 in Maharashtra on BOT (Toll) basis.� | 137.9 KM (Kilometer) | 1348.2 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
348 | Four-laning a section between Yadgiri-Warangal section of NH 202 from km 54.000 to km 150.000 in AP on BOT (Toll) basis | 99.103 KM (Kilometer) | 1905 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Andhra Pradesh | 09-Nov-2019 |
349 | Four-laning and Strengthening of the existing two lane stretches of NH5* | Not Available | 0 | Transport | Roads and bridges | Not Available | National Highways Authority of India (NHAI) | Andhra Pradesh | 09-Nov-2019 |
350 | Four-laning Kiratpur- Ner Chowk Section from� Km 73.20 to Km 186.50 of NH-21 in Himachal Pradesh on BOT (Toll) basis | 84.3 KM (Kilometer) | 2291 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Himachal Pradesh | 09-Nov-2019 |
351 | Four-laning of a section under NHDP-IV, between Hubli - Hospet section of NH 63 on BOT (Toll) basis. | 143.29 KM (Kilometer) | 2119 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Karnataka | 09-Nov-2019 |
352 | Four-Laning of Hospet, Bellary Section of NH-63 under NHDP Phase IV, length 95.44 km | 95.0 KM (Kilometer) | 1625 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Karnataka | 09-Nov-2019 |
353 | Four-laning of Kashipur-Sitarganj Section of NH-74 from km 175 to km 252.2 in Uttarakhand and UP on BOT (Toll) basis | 77.20 KM (Kilometer) | 605.85 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 09-Nov-2019 |
354 | Four-laning of Meerut, Bulandshahar section of NH-235 from km 7.469 to km 73.156 in Uttar Pradesh on DBFOT (Toll) | 65.7 KM (Kilometer) | 869 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 09-Nov-2019 |
355 | Four/six laning of Bodare-Dhule section in length of 62.8 km under NHDP-IV | 67.23 KM (Kilometer) | 1315 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Andhra Pradesh | 09-Nov-2019 |
356 | Four/Six laning of Gandhidham-Mundra Port section of NH8A in Gujarat under NHDP Phase III on DBFOT pattern* | 71.4 KM (Kilometer) | 1315 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Gujarat | 09-Nov-2019 |
357 | Four/Six laning of Ghaziabad-Aligarh section of NH 91under NHDP Phase III on BOT Basis. | 126.0 KM (Kilometer) | 1031.14 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 09-Nov-2019 |
358 | Four/Six Laning of Gujarat/Maharashtra Border-Surat-Hazira Port Section of NH 6 under NHDP Phase III | 133.0 KM (Kilometer) | 1509 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Multi State/ Centre | 09-Nov-2019 |
359 | Four/Six laning of Panvel Indapur section of NH 17 in the State of Maharashtra | 84.0 KM (Kilometer) | 1206 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
360 | Four/six laning of Raipur-Bilaspur section of NH 200 from km 0.000 to km 127.650 in Chhattisgarh on BoT (Toll) basis* | 126.525 KM (Kilometer) | 1548.88 | Transport | Roads and bridges | Pre-construction Stage | Ministry of Road Transport and Highways | Chhattisgarh | 09-Nov-2019 |
361 | Girls Polytechnic College (Baran) Project * | 5.0 Acres | 5.49 | Social and Commercial Infrastructure | Education | Under Construction | Directorate of Technical Education, Rajasthan | Rajasthan | 09-Nov-2019 |
362 | Girls Polytechnic College (Jaisalmer) Project * | 5.0 Acres | 5.49 | Social and Commercial Infrastructure | Education | Under Construction | Directorate of Technical Education, Rajasthan | Rajasthan | 09-Nov-2019 |
363 | Golf Course At Naya Quilla Hyderabad * | Not Available | 12.5 | Social and Commercial Infrastructure | Tourism | Under Construction | Andhra Pradesh Tourism Development Corporation Limited | Telangana | 09-Nov-2019 |
364 | Grain Yard Project (Amravati) * | Not Available | 21.66 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Under Construction | Agricultural Produce Market Committee (Amravati) | Maharashtra | 09-Nov-2019 |
365 | Heritage Village Project (Amritsar) * | Not Available | 15 | Social and Commercial Infrastructure | Tourism | Under Construction | Punjab Heritage and Tourism Promotion Board | Punjab | 09-Nov-2019 |
366 | High Level Bridge (Makhu) | 0.72 KM (Kilometer) | 60 | Transport | Roads and bridges | Operation and Maintenance Stage | Punjab Infrastrucrure Development Board | Punjab | 09-Nov-2019 |
367 | Hop on Hop Tourist Bus Terminal * | Not Available | 25 | Social and Commercial Infrastructure | Tourism | Under Construction | Odisha Tourism Development Corporation (OTDC) | Odisha | 09-Nov-2019 |
368 | Hospital (Dorando) Project # * | 200.0 Beds | 80.1 | Social and Commercial Infrastructure | Health Care | Pre-construction Stage | Ranchi Municipal Corporation | Jharkhand | 09-Nov-2019 |
369 | Hospital (Wanjri) Project * | Not Available | 98.78 | Social and Commercial Infrastructure | Health Care | Under Construction | Nagpur Municipal Corporation | Maharashtra | 09-Nov-2019 |
370 | Hubli-Dharwar Bypass* | 30.0 KM (Kilometer) | 68 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Karnataka | 09-Nov-2019 |
371 | I T Park (Parsodi) * | Not Available | 46 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Nagpur Municipal Corporation | Maharashtra | 09-Nov-2019 |
372 | IGIAT Multi Skill Development Centre Pulivendula, Kadappa District of AP * | Not Available | 25 | Social and Commercial Infrastructure | Education | Under Construction | Directorate of Employment and Training, Andhra Pradesh | Andhra Pradesh | 09-Nov-2019 |
373 | Implementation of 17 MLD sewage treatment plant at Dudhali Nallah in Kolhapur * | 17.0 MLD (Millons Liter per day) | 21.5 | Water Sanitation | Sewage collection, treatment and disposal system | Under Construction | Kolhapur Municipal Corporation | Maharashtra | 09-Nov-2019 |
374 | Implementation of 50 MLD sewage treatment plant at Ramana * | 50.0 MLD (Millons Liter per day) | 156 | Water Sanitation | Sewage collection, treatment and disposal system | Pre-construction Stage | Uttar Pradesh Jal Nigam | Uttar Pradesh | 09-Nov-2019 |
375 | Implementation of 500 TPD, solid waste management unit at Brahmapuram * | 500.0 TPD (Tonne per day) | 350 | Water Sanitation | Solid waste management | Pre-construction Stage | Local Self Government Department, Kerala | Kerala | 09-Nov-2019 |
376 | Implementation of common municipal solid waste management facility with a capacity of 180 TPD at Kacchar * | 180.0 TPD (Tonne per day) | 25.41 | Water Sanitation | Solid waste management | Pre-construction Stage | Bilaspur Municipal Corporation | Chhattisgarh | 09-Nov-2019 |
377 | Implementation of integrated solid waste management project at Katni * | 150.0 MTPA (Metric Tonne Per Annum) | 35.4 | Water Sanitation | Solid waste management | Under Construction | Katni Municipal Corporation | Madhya Pradesh | 09-Nov-2019 |
378 | Implementation of solid waste management unit in Badaun district * | 55.0 TPD (Tonne per day) | 13.02 | Water Sanitation | Solid waste management | Under Construction | Uttar Pradesh Jal Nigam | Uttar Pradesh | 09-Nov-2019 |
379 | Implementation of solid waste management unit in Firozabad district * | 130.0 TPD (Tonne per day) | 13.69 | Water Sanitation | Solid waste management | Under Construction | Uttar Pradesh Jal Nigam | Uttar Pradesh | 09-Nov-2019 |
380 | Implementation of solid waste management unit in Jaunpur district * | 80.0 TPD (Tonne per day) | 13.85 | Water Sanitation | Solid waste management | Under Construction | Uttar Pradesh Jal Nigam | Uttar Pradesh | 09-Nov-2019 |
381 | Implementation of solid waste management unit in Mirzapur district * | 100.0 TPD (Tonne per day) | 18.1 | Water Sanitation | Solid waste management | Under Construction | Uttar Pradesh Jal Nigam | Uttar Pradesh | 09-Nov-2019 |
382 | Improvements of Road from Yelahanka to Karnataka/AP border Section of SH9 on DBFOT (Toll) basis* | 74.35 KM (Kilometer) | 380.85 | Transport | Roads and bridges | Under Construction | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
383 | Info Park (Bhubaneswar) * | 54.0 Acres | 500 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Odisha Industrial Infrastructure Development Corporation | Odisha | 09-Nov-2019 |
384 | Input Based Urban Electric Distribution Moradabad * | Not Available | 0 | Energy | Electricity Distribution | Under Construction | Paschimanchal Vidyut Vitran Nigam Limited | Uttar Pradesh | 09-Nov-2019 |
385 | Installation of 100 Reverse Osmosis Plants in 100 villages * | 100.0 Numbers | 11.25 | Water Sanitation | Water treatment plants | Under Construction | Water Supply and Sanitation Department, Haryana | Haryana | 09-Nov-2019 |
386 | Integrated Border Check Post (Maharashtra) Project - Modernisation* | 22.0 Numbers | 1000 | Transport | Roads and bridges | Under Construction | Maharashtra State Road Development Corporation Limited (MSRDC) | Maharashtra | 09-Nov-2019 |
387 | Integrated Disposal & Landfill Facility (Mysuru) Project - JNNURM * | 34.5 Acres | 34.85 | Water Sanitation | Solid waste management | Under Construction | Mysuru City Corporation | Karnataka | 09-Nov-2019 |
388 | Integrated Municipal Solid Waste Management Facility for Madurai City * | 350.0 TPD (Tonne per day) | 300 | Water Sanitation | Solid waste management | Under Construction | Madurai Municipal Corporation | Tamil Nadu | 09-Nov-2019 |
389 | Integrated Municipal solid waste treatment Kannahalli * | 500.0 MT (Metric Tonne ) | 25 | Water Sanitation | Solid waste management | Under Construction | Bruhat Bengaluru Mahanagara Palike | Karnataka | 09-Nov-2019 |
390 | Integrated Municipal solid waste treatment Mavalipura * | 70.0 MTPD | 40 | Water Sanitation | Solid waste management | Under Construction | Bruhat Bengaluru Mahanagara Palike | Karnataka | 09-Nov-2019 |
391 | Integrated Solid Waste Management (Sambhal) Project * | 75.0 TPD (Tonne per day) | 12.23 | Water Sanitation | Solid waste management | Under Construction | Uttar Pradesh Jal Nigam | Uttar Pradesh | 09-Nov-2019 |
392 | International Convention Centre in Orissa * | 18.75 Acres | 480 | Social and Commercial Infrastructure | Tourism | Pre-construction Stage | Odisha Industrial Infrastructure Development Corporation | Odisha | 09-Nov-2019 |
393 | IT City (Lucknow) Project * | 100.0 Acres | 1500 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Uttar Pradesh Electronics Corporation Limited | Uttar Pradesh | 09-Nov-2019 |
394 | Jagraon Nakodar Road Project* | 38.9 KM (Kilometer) | 52.23 | Transport | Roads and bridges | Under Construction | Public Works Department, Punjab | Punjab | 09-Nov-2019 |
395 | Jaipur City ring road project phase I* | 47.0 KM (Kilometer) | 890 | Transport | Roads and bridges | Under Construction | Jaipur development Authority | Rajasthan | 09-Nov-2019 |
396 | Jal Mahal Tourism Project on 100 acres in Jaipur * | 100.0 Acres | 200 | Social and Commercial Infrastructure | Tourism | Under Construction | Rajasthan Tourism Development Coorporation | Rajasthan | 09-Nov-2019 |
397 | Karnataka Urban Water Sector Improvement Project * | Not Available | 70 | Water Sanitation | Water supply pipeline | Under Construction | Karnataka Urban Infrastructure Development and Finance Corporation | Karnataka | 09-Nov-2019 |
398 | Latur - Ausa - Lamjana Road | 19.0 KM (Kilometer) | 54 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Maharashtra | Maharashtra | 09-Nov-2019 |
399 | Luxury Tourist Train Project * | Not Available | 32 | Social and Commercial Infrastructure | Tourism | Under Construction | Karnataka State Tourism Development Corporation | Karnataka | 09-Nov-2019 |
400 | Modern Bus Terminus along with Commercial Facilities * | Not Available | 200 | Transport | Urban public transport (except rolling stock) | Not Available | Department of Commerce and Transport, Odisha | Odisha | 09-Nov-2019 |
401 | Mrugavani National Park, Chilkur Eco-Tourism Project * | Not Available | 0 | Social and Commercial Infrastructure | Tourism | Not Available | Andhra Pradesh Forest Development Corporation Limited | Andhra Pradesh | 09-Nov-2019 |
402 | Multiplex & Shopping Mall at Secunderabad * | Not Available | 26.74 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Andhra Pradesh Tourism Development Corporation Limited | Telangana | 09-Nov-2019 |
403 | National Games Housing Complex at Ranchi * | Not Available | 250 | Social and Commercial Infrastructure | Tourism | Under Construction | Department of Arts, Culture, Sports and Youth Affairs, Jharkhand | Jharkhand | 09-Nov-2019 |
404 | Neyveli Lignite Fired Power Plant * | 1000.0 MW (Mega Watt) | 4256 | Energy | Electricity generation (grid) | Under Construction | Not Available | Tamil Nadu | 09-Nov-2019 |
405 | Operation and Maintenance of 50 Skill Development Training Centres in 14 districts of Assam * | Not Available | 0 | Social and Commercial Infrastructure | Education | Not Available | Directorate of Welfare of Tea and Ex-Tea Garden Tribes, Assam | Assam | 09-Nov-2019 |
406 | Package II Development of Tourism Infrastructure Projects at Badami Pattadakal & Aihole * | 5.0 Acres | 21 | Social and Commercial Infrastructure | Tourism | Not Available | Department of Tourism, Karnataka | Karnataka | 09-Nov-2019 |
407 | Parking cum Logistics Hub at Mandideep for 500 trucks, Bhopal * | 18.5 Acres | 140 | Transport | Urban public transport (except rolling stock) | Under Construction | MP Audyogik Kendra Vikas Nigam (Indore) Limited | Madhya Pradesh | 09-Nov-2019 |
408 | Parwanoo-Solan section of NH 22 in the State of Himachal Pradesh on BOT (Annuity) under NHDP Phase III | 39.41 KM (Kilometer) | 934.46 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Himachal Pradesh | 09-Nov-2019 |
409 | Polytechnic at Sultanpur Lodhi * | Not Available | 15 | Social and Commercial Infrastructure | Education | Not Available | Department of Technical Education and Industrial Training, Punjab | Punjab | 09-Nov-2019 |
410 | Positra Port Project * | Not Available | 0 | Transport | Ports (excluding captive) | Under Construction | Gujarat Maritime Board (GMB) | Gujarat | 09-Nov-2019 |
411 | Raisen- Gairatganj- Rahatgarh Road | 101.4 KM (Kilometer) | 57.7 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
412 | Rajpura Power Project | 1400.0 MW (Mega Watt) | 9600 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Punjab State Power Corporation Ltd. | Punjab | 09-Nov-2019 |
413 | Reuse of Recycled Water Tertiary Treatment Water Plant, at Jaipur * | Not Available | 200 | Water Sanitation | Sewage collection, treatment and disposal system | Not Available | Public Health Engineering Department, Rajasthan | Rajasthan | 09-Nov-2019 |
414 | Rice storage and management facility project at Krushnaprasad (Puri) * | 2500.0 MTC | 0 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Not Available | Odisha State Civil Supplies Corporation Limited | Odisha | 09-Nov-2019 |
415 | Road from AP border near Kothadoddi-Yaragara-Purthipalli to join SH-23 near Kapgal and other connecting roads* | 234.34 KM (Kilometer) | 488.6 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
416 | Road from SH-17 Srirangapatana-Padavapura-Nagamandala-Chikkanayakanahalli-Hiriyuru-Challakere-Bellary-A P Border* | 345.45 KM (Kilometer) | 1413.06 | Transport | Roads and bridges | Not Available | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
417 | Road Upgradation of Chakeri-Allahabad section of 145.3 km | 145.3 KM (Kilometer) | 3691 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 09-Nov-2019 |
418 | Road Upgradation (Ahmednagar-Kopergaon) Project* | 42.0 KM (Kilometer) | 110.4 | Transport | Roads and bridges | Under Construction | Public Works Department, Maharashtra | Maharashtra | 09-Nov-2019 |
419 | Road Upgradation (Arawali-Kante) Project # * | 40.0 KM (Kilometer) | 594.33 | Transport | Roads and bridges | Pre-construction Stage | National Highways Authority of India (NHAI) | Maharashtra | 09-Nov-2019 |
420 | Road Upgradation (Bar-Bilara-Jodhpur) Project # | 15.0 KM (Kilometer) | 8.93 | Transport | Roads and bridges | Completed | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
421 | Road Upgradation (Chutmalpur-Ganeshpur) Project | 53.0 KM (Kilometer) | 1443 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 09-Nov-2019 |
422 | Road Upgradation (Dausa-Lalsot-Kauthun) Project | 83.5 KM (Kilometer) | 688.7 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 09-Nov-2019 |
423 | Road Upgradation (Gagalheri-Saharanpur-Yamunanagar) Project | 51.0 KM (Kilometer) | 1668 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 09-Nov-2019 |
424 | Road Upgradation (Greater Noida-Ballia) Project* | 1047.0 KM (Kilometer) | 29825 | Transport | Roads and bridges | Under Construction | Uttar Pradesh Expressways Industrial Development Authority | Uttar Pradesh | 09-Nov-2019 |
425 | Road Upgradation (Gwalior-Jhansi NH-75) Project | 80.0 KM (Kilometer) | 604 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Madhya Pradesh | 09-Nov-2019 |
426 | Road Upgradation (Hoshangabad-Piparia-Pachmarhi) Project | 126.0 KM (Kilometer) | 57 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
427 | Road Upgradation (Jinzira Bazzar-Batanagar) Project | 6.8 KM (Kilometer) | 24.3 | Transport | Roads and bridges | Operation and Maintenance Stage | Kolkata Metropolitan Development Authority | West Bengal | 09-Nov-2019 |
428 | Road Upgradation (Kasaragod-Kannur) Project* | 48.2 KM (Kilometer) | 150.4 | Transport | Roads and bridges | Under Construction | Road Infrastructure Company Kerala Limited | Kerala | 09-Nov-2019 |
429 | Road Upgradation (Kottayam-Thiruvananthapuram) Project* | 58.0 KM (Kilometer) | 128.91 | Transport | Roads and bridges | Under Construction | Road Infrastructure Company Kerala Limited | Kerala | 09-Nov-2019 |
430 | Road Upgradation (MP/Maharashtra Border-Nagpur) Project | 95.0 KM (Kilometer) | 1920 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 09-Nov-2019 |
431 | Road Upgradation (Patna-Hajipur-Muzaffarpur) Project | 63.0 KM (Kilometer) | 672 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Bihar | 09-Nov-2019 |
432 | Road Upgradation (Potin-Pangin) Project # * | 407.0 KM (Kilometer) | 1985 | Transport | Roads and bridges | Pre-construction Stage | Ministry of Road Transport and Highways | Arunachal Pradesh | 09-Nov-2019 |
433 | Road Upgradation (Rau-Pithampur) Project* | 13.83 KM (Kilometer) | 73 | Transport | Roads and bridges | Pre-construction Stage | Madhya Pradesh Audyogik Kendra Vikas Nigam (Indore) Limited | Madhya Pradesh | 09-Nov-2019 |
434 | Road Upgradation (Rewa-Shahdol-Amarkantak) Project | 242.7 KM (Kilometer) | 111.3 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
435 | Road Upgradation (Shivpuri-Guna) Project | 97.7 KM (Kilometer) | 830.36 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Madhya Pradesh | 09-Nov-2019 |
436 | Road Upgradation (Talaja-Mahuva) Project | 45.46 KM (Kilometer) | 834.64 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Gujarat | 09-Nov-2019 |
437 | Road Upgradation (Thrissur-Angamali NH-47) Project (KL-I) | 40.0 KM (Kilometer) | 604.4 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Kerala | 09-Nov-2019 |
438 | Road Upgradation (Udaipur-Rajasthan/Gujarat Border) Project | 113.80 KM (Kilometer) | 2100 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Rajasthan | 09-Nov-2019 |
439 | Road upgradation of Raebareilly-Allahabad section of NH-24B in length of 106.6 Km under NHDP-IV | 119.0 KM (Kilometer) | 291.36 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 09-Nov-2019 |
440 | Road Upgradation Project (Tikamgarh-Orchha) Project | 9.34 KM (Kilometer) | 47.56 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
441 | Ropar-Phagwara Road Project | 80.66 KM (Kilometer) | 70 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Punjab | Punjab | 09-Nov-2019 |
442 | Saoner - Bypass Road* | Not Available | 125 | Transport | Roads and bridges | Under Construction | Public Works Department, Maharashtra | Maharashtra | 09-Nov-2019 |
443 | School Building (Solapur) Project * | 1.10 Acres | 6.27 | Social and Commercial Infrastructure | Education | Under Construction | Solapur Municipal Corporation | Maharashtra | 09-Nov-2019 |
444 | Second Adityapur Toll Bridge over River Kharkali* | 0.27 KM (Kilometer) | 55 | Transport | Roads and bridges | Under Construction | Department of Industries, Jharkhand | Jharkhand | 09-Nov-2019 |
445 | Secured Engineered Landfill Facility (Vadodara) * | Not Available | 30.98 | Water Sanitation | Solid waste management | Under Construction | Vadodara Municipal Corporation | Gujarat | 09-Nov-2019 |
446 | Setting up of 60 MW Tidong-II Hydel Power Project # * | 60.0 MW (Mega Watt) | 420 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 09-Nov-2019 |
447 | Setting up of 15 MW Pitgong-I hydel power unit in Arunachal Pradesh # * | 15.0 MW (Mega Watt) | 112 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 09-Nov-2019 |
448 | Setting up of 51 MW Bhasmey hydel power unit in East Sikkim district * | 51.0 MW (Mega Watt) | 297.76 | Energy | Renewable energy (grid) | Under Construction | Sikkim Power Development Corporation Limited | Sikkim | 09-Nov-2019 |
449 | Setting up of Iron ore handling facilities on BOT basis at New Mangalore Port * | Not Available | 119.66 | Transport | Ports (excluding captive) | Under Construction | Ministry of Shipping | Karnataka | 09-Nov-2019 |
450 | Setting up of Medical College and Hospital in Bolangir * | 25.0 Acres | 326.4 | Social and Commercial Infrastructure | Health Care | Pre-construction Stage | Department of Health & Family Welfare, Odisha | Odisha | 09-Nov-2019 |
451 | Shopping-cum-Commercial Complex (Parola Road) Project * | Not Available | 12 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Dhule Municipal Corporation | Maharashtra | 09-Nov-2019 |
452 | Six laning from 90.0 km to 214.9 km of Kishangarh-Udaipur-Ahmedabad section under NHDP Phase-V | 124.90 KM (Kilometer) | 1239.82 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 09-Nov-2019 |
453 | Six laning of Kishangarh-Gulabpura section in length of 90.0 Km NHDP-V | 90.0 KM (Kilometer) | 1031.95 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 09-Nov-2019 |
454 | Six laning of Agra-Etawah Section of NH 2 from Km 199/660 to km 323.525 on BoT (Toll) in Uttar Pradesh under NHDP Phase V. | 124.5 KM (Kilometer) | 1657.2 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 09-Nov-2019 |
455 | Six laning of Barwa-Adda-Panagarh section of NH 2 inJharkhand and West Bengal under NHDP PhaseV on BOT (Toll) basis | 122.8 KM (Kilometer) | 2434.5 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 09-Nov-2019 |
456 | Six laning of Chandikol-Jagatpur-Bhubhaneshwar section of NH 5 from Km 413 to 418 and Km 0 to Km 62 in Orissa on BOT basis | 67.0 KM (Kilometer) | 1047 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Odisha | 09-Nov-2019 |
457 | Six laning of Chilkaluripet-Nellore section of NH 5 from km 1182.802 to km 1366.547 in AP on BOT (Toll) project on DBFO pattern | 183.5 KM (Kilometer) | 2163.9 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Andhra Pradesh | 09-Nov-2019 |
458 | Six laning of Chitradurga-Davanagere section in length of 72.7 km | 72.7 KM (Kilometer) | 993.16 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Karnataka | 09-Nov-2019 |
459 | Six laning of Chittorgarh - Udaipur section of NH-76 PKG-III | 93.5 KM (Kilometer) | 1245.75 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 09-Nov-2019 |
460 | Six laning of Delhi-Agra section of NH 2 from Km 20.500 to Km 199.600 in the States of Haryana/UP under NHDP V on BOT basis | 179.5 KM (Kilometer) | 2960 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 09-Nov-2019 |
461 | Six laning of Dhankuni-Kharagpur section in length of 111.4 km on NH-6 under NHDP-V | 111.4 KM (Kilometer) | 1396.2 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | West Bengal | 09-Nov-2019 |
462 | Six laning of Etawah Chakeri (Kanpur) section of NH 2� under NHDP Phase V, length 160.21 km | 160.2 KM (Kilometer) | 1573 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 09-Nov-2019 |
463 | Six Laning of Gurgaon-Kotputli-Jaipur Section of NH-8 in Haryana/Rajasthan on BOT (Toll) basis following by DBFO pattern. | 225.6 KM (Kilometer) | 1896 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 09-Nov-2019 |
464 | Six Laning of Handia Varanasi Section of NH-2 from KM 713.146 to KM 785.544 in Uttar Pradesh on Hybrid Annuity Mode | 72.4 KM (Kilometer) | 2356.16 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 09-Nov-2019 |
465 | Six laning of Indore-Dewas section of NH 3 from Km 577.55 to km 610.00 and Km 0.00 to Km 12.60 inMP under NHDP V on BOT basis | 45.0 KM (Kilometer) | 410 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Madhya Pradesh | 09-Nov-2019 |
466 | Six Laning of Kharar-Ludhiana Section of NH-95 (New NH-05) from Kharar Km 10.185 to Samrala Chowk Ludhiana Km 86.199 on HAM Mode | 86.19 KM (Kilometer) | 1388.34 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 09-Nov-2019 |
467 | Six laning of Krishnagiri-Walahjpet section of NH 46 from Km 0 to km 148.30 in the State of Tamil Nadu under NHDP V on BOT basis | 148.3 KM (Kilometer) | 1489.55 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 09-Nov-2019 |
468 | Six laning of NH-8 in length of 93.2 k m of Shamlaji-Chiloda section* | 93.2 KM (Kilometer) | 1251 | Transport | Roads and bridges | Pre-construction Stage | National Highways Authority of India (NHAI) | Gujarat | 09-Nov-2019 |
469 | Six Laning of Panipat - Jalandhar Section of NH-1 (291 Km) in Haryana and Punjab. | 291.0 KM (Kilometer) | 2748 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 09-Nov-2019 |
470 | Six laning of Udaipur bypass in length of 23.9 km under NHDP-V | 23.88 KM (Kilometer) | 891 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 09-Nov-2019 |
471 | Six Laning of Vadakkancherry to Thrissur Section (Package No.NS-2/BOT/KL-3 | 30.0 KM (Kilometer) | 910 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Kerala | 09-Nov-2019 |
472 | Six-laning of Vijayawada-Gundugolanu section of NH-5 section from km 1076.48 to km 1022.48 on BOT (Toll) basis | 103.5 KM (Kilometer) | 1684 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Andhra Pradesh | 09-Nov-2019 |
473 | Solid Waste Management (700 TPD) at Asansol UA * | 700.0 TPD (Tonne per day) | 44 | Water Sanitation | Solid waste management | Under Construction | Asansol Durgapur Development Authority | West Bengal | 09-Nov-2019 |
474 | Solid Waste Management (Allahabad) * | Not Available | 30.41 | Water Sanitation | Solid waste management | Under Construction | Allahabad Municipal Corporation | Uttar Pradesh | 09-Nov-2019 |
475 | Solid Waste Management (Dehradun) * | Not Available | 24.6 | Water Sanitation | Solid waste management | Under Construction | Dehradun Nagar Nigam | Uttarakhand | 09-Nov-2019 |
476 | Solid Waste Management (Lucknow) * | Not Available | 42.92 | Water Sanitation | Solid waste management | Under Construction | Lucknow Municipal Corporation | Uttar Pradesh | 09-Nov-2019 |
477 | Solid Waste Management (Meerut) * | Not Available | 22.59 | Water Sanitation | Solid waste management | Under Construction | Meerut Nagar Nigam | Uttar Pradesh | 09-Nov-2019 |
478 | Solid Waste Management (PCMC) * | Not Available | 70.44 | Water Sanitation | Solid waste management | Under Construction | Pimpri Chinchwad Municipal Corporation | Maharashtra | 09-Nov-2019 |
479 | Solid Waste Management (Shahdara) Project * | 500.0 TPD (Tonne per day) | 18 | Water Sanitation | Solid waste management | Under Construction | East Delhi Municipal Corporation | Delhi (UT) | 09-Nov-2019 |
480 | Solid Waste Management (Varanasi) * | 600.0 TPD (Tonne per day) | 68.8 | Water Sanitation | Solid waste management | Under Construction | Uttar Pradesh Jal Nigam | Uttar Pradesh | 09-Nov-2019 |
481 | Solid Waste Management Project (Kanjur) * | 1000.0 TPD (Tonne per day) | 4116.65 | Water Sanitation | Solid waste management | Under Construction | Municipal Corporation of Greater Mumbai | Maharashtra | 09-Nov-2019 |
482 | Sport Complex-cum-Commercial Complex (Mouje-Navsari) * | 4.1 Acres | 12.37 | Social and Commercial Infrastructure | Tourism | Under Construction | Amravati Municipal Corporation | Maharashtra | 09-Nov-2019 |
483 | Sports City at Village Satgarhi, Bhopal * | Not Available | 900 | Social and Commercial Infrastructure | Tourism | Not Available | Directorate of Institutional Finance, Govt. of Madhya Pradesh | Madhya Pradesh | 09-Nov-2019 |
484 | Sports City cum International Convention Centre cum Star Hotel cum Shopping Complex cum Residential Complex * | 172.0 Acres | 900 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Food, Civil Supplies and Consumer Affairs Department, Karnatak | Karnataka | 09-Nov-2019 |
485 | Srinagar-banihal section of NH1A from 187-189.35km, km 220.7-286.11km and 187 to 220.7 on DBFOT (Annuity) in Jammu and Kashmir | 67.7 KM (Kilometer) | 1625 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Jammu & Kashmir | 09-Nov-2019 |
486 | Sundarabad - Runija - Khachrod - Runija - Satrunda | 43.79 KM (Kilometer) | 65 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
487 | Terminal Market Complex (Coimbatore) * | Not Available | 13 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Tamil Nadu State Agricultural Marketing Board | Tamil Nadu | 09-Nov-2019 |
488 | Transport nagar at Ahmedabad for 600 trucks * | Not Available | 150 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Gujarat State Road Transport Corporation | Gujarat | 09-Nov-2019 |
489 | Two lane road project from KM 24.800 of NH-75 (Gwalior - Jhansi Section) to KM 19.000 upto Ghongha | 5.8 KM (Kilometer) | 67.38 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
490 | Two lane with hard shoulder of State Highway 2 between Dausa-Dadu Road on BOT (Toll) basis | Not Available | 164.7 | Transport | Roads and bridges | Under Construction | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
491 | Two lane with paved shoulders from Sikar to Bikaner and Bikaner Bypass of NH-11 under DBFOT basis | 217.6 KM (Kilometer) | 734.8 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
492 | Two laning Nechipu to Hoj via Seppa, Saggali in length of 311 km* | 311.0 KM (Kilometer) | 1486 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Arunachal Pradesh | 09-Nov-2019 |
493 | Two laning of Hata-Fatehpur-Bajna-Dargawon road in length of 64.4 km* | 64.4 KM (Kilometer) | 74.25 | Transport | Roads and bridges | Under Construction | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
494 | Two Laning of proposed Shimla Bypass (Kaithalighat to Shimla Section) of NH-22 under NHDP Phase III on Hybrid Annuity Mode | 27.45 KM (Kilometer) | 1583.18 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Himachal Pradesh | 09-Nov-2019 |
495 | Two laning of Rau-Mhow-Jamghat-Mandleshwar section of SH 38 in MP on BOT(Toll)* | 74.4 KM (Kilometer) | 176.06 | Transport | Roads and bridges | Under Construction | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
496 | Two laning of Zojila Tunnel of 14.083 km length on NH - 1D in the State of Jammu & Kashmir on BOT annuity basis* | 14.083 KM (Kilometer) | 9090.13 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Jammu & Kashmir | 09-Nov-2019 |
497 | Two laning with Pave shoulder from Varanasi to Gorakhpur section Km 2 to Km 208 of NH 29 in the State of UP�* | Not Available | 538.88 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Uttar Pradesh | 09-Nov-2019 |
498 | Two laning with pave shoulder on Raigarh - Saraipalli from 3.800 to Km 90.460 on NH 216 in the State of Chattisgarh* | Not Available | 189.19 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Chhattisgarh | 09-Nov-2019 |
499 | Two laning with paved shoulder of Dindigul - Theni and Theni - Kumili in Tamil Nadu under NHDP III� | 134.0 KM (Kilometer) | 501 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 09-Nov-2019 |
500 | Two laning with paved shoulder of Tindivam Krishnagiri section of NH 66 from km 38.150 to km 214 in the state of Tamil Nadu | 176.5 KM (Kilometer) | 828.26 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 09-Nov-2019 |
501 | Two laning with paved shoulders of Jhansi-Khajuraho section of NH 75 in UP and MP | 76.6 KM (Kilometer) | 1373.28 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 09-Nov-2019 |
502 | Two laning with PSS of Kotkapura to Muktsar Road to on SH-16 Road on BOT (Toll) | 30.0 KM (Kilometer) | 66.21 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Punjab | Punjab | 09-Nov-2019 |
503 | Two laning Z-Morh Tunnel section of NH-I on BOT (Annuity) in Sonamarg, Srinagar, Jammu and Kashmir�* | 34.0 KM (Kilometer) | 3289 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Jammu & Kashmir | 09-Nov-2019 |
504 | Two-lanning of 68.7 km, Motihari-Raxaul Road on NH-28A | 68.70 KM (Kilometer) | 375.09 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Bihar | 09-Nov-2019 |
505 | Two/ Four laning of Bellary to AP Border section of SH 132 in Karnataka on BOT (Toll) basis | 25.67 KM (Kilometer) | 169.33 | Transport | Roads and bridges | Operation and Maintenance Stage | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
506 | Upgradation of Abhor-Bali-Mundara road in length of 28.5 km* | 29.42 KM (Kilometer) | 65.13 | Transport | Roads and bridges | Under Construction | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
507 | Upgradation of Alot-Gangdhar-Suwansara (MP) highway road in length of 24.6 km* | 24.6 KM (Kilometer) | 36.12 | Transport | Roads and bridges | Under Construction | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
508 | Upgradation of Bagewadi (NH-4)-Bailhongal-Saundatti road in length of 63.8 km in Bengaluru | 63.8 KM (Kilometer) | 238 | Transport | Roads and bridges | Operation and Maintenance Stage | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
509 | Upgradation of Bameetha-Panna-Nagod-Satna road on NH-75 in length of 97.6 km* | 97.6 KM (Kilometer) | 275.6 | Transport | Roads and bridges | Under Construction | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
510 | Upgradation of Banner-Sindari-Jalore road in length of 149.8 km* | 149.8 KM (Kilometer) | 281.64 | Transport | Roads and bridges | Under Construction | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
511 | Upgradation of Bidar-NH-9 (Ekhelli)-Chincholi road in length of 60 km in Bengaluru district* | 60.0 KM (Kilometer) | 226 | Transport | Roads and bridges | Pre-construction Stage | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
512 | Upgradation of Churu-Bhaleri road in length of 35 km* | 35.0 KM (Kilometer) | 63.59 | Transport | Roads and bridges | Under Construction | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
513 | Upgradation of Deoli-Kanwas road in length of 14.8 km* | 14.80 KM (Kilometer) | 45.97 | Transport | Roads and bridges | Under Construction | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
514 | Upgradation of Hassan-Ramanathapura-Piriyapatna road in length of 73.5 Km in in Bengaluru district | 73.5 KM (Kilometer) | 274 | Transport | Roads and bridges | Operation and Maintenance Stage | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
515 | Upgradation of Hoshangabad-Harda-Khandwa road in length of 185.6 km in Khandwa & Hoshangabad | 185.0 KM (Kilometer) | 81 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
516 | Upgradation of Hungund-Muddebihal-Talikot road in length of 56.8 km in Bengaluru | 56.8 KM (Kilometer) | 205 | Transport | Roads and bridges | Operation and Maintenance Stage | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
517 | Upgradation of Jaipur to Bhilwara State Highway, Rajasthan | 212.0 KM (Kilometer) | 322 | Transport | Roads and bridges | Operation and Maintenance Stage | Rajasthan State Road Development and Construction Corporation Limited | Rajasthan | 09-Nov-2019 |
518 | Upgradation of Kanwas-Khanpur-Aklera road in length of 73.12 km* | 73.12 KM (Kilometer) | 136.8 | Transport | Roads and bridges | Under Construction | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
519 | Upgradation of Khedali-Pahadi road in length of 59 km* | 59.0 KM (Kilometer) | 116.01 | Transport | Roads and bridges | Under Construction | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
520 | Upgradation of Madurai ring road in length of 27.2 Km | 27.2 KM (Kilometer) | 213.69 | Transport | Roads and bridges | Operation and Maintenance Stage | Tamil Nadu Road Infrastructure Development Corporation | Tamil Nadu | 09-Nov-2019 |
521 | Upgradation of Mundaragi-Hadagali-Harapanahalli road in length of 53.7 Km in Bengaluru district | 53.7 KM (Kilometer) | 203 | Transport | Roads and bridges | Operation and Maintenance Stage | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
522 | Upgradation of Nagaur-Mukundgarh road in length of 196 km* | 196.0 KM (Kilometer) | 557.92 | Transport | Roads and bridges | Under Construction | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
523 | Upgradation of of Hirekerur-Ranibennur road in length of 58.3 Km in Bengaluru district | 58.3 KM (Kilometer) | 257 | Transport | Roads and bridges | Operation and Maintenance Stage | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 09-Nov-2019 |
524 | Upgradation of Peelibanga-Lukhuwali road in length of 35.5 km* | 34.5 KM (Kilometer) | 71.99 | Transport | Roads and bridges | Under Construction | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
525 | Upgradation of Salasar-Nagaur section of NH-65 under NHDP-IV | 119.6 KM (Kilometer) | 637.18 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 09-Nov-2019 |
526 | Upgradation of Sanju-Tarnau road in length of 16.7 km* | 16.7 KM (Kilometer) | 34.8 | Transport | Roads and bridges | Under Construction | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
527 | Upgradation of Sardarshashar-Lunkaransar road in length of 76.5 km* | 76.5 KM (Kilometer) | 123.58 | Transport | Roads and bridges | Under Construction | Public Works Department, Rajasthan | Rajasthan | 09-Nov-2019 |
528 | Upgradation of Sawai Madhopur to Bharatpur State Highway in Rajasthan* | 111.0 KM (Kilometer) | 350 | Transport | Roads and bridges | Under Construction | Rajasthan State Road Development and Construction Corporation Limited | Rajasthan | 09-Nov-2019 |
529 | Upgradation of Seoni-Balaghat-Gondia road in length of 114 Km in Seoni and Balaghat districts | 114.0 KM (Kilometer) | 59.8 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
530 | Upgradation of Ujjain-Jhalawad road in length of 134 Km in Shajapur district # | 134.0 KM (Kilometer) | 66.7 | Transport | Roads and bridges | Completed | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Nov-2019 |
531 | Useful Conversion of Solid Waste in Ajmer * | Not Available | 5.16 | Water Sanitation | Solid waste management | Under Construction | Ajmer Municipal Corporation | Rajasthan | 09-Nov-2019 |
532 | Useful Conversion of Solid Waste in Bikaner * | Not Available | 6.79 | Water Sanitation | Solid waste management | Under Construction | Bikaner Nagar Parishad | Rajasthan | 09-Nov-2019 |
533 | Waste to Energy Project Mandur * | 8.0 MW (Mega Watt) | 73 | Water Sanitation | Solid waste management | Under Construction | Bruhat Bengaluru Mahanagara Palike | Karnataka | 09-Nov-2019 |
534 | Waste Water Recycling Plant (Nagpur) # | 130.0 MLD (Millons Liter per day) | 275 | Water Sanitation | Sewage collection, treatment and disposal system | Operation and Maintenance Stage | Nagpur Municipal Corporation | Maharashtra | 09-Nov-2019 |
535 | Water Supply Improvement (Malviya Nagar) Pilot Project # * | Not Available | 519.07 | Water Sanitation | Water supply pipeline | Under Construction | Delhi Jal Board | Delhi (UT) | 09-Nov-2019 |
536 | Water Supply Improvement Scheme (Nangloi) * | 40.0 MGD (Million Gallon per Day) | 652.32 | Water Sanitation | Water supply pipeline | Under Construction | Delhi Jal Board | Delhi (UT) | 09-Nov-2019 |
537 | Water Supply Scheme (Mysore) * | Not Available | 194.54 | Water Sanitation | Water supply pipeline | Under Construction | Mysuru City Corporation | Karnataka | 09-Nov-2019 |
538 | Water Treatment Plant (Vijayapura) Project * | 2.66 MLD (Millons Liter per day) | 9.99 | Water Sanitation | Water treatment plants | Under Construction | Zilla Panchayat, Vijayapura | Karnataka | 09-Nov-2019 |
539 | Widening and Strengthening of Bikaner - Phalodi section of NH - 15 to 4 lane and two lane with paved shoulderon BOT (Toll) mode | 159.0 KM (Kilometer) | 844 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 09-Nov-2019 |
540 | Women Polytechnic College (Bhilwara) Project * | 5.0 Acres | 5.49 | Social and Commercial Infrastructure | Education | Under Construction | Directorate of Technical Education, Rajasthan | Rajasthan | 09-Nov-2019 |
541 | Angul-Sukinda New Railway Line Project * | 100.0 KM (Kilometer) | 1202.7 | Transport | Railway track, tunnel, viaducts, bridges | Under Construction | Rail Vikas Nigam Limited | Odisha | 08-Nov-2019 |
542 | Astaranga Port Project * | 70.0 MMTPA (million metric tonnes per annum) | 6500 | Transport | Ports (excluding captive) | Pre-construction Stage | Department of Commerce and Transport, Odisha | Odisha | 08-Nov-2019 |
543 | Augumentation of Existing Water Supply Scheme including Service Reservoirs at Bhiwandi * | 275.0 KM (Kilometer) | 50 | Water Sanitation | Water supply pipeline | Under Construction | Bhiwandi Nizampur City Municipal Corporation | Maharashtra | 08-Nov-2019 |
544 | Bus Rapid Transport System (Visakhapatnam) * | 43.36 KM (Kilometer) | 454.73 | Transport | Urban public transport (except rolling stock) | Under Construction | Greater Vishakhapatnam Municipalicy | Andhra Pradesh | 08-Nov-2019 |
545 | Bus Stand Property (Gandhi Road) * | Not Available | 25 | Transport | Urban public transport (except rolling stock) | Under Construction | Uttarakhand Transport Corporation | Uttarakhand | 08-Nov-2019 |
546 | Bus Terminal (Kashipur) Project - Redevelopment * | 3.3 Acres | 10 | Transport | Urban public transport (except rolling stock) | Under Construction | Uttarakhand Transport Corporation | Uttarakhand | 08-Nov-2019 |
547 | Bus Terminal (Rudrapur) Project - Redevelopment * | 3.5 Acres | 10 | Transport | Urban public transport (except rolling stock) | Under Construction | Uttarakhand Transport Corporation | Uttarakhand | 08-Nov-2019 |
548 | Bus Terminal (Srinagar) Project - Redevelopment * | 2.9 Acres | 10 | Transport | Urban public transport (except rolling stock) | Under Construction | Uttarakhand Transport Corporation | Uttarakhand | 08-Nov-2019 |
549 | Chudamani Port * | 10.0 MTPA (Metric Tonne Per Annum) | 1500 | Transport | Ports (excluding captive) | Under Construction | Odisha Maritime Board | Odisha | 08-Nov-2019 |
550 | City side development of Amritsar Airport through PPP * | Not Available | 0 | Transport | Airports | Under Construction | Ministry of Civil Aviation | Punjab | 08-Nov-2019 |
551 | Clinker handling jetty at Azhicode/Kodungallur Port * | Not Available | 50 | Transport | Ports (excluding captive) | Pre-construction Stage | Ports Department, Kerala | Kerala | 08-Nov-2019 |
552 | Construction of Digni-Jaigarh Port Railway Line in length of 33.70 km in Ratnagiri * | 33.7 KM (Kilometer) | 771.51 | Transport | Railway track, tunnel, viaducts, bridges | Under Construction | Konkan Railway Corporation Limited | Maharashtra | 08-Nov-2019 |
553 | Construction of Haridaspur-Paradip BG railway line in length of 82 km in Cuttack and Jagatsingpur * | 82.0 KM (Kilometer) | 1800 | Transport | Railway track, tunnel, viaducts, bridges | Under Construction | Rail Vikas Nigam Limited | Odisha | 08-Nov-2019 |
554 | Construction of Offshore Container Berths & Development of Container Terminal in Mumbai Harbour # | 9.6 MTPA (Metric Tonne Per Annum) | 2098 | Transport | Ports (excluding captive) | Under Construction | Mumbai Port Trust | Maharashtra | 08-Nov-2019 |
555 | Construction of State of Art Bus Stands in Haryana * | Not Available | 130 | Transport | Urban public transport (except rolling stock) | Under Construction | Transport Department, Haryana | Haryana | 08-Nov-2019 |
556 | Construction, operation and Maintenance of a multi-user liquid terminal at Puthuvypeen SEZ at Cochin Port * | 4.1 MMTPA (million metric tonnes per annum) | 240 | Transport | Ports (excluding captive) | Under Construction | Cochin Port Trust | Kerala | 08-Nov-2019 |
557 | Development and Operation of an International Ship repair facility at W/Island with private sector participation * | Not Available | 970 | Transport | Ports (excluding captive) | Under Construction | Cochin Port Trust | Kerala | 08-Nov-2019 |
558 | Development of 250 Bus Queue shelters (BQS) * | Not Available | 37.5 | Transport | Urban public transport (except rolling stock) | Under Construction | Transport Department, GNCTD | Delhi (UT) | 08-Nov-2019 |
559 | Development of a 7.2 MMTPA Iron Ore Export Terminal at Waterfront West of the Breakwater on DBFOT basis (Mormugao Port Trust) * | 7.2 MMTPA (million metric tonnes per annum) | 721 | Transport | Ports (excluding captive) | Under Construction | Ministry of Shipping | Goa | 08-Nov-2019 |
560 | Development of a multipurpose Berth and a Mechanised Berth at Haldia Dock -II (North), Haldia Dock Complex, Kolkata Port Trust * | 1.177 MT (Metric Tonne ) | 821.4 | Transport | Ports (excluding captive) | Under Construction | Ministry of Shipping | West Bengal | 08-Nov-2019 |
561 | Development of a Municipal Solid Waste Management Facity for treating MSW collected from Cuttack * | 800.0 TPD (Tonne per day) | 200 | Water Sanitation | Solid waste management | Under Construction | Cuttack Municipal Corporation | Odisha | 08-Nov-2019 |
562 | Development of a regional municipal solid waste management facility in Bhubaneswar * | 800.0 MT (Metric Tonne ) | 0 | Water Sanitation | Solid waste management | Not Available | Bhubaneswar Municipal Corporation | Odisha | 08-Nov-2019 |
563 | Development of Bus Station with Passenger Amenities and Commercial Complex on NEKRTC site at Gulbarga * | 1.72 Acres | 20.2 | Transport | Urban public transport (except rolling stock) | Under Construction | North Eastern Karnataka Road Transport Corporation (NEKRTC) | Karnataka | 08-Nov-2019 |
564 | Development of bus terminal and commercial development at Musheerabad * | Not Available | 250 | Transport | Urban public transport (except rolling stock) | Under Construction | Andhra Pradesh State Road Transport Corporation | Telangana | 08-Nov-2019 |
565 | Development of Bus Terminal cum Commercial Complex (C and C Mohali Junction) at Mohali # * | 7.0 Acres | 530 | Transport | Urban public transport (except rolling stock) | Under Construction | Greater Mohali Area Development Authority | Punjab | 08-Nov-2019 |
566 | Development of Bus Terminal cum Commercial Complex at Patiala * | 13.13 Acres | 175 | Transport | Urban public transport (except rolling stock) | Under Construction | Punjab Road Transport Corporation | Punjab | 08-Nov-2019 |
567 | Development of bus terminal on 2.5 acres at Jagnade Square in Nagpur district * | 2.5 Acres | 46.8 | Transport | Urban public transport (except rolling stock) | Under Construction | Nagpur Municipal Corporation | Maharashtra | 08-Nov-2019 |
568 | Development of Honnavar port in UK District of Karnataka Maritime State * | Not Available | 1100 | Transport | Ports (excluding captive) | Pre-construction Stage | Public Works, Ports and Inland Water Transport Department, Karnataka | Karnataka | 08-Nov-2019 |
569 | Development of Integrated Multilevel Parking Infrastructure at 3 sites in NDMC Area * | Not Available | 8 | Transport | Urban public transport (except rolling stock) | Under Construction | New Delhi Municipal Council | Delhi (UT) | 08-Nov-2019 |
570 | Development of parking & commercial complex on 9 acres at Takheda in Amravati district * | 9.0 Acres | 14.26 | Transport | Urban public transport (except rolling stock) | Under Construction | Nagpur Improvement Trust | Maharashtra | 08-Nov-2019 |
571 | Development of parking complex with a capacity of 160 ECS Palampur in Kangra # | 160.0 ECS | 7 | Transport | Urban public transport (except rolling stock) | Pre-construction Stage | Municipal Council, Palampur | Himachal Pradesh | 08-Nov-2019 |
572 | Development of parking complex with a capacity of 225 vehicles at Jail Road in Mandi # | 225.0 ECS | 20 | Transport | Urban public transport (except rolling stock) | Pre-construction Stage | Municipal Council, Mandi | Himachal Pradesh | 08-Nov-2019 |
573 | Hyderabad Metro Rail Project # | 71.0 KM (Kilometer) | 16375 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Hyderabad Metro Rail Limited | Telangana | 08-Nov-2019 |
574 | Hyderabad Multi-Modal Suburban Transportation Project - Phase II * | 101.05 KM (Kilometer) | 1800 | Transport | Railway track, tunnel, viaducts, bridges | Under Construction | Rail Vikas Nigam Limited | Telangana | 08-Nov-2019 |
575 | Implementation of solid waste management facility of 500 TPD at Keru dumping station * | 500.0 TPD (Tonne per day) | 100 | Water Sanitation | Solid waste management | Pre-construction Stage | Jodhpur Municipal Corporation | Rajasthan | 08-Nov-2019 |
576 | Integrated Solid Waste Management (3800 TPD) for Hyderabad * | 3800.0 TPD (Tonne per day) | 508 | Water Sanitation | Solid waste management | Under Construction | Greater Hyderabad Municipal Corporation | Telangana | 08-Nov-2019 |
577 | Jakhau Port * | Not Available | 46 | Transport | Ports (excluding captive) | Under Construction | Gujarat Maritime Board (GMB) | Gujarat | 08-Nov-2019 |
578 | Kirtania Port Subarnarekha Mouth * | 10.0 MTPA (Metric Tonne Per Annum) | 2187 | Transport | Ports (excluding captive) | Under Construction | Department of Commerce and Transport, Odisha | Odisha | 08-Nov-2019 |
579 | LNG Terminal (Jafrabad) Project * | 4.5 MMTPA (million metric tonnes per annum) | 5000 | Transport | Ports (excluding captive) | Under Construction | Gujarat Pipavav Port Limited | Gujarat | 08-Nov-2019 |
580 | Multilevel Automated car parking cum commercial complex Kamla Nagar, New Delhi * | Not Available | 109.39 | Transport | Urban public transport (except rolling stock) | Under Construction | Municipal Corporation of Delhi | Delhi (UT) | 08-Nov-2019 |
581 | Multipurpose Berth (Visakhapatnam Port) Project # | 2.0 MTPA (Metric Tonne Per Annum) | 317 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Visakhapatnam Port Trust | Andhra Pradesh | 08-Nov-2019 |
582 | Multipurpose Cargo Port (Rewas) Project # | 198.0 MMTPA (million metric tonnes per annum) | 5200 | Transport | Ports (excluding captive) | Pre-construction Stage | Maharashtra Maritime Board (MMB) | Maharashtra | 08-Nov-2019 |
583 | Office cum Institutional cum Commercial Complex at Salt Lake * | 4.0 Acres | 500 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Under Construction | Kolkata Metropolitan Development Authority | West Bengal | 08-Nov-2019 |
584 | Oil Jetty (Kandla) Project # | Not Available | 233.5 | Transport | Ports (excluding captive) | Pre-construction Stage | Deendayal Port Trust | Gujarat | 08-Nov-2019 |
585 | Package IA Development of Tourism Infrastructure Projects at Jog and Banavasi Package IB Development of Tourism Infrastructure* | 5.0 Acres | 67.5 | Social and Commercial Infrastructure | Tourism | Not Available | Department of Tourism, Karnataka | Karnataka | 08-Nov-2019 |
586 | Parking Complex (Bilaspur) Project * | 194.0 ECS | 8 | Transport | Urban public transport (except rolling stock) | Under Construction | Municipal Council, Bilashpur | Himachal Pradesh | 08-Nov-2019 |
587 | Parking Complex (Jainchu-Ka-Naun) Project * | 200.0 ECS | 15 | Transport | Urban public transport (except rolling stock) | Pre-construction Stage | Municipal Council, Mandi | Himachal Pradesh | 08-Nov-2019 |
588 | Ponnani Port Project - Phase I * | 4.0 MMTPA (million metric tonnes per annum) | 763 | Transport | Ports (excluding captive) | Under Construction | Kerala State Maritime Development Corporation Limited | Kerala | 08-Nov-2019 |
589 | Purnagiri Ropeway Project * | 800.0 Passengers | 60 | Social and Commercial Infrastructure | Tourism | Under Construction | Uttarakhand Tourism Development Board | Uttarakhand | 08-Nov-2019 |
590 | Redevelopment of New delhi Railway station * | Not Available | 8500 | Transport | Railway track, tunnel, viaducts, bridges | Pre-construction Stage | Ministry of Railways | Delhi (UT) | 08-Nov-2019 |
591 | Riverine Multipurpose Jetty at Haldia Port * | Not Available | 278.9 | Transport | Ports (excluding captive) | Pre-construction Stage | Kolkata Port Trust | West Bengal | 08-Nov-2019 |
592 | Ropeway (Kaddukhal-Surkanda Devi Temple) Project * | 0.5 KM (Kilometer) | 15 | Social and Commercial Infrastructure | Tourism | Under Construction | Uttarakhand Tourism Development Board | Uttarakhand | 08-Nov-2019 |
593 | Ropeway (Yamunotri-Kharsali) Project * | 3.8 KM (Kilometer) | 70 | Social and Commercial Infrastructure | Tourism | Under Construction | Uttarakhand Tourism Development Board | Uttarakhand | 08-Nov-2019 |
594 | Setting up of 1.75 MW hydel based power unit at Bhima in Solapur | 1.75 MW (Mega Watt) | 6.97 | Energy | Renewable energy (grid) | Pre-construction Stage | Water Resources Department, Maharashtra | Maharashtra | 08-Nov-2019 |
595 | Tornagallu Truck Terminal * | Not Available | 29.9 | Transport | Urban public transport (except rolling stock) | Pre-construction Stage | Bellary Urban Development Authority (BUDA) | Karnataka | 08-Nov-2019 |
596 | Hurla Hydel Power Project - Stage I # | 9.40 MW (Mega Watt) | 62 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 04-Nov-2019 |
597 | Alaknanda Hydro Power Co Ltd | 330.0 MW (Mega Watt) | 4573 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Not Available | Uttarakhand | 01-Nov-2019 |
598 | Biomass Power Project, Patiala | 12.0 MW (Mega Watt) | 100 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Punjab Energy Development Agency | Punjab | 01-Nov-2019 |
599 | Chanju Hydel Power Project - Stage I | 36.0 MW (Mega Watt) | 295.09 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
600 | Chitaura Small Hydel Power Project * | 3.0 MW (Mega Watt) | 59.8 | Energy | Renewable energy (grid) | Pre-construction Stage | Uttar Pradesh Jal Vidyut Nigam Limited | Uttar Pradesh | 01-Nov-2019 |
601 | Development of 400 kV Babai (Jhunjhunu) - Jaipur (North) Double Circuit Twin Moose Power Transmission line * | 85.58 KM (Kilometer) | 294 | Energy | Electricity transmission | Under Construction | Rajasthan Rajya Vidyut Prasaran Nigam Limited | Rajasthan | 01-Nov-2019 |
602 | Development of 400 kV Suratgarh-Bikaner Double Circuit of Super Critical Thermal Power Plant at Suratgarh | 400.0 KV (Kilo Volt) | 160 | Energy | Electricity transmission | Under Construction | Rajasthan Rajya Vidyut Prasaran Nigam Limited | Rajasthan | 01-Nov-2019 |
603 | Development of a 400 kV Bikaner Sikar D/C Power Transmission Line for evacuation of power from wind and solar power in Rajasthan | 400.0 KM (Kilometer) | 244 | Energy | Electricity transmission | Operation and Maintenance Stage | Rajasthan Rajya Vidyut Prasaran Nigam Limited | Rajasthan | 01-Nov-2019 |
604 | Dikchu Hydro Power Plant * | 96.0 MW (Mega Watt) | 499 | Energy | Renewable energy (grid) | Under Construction | Sikkim Power Development Corporation Limited | Sikkim | 01-Nov-2019 |
605 | Dunda Small Hydel Power Project # * | 3.5 MW (Mega Watt) | 28.04 | Energy | Renewable energy (grid) | Pre-construction Stage | Uttar Pradesh Jal Vidyut Nigam Limited | Uttar Pradesh | 01-Nov-2019 |
606 | Electricity Distribution Bhiwandi | Not Available | 311 | Energy | Electricity Distribution | Operation and Maintenance Stage | Maharashtra State Electricity Distribution Company Limited | Maharashtra | 01-Nov-2019 |
607 | Haindaun-Alwar Transmission line project | 400.0 KV (Kilo Volt) | 188.32 | Energy | Electricity transmission | Operation and Maintenance Stage | Rajasthan Rajya Vidyut Prasaran Nigam Limited | Rajasthan | 01-Nov-2019 |
608 | Hydel Power (Darna) Project | 4.9 MW (Mega Watt) | 23.52 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
609 | Hydel Power (Kasari) Project | 2.5 MW (Mega Watt) | 12 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
610 | Hydel Power (Khodashi) Project | 4.9 MW (Mega Watt) | 23.52 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
611 | Hydel Power (Kutehr) Project | 240.0 MW (Mega Watt) | 105.08 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
612 | Hydel Power (Palchan Bhang) Project | 9.0 MW (Mega Watt) | 65.36 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
613 | Hydel Power (Radhanagari) Project | 10.0 MW (Mega Watt) | 48 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
614 | Hydel Power (Sarsadi-II) Project | 9.0 MW (Mega Watt) | 62.46 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
615 | Hydel Power (Telling) Project | 94.0 MW (Mega Watt) | 658 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
616 | Hydel Power (Tinget) Project # | 81.0 MW (Mega Watt) | 567 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
617 | Hydel Power (Uhl Khad) Project | 14.0 MW (Mega Watt) | 115 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
618 | Hydel Power (Vajra - III) Project | 1.5 MW (Mega Watt) | 7.2 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
619 | Hydro Electric Power (Akole) Project | 7.0 MW (Mega Watt) | 43.2 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
620 | Hydro Electric Power (Bhor) Project | 4.8 MW (Mega Watt) | 23.04 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
621 | Hydro Electric Power (Bhusaval) Project | 2.0 MW (Mega Watt) | 10.56 | Energy | Renewable energy (grid) | Under Construction | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
622 | Hydro Electric Power (Chikotra) Project | 1.8 MW (Mega Watt) | 10.5 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
623 | Hydro Electric Power (Chitri) Project | 2.0 MW (Mega Watt) | 9.6 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
624 | Hydro Electric Power (Dhom Balkawadi) Project | 4.0 MW (Mega Watt) | 19.2 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
625 | Hydro Electric Power (Gautami Godavari) Project | 1.2 MW (Mega Watt) | 5.76 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
626 | Hydro Electric Power (Ghataprabha) Project | 8.0 MW (Mega Watt) | 38.4 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
627 | Hydro Electric Power (Hetawane) Project | 1.50 MW (Mega Watt) | 6.8 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
628 | Hydro Electric Power (Jambre) Project | 2.0 MW (Mega Watt) | 14.32 | Energy | Renewable energy (grid) | Under Construction | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
629 | Hydro Electric Power (Junnar) Project | 3.0 MW (Mega Watt) | 15.62 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
630 | Hydro Electric Power (Kadavi) Project | 1.5 MW (Mega Watt) | 7.2 | Energy | Renewable energy (grid) | Completed | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
631 | Hydro Electric Power (Kumbhi) Project | 2.5 MW (Mega Watt) | 12 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
632 | Hydro Electric Power (Mukane) Project | 1.45 MW (Mega Watt) | 7.32 | Energy | Renewable energy (grid) | Completed | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
633 | Hydro Electric Power (Nisare) Project | 2.25 MW (Mega Watt) | 10.8 | Energy | Renewable energy (grid) | Pre-construction Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
634 | Hydro Electric Power (Parseoni) Project - Package 1 | 1.4 MW (Mega Watt) | 6.72 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
635 | Hydro Electric Power (Parseoni) Project - Package 2 | 4.4 MW (Mega Watt) | 32.94 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
636 | Hydro Electric Power (Patgaon) Project | 2.5 MW (Mega Watt) | 12 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
637 | Hydro Electric Power (Satara) Project | 1.20 MW (Mega Watt) | 7.5 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
638 | Hydro Electric Power (Temghar) Project | 4.0 MW (Mega Watt) | 26.24 | Energy | Renewable energy (grid) | Completed | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
639 | Hydro Electric Power (Urmodi) Project | 3.0 MW (Mega Watt) | 14.4 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
640 | Hydro Electric Power (Waghur) Project | 1.5 MW (Mega Watt) | 7.89 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
641 | Hydro Electric Power (Waki) Project | 1.15 MW (Mega Watt) | 6.54 | Energy | Renewable energy (grid) | Under Construction | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
642 | Kilhi-Bahl Hydel Power Project # | 7.5 MW (Mega Watt) | 21 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
643 | Kurhed Hydel Power Project - Stage II # | 7.5 MW (Mega Watt) | 58.27 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
644 | Kurpan Hydel Power Project - Stage III # | 14.6 MW (Mega Watt) | 122.14 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
645 | Kuwarsi Hydel Power Project - Stage II | 15.0 MW (Mega Watt) | 95.79 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
646 | Laxman Mandwa Small Hydro Power Project * | 5.0 MW (Mega Watt) | 25 | Energy | Renewable energy (grid) | Not Available | Narmada Valley Development Authority | Madhya Pradesh | 01-Nov-2019 |
647 | Madho-I Small Hydel Power Project # * | 3.7 MW (Mega Watt) | 45.97 | Energy | Renewable energy (grid) | Pre-construction Stage | Uttar Pradesh Jal Vidyut Nigam Limited | Uttar Pradesh | 01-Nov-2019 |
648 | Madho-II Small Hydel Power Project # * | 2.5 MW (Mega Watt) | 23.05 | Energy | Renewable energy (grid) | Pre-construction Stage | Uttar Pradesh Jal Vidyut Nigam Limited | Uttar Pradesh | 01-Nov-2019 |
649 | Malana Hydel Power Project - Stage III # | 30.0 MW (Mega Watt) | 212.66 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
650 | Mandsaur Wind Power Project in Madhya Pradesh | 55.2 MW (Mega Watt) | 326 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Marut-Shakti Energy India Limited | Madhya Pradesh | 01-Nov-2019 |
651 | Miyar Hydel Power Project # | 120.0 MW (Mega Watt) | 1125.16 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
652 | Muzaffarpur -Sursand Transmission Line * | 87.0 CKM (Circuit Kilo Meter) | 210.7 | Energy | Electricity transmission | Under Construction | Power Grid Corpn. of India Ltd. | Bihar | 01-Nov-2019 |
653 | Nazeerabad Wind Farm, Mytrah | 100.0 MW (Mega Watt) | 795 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Not Available | Telangana | 01-Nov-2019 |
654 | Nesang Hydel Power Project # | 20.0 MW (Mega Watt) | 70 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
655 | Nirgajini Small Hydel Power Project * | 5.0 MW (Mega Watt) | 108.43 | Energy | Renewable energy (grid) | Pre-construction Stage | Uttar Pradesh Jal Vidyut Nigam Limited | Uttar Pradesh | 01-Nov-2019 |
656 | Northern Region System Strengthening Scheme (NRSS-XXXI (Part-B) * | Not Available | 200 | Energy | Electricity transmission | Under Construction | REC Transmission Projects Company Limited | Multi State/ Centre | 01-Nov-2019 |
657 | Panan Hydro Power project # * | 300.0 MW (Mega Watt) | 2021.9 | Energy | Renewable energy (grid) | Pre-construction Stage | Sikkim Power Development Corporation Limited | Sikkim | 01-Nov-2019 |
658 | Parbati Hydel Power Project # | 12.0 MW (Mega Watt) | 78.35 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
659 | Power Plant Hetwane, Raigarh * | 1.5 MW (Mega Watt) | 6.8 | Energy | Electricity generation (grid) | Under Construction | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
660 | PPP-10:5 No. transmisson line of 132 kV at various places | 132.0 KV (Kilo Volt) | 117.7 | Energy | Electricity transmission | Operation and Maintenance Stage | Rajasthan Rajya Vidyut Prasaran Nigam Limited | Rajasthan | 01-Nov-2019 |
661 | PPP-8:1 No. transmission line of 220 kV and 5 No. 132 kV GSS at various places | 220.0 KV (Kilo Volt) | 149 | Energy | Electricity transmission | Operation and Maintenance Stage | Rajasthan Rajya Vidyut Prasaran Nigam Limited | Rajasthan | 01-Nov-2019 |
662 | PPP-9:6 No. transmisson line of 132 kV at various places | 132.0 KV (Kilo Volt) | 128.81 | Energy | Electricity transmission | Operation and Maintenance Stage | Rajasthan Rajya Vidyut Prasaran Nigam Limited | Rajasthan | 01-Nov-2019 |
663 | Ram Ganga Small Hydel Power Project # * | 3.2 MW (Mega Watt) | 30.41 | Energy | Renewable energy (grid) | Pre-construction Stage | Uttar Pradesh Jal Vidyut Nigam Limited | Uttar Pradesh | 01-Nov-2019 |
664 | Rewa Ultra Mega Solar Ltd | 750.0 MW (Mega Watt) | 4000 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Not Available | Madhya Pradesh | 01-Nov-2019 |
665 | Rongnichu Stroage Hydro Power Plant * | 96.0 MW (Mega Watt) | 544 | Energy | Renewable energy (grid) | Under Construction | Sikkim Power Development Corporation Limited | Sikkim | 01-Nov-2019 |
666 | Rupin Hydel Power Project # | 45.0 MW (Mega Watt) | 292.61 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
667 | Salawa Small Hydel Power Project * | 3.0 MW (Mega Watt) | 54.55 | Energy | Renewable energy (grid) | Pre-construction Stage | Uttar Pradesh Jal Vidyut Nigam Limited | Uttar Pradesh | 01-Nov-2019 |
668 | Sarsadi Hydel Power Project - Stage I # | 9.6 MW (Mega Watt) | 88.3 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
669 | Setting up a 120 MW Rangit-IV Hydel Power Project # | 120.0 MW (Mega Watt) | 726.16 | Energy | Renewable energy (grid) | Under Construction | Sikkim Power Development Corporation Limited | Sikkim | 01-Nov-2019 |
670 | Setting up of 66 MW Rangit-II Hydel Power Project * | 66.0 MW (Mega Watt) | 497.17 | Energy | Renewable energy (grid) | Under Construction | Sikkim Power Development Corporation Limited | Sikkim | 01-Nov-2019 |
671 | Setting up of 0.9 MW Dham hydro electric power unit at Arvi in Wardha district | 0.95 MW (Mega Watt) | 6.59 | Energy | Renewable energy (grid) | Under Construction | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
672 | Setting up of 1.5 MW hydel based power unit at Bor in Wardha district # | 1.5 MW (Mega Watt) | 7.55 | Energy | Renewable energy (grid) | Pre-construction Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
673 | Setting up of 1.5 MW hydel based power unit at Karwand in Dhule | 1.5 MW (Mega Watt) | 5.67 | Energy | Renewable energy (grid) | Pre-construction Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
674 | Setting up of 10 MW Konal hydel power unit in Sindhudurga district | 10.0 MW (Mega Watt) | 67 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
675 | Setting up of 11 MW hydel based power unit at Mokhada in Thane | 11.0 MW (Mega Watt) | 8.57 | Energy | Renewable energy (grid) | Pre-construction Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
676 | Setting up of 15 MW co-generation power unit at Fazilka Sugar Mill in Ferozepur district * | 15.0 MW (Mega Watt) | 80 | Energy | Renewable energy (grid) | Under Construction | Punjab State Federation of Co-operative Sugar Mills Limited | Punjab | 01-Nov-2019 |
677 | Setting up of 15 MW co-generation power unit at Morinda Sugar Mill in Rupnagar district * | 15.0 MW (Mega Watt) | 100 | Energy | Renewable energy (grid) | Under Construction | Punjab State Federation of Co-operative Sugar Mills Limited | Punjab | 01-Nov-2019 |
678 | Setting up of 15 MW Taramchu small hydel based power unit in North Sikkim # * | 15.0 MW (Mega Watt) | 240 | Energy | Renewable energy (grid) | Pre-construction Stage | Sikkim Power Development Corporation Limited | Sikkim | 01-Nov-2019 |
679 | Setting up of 2 MW hydel based power unit at Gunjawani in Pune | 2.0 MW (Mega Watt) | Not Available | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
680 | Setting up of 24 MW hydel based power unit at Gosikhurd in Bhandara district | 24.0 MW (Mega Watt) | Not Available | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
681 | Setting up of 2x50 MW Tidong-I hydel power unit in Kinnaur district | 100.0 MW (Mega Watt) | Not Applicable | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
682 | Setting up of 3 MW hydel based power unit at Nardave in Sindhudurg | 3.0 MW (Mega Watt) | Not Applicable | Energy | Renewable energy (grid) | Pre-construction Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
683 | Setting up of 4 MW hydel power unit at Mula right bank canal in Rahuri district | 4.0 MW (Mega Watt) | 19 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
684 | Setting up of 4.5 MW Tembhu barrage hydro electric power project in Satara district | 4.5 MW (Mega Watt) | 34.31 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
685 | Setting up of 44 MW Tangnu Romai-I hydel power unit in Shimla district | 44.0 MW (Mega Watt) | 255 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
686 | Setting up of 5 MW hydel based power unit at Tarali in Satara | 5.0 MW (Mega Watt) | 39.18 | Energy | Renewable energy (grid) | Pre-construction Stage | Water Resources Department, Maharashtra | Maharashtra | 01-Nov-2019 |
687 | Setting up of 500 MW Teesta-VI hydel power unti in Southern Sikkim # | 500.0 MW (Mega Watt) | 5400 | Energy | Renewable energy (grid) | Under Construction | Sikkim Power Development Corporation Limited | Sikkim | 01-Nov-2019 |
688 | Setting up of 850 MW hydel power unit at Kishtwar in Doda district * | 850.0 MW (Mega Watt) | 5500 | Energy | Renewable energy (grid) | Under Construction | Jammu and Kashmir State Power Development Corporation Limited | Jammu & Kashmir | 01-Nov-2019 |
689 | Setting up of 99 MW Singoli Bhatwari hydroelectric power plant in Rudraprayag district # | 99.0 MW (Mega Watt) | 666.47 | Energy | Renewable energy (grid) | Under Construction | Uttar Pradesh Jal Vidyut Nigam Limited | Uttarakhand | 01-Nov-2019 |
690 | Shangling Hydel Power Project # | 44.0 MW (Mega Watt) | 308 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
691 | Sharni Hydel Power Project # | 9.6 MW (Mega Watt) | 87.02 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
692 | Small Hydel Power (Kareri) Project | 5.0 MW (Mega Watt) | 34.16 | Energy | Renewable energy (grid) | Under Construction | Himachal Pradesh Energy Development Agency | Himachal Pradesh | 01-Nov-2019 |
693 | Small Hydel Power (Lower Sumej) Project | 5.0 MW (Mega Watt) | 42.38 | Energy | Renewable energy (grid) | Pre-construction Stage | Himachal Pradesh Energy Development Agency | Himachal Pradesh | 01-Nov-2019 |
694 | Small Hydel Power (Tauhak ) Project | 4.5 MW (Mega Watt) | 28.6 | Energy | Renewable energy (grid) | Pre-construction Stage | Himachal Pradesh Energy Development Agency | Himachal Pradesh | 01-Nov-2019 |
695 | Solar Power (Shivajinagar) Project * | 25.0 MW (Mega Watt) | 200 | Energy | Renewable energy (grid) | Under Construction | Maharashtra State Power Generation Company Limited | Maharashtra | 01-Nov-2019 |
696 | Suil Hydel Power Project # | 13.0 MW (Mega Watt) | 91 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
697 | Tangnu Romai Hydel Power Project - Stage II | 6.0 MW (Mega Watt) | 31.5 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
698 | Tashiding Hydro Electric Power Project | 97.0 MW (Mega Watt) | 494.44 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Sikkim Power Development Corporation Limited | Sikkim | 01-Nov-2019 |
699 | Transmission Line (Bara-Mainpuri) Project * | 765.0 KM (Kilometer) | 5158.91 | Energy | Electricity transmission | Under Construction | Uttar Pradesh Power Transmission Corporation Limited | Uttar Pradesh | 01-Nov-2019 |
700 | Transmission Line (Bikaner-Deedwana-Ajmer) Project | 400.0 KV (Kilo Volt) | 285 | Energy | Electricity transmission | Operation and Maintenance Stage | Rajasthan Rajya Vidyut Prasaran Nigam Limited | Rajasthan | 01-Nov-2019 |
701 | Transmission Line (Mainpuri-Hapur) Project * | 764.0 KM (Kilometer) | 4706.49 | Energy | Electricity transmission | Under Construction | Uttar Pradesh Power Transmission Corporation Limited | Uttar Pradesh | 01-Nov-2019 |
702 | Walipura Small Hydel Power Project * | 0.4 MW (Mega Watt) | 7 | Energy | Renewable energy (grid) | Under Construction | Uttar Pradesh New and Renewable Energy Development Agency | Uttar Pradesh | 01-Nov-2019 |
703 | Youngthang Khab Hydel Power Project # | 261.0 MW (Mega Watt) | 2500 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 01-Nov-2019 |
704 | Adani Power Maharashtra Limited | 3300.0 MW (Mega Watt) | 19003 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Maharashtra State Electricity Distribution Company Limited | Maharashtra | 30-Oct-2019 |
705 | Adani Power Rajasthan Limited | 1320.0 MW (Mega Watt) | 8323 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Jaipur Vidyut Vitran Nigam Ltd, Jodhpur Vidyut Vitran Nigam Ltd, Ajmer Vidyut Vitran Nigam Ltd | Rajasthan | 30-Oct-2019 |
706 | Bara Bangahal Hydel Power Project - Stage I # | 92.0 MW (Mega Watt) | 644 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
707 | Bara Bangahal Hydel Power Project - Stage II # | 108.0 MW (Mega Watt) | 756 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
708 | Baspa Hydel Power Project - Stage II | 300.0 MW (Mega Watt) | 1629.84 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
709 | Bhang Hydel Power Project # | 9.0 MW (Mega Watt) | 81.78 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
710 | Bharmour Hydel Power Project - Stage I Bharmour Hydel Power Project - Stage I # | 24.0 MW (Mega Watt) | 254.2 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
711 | Bharmour Hydel Power Project - Stage II # | 21.0 MW (Mega Watt) | 167.5 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
712 | Bina thermal power project | 500.0 MW (Mega Watt) | 3518.83 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Madhya Pradesh Electricity Regulatory Commission | Madhya Pradesh | 30-Oct-2019 |
713 | Brua Hydel Power Project | 9.0 MW (Mega Watt) | 70.18 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
714 | Chango-Yangthang Hydel Power Project # | 180.0 MW (Mega Watt) | 2077.29 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
715 | Chanju Hydel Power Project - Stage II # | 19.8 MW (Mega Watt) | 161 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
716 | Chatru Hydel Power Project # | 126.0 MW (Mega Watt) | 540.33 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
717 | Dhancho Hydel Power Project # | 18.0 MW (Mega Watt) | 135.51 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
718 | Electricity Distribution Ahmedabad, Surat, Gandhinagar and Dahej cities | Not Available | 4632.54 | Energy | Electricity Distribution | Operation and Maintenance Stage | Gujarat Urja Vikas Nigam Limited | Gujarat | 30-Oct-2019 |
719 | Electricity distribution Ajmer City (TPADL) | Not Available | 208.1 | Energy | Electricity Distribution | Operation and Maintenance Stage | Ajmer Vidyut Vitran Nigam Limited | Rajasthan | 30-Oct-2019 |
720 | Electricity distribution Bikaner City Circle (BkESL) | Not Available | 114.61 | Energy | Electricity Distribution | Operation and Maintenance Stage | Jodhpur Vidyut Vitran Nigam Limited | Rajasthan | 30-Oct-2019 |
721 | Electricity Distribution Delhi (TPDDL) | Not Available | 5836.02 | Energy | Electricity Distribution | Operation and Maintenance Stage | Tata Power Delhi Distribution Limited (TPDDL) | Delhi (UT) | 30-Oct-2019 |
722 | Electricity Distribution Delhi city (BYPL) | Not Available | 3080.5 | Energy | Electricity Distribution | Operation and Maintenance Stage | BSES YAMUNA POWER LIMITED (BYPL) | Delhi (UT) | 30-Oct-2019 |
723 | Electricity Distribution in various parts of Odisha (Khurda, Balugaon, Puri and Nayagarh) | Not Available | 80.47 | Energy | Electricity Distribution | Operation and Maintenance Stage | Orissa Electricity Regulatory Commission | Odisha | 30-Oct-2019 |
724 | Electricity Distribution Jamshedpur city | Not Available | 181.43 | Energy | Electricity Distribution | Operation and Maintenance Stage | Jamshedpur Utility Services Company Limited(JUSCO) | Jharkhand | 30-Oct-2019 |
725 | Electricity Distribution New Delhi city (BRPL) | Not Available | 6021 | Energy | Electricity Distribution | Operation and Maintenance Stage | BSES RajdhaniPowerLimited (BRPL) | Delhi (UT) | 30-Oct-2019 |
726 | Electricity Distribution Noida city (NPCL) | Not Available | 1457.1 | Energy | Electricity Distribution | Operation and Maintenance Stage | NOIDA POWER COMPANY LIMITED (NPCL) | Uttar Pradesh | 30-Oct-2019 |
727 | ESSAR Power-Hazira, Power Plant Project | 515.0 MW (Mega Watt) | 1600 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Energy & Petrochemicals Department, Gujarat | Gujarat | 30-Oct-2019 |
728 | Gas based power plants and Thermal based power plants in Vadodara and Surat | 815.0 MW (Mega Watt) | 2037 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Gujarat Industries Power Company Limited | Gujarat | 30-Oct-2019 |
729 | Gujarat Paguthan Energy Corporation Power Plant Project | 655.0 MW (Mega Watt) | 2247 | Energy | Electricity generation (grid) | Completed | Gujarat Urja Vikas Nigam Limited | Gujarat | 30-Oct-2019 |
730 | Gurha Lignite Power Project * | 70.0 MW (Mega Watt) | 0 | Energy | Electricity generation (grid) | Under Construction | Rajasthan Rajya Vidyut Prasaran Nigam Limited | Rajasthan | 30-Oct-2019 |
731 | Haldia Coal based power project | 600.0 MW (Mega Watt) | 3307 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | India Power Corpn (Haldia) Limited | West Bengal | 30-Oct-2019 |
732 | Hydel Power (Sachkhas) Project | 267.0 MW (Mega Watt) | 2845.75 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
733 | Hydel Power (Bharari) Project | 6.0 MW (Mega Watt) | 41.62 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
734 | Hydel Power (Chirchind-II) Project | 12.9 MW (Mega Watt) | 67.46 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
735 | Hydel Power (Choned) Project | 15.0 MW (Mega Watt) | 114.72 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
736 | Hydel Power (Harsar Stage-I) Project | 28.5 MW (Mega Watt) | 199.5 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
737 | Hydel Power (Harsar Stage-II) Project | 22.5 MW (Mega Watt) | 212.31 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
738 | Hydel Power (Harsar Stage-III) Project | 19.0 MW (Mega Watt) | 178.57 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
739 | Hydel Power (Holi-II) Project | 7.0 MW (Mega Watt) | 64.9 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
740 | Hydel Power (Shirikhand) Project | 8.0 MW (Mega Watt) | 45.9 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
741 | Hydel Power (Uhl) Project | 14.0 MW (Mega Watt) | 140 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
742 | Hydel Power (Umli) Project | 10.0 MW (Mega Watt) | 99.62 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
743 | Jegurupadu Combined Cycle Power Project | 445.0 MW (Mega Watt) | 1025 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Andhra Pradesh State Electricity Board | Andhra Pradesh | 30-Oct-2019 |
744 | Jobrie Hydel Power Project | 12.0 MW (Mega Watt) | 84 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
745 | Krishnapatnam Ultra Mega Power Project # * | 4000.0 MW (Mega Watt) | 1015 | Energy | Electricity generation (grid) | Under Construction | Power Finance Corporation Ltd | Andhra Pradesh | 30-Oct-2019 |
746 | KSK Mahanadi Power Co Limited | 3600.0 MW (Mega Watt) | 14969 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Not Available | Chhattisgarh | 30-Oct-2019 |
747 | Kudgi TPS Transmission Line Project * | 482.0 KM (Kilometer) | 1350 | Energy | Electricity transmission | Under Construction | Kudgi Transmission Limited | Karnataka | 30-Oct-2019 |
748 | Malana Hydel Power Project - Stage I | 86.0 MW (Mega Watt) | 341.91 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
749 | Masrang Selti Hydel Power Project | 24.0 MW (Mega Watt) | 215.74 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
750 | Mundra Ultra Mega Power Project | 4000.0 MW (Mega Watt) | 17900 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Not Available | Gujarat | 30-Oct-2019 |
751 | Nagarjuna Power Project | 1015.0 MW (Mega Watt) | 5496 | Energy | Electricity Distribution | Operation and Maintenance Stage | Karnataka Power Transmission Corporation Limited (KPTCL) | Karnataka | 30-Oct-2019 |
752 | Nardana coal based thermal power plant # | 300.0 MW (Mega Watt) | 2485 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Not Available | Maharashtra | 30-Oct-2019 |
753 | Natural Gas based 220 MW, Kakinada Power project | 220.0 MW (Mega Watt) | 600 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Not Available | Andhra Pradesh | 30-Oct-2019 |
754 | Nawapara coal based power project, Raigarh | 600.0 MW (Mega Watt) | 2844 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Chhattisgarh State Electricity Board | Chhattisgarh | 30-Oct-2019 |
755 | Nigrie Super Thermal Power Project | 1320.0 MW (Mega Watt) | 12350 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Not Available | Madhya Pradesh | 30-Oct-2019 |
756 | Reoli Dugli Hydel Power Project # * | 429.0 MW (Mega Watt) | 2132.19 | Energy | Renewable energy (grid) | Pre-construction Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
757 | Sasan Ultra Mega Power Project | 3960.0 MW (Mega Watt) | 25186 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Central Electricity Regulatory Commission | Madhya Pradesh | 30-Oct-2019 |
758 | Setting up of 45 MW Saskangrong hydel power unit in West Kameng # * | 45.0 MW (Mega Watt) | 25186 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
759 | Setting up of 10 MW Pein hydel power unit in Lower Subansiri# * | 10.0 MW (Mega Watt) | 71 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
760 | Setting up of 10 MW Pitgong-II hydel power unit in Arunachal Pradesh # * | 10.0 MW (Mega Watt) | 77 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
761 | Setting up of 100 MW Malana II hydel power unit in Kullu district | 100.0 MW (Mega Watt) | 981.91 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
762 | Setting up of 100 MW Sissiri hydel power unit in Lower Dibang Valley # * | 100.0 MW (Mega Watt) | 699 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
763 | Setting up of 100 MW Sorang hydel power unit in Kinnaur district | 100.0 MW (Mega Watt) | 586 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
764 | Setting up of 1000 MW Karchham Wangtoo hydel power unit in Kinnaur district # | 1000.0 MW (Mega Watt) | 6900 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
765 | Setting up of 1000 MW Naba hydel power unit in Arunachal Pradesh # * | 1000.0 MW (Mega Watt) | 6500 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
766 | Setting up of 1000 MW Naying hydel power unit in West Siang # * | 1000.0 MW (Mega Watt) | 9301.1 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
767 | Setting up of 1000 MW Siyom hydel power unit in West Siang district # * | 1000.0 MW (Mega Watt) | 12100 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
768 | Setting up of 1080 MW Upper Demwe hydel power unit in Lohit # * | 1080.0 MW (Mega Watt) | 5000 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
769 | Setting up of 111 MW Lower Yamne-I hydel power unit in Upper Siang # * | 111.0 MW (Mega Watt) | 540 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
770 | Setting up of 111 MW Yamne Stage-I hydel power unit in Upper Siang* | 111.0 MW (Mega Watt) | 775 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
771 | Setting up of 12 MW Pichang hydel power unit in East Kameng # * | 12.0 MW (Mega Watt) | 84 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
772 | Setting up of 12 MW Raura hydel power unit in Kinnaur district * | 12.0 MW (Mega Watt) | 65.95 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
773 | Setting up of 12 MW Tenga hydel power unit in West Kameng # * | 12.0 MW (Mega Watt) | 84 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
774 | Setting up of 12 MW Upper Joiner hydel power unit in Chamba district # | 12.0 MW (Mega Watt) | 72.25 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
775 | Setting up of 120 MW Bhareli-II hydel power unit in West Kameng # * | 120.0 MW (Mega Watt) | 4200 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
776 | Setting up of 120 MW Dibbin hydel power unit in West Kameng district # * | 120.0 MW (Mega Watt) | 900 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
777 | Setting up of 1200 MW Hutong- II hydel power unit in Anjaw district* | 1200.0 MW (Mega Watt) | 15167 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
778 | Setting up of 1200 MW Kalai-II hydel power unit in Anjaw district# * | 1200.0 MW (Mega Watt) | 6955 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
779 | Setting up of 13 MW Nyikong hydel power unit in Upper Siang # * | 13.0 MW (Mega Watt) | 94.9 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
780 | Setting up of 13 MW Pith hydel power unit at Yazali# * | 13.0 MW (Mega Watt) | 91 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
781 | Setting up of 13 MW Rala hydel power unit in Kinnaur district | 13.0 MW (Mega Watt) | 58.04 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
782 | Setting up of 13.5 MW Upper Nanti hydel power unit in Shimla | 13.5 MW (Mega Watt) | 80.66 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
783 | Setting up of 1304 MW Kalai-I hydel power unit in Anjaw district # * | 1304.0 MW (Mega Watt) | 13444 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
784 | Setting up of 14 MW Kaying hydel power unit in West Siang# * | 14.0 MW (Mega Watt) | 115.5 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
785 | Setting up of 14 MW nanti hydel power unit in Shimla district # | 14.0 MW (Mega Watt) | 66.94 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
786 | Setting up of 14 MW Sumez hydel power unit in Shimla district # | 14.0 MW (Mega Watt) | 92.08 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
787 | Setting up of 141 MW Raigam hydel power unit in Lohit# * | 141.0 MW (Mega Watt) | 1609.38 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
788 | Setting up of 144 MW Gongri hydel power unit in West Kameng # * | 144.0 MW (Mega Watt) | 1436.27 | Energy | Renewable energy (grid) | Under Construction | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
789 | Setting up of 145 MW Pauk hydel power unit in West Siang # * | 145.0 MW (Mega Watt) | 1015 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
790 | Setting up of 15 MW Neogal hydel power unit in Kangra district # | 15.0 MW (Mega Watt) | 61.74 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
791 | Setting up of 15 MW Pakke Bung-II hydel power unit in East Kameng # * | 15.0 MW (Mega Watt) | 105 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
792 | Setting up of 15 MW Pakke Bung-IV hydel power unit in East Kameng # * | 15.0 MW (Mega Watt) | 105 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
793 | Setting up of 15 MW Palin hydel power unit in Kra Daadi # * | 15.0 MW (Mega Watt) | 106.5 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
794 | Setting up of 16 MW Jongini hydel power unit in Shimla district # | 16.0 MW (Mega Watt) | 79.06 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
795 | Setting up of 16 MW Patikari hydel power unit in Mandi district | 16.0 MW (Mega Watt) | 115.63 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
796 | Setting up of 1750 MW Lower Demwe hydel power unit in Lohit # * | 1750.0 MW (Mega Watt) | 10000 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
797 | Setting up of 18 MW Ankaling hydel power unit in West kameng # * | 18.0 MW (Mega Watt) | 126 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
798 | Setting up of 18 MW Lower Ngorgum hydel power unit in Arunachal Pradesh # * | 18.0 MW (Mega Watt) | 127.8 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
799 | Setting up of 18 MW Pacha hydel power unit in East Kameng # * | 18.0 MW (Mega Watt) | 126 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
800 | Setting up of 180 MW Bajoli Holi hydel power unit in Chamba district * | 180.0 MW (Mega Watt) | 1681.82 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
801 | Setting up of 1800 MW Kamala hydel power unit in Lower Subansiri district # * | 1800.0 MW (Mega Watt) | 20140.77 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
802 | Setting up of 1800 MW Oju hydel power unit in Upper Subansiri # * | 1800.0 MW (Mega Watt) | 10800 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
803 | Setting up of 186 MW Tato-I hydel power unit in West Siang # * | 186.0 MW (Mega Watt) | 1302 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
804 | Setting up of 192 MW Allain Duhangan hydel power unit in Kullu district # | 192.0 MW (Mega Watt) | 2021 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
805 | Setting up of 21 MW Panyor Lepa Middle hydel power unit on Ranganadi river in Arunachal Pradesh* | 21.0 MW (Mega Watt) | 153.3 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
806 | Setting up of 21 MW Papumpam hydel power unit in Papum Pare # * | 21.0 MW (Mega Watt) | 157.5 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
807 | Setting up of 21 MW Sepla hydel power unit in East Kameng # * | 21.0 MW (Mega Watt) | 147 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
808 | Setting up of 22 MW Ithipani-II hydel power unit in Lower Dibang Valley # * | 22.0 MW (Mega Watt) | 154 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
809 | Setting up of 225 MW Talong hydel power unit in East Kameng # * | 225.0 MW (Mega Watt) | 2172 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
810 | Setting up of 23 MW Keyi hydel power unit in Lower Subansiri # * | 23.0 MW (Mega Watt) | 161 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
811 | Setting up of 24 MW Baragaon hydel power unit in Kullu district | 24.0 MW (Mega Watt) | 174.81 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
812 | Setting up of 24 MW Dikshi hydel power unit in West kameng # * | 24.0 MW (Mega Watt) | 168 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
813 | Setting up of 24 MW Kamlang hydel power unit in Lohit # * | 24.0 MW (Mega Watt) | 182.4 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
814 | Setting up of 24 MW Kut hydel power unit in Shimla district | 24.0 MW (Mega Watt) | 189.5 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
815 | Setting up of 24 MW Pakke Bung-III hydel power unit in East Kameng # * | 24.0 MW (Mega Watt) | 168 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
816 | Setting up of 24 MW Palsi-I hydel power unit in Upper Siang # * | 24.0 MW (Mega Watt) | 168 | Energy | Renewable energy (grid) | Under Construction | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
817 | Setting up of 24 MW Panyi hydel power unit # * | 24.0 MW (Mega Watt) | 168 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
818 | Setting up of 24 MW Paudital hydel power unit in Shimla district | 24.0 MW (Mega Watt) | 210 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
819 | Setting up of 24 MW Phudung hydel power unit in West Kameng # * | 24.0 MW (Mega Watt) | 172.8 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
820 | Setting up of 24 MW Roura-II hydel power unit in Kinnaur district | 24.0 MW (Mega Watt) | 159.2 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
821 | Setting up of 24 MW Sichi hydel power unit # * | 24.0 MW (Mega Watt) | 175.2 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
822 | Setting up of 24.6 MW Wanger-Homte hydel power unit in Kinnaur district | 24.6 MW (Mega Watt) | 274.5 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
823 | Setting up of 240 MW Heo hydel power unit in West Siang # * | 240.0 MW (Mega Watt) | 1680 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
824 | Setting up of 25 MW Adum Panyor hydel power unit on Ranganadi River in Arunachal Pradesh # * | 25.0 MW (Mega Watt) | 175 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
825 | Setting up of 25 MW Lambadug hydel power unit in Kangra district | 25.0 MW (Mega Watt) | 149.81 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
826 | Setting up of 252 MW Dinchang hydel power unit near Bomdila in West Kameng district # * | 252.0 MW (Mega Watt) | 1980 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
827 | Setting up of 27.5 MW Tagurshit-II hydel power unit in West Siang # * | 27.5 MW (Mega Watt) | 192.5 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
828 | Setting up of 270 MW hydel power unit in Anjaw * | 270.0 MW (Mega Watt) | 1890 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
829 | Setting up of 2700 MW Lower Siang hydel power unit in East Siang # * | 2700.0 MW (Mega Watt) | 20000 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
830 | Setting up of 275 MW Emra-I hydel power unit in Arunachal Pradesh # * | 275.0 MW (Mega Watt) | 1925 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
831 | Setting up of 30 MW Ashupani hydel power unit in Arunachal Pradesh # * | 30.0 MW (Mega Watt) | 210 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
832 | Setting up of 3097 MW Etalin hydel power unit in Dibang Valley district # * | 3097.0 MW (Mega Watt) | 25.296.95 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
833 | Setting up of 360 MW Nalo hydel power unit in Upper Subansiri # * | 360.0 MW (Mega Watt) | 2520 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
834 | Setting up of 38 MW Meyong hydel power unit in Kameng basin # * | 38.0 MW (Mega Watt) | 266 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
835 | Setting up of 390 MW Emra-II hydel power unit in Arunachal Pradesh * | 390.0 MW (Mega Watt) | 2730 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
836 | Setting up of 40 MW Pakke Bung-I hydel power unit in Arunachal Pradesh # * | 40.0 MW (Mega Watt) | 280 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
837 | Setting up of 40 MW Rapum hydel power unit in West Siang # * | 40.0 MW (Mega Watt) | 280 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
838 | Setting up of 420 MW Amulin hydel power unit in Anini district # * | 420.0 MW (Mega Watt) | 2940 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
839 | Setting up of 45 MW Lower Pachuk-II hydel power unit in Kameng # * | 45.0 MW (Mega Watt) | 315 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
840 | Setting up of 45 MW Tirap hydel power unit in Changlang # * | 45.0 MW (Mega Watt) | 315 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
841 | Setting up of 46 MW Digin hydel power unit in West Kameng # * | 46.0 MW (Mega Watt) | 322 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
842 | Setting up of 46 MW Sepia hydel power unit in Arunachal Pradesh # * | 46.0 MW (Mega Watt) | 322 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
843 | Setting up of 48 MW Ithun-II hydel power unit in Lower Dibang Valley # * | 48.0 MW (Mega Watt) | 336 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
844 | Setting up of 48 MW Lower Marjingla hydel power unit in East Kameng # * | 48.0 MW (Mega Watt) | 336 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
845 | Setting up of 48 MW Papu Valley hydel power unit in East Kameng # * | 48.0 MW (Mega Watt) | 345.6 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
846 | Setting up of 5.4 MW Sarbari-II small hydel power unit in Kullu district | 5.4 MW (Mega Watt) | 46 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
847 | Setting up of 50 MW Tsa Chu-ILower hydel power unit in Tawang # * | 50.0 MW (Mega Watt) | 350 | Energy | Electricity transmission | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
848 | Setting up of 500 MW Emini hydel power unit in Dibang Valley district # * | 500.0 MW (Mega Watt) | 3500 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
849 | Setting up of 55 MW Para hydel power unit in Kameng # * | 55.0 MW (Mega Watt) | 385 | Energy | Electricity transmission | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
850 | Setting up of 552 MW Dengser hydel power unit in Upper Subansiri # * | 552.0 MW (Mega Watt) | 3864 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
851 | Setting up of 56 MW Taiyong hydel power unit in West Siang # * | 56.0 MW (Mega Watt) | 392 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
852 | Setting up of 6 MW Baner hydel power unit in Kangra district | 6.0 MW (Mega Watt) | 54.59 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
853 | Setting up of 60 MW Marjingla hydel power unit in East Kameng # * | 60.0 MW (Mega Watt) | 432 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
854 | Setting up of 60 MW Pachuk-II hydel power unit in Kameng # * | 60.0 MW (Mega Watt) | 420 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
855 | Setting up of 600 MW Kameng-II hydel power unit in West Kameng district # * | 600.0 MW (Mega Watt) | 4200 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
856 | Setting up of 63 MW Dardu hydel power unit in Papum Pare# * | 60.0 MW (Mega Watt) | 463 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
857 | Setting up of 66 MW Simang-II hydel power unit in East Siang # * | 66.0 MW (Mega Watt) | 475.2 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
858 | Setting up of 67 MW Simang-I hydel power unit in East Siang # * | 67.0 MW (Mega Watt) | 469 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
859 | Setting up of 68 MW Tidding-II hydel power unit in Arunachal Pradesh # * | 68.0 MW (Mega Watt) | 496.4 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
860 | Setting up of 680 MW Attunli hydel power unit in Dibang Valley district # * | 680.0 MW (Mega Watt) | 7158.84 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
861 | Setting up of 70 MW Badao hydel power unit in Kameng # * | 70.0 MW (Mega Watt) | 490 | Energy | Electricity transmission | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
862 | Setting up of 70 MW Budhil hydel power unit in Chamba district # | 70.0 MW (Mega Watt) | 418.8 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
863 | Setting up of 700 MW Tato-II hydel power unit in West Siang district# * | 700.0 MW (Mega Watt) | 6000 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
864 | Setting up of 74 MW Tagurshit hydel power unit at Tado Gitu in West Siang # * | 74.0 MW (Mega Watt) | 518 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
865 | Setting up of 75 MW Chela hydel power unit in Arunachal Pradesh # * | 75.0 MW (Mega Watt) | 525 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
866 | Setting up of 780 MW Nyamjang Chhu hydel power unit in Tawang # * | 780.0 MW (Mega Watt) | 6852.28 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
867 | Setting up of 8 MW hydel power unit at Kurmi in Shimla district # | 8.0 MW (Mega Watt) | 68.49 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
868 | Setting up of 8 MW Rima hydel power unit in Changlang # * | 8.0 MW (Mega Watt) | 57.6 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
869 | Setting up of 8.0 MW Upper Joiner (Stage II) hydel power unit in Chamba | 8.0 MW (Mega Watt) | 50.44 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
870 | Setting up of 80 MW Chomi hydel power unit in Arunachal Pradesh # * | 80.0 MW (Mega Watt) | 584 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
871 | Setting up of 80 MW Gimliang hydel power unit in Lohit # * | 80.0 MW (Mega Watt) | 870.39 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
872 | Setting up of 80 MW Kangtangshiri hydel power unit in West Siang # * | 80.0 MW (Mega Watt) | 245 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
873 | Setting up of 80 MW Panyor hydel power unit at Yazali in Lower Subansiri # * | 80.0 MW (Mega Watt) | 820 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
874 | Setting up of 800 MW Niare hydel power unit in upper reaches of Subansiri river, Arunachal Pradesh # * | 800.0 MW (Mega Watt) | 5600 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
875 | Setting up of 84 MW Ithun-I hydel power unit in Lower Dibang Valley # * | 84.0 MW (Mega Watt) | 588 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
876 | Setting up of 84 MW Pachuk I hydel power project in Kameng # * | 84.0 MW (Mega Watt) | 588 | Energy | Electricity transmission | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
877 | Setting up of 9 MW Beas Kund hydel power unit in Kullu district # | 9.0 MW (Mega Watt) | 75.84 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
878 | Setting up of 9 MW Upper Ngorgum hydel power unit in Arunachal Pradesh # * | 9.0 MW (Mega Watt) | 63.9 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
879 | Setting up of 9.6 MW Jeori hydel power unit in Shimla district | 9.6 MW (Mega Watt) | 74.16 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
880 | Setting up of 9.9 MW Rajpur hydel power unit in Shimla district | 9.9 MW (Mega Watt) | 42.03 | Energy | Renewable energy (grid) | Under Construction | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 30-Oct-2019 |
881 | Setting up of 90 MW Papu hydel power unit in Kameng # * | 90.0 MW (Mega Watt) | 620 | Energy | Electricity transmission | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
882 | Setting up of 92 MW Jidu hydel power unit in Upper Siang # * | 92.0 MW (Mega Watt) | 644 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
883 | Setting up of 93 MW Rho hydel power unit in Tawang # * | 93.0 MW (Mega Watt) | 1160.75 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
884 | Setting up of 96 MW Mago Chu hydel power unit in Tawang # * | 96.0 MW (Mega Watt) | 1048 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
885 | Setting up of 96 MW Nyukcharong Chu hydel power unit in Tawang # * | 96.0 MW (Mega Watt) | 995.9 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
886 | Setting up of 96 MW Pango hydel power unit in Upper Siang # * | 96.0 MW (Mega Watt) | 672 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
887 | Setting up of 96 MW Pema Selphu hydel power unit in West Siang # * | 96.0 MW (Mega Watt) | 672 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
888 | Setting up of 96 MW Sippi hydel power unit in Upper Siang # * | 96.0 MW (Mega Watt) | 672 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
889 | Setting up of 98 MW Tidding-I hydel power unit in Arunachal Pradesh # * | 98.0 MW (Mega Watt) | 686 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
890 | Setting up of Nafra 96 MW hydel power unit in West Kameng # * | 96.0 MW (Mega Watt) | 672 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 30-Oct-2019 |
891 | Teesta III-Kishanganj Transmission Line # * | 211.0 CKM (Circuit Kilo Meter) | 1032 | Energy | Electricity transmission | Under Construction | Power Grid Corpn. of India Ltd. | Multi State/ Centre | 30-Oct-2019 |
892 | Wardha Power Company (WPCL) - Coal based power plant | 540.0 MW (Mega Watt) | 2811 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Maharashtra Electricity Regulatory Commission | Maharashtra | 30-Oct-2019 |
893 | Waste Based Power (Ranchi) Project * | 11.0 MW (Mega Watt) | 77 | Energy | Electricity generation (grid) | Pre-construction Stage | Ranchi Municipal Corporation | Jharkhand | 30-Oct-2019 |
894 | "DCFOMT" of a Regional Municipal Solid Waste to Energy & Land fill facility at Patna in Bihar * | 11.5 MW (Mega Watt) | 15 | Energy | Renewable energy (grid) | Under Construction | Bihar Urban Infrastructure Development Corporation Limited | Bihar | 25-Oct-2019 |
895 | Balighat Small Hydro Power Project * | 5.5 MW (Mega Watt) | 41.32 | Energy | Renewable energy (grid) | Under Construction | Department of Energy, Uttarakhand | Uttarakhand | 25-Oct-2019 |
896 | Burthing Small Hydro Power Project * | 5.0 MW (Mega Watt) | 34.99 | Energy | Renewable energy (grid) | Under Construction | Department of Energy, Uttarakhand | Uttarakhand | 25-Oct-2019 |
897 | Desang Small Hydro Power (Dillighat) Project # * | 9.0 MW (Mega Watt) | 73.8 | Energy | Renewable energy (grid) | Pre-construction Stage | Assam Power Project Development Company Limited | Assam | 25-Oct-2019 |
898 | Development of 20 MW Power Station at Port Blair * | 20.0 MW (Mega Watt) | 0 | Energy | Renewable energy (grid) | Not Available | Andaman and Nicobar Administration | Andaman & Nicobar Islands (UT) | 25-Oct-2019 |
899 | Establishment of 20 MW DG power plant at Bambooflat, South Andaman District # | 20.0 MW (Mega Watt) | 74.96 | Energy | Electricity generation (grid) | Completed | Andaman and Nicobar Administration | Andaman & Nicobar Islands (UT) | 25-Oct-2019 |
900 | Establishment of 5 MWp SPV power plant at Garacharama, South Andaman | 5.0 MW (Mega Watt) | 60 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Andaman and Nicobar Administration | Andaman & Nicobar Islands (UT) | 25-Oct-2019 |
901 | Hinduja National Power Corp Ltd (HNPCL) - Thermal Power plant at Visakhapatnam | 1040.0 MW (Mega Watt) | 7987 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Andhra Pradesh Electricity Regulatory Commission | Andhra Pradesh | 25-Oct-2019 |
902 | Implementation of 11.5 MW municipal solid waste based power unit at Giddenahalli in Bengaluru district * | 11.5 MW (Mega Watt) | 233.06 | Energy | Renewable energy (grid) | Under Construction | Bruhat Bengaluru Mahanagara Palike | Karnataka | 25-Oct-2019 |
903 | Khutani Small Hydro Power Project * | 21.0 MW (Mega Watt) | 189.53 | Energy | Renewable energy (grid) | Under Construction | Department of Energy, Uttarakhand | Uttarakhand | 25-Oct-2019 |
904 | Phulibagar Small Hydro Power Project * | 5.0 MW (Mega Watt) | 29.02 | Energy | Renewable energy (grid) | Under Construction | Department of Energy, Uttarakhand | Uttarakhand | 25-Oct-2019 |
905 | Setting up of 18 MW Dengzi hydel power unit at Kalaktang # * | 18.0 MW (Mega Watt) | 133.2 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
906 | Setting up of 2000 MW Upper Subansiri hydel power unit at Menga village * | 2000.0 MW (Mega Watt) | 16100 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
907 | Setting up of 31 MW Rebby hydel power unit in Kameng # * | 31.0 MW (Mega Watt) | 217 | Energy | Electricity transmission | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
908 | Setting up of 36 MW Tarang Warang hydel power unit in Kameng # * | 36.0 MW (Mega Watt) | 252 | Energy | Electricity transmission | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
909 | Setting up of 400 MW Mihumdon hydel power unit in Arunachal Pradesh * | 400.0 MW (Mega Watt) | 2800 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
910 | Setting up of 41 MW Lachung hydel power unit in Kameng # * | 41.0 MW (Mega Watt) | 287 | Energy | Electricity transmission | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
911 | Setting up of 45 MW Phanchung hydel power unit in Kameng # * | 45.0 MW (Mega Watt) | 415 | Energy | Electricity transmission | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
912 | Setting up of 52 MW Par hydel power unit in Papum Pare # * | 65.0 MW (Mega Watt) | 461 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
913 | Setting up of 60 MW New Melling hydel power unit in Tawang # * | 60.0 MW (Mega Watt) | 1086 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
914 | Setting up of 63 MW Turu hydel power unit in Papum Pare# * | 90.0 MW (Mega Watt) | 630 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
915 | Setting up of 66 MW Khuitam hydel power unit in West Kameng # * | 66.0 MW (Mega Watt) | 462 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
916 | Setting up of 75 MW Lower Yamne-II hydel power unit in Upper Siang # * | 75.0 MW (Mega Watt) | 609 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
917 | Setting up of 80 MW Rapum hydel power unit in West Siang # * | 80.0 MW (Mega Watt) | 560 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
918 | Setting up of 90 MW Jameri hydel power unit in Kameng # * | 90.0 MW (Mega Watt) | 355 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
919 | Setting up of 90 MW Tsa Chu-II hydel power unit in Tawang * | 90.0 MW (Mega Watt) | 630 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
920 | Setting up of 96 MW Barpu hydel power unit in Arunachal Pradesh# * | 96.0 MW (Mega Watt) | 490 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
921 | Setting up of 96 MW Lower Yamne-II hydel power unit in Upper Siang # * | 96.0 MW (Mega Watt) | 681.6 | Energy | Renewable energy (grid) | Pre-construction Stage | Department of Hydro Power Development, Arunachal Pradesh | Arunachal Pradesh | 25-Oct-2019 |
922 | Electricity Distribution Agra City | Not Available | 400 | Energy | Electricity Distribution | Operation and Maintenance Stage | Torrent Power Limited | Uttar Pradesh | 24-Oct-2019 |
923 | Hydro Electric Power (Hetavane) Project | 0.35 MW (Mega Watt) | 5.16 | Energy | Renewable energy (grid) | Pre-construction Stage | Water Resources Department, Maharashtra | Maharashtra | 22-Oct-2019 |
924 | Bangalore International Airport (Expanded Terminal) | 17.2 MPPA (Million Passenger Per Annum) | 1547 | Transport | Airports | Operation and Maintenance Stage | Airports Authority of India (AAI) | Karnataka | 03-Oct-2019 |
925 | Bangalore International Airport Project | 11.5 MPPA (Million Passenger Per Annum) | 2353 | Transport | Airports | Operation and Maintenance Stage | Airports Authority of India (AAI) | Karnataka | 03-Oct-2019 |
926 | Cochin International Airport | Not Available | 303 | Transport | Airports | Operation and Maintenance Stage | Kochi International Airport Society (KIAS) | Kerala | 03-Oct-2019 |
927 | Development of Common user Coal Terminal | 10.0 MMTPA (million metric tonnes per annum) | 351.08 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Kamarajar Port Limited | Tamil Nadu | 03-Oct-2019 |
928 | International Airport (Mopa) Project | 13.1 MPPA (Million Passenger Per Annum) | 3100 | Transport | Airports | Under Construction | Government of Goa | Goa | 03-Oct-2019 |
929 | 2nd Container Terminal (NSICT) JNPT | 15.0 MTPA (Metric Tonne Per Annum) | 750 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Jawaharlal Nehru Port Trust | Maharashtra | 01-Oct-2019 |
930 | 3rd Container Terminal (GTIPL) JNPT | 22.5 MTPA (Metric Tonne Per Annum) | 1078 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Jawaharlal Nehru Port Trust | Maharashtra | 01-Oct-2019 |
931 | Aircraft Maintenance Hangar (Kochi) | Not Available | 42 | Transport | Airports | Operation and Maintenance Stage | Cochin International Airport Limited | Kerala | 01-Oct-2019 |
932 | Airport Metro Express Line - New Delhi Railway Station to IGI Airport to Sector 21, Dwarka, New Delhi | 23.0 KM (Kilometer) | 5700 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Delhi Metro Rail Corporation Limited, | Delhi (UT) | 01-Oct-2019 |
933 | Bus cum Truck Terminal at Alisha PS & District Burdwan | Not Available | 65 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Burdwan Development Authority | West Bengal | 01-Oct-2019 |
934 | Bus cum Truck Terminal at Nababhat | Not Available | 35 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Burdwan Development Authority | West Bengal | 01-Oct-2019 |
935 | Bus Rapid Transport System (Ahmedabad) Phase IA | 12.0 KM (Kilometer) | 87.6 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Gujarat Infrastructure Development Board | Gujarat | 01-Oct-2019 |
936 | Bus Terminal (Alambagh) Project | 50.0 Numbers | 201 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Uttar Pradesh State Road Transport Corporation | Uttar Pradesh | 01-Oct-2019 |
937 | Chhara Port Project - Phase I | 5.5 MMTPA (million metric tonnes per annum) | 1200 | Transport | Ports (excluding captive) | Under Construction | Gujarat Maritime Board (GMB) | Gujarat | 01-Oct-2019 |
938 | Construction and Operation of Two Multipurpose Bulk Cargo Berths (5A & 6A) at the Port of Mormugao | 5.0 MMTPA (million metric tonnes per annum) | 250 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Mormugao Port Trust | Goa | 01-Oct-2019 |
939 | Construction of bus terminal on 2.8 acres of land in Rajkot | 2.80 Acres | 128.01 | Transport | Urban public transport (except rolling stock) | Pre-construction Stage | Gujarat State Road Transport Corporation | Gujarat | 01-Oct-2019 |
940 | Construction of bus terminal on 3.1 acres of land in Bhuj | 3.10 Acres | 28.85 | Transport | Urban public transport (except rolling stock) | Pre-construction Stage | Gujarat State Road Transport Corporation | Gujarat | 01-Oct-2019 |
941 | Construction of bus terminal on 4.2 acres of land in Amreli | 4.20 Acres | 40.43 | Transport | Urban public transport (except rolling stock) | Pre-construction Stage | Gujarat State Road Transport Corporation | Gujarat | 01-Oct-2019 |
942 | Construction of bus terminal on 5 acres of land at Nadiad | 5.0 Acres | 50.71 | Transport | Urban public transport (except rolling stock) | Pre-construction Stage | Gujarat State Road Transport Corporation | Gujarat | 01-Oct-2019 |
943 | Construction of bus terminal on 5.3 acres of land in Bharuch | 5.30 Acres | 74.49 | Transport | Urban public transport (except rolling stock) | Pre-construction Stage | Gujarat State Road Transport Corporation | Gujarat | 01-Oct-2019 |
944 | Construction of bus terminal on 7.3 acres of land at Palanpur | 7.30 Acres | 75.8 | Transport | Urban public transport (except rolling stock) | Pre-construction Stage | Gujarat State Road Transport Corporation | Gujarat | 01-Oct-2019 |
945 | Construction of bus terminal on 7.3 acres of land in Navsari | 7.30 Acres | 64.64 | Transport | Urban public transport (except rolling stock) | Pre-construction Stage | Gujarat State Road Transport Corporation | Gujarat | 01-Oct-2019 |
946 | Construction of bus terminal on 7.4 acres of land at Modasa | 7.40 Acres | 60.47 | Transport | Urban public transport (except rolling stock) | Pre-construction Stage | Gujarat State Road Transport Corporation | Gujarat | 01-Oct-2019 |
947 | Construction of bus terminal on 7.7 acres of land in Patan | 7.70 Acres | 52.5 | Transport | Urban public transport (except rolling stock) | Pre-construction Stage | Gujarat State Road Transport Corporation | Gujarat | 01-Oct-2019 |
948 | Construction of central bus terminal on 14.9 acres at Geeta Mandir in Ahmedabad | 14.90 Acres | 186.67 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Gujarat State Road Transport Corporation | Gujarat | 01-Oct-2019 |
949 | Construction of central bus terminal on 21.6 acres at Modhera cross road in Mehsana | 21.60 Acres | 57.16 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Gujarat State Road Transport Corporation | Gujarat | 01-Oct-2019 |
950 | Construction of central bus terminal on 5.4 acres at Subhash bridge in Ahmedabad | 5.40 Acres | 77.91 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Gujarat State Road Transport Corporation | Gujarat | 01-Oct-2019 |
951 | Construction of Deep draught iron ore berth on BOT basis by Paradip Port Trust | 10.0 MMTPA (million metric tonnes per annum) | 740 | Transport | Ports (excluding captive) | Under Construction | Ministry of Shipping | Odisha | 01-Oct-2019 |
952 | DCDFO&M of eight Lane access controlled expressway under Phase II A Programme, in Telangana | 11.7 KM (Kilometer) | 502 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Hyderabad Metropolitan Development Authority | Telangana | 01-Oct-2019 |
953 | Development of a Coal Terminal at Port of Mormugao, Goa on Design, Build, Finance, Operate and Transfer (DBFOT) Basis | 4.61 MMTPA (million metric tonnes per annum) | 404.97 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Mormugao Port Trust | Goa | 01-Oct-2019 |
954 | Development of a Container Terminal at Tuna Tekra in Kandla Port Kutch region in the State of Gujarat on DBFOT basis | 14.11 MTPA (Metric Tonne Per Annum) | 5991.71 | Transport | Ports (excluding captive) | Pre-construction Stage | Ministry of Shipping | Gujarat | 01-Oct-2019 |
955 | Development of a multipurpose Berth and a Mechanised Berth at Haldia Dock -II (South), Haldia Dock Complex, Kolkata Port Trust | Not Available | 886.1 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Ministry of Shipping | West Bengal | 01-Oct-2019 |
956 | Development of a new terminal termed as the extension of the existing container terminal, Outer Harbour at Visakhapatnam Port | Not Available | 635.11 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Ministry of Shipping | Andhra Pradesh | 01-Oct-2019 |
957 | Development of an integrated bus station-cum-commercial complex at KSRTC Bus Station, Puttur in Dakshina Kannada district | 2.4 Acres | 33 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Karnataka State Road Transport Corporation (KSRTC) | Karnataka | 01-Oct-2019 |
958 | Development of Container Terminal at Ennore Port, Tiruvallur District in the State of Tamil Nadu | 16.8 MTPA (Metric Tonne Per Annum) | 1436 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Kamarajar Port Limited | Tamil Nadu | 01-Oct-2019 |
959 | Development of Dry Bulk Terminal at Tekra near Tuna on BOT basis | 14.0 MMTPA (million metric tonnes per annum) | 1410 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Ministry of Shipping | Gujarat | 01-Oct-2019 |
960 | Development of Eighth Berth as Container Terminal on Build Operate & Transfer (BOT) basis at Tuticorin Port | 7.20 MMTPA (million metric tonnes per annum) | 312.23 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | V.O. Chidambaranar Port Trust | Tamil Nadu | 01-Oct-2019 |
961 | Development of EQ-10 berth in the northern arm of inner harbour of Visakhapatnam port | 1.8 MTPA (Metric Tonne Per Annum) | 55.38 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Visakhapatnam Port Trust | Andhra Pradesh | 01-Oct-2019 |
962 | Development of Fourth Container Terminal at Jawahar Lal Nehru Port Trust | 60.0 MMTPA (million metric tonnes per annum) | 7915 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Ministry of Shipping | Maharashtra | 01-Oct-2019 |
963 | Development of Modern Bus Terminal at Amritsar | 90000.0 Passengers | 12.75 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Director State Transport / Government of Punjab | Punjab | 01-Oct-2019 |
964 | Development of Modern Bus Terminal at Jalandhar | 100000.0 Passengers | 12 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Director State Transport / Government of Punjab | Punjab | 01-Oct-2019 |
965 | Development of multilevel car parking on 0.6 acres of land at Nungambakkam | Not Available | 43 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Greater Chennai Corporation | Tamil Nadu | 01-Oct-2019 |
966 | Development of Multipurpose Berth to handle clean cargo including containers on BOT basis at Paradip Port | 5.0 MMTPA (million metric tonnes per annum) | 431 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Paradip Port Trust | Odisha | 01-Oct-2019 |
967 | Development of North Cargo Berth II for handling bulk cargo at Tuticorin Port on DBFOT basis | 7.0 MMTPA (million metric tonnes per annum) | 335 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | V.O. Chidambaranar Port Trust | Tamil Nadu | 01-Oct-2019 |
968 | Development of North Cargo Berth-IV to handle bulk cargo, Thermal Coal and Copper Concentrate at V.O Chidambaranar Port on DBFOT | Not Available | 355 | Transport | Ports (excluding captive) | Under Construction | Ministry of Shipping | Tamil Nadu | 01-Oct-2019 |
969 | Development of Standalone container handling facility with a quay length of 300m towards North at Jahawar Lal Nehru Port Trust | 10.0 MTPA (Metric Tonne Per Annum) | 600 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Jawaharlal Nehru Port Trust | Maharashtra | 01-Oct-2019 |
970 | Development of WQ-6 berth in the northern arm of inner harbour of Vishakhapatnam Port for handling dry bulk cargo on DBFOT basis | 2.08 MMTPA (million metric tonnes per annum) | 139.9 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Visakhapatnam Port Trust | Andhra Pradesh | 01-Oct-2019 |
971 | Dholera Port | Not Available | 551 | Transport | Ports (excluding captive) | Under Construction | Gujarat Maritime Board (GMB) | Gujarat | 01-Oct-2019 |
972 | Establishment of Container Terminal and O & M of handling equipment at multipurpose berth, Visakhapatnam Port | Not Available | 108 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Visakhapatnam Port Trust | Andhra Pradesh | 01-Oct-2019 |
973 | Hazira LNG Terminal | 5.0 MMTPA (million metric tonnes per annum) | 1150 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Gujarat Maritime Board (GMB) | Gujarat | 01-Oct-2019 |
974 | Krishnapatnam Port Project - Phase I | 13.5 MTPA (Metric Tonne Per Annum) | 1200 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Department of Ports, Andhra Pradesh | Andhra Pradesh | 01-Oct-2019 |
975 | Mechanization of EQ 1,2,3 Berths at Paradip Port on BOT basis under PPP Mode | Not Available | 1437.76 | Transport | Ports (excluding captive) | Under Construction | Ministry of Shipping | Odisha | 01-Oct-2019 |
976 | Multi Cargo Terminal (Tamil Nadu) Project | 2.0 MMTPA (million metric tonnes per annum) | 151 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Kamarajar Port Limited | Tamil Nadu | 01-Oct-2019 |
977 | Multi Level Parking (Ashok Marg) Project | 400.0 PCU (Passenger Car Unit) | 30 | Transport | Urban public transport (except rolling stock) | Under Construction | Jaipur Municipal Corporation | Rajasthan | 01-Oct-2019 |
978 | Multi purpose berth 4A at HDC Kolkata Port Trust | 3.1 MTPA (Metric Tonne Per Annum) | 150 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Kolkata Port Trust | West Bengal | 01-Oct-2019 |
979 | Multilevel Parking at Sector 17 | Not Available | 60 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Chandigarh Municipal Corporation | Haryana | 01-Oct-2019 |
980 | Multipurpose Berth No. 12 at HDC KoPT | 1.12 MTPA (Metric Tonne Per Annum) | 37 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Kolkata Port Trust | West Bengal | 01-Oct-2019 |
981 | Multipurpose Cargo Port (Dighi) Project | 7.5 MTPA (Metric Tonne Per Annum) | 13556.11 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Maharashtra Maritime Board (MMB) | Maharashtra | 01-Oct-2019 |
982 | Multipurpose Cargo Port (Jaigad) Project | 18.0 MTPA (Metric Tonne Per Annum) | 3000 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Maharashtra Maritime Board (MMB) | Maharashtra | 01-Oct-2019 |
983 | Multipurpose Cargo Port (Vijaydurg) Project | 75.0 MTPA (Metric Tonne Per Annum) | 2275 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Maharashtra Maritime Board (MMB) | Maharashtra | 01-Oct-2019 |
984 | O & M of Rajiv Gandhi Container Terminal & Development, Operation of International Container Terminal | 4.0 MTEU | 2118 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Cochin Port Trust | Kerala | 01-Oct-2019 |
985 | Pipavav Greenfield port - phase - I | 12.6 MMTPA (million metric tonnes per annum) | 731 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Gujarat Maritime Board (GMB) | Gujarat | 01-Oct-2019 |
986 | Second Container Terminal (Chennai) Project | 29.5 MTPA (Metric Tonne Per Annum) | 783.32 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Chennai Port Trust | Tamil Nadu | 01-Oct-2019 |
987 | Surendranagar-Pipapav Rail Project | 271.0 KM (Kilometer) | 373 | Transport | Railway track, tunnel, viaducts, bridges | Operation and Maintenance Stage | Ministry of Railways | Gujarat | 01-Oct-2019 |
988 | Upgradation of existing facilities of OB-1, OB-2 at Outer Harbour and WQ-1 Berth at Inner Harbour of Visakhapatnam Port | 15.0 MTPA (Metric Tonne Per Annum) | 845.41 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Ministry of Shipping | Andhra Pradesh | 01-Oct-2019 |
989 | Upgradation of Mechanical handling Infrastructure at V.O. Chidambaranar Port Trust (Berths I to VI & IX) | 8.72 MMTPA (million metric tonnes per annum) | 50.99 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | V.O. Chidambaranar Port Trust | Tamil Nadu | 01-Oct-2019 |
990 | Upgradation Operation and Maintenance of Ludhiana Bus Terminal | 70000.0 Passengers | 13.47 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Director State Transport / Government of Punjab | Punjab | 01-Oct-2019 |
991 | Four Laning of Panikoili-Rimuli Section of NH 215 under NHDP Phase III, length 163 km | 106.0 KM (Kilometer) | 1648.92 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Odisha | 19-Sep-2019 |
992 | Jamb Wind Power Project, Satara district | 28.0 MW (Mega Watt) | 165.9 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Not Available | Maharashtra | 19-Sep-2019 |
993 | 4 laning of Chenani-Nashri section of NH 1A including 9 km long tunnel with parallel escape tunnel on BOT (Annuity) basis | 41.0 KM (Kilometer) | 2108 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Jammu & Kashmir | 17-Sep-2019 |
994 | 4 laning of Qazigund-Banihal Section of NH 1A from 189.35-204.7km including 2 tunnels of 0.69 & 8.45 km length in J&K | 15.2 KM (Kilometer) | 2414 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Jammu & Kashmir | 17-Sep-2019 |
995 | 6/4 Laning of Delhi-Haryana Border to Rohtak Section of NH-10 from 29.7-87 km with construction of Bahadurgarh and Rohtak Bypass | 63.4 KM (Kilometer) | 486 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Haryana | 17-Sep-2019 |
996 | Development and Operation of Bikaner to Suratgarh section on NH 11 from km 553.869 to km 173.000 on NH 15 | 172.4 KM (Kilometer) | 501.08 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 17-Sep-2019 |
997 | Development of Four lane of Sidhi to Singrauli section (km 83/4 to km 195/8) of NH 75E on DBFOT (Toll) basis | 102.6 KM (Kilometer) | 954.43 | Transport | Roads and bridges | Under Construction | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Sep-2019 |
998 | Four laning of Baharampur-Farakka section of NH 34 from km 193 to km 295.700 inWest Bengal on DBFOT basis under NHDP III | 101.0 KM (Kilometer) | 1006.53 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | West Bengal | 17-Sep-2019 |
999 | Four laning of Cuddapah-Kurnool section (Km 167.750 to km 356.030) of NH 18 Under NHDP Phase III on BOT Basis | 188.7 KM (Kilometer) | 1567.31 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Andhra Pradesh | 17-Sep-2019 |
1000 | Four laning of Nagpur-Saoner-Betul, Section of NH-69 Maharashtra and Madhya Pradesh on DBFOT (Annuity) basis | 276.3 KM (Kilometer) | 3515 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 17-Sep-2019 |
1001 | Four laning of YSR-Kurnool section in length of 188.3 km on NH-18 under NHDP-III | 188.3 KM (Kilometer) | 1585 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Andhra Pradesh | 17-Sep-2019 |
1002 | Four/Six laning of Moradabad-Bareilly section of NH 24 from km 1+C28348 to km 262 inUttar Pradesh on DBFOT basis under NHDP III | 114.0 KM (Kilometer) | 1984 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 17-Sep-2019 |
1003 | Rehabilitation strengthening and 4 laning of Jammu-Udhampur sec of NH 1A from 15-67km on BOT basis on DBFO pattern | 52.0 KM (Kilometer) | 1939 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Jammu & Kashmir | 17-Sep-2019 |
1004 | Six laning of Pune-Satara section of NH 4 from km 725 to km 865.35 in Maharashtra on BOT (Toll) basis on DBFO pattern | 140.3 KM (Kilometer) | 1948.77 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 17-Sep-2019 |
1005 | Construction of Four-lane Bhopal By-pass in Madhya Pradesh | 52.0 KM (Kilometer) | 305 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 16-Sep-2019 |
1006 | Four laning of Bangalore Maddur State Highway SH-17 in length of 62.5 km | 62.5 KM (Kilometer) | 188 | Transport | Roads and bridges | Operation and Maintenance Stage | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 16-Sep-2019 |
1007 | Four Laning of Nelamangala Junction on NH-4 with NH-48 to Devihalli under NHDP phase III A on BOT basis | 80.0 KM (Kilometer) | 742.07 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Karnataka | 16-Sep-2019 |
1008 | Four laning of Pune-Sholapur section of NH 9 under NHDP Phase III, length 110.05 km� Package II | 110.0 KM (Kilometer) | 1110 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Maharashtra | 16-Sep-2019 |
1009 | Road Upgradation (Salem-Karur) (NS-2/TN-3) Project | 33.4 KM (Kilometer) | 205.6 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 16-Sep-2019 |
1010 | The Project of LNG Port & Terminal Facility in the Puthuvypeen sea at Cochin Port | 5.0 MMTPA (million metric tonnes per annum) | 4182 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Cochin Port Trust | Kerala | 16-Sep-2019 |
1011 | 100 MLD Sea Water Desalination Plant-Reverse Osmosis | 237.0 MLD (Millons Liter per day) | 550 | Water Sanitation | Water treatment plants | Operation and Maintenance Stage | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | Tamil Nadu | 13-Sep-2019 |
1012 | Brackish Water Desalination Plant | 20.0 MLD (Millons Liter per day) | 300 | Water Sanitation | Water treatment plants | Operation and Maintenance Stage | Rajasthan State Mines and Minerals Limited | Rajasthan | 13-Sep-2019 |
1013 | Bulk Water Supply Project for IIT Bhubaneshwar, NISAR, INFO City and adjoining areas, Bhubaneshwar | 70.0 MLD (Millons Liter per day) | 187.71 | Water Sanitation | Water supply pipeline | Under Construction | Public Health Engineering Organisation, Odisha | Odisha | 13-Sep-2019 |
1014 | Cold Storage Project (Sikar) | 2000.0 MT (Metric Tonne ) | 17.3 | Social and Commercial Infrastructure | Cold Chain | Operation and Maintenance Stage | Rajasthan State Agriculture Marketing Board | Rajasthan | 13-Sep-2019 |
1015 | Construction of multi chamber cold storage having capacity 4000 MT at Bhawani mandi | 4000.0 MT (Metric Tonne ) | 7.37 | Social and Commercial Infrastructure | Cold Chain | Operation and Maintenance Stage | Rajasthan State Agriculture Marketing Board | Rajasthan | 13-Sep-2019 |
1016 | Door to Dump waste disposal Central zone, Ahmedabad | Not Available | 30 | Water Sanitation | Solid waste management | Operation and Maintenance Stage | Ahmedabad Municipal Corporation | Gujarat | 13-Sep-2019 |
1017 | Door to Dump waste disposal North zone, Ahmedabad | Not Available | 34 | Water Sanitation | Solid waste management | Operation and Maintenance Stage | Ahmedabad Municipal Corporation | Gujarat | 13-Sep-2019 |
1018 | High-Tech Amusement Park (Surat) Project | 15.0 Acres | 228.77 | Social and Commercial Infrastructure | Tourism | Operation and Maintenance Stage | Surat Municipal Corporation | Gujarat | 13-Sep-2019 |
1019 | Implementation of 8.0 MLD water supply and sewerage scheme at Salt Lake | 8.0 MLD (Millons Liter per day) | 72 | Water Sanitation | Sewage collection, treatment and disposal system | Operation and Maintenance Stage | Kolkata Metropolitan Development Authority | West Bengal | 13-Sep-2019 |
1020 | Setting up of 50,000 MT modern food silo complex at Bhopal | 50000.0 MT (Metric Tonne ) | 30.63 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Operation and Maintenance Stage | Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) | Madhya Pradesh | 13-Sep-2019 |
1021 | Setting up of 50,000 MT modern food silo complex at Dewas District Village Durgapura | 50000.0 MT (Metric Tonne ) | 29.43 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Operation and Maintenance Stage | Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) | Madhya Pradesh | 13-Sep-2019 |
1022 | Setting up of 50,000 MT modern food silo complex at Harda District Village Bhadawad | 50000.0 MT (Metric Tonne ) | 28.97 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Operation and Maintenance Stage | Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) | Madhya Pradesh | 13-Sep-2019 |
1023 | Setting up of 50,000 MT modern food silo complex at Hoshangabad District Village Junheta Bankhedi | 50000.0 MT (Metric Tonne ) | 28.82 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Operation and Maintenance Stage | Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) | Madhya Pradesh | 13-Sep-2019 |
1024 | Setting up of 50,000 MT modern food silo complex at Indore | 50000.0 MT (Metric Tonne ) | 30.64 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Operation and Maintenance Stage | Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) | Madhya Pradesh | 13-Sep-2019 |
1025 | Setting up of 50,000 MT modern food silo complex at Satna District Village Mohari | 50000.0 MT (Metric Tonne ) | 28.95 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Operation and Maintenance Stage | Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) | Madhya Pradesh | 13-Sep-2019 |
1026 | Setting up of 50,000 MT modern food silo complex at Sehore District Village Murli | 50000.0 MT (Metric Tonne ) | 30.55 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Operation and Maintenance Stage | Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) | Madhya Pradesh | 13-Sep-2019 |
1027 | Setting up of 50,000 MT modern food silo complex at Ujjain District Village Manpur | 50000.0 MT (Metric Tonne ) | 29.6 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Operation and Maintenance Stage | Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) | Madhya Pradesh | 13-Sep-2019 |
1028 | Setting up of 50,000 MT modern food silo complex at Vidisha District Village Patheri Haveli | 50000.0 MT (Metric Tonne ) | 30.96 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Operation and Maintenance Stage | Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) | Madhya Pradesh | 13-Sep-2019 |
1029 | Shivpuri Water Supply Project | 60.0 MLD (Millons Liter per day) | 80.71 | Water Sanitation | Water supply pipeline | Operation and Maintenance Stage | Nagar Palika Parishad Shivpuri | Madhya Pradesh | 13-Sep-2019 |
1030 | Visakhapatnam Industrial Water Supply Project | 388.0 MLD (Millons Liter per day) | 453 | Water Sanitation | Water treatment plants | Operation and Maintenance Stage | Andhra Pradesh Industrial Infrastructure Corporation Limited (APIIC) | Andhra Pradesh | 13-Sep-2019 |
1031 | Water Supply Improvement (Mehrauli) Project | Not Available | 201 | Water Sanitation | Water supply pipeline | Operation and Maintenance Stage | Delhi Jal Board | Delhi (UT) | 13-Sep-2019 |
1032 | Water Supply Scheme ( Naba Diganta Industrial Township) | Not Available | 68.01 | Water Sanitation | Water supply pipeline | Operation and Maintenance Stage | Kolkata Metropolitan Development Authority | West Bengal | 13-Sep-2019 |
1033 | Water Supply Scheme (Khandwa) - Augmentation | Not Available | 115.32 | Water Sanitation | Water supply pipeline | Operation and Maintenance Stage | Khandwa Municipal Corporation | Madhya Pradesh | 13-Sep-2019 |
1034 | Kantaphod - Nachabhor | 39.22 KM (Kilometer) | 196.47 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 30-Aug-2019 |
1035 | Dedicated Container Terminal at Pipavav Port | 1000.0 MMTPA (million metric tonnes per annum) | 2000 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Gujarat Maritime Board (GMB) | Gujarat | 21-Aug-2019 |
1036 | Laying of ropeway at Jakhu in Shimla district | 600.0 Passengers | 40 | Social and Commercial Infrastructure | Tourism | Operation and Maintenance Stage | Department of Tourism and Civil Aviation, Himachal Pradesh | Himachal Pradesh | 21-Aug-2019 |
1037 | Madivala Commercial Plaza. | 6.88 Acres | 30 | Social and Commercial Infrastructure | Tourism | Operation and Maintenance Stage | Bruhat Bangalore Mahanagar Palike | Karnataka | 21-Aug-2019 |
1038 | Solid Waste Management (Rajkot) | Not Available | 8.67 | Water Sanitation | Solid waste management | Operation and Maintenance Stage | Rajkot Municipal Corporation | Gujarat | 21-Aug-2019 |
1039 | 4-laning of Muzaffarnagar-Saharanpur Road (SH-59) from Km.0.000 to Km.52.950 on DBFOT toll basis | 52.9 KM (Kilometer) | 752.88 | Transport | Roads and bridges | Operation and Maintenance Stage | Uttar Pradesh State Highways Authority | Uttar Pradesh | 20-Aug-2019 |
1040 | Development of modern food silo for storage of wheat on DBFOT at Whitefield, Bangalore (Karnataka) - Proposed by FPD | 25000.0 MT (Metric Tonne ) | 28.52 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Under Construction | Food Corporation of India | Karnataka | 20-Aug-2019 |
1041 | Four laning with paved shoulder in Bareilly-Almora section of SH 37 in the State of Uttar Pradesh on DBFOT basis | 54.0 KM (Kilometer) | 604.55 | Transport | Roads and bridges | Operation and Maintenance Stage | Uttar Pradesh State Highways Authority | Uttar Pradesh | 20-Aug-2019 |
1042 | Four-laning of Varanasi-Shaktinagar road of SH-5A in UP under DBFOT basis | 115.0 KM (Kilometer) | 1757.39 | Transport | Roads and bridges | Operation and Maintenance Stage | Uttar Pradesh State Highways Authority | Uttar Pradesh | 20-Aug-2019 |
1043 | Multilevel Parking (Shimla) Project | 700.0 ECS | 46.11 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Shimla Municipal Corporation | Himachal Pradesh | 20-Aug-2019 |
1044 | Roadways between Madhyakailash-Sholinganallur | 22.0 KM (Kilometer) | 412 | Transport | Roads and bridges | Operation and Maintenance Stage | Tamil Nadu Road Development Company Limited | Tamil Nadu | 20-Aug-2019 |
1045 | Solid Waste Management (Sewapura) Project | 250.0 TPD (Tonne per day) | 26.34 | Water Sanitation | Solid waste management | Operation and Maintenance Stage | Jaipur Municipal Corporation | Rajasthan | 20-Aug-2019 |
1046 | "Mohol � Kurul � Mandrup Kamti Project " | 33.4 KM (Kilometer) | 18 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Maharashtra | Maharashtra | 19-Aug-2019 |
1047 | Amusement Park (Kankaria Balvatika) | Not Available | 32 | Social and Commercial Infrastructure | Tourism | Operation and Maintenance Stage | Ahmedabad Municipal Corporation | Gujarat | 19-Aug-2019 |
1048 | Bikaner Bypass Project | 28.0 KM (Kilometer) | 12.02 | Transport | Roads and bridges | Completed | Public Works Department, Rajasthan | Rajasthan | 19-Aug-2019 |
1049 | Construction of 2 lane Bridge across Vasista Branch of river Godavari connecting Narsapur of West Godavri District with Sakhinet | Not Available | 66.57 | Transport | Roads and bridges | Operation and Maintenance Stage | Andhra Pradesh Road Development Corporation | Andhra Pradesh | 19-Aug-2019 |
1050 | Construction of central bus terminal on 5.1 acres in Vadodara | 5.1 Acres | 144 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Gujarat State Road Transport Corporation | Gujarat | 19-Aug-2019 |
1051 | Construction of cold storage 6000 MT at KUMS Jodhpur | 6000.0 MT (Metric Tonne ) | 5.11 | Social and Commercial Infrastructure | Cold Chain | Operation and Maintenance Stage | Rajasthan State Agriculture Marketing Board | Rajasthan | 19-Aug-2019 |
1052 | Construction of green field bridge across river Ganga connecting Bakhtiyarpur | 50.95 KM (Kilometer) | 1599.57 | Transport | Roads and bridges | Operation and Maintenance Stage | Bihar State Road Development Corporation Limited | Bihar | 19-Aug-2019 |
1053 | Construction,O&M of Durg bypass on NH6 in Madhya Pradesh on BOT basis | 18.0 KM (Kilometer) | 123 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Chhattisgarh | 19-Aug-2019 |
1054 | Design, engineering, construction, development, finance,O&M Palanpur-Swaroopganj section,NH-14 Gujarat & Rajasthan | 76.0 KM (Kilometer) | 498 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 19-Aug-2019 |
1055 | Design, Engineering, Upgradation, Development, Finance, Operation and Maintenance of Hyderabad-Bangalore section of NH 7 | 22.1 KM (Kilometer) | 747.3 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 19-Aug-2019 |
1056 | Design,Engineering,Finance,Construction,O&M,highway project of Bangalore-Nelamangala section of NH:4 from Karnataka on (BOT) | 19.5 KM (Kilometer) | 718.59 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Karnataka | 19-Aug-2019 |
1057 | Development of East Quay-I (EQ-1) berth for handling steam coal in the inner harbour of Visakhapatnam port | 6.4 MTPA (Metric Tonne Per Annum) | 323.7 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Visakhapatnam Port Trust | Andhra Pradesh | 19-Aug-2019 |
1058 | Four Laning from Junction of NH-68 with NH-7 near Salem to Junction of NH-68 with NH-45 near Ulundrupet in Tamil Nadu on BOT | 136.3 KM (Kilometer) | 1061 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 19-Aug-2019 |
1059 | Four laning of Haryana/Punjab Border to Jind Section of NH-71 from Km 239.000 to Km 307.000 in Haryana on BOT (Toll) basis | 69.35 KM (Kilometer) | 438.75 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Haryana | 19-Aug-2019 |
1060 | Four laning of Pune-Solapur NH-9 road in length of 110 km under NHDP-IIIB (Pkg-I) | 110.0 KM (Kilometer) | 1110 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 19-Aug-2019 |
1061 | Four laning of Rewa to MP/UP Border of NH 7 in the State of Madhya Pradesh | 89.3 KM (Kilometer) | 736.7 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Aug-2019 |
1062 | Four/Six laning of Amritsar-Pathankot Section from KM 6.082 to KM 108.502 of NH 15 Under NHDP Phase III on BOT Basis | 102.4 KM (Kilometer) | 705 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Punjab | 19-Aug-2019 |
1063 | Four/six laning of Reengus-Sikar road in length of 43.9 km on NH-11 under NHDP-III A | 43.9 KM (Kilometer) | 228 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 19-Aug-2019 |
1064 | Improvement of Dharwad- Ramnagar Stretch | 61.75 KM (Kilometer) | 237.6 | Transport | Roads and bridges | Operation and Maintenance Stage | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 19-Aug-2019 |
1065 | Improvement,O&M including strengthening and widening of existing 2 lane NH 24 (Lucknow - Sitapur section) U.P(BOT) basis | 75.0 KM (Kilometer) | 450.41 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 19-Aug-2019 |
1066 | Kharpada Bridge Project | 1.4 KM (Kilometer) | 32 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Maharashtra | 19-Aug-2019 |
1067 | Logistics Hub (Pawarkheda) Project | 115.0 Acres | 138.5 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Operation and Maintenance Stage | Madhya Pradesh State Agriculture Marketing Board | Madhya Pradesh | 19-Aug-2019 |
1068 | Maheshwaram Transmission Limited | 236.0 KM (Kilometer) | 345 | Energy | Electricity transmission | Operation and Maintenance Stage | Not Available | Telangana | 19-Aug-2019 |
1069 | Maintenance of Thane Ghodabunder Road | 14.9 KM (Kilometer) | 246.28 | Transport | Roads and bridges | Operation and Maintenance Stage | Maharashtra State Road Development Corporation Limited (MSRDC) | Maharashtra | 19-Aug-2019 |
1070 | MIHAN Coal Based Power Project | 271.6 MW (Mega Watt) | 1748 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Maharashtra Airport Development Company Limited | Maharashtra | 19-Aug-2019 |
1071 | Mumbai International Airport Project - Modernisation | 40.0 MPPA (Million Passenger Per Annum) | 12630 | Transport | Airports | Operation and Maintenance Stage | Airports Authority of India (AAI) | Maharashtra | 19-Aug-2019 |
1072 | Operation & maintenance of Badnawar-Thandla road in length of 78.8 Km in Jhabua & Dhar districts | 78.8 KM (Kilometer) | 44.12 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Aug-2019 |
1073 | Operation & Maintenance of Baran-Shivpuri-Jhansi section in length of 196.1 Km of NH-27 | 196.1 KM (Kilometer) | 19 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 19-Aug-2019 |
1074 | Operation & maintenance of Bela-Govindgarh-Churhat road in length of 56.6 Km in Rewa & Sidhi districts | 56.74 KM (Kilometer) | 60.85 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Aug-2019 |
1075 | Operation & Maintenance of Borkhedi-Wadner section in length of 57.15 Km of NH-7 | 57.15 KM (Kilometer) | 21.58 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 19-Aug-2019 |
1076 | Operation & maintenance of Budhni-Rehti-Nasrullaganj-Khategaon road in length of 87.6 Km in Sehore & Dewas districts | 87.4 KM (Kilometer) | 77.45 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Aug-2019 |
1077 | Operation & maintenance of Chennai Bypass in length of 32.60 km. | 32.6 KM (Kilometer) | 480 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 19-Aug-2019 |
1078 | Operation & maintenance of Edapally-Vytilla-Aroor section of NH-66 | 17.0 KM (Kilometer) | 184 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Kerala | 19-Aug-2019 |
1079 | Operation & maintenance of multi chamber cold storages at Udaipur, Bhilwara & Pali districts. | 5000.0 MTPA (Metric Tonne Per Annum) | 5.64 | Social and Commercial Infrastructure | Cold Chain | Operation and Maintenance Stage | Rajasthan State Agriculture Marketing Board | Rajasthan | 19-Aug-2019 |
1080 | Operation & maintenance of various roads in length of 95 km in Bhopal, Vidihsa & Sehore districts | 95.0 KM (Kilometer) | 29.2 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Aug-2019 |
1081 | Operation and maintaenance of organic agriculture produces market complex at Sixmile, Khanapara, Guwahati on PPP mode | 1.4 Acres | 7.7 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Operation and Maintenance Stage | Assam State Agricultural Marketing Board | Assam | 19-Aug-2019 |
1082 | Patan-Tendukheda-Rehli | 86.6 KM (Kilometer) | 219.62 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Aug-2019 |
1083 | Road Upgradation (Bilaspur-Katghora-Korba-Champa) Project | 151.0 KM (Kilometer) | 26.53 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Chhattisgarh | Chhattisgarh | 19-Aug-2019 |
1084 | Road Upgradation (Chinchoti-Kaman-Anjurphata-Mankoli Road) Project | 26.4 KM (Kilometer) | 120.51 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Maharashtra | Maharashtra | 19-Aug-2019 |
1085 | Road Upgradation (Kadapa-Pulivendula) KP-03 Project | 18.0 KM (Kilometer) | 81.32 | Transport | Roads and bridges | Operation and Maintenance Stage | Andhra Pradesh Road Development Corporation | Andhra Pradesh | 19-Aug-2019 |
1086 | Road Upgradation (Makhupura-Gujarat State Border) Project | 12.0 KM (Kilometer) | 11.61 | Transport | Roads and bridges | Completed | Public Works Department, Rajasthan | Rajasthan | 19-Aug-2019 |
1087 | Road Upgradation (Rayalapuram-Gandluru) Project | 1.0 KM (Kilometer) | 17.7 | Transport | Roads and bridges | Operation and Maintenance Stage | Andhra Pradesh Road Development Corporation | Andhra Pradesh | 19-Aug-2019 |
1088 | Road Upgradation (Ro-Ro Point-NH-8 E) Project | 14.7 KM (Kilometer) | 29.36 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Gujarat | Gujarat | 19-Aug-2019 |
1089 | Road Upgradation (Salumber-Banswara) Project | 93.0 KM (Kilometer) | 68.14 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 19-Aug-2019 |
1090 | Road Upgradation Project (Deharda-Ishagarh ) Project | 32.93 KM (Kilometer) | 50.57 | Transport | Roads and bridges | Under Construction | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Aug-2019 |
1091 | Road Upgradation Project (Mhow-Ghatabillod) Project | 27.0 KM (Kilometer) | 177.3 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Aug-2019 |
1092 | Road Upgradation Project (Sehore-Ichhawar-Kosmi) Project | 50.12 KM (Kilometer) | 89 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Aug-2019 |
1093 | Road Upgradation Project (Sijhata-Hinoti-Malgaon-Khamariya-Ater) Project | 32.2 KM (Kilometer) | 43.56 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Aug-2019 |
1094 | Road Upgradation Project (Sitamau-Basai-Suwasara) Project | 34.97 KM (Kilometer) | 54.26 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Aug-2019 |
1095 | Two laning of Ujjain Unhel Nagda Jawra Road | 95.2 KM (Kilometer) | 189.05 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Aug-2019 |
1096 | Two laning with granular shoulder from km 0.00 to km 38.00 of Lakhnadon-Ghansore section of SH 40 on DBFOT (Toll) basis | 38.0 KM (Kilometer) | 79 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Aug-2019 |
1097 | Upgradation of Bhuj-Nakhtrana road in length of 44.8 Km | 45.0 KM (Kilometer) | 35.04 | Transport | Roads and bridges | Operation and Maintenance Stage | Gujarat State Road Development Corporation Limited (GSRDC) | Gujarat | 19-Aug-2019 |
1098 | Upgradation of Uchera-Nagod-Singhpur-Kalinjer road in length of 55.6 km in Raisen district | 55.56 KM (Kilometer) | 115.2 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Aug-2019 |
1099 | Upgradation of Umari-Phoop-Pratappura road in length of 43.39 km in Madhya Pradesh | 43.67 KM (Kilometer) | 75.29 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Aug-2019 |
1100 | Viramgam Mehsana Gauge (Railway Track) Conversion Project | 90.0 KM (Kilometer) | 102.22 | Transport | Railway track, tunnel, viaducts, bridges | Operation and Maintenance Stage | Western Railway | Gujarat | 19-Aug-2019 |
1101 | Waste Based Power Unit (Kathonda) | 11.50 MW (Mega Watt) | 177.96 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Jabalpur Municipal Corporation | Madhya Pradesh | 19-Aug-2019 |
1102 | Widening of Existing 2 Lane carriageway to 4/6 lane divided carriageway of Bangalore-Hoskate-Mulbagal section of NH-4 on BOT | 79.7 KM (Kilometer) | 565 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Karnataka | 19-Aug-2019 |
1103 | Augmentation of 200 MLD sewage treatment plant at Bhandewadi in Nagpur district | 200.0 MLD (Millons Liter per day) | 170 | Water Sanitation | Sewage collection, treatment and disposal system | Operation and Maintenance Stage | Nagpur Municipal Corporation | Maharashtra | 16-Aug-2019 |
1104 | Sikka 2 Captive Port Terminals | Not Available | 3000 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Gujarat Maritime Board (GMB) | Gujarat | 16-Aug-2019 |
1105 | Widening and strengthening of Wadi Raichur Road | 88.0 KM (Kilometer) | 82 | Transport | Roads and bridges | Operation and Maintenance Stage | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 16-Aug-2019 |
1106 | "DEFC",O&M of end of Durg bypass - Chhattisgarh/Maharashtra border sec. NH6 under NHDP 3A on(BOT) basis | 82.6 KM (Kilometer) | 464 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Chhattisgarh | 14-Aug-2019 |
1107 | Dahej LNG Terminal | 5.0 MMTPA (million metric tonnes per annum) | 2287 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Gujarat Maritime Board (GMB) | Gujarat | 14-Aug-2019 |
1108 | Design, Engineering, Construction, Development, Finance, O and M near Padalur near Trichy NH-45 Tamil Nadu on (BOT) basis | 40.0 KM (Kilometer) | 320 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 14-Aug-2019 |
1109 | Four laning of Ahmedabad to Godhra section of NH 59 in the State of Gujarat under NHDP Phase III on DBFOT pattern | 117.6 KM (Kilometer) | 1174.36 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Gujarat | 14-Aug-2019 |
1110 | Operation & Maintenance of Kanpur-Lucknow, Lucknow bypass & Lucknow-Ayodhya section in length of 217.4 Km | 217.4 KM (Kilometer) | 965.56 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 14-Aug-2019 |
1111 | Operation & maintenance of Kolaghat-Haldia section of NH-41 | 53.0 KM (Kilometer) | 622 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | West Bengal | 14-Aug-2019 |
1112 | Rehabilitation and upgrading of Forbesganj - Jogbani road | 9.25 KM (Kilometer) | 322 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Bihar | 14-Aug-2019 |
1113 | Road Upgradation (Vadodara-Bharuch NH-8) Project | 83.3 KM (Kilometer) | 1450 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Gujarat | 14-Aug-2019 |
1114 | Two laning of Jhalawar-Ujjain section in length of 31.0 Km | 31.0 KM (Kilometer) | 75.88 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 14-Aug-2019 |
1115 | Two laning of Khushkhera-Kasola Chowk in length of 8.5 Km | 8.5 KM (Kilometer) | 34.5 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 14-Aug-2019 |
1116 | Yamuna Expressway Connecting Greater Noida to Agra | 165.0 KM (Kilometer) | 14000 | Transport | Roads and bridges | Operation and Maintenance Stage | Yamuna Expressway Industrial Development Authority (YEA) | Uttar Pradesh | 14-Aug-2019 |
1117 | Bhina-Khimalsa-Malthon Road Project | 39.4 KM (Kilometer) | 67.3 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 13-Aug-2019 |
1118 | Manawar-Singhan-Kukshi | 38.23 KM (Kilometer) | 96.73 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 13-Aug-2019 |
1119 | Road Upgradation Project (Biaora- Rajasthan) Project | 61.0 KM (Kilometer) | 221 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 13-Aug-2019 |
1120 | 140 MW Solar Photovoltaic Project in Rajasthan | 140.0 MW (Mega Watt) | 524.86 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Not Available | Rajasthan | 12-Aug-2019 |
1121 | 220 MW CCPP Tanir Bavi Barge | 220.0 MW (Mega Watt) | 1400 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Karnataka Power Transmission Corporation Limited (KPTCL) | Karnataka | 12-Aug-2019 |
1122 | 300 MW Thermal power plant in Chattisgarh | 300.0 MW (Mega Watt) | 3828 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Not Available | Chhattisgarh | 12-Aug-2019 |
1123 | Bhesada Renew Wind Energy Project | 100.8 MW (Mega Watt) | 696 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Not Available | Rajasthan | 12-Aug-2019 |
1124 | Dahej SEZ power project | 1200.0 MW (Mega Watt) | 5325.39 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Not Available | Gujarat | 12-Aug-2019 |
1125 | Development of Kaman Paygon Bhiwandi road | 22.0 KM (Kilometer) | 14.4 | Transport | Roads and bridges | Completed | Public Works Department, Maharashtra | Maharashtra | 12-Aug-2019 |
1126 | Devgarh wind power project, Rajsamand district | 37.5 MW (Mega Watt) | 314.5 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Not Available | Rajasthan | 12-Aug-2019 |
1127 | Four Laning of Pune-Khed section in 29.8 Km under NHDP-III | 29.8 KM (Kilometer) | 127.6 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 12-Aug-2019 |
1128 | Four Lanning of Panagarh - Palsit Road | 64.4 KM (Kilometer) | 517 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | West Bengal | 12-Aug-2019 |
1129 | Karaikal Port | 14.5 MMTPA (million metric tonnes per annum) | 2066 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Port Department, Puducherry | Puducherry (UT) | 12-Aug-2019 |
1130 | Khandke Wind Farm | 50.0 MW (Mega Watt) | 340.88 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Not Available | Maharashtra | 12-Aug-2019 |
1131 | Lalitpur Power Generation Company Ltd. | 1980.0 MW (Mega Watt) | 14306 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Not Available | Uttar Pradesh | 12-Aug-2019 |
1132 | Liquid Cargo Berth (JNPT) Project | 6.5 MMTPA (million metric tonnes per annum) | 200 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Jawaharlal Nehru Port Trust | Maharashtra | 12-Aug-2019 |
1133 | Mundra Thermal Power Project | 4620.0 MW (Mega Watt) | 22001 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Not Available | Gujarat | 12-Aug-2019 |
1134 | Operation & Maintenance of Hyderabad-Bangalore section in length of 251.2 Km | 251.2 KM (Kilometer) | 48.6 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Andhra Pradesh | 12-Aug-2019 |
1135 | Pench IV (Godhani)water treatment plant | 115.0 MLD (Millons Liter per day) | 25 | Water Sanitation | Water treatment plants | Operation and Maintenance Stage | Nagpur Municipal Corporation | Maharashtra | 12-Aug-2019 |
1136 | Prayagraj Power Generation Co. Ltd. - Coal based super-critical thermal power project | 1980.0 MW (Mega Watt) | 15537 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Prayagraj Power Generation Co. Ltd | Uttar Pradesh | 12-Aug-2019 |
1137 | Sagar-Damoh Road Project | 68.8 KM (Kilometer) | 130.3 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 12-Aug-2019 |
1138 | Thermal Power Project in Janjgir-Champa District | 1200.0 MW (Mega Watt) | 8464 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Athena Chhattisgarh Power Limited�(ACPL) | Chhattisgarh | 12-Aug-2019 |
1139 | Vemagiri Power Generation Limited | 388.0 MW (Mega Watt) | 1150 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | GMR Vemagiri Power Generation Limited | Andhra Pradesh | 12-Aug-2019 |
1140 | Vishnu Prayag HEP (400 MW) | 400.0 MW (Mega Watt) | 1694 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Not Available | Uttarakhand | 12-Aug-2019 |
1141 | "DCDF", O&M of Islam Nagar Nagpur-Hyderabad sec.NH7 Andhra Pradesh NHDP-2 on BOT (Annuity) basis | 53.0 KM (Kilometer) | 518 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Telangana | 09-Aug-2019 |
1142 | Construction of ring road in length of 18 km in Bellary | 18.0 KM (Kilometer) | 90 | Transport | Roads and bridges | Operation and Maintenance Stage | Bellary Urban Development Authority (BUDA) | Karnataka | 09-Aug-2019 |
1143 | Four Laning of following State Highways in Madhya Pradesh : Joura-Nnayagaon | 127.8 KM (Kilometer) | 730 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Aug-2019 |
1144 | Hydro Electric Power (Barvi) Project | 5.0 MW (Mega Watt) | 53 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Maharashtra Industrial Development Corporation | Maharashtra | 09-Aug-2019 |
1145 | Implementation of 600 TPD solid waste management in Faridabad | 600.0 TPD (Tonne per day) | 37.33 | Water Sanitation | Solid waste management | Operation and Maintenance Stage | Municipal Corporation of Faridabad | Haryana | 09-Aug-2019 |
1146 | IT Expressway (Three-lane carriageway) | 20.0 KM (Kilometer) | 290 | Transport | Roads and bridges | Operation and Maintenance Stage | Highway Department, Government of Tamil Nadu | Tamil Nadu | 09-Aug-2019 |
1147 | Nellore-Tada Road | 110.5 KM (Kilometer) | 511 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Andhra Pradesh | 09-Aug-2019 |
1148 | Operation & maintenance of Rajiv Gandhi Sea Link Project | 5.0 KM (Kilometer) | 11 | Transport | Roads and bridges | Operation and Maintenance Stage | Maharashtra State Road Development Corporation Limited (MSRDC) | Maharashtra | 09-Aug-2019 |
1149 | Providing fixing & maintenance of overhead signage & foot bridges on roads of JDA region | Not Available | 8.2 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Jaipur Development Authority | Rajasthan | 09-Aug-2019 |
1150 | Road Upgradation Project (Harda-Chhipaner) Project | 29.3 KM (Kilometer) | 38.6 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 09-Aug-2019 |
1151 | Development of road from NH-63 near Ginigere-Gangavathi to Sindhanur | 83.0 KM (Kilometer) | 190.16 | Transport | Roads and bridges | Operation and Maintenance Stage | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 08-Aug-2019 |
1152 | Two laning of Whaghari- Ribbanpally stretch | 141.2 KM (Kilometer) | 242.75 | Transport | Roads and bridges | Operation and Maintenance Stage | Karnataka Road Development Corporation Limited (KRDCL) | Karnataka | 08-Aug-2019 |
1153 | 4 laning of Ghaghar Bridge(Indo Nepal Border) to Varanasi section from Km 121.8 to Km 298.45 of NH 233 in UP on BOT (Toll) basis | 177.652 KM (Kilometer) | 2200 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Uttar Pradesh | 06-Aug-2019 |
1154 | Four laning of Muzzafarnagar-Nepali farm section of NH 58 in Uttar Pradesh and Uttrakhand from Nepali to ISBT Dehradun | 97.0 KM (Kilometer) | 1251.42 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Multi State/ Centre | 06-Aug-2019 |
1155 | Four-laning of Jabalpur- Kanti- Rewa Section of NH-7 from km 242.30 to km 465.50 in MP on BOT (Toll) | 65.0 KM (Kilometer) | 1906.83 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Madhya Pradesh | 06-Aug-2019 |
1156 | Ichchhapore - Hazira | Not Available | 16 | Transport | Roads and bridges | Operation and Maintenance Stage | Roads and Buildings Department, Gujarat | Gujarat | 06-Aug-2019 |
1157 | Four laning of Kundapur to Suratkal section and Mangalore-Kerala border section of NH 17 on BOT Basis | 90.28 KM (Kilometer) | 616 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Karnataka | 31-Jul-2019 |
1158 | Design, Engineering, Finance, Construction, Operation and Maintenance of 4 laning of Bijapur-Hungund section of NH13 on DBFOT | 97.0 KM (Kilometer) | 1226.37 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Karnataka | 25-Jul-2019 |
1159 | Two /Four laning with PSS of Gadu to Dwaraka section on NH 8E from km 263.000 to km 473.000 inGujarat on DBFOT pattern | Not Available | 1528.72 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Gujarat | 24-Jul-2019 |
1160 | Two laning with PSS a section, between Kerala Border to Kollegal section of NH-212 inKarnataka on BOT (Toll) basis under NHDP-IV | 150.041 KM (Kilometer) | 523.49 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Karnataka | 24-Jul-2019 |
1161 | Two-laning with PSS section, between Bijapur, Gulbarga, Homnabad section of NH 218 from Km 195 to Km 418 on BOT (Toll) | 220.47 KM (Kilometer) | 680.73 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Rajasthan | 24-Jul-2019 |
1162 | Two/ four laning of Obedullaganj -Shahganj Junction, Budhni- Betul Section of NH 69� under NHDP-IV, length� 121.36 km | Not Available | 1152 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Madhya Pradesh | 24-Jul-2019 |
1163 | Four-laning of Rewa - Sidhi section of NH -75E in the State of Madhya Pradesh | 80.6 KM (Kilometer) | 627.87 | Transport | Roads and bridges | Under Construction | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 23-Jul-2019 |
1164 | Rehabilitation, strengthening and 4 laning of Ramban to Banihal section of NH 1A in Jammu and Kashmir | 32.1 KM (Kilometer) | 986 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Jammu & Kashmir | 23-Jul-2019 |
1165 | Rehabilitation, strengthening and Four laning of Udhampur to Ramban section of NH 1A from km 67 to km 89 & km 130 to km 151 | 40.07 KM (Kilometer) | 971 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Jammu & Kashmir | 23-Jul-2019 |
1166 | 2 laning from 0 to km7.95( Katni Bypass) & 4.6 to 245km of Katni-Shahdol-Anooppur to MP/CG Border section on NH-78 | 234.0 KM (Kilometer) | 811.47 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Madhya Pradesh | 22-Jul-2019 |
1167 | Development and Operation of Suratgarh-Sriganganagar section of NH 15 in the State of Rajasthan | 78.11 KM (Kilometer) | 224.03 | Transport | Roads and bridges | Under Construction | Public Works Department, Rajasthan | Rajasthan | 22-Jul-2019 |
1168 | Four laning of Phagwara-Rupnagar of NH-344A in Punjab on Hybrid Annuity Mode (total 80.82 KM) | 80.82 KM (Kilometer) | 1444 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Punjab | 22-Jul-2019 |
1169 | Two-laning with Paved Side Shoulder (PSS) of Bihta- Mahabalipur-Aurangabad section of SH-2 & NH-98 | 118.0 KM (Kilometer) | 362 | Transport | Roads and bridges | Under Construction | Bihar State Road Development Corporation Limited | Bihar | 22-Jul-2019 |
1170 | 2 laning with paved shoulder/4 laning of Tamil Nadu/Karnataka Border to Bangalore section of NH-209 on DBFOT (Toll) basis | 191.89 KM (Kilometer) | 693 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Karnataka | 19-Jul-2019 |
1171 | 2/4 laning of Vikravandi-Meensuruti Section of NH-45C and 2 laning with PSS from Meensuruti 93.5km to Thanjavur 164.614km | 164.22 KM (Kilometer) | 1090 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Tamil Nadu | 19-Jul-2019 |
1172 | 4 laning of Chandikhole-Dubari-Talchar Secton of NH 200, 301.89-428.03km including km 8.5- km 15.75�in Orissa | 132.5 KM (Kilometer) | 1273 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Odisha | 19-Jul-2019 |
1173 | 4 laning of Jorhat-Demow section from Km 453 to 534.8 (part of Nagaon-Dirbugah section) of NH 37 in Assam on BOT (Annuity) basis | Not Available | 562 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Assam | 19-Jul-2019 |
1174 | 4 laning with PSS of Jodhpur-Pali section of NH-65 and Pali bypass starting from on DBFOT (Toll) basis | 70.0 KM (Kilometer) | 425 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 19-Jul-2019 |
1175 | Construction of Access Controlled Highways from Km. 10/0 to Km. 29/5 of Bangolore section of NH-4 inKarnataka on BOT basis | Not Available | 380 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Karnataka | 19-Jul-2019 |
1176 | Construction of Elevated Six Lane Highway(Flyover) from Km 16(Delhi) to Km 20.5(Haryana) and its approaches on NH2 on BOT basis. | 4.4 KM (Kilometer) | 570 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 19-Jul-2019 |
1177 | Construction of new bridges and O&M of 4-laned road of the Baleshwar-Kharagpur section of NH60 from 0-119.3 km on BOT (Toll) | 119.3 KM (Kilometer) | 480.38 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 19-Jul-2019 |
1178 | Design Engineering,Construction,Development, Finance and Operation and maintenance of MP/Maharashtra Border Dhule section of NH3 | 97.0 KM (Kilometer) | 1420 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 19-Jul-2019 |
1179 | Design, Engineering, Finance, Construction, O&M of 4 laning of Bijapur-Hungund section of NH 13 on DBFOT basis | 100.0 KM (Kilometer) | 748 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Karnataka | 19-Jul-2019 |
1180 | Four -laning of Orrisa border to Aurang section of NH-6 from km 88 to km 239 in Chattisgarh on DBFOT (Toll) basis | 150.0 KM (Kilometer) | 1234 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Chhattisgarh | 19-Jul-2019 |
1181 | Four laning of Baihata Chariali to Tejpur Section of NH-52 (Km 0.00 to km 130.00) inAssam under NHDP Phase III on BOT basis. | Not Available | 1203.46 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Assam | 19-Jul-2019 |
1182 | Four laning of Beawar Pali Pindwara Section of NH 14 from km 0 to km 244.12 in Rajasthan on BOT(Toll) basis� | 244.12 KM (Kilometer) | 2388 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 19-Jul-2019 |
1183 | Four laning of Hazaribagh-Ranchi stretch of NH33 from Km 40.5 to Km114 including Kujju bypass in Jharkhand on BOT(Annuity) Basis | 73.7 KM (Kilometer) | 625.07 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Jharkhand | 19-Jul-2019 |
1184 | Four laning of Hospet-Chitradurga section of NH-13 from km 299 to km 418.6 in Karnataka on BoT (Toll) basis | 120.0 KM (Kilometer) | 1388 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Karnataka | 19-Jul-2019 |
1185 | Four laning of Lucknow Raebarelly Section of NH-24 B from km 12.700 to km 82.700 on BoT (Annuity) under NHDP Phase-IV B inU.P. | 70.0 KM (Kilometer) | 635.9 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 19-Jul-2019 |
1186 | Four laning of Nagpur Wainganga Bridge Section of NH 6 from km 498 to km 544.2 in Maharashtra on BOT(Toll) basis� | 60.0 KM (Kilometer) | 484.19 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 19-Jul-2019 |
1187 | Four laning of PSS of Sangrur - Punjab/Haryana border section of NH - 71 in Punjab on BOT (Toll) basis | Not Available | 481.59 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Punjab | 19-Jul-2019 |
1188 | Four laning of Raiganj-Dalkhola section of NH 34 from km 398 to km 452.700 inWest Bangal on DBFOT basis under NHDP III | 54.7 KM (Kilometer) | 560.16 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | West Bengal | 19-Jul-2019 |
1189 | Four laning of Rampur-Kathgodam section of NH-87 from km 0 to km 88 in UP and Uttarakhand on BoT (Toll) basis | 88.0 KM (Kilometer) | 790 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Uttarakhand | 19-Jul-2019 |
1190 | Four-laning of Rajsamand-Bhilwara section of NH-(78, 79 & 8) from km 0 to km 87.250 inRajasthan on BOT (Toll) basis. | 87.2 KM (Kilometer) | 677.79 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 19-Jul-2019 |
1191 | Four/Six Laning of Jaipur-Tonk-Deoli section of NH 12 from km 18.7 to km 165 (length 148.77 kms) inRajasthan on BOT (Toll) basis | 148.9 KM (Kilometer) | 1733 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 19-Jul-2019 |
1192 | Four/Two-laning of Baharagora to Sambalpur Section from km 200.00 to 566.000 Section of NH-6 in Orissa on BOT (Toll) basis | 368.2 KM (Kilometer) | 1948.64 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Odisha | 19-Jul-2019 |
1193 | Six laning of Belgaum-Dharwad section of NH 4 from Km 515 to km 433 and Km 0 to Km62 in Karnataka under NHDP V on BOT basis | 144.0 KM (Kilometer) | 637.5 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Karnataka | 19-Jul-2019 |
1194 | Six Laning of Chilkaluripet-Vijayawada, including Guntur bypass and Mangalagiri bypass of Chennai-Vijayawada Section of NH-5 | 67.7 KM (Kilometer) | 572.3 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Andhra Pradesh | 19-Jul-2019 |
1195 | Six laning of Samakhiali-Gandhidham section of NH 8A from km 306 to km 362.16 in Gujarat on BOT (Toll) basis on DBFO pattern | 56.1 KM (Kilometer) | 805.39 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Gujarat | 19-Jul-2019 |
1196 | Six/Four Laning of Zirakpur - Parwanoo section of NH-22 including Pinjore - Kalka - Parwanoo bypass in Punjab, Haryana and HP | 28.6 KM (Kilometer) | 295 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 19-Jul-2019 |
1197 | Two laning with paved shoulders of Raibarelly-Jaunpur Section of NH-231 from Km 0 to Km 166.4 in UP on BoT (Annuity) basis | 166.4 KM (Kilometer) | 993 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 19-Jul-2019 |
1198 | Design, Engineering, Construction, Finance and Maintenance of Jaipur Reengus section of NH 11 | 51.8 KM (Kilometer) | 343 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 18-Jul-2019 |
1199 | Development of Hyderabad-Vijayawada section and additional 2 Laning/future 6 Laning of NH 9 in Andhra Pradesh (km 160- km 221.5) | 61.5 KM (Kilometer) | 492 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 18-Jul-2019 |
1200 | Development of Hyderabad-Vijayawada section and additional 2 Laning/future 6 Laning of NH 9 in Andhra Pradesh (km 40 to km 160) | 120.0 KM (Kilometer) | 1740 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 18-Jul-2019 |
1201 | Development of Sinnar-Nashik section of NH-50 (from km 177.0001 to 201.350) with 4-lane through DBFOT (Toll)] basis. | 25.31 KM (Kilometer) | 312.96 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Maharashtra | Maharashtra | 18-Jul-2019 |
1202 | Eight laning of Mukarba Chowk to Panipat of NH 1 (DEL-HRY) | 72.0 KM (Kilometer) | 2128.72 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Haryana | 18-Jul-2019 |
1203 | Four laining of Gomti-Chauraha - Udaipur Section of NH - 8 , km 177.000 to km 260. 10 under NHDP�- IV A on BOT (Toll) Basis | 83.0 KM (Kilometer) | 1114.27 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 18-Jul-2019 |
1204 | Four Laning from Trichy city of NH-45 to Dindigul on NH-45 in the state of Tamil Nadu under NHDP Phase III A on BOT basis | 88.2 KM (Kilometer) | 600 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 18-Jul-2019 |
1205 | Four laning of Amritsar Wagha Boarder Section from Km.455.400 to Km 491.330 of NH-I in the State of Punjab on BOT basis. | 35.9 KM (Kilometer) | 206 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Punjab | 18-Jul-2019 |
1206 | Four laning of Armur-Adloor Yellareddy section of NH7 in the State of Andhra Pradesh | 60.0 KM (Kilometer) | 491 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Telangana | 18-Jul-2019 |
1207 | Four laning of Biora - Dewas section of NH-3 from Km 426.100 to Km 566.450 in the state of Madhya Pradesh under NHDP phase IV | 140.4 KM (Kilometer) | 1583.79 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Madhya Pradesh | 18-Jul-2019 |
1208 | Four Laning of Devilalli Hassan Section of NH- 48 in the state of Karnataka under NHDP phase III A on BOT basis | 79.0 KM (Kilometer) | 453 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Karnataka | 18-Jul-2019 |
1209 | Four laning of Hoskate-Dabespet Section on NH-207 in the State of Karnataka under NHDP Phase IV on DBFOT (Toll) basis | 80.02 KM (Kilometer) | 720.69 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Karnataka | 18-Jul-2019 |
1210 | Four laning of Hyderabad-Yadgiri section of NH 202 in the State of Andhra Pradesh under NHDP Phase III on BOT basis | 35.6 KM (Kilometer) | 514.91 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Telangana | 18-Jul-2019 |
1211 | Four laning of Jetput - Somnath Section of NH 80 in the State of Gujarat | 123.0 KM (Kilometer) | 828 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Gujarat | 18-Jul-2019 |
1212 | Four laning of Kazhakkuttam to Mukkola section in the State of Kerala | 26.798 KM (Kilometer) | 577.95 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Kerala | 18-Jul-2019 |
1213 | Four Laning of Khalghat-MP/ Maharashtra Border section of NH-3 from Km. 84.700 to Km.167.500 in the state of M.P. on BOT basis. | 82.8 KM (Kilometer) | 549 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Madhya Pradesh | 18-Jul-2019 |
1214 | Four laning of Kuttipuram-Edapally section of NH17 in the state of Kerala | Not Available | 1157.92 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Kerala | 18-Jul-2019 |
1215 | Four laning of Mangwan to� Satna to Bela section of NH 75 under VGF Scheme, length 48.04 km | Not Available | 320.48 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Madhya Pradesh | 18-Jul-2019 |
1216 | Four laning of Patna-Buxar section of NH 30 in the state of Bihar | Not Available | 1619.83 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Bihar | 18-Jul-2019 |
1217 | Four Laning of Pondicherry to Tindivanam on NH-66 in the state of Tamil Nadu under NHDP Phase III A on BOT basis | 38.6 KM (Kilometer) | 285 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Puducherry (UT) | 18-Jul-2019 |
1218 | Four laning of Rohtak to Bawal Section of NH 71 in the state of Haryana on DBFOT basis under NHDP III | 83.6 KM (Kilometer) | 669 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Haryana | 18-Jul-2019 |
1219 | Four laning of Rohtak to Panipat section of NH 71A from km 0 to km 80.858 in the state of Haryana on BOT basis under NHDP III | 80.8 KM (Kilometer) | 1087.83 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Haryana | 18-Jul-2019 |
1220 | Four laning of Sambalpur Baragarh of Orissa/Chhatisgarh border section of NH 6 from Km 0 to Km 88 in Orissa� | 88.0 KM (Kilometer) | 1142 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Odisha | 18-Jul-2019 |
1221 | Four laning of Talegaon - Amravati section of NH 6 in Maharashtra on DBFOT basis | 67.8 KM (Kilometer) | 610.59 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 18-Jul-2019 |
1222 | Four Laning of Trivandrum, Kerala/ Tamil Nadu border including Trivandrum by-pass (Package I) | Not Available | 822.41 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Kerala | 18-Jul-2019 |
1223 | Four Laning of Walayar to Vadakkancherry Section (Package No.NS-2/BOT/KL-2) | 58.0 KM (Kilometer) | 901 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Kerala | 18-Jul-2019 |
1224 | Four-laning of Bhuban-Dubari-Chandikhole section of NH-200 in Odisha under NHDP-III on DBFOT (Toll) basis. | 62.185 KM (Kilometer) | 652 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Odisha | 18-Jul-2019 |
1225 | Four-laning of Rohtak - Hisar Section of NH-10 connecting to NH-71, in Haryana under NHDP-III on BOT (Toll) basis | 98.8 KM (Kilometer) | 959.25 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Haryana | 18-Jul-2019 |
1226 | Four-laning with PSS of Jabalpur-Bhopal section of NH-12 from km 10.400 to km 301.800 under NHDP Phase III on BOT (Toll) basis | 294.21 KM (Kilometer) | 2485.96 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | Madhya Pradesh | 18-Jul-2019 |
1227 | Mechanisation of WQ-1� Berth in the Inner Harbour of Visakhapatanam� Port for handling Iron Ore on DBFOT Basis | 280.0 Meter | 275.2 | Transport | Ports (excluding captive) | Under Construction | Ministry of Shipping | Andhra Pradesh | 18-Jul-2019 |
1228 | Six Laning of Chennai-Tada Section of NH-5 (43 Km) in Tamil Nadu | 43.4 KM (Kilometer) | 353.37 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 18-Jul-2019 |
1229 | Six laning of Dankuni - Baleshwar section of NH 6 in West Bengal� | 111.0 KM (Kilometer) | 2034 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | West Bengal | 18-Jul-2019 |
1230 | Six Laning of Kishangarh-Ajmer-Beawar Section from KM 364.125 to KM 58.245 of NH 8 on BOT Basis | 92.3 KM (Kilometer) | 1712.77 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 18-Jul-2019 |
1231 | Six laning of NH 4 from Tumkur to Chitradurga in Karnataka under NHDP Phase V on BOT (Toll) on DBFO pattern | 114.0 KM (Kilometer) | 1200 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Karnataka | 18-Jul-2019 |
1232 | Six laning of NH7 from Hosur to Krishnagiri on NH93 in Tamil Nadu | 59.8 KM (Kilometer) | 535 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 18-Jul-2019 |
1233 | Six Laning of Pimpalgaon-Nashik-Gonde section of NH-3 in the State of Maharashtra under NHDP Phase IIIA on BOT basis. | 60.0 KM (Kilometer) | 1691 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 18-Jul-2019 |
1234 | Six laning of Poonamallee-Walajapet section of NH 4 under NHDP V on BOT(Toll) basis | 93.0 KM (Kilometer) | 1548.61 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Tamil Nadu | 18-Jul-2019 |
1235 | Six Laning of Surat-Dahisar Section of NH-8 (239 Km) in Gujarat and Maharashtra | 239.0 KM (Kilometer) | 2853 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 18-Jul-2019 |
1236 | Two laning of Deali - Kota section of NH 12 on Kota bypass in Rajasthan | 83.04 KM (Kilometer) | 823 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 18-Jul-2019 |
1237 | Two laning of Purnea-Khagaria section of NH 31 in the State of Bihar under NHDP Phase III on BOT (Annuity) basis� | 140.0 KM (Kilometer) | 676 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Bihar | 18-Jul-2019 |
1238 | Aurangabad Paithan and Baramati-Phaltan-Lonand-Shirwal Road projects | 77.9 KM (Kilometer) | 355.65 | Transport | Roads and bridges | Under Construction | Public Works Department, Maharashtra | Maharashtra | 17-Jul-2019 |
1239 | Bhind-Mihona-Gopalpur Road project | 50.9 KM (Kilometer) | 82.1 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1240 | Construction of Bridge across river Godavari | 4.15 KM (Kilometer) | 1070 | Transport | Roads and bridges | Operation and Maintenance Stage | Andhra Pradesh Road Development Corporation | Andhra Pradesh | 17-Jul-2019 |
1241 | Construction of new four lane connecting Lebad to Manpur | 34.3 KM (Kilometer) | 206.53 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1242 | Damoh- Jabalpur Road Project | 98.5 KM (Kilometer) | 249.6 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1243 | Development of 400 kV DCDS Sarni (Satpura)-Ashta transmission line project under DBFOT (Toll) | 240.0 KM (Kilometer) | 282.7 | Energy | Electricity transmission | Operation and Maintenance Stage | Madhya Pradesh Power Transmission Company Limited | Madhya Pradesh | 17-Jul-2019 |
1244 | Development of Food grain Silos at Kaimur and Buxer, Bihar on DBFOT basis through PPP mode | 100000.0 MT (Metric Tonne ) | 65.28 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Pre-construction Stage | Food Corporation of India | Bihar | 17-Jul-2019 |
1245 | Development of Modern Silos for storage of Wheat on DBFOT basis under PPP mode at Borivali, Maharashtra | 50000.0 MT (Metric Tonne ) | 41.52 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Pre-construction Stage | Food Corporation of India | Maharashtra | 17-Jul-2019 |
1246 | Development of Modern Silos for storage of Wheat on DBFOT basis under PPP mode at Dhamora, Uttar Pradesh | 50000.0 MT (Metric Tonne ) | 37.86 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Pre-construction Stage | Food Corporation of India | Uttar Pradesh | 17-Jul-2019 |
1247 | Development of Silos for storage of wheat on DBFOT basis under PPP mode at Kotkapura, Punjab | 25000.0 MT (Metric Tonne ) | 35.62 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Operation and Maintenance Stage | Ministry of Consumer Affairs, Food & Public Distribution, Government of India | Punjab | 17-Jul-2019 |
1248 | Development of two lane Road of Beawer- Gomti section of NH 8 | 118.9 KM (Kilometer) | 195 | Transport | Roads and bridges | Under Construction | Ministry of Road Transport and Highways | Rajasthan | 17-Jul-2019 |
1249 | Development, operation and maintenace of Chomu chandwaji on SH-8B (total 15.4 km) | 15.6 KM (Kilometer) | 40 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 17-Jul-2019 |
1250 | Four Laning of following State Highways in Madhya Pradesh : Bhopal, Devas | 143.2 KM (Kilometer) | 640 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1251 | Four Laning of Halol-Godhra-Shamlaji Road | 173.0 KM (Kilometer) | 1422 | Transport | Roads and bridges | Operation and Maintenance Stage | Gujarat State Road Development Corporation Limited (GSRDC) | Gujarat | 17-Jul-2019 |
1252 | Four laning of Hyderabad-Karimnagar-Ramagundam Road Project | 207.0 KM (Kilometer) | 2209 | Transport | Roads and bridges | Operation and Maintenance Stage | Andhra Pradesh Road Development Corporation | Telangana | 17-Jul-2019 |
1253 | Four laning of Jam Warora-Chandrapur-Rajura-Asifabad Road section of SH 266 | 40.0 KM (Kilometer) | 228.26 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Maharashtra | Maharashtra | 17-Jul-2019 |
1254 | Four laning of Lebad-Jaora section of SH 31 in Madhya Pradesh | 125.0 KM (Kilometer) | 682.5 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1255 | Four laning of Manjarsumba-Lokhandi-Sawargaon-Latur | Not Available | 203 | Transport | Roads and bridges | Under Construction | Public Works Department, Maharashtra | Maharashtra | 17-Jul-2019 |
1256 | Four-laning of Ahmedabad � Viramgam - Maliya road | 180.0 KM (Kilometer) | 1397 | Transport | Roads and bridges | Operation and Maintenance Stage | Gujarat State Road Development Corporation Limited (GSRDC) | Gujarat | 17-Jul-2019 |
1257 | Four-laning of Ahmednagar-Karmala road (SH-141) km 0.00 to km 80.6 road | 59.5 KM (Kilometer) | 638.2 | Transport | Roads and bridges | Under Construction | Public Works Department, Maharashtra | Maharashtra | 17-Jul-2019 |
1258 | Four-laning of Rajkot-Jamnagar-Vadinar road | 131.7 KM (Kilometer) | 1096 | Transport | Roads and bridges | Operation and Maintenance Stage | Gujarat State Road Development Corporation Limited (GSRDC) | Gujarat | 17-Jul-2019 |
1259 | Four-laning with paved shoulders of Rewa-Ring Road section from km 229.10 of NH-7 to km 6.2 of SH-9 under DBFOT (Toll) | 8.3 KM (Kilometer) | 74.2 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1260 | HVPNL 400 KV Jhajjar Power Transmission Project in Haryana on DBFOT basis | 400.0 KV (Kilo Volt) | 444 | Energy | Electricity transmission | Operation and Maintenance Stage | Haryana Vidyut Prasaran Nigam Limited | Haryana | 17-Jul-2019 |
1261 | Improvement of Karanji-Chandrapur Road section of MSH - 6 & 7 on DBFOT basis | 85.11 KM (Kilometer) | 498.77 | Transport | Roads and bridges | Under Construction | Public Works Department, Maharashtra | Maharashtra | 17-Jul-2019 |
1262 | Jam Warora-Chandrapur-Ballarpur-Bamni Road project | 64.0 KM (Kilometer) | 688.62 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Maharashtra | Maharashtra | 17-Jul-2019 |
1263 | Providing VGF Funding for Construction of Silo at Changsari, Assam - Proposed by FPD | 50000.0 MT (Metric Tonne ) | 42.48 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Under Construction | Food Corporation of India | Assam | 17-Jul-2019 |
1264 | Providing VGF Funding for Construction of Silo at Narela, Delhi - Proposed by FPD | 50000.0 MT (Metric Tonne ) | 41.84 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Pre-construction Stage | Food Corporation of India | Delhi (UT) | 17-Jul-2019 |
1265 | Sehora-Majhgawan | 39.85 KM (Kilometer) | 92.65 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1266 | Strengthening and widening of Sarkhej Bhavanagar highway | Not Available | 883.04 | Transport | Roads and bridges | Operation and Maintenance Stage | Gujarat State Road Development Corporation Limited (GSRDC) | Gujarat | 17-Jul-2019 |
1267 | Strengthening and Widening of two lane road with paved shoulders of Bhuj - Bachau Section of SH-42 in the State of Gujarat | 77.0 KM (Kilometer) | 256.94 | Transport | Roads and bridges | Under Construction | Gujarat State Road Development Corporation Limited (GSRDC) | Gujarat | 17-Jul-2019 |
1268 | Strengthening of Chandpur-Alirajpur-Kukshi-Badwani State Highways in Madhya Pradesh | 99.1 KM (Kilometer) | 144 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1269 | Strengthening of Mandsaur-Sitamau Road (Upto Rajasthan Border) State Highway in Madhya Pradesh | 44.0 KM (Kilometer) | 42.3 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1270 | Strengthening of Matkuli-Tamia-Chindwara State Highways in Madhya Pradesh | 112.0 KM (Kilometer) | 213.3 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1271 | Two lane with paved side shoulders of Rawatsar-Nohar-Bhadra section of MDR 18 | 118.0 KM (Kilometer) | 285.1 | Transport | Roads and bridges | Operation and Maintenance Stage | Road Infrastructure Development Company of Rajasthan Limited | Rajasthan | 17-Jul-2019 |
1272 | Two laning of Ashoknagar-Vidisha | 35.68 KM (Kilometer) | 87.06 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1273 | Two laning of Betul-Sarni-Tikadhan-Junnardeo-Parasia section of SH 43 in MP on BOT(Toll) | 124.1 KM (Kilometer) | 238 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1274 | Two laning of Bina-Kurwal-Sironj | 56.1 KM (Kilometer) | 107 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1275 | Two laning of Chomu to Mahla via Renwal Jobner | 89.0 KM (Kilometer) | 270 | Transport | Roads and bridges | Under Construction | Public Works Department, Rajasthan | Rajasthan | 17-Jul-2019 |
1276 | Two laning of Damoh - Katni section of SH-14 with NH-7 at km 366.1 under DBFOT (Toll) | 117.93 KM (Kilometer) | 272.07 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1277 | Two laning of Guna-Ashoknagar-Ishagarh Project (SH 20) on BOT basis | 76.15 KM (Kilometer) | 105.1 | Transport | Roads and bridges | Under Construction | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1278 | Two laning of Jhabua-Jobat-Zeerpanya-Bagh-Kukshi section of SH 39 in MP on BOT(Toll) | 92.42 KM (Kilometer) | 158 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1279 | Two laning of Khandwa-Dehtala-Burhanpur section of SH 50 in MP on BOT (Toll) | 127.1 KM (Kilometer) | 224.4 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1280 | Two laning of Morinda, Kurali, Siswan, H.P. Border Road (MDR-31)on BOT (Toll) | 29.7 KM (Kilometer) | 78.59 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Punjab | Punjab | 17-Jul-2019 |
1281 | Two laning of Ratlam-Sailana-Banswada-section (MP - Rajasthan Border) at km 42.6 on SH-39 under DBFOT (Toll) | 43.6 KM (Kilometer) | 118 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1282 | Two laning with granular shoulder from km 0/10 to km 67/10 of Balaghat to Baihar section of SH 26 on DBFOT (Toll) basis | 66.7 KM (Kilometer) | 122.97 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Jul-2019 |
1283 | Two-laning with paved side shoulder in Northern Kota Bypass | 14.65 KM (Kilometer) | 136.89 | Transport | Roads and bridges | Under Construction | Urban Improvement Trust, Kota | Rajasthan | 17-Jul-2019 |
1284 | Upgradation of Narnaul to Kotputli- Chala- Sikar-Khud- Losal- Kuchaman State Highway | Not Available | 357.75 | Transport | Roads and bridges | Operation and Maintenance Stage | Rajasthan State Road Development and Construction Corporation Limited | Rajasthan | 17-Jul-2019 |
1285 | Construction of 17 km long four lane Laddowal Bypass in Ludhiana district | 17.0 KM (Kilometer) | 392 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Punjab | 16-Jul-2019 |
1286 | Four laning of Ajmer to Nagaur section on NH 89 from km 0.000 to km 161.000 in the State of Rajasthan | 148.25 KM (Kilometer) | 377.15 | Transport | Roads and bridges | Under Construction | Public Works Department, Rajasthan | Rajasthan | 16-Jul-2019 |
1287 | Four Lanning of Hubli-Haveri section in length of 63.4 km | 63.4 KM (Kilometer) | 262.94 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Karnataka | 16-Jul-2019 |
1288 | Road Upgradation (Kante-Waked) Project | 50.9 KM (Kilometer) | 805.59 | Transport | Roads and bridges | Pre-construction Stage | National Highways Authority of India (NHAI) | Maharashtra | 16-Jul-2019 |
1289 | Six laning of Ranastalam-Anandpuram section in length of 47 km | 47.0 KM (Kilometer) | 1041.62 | Transport | Roads and bridges | Pre-construction Stage | National Highways Authority of India (NHAI) | Andhra Pradesh | 16-Jul-2019 |
1290 | Setting up of 9 MW Balargha small hydel power unit in Kullu district | 9.0 MW (Mega Watt) | 77.68 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | Himachal Pradesh | 23-Jun-2019 |
1291 | Four laning of Ahmednagar-Kopargaon road in length of 55.5 Km | 55.5 KM (Kilometer) | 234 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Maharashtra | Maharashtra | 22-Jun-2019 |
1292 | Aircel 2012-13 | Not Available | 669 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1293 | Aircel 2013-14 | Not Available | 502 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1294 | Aircel 2014-15 | Not Available | 5548 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1295 | Aircel 2015-16 | Not Available | 4758 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1296 | Bharat Broadband Network Limited 2012-13 | Not Available | 0 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1297 | Bharat Broadband Network Limited 2013-14 | Not Available | 0 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1298 | Bharat Broadband Network Limited 2014-15 | Not Available | 238 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1299 | Bharat Broadband Network Limited 2015-16 | Not Available | 1048 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1300 | Bharat Broadband Network Limited 2016-17 | Not Available | 4900 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1301 | Bharat Sanchar Nigam Limited 2012-13 | Not Available | 3892.73 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1302 | Bharat Sanchar Nigam Limited 2013-14 | Not Available | 7103.48 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1303 | Bharat Sanchar Nigam Limited 2014-15 | Not Available | 5446.24 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1304 | Bharat Sanchar Nigam Limited 2015-16 | Not Available | 3644.53 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1305 | Bharat Sanchar Nigam Limited 2016-17 | Not Available | 4719.64 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1306 | Bharat Sanchar Nigam Limited till 2011-12 | Not Available | 170671.16 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1307 | Bharti Airtel Limited 2012-13 | Not Available | 9657.1 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1308 | Bharti Airtel Limited 2013-14 | Not Available | 4614.6 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1309 | Bharti Airtel Limited 2014-15 | Not Available | 20989.7 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1310 | Bharti Airtel Limited 2015-16 | Not Available | 48446.7 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1311 | Bharti Airtel Limited 2016-17 | Not Available | 1072.8 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1312 | Bharti Airtel Limited investment till 2011-12 | Not Available | 66906.8 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1313 | Development of Terminal with Four Shore connected berths at Kakinada Port | 40.0 MMTPA (million metric tonnes per annum) | 1320 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Department of Ports, Andhra Pradesh | Andhra Pradesh | 21-Jun-2019 |
1314 | Gangavaram Port Project - Phase I | 100.0 MTPA (Metric Tonne Per Annum) | 1696 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Department of Ports, Andhra Pradesh | Andhra Pradesh | 21-Jun-2019 |
1315 | Green Field Super Speciality Hospital (Bathinda) | 200.0 Beds | 87.02 | Social and Commercial Infrastructure | Health Care | Operation and Maintenance Stage | Punjab Health Systems Corporation | Punjab | 21-Jun-2019 |
1316 | IDEA India Limited 2012-13 | Not Available | 23933.9 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1317 | IDEA India Limited 2013-14 | Not Available | 4195.41 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1318 | IDEA India Limited 2014-15 | Not Available | 74690.06 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1319 | IDEA India Limited 2015-16 | Not Available | 39007.73 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1320 | IDEA India Limited 2016-17 | Not Available | 19306.62 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1321 | IDEA India Limited till 2011-12 | Not Available | 36032.31 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1322 | Implementation of 20 MLD sewage treatment plant at Udaipur | 20.0 MLD (Millons Liter per day) | 20 | Water Sanitation | Sewage collection, treatment and disposal system | Operation and Maintenance Stage | Udaipur Municipal Corporation | Rajasthan | 21-Jun-2019 |
1323 | Improvement of Alwar - Bhiwari Road | 79.0 KM (Kilometer) | 18.62 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 21-Jun-2019 |
1324 | Mahanagar Telephone Nigam Limited 2012-13 | Not Available | 526.19 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1325 | Mahanagar Telephone Nigam Limited 2013-14 | Not Available | 665.06 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1326 | Mahanagar Telephone Nigam Limited 2014-15 | Not Available | 559.11 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1327 | Mahanagar Telephone Nigam Limited 2015-16 | Not Available | 543.73 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1328 | Mahanagar Telephone Nigam Limited 2016-17 | Not Available | 311.04 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1329 | Mahanagar Telephone Nigam Limited till 2011-12 | Not Available | 30117.01 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1330 | Operation & maintenance of Allahabad bypass in length of 85 Km | 85.0 KM (Kilometer) | 1285 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 21-Jun-2019 |
1331 | Operation & maintenance of Garamore to Samakhiyali section in length of 52 km of NH-8A (New NH-27) | 52.0 KM (Kilometer) | 339 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Gujarat | 21-Jun-2019 |
1332 | Reliance Communication 2012-13 | Not Available | 1849 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1333 | Reliance Communication 2013-14 | Not Available | 1970 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1334 | Reliance Communication 2014-15 | Not Available | 1413 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1335 | Reliance Communication 2015-16 | Not Available | 2852 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1336 | Reliance Communication 2016-17 | Not Available | 10069 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1337 | Reliance Communication till 2011-12 | Not Available | 52455 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1338 | Reliance Jio Infocom Limited 2012-13 | Not Available | 2247 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1339 | Reliance Jio Infocom Limited 2013-14 | Not Available | 14181 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1340 | Reliance Jio Infocom Limited 2014-15 | Not Available | 43485 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1341 | Reliance Jio Infocom Limited 2015-16 | Not Available | 17100 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1342 | Reliance Jio Infocom Limited 2016-17 | Not Available | 50554 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1343 | Road Upgradation (Jabalpur-Narsinghpur-Piparia) Project | 141.37 KM (Kilometer) | 75 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 21-Jun-2019 |
1344 | Road Upgradation Project (Mundi-Punasa-Sulagoan-Sanawad) Project | 67.6 KM (Kilometer) | 124.8 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 21-Jun-2019 |
1345 | Road Upgradation Project (Sardarpur-Badnawar) Project | 35.0 KM (Kilometer) | 84 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 21-Jun-2019 |
1346 | Tata Communications 2012-13 | Not Available | 856.51 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1347 | Tata Communications 2013-14 | Not Available | 430.08 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1348 | Tata Communications 2014-15 | Not Available | 710.29 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1349 | Tata Communications 2015-16 | Not Available | 770.3 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1350 | Tata Communications 2016-17 | Not Available | 1463 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1351 | Tata Communications till 2011-12 | Not Available | 8805.93 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1352 | Telenor 2012-13 | Not Available | 4018 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1353 | Telenor 2013-14 | Not Available | 2198 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1354 | Telenor 2014-15 | Not Available | 1363 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1355 | Telenor 2015-16 | Not Available | 750 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1356 | Videocon Telecommunications 2012-13 | Not Available | 427 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1357 | Videocon Telecommunications 2013-14 | Not Available | 11 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1358 | Videocon Telecommunications 2014-15 | Not Available | 14 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1359 | Vodafone India Limited 2014-15 | Not Available | 14066 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1360 | Vodafone India Limited 2015-16 | Not Available | 34400 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1361 | Vodafone India Limited 2016-17 | Not Available | 12756 | Communication | Telecommunication Network and Services | Operation and Maintenance Stage | Department of Telecom | Multi State/ Centre | 21-Jun-2019 |
1362 | Centralized Biomedical Waste treatment facility at Gazipur | Not Available | 6 | Water Sanitation | Solid waste management | Operation and Maintenance Stage | Government of National Capital Territory of Delhi | Delhi (UT) | 20-Jun-2019 |
1363 | Green Field Super Speciality Hospital (Mohali) | 200.0 Beds | 178.82 | Social and Commercial Infrastructure | Health Care | Operation and Maintenance Stage | Punjab Health Systems Corporation | Punjab | 20-Jun-2019 |
1364 | Construction of Karalphata Interchange road | 5.0 KM (Kilometer) | 531.13 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Maharashtra | 19-Jun-2019 |
1365 | Design, construction , development, finance, O & M of NH-7 Madhya Pradesh on BOT (Annuity) basis | 49.35 KM (Kilometer) | 263.17 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Madhya Pradesh | 19-Jun-2019 |
1366 | Design, Construction, Development, Finance, O&M (Kumarpalyam,after Chengapali) on NH47 in the state of Tamil Nadu(BOT) basis | 47.0 KM (Kilometer) | 421 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 19-Jun-2019 |
1367 | Design,Construction,Development,Finance,O&M,Jadcherla,end ofproposed Kotakata bypass,on NH7 Andhra Pradesh on (BOT) basis | 55.42 KM (Kilometer) | 373 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Andhra Pradesh | 19-Jun-2019 |
1368 | Ind-Barath Energies Thoothukudi Limited (IBETL) - Biomass based power plant | 20.0 MW (Mega Watt) | 74.7 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Not Available | Tamil Nadu | 19-Jun-2019 |
1369 | Inter laning of Garakota-Rehli-Deori in length of 49.3 km in Sagar district | 49.3 KM (Kilometer) | 72.98 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Jun-2019 |
1370 | Jegurupadu Combined Cycle Power Plant, Phase II | 228.0 MW (Mega Watt) | 725.16 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Not Available | Andhra Pradesh | 19-Jun-2019 |
1371 | Konaseema Combined Cycle Power Plant | 460.0 MW (Mega Watt) | 2100 | Energy | Electricity transmission | Operation and Maintenance Stage | AP TRANSMISSION CORPORATION LIMITED | Andhra Pradesh | 19-Jun-2019 |
1372 | Mathura (State Border) - Bharatpur | 65.5 KM (Kilometer) | 181.75 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 19-Jun-2019 |
1373 | Operation & maintenance of Agra-Gwalior road of 137 Km | 137.0 KM (Kilometer) | 196 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 19-Jun-2019 |
1374 | Operation & Maintenance of Ayodhya-Gorakhpur section in length of 114.9 Km of NH-28 | 114.9 KM (Kilometer) | 1292 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 19-Jun-2019 |
1375 | Operation and maintainance of Anabaru and Arasinagundi Power plants in Chitradurga and Davangere districts of karnataka | 29.7 MW (Mega Watt) | 210 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Not Available | Karnataka | 19-Jun-2019 |
1376 | Raghu Rama Renewable Energy Limited (RRREL) | 18.0 MW (Mega Watt) | 57.2 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Not Available | Tamil Nadu | 19-Jun-2019 |
1377 | Road (AP/Karnataka Border & Nandi Hill Crossing NH-7) Project | 64.0 KM (Kilometer) | 410 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Karnataka | 19-Jun-2019 |
1378 | Road Upgradation (Namakkal-Karur) Project | 44.0 KM (Kilometer) | 345 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 19-Jun-2019 |
1379 | Road Upgradation Project (Bahari-Hanumana) Project | 49.3 KM (Kilometer) | 106.7 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Jun-2019 |
1380 | Road Upgradation Project (Betul-Athner) Project | 34.5 KM (Kilometer) | 45.4 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Jun-2019 |
1381 | Road Upgradation Project (Damoh-Patharia-Garhakota) Project | 40.5 KM (Kilometer) | 71.88 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Jun-2019 |
1382 | Road Upgradation Project (Mandsaur-Pratapgarh-Rajasthan Border) Project | 14.0 KM (Kilometer) | 19.45 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Jun-2019 |
1383 | Samal Hydro Electric Project | 20.0 MW (Mega Watt) | 116.47 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Not Available | Odisha | 19-Jun-2019 |
1384 | Setting up of 12 MW co-generation power unit at sugar mill in Nawanshahr district | 12.0 MW (Mega Watt) | 60 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Punjab State Federation of Co-operative Sugar Mills Limited | Punjab | 19-Jun-2019 |
1385 | Solar Power Plant, Mainawali minor of Norangdeshar of Hanumangarh Region | 2.0 MW (Mega Watt) | 26 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Rajasthan Renewable Energy Corporation Limited | Rajasthan | 19-Jun-2019 |
1386 | TN Solar Power Energy Private Limited | 23.0 MW (Mega Watt) | 206 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Not Available | Tamil Nadu | 19-Jun-2019 |
1387 | Tuppadahalli Energy India Private Limited_56MW Windfarm - Tuppadahalli onshore wind farm | 56.1 MW (Mega Watt) | 368.14 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Not Available | Karnataka | 19-Jun-2019 |
1388 | Two laning of Tikamgarh - Mahrauni | 15.7 KM (Kilometer) | 29.38 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Jun-2019 |
1389 | Ugradation of Beed - Mundi - Devala - Khutala - Attoot - NVDA road in length of 28.4 km in Bhopal | 28.4 KM (Kilometer) | 45.35 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Jun-2019 |
1390 | Upgradation of Indore-Edalabad road in length of 203 km | 203.0 KM (Kilometer) | 124 | Transport | Roads and bridges | Completed | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Jun-2019 |
1391 | Upgradation Operation and Maintenance of Kiratpursahib - Una Road | 35.72 KM (Kilometer) | 41.84 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Punjab | Punjab | 19-Jun-2019 |
1392 | Vayu Urja Bharat Pvt. Ltd. | 120.0 MW (Mega Watt) | 299.07 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Andhra Pradesh Southern Power Distribution Company Limited | Andhra Pradesh | 19-Jun-2019 |
1393 | Ahmednagar-Shirur Road | 56.0 KM (Kilometer) | 155.57 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Maharashtra | Maharashtra | 18-Jun-2019 |
1394 | Chennai Bypass Road Project - Phase II | 32.22 KM (Kilometer) | 480 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 18-Jun-2019 |
1395 | Construction of four lane connecting road at New Mangalore Port | 37.0 KM (Kilometer) | 168 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Karnataka | 18-Jun-2019 |
1396 | Dadupur Hydel Power Project | 6.0 MW (Mega Watt) | 49.92 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Uttar�Haryana Bijli�Vitran Nigam Limited | Haryana | 18-Jun-2019 |
1397 | Municipal Garbage Processing Unit | Not Available | 15 | Water Sanitation | Solid waste management | Operation and Maintenance Stage | Department of Health, Chandigarh | Chandigarh (UT) | 18-Jun-2019 |
1398 | Road Upgradation Project (Sonapipari-Umreth-Monari-Ambah) Project | 22.25 KM (Kilometer) | 43.73 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 18-Jun-2019 |
1399 | Upgradation Operation and Maintenance of Ferozepur - Fazilka Road | 84.4 KM (Kilometer) | 105.2 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Punjab | Punjab | 18-Jun-2019 |
1400 | 2- laning with paved shoulder of a Agra-Aligarh section of NH-93 Uttar Pradesh on (DBFOT) basis | 79.0 KM (Kilometer) | 250.5 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 17-Jun-2019 |
1401 | Construction of four lane connecting road at Cochin Port | 256.71 KM (Kilometer) | 193 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Kerala | 17-Jun-2019 |
1402 | Container Terminal (Kandla) Project | 175000.0 TEU (Twenty-foot Equivalent Units) | 200 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Deendayal Port Trust | Gujarat | 17-Jun-2019 |
1403 | Crude Oil Handling for Kochi Refineries Ltd | 13.5 MMTPA (million metric tonnes per annum) | 703.34 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Cochin Port Trust | Kerala | 17-Jun-2019 |
1404 | Design construction development, finance,O&M,(Kadtal) (Armur) on NH7 (NHDP-2) on (BOT) basis | 31.0 KM (Kilometer) | 272 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Telangana | 17-Jun-2019 |
1405 | Development of Exhibition cum Convention Centre at Sitapur Industrial Area, Jaipur | 3.0 Acres | 216.65 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Operation and Maintenance Stage | Rajasthan State Industrial Development and Investment Corporation Limited | Rajasthan | 17-Jun-2019 |
1406 | Lakhnadon to MP/MH Border Road Project (NS-I/BOT/MP-3) | 57.0 KM (Kilometer) | 408 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Madhya Pradesh | 17-Jun-2019 |
1407 | Nandigama-Vijayawada Road | 35.0 KM (Kilometer) | 760 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Andhra Pradesh | 17-Jun-2019 |
1408 | Operation & Maintenance of Swaroopganj-Pindwara & Pindwara-Udaipur section in length of 120.0 Km | 120.0 KM (Kilometer) | 13 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 17-Jun-2019 |
1409 | Road Upgradation (Delhi-Ramgarh-Alwar) Project | 34.9 KM (Kilometer) | 25.28 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Multi State/ Centre | 17-Jun-2019 |
1410 | Road Upgradation (Jhalawar-Indore) Project | 20.2 KM (Kilometer) | 7.15 | Transport | Roads and bridges | Completed | Public Works Department, Rajasthan | Multi State/ Centre | 17-Jun-2019 |
1411 | Multilevel Parking (Sanjauli) Project | 400.0 ECS | Not Available | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Shimla Municipal Corporation | Himachal Pradesh | 14-Jun-2019 |
1412 | Multilevel Parking (Chotta Shimla) Project | 250.0 ECS | 20 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Shimla Municipal Corporation | Himachal Pradesh | 14-Jun-2019 |
1413 | Useful Conversion of Solid Waste in Jaipur | Not Available | 20 | Water Sanitation | Solid waste management | Operation and Maintenance Stage | Jaipur Municipal Corporation | Rajasthan | 14-Jun-2019 |
1414 | Construction, O and M of a new 2-lane road NH3 (Guna - bypass section) Madhya Pradesh | 12.0 KM (Kilometer) | 46 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Madhya Pradesh | 13-Jun-2019 |
1415 | Consulting services, O&M of 4-lane divided carriageway facility of Tuni -Ankapalli NH5 Andhra Pradesh on BOT basis | 58.9 KM (Kilometer) | 295 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Andhra Pradesh | 07-Jun-2019 |
1416 | Development of Datia-Dinara road in length of 8.9 km in Datia | 8.93 KM (Kilometer) | 16 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1417 | Development of Sausr-Mohgaon-Mordongri, Sonapipari-Umrethmonari-Umbah & Gadarwara-Tendukheda Roads | 83.95 KM (Kilometer) | 58.2 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1418 | Development of Ujjain - Simhastha bypass on BOT (Toll + Annuity) Basis | 14.5 KM (Kilometer) | 98.26 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1419 | Dewas-Ujjain-Badnagar-Badnawar Road Project | 98.3 KM (Kilometer) | 49.9 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1420 | Improvement, Including Strengthening and Widening of NH-3 Indore-Khalghat section, M.P. on BOT basis. | 77.0 KM (Kilometer) | 472 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Madhya Pradesh | 07-Jun-2019 |
1421 | Improvement,O&M and strengthening and widening of existing 2 to 4 lane NH1 Jalandhar-Amritsar section Punjab on BOT basis | 49.0 KM (Kilometer) | 263 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Punjab | 07-Jun-2019 |
1422 | Impvt,O&M,strengthening &widening of existing 2 to 4 lane NH22 &(ii )NH21 Ambala-Chandigarh,Haryana &Punjab | 35.0 KM (Kilometer) | 298 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 07-Jun-2019 |
1423 | Paron-Goras Road (SH-23) | 36.48 KM (Kilometer) | 102 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1424 | Road Upgradation (AB Road-Magarkhedi-Bamari) Project | 12.61 KM (Kilometer) | 17.31 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1425 | Road Upgradation (Alirajpur-Jobat) Project | 32.16 KM (Kilometer) | 45.31 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1426 | Road Upgradation (Ankiya-Barkheda-Dongargaon-Nazirabad) Project | 10.4 KM (Kilometer) | 14.13 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1427 | Road Upgradation (Ashapur-Khalwa-Singhot) Project | 42.0 KM (Kilometer) | 56.9 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1428 | Road Upgradation (Babangaja-Pati-Bokrata) Project | 33.31 KM (Kilometer) | 46.87 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1429 | Road Upgradation (Chirawa-Singhana-Pacheri/Haryana Border) Project | 44.8 KM (Kilometer) | 44.55 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 07-Jun-2019 |
1430 | Road Upgradation (Gwalior-Bhind up to UP Border) Project | 108.0 KM (Kilometer) | 314.5 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1431 | Road Upgradation (Khandela-Srimadhopur-Reengus-Khatushvaji) Project | 50.93 KM (Kilometer) | 43.26 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 07-Jun-2019 |
1432 | Road Upgradation (Phoolsagar-Niwas Shalpura) Project | 84.0 KM (Kilometer) | 156.9 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1433 | Road Upgradation (Sheopur-Baroda-Khuwajapur) Project | 32.29 KM (Kilometer) | 61.8 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1434 | Road Upgradation (Tyonda-Ganjbasoda) Project | 37.8 KM (Kilometer) | 46.03 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1435 | Road Upgradation Project (Badwani-Palsood-Sendhawa) Project | 56.9 KM (Kilometer) | 103.99 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1436 | Road Upgradation Project (Gormi-Udotgarh) Project | 16.77 KM (Kilometer) | 37 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1437 | Road Upgradation Project (Panna-Amanganj-Semariya-Gaisabad) Project | 58.2 KM (Kilometer) | 97.13 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1438 | Road Upgradation Project (Semaria-Manikpur) Project | 16.36 KM (Kilometer) | 34.84 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1439 | Road Upgradation Project (Thandla-Limdi-Gujarat Border) Project | 31.2 KM (Kilometer) | 56.16 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1440 | Satna-Maihar-Umaria Road Project | 242.7 KM (Kilometer) | 53.3 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1441 | Second Vivekanand Bridge Tollway Project, Kolkata | 6.0 KM (Kilometer) | 642 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | West Bengal | 07-Jun-2019 |
1442 | Tambaram - Tindivanam Road | 93.0 KM (Kilometer) | 375 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 07-Jun-2019 |
1443 | Upgradation of Nagda-Gogapur (Mahidpur) road in length of 15 km in Ujjain and Aurangabad | 15.0 KM (Kilometer) | 40.58 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1444 | Upgradation of Tikamgarh-Jatara-Palera-Nowgaon road in length of 76.4 km in Tikamgarh district | 76.4 KM (Kilometer) | 107.34 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 07-Jun-2019 |
1445 | Widening & Improvement of Dantiwara-Pipar City-Merta City road | 26.5 KM (Kilometer) | 219.94 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 07-Jun-2019 |
1446 | Development of Dakha-Raikot-Barnala Phase 2 | 57.9 KM (Kilometer) | 78.67 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Punjab | Punjab | 25-Apr-2019 |
1447 | Four laning of Ropar-Chamkaur Sahib-Neelon-Doraha Road (Sirhind canal) upto NH-1 in length of 54.74 km in Punjab | 54.75 KM (Kilometer) | 240 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Chandigarh | Punjab | 25-Apr-2019 |
1448 | Road Upgradation of Bhawanigarh-Nabha-Gobindgarh road in length of 55.4 Km in Fatehgarh Sahib district | 55.4 KM (Kilometer) | 70.25 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Punjab | Punjab | 25-Apr-2019 |
1449 | Road Upgradation of Patiala-Nabha-Malerkotla Road under Punjab Road Sector of 55.8 km Phase 2 project | 55.8 KM (Kilometer) | 63.56 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Punjab | Punjab | 25-Apr-2019 |
1450 | Upgradation Operation and Maintenance of Moga-Kotkapura Road | 47.7 KM (Kilometer) | 62.09 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Punjab | Punjab | 25-Apr-2019 |
1451 | Dhaneta - Rakhi - Shahajpur | 13.5 KM (Kilometer) | 22 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1452 | Inter laning of Bamkhalfata-Dogawa-Borawa-Sarvardevla in length of 23.7 km | 23.67 KM (Kilometer) | 33.6 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1453 | Operation & maintenance of Badwah-Dhamnod road in length of 61.9 Km in Dhar district | 61.93 KM (Kilometer) | 71.31 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1454 | Road Upgradation (Dariyapur-Jasaondhi-Maharashtra Border) Project | 16.0 KM (Kilometer) | 21.2 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1455 | Road Upgradation (Intkhedi-Raslakhedi) Project | 9.34 KM (Kilometer) | 11.52 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1456 | Road Upgradation (Jaora-Piplodha-Jalandharkheda-Piploda Sailana) Project | 42.27 KM (Kilometer) | 60 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1457 | Road Upgradation (Kurawar-Eklera Talen) Project | 39.22 KM (Kilometer) | 49.89 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1458 | Road Upgradation (Lateri Anandpur-Bhagawantpur) Project | 22.6 KM (Kilometer) | 24.47 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1459 | Road Upgradation (Mangawan-Baikunthpur) Project | 18.8 KM (Kilometer) | 26.29 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1460 | Road Upgradation (Pondi-Maharajpur-Parasmaniya Road) Project | 25.09 KM (Kilometer) | 31.42 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1461 | Road upgradation of Waraseoni-Lalbarra Road in length of 18.30 km in Balaghat. | 18.3 KM (Kilometer) | 42.51 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1462 | Road Upgradation Project (Bijwad-Kusmaniya-Haran-Deepgaon) Project | 75.62 KM (Kilometer) | 109.01 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1463 | Road Upgradation Project (Datia-Bhander) Project | 29.17 KM (Kilometer) | 52.8 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1464 | Road Upgradation Project (Rehli-Gorjhamar) Project | 18.08 KM (Kilometer) | 28.27 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1465 | Road Upgradation Project (Salsalai-Gulana-Bolai Railway Station Road) Project | 19.39 KM (Kilometer) | 31.03 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1466 | Road Upgradation Project (Soyat-Pidawa) Project | 6.25 KM (Kilometer) | 8.8 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1467 | Upgradation of DevgulgarJod-Arandiyajod road in length of 35 km Shajapur district | 35.0 KM (Kilometer) | 57.83 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1468 | Upgradation of Javad-Khoh road in length of 21.0 km in Neemuch district | 21.0 KM (Kilometer) | 30.86 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1469 | Upgradation of Punasa - Mundi - Singhaji Road in length of 13.3 km. | 13.3 KM (Kilometer) | 24.5 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 17-Apr-2019 |
1470 | Development of metro link from Delhi Metro Sikanderpur to NH 8 Gurgaon | 5.1 KM (Kilometer) | 1088 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Haryana Urban Development Authority | Haryana | 11-Apr-2019 |
1471 | Road Upgradation (Gurgaon-Faridabad-Ballabhgarh-Sohna) Project | 66.2 KM (Kilometer) | 779.12 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Haryana | Haryana | 11-Apr-2019 |
1472 | Hospital (Fatehgarh Sahib) Project | 60.0 Beds | 5.25 | Social and Commercial Infrastructure | Health Care | Operation and Maintenance Stage | Punjab Health Systems Corporation | Punjab | 04-Apr-2019 |
1473 | Implementation of 70 MLD sewage treatment plant in Jamnagar district | 70.0 MLD (Millons Liter per day) | 78 | Water Sanitation | Sewage collection, treatment and disposal system | Operation and Maintenance Stage | Jamnagar Municipal Corporation | Gujarat | 27-Mar-2019 |
1474 | Bailkhedu - Saraoud | 12.69 KM (Kilometer) | 24 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Mar-2019 |
1475 | Road Upgradation Project (Guna-Aron-Sironaj) Project | 86.76 KM (Kilometer) | 190.62 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Mar-2019 |
1476 | Silwali-Sultanganj-Jaisingh Nagar Sagar | 76.8 KM (Kilometer) | 121 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Mar-2019 |
1477 | Suraiya - Padariya - Dhamni - Singori | 13.22 KM (Kilometer) | 25 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Mar-2019 |
1478 | Two laning of Satna-Majhgawan | 74.132 KM (Kilometer) | 121.78 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 19-Mar-2019 |
1479 | Kishangarh Gulabpura NH 79 Project ROB | Not Available | 16.66 | Transport | Roads and bridges | Completed | National Highways Authority of India (NHAI) | Maharashtra | 28-Jan-2019 |
1480 | Ulundurpet - Padalur (Pkg - VI-B) | 93.89 KM (Kilometer) | 748 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 28-Jan-2019 |
1481 | Karcham Wangtoo- Abdullapur Transmission Line | 223.0 CKM (Circuit Kilo Meter) | 1003 | Energy | Electricity transmission | Operation and Maintenance Stage | Power Grid Corpn. of India Ltd. | Himachal Pradesh | 20-Dec-2018 |
1482 | 225 MW combined cylce gas turbine power project in Uttarakhand | 225.0 MW (Mega Watt) | 1380 | Energy | Electricity generation (grid) | Operation and Maintenance Stage | Not Available | Uttarakhand | 17-Dec-2018 |
1483 | Development of Polytechnic at Rahon | Not Available | 10 | Social and Commercial Infrastructure | Education | Operation and Maintenance Stage | Department of Technical Education and Industrial Training, Punjab | Punjab | 17-Dec-2018 |
1484 | Implementation of 237 TPD solid waste management system at Haridwar | 237.0 TPD (Tonne per day) | 18.56 | Water Sanitation | Solid waste management | Operation and Maintenance Stage | Nagar Nigam Haridwar | Uttarakhand | 17-Dec-2018 |
1485 | Road Upgradation (Jhansi-Lalitpur NS-1/UP-3) Project | 49.7 KM (Kilometer) | 355 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Uttar Pradesh | 17-Dec-2018 |
1486 | Two laning of Alwar-Sikandra section in length of 81.0 Km | 81.0 KM (Kilometer) | 128.1 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 17-Dec-2018 |
1487 | Two laning of Jhalawar to Jhalawar road in length of 31 Km | 31.0 KM (Kilometer) | 79.73 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 17-Dec-2018 |
1488 | Two laning of Lalsot-Kota section in length of 195.0 Km | 195.0 KM (Kilometer) | 303.7 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 17-Dec-2018 |
1489 | Two laning of Phalodi-Ramji Ki Gol section in length of 292.0 Km | 292.0 KM (Kilometer) | 386.3 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 17-Dec-2018 |
1490 | Widening of 2- 6 lanes divided carriageway including rehabilitation of 2 lanes Jaipur-Kishangarh section of NH8,Rajasthan | 90.38 KM (Kilometer) | 615 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Rajasthan | 17-Dec-2018 |
1491 | Women Polytechnic College (Dausa) Project | 5.0 Acres | 5.49 | Social and Commercial Infrastructure | Education | Operation and Maintenance Stage | Directorate of Technical Education, Rajasthan | Rajasthan | 17-Dec-2018 |
1492 | Engineering College (Abu Road) Project | 10.0 Acres | 16.4 | Social and Commercial Infrastructure | Education | Operation and Maintenance Stage | Directorate of Technical Education, Rajasthan | Rajasthan | 13-Dec-2018 |
1493 | Five Star Hotel at Guwahati | 125.0 Rooms | 31.08 | Social and Commercial Infrastructure | Tourism | Operation and Maintenance Stage | Government of Assam | Assam | 13-Dec-2018 |
1494 | Gandhidham-Palanpur Railway Project | 301.0 KM (Kilometer) | 500 | Transport | Railway track, tunnel, viaducts, bridges | Operation and Maintenance Stage | Ministry of Railways | Gujarat | 13-Dec-2018 |
1495 | Mega Food Park (Murshidabad) Project | 82.0 Acres | 132.71 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Operation and Maintenance Stage | Ministry of Food Processing Industries | West Bengal | 13-Dec-2018 |
1496 | Setting up of 110 MW Chuzachen hydel power unit in East Sikkim | 110.0 MW (Mega Watt) | 1188.57 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Sikkim Power Development Corporation Limited | Sikkim | 13-Dec-2018 |
1497 | Technical & Engineering College (Kota Road) Project | 10.0 Acres | 16.4 | Social and Commercial Infrastructure | Education | Operation and Maintenance Stage | Directorate of Technical Education, Rajasthan | Rajasthan | 13-Dec-2018 |
1498 | Women Polytechnic College (Jalore) Project | 5.0 Acres | 5.49 | Social and Commercial Infrastructure | Education | Operation and Maintenance Stage | Directorate of Technical Education, Rajasthan | Rajasthan | 13-Dec-2018 |
1499 | Road Upgradation (Badwah-Katkut ) Project | 24.0 KM (Kilometer) | 35 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 12-Dec-2018 |
1500 | Sikka Jetty | Not Available | 87 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Gujarat Maritime Board (GMB) | Gujarat | 12-Dec-2018 |
1501 | Two laning of Baran-Jhalawar section in length of 78.0 Km | 78.0 KM (Kilometer) | 111.7 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 12-Dec-2018 |
1502 | Women Polytechnic College (Dholpur) Project | 5.0 Acres | 5.49 | Social and Commercial Infrastructure | Education | Operation and Maintenance Stage | Directorate of Technical Education, Rajasthan | Rajasthan | 12-Dec-2018 |
1503 | Design Construction for improvement upgrading to four lanes finance operation and maintenance of Kadapa Pulivendula Road KP01 | 13.3 KM (Kilometer) | 51.95 | Transport | Roads and bridges | Operation and Maintenance Stage | Andhra Pradesh Road Development Corporation | Andhra Pradesh | 10-Dec-2018 |
1504 | Operation & Maintenance of Lalitpur-Sagar-Lakhnadon in length of 316.1 Km | 316.1 KM (Kilometer) | 30.46 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Madhya Pradesh | 10-Dec-2018 |
1505 | Road Upgradation (Kataphod-Nachalbor) Project | 60.38 KM (Kilometer) | 91 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Madhya Pradesh | 10-Dec-2018 |
1506 | Road Upgradation (Nasirabad-Mangliawas) Project | 24.0 KM (Kilometer) | 21.52 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | Rajasthan | 10-Dec-2018 |
1507 | Road Upgradation (Pulivendula-Ambakapalli-Murarichintala) Project | 1.0 KM (Kilometer) | 26.5 | Transport | Roads and bridges | Operation and Maintenance Stage | Andhra Pradesh Road Development Corporation | Andhra Pradesh | 10-Dec-2018 |
1508 | Road Upgradation (Pulivendula-Ramireddypalli-Palagiri) Project | 1.0 KM (Kilometer) | 36.6 | Transport | Roads and bridges | Operation and Maintenance Stage | Andhra Pradesh Road Development Corporation | Andhra Pradesh | 10-Dec-2018 |
1509 | Upgradation of Deesa-Panthawada-Gudari road of 44.1 km | 44.32 KM (Kilometer) | 89 | Transport | Roads and bridges | Operation and Maintenance Stage | Gujarat State Road Development Corporation Limited (GSRDC) | Gujarat | 10-Dec-2018 |
1510 | Design, Construction, Development, Finance, O&M NH-7 (Salem,Kumarpalyam) NH-47,Tamilnadu (BOT) basis | 54.0 KM (Kilometer) | 502 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 07-Dec-2018 |
1511 | Design. Construction, Development, Finance,O&M,End of proposed Kotakatta bypass,NH-7 Andhra Pradesh,NHDP PH-2 ON BOT basis | 75.5 KM (Kilometer) | 745 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Multi State/ Centre | 07-Dec-2018 |
1512 | Kadloor Yellareddy - Kalkallu - Gundla Pochanpalli on NH - 7 | 103.0 KM (Kilometer) | 546 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Andhra Pradesh | 07-Dec-2018 |
1513 | Operation & maintenance of Madurai-Kanyakumari road in length of 243.17 km on NH-7 | 243.1 KM (Kilometer) | 2309 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 07-Dec-2018 |
1514 | Tuni - Dharmavaram Road | 47.0 KM (Kilometer) | 231.9 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Andhra Pradesh | 07-Dec-2018 |
1515 | Upgradation of four lane Bhandara Road-Maharashtra-Chhattisgarh Border in length of 80 Km | 80.0 KM (Kilometer) | 528 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Maharashtra | 07-Dec-2018 |
1516 | Bay Park Project, Rushikonda, Visakhapatnam | Not Available | 38 | Social and Commercial Infrastructure | Tourism | Operation and Maintenance Stage | Not Available | Andhra Pradesh | 03-Dec-2018 |
1517 | MSW Processing Plant at Khajod | Not Available | 50 | Water Sanitation | Solid waste management | Operation and Maintenance Stage | Surat Municipal Corporation | Gujarat | 03-Dec-2018 |
1518 | 4-Laning of Hungund - Hospet Section of NH-13 Karnataka on("DBFOT") basis under NHDP III | 99.0 KM (Kilometer) | 946 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Karnataka | 30-Nov-2018 |
1519 | 6/8 Laning of Road port connectivity JNPT phase II | 18.0 KM (Kilometer) | 872 | Transport | Roads and bridges | Under Construction | National Highways Authority of India (NHAI) | Maharashtra | 30-Nov-2018 |
1520 | Design, Engineering, Construction, Development, Finance, O & M, near Padailjr NH-45 Tamil Nadu on (BOT) Basis | 93.8 KM (Kilometer) | 747.56 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Tamil Nadu | 30-Nov-2018 |
1521 | Development of Punjab Institute of Medical Sciences, Jalandhar | Not Available | 250 | Social and Commercial Infrastructure | Health Care | Operation and Maintenance Stage | Directorate of Research and Medical Education, Punjab | Punjab | 30-Nov-2018 |
1522 | Nellore bypass project, National Highway No. 5 | 17.1 KM (Kilometer) | 389 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | Andhra Pradesh | 30-Nov-2018 |
1523 | Raja Canal wastewater treatment plant | 40.0 MLD (Millons Liter per day) | 44.8 | Water Sanitation | Sewage collection, treatment and disposal system | Operation and Maintenance Stage | Not Available | Karnataka | 30-Nov-2018 |
1524 | Savitri Mata Mandir Ropeway Project, Pushkar | Not Available | 9 | Social and Commercial Infrastructure |