List of Goverment Infrastructure Projects (Traditional Procurement)
This Report provides information on infrastructure projects implemented by the Government on PPP basis across pre-defined set of parameters and following coverage criteria:
Export to Excel
Projects that were either under 'Pre-construction Stage', 'Under Construction' or 'Operation and Maintenance Stage' as on April 1, 2011 or 'Awarded' thereafter and with Project Cost >INR 5 crore.
Please click on project name for more details of the project.
- No. of Projects in this Report: 6157
- Total Project Cost(in Rs Crore): 3539118.537
Sr No. | Project Name | Project Capacity | Total Project Cost (In Rs.Crore) | Sector | Sub-Sector | Status | Project Authority | Date Of Award | Location | Update Date |
---|---|---|---|---|---|---|---|---|---|---|
1 | Solar Photovoltaic Power (Andaman & Nicobar) Project | 5 | 52.09 | Energy | Renewable energy (grid) | Completed | NTPC Limited | 12 Dec 2011 | Andaman & Nicobar Islands (UT) | 27 Sep 2015 |
2 | Upgradation Penchalakona-Yerpedu road in length of 83.6 km in Anantapur district | 84 | 361.30 | Transport | Roads and bridges | Completed | Roads and Buildings Department, Andhra Pradesh | 19 May 2014 | Andhra Pradesh | 06 Mar 2017 |
3 | Road Upgradation (Chittoor-Puttur) Project | 60.8 | 112.12 | Transport | Roads and bridges | Completed | Andhra Pradesh Road Development Corporation | 09 Sep 2009 | Andhra Pradesh | 27 Sep 2015 |
4 | Four laning of Tadipatri-Bhaogasamudram road in length of 67.3 Km in Anantapur district | 67.3 | 325.00 | Transport | Roads and bridges | Completed | Andhra Pradesh Road Development Corporation | 09 Jan 2012 | Andhra Pradesh | 09 Dec 2016 |
5 | Gooty-Pullampet DL Railway Line | 151 | 689.00 | Transport | Railway track, tunnel, viaducts, bridges | Completed | Rail Vikas Nigam Limited | 07 Jul 2006 | Andhra Pradesh | 16 Aug 2019 |
6 | Simhadri Coal Based Power Project - Stage II | 1000 | 5,401.17 | Energy | Electricity generation (grid) | Completed | NTPC Limited | 30 Mar 2007 | Andhra Pradesh | 22 Jun 2019 |
7 | Transmission Line (Yemmiganur-Uravakonda) Project | 102.5 | 125.84 | Energy | Electricity transmission | Completed | Transmission Corporation of Andhra Pradesh Limited | 16 Dec 2013 | Andhra Pradesh | 18 Aug 2016 |
8 | Transmission Line (Rajapuram) Project | 76 | 97.82 | Energy | Electricity transmission | Completed | Transmission Corporation of Andhra Pradesh Limited | 21 Jul 2014 | Andhra Pradesh | 05 Jan 2016 |
9 | Setting up of 600 MW Kameng hydel power unit at West Kameng# | 600 | 5,269.00 | Energy | Renewable energy (grid) | Under Construction | North Eastern Electric Power Corporation Limited | 08 Apr 2004 | Arunachal Pradesh | 04 Dec 2019 |
10 | Four laning of Itanagar to Holongi section road in length of 19.3 Km of NH-52A (New NH-415) | 19.3 | 536.70 | Transport | Roads and bridges | Completed | Public Works Department, Arunachal Pradesh | 15 Aug 2011 | Arunachal Pradesh | 04 Dec 2019 |
11 | Laying of Bogibeel rail-cum-road bridge over Brahmaputra river | 76 | 5,920.00 | Transport | Railway track, tunnel, viaducts, bridges | Completed | Northeast Frontier Railway | 30 Apr 2008 | Assam | 04 Dec 2019 |
12 | Road Upgradation of 135 km including construction of paved shoulder and spot raising on NH-52 | 135 | 135.80 | Transport | Roads and bridges | Completed | Public Works Department, Assam | 01 Aug 2012 | Assam | 04 Dec 2019 |
13 | Road Upgradation (Silchar-Balachera) Project - Phase II [AS-01] | 25.7 | 302.75 | Transport | Railway track, tunnel, viaducts, bridges | Completed | National Highways Authority of India (NHAI) | 17 Sep 2004 | Assam | 04 Jul 2016 |
14 | Transmission Line (Mariani-Namrup) Project | 146.05 | 55.75 | Energy | Electricity transmission | Completed | Assam Electricity Grid Corporation Limited | 20 Jul 2012 | Assam | 15 Mar 2016 |
15 | Setting up a 1320 MW Barh super thermal based power unit stage-II at Barh in Patna | 1320 | 10,071.50 | Energy | Electricity generation (grid) | Completed | NTPC Limited | 31 Mar 2008 | Bihar | 24 Mar 2017 |
16 | Two laning of Shivganj-Baidrabad road of SH-68 in length of 83.1 km | 83.1 | 174.32 | Transport | Roads and bridges | Completed | Bihar State Road Development Corporation Limited | 15 Jul 2009 | Bihar | 04 Dec 2019 |
17 | Two laning of Dumaria-Ranitalab road of SH-69 in length of 154.2 km | 154.2 | 318.75 | Transport | Roads and bridges | Completed | Bihar State Road Development Corporation Limited | 30 Dec 2008 | Bihar | 04 Dec 2019 |
18 | Road Upgradation (Kameshwarnagar-Ramchandrapur-Lurgi) Project | 48 | 51.17 | Transport | Roads and bridges | Completed | Public Works Department, Chhattisgarh | 24 May 2010 | Chhattisgarh | 06 Sep 2016 |
19 | High Level Bridge (Surajgarh) Project | 1.3 | 56.16 | Transport | Roads and bridges | Completed | Public Works Department, Chhattisgarh | 03 Oct 2008 | Chhattisgarh | 17 Nov 2015 |
20 | Sipat Coal Based Power Project - Stage I | 1980 | 9,031.22 | Energy | Electricity generation (grid) | Completed | NTPC Limited | 30 Apr 2004 | Chhattisgarh | 27 Sep 2015 |
21 | Marwa Tendubhata Coal Based Power Project | 1000 | 8,500.00 | Energy | Electricity generation (grid) | Completed | Chhattisgarh State Power Generation Company Limited | 31 Dec 2008 | Chhattisgarh | 07 Aug 2016 |
22 | Elevated Corridor (Vikaspuri-Meera Bagh) Project | 4.3 | 464.23 | Transport | Roads and bridges | Completed | Public Works Department, Delhi | 22 Feb 2013 | Delhi (UT) | 18 Aug 2016 |
23 | Road Corridor (Mangolpuri-Madhuban Chowk) Project | 3.9 | 300.00 | Transport | Roads and bridges | Completed | Public Works Department, Delhi | 10 Apr 2013 | Delhi (UT) | 31 Mar 2016 |
24 | Road Corridor (Madhuban Chowk-Mukarba Chowk) Project | 4 | 380.10 | Transport | Airports | Completed | Public Works Department, Delhi | 10 Apr 2013 | Delhi (UT) | 31 Mar 2016 |
25 | Integrated Terminal Building (Goa) | 4 | 380.10 | Transport | Airports | Completed | Airports Authority of India (AAI) | 06 May 2010 | Goa | 03 Nov 2016 |
26 | R-O-B (Gondal Road & Mavdi Road) Project | 1.2 | 51.09 | Transport | Roads and bridges | Completed | Rajkot Municipal Corporation | 03 Nov 2008 | Gujarat | 01 Jun 2016 |
27 | Grade Separator (Thaltej & Gurudwara) Project | 1.45 | 60.02 | Transport | Roads and bridges | Completed | Roads and Buildings Department, Gujarat | 25 Sep 2012 | Gujarat | 06 Mar 2017 |
28 | Water Supply Scheme (Dhanki-Ratanpar) NC-34 | 60 | 352.82 | Water Sanitation | Water supply pipeline | Completed | Gujarat Water Infrastructure Limited | 07 Feb 2012 | Gujarat | 03 Oct 2016 |
29 | Setting up of 400 kV Veloda substation at Sankhari# | 400 | 89.78 | Energy | Electricity transmission | Completed | Gujarat Energy Transmission Corporation Limited | 16 Aug 2013 | Gujarat | 04 Dec 2019 |
30 | Ukai Coal Based Power Project - Unit No. 6 | 500 | 3,044.57 | Energy | Electricity generation (grid) | Completed | Gujarat State Electricity Corporation Limited | 07 Sep 2007 | Gujarat | 30 Nov 2015 |
31 | Sikka Coal Based Power Project - Unit No. 3 & 4 | 500 | 3,179.51 | Energy | Electricity generation (grid) | Completed | Gujarat State Electricity Corporation Limited | 10 Apr 2007 | Gujarat | 30 Nov 2015 |
32 | BRTS Corridor (Anuvrat Dwar-Kharwar Nagar Junction) Project | 4.5 | 97.54 | Transport | Urban public transport (except rolling stock) | Completed | Surat Municipal Corporation | 18 Sep 2012 | Gujarat | 31 Mar 2016 |
33 | Setting up of 10 MW solar photovoltaic based power unit at Panipat Thermal power station | 10 | 60.55 | Energy | Renewable energy (grid) | Completed | Haryana Power Generation Corporation Limited | 30 May 2016 | Haryana | 26 Mar 2017 |
34 | Biomass Based Power (Mohindergarh) Project | 9.9 | 64.00 | Energy | Renewable energy (grid) | Completed | Haryana Renewable Energy Development Agency | 20 Feb 2007 | Haryana | 27 Sep 2015 |
35 | Setting up a 1500 MW coal based power unit at Jhajjar | 1500 | 10,131.00 | Energy | Electricity generation (grid) | Completed | Haryana Power Generation Corporation Limited | 05 Jul 2007 | Haryana | 24 Mar 2017 |
36 | Water Supply Scheme (Kaushalya Dam) | 45 | 207.32 | Water Sanitation | Water supply pipeline | Completed | Haryana Urban Development Authority | 18 Mar 2008 | Haryana | 04 Dec 2019 |
37 | Road Upgradation (Una - Barsar - Bhota - Bhamla - Kalkhar - Ner Chowk) Project | 45 | 115.83 | Transport | Roads and bridges | Completed | Public Works Department, Himachal Pradesh | 29 Feb 2008 | Himachal Pradesh | 01 Nov 2016 |
38 | 45.8 km Road Upgradation (Una - Barsar - Bhota - Bhamla - Kalkhar - Ner Chowk) Project | 45.8 | 141.92 | Transport | Roads and bridges | Completed | Public Works Department, Himachal Pradesh | 29 Feb 2008 | Himachal Pradesh | 01 Nov 2016 |
39 | Road Upgradation (Kamarhati - Sarahan-Nahan) Project | 71.7 | 202.66 | Transport | Roads and bridges | Completed | Public Works Department, Himachal Pradesh | 26 Oct 2009 | Himachal Pradesh | 01 Nov 2016 |
40 | Road Upgradation (Mehatpur-Una- Amb Road) Project | 44.7 | 98.77 | Transport | Roads and bridges | Completed | Public Works Department, Himachal Pradesh | 10 Oct 2007 | Himachal Pradesh | 15 Sep 2016 |
41 | Widening and Strengthening of Draman-Sihunta-Chowari-Jot-Chamba-Bharmour Road from 0.00 km to 24.00 km at Draman | 24 | 48.70 | Transport | Roads and bridges | Completed | Public Works Department, Himachal Pradesh | 20 Nov 2009 | Himachal Pradesh | 02 Nov 2016 |
42 | Implementation of Balh Valley medium irrigation project at Sundar Nagar in Mandi district | 6869.5 | 103.86 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Completed | Irrigation and Public Health Department, Himachal Pradesh | 02 Dec 2004 | Himachal Pradesh | 27 Feb 2017 |
43 | Shah Nahar Canal Extension Project | 62.7 | 392.85 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Completed | Irrigation and Public Health Department, Himachal Pradesh | 31 Dec 1997 | Himachal Pradesh | 27 Feb 2017 |
44 | Koldam Thermal Power Project | 800 | 6,289.69 | Energy | Electricity generation (grid) | Completed | NTPC Limited | 31 Dec 2003 | Himachal Pradesh | 21 Jul 2016 |
45 | Storm Water Drainage (Pohru Chowk-Chanapora Bridge) Project | 9.3 | 50.68 | Water Sanitation | Storm water drainage system | Completed | Jammu and Kashmir Economic Reconstruction Agency | 26 Dec 2007 | Jammu & Kashmir | 27 Feb 2017 |
46 | Storm Water Drainage (Rawalpora chowk-Tengpora Bridge) Project | 23.09 | 86.04 | Water Sanitation | Storm water drainage system | Completed | Jammu and Kashmir Economic Reconstruction Agency | 10 Aug 2007 | Jammu & Kashmir | 27 Feb 2017 |
47 | Road Upgradation (Hablipora-Qadar-Qaimh) Project | 24 | 54.90 | Transport | Roads and bridges | Completed | Jammu and Kashmir Economic Reconstruction Agency | 08 Nov 2008 | Jammu & Kashmir | 27 Feb 2017 |
48 | Road Upgradation (Wanpoh-Chawalgam-Aharbal) Project | 42.7 | 60.92 | Transport | Roads and bridges | Completed | Jammu and Kashmir Economic Reconstruction Agency | 07 Jan 2008 | Jammu & Kashmir | 27 Feb 2017 |
49 | Upgradation of Chandrapura-Phusro-Gomia road in length of 36.3 km in Bokaro | 36.3 | 129.76 | Transport | Roads and bridges | Completed | State Highways Authority of Jharkhand | 10 Sep 2014 | Jharkhand | 15 Jun 2017 |
50 | Road Upgradation (Medininagar NH-75) Project | 59 | 110.18 | Transport | Roads and bridges | Completed | Department of Road Construction, Jharkhand | 27 Oct 2010 | Jharkhand | 29 Jan 2016 |
51 | Road Upgradation (Medininagar NH-98) Project | 53.54 | 73.14 | Transport | Roads and bridges | Completed | Department of Road Construction, Jharkhand | 27 Feb 2012 | Jharkhand | 01 Jul 2019 |
52 | Road Upgradation (Hazaribagh) Project - Phase II | 46.17 | 72.40 | Transport | Roads and bridges | Completed | Department of Road Construction, Jharkhand | 28 Feb 2011 | Jharkhand | 29 Jan 2016 |
53 | Setting up of 500 MW Bokaro A coal based power project in Bokaro district | 500 | 4,138.41 | Energy | Electricity generation (grid) | Completed | Damodar Valley Corporation | 16 Sep 2008 | Jharkhand | 16 Sep 2019 |
54 | Setting up of 800 MW Yermarus thermal power station project in Raichur district | 800 | 12,589.00 | Energy | Electricity generation (grid) | Completed | Karnataka Power Corporation Limited | 09 Apr 2010 | Karnataka | 04 Dec 2019 |
55 | Coal Based Power (Ballari) Project | 700 | 4,686.20 | Energy | Electricity generation (grid) | Completed | Karnataka Power Corporation Limited | 05 Oct 2013 | Karnataka | 04 Dec 2019 |
56 | Rural Electrification (Bangalore) Project - R-APDRP | 25 | 431.01 | Energy | Electricity transmission | Completed | Bangalore Electricity Supply Company Limited | 11 Dec 2009 | Karnataka | 17 Oct 2016 |
57 | Rural Electrification (Dakshina Kannada) Project - RGGVY | 620.8 | 87.38 | Energy | Electricity transmission | Completed | Mangalore Electricity Supply Company Limited | 09 Oct 2012 | Karnataka | 18 Oct 2016 |
58 | Water Supply (Bijapur) Project - UIDSSMT | 38 | 88.90 | Water Sanitation | Water supply pipeline | Completed | Karnataka Urban Water Supply and Drainage Board | 12 Jul 2012 | Karnataka | 30 Nov 2015 |
59 | Water Supply (Hungund-Ilkal-Kustagi) Project - UIDSSMT | 32.32 | 88.00 | Water Sanitation | Water supply pipeline | Completed | Karnataka Urban Water Supply and Drainage Board | 04 Feb 2009 | Karnataka | 03 Mar 2017 |
60 | Implementation of LPG pipeline between Mangalore-Yediyur with a capacity of 3.1 MMTPA | 3.1 | 838.08 | Energy | Gas pipelines | Completed | Hindustan Petroleum Corporation Limited | 20 Nov 2012 | Karnataka | 20 Dec 2016 |
61 | Upgradation of Chowdapur-Gulbarga road in length of 29.3 km in Ranga Reddy | 29.3 | 58.46 | Transport | Roads and bridges | Completed | Public Works, Ports and Inland Water Transport Department, Karnataka | 11 Mar 2011 | Karnataka | 20 Mar 2017 |
62 | Upgradation of Dharwad-Saundatti road in length of 36 km in Belgaum | 36 | 84.40 | Transport | Roads and bridges | Completed | Public Works, Ports and Inland Water Transport Department, Karnataka | 11 Mar 2011 | Karnataka | 25 Oct 2019 |
63 | Kottur-Harpanhalli-Harihar BG Railway Line Project | 65 | 488.70 | Transport | Railway track, tunnel, viaducts, bridges | Completed | South Western Railway | 18 Feb 2008 | Karnataka | 20 Apr 2016 |
64 | Upgradation of various roads in length of 93.5 km in Gadag district | 93.5 | 50.00 | Transport | Roads and bridges | Completed | Public Works, Ports and Inland Water Transport Department, Karnataka | 20 Oct 2012 | Karnataka | 05 Mar 2017 |
65 | Dharwad-Kambarganvi GC Railway Line Project | 26.68 | 188.88 | Transport | Railway track, tunnel, viaducts, bridges | Completed | South Western Railway | 22 Jan 2007 | Karnataka | 19 Apr 2016 |
66 | International Airport Terminal (Trivandrum) Project | 0 | 289.00 | Transport | Airports | Completed | Airports Authority of India (AAI) | 22 Jan 2007 | Kerala | 01 Jul 2019 |
67 | Implementation of 100 MLD water treatment plant at Maradu, Kochi in Ernakulam district | 100 | 250.00 | Water Sanitation | Water supply pipeline | Completed | Kerala Water Authority | 01 Jan 2010 | Kerala | 13 Dec 2016 |
68 | Water Supply (Pattuvam) Project - Package 1 | 90 | 101.30 | Water Sanitation | Water supply pipeline | Completed | Kerala Water Authority | 13 Oct 2006 | Kerala | 21 Jul 2016 |
69 | Sewerage Scheme (Thiruvananthapuram) Phase - I | 107 | 75.57 | Water Sanitation | Sewage collection, treatment and disposal system | Completed | Local Self Government Department, Kerala | 27 Feb 2009 | Kerala | 02 Jul 2019 |
70 | Water Supply (Cherthala) Project | 107 | 411.47 | Water Sanitation | Water treatment plants | Completed | Kerala Water Authority | 27 Sep 2006 | Kerala | 02 Jul 2019 |
71 | Water Supply (Meenad) Project | 73 | 143.49 | Water Sanitation | Water supply pipeline | Completed | Kerala Water Authority | 19 Sep 2006 | Kerala | 21 Jul 2016 |
72 | Feeder Separation Project (Mandsaur & Sitamau) | 0 | 52.96 | Energy | Electricity transmission | Completed | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited | 04 Oct 2011 | Madhya Pradesh | 02 Jul 2019 |
73 | Feeder Separation Project (Neemuch, Manasa & Jawad) | 0 | 54.18 | Energy | Electricity transmission | Completed | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited | 04 Oct 2011 | Madhya Pradesh | 02 Jul 2019 |
74 | Feeder Separation Project (Garoth & Malhargarh) | 0 | 53.77 | Energy | Electricity transmission | Completed | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited | 04 Oct 2011 | Madhya Pradesh | 02 Jul 2019 |
75 | Feeder Separation Project (Ratlam) | 0 | 22.08 | Energy | Electricity transmission | Completed | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited | 30 Nov 2010 | Madhya Pradesh | 02 Jul 2019 |
76 | Power Sector Investment Program - Project 5 (992 CKM) | 992 | 72.50 | Energy | Electricity transmission | Completed | Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited | 19 Nov 2009 | Madhya Pradesh | 02 Jul 2019 |
77 | Power Sector Investment Program - Project 5 (1097 CKM) | 1097 | 80.47 | Energy | Electricity transmission | Completed | Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited | 19 Nov 2009 | Madhya Pradesh | 27 Sep 2015 |
78 | Jobat Irrigation Project | 24334.9 | 117.45 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Completed | Narmada Valley Development Authority | 31 Mar 2004 | Madhya Pradesh | 03 Oct 2016 |
79 | IT Park (Indore) Project | 0 | 88.12 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Completed | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 21 Nov 2011 | Madhya Pradesh | 02 Jul 2019 |
80 | Road Upgradation (Bhind-Ater-Porsa) Project | 60.9 | 84.78 | Transport | Roads and bridges | Completed | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 29 Jan 2011 | Madhya Pradesh | 28 Feb 2016 |
81 | R-O-B (Habibganj) Project | 1.1 | 64.80 | Transport | Roads and bridges | Completed | Bhopal Municipal Corporation | 10 Jun 2011 | Madhya Pradesh | 04 Dec 2019 |
82 | Khajuraho Airport Project - Modernisation | 1 | 82.72 | Transport | Airports | Completed | Airports Authority of India (AAI) | 24 Dec 2009 | Madhya Pradesh | 01 Nov 2016 |
83 | Flyover (Shil-Mahape) Project | 1.1 | 82.46 | Transport | Roads and bridges | Completed | Mumbai Metropolitan Region Development Authority (MMRDA) | 03 Oct 2011 | Maharashtra | 16 Dec 2015 |
84 | Road Upgradation (Santacruz-Chembur) Project (Section - 2) | 6.5 | 375.24 | Transport | Roads and bridges | Completed | Mumbai Metropolitan Region Development Authority (MMRDA) | 10 May 2004 | Maharashtra | 18 Jul 2019 |
85 | Road Upgradation (Chowk Karjat-Murbad) Project | 32.9 | 70.16 | Transport | Roads and bridges | Completed | Public Works Department, Maharashtra | 11 Feb 2013 | Maharashtra | 06 Oct 2015 |
86 | Construction of flyover at Pune-Satara road in length of 1.2 km | 1.2 | 55.78 | Transport | Roads and bridges | Completed | Pune Municipal Corporation | 28 Dec 2011 | Maharashtra | 01 Jul 2019 |
87 | Flyover Project (Kapurbawadi) | 3.9 | 197.00 | Transport | Roads and bridges | Completed | Maharashtra State Road Development Corporation Limited (MSRDC) | 24 Jul 2009 | Maharashtra | 19 Aug 2019 |
88 | Eastern Freeway - Part II (Anik-Panjarpol) Project | 4.3 | 304.14 | Transport | Roads and bridges | Completed | Mumbai Metropolitan Region Development Authority (MMRDA) | 11 Aug 2008 | Maharashtra | 16 Dec 2015 |
89 | Sahar Elevated Road (Western Express Highway-T2 International Airport) | 2.2 | 404.00 | Transport | Roads and bridges | Completed | Mumbai Metropolitan Region Development Authority (MMRDA) | 09 Jan 2008 | Maharashtra | 24 Dec 2015 |
90 | Underground Sewerage Project - I | 163 | 163.16 | Water Sanitation | Sewage collection, treatment and disposal system | Completed | Nashik Municipal Corporation | 31 Jul 2006 | Maharashtra | 27 Sep 2015 |
91 | Sewerage Scheme (Koparkhairane) | 87.5 | 155.82 | Water Sanitation | Sewage collection, treatment and disposal system | Completed | Navi Mumbai Municipal Corporation | 18 Aug 2009 | Maharashtra | 02 Jul 2019 |
92 | Sewerage Scheme (Belapur-Nerul)Underground Sewerage Project - I | 19.5 | 104.37 | Water Sanitation | Sewage collection, treatment and disposal system | Completed | Navi Mumbai Municipal Corporation | 18 Aug 2009 | Maharashtra | 02 Jul 2019 |
93 | Sewerage Scheme (Vashi-Turbhe) | 37.5 | 122.43 | Water Sanitation | Sewage collection, treatment and disposal system | Completed | Navi Mumbai Municipal Corporation | 18 Aug 2009 | Maharashtra | 03 Jul 2019 |
94 | Underground Sewerage Scheme (Kulgaon-Badlapur) | 22 | 226.43 | Water Sanitation | Sewage collection, treatment and disposal system | Completed | Kulgaon Badlapur Municipal Council | 15 Feb 2010 | Maharashtra | 04 Dec 2019 |
95 | Storm Water Drainage Project | 306 | 340.57 | Water Sanitation | Storm water drainage system | Completed | Nashik Municipal Corporation | 30 Apr 2009 | Maharashtra | 27 Sep 2015 |
96 | Mumbai Uran LPG Pipeline | 0.876 | 246.00 | Energy | Gas pipelines | Completed | Bharat Petroleum Corporation Limited | 10 Aug 2012 | Maharashtra | 23 Jul 2019 |
97 | Setting up of 400 kV substation at Alkud in Sangali | 400 | 86.24 | Energy | Electricity transmission | Completed | Maharashtra State Electricity Transmission Company Limited | 27 Aug 2014 | Maharashtra | 20 Mar 2017 |
98 | Construction of tunnel from Gundavali to Kapurbawadi section 'A' in length of 6.8 km | 6.8 | 1,543.20 | Water Sanitation | Water supply pipeline | Completed | Municipal Corporation of Greater Mumbai | 07 Dec 2009 | Maharashtra | 04 Dec 2019 |
99 | Implementation of 29.04 MLD water supply scheme in Hingoli district under UIDSSMT scheme | 29.04 | 65.25 | Water Sanitation | Water supply pipeline | Completed | Hingoli Municipal Council | 28 Aug 2009 | Maharashtra | 04 Dec 2019 |
100 | Water Supply Project | 0 | 58.76 | Water Sanitation | Water supply pipeline | Completed | Nashik Municipal Corporation | 30 Nov 2006 | Maharashtra | 27 Sep 2015 |