List of Infrastructure Projects – Sector Wise
This Report provides information on all infrastructure projects in the database across pre-defined set of parameters and following coverage criteria:
Export to Excel
Government Infrastructure Projects (PPP) that were either under 'Pre-construction Stage', 'Under Construction' or 'Operation and Maintenance Stage' as on April 1, 2011 or 'Awarded' thereafter and with Project Cost >INR 5 crore.
Government Infrastructure Projects (Traditional Procurement) that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore; and
Private Sector Projects that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore.
- No. of Projects in this Report: 9242
- Total Project Cost(in Rs Crore): 6813008.32
Sr No. | Project Name | Project Capacity | Total Project Cost (In Rs.Crore) | Sector | Sub-Sector | Status | Project Authority | Date Of Award | Location | Update Date |
---|---|---|---|---|---|---|---|---|---|---|
1 | Establishment of 20 MW DG power plant at Bambooflat, South Andaman District # | 20 | 74.96 | Energy | Electricity generation (grid) | Completed | Andaman and Nicobar Administration | 20 Nov 1997 | Andaman & Nicobar Islands (UT) | 25 Oct 2019 |
2 | Solar Photovoltaic Power (Andaman & Nicobar) Project | 5 | 52.09 | Energy | Renewable energy (grid) | Completed | NTPC Limited | 12 Dec 2011 | Andaman & Nicobar Islands (UT) | 27 Sep 2015 |
3 | Transmission Line (Rajapuram) Project | 76 | 97.82 | Energy | Electricity transmission | Completed | Transmission Corporation of Andhra Pradesh Limited | 21 Jul 2014 | Andhra Pradesh | 05 Jan 2016 |
4 | Transmission Line (Yemmiganur-Uravakonda) Project | 102.5 | 125.84 | Energy | Electricity transmission | Completed | Transmission Corporation of Andhra Pradesh Limited | 16 Dec 2013 | Andhra Pradesh | 18 Aug 2016 |
5 | Setting up of 26 MW captive coal based power unit at Gondiparla in Kurnool district | 26 | 208.00 | Energy | Electricity generation (grid) | Completed | Sree Rayalaseema Alkalies & Allied Chemicals Limited | 01 Dec 2010 | Andhra Pradesh | 20 Dec 2016 |
6 | Simhadri Coal Based Power Project - Stage II | 1000 | 5,401.17 | Energy | Electricity generation (grid) | Completed | NTPC Limited | 30 Mar 2007 | Andhra Pradesh | 22 Jun 2019 |
7 | Gooty-Pullampet DL Railway Line | 151 | 689.00 | Transport | Railway track, tunnel, viaducts, bridges | Completed | Rail Vikas Nigam Limited | 07 Jul 2006 | Andhra Pradesh | 16 Aug 2019 |
8 | 8 Combined Cycle Power (West Godavari) Project Phase I | 100 | 858.00 | Energy | Electricity generation (grid) | Completed | Panduranga Energy Systems Private Limited | 18 Dec 2010 | Andhra Pradesh | 06 Jun 2019 |
9 | Four laning of Narketpally-Addanki-Medarametla Road Project | 212.5 | 1,760.53 | Transport | Roads and bridges | Operation and Maintenance Stage | Andhra Pradesh Road Development Corporation | 23 Jul 2010 | Andhra Pradesh | 20 Nov 2019 |
10 | Upgradation Penchalakona-Yerpedu road in length of 83.6 km in Anantapur district | 84 | 361.30 | Transport | Roads and bridges | Completed | Roads and Buildings Department, Andhra Pradesh | 19 May 2014 | Andhra Pradesh | 06 Mar 2017 |
11 | Road Upgradation (Chittoor-Puttur) Project | 60.8 | 112.12 | Transport | Roads and bridges | Completed | Andhra Pradesh Road Development Corporation | 09 Sep 2009 | Andhra Pradesh | 27 Sep 2015 |
12 | Four laning of Tadipatri-Bhaogasamudram road in length of 67.3 Km in Anantapur district | 67.3 | 325.00 | Transport | Roads and bridges | Completed | Andhra Pradesh Road Development Corporation | 09 Jan 2012 | Andhra Pradesh | 09 Dec 2016 |
13 | Mechanism of Coal Handling facilities and upgradation of General Cargo Berth at Outer Harbour of Visakhapatnam Port | 10.18 | 640.40 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Ministry of Shipping | 10 Jun 2010 | Andhra Pradesh | 04 Dec 2019 |
14 | Establishment of Container Terminal and O & M of handling equipment at multipurpose berth, Visakhapatnam Port | 0 | 108.00 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Visakhapatnam Port Trust | 11 Sep 2002 | Andhra Pradesh | 01 Oct 2019 |
15 | Setting up of 600 MW Kameng hydel power unit at West Kameng# | 600 | 5,269.00 | Energy | Renewable energy (grid) | Under Construction | North Eastern Electric Power Corporation Limited | 08 Apr 2004 | Arunachal Pradesh | 04 Dec 2019 |
16 | Four laning of Itanagar to Holongi section road in length of 19.3 Km of NH-52A (New NH-415) | 19.3 | 536.70 | Transport | Roads and bridges | Completed | Public Works Department, Arunachal Pradesh | 15 Aug 2011 | Arunachal Pradesh | 04 Dec 2019 |
17 | Transmission Line (Mariani-Namrup) Project | 146.05 | 55.75 | Energy | Electricity transmission | Completed | Assam Electricity Grid Corporation Limited | 20 Jul 2012 | Assam | 15 Mar 2016 |
18 | Laying of Bogibeel rail-cum-road bridge over Brahmaputra river | 76 | 5,920.00 | Transport | Railway track, tunnel, viaducts, bridges | Completed | Northeast Frontier Railway | 30 Apr 2008 | Assam | 04 Dec 2019 |
19 | Road Upgradation of 135 km including construction of paved shoulder and spot raising on NH-52 | 135 | 135.80 | Transport | Roads and bridges | Completed | Public Works Department, Assam | 01 Aug 2012 | Assam | 04 Dec 2019 |
20 | Road Upgradation (Silchar-Balachera) Project - Phase II [AS-01] | 25.7 | 302.75 | Transport | Roads and bridges | Completed | National Highways Authority of India (NHAI) | 17 Sep 2004 | Assam | 04 Jul 2016 |
21 | Operation and maintaenance of organic agriculture produces market complex at Sixmile, Khanapara, Guwahati on PPP mode | 1.4 | 7.70 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Operation and Maintenance Stage | Assam State Agricultural Marketing Board | 29 Apr 2015 | Assam | 19 Aug 2019 |
22 | Two laning of Shivganj-Baidrabad road of SH-68 in length of 83.1 km | 83.1 | 174.32 | Transport | Roads and bridges | Completed | Bihar State Road Development Corporation Limited | 15 Jul 2009 | Bihar | 04 Dec 2019 |
23 | Two laning of Dumaria-Ranitalab road of SH-69 in length of 154.2 km | 154.2 | 318.75 | Transport | Roads and bridges | Completed | Bihar State Road Development Corporation Limited | 30 Dec 2008 | Bihar | 04 Dec 2019 |
24 | Setting up a 1320 MW Barh super thermal based power unit stage-II at Barh in Patna | 1320 | 10,071.50 | Energy | Electricity generation (grid) | Completed | NTPC Limited | 31 Mar 2008 | Bihar | 24 Mar 2017 |
25 | Setting up of 5 MW solar photovoltaic power unit in Gopalganj | 5 | 50.00 | Energy | Renewable energy (grid) | Completed | Claro Energy Private Limited | 30 Jan 2015 | Bihar | 16 Aug 2019 |
26 | Setting up of 5 MW solar photovoltaic power unit in Khagaria | 5 | 50.00 | Energy | Renewable energy (grid) | Completed | Claro Energy Private Limited | 30 Jan 2015 | Bihar | 16 Aug 2019 |
27 | Road Upgradation (Kameshwarnagar-Ramchandrapur-Lurgi) Project | 48 | 51.17 | Transport | Roads and bridges | Completed | Public Works Department, Chhattisgarh | 24 May 2010 | Chhattisgarh | 06 Sep 2016 |
28 | High Level Bridge (Surajgarh) Project | 1.3 | 56.16 | Transport | Roads and bridges | Completed | Public Works Department, Chhattisgarh | 03 Oct 2008 | Chhattisgarh | 17 Nov 2015 |
29 | Marwa Tendubhata Coal Based Power Project | 1000 | 8,500.00 | Energy | Electricity generation (grid) | Completed | Chhattisgarh State Power Generation Company Limited | 31 Dec 2008 | Chhattisgarh | 07 Aug 2016 |
30 | Sipat Coal Based Power Project - Stage I | 1980 | 9,031.22 | Energy | Electricity generation (grid) | Completed | NTPC Limited | 30 Apr 2004 | Chhattisgarh | 27 Sep 2015 |
31 | Elevated Corridor (Vikaspuri-Meera Bagh) Project | 4.3 | 464.23 | Transport | Roads and bridges | Completed | Public Works Department, Delhi | 22 Feb 2013 | Delhi (UT) | 18 Aug 2016 |
32 | Road Corridor (Mangolpuri-Madhuban Chowk) Project | 3.9 | 300.00 | Transport | Roads and bridges | Completed | Public Works Department, Delhi | 10 Apr 2013 | Delhi (UT) | 31 Mar 2016 |
33 | Road Corridor (Madhuban Chowk-Mukarba Chowk) Project | 3.8 | 300.00 | Transport | Roads and bridges | Completed | Public Works Department, Delhi | 10 Apr 2013 | Delhi (UT) | 31 Mar 2016 |
34 | Integrated Terminal Building (Goa) | 4 | 380.10 | Transport | Airports | Completed | Airports Authority of India (AAI) | 06 May 2010 | Goa | 03 Nov 2016 |
35 | Implementation of 70 MLD sewage treatment plant in Jamnagar district | 70 | 78.00 | Water Sanitation | Sewage collection, treatment and disposal system | Operation and Maintenance Stage | Jamnagar Municipal Corporation | 08 Oct 2013 | Gujarat | 27 Mar 2019 |
36 | Water Supply Scheme (Dhanki-Ratanpar) NC-34 | 60 | 352.82 | Water Sanitation | Water supply pipeline | Completed | Gujarat Water Infrastructure Limited | 07 Feb 2012 | Gujarat | 03 Oct 2016 |
37 | Setting up of 400 kV Veloda substation at Sankhari# | 400 | 89.78 | Energy | Electricity transmission | Completed | Gujarat Energy Transmission Corporation Limited | 16 Aug 2013 | Gujarat | 04 Dec 2019 |
38 | Ukai Coal Based Power Project - Unit No. 6 | 500 | 3,044.57 | Energy | Electricity generation (grid) | Completed | Gujarat State Electricity Corporation Limited | 07 Sep 2007 | Gujarat | 30 Nov 2015 |
39 | Sikka Coal Based Power Project - Unit No. 3 & 4 | 500 | 3,179.51 | Energy | Completed |
Gujarat State Electricity Corporation Limited |
10 Apr 2007 |
Gujarat |
30 Nov 2015 |
|
40 | BRTS Corridor (Anuvrat Dwar-Kharwar Nagar Junction) Project | 4.5 | 97.54 | Transport | Urban public transport (except rolling stock) | Completed | Surat Municipal Corporation | 18 Sep 2012 | Gujarat | 31 Mar 2016 |
41 | 6 laning of Ahmedabad Vadodara Section of NH 8 and improvement of Ahmedabad Vadodara Expressway in Gujarat under NHDP Phase V | 102.3 | 4,880.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 25 Jul 2011 | Gujarat | 09 Nov 2019 |
42 | Four-laning of Ahmedabad – Viramgam - Maliya road | 180 | 1,397.00 | Transport | Roads and bridges | Operation and Maintenance Stage | Gujarat State Road Development Corporation Limited (GSRDC) | 17 Sep 2008 | Gujarat | 17 Jul 2019 |
43 | Four Laning of Halol-Godhra-Shamlaji Road | 173 | 1,422.00 | Transport | Roads and bridges | Operation and Maintenance Stage | Gujarat State Road Development Corporation Limited (GSRDC) | 17 Sep 2008 | Gujarat | 17 Jul 2019 |
44 | R-O-B (Gondal Road & Mavdi Road) Project | 1.2 | 51.09 | Transport | Roads and bridges | Completed | Rajkot Municipal Corporation | 03 Nov 2008 | Gujarat | 01 Jun 2016 |
45 | Four-laning of Rajkot-Jamnagar-Vadinar road | 131.7 | 1,096.00 | Transport | Roads and bridges | Operation and Maintenance Stage | Gujarat State Road Development Corporation Limited (GSRDC) | 17 Sep 2008 | Gujarat | 17 Jul 2019 |
46 | Grade Separator (Thaltej & Gurudwara) Project | 1.45 | 60.02 | Transport | Roads and bridges | Completed | Roads and Buildings Department, Gujarat | 25 Sep 2012 | Gujarat | 06 Mar 2017 |
47 | Biomass Based Power (Mohindergarh) Project | 9.9 | 64.00 | Energy | Renewable energy (grid) | Completed | Haryana Renewable Energy Development Agency | 20 Feb 2007 | Haryana | 27 Sep 2015 |
48 | Setting up of 10 MW solar photovoltaic based power unit at Panipat Thermal power station | 10 | 60.55 | Energy | Renewable energy (grid) | Completed | Haryana Power Generation Corporation Limited | 30 May 2016 | Haryana | 26 Mar 2017 |
49 | Setting up a 1500 MW coal based power unit at Jhajjar | 1500 | 10,131.00 | Energy | Electricity generation (grid) | Completed | Haryana Power Generation Corporation Limited | 05 Jul 2007 | Haryana | 24 Mar 2017 |
50 | Water Supply Scheme (Kaushalya Dam) | 45 | 207.32 | Water Sanitation | Water supply pipeline | Completed | Haryana Urban Development Authority | 18 Mar 2008 | Haryana | 04 Dec 2019 |
51 | HVPNL 400 KV Jhajjar Power Transmission Project in Haryana on DBFOT basis | 400 | 444.00 | Energy | Electricity transmission | Operation and Maintenance Stage | Haryana Vidyut Prasaran Nigam Limited | 27 May 2010 | Haryana | 17 Jul 2019 |
52 | Gurgaon Metro South Extension (RMGSL) project | 12 | 2,150.00 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Haryana Urban Development Authority | 01 Oct 2012 | Haryana | 13 Nov 2019 |
53 | Setting up of 9 MW Beas Kund hydel power unit in Kullu district # | 9 | 75.84 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 23 Mar 2001 | Himachal Pradesh | 30 Oct 2019 |
54 | Setting up of 12 MW Upper Joiner hydel power unit in Chamba district # | 12 | 72.25 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 12 Jan 2005 | Himachal Pradesh | 30 Oct 2019 |
55 | Setting up of 5.4 MW Sarbari-II small hydel power unit in Kullu district | 5.4 | 46.00 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 15 Mar 2001 | Himachal Pradesh | 30 Oct 2019 |
56 | Setting up of 14 MW Sumez hydel power unit in Shimla district # | 14 | 92.08 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 12 Jan 2005 | Himachal Pradesh | 30 Oct 2019 |
57 | Setting up of 24 MW Baragaon hydel power unit in Kullu district | 24 | 174.81 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 06 Jun 2002 | Himachal Pradesh | 30 Oct 2019 |
58 | Baspa Hydel Power Project - Stage II | 300 | 1,629.84 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 23 Nov 1991 | Himachal Pradesh | 30 Oct 2019 |
59 | Setting up of 192 MW Allain Duhangan hydel power unit in Kullu district # | 192 | 2,021.00 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 28 Aug 1993 | Himachal Pradesh | 30 Oct 2019 |
60 | Setting up of 6 MW Baner hydel power unit in Kangra district | 6 | 54.59 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 29 May 2000 | Himachal Pradesh | 30 Oct 2019 |
61 | Setting up of 70 MW Budhil hydel power unit in Chamba district # | 70 | 418.80 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 23 Sep 2004 | Himachal Pradesh | 30 Oct 2019 |
62 | Setting up of 16 MW Patikari hydel power unit in Mandi district | 16 | 115.63 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 21 Jun 2000 | Himachal Pradesh | 30 Oct 2019 |
63 | Setting up of 15 MW Neogal hydel power unit in Kangra district # | 15 | 61.74 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 28 Aug 1993 | Himachal Pradesh | 30 Oct 2019 |
64 | Setting up of 14 MW nanti hydel power unit in Shimla district # | 14 | 66.94 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 12 Jan 2005 | Himachal Pradesh | 30 Oct 2019 |
65 | Malana Hydel Power Project - Stage I | 86 | 341.91 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 28 Aug 1993 | Himachal Pradesh | 30 Oct 2019 |
66 | Setting up of 100 MW Malana II hydel power unit in Kullu district | 100 | 981.91 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 27 May 2002 | Himachal Pradesh | 30 Oct 2019 |
67 | Setting up of 16 MW Jongini hydel power unit in Shimla district # | 16 | 79.06 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 27 Oct 2006 | Himachal Pradesh | 30 Oct 2019 |
68 | Setting up of 8 MW hydel power unit at Kurmi in Shimla district # | 8 | 68.49 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 19 Jun 2007 | Himachal Pradesh | 30 Oct 2019 |
69 | Shah Nahar Canal Extension Project | 62.7 | 392.85 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Completed | Irrigation and Public Health Department, Himachal Pradesh | 31 Dec 1997 | Himachal Pradesh | 27 Feb 2017 |
70 | Implementation of Balh Valley medium irrigation project at Sundar Nagar in Mandi district | 6869.5 | 103.86 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Completed | Irrigation and Public Health Department, Himachal Pradesh | 02 Dec 2004 | Himachal Pradesh | 27 Feb 2017 |
71 | Koldam Thermal Power Project | 800 | 6,289.69 | Energy | Electricity generation (grid) | Completed | NTPC Limited | 31 Dec 2003 | Himachal Pradesh | 21 Jul 2016 |
72 | 45.8 km Road Upgradation (Una - Barsar - Bhota - Bhamla - Kalkhar - Ner Chowk) Project | 45.8 | 141.92 | Transport | Roads and bridges | Completed | Public Works Department, Himachal Pradesh | 29 Feb 2008 | Himachal Pradesh | 01 Nov 2016 |
73 | Road Upgradation (Una - Barsar - Bhota - Bhamla - Kalkhar - Ner Chowk) Project | 45 | 115.83 | Transport | Roads and bridges | Completed | Public Works Department, Himachal Pradesh | 29 Feb 2008 | Himachal Pradesh | 01 Nov 2016 |
74 | Widening and Strengthening of Draman-Sihunta-Chowari-Jot-Chamba-Bharmour Road from 0.00 km to 24.00 km at Draman | 24 | 48.70 | Transport | Roads and bridges | Completed | Public Works Department, Himachal Pradesh | 20 Nov 2009 | Himachal Pradesh | 02 Nov 2016 |
75 | Road Upgradation (Kamarhati - Sarahan-Nahan) Project | 71.7 | 202.66 | Transport | Roads and bridges | Completed | Public Works Department, Himachal Pradesh | 26 Oct 2009 | Himachal Pradesh | 01 Nov 2016 |
76 | Road Upgradation (Mehatpur-Una- Amb Road) Project | 44.7 | 98.77 | Transport | Roads and bridges | Completed | Public Works Department, Himachal Pradesh | 10 Oct 2007 | Himachal Pradesh | 15 Sep 2016 |
77 | Road Upgradation (Hablipora-Qadar-Qaimh) Project | 24 | 54.90 | Transport | Roads and bridges | Completed | Jammu and Kashmir Economic Reconstruction Agency | 08 Nov 2008 | Jammu & Kashmir | 27 Feb 2017 |
78 | Road Upgradation (Wanpoh-Chawalgam-Aharbal) Project | 42.7 | 60.92 | Transport | Roads and bridges | Completed | Jammu and Kashmir Economic Reconstruction Agency | 07 Jan 2008 | Jammu & Kashmir | 27 Feb 2017 |
79 | Storm Water Drainage (Pohru Chowk-Chanapora Bridge) Project | 9.3 | 50.68 | Water Sanitation | Storm water drainage system | Completed | Jammu and Kashmir Economic Reconstruction Agency | 26 Dec 2007 | Jammu & Kashmir | 27 Feb 2017 |
80 | etting up of 500 MW Bokaro A coal based power project in Bokaro district | S500 | 4,138.41 | Energy | Electricity generation (grid) | Completed | Damodar Valley Corporation | 16 Sep 2008 | Jharkhand | 16 Sep 2019 |
81 | Road Upgradation (Medininagar NH-75) Project | 59 | 110.18 | Transport | Roads and bridges | Completed | Department of Road Construction, Jharkhand | 27 Oct 2010 | Jharkhand | 29 Jan 2016 |
82 | Road Upgradation (Medininagar NH-98) Project | 53.54 | 73.14 | Transport | Roads and bridges | Completed | Department of Road Construction, Jharkhand | 27 Feb 2012 | Jharkhand | 01 Jul 2019 |
83 | Road Upgradation (Medininagar NH-98) Project | 53.54 | 73.14 | Transport | Roads and bridges | Completed | Department of Road Construction, Jharkhand | 27 Feb 2012 | Jharkhand | 01 Jul 2019 |
84 | Road Upgradation (Hazaribagh) Project - Phase II | 46.17 | 72.40 | Transport | Roads and bridges | Completed | Department of Road Construction, Jharkhand | 28 Feb 2011 | Jharkhand | 29 Jan 2016 |
85 | Upgradation of Chandrapura-Phusro-Gomia road in length of 36.3 km in Bokaro | 36.3 | 129.76 | Transport | Roads and bridges | Completed | State Highways Authority of Jharkhand | 10 Sep 2014 | Jharkhand | 15 Jun 2017 |
86 | Upgradation of various roads in length of 93.5 km in Gadag district | 93.5 | 50.00 | Transport | Roads and bridges | Completed | Public Works, Ports and Inland Water Transport Department, Karnataka | 20 Oct 2012 | Karnataka | 05 Mar 2017 |
87 | Upgradation of Dharwad-Saundatti road in length of 36 km in Belgaum | 36 | 84.40 | Transport | Roads and bridges | Completed | Public Works, Ports and Inland Water Transport Department, Karnataka | 11 Mar 2011 | Karnataka | 25 Oct 2019 |
88 | Upgradation of Chowdapur-Gulbarga road in length of 29.3 km in Ranga Reddy | 29.3 | 58.46 | Transport | Roads and bridges | Completed | Public Works, Ports and Inland Water Transport Department, Karnataka | 11 Mar 2011 | Karnataka | 20 Mar 2017 |
89 | Improvement of Dharwad- Ramnagar Stretch | 61.75 | 237.60 | Transport | Roads and bridges | Operation and Maintenance Stage | Karnataka Road Development Corporation Limited (KRDCL) | 04 Jun 2010 | Karnataka | 19 Aug 2019 |
90 | Setting up of 800 MW Yermarus thermal power station project in Raichur district. | 800 | 12,589.00 | Energy | Electricity generation (grid) | Completed | Karnataka Power Corporation Limited | 09 Apr 2010 | Karnataka | 04 Dec 2019 |
91 | Coal Based Power (Ballari) Project | 700 | 4,686.20 | Energy | Electricity generation (grid) | Completed | Karnataka Power Corporation Limited | 05 Oct 2013 | Karnataka | 04 Dec 2019 |
92 | Kottur-Harpanhalli-Harihar BG Railway Line Project | 65 | 488.70 | Transport | Railway track, tunnel, viaducts, bridges | Completed | South Western Railway | 18 Feb 2008 | Karnataka | 20 Apr 2016 |
93 | Dharwad-Kambarganvi GC Railway Line Project | 26.68 | 188.88 | Transport | Railway track, tunnel, viaducts, bridges | Completed | South Western Railway | 22 Jan 2007 | Karnataka | 19 Apr 2016 |
94 | Setting up of 10 MW ground mounted solar photovoltaic power unit at Tumkuru | 10 | 67.98 | Energy | Renewable energy (grid) | Completed | Asian Fab Tec Limited | 01 Nov 2014 | Karnataka | 24 Jul 2017 |
95 | Rural Electrification (Dakshina Kannada) Project - RGGVY | 620.8 | 87.38 | Energy | Electricity transmission | Completed | Mangalore Electricity Supply Company Limited | 09 Oct 2012 | Karnataka | 18 Oct 2016 |
96 | Implementation of LPG pipeline between Mangalore-Yediyur with a capacity of 3.1 MMTPA | 3.1 | 838.08 | Energy | Gas pipelines | Completed | Hindustan Petroleum Corporation Limited | 20 Nov 2012 | Karnataka | 20 Dec 2016 |
97 | Rural Electrification (Bangalore) Project - R-APDRP | 25 | 431.01 | Energy | Electricity transmission | Completed | Bangalore Electricity Supply Company Limited | 11 Dec 2009 | Karnataka | 17 Oct 2016 |
98 | Water Supply (Bijapur) Project - UIDSSMT | 38 | 88.90 | Water Sanitation | Water supply pipeline | Completed | Karnataka Urban Water Supply and Drainage Board | 12 Jul 2012 | Karnataka | 30 Nov 2015 |
99 | Water Supply (Hungund-Ilkal-Kustagi) Project - UIDSSMT | 32.32 | 88.00 | Water Sanitation | Water supply pipeline | Completed | Karnataka Urban Water Supply and Drainage Board | 04 Feb 2009 | Karnataka | 03 Mar 2017 |
100 | Bangalore International Airport Project | 11.5 | 2,353.00 | Transport | Airports | Operation and Maintenance Stage | Airports Authority of India (AAI) | 05 Jul 2004 | Karnataka | 03 Oct 2019 |