List of Private Sector Infrastructure Projects
This Report provides information on infrastructure projects implemented solely by the private sector across pre-defined set of parameters and following coverage criteria:
Projects that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore.
Please click on project name for more details of the project.
- No. of Projects in this Report: 1261
- Total Project Cost(in Rs Crore): 778349.86
Sr No. | Project Name | Project Capacity | Total Project Cost (In Rs.Crore) | Sector | Sub-Sector | Status | Project Authority | Date Of Award | Location | Update Date |
---|---|---|---|---|---|---|---|---|---|---|
1 | Implementation of barrage at Kharda in Wardha district#* | 12.5 | 107.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Under Construction | Vidarbha Irrigation Development Corporation | 31 Jan 2012 | Maharashtra | 27 Nov 2019 |
2 | Wind Power (Chilarwadi) Project* | 75 | 515.50 | Energy | Renewable energy (grid) | Under Construction | NSL Power Limited | 01 Jan 1900 | Maharashtra | 21 Nov 2019 |
3 | Wind Based Power (Rajgarh) Project* | 50.4 | 252.00 | Energy | Renewable energy (grid) | Under Construction | Ostro Energy Private Limited | 01 Jan 1900 | Rajasthan | 21 Nov 2019 |
4 | Wind Power (Dangri) Project - Phase II* | 20 | 100.00 | Energy | Renewable energy (grid) | Under Construction | BG Wind Power Limited | 30 Nov 2014 | Rajasthan | 21 Nov 2019 |
5 | Wind Power (Visapur) Project* | 8 | 56.00 | Energy | Renewable energy (grid) | Under Construction< | Tata Power Company Limited | 25 Nov 2013 | Maharashtra | 21 Nov 2019 |
6 | Solar Power (Bhetala) Project* | 20 | 147.40 | Energy | Renewable energy (grid) | Under Construction | ACME Mumbai Power Private Limited | 01 Jul 2014 | Rajasthan | 21 Nov 2019 |
7 | Solar Energy Park (Paramakudi) Project* | 100 | 920.00 | Energy | Renewable energy (grid) | Under Construction | Raasi Green Earth Energy Private Limited | 01 Jan 1900 | Tamil Nadu | 21 Nov 2019 |
8 | Setting up of 50.4 MW wind power unit at Rajgadh in Jaisalmer district* | 50.4 | 278.10 | Energy | Renewable energy (grid) | Under Construction | Adani Green Energy (MP) Limited | 17 Aug 2016 | Rajasthan | 21 Nov 2019 |
9 | Solar Power (Bhadla) Project* | 10 | 75.00 | Energy | Renewable energy (grid) | Under Construction | Energo Engineering Projects Limited | 01 Jan 1900 | Rajasthan | 21 Nov 2019 |
10 | Setting up of 48 MW biomass power unit at Vadamugam in Coimbatore* | 48 | 225.00 | Energy | Renewable energy (grid) | Under Construction | IG3 Infra Limited | 01 Jan 1900 | Tamil Nadu | 21 Nov 2019 |
11 | Setting up of 100.8 MW wind based power unit at Bhesada wind site in Jaisalmer* | 100.8 | 504.00 | Energy | Renewable energy (grid) | Under Construction | ReNew Power Private Limited | 05 Jun 2014 | Rajasthan | 21 Nov 2019 |
12 | Co-generation Power (Dnyaneshwarnagar) Project - Expansion* | 19.5 | 100.00 | Energy | Renewable energy (grid) | Under Construction | Shri Dnyaneshwar SSK Limited | 01 Feb 2016 | Maharashtra | 21 Nov 2019 |
13 | Choramba Biomass Power Project* | 12 | 71.00 | Energy | Renewable energy (grid) | Under Construction | Vidarbha Energy and Infrastructure Private Limited | 01 Jan 1900 | Maharashtra | 21 Nov 2019 |
14 | Biomass Based Power (Perundurai) Project* | 6.4 | 57.00 | Energy | Renewable energy (grid) | Under Construction | Perundurai Green Energy Private Limited | 09 Nov 2012 | Tamil Nadu | 21 Nov 201 |
15 | Bagasse Power (Karaipoonde) Project* | 30 | 158.00 | Energy | Renewable energy (grid) | Under Construction | Dharani Sugars and Chemicals Limited | 01 Jan 1900 | Tamil Nadu | 21 Nov 2019 |
16 | Bagasse Power (Ajani) Project* | 18 | 380.00 | Energy | Renewable energy (grid) | Under Construction | Twentyone Sugars Limited | 01 Jan 1900 | Maharashtra | 21 Nov 2019 |
17 | Bagasse Based Power (Nhavare) Project - Expansion* | 18 | 80.00 | Energy | Renewable energy (grid) | Under Construction | Raosahebdada Pawar Ghodganga SSK Limited | 01 Jan 1900 | Maharashtra | 21 Nov 2019 |
18 | Bagasse Based Power (Bhende) Project - Expansion* | 8 | 110.00 | Energy | Renewable energy (grid) | Under Construction | Shri Dnyaneshwar SSK Limited | 01 Jan 1900 | Maharashtra | 21 Nov 2019 |
19 | 75.6 MW Wind Based Power (Rajasthan) Project* | 75.6 | 470.00 | Energy | Renewable energy (grid) | Under Construction | Coromandel Wind Energy Limited | 01 Jan 1900 | Rajasthan | 21 Nov 2019 |
20 | 38 MW Co-generation Power (Kumathe) Project* | 38 | 200.00 | Energy | Renewable energy (grid) | Under Construction | Shree Siddheshwar SSK Limited | 10 Jul 2012 | Maharashtra | 21 Nov 2019 |
21 | Wind Power (Ujjain and Tonk Khurd - 30 MW) Project* | 30 | 210.00 | Energy | Renewable energy (grid) | Under Construction | 27 Jun 2015 | Madhya Pradesh | 21 Nov 2019 | Badoni Power Private Limited |
22 | Wind Power (Ujjain and Tonk Khurd - 14.7 MW) Project* | 14.7 | 102.90 | Energy | Renewable energy (grid) | Under Construction | Prismtech Energy Solution Private Limited | 27 Jun 2015 | Madhya Pradesh | 21 Nov 2019 |
23 | Wind Power (Tonk Khurd) Project | 192 | 1,344.00 | Energy | Renewable energy (grid) | Completed | Gamesa Wind Turbines Private Limited | 09 Sep 2015 | Madhya Pradesh | 21 Nov 2019 |
24 | Wind Power (Tonk Khurd and Sonkatch) Project* | 30 | 210.00 | Energy | Renewable energy (grid) | Under Construction | Prisma Green Energy Bhojpura Private Limited | 21 Sep 2015 | Madhya Pradesh | 21 Nov 2019 |
25 | Wind Power (Tarana-88 MW) Project* | 88 | 440.00 | Energy | Renewable energy (grid) | Under Construction | Inox Wind Infrastructure Services Limited | 29 Oct 2014 | Madhya Pradesh | 21 Nov 2019 |
26 | Wind Power (Tarana) Project* | 154 | 1,078.00 | Energy | Renewable energy (grid) | Under Construction | Green Infra Wind Ventures Limited | 12 Nov 2014 | Madhya Pradesh | 21 Nov 2019 |
27 | Wind Power (Zaheerabad) Project - Phase I* | 31.5 | 250.00 | Energy | Renewable energy (grid) | Under Construction | Clean Wind Power (Anantapur) Private Limited | 01 Oct 2015 | Telangana | 21 Nov 2019 |
28 | Wind Power (Tarana and Shajapur) Project* | 30 | 210.00 | Energy | Renewable energy (grid) | Under Construction | Sudheer Project Private Limited | 31 Aug 2013 | Madhya Pradesh | 21 Nov 2019 |
29 | Wind Power (Sitamau-30 MW) Project* | 30 | 210.00 | Energy | Renewable energy (grid) | Under Construction | Shree Halduni Renewal Energy Private Limited | 08 Dec 2015 | Madhya Pradesh | 21 Nov 2019 |
30 | Wind Power (Sitamau-142 MW) Project* | 142 | 710.00 | Energy | Renewable energy (grid) | Under Construction | Inox Wind Infrastructure Services Limited | 29 Oct 2014 | Madhya Pradesh | 21 Nov 2019 |
31 | Wind Power (Sironj) Project* | 100 | 700.00 | Energy | Renewable energy (grid) | Under Construction | Begusarai Biomass Private Limited | 07 Nov 2014 | Madhya Pradesh | 21 Nov 2019 |
32 | Wind Power (Shamgarh and Garoth) Project* | 52 | 364.00 | Energy | Renewable energy (grid) | Under Construction | Marut-Shakti Energy India Limited | 23 Dec 2015 | Madhya Pradesh | 21 Nov 2019 |
33 | Wind Power (Shahdol) Project* | 50 | 350.00 | Energy | Renewable energy (grid) | Under Construction | Vaishali Bioenergy Private Limited | 29 Oct 2014 | Madhya Pradesh | 21 Nov 2019 |
34 | Wind Power (Sardarpur 66MW) Project* | 66 | 462.00 | Energy | Renewable energy (grid) | Under Construction | Green Infra Wind Ventures Limited | 21 Nov 2014 | Madhya Pradesh | 21 Nov 2019 |
35 | Wind Power (Sailana and Piploda - 166 MW) Project* | 166 | 1,162.00 | Energy | Renewable energy (grid) | Under Construction | Kshema Power and Infrastructure Company Private Limited | 16 Jul 2013 | Madhya Pradesh | 21 Nov 2019 |
36 | Wind Power (Sailana 70MW) Project* | 70 | 490.00 | Energy | Renewable energy (grid) | Under Construction | Kshema Power & Infrastructure Company Private Limited | 29 Oct 2014 | Madhya Pradesh | 21 Nov 2019 |
37 | Wind Power (Sailana 63MW) Project* | 63 | 441.00 | Energy | Renewable energy (grid) | Under Construction | Raj Multitrade Private Limited | 14 Aug 2013 | Madhya Pradesh | 21 Nov 2019 |
38 | Wind Power (Ratlam) Project | 30 | 195.00 | Energy | Renewable energy (grid) | Completed | Choksi Energy and Infrastructure Private Limited | 01 Jan 1900 | Madhya Pradesh | 21 Nov 2019 |
39 | Wind Power (Piploda and Sailana) Project* | 66.3 | 464.10 | Energy | Renewable energy (grid) | Under Construction | Ganeshganj Renewable Energy Private Limited | 20 Jan 2014 | Madhya Pradesh | 21 Nov 2019 |
40 | Wind Power (Piploda and Namli) Project* | 52 | 364.00 | Energy | Renewable energy (grid) | Under Construction | Saravanti Tuticorin Energy Generation Private Limited | 24 Jul 2013 | Madhya Pradesh | 21 Nov 2019 |
41 | Wind Power (Piploda 14MW) Project* | 14 | 98.00 | Energy | Renewable energy (grid) | Under Construction | Naveen Wind Mill, Jabalpur | 24 Jul 2013 | Madhya Pradesh | 21 Nov 2019 |
42 | Wind Power (Petlawad - 81.9MW) Project* | 81.9 | 573.30 | Energy | Renewable energy (grid) | Under Construction | Saimran Realities Limited | 16 Sep 2014 | Madhya Pradesh | 21 Nov 2019 |
43 | Wind Power (Pethshivpur) Project | 49.5 | 303.00 | Energy | Renewable energy (grid) | Completed | Tata Power Company Limited | 01 Jan 1900 | Maharashtra | 21 Nov 2019 |
44 | Wind Power (Namli-40 MW) Project* | 40 | 280.00 | Energy | Renewable energy (grid) | Under Construction | Sravanthi Ratlam Energy Private Limited | 21 Nov 2014 | Madhya Pradesh | 21 Nov 2019 |
45 | Wind Power (Namli) Project* | 10 | 70.00 | Energy | Renewable energy (grid) | Under Construction | Maa Baglamukhi Energy Private Limited | 24 Jul 2013 | Madhya Pradesh | 21 Nov 2019 |
46 | Wind Power (Nagda, Badnagar and Ghatiya) Project* | 40 | 280.00 | Energy | Renewable energy (grid) | Under Construction | IL&FS Renewable Energy Limited | 29 Oct 2014 | Madhya Pradesh | 21 Nov 2019 |
47 | Wind Power (Nagda - 74MW) Project* | 74 | 518.00 | Energy | Renewable energy (grid) | Under Construction | Green Infra Wind Ventures Limited | 07 Nov 2014 | Madhya Pradesh | 21 Nov 2019 |
48 | Wind Power (Nagda - 12MW) Project* | 12 | 84.00 | Energy | Renewable energy (grid) | Under Construction | Safal Renewables Private Limited | 04 Oct 2014 | Madhya Pradesh | 21 Nov 2019 |
49 | Wind Power (Mhow) Project* | 14.4 | 100.80 | Energy | Renewable energy (grid) | Under Construction | Renew Wind Energy (Karnataka 2) Private Limited | 19 Aug 2013 | Madhya Pradesh | 21 Nov 2019 |
50 | Wind Power (Mandsaur-100 MW) Project | 100 | 500.00 | Energy | Renewable energy (grid) | Completed | Inox Wind Infrastructure Services Limited | 29 Oct 2014 | Madhya Pradesh | 21 Nov 2019 |
51 | Wind Power (Sironj and Mungaoli) Project* | 77.6 | 543.20 | Energy | Renewable energy (grid) | Under Construction | Wind World (India) Limited | 19 Jan 2015 | Madhya Pradesh | 21 Nov 2019 |
52 | Wind Power (Khachrod - 35.7MW) Project* | 35.7 | 249.90 | Energy | Renewable energy (grid) | Under Construction | Sarjan Realities Limited | 03 Jul 2015 | Madhya Pradesh | 21 Nov 2019 |
53 | Wind Power (Khachrod - 21MW) Project* | 21 | 147.00 | Energy | Renewable energy (grid) | Under Construction | Renew Wind Energy (AP 4) Private Limited | 13 Feb 2015 | Madhya Pradesh | 21 Nov 2019 |
54 | Wind Power (Khachrod - 12MW) Project* | 12 | 84.00 | Energy | Renewable energy (grid) | Under Construction | Global Powernet Private Limited | 16 Sep 2014 | Madhya Pradesh | 21 Nov 2019 |
55 | Wind Power (Ichhawar) Project* | 70.5 | 493.50 | Energy | Renewable energy (grid) | Under Construction | DKV Construction | 25 Aug 2014 | Madhya Pradesh | 21 Nov 2019 |
56 | Wind Power (Hatpipalya) Project* | 18 | 126.00 | Energy | Renewable energy (grid) | Under Construction | Anemo Power Private Limited | 19 Jul 2013 | Madhya Pradesh | 21 Nov 2019 |
57 | Wind Power (Ghatiya and Mahidpur) Project* | 9 | 63.00 | Energy | Renewable energy (grid) | Under Construction | Kshema Power and Infrastructure Company Private Limited | 06 Aug 2015 | Madhya Pradesh | 21 Nov 2019 |
58 | Wind Power (Ghatia - 51MW) Project* | 51 | 357.00 | Energy | Renewable energy (grid) | Under Construction | Kshema Power & Infrastructure Company Private Limited | 21 Nov 2014 | Madhya Pradesh | 21 Nov 2019 |
59 | Wind Power (Ghatia - 45MW) Project* | 45 | 315.00 | Energy | Renewable energy (grid) | Under Construction | Safal Renewables Private Limited | 04 Oct 2014 | Madhya Pradesh | 21 Nov 2019 |
60 | Wind Power (Dahi) Project* | 45 | 315.00 | Energy | Renewable energy (grid) | Under Construction | Breakthrough Entertainment Private Limited | 25 Aug 2014 | Madhya Pradesh | 21 Nov 2019 |
61 | Wind Power (Chandgarh) Project* | 100 | 500.00 | Energy | Renewable energy (grid) | Under Construction | CLP India Private Limited | 13 Feb 2015 | Madhya Pradesh | 21 Nov 2019 |
62 | Wind Power (Bhainsdehi) Project* | 50 | 350.00 | Energy | Renewable energy (grid) | Under Construction | Betul Wind Farm Limited | 10 Dec 2014 | Madhya Pradesh | 21 Nov 2019 |
63 | Wind Power (Bersiya) Project* | 15.2 | 106.40 | Energy | Renewable energy (grid) | Under Construction | Renew Wind Energy (R-2) Private Limited | 31 Aug 2013 | Madhya Pradesh | 21 Nov 2019 |
64 | Wind Power (Bagli and Indore) Project* | 24.65 | 172.90 | Energy | Renewable energy (grid) | Under Construction | Abaha Wind Energy Private Limited | 01 Oct 2013 | Madhya Pradesh | 21 Nov 2019 |
65 | Wind Power (Badnawar - 218 MW ) Project* | 218 | 1,526.00 | Energy | Renewable energy (grid) | Under Construction | Gamesa Wind Turbines Private Limited | 29 Oct 2014 | Madhya Pradesh | 21 Nov 2019 |
66 | Wind Power (Badnagar and Badnawar - 80 MW) Project* | 80 | 560.00 | Energy | Renewable energy (grid) | Under Construction | Kshema Power and Infrastructure Company Private Limited | 26 Oct 2015 | Madhya Pradesh | 21 Nov 2019 |
67 | Wind Power (Badnagar and Badnawar - 60 MW) Project* | 60 | 420.00 | Energy | Renewable energy (grid) | Under Construction | Uppaluru Power Projects Private Limited | 05 Nov 2015 | Madhya Pradesh | 21 Nov 2019 |
68 | Wind Power (Badnagar 79.8 MW) Project* | 79.8 | 558.60 | Energy | Renewable energy (grid) | Under Construction | Sarjan Realities Limited | 06 Aug 2015 | Madhya Pradesh | 21 Nov 2019 |
69 | Wind Power (Alot) Project* | 45 | 315.00 | Energy | Renewable energy (grid) | Under Construction | NSL Renewable Power Private Limited | 19 Jul 2013 | Madhya Pradesh | 21 Nov 2019 |
70 | Solar Power (Zeerapur) Project* | 10 | 70.00 | Energy | Renewable energy (grid) | Under Construction | Made Easy Education Private Limited | 01 Jan 1900 | Madhya Pradesh | 21 Nov 2019 |
71 | Solar Power (Veltoor) Project | 100 | 1,000.00 | Energy | Renewable energy (grid) | Completed | SE Solar Limited | 13 Jan 2016 | Telangana | 21 Nov 2019 |
72 | Solar Power (Sadashivpet-Nagulpalle ) Project* | 20 | 156.04 | Energy | Renewable energy (grid) | Under Construction | Karvy Solar Power Limited | 18 Mar 2015 | Telangana | 21 Nov 2019 |
73 | Solar Power (Pudukkottai) Project | 5 | 50.00 | Energy | Renewable energy (grid) | Completed | Aeon Renewable Energy Solution Private Limited | 04 Sep 2015 | Tamil Nadu | 21 Nov 2019 |
74 | Solar Power (Polepally) Project | 120 | 840.00 | Energy | Renewable energy (grid) | Completed | First Solar Power India Private Limited | 25 Mar 2015 | Telangana | 21 Nov 2019 |
75 | Solar Power (Panwari) Project | 30 | 240.00 | Energy | Renewable energy (grid) | Completed | Jakson Power Private Limited | 31 Mar 2015 | Uttar Pradesh | 21 Nov 2019 |
76 | Solar Power (Nagarkurnool) Project | 10 | 70.00 | Energy | Renewable energy (grid) | Completed | Keerthi Estates Private Limited | 29 Feb 2016 | Telangana | 21 Nov 2019 |
77 | Solar Power (Karajagi) Project - Phase I* | 25 | 70.00 | Energy | Renewable energy (grid) | Under Construction | Enrich Energy Limited | 10 Mar 2015 | Maharashtra | 21 Nov 2019 |
78 | Solar Power (Jalaun) Project | 50 | 350.00 | Energy | Renewable energy (grid) | Completed | Rays Power Infra Private Limited | 01 Jan 1900 | Uttar Pradesh | 21 Nov 2019 |
79 | Solar Power (Debbak) Project* | 35 | 150.00 | Energy | Renewable energy (grid) | Under Construction | Rays Power Infra Private Limited | 07 Sep 2015 | Telangana | 21 Nov 2019 |
80 | Solar Photovoltaic Power (Yenkepally) Project* | 8 | 60.00 | Energy | Renewable energy (grid) | Under Construction | Ushas Ventures Private Limited | 01 Jan 1900 | Telangana | 21 Nov 2019 |
81 | Solar Photovoltaic Power (Tuljapur) Project* | 30 | 250.00 | Energy | Renewable energy (grid) | Under Construction | Fourth Dimension Infra & Power Limited | 01 Jan 1900 | Maharashtra | 21 Nov 2019 |
82 | Solar Photovoltaic Power (Mahoba) Project* | 10 | 800.00 | Energy | Renewable energy (grid) | Completed | Azure Power India Private Limited | 01 Jan 1900 | Uttar Pradesh | 21 Nov 2019 |
83 | Solar Photovoltaic Power (Erraram) Project* | 10 | 70.00 | Energy | Renewable energy (grid) | Under Construction | Emmvee Energy Private Limited | 15 Dec 2014 | Telangana | 21 Nov 2019 |
84 | Wind Power (Badnawar-102.9 MW) Project* | 102.9 | 720.30 | Energy | Renewable energy (grid) | Under Construction | Sarjan Realities Limited | 07 Nov 2014 | Madhya Pradesh | 21 Nov 2019 |
85 | Solar Photovoltaic Power (Durgapur) Project* | 5 | 50.00 | Energy | Renewable energy (grid) | Completed | Solitaire Industrial Infrastructure Private Limited | 01 Jan 1900 | West Bengal | 21 Nov 2019 |
86 | Solar Photovoltaic Power (Bundelkhand) Project | 385 | 385.00 | Energy | Renewable energy (grid) | Completed | Essel Clean Energy Private Limited | 01 Jan 1900 | Uttar Pradesh | 21 Nov 2019 |
87 | Solar Park (Neemuch)* | 50 | 325.00 | Energy | Renewable energy (grid) | Under Construction | Rays Power Experts Private Limited | 01 Jan 1900 | Madhya Pradesh | 21 Nov 2019 |
88 | Small Hydel Power (Gangani) Project* | 8 | 81.00 | Energy | Renewable energy (grid) | Completed | Regency Gangani Energy Private Limited | 01 Jan 1900 | Uttarakhand | 21 Nov 2019 |
89 | Setting up of 80 MW solar power unit at Khariya Mishar in Lalitpur district* | 80 | 555.00 | Energy | Renewable energy (grid) | Under Construction | Essel Green Energy Private Limited | 16 Aug 2016 | Uttar Pradesh | 21 Nov 2019 |
90 | Setting up of 80 MW solar based power unit in Dhule* | 80 | 335.00 | Energy | Renewable energy (grid) | Under Construction | PLG Clean Energy Projects Private Limited | 10 Aug 2016 | Maharashtra | 21 Nov 2019 |
91 | Setting up of 8 MW solar power unit at Arvapally in Nalgonda district* | 8 | 52.00 | Energy | Renewable energy (grid) | Under Construction | Mytrah Energy Limited | 30 Jun 2016 | Telangana | 21 Nov 2019 |
92 | Setting up of 70 MW solar power unit in Mahoba* | 70 | 350.00 | Energy | Renewable energy (grid) | Completed | Hartek Power Private Limited | 30 Sep 2015 | Uttar Pradesh | 21 Nov 2019 |
93 | Setting up of 50 solar power unit at Islamwadi in Jalna district* | 50 | 430.00 | Energy | Renewable energy (grid) | Under Construction | Neel Metal Products Limited | 23 Nov 2016 | Maharashtra | 21 Nov 2019 |
94 | Setting up of 50 MW solar power unit at Wagdari in Solapur district* | 50 | 435.00 | Energy | Renewable energy (grid) | Under Construction | Lightsource Renewable Energy Holdings Limited | 23 Nov 2016 | Maharashtra | 21 Nov 2019 |
95 | Setting up of 50 MW solar power unit at Parli in Beed district* | 50 | 390.00 | Energy | Renewable energy (grid) | Under Construction | Solar Edge Power and Energy Private Limited | 23 Nov 2016 | Maharashtra | 21 Nov 2019 |
96 | Setting up of 50 MW solar power unit at Manapur in Jalna district* | 50 | 349.00 | Energy | Renewable energy (grid) | Under Construction | Orange Renewable Power Private Limited | 10 Mar 2016 | Maharashtra | 21 Nov 2019 |
97 | Setting up of 50 MW solar power unit at Haidarpur, Nasirpur & Sadhara in Jalaun district* | 50 | 357.63 | Energy | Renewable energy (grid) | Under Construction | TN Urja Private Limited | 23 Dec 2015 | Uttar Pradesh | 21 Nov 2019 |
98 | Setting up of 50 MW solar power unit at Chukoda in Ahmednagar district* | 50 | 350.00 | Energy | Renewable energy (grid) | Under Construction | Talettutayi Solar Projects Four Private Limited | 10 Mar 2016 | Maharashtra | 21 Nov 2019 |
99 | Setting up of 50 MW solar power unit at Bodhare in Jalgaon district* | 50 | 390.00 | Energy | Renewable energy (grid) | Under Construction | Neel Metal Products Limited | 23 Nov 2016 | Maharashtra | 21 Nov 2019 |
100 | Setting up of 50 MW solar power unit at Bhonigir in Nalgonda* | 50 | 389.77 | Energy | Renewable energy (grid) | Under Construction | Acme Solar Power Technology Private Limited | 31 Aug 2016 | Telangana | 21 Nov 2019 |