List of Goverment Infrastructure Projects (PPP)
This Report provides information on infrastructure projects implemented by the Government on PPP basis across pre-defined set of parameters and following coverage criteria:
Export to Excel
Projects that were either under 'Pre-construction Stage', 'Under Construction' or 'Operation and Maintenance Stage' as on April 1, 2011 or 'Awarded' thereafter and with Project Cost >INR 5 crore.
Please click on project name for more details of the project.
- No. of Projects in this Report: 1824
- Total Project Cost(in Rs Crore): 2495539.92
Sr No. | Project Name | Project Capacity | Total Project Cost (In Rs.Crore) | Sector | Sub-Sector | Status | Project Authority | Date Of Award | Location | Update Date |
---|---|---|---|---|---|---|---|---|---|---|
1 | Operation and maintaenance of organic agriculture produces market complex at Sixmile, Khanapara, Guwahati on PPP mode | 1.4 | 7.70 | Social and Commercial Infrastructure | Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage | Operation and Maintenance Stage | Assam State Agricultural Marketing Board | 29 Apr 2015 | Assam | 19 Aug 2019 |
2 | Electricity distribution Kota City (KEDL) | 0 | 252.83 | Energy | Electricity Distribution | Operation and Maintenance Stage | Jaipur Vidyut Vitran Nigam Limited | 17 Jun 2016 | Rajasthan | 13 Nov 2019 |
3 | Green Field Super Speciality Hospital (Bathinda) | 200 | 87.02 | Social and Commercial Infrastructure | Health Care | Operation and Maintenance Stage | Punjab Health Systems Corporation | 05 Aug 2009 | Punjab | 21 Jun 2019 |
4 | Mega Food Park (Murshidabad) Project | 82 | 132.71 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Operation and Maintenance Stage | Ministry of Food Processing Industries | 16 Mar 2010 | West Bengal | 13 Dec 2018 |
5 | Cold Storage Project (Alwar) | 4000 | 17.30 | Social and Commercial Infrastructure | Cold Chain | Operation and Maintenance Stage | Rajasthan State Agriculture Marketing Board | 22 Mar 2010 | Rajasthan | 19 Mar 2018 |
6 | Construction of multi chamber cold storage with a capacity of 4000 MT in Barmer | 4000 | 7.38 | Social and Commercial Infrastructure | Cold Chain | Operation and Maintenance Stage | Rajasthan State Agriculture Marketing Board | 26 Sep 2014 | Rajasthan | 04 Dec 2019 |
7 | Construction of multi chamber cold storage having capacity 4000 MT at Bhawani mandi | 4000 | 7.37 | Social and Commercial Infrastructure | Cold Chain | Operation and Maintenance Stage | Rajasthan State Agriculture Marketing Board | 13 Feb 2014 | Rajasthan | 13 Sep 2019 |
8 | Construction of cold storage 6000 MT at KUMS Jodhpur | 6000 | 5.11 | Social and Commercial Infrastructure | Cold Chain | Operation and Maintenance Stage | Rajasthan State Agriculture Marketing Board | 15 Apr 2010 | Rajasthan | 19 Aug 2019 |
9 | Cold Storage Project (Sikar) | 2000 | 17.30 | Social and Commercial Infrastructure | Cold Chain | Operation and Maintenance Stage | Rajasthan State Agriculture Marketing Board | 01 Apr 2010 | Rajasthan | 13 Sep 2019 |
10 | Implementation of Nagziri Irrigation scheme with a capacity of 1.8 CBM | 1.8 | 9.50 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Operation and Maintenance Stage | Tapi Irrigation Development Corporation, Jalgaon | 06 Aug 2010 | Maharashtra | 18 Dec 2016 |
11 | Waste Water Recycling Plant (Nagpur) | 130 | 275.00 | Water Sanitation | Sewage collection, treatment and disposal system | Operation and Maintenance Stage | Nagpur Municipal Corporation | 04 Oct 2008 | Maharashtra | 09 Nov 2019 |
12 | Implementation of 70 MLD sewage treatment plant in Jamnagar district | 70 | 78.00 | Water Sanitation | Sewage collection, treatment and disposal system | Operation and Maintenance Stage | Jamnagar Municipal Corporation | 08 Oct 2013 | Gujarat | 27 Mar 2019 |
13 | Setting up of 115 MLD of water supply scheme Nagpur Pench IV-Part 2 in Godhni | 115 | 110.00 | Water Sanitation | Water supply pipeline | Operation and Maintenance Stage | Nagpur Municipal Corporation | 24 Apr 2009 | Maharashtra | 07 Jun 2017 |
14 | Water Supply Scheme (Khandwa) - Augmentation | 42 | 115.32 | Water Sanitation | Water supply pipeline | Operation and Maintenance Stage | Khandwa Municipal Corporation | 30 Sep 2009 | Madhya Pradesh | 13 Sep 2019 |
15 | HVPNL 400 KV Jhajjar Power Transmission Project in Haryana on DBFOT basis | 400 | 444.00 | Energy | Electricity transmission | Operation and Maintenance Stage | Haryana Vidyut Prasaran Nigam Limited | 27 May 2010 | Haryana | 17 Jul 2019 |
16 | Hydel Power (Radhanagari) Project | 10 | 48.00 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Water Resources Department, Maharashtra | 17 Sep 2004 | Maharashtra | 01 Nov 2019 |
17 | Setting up of 8 MW hydel power unit at Kurmi in Shimla district | 8 | 68.49 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 19 Jun 2007 | Himachal Pradesh | 30 Oct 2019 |
18 | Setting up of 16 MW Patikari hydel power unit in Mandi district | 16 | 115.63 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 21 Jun 2000 | Himachal Pradesh | 30 Oct 2019 |
19 | Setting up of 15 MW Neogal hydel power unit in Kangra district | 15 | 61.74 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 28 Aug 1993 | Himachal Pradesh | 30 Oct 2019 |
20 | Setting up of 14 MW nanti hydel power unit in Shimla district | 14 | 66.94 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 12 Jan 2005 | Himachal Pradesh | 30 Oct 2019 |
21 | Malana Hydel Power Project - Stage I | 86 | 341.91 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 28 Aug 1993 | Himachal Pradesh | 30 Oct 2019 |
22 | Setting up of 100 MW Malana II hydel power unit in Kullu district | 100 | 981.91 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 27 May 2002 | Himachal Pradesh | 30 Oct 2019 |
23 | Setting up of 5.4 MW Sarbari-II small hydel power unit in Kullu district | 5.4 | 46.00 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 15 Mar 2001 | Himachal Pradesh | 30 Oct 2019 |
24 | Setting up of 24 MW Baragaon hydel power unit in Kullu district | 24 | 174.81 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 06 Jun 2002 | Himachal Pradesh | 30 Oct 2019 |
25 | Baspa Hydel Power Project - Stage II | 300 | 1,629.84 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 23 Nov 1991 | Himachal Pradesh | 30 Oct 2019 |
26 | Setting up of 192 MW Allain Duhangan hydel power unit in Kullu district | 192 | 2,021.00 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 28 Aug 1993 | Himachal Pradesh | 30 Oct 2019 |
27 | Setting up of 6 MW Baner hydel power unit in Kangra district | 6 | 54.59 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 29 May 2000 | Himachal Pradesh | 30 Oct 2019 |
28 | Setting up of 70 MW Budhil hydel power unit in Chamba district | 70 | 418.80 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 23 Sep 2004 | Himachal Pradesh | 30 Oct 2019 |
29 | Setting up of 12 MW Upper Joiner hydel power unit in Chamba district | 12 | 72.25 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 12 Jan 2005 | Himachal Pradesh | 30 Oct 2019 |
30 | Setting up of 14 MW Sumez hydel power unit in Shimla district | 14 | 92.08 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 12 Jan 2005 | Himachal Pradesh | 30 Oct 2019 |
31 | Setting up of 16 MW Jongini hydel power unit in Shimla district | 16 | 79.06 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 27 Oct 2006 | Himachal Pradesh | 30 Oct 2019 |
32 | Setting up of 9 MW Beas Kund hydel power unit in Kullu district | 9 | 75.84 | Energy | Renewable energy (grid) | Operation and Maintenance Stage | Directorate of Energy, Himachal Pradesh | 23 Mar 2001 | Himachal Pradesh | 30 Oct 2019 |
33 | Development of multilevel car parking on 0.6 acres of land at Nungambakkam | 0 | 43.00 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Greater Chennai Corporation | 24 Mar 2009 | Tamil Nadu | 01 Oct 2019 |
34 | Gurgaon Metro South Extension (RMGSL) project | 12 | 2,150.00 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Haryana Urban Development Authority | 01 Oct 2012 | Haryana | 13 Nov 2019 |
35 | Development of an integrated bus station-cum-commercial complex at KSRTC Bus Station, Puttur in Dakshina Kannada district | 2.4 | 33.00 | Transport | Urban public transport (except rolling stock) | Operation and Maintenance Stage | Karnataka State Road Transport Corporation (KSRTC) | 10 Oct 2011 | Karnataka | 01 Oct 2019 |
36 | Bangalore International Airport Project | 11.5 | 2,353.00 | Transport | Airports | Operation and Maintenance Stage | Airports Authority of India (AAI) | 05 Jul 2004 | Karnataka | 03 Oct 2019 |
37 | Development of Marine Liquid Terminal | 3 | 417.00 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Kamarajar Port Limited | 10 Nov 2004 | Tamil Nadu | 31 Oct 2016 |
38 | Gopalpur Port | 54 | 3,500.00 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Department of Commerce and Transport, Odisha | 14 Sep 2006 | Odisha | 29 Nov 2018 |
39 | Mechanism of Coal Handling facilities and upgradation of General Cargo Berth at Outer Harbour of Visakhapatnam Port | 10.18 | 640.40 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Ministry of Shipping | 10 Jun 2010 | Andhra Pradesh | 04 Dec 2019 |
40 | Establishment of Container Terminal and O & M of handling equipment at multipurpose berth, Visakhapatnam Port | 0 | 108.00 | Transport | Ports (excluding captive) | Operation and Maintenance Stage | Visakhapatnam Port Trust | 11 Sep 2002 | Andhra Pradesh | 01 Oct 2019 |
41 | Design. Construction, Development, Finance,O&M,End of proposed Kotakatta bypass,NH-7 Andhra Pradesh,NHDP PH-2 ON BOT basis | 75.5 | 745.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 20 Mar 2006 | Multi State/ Centre | 07 Dec 2018 |
42 | Upgradation of four lane Bhandara Road-Maharashtra-Chhattisgarh Border in length of 80 Km | 80 | 528.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 18 Sep 2007 | Maharashtra | 07 Dec 2018 |
43 | Four laning of Pune-Solapur NH-9 road in length of 110 km under NHDP-IIIB (Pkg-I) | 110 | 1,110.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 01 Feb 2009 | Maharashtra | 19 Aug 2019 |
44 | Four/six laning of Reengus-Sikar road in length of 43.9 km on NH-11 under NHDP-III A | 43.9 | 228.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 11 Mar 2011 | Rajasthan | 19 Aug 2019 |
45 | Upgradation of Jaipur to Bhilwara State Highway, Rajasthan | 212 | 322.00 | Transport | Roads and bridges | Operation and Maintenance Stage | Rajasthan State Road Development and Construction Corporation Limited | 12 Jul 2010 | Rajasthan | 09 Nov 2019 |
46 | Improvement of Dharwad- Ramnagar Stretch | 61.75 | 237.60 | Transport | Roads and bridges | Operation and Maintenance Stage | Karnataka Road Development Corporation Limited (KRDCL) | 04 Jun 2010 | Karnataka | 19 Aug 2019 |
47 | Four laning with paved shoulder in Bareilly-Almora section of SH 37 in the State of Uttar Pradesh on DBFOT basis | 54 | 604.55 | Transport | Roads and bridges | Operation and Maintenance Stage | Uttar Pradesh State Highways Authority | 11 Aug 2011 | Uttar Pradesh | 20 Aug 2019 |
48 | Impvt,O&M,strengthening of existing 2 to 4 lane divided highway NH 58 (Meerut-Muzzafarnagar section)U.P, BOT NHD III | 78.31 | 534.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 09 Sep 2005 | Uttar Pradesh | 29 Nov 2018 |
49 | Widening of 2- 6 lanes divided carriageway including rehabilitation of 2 lanes Jaipur-Kishangarh section of NH8,Rajasthan | 90.38 | 615.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 08 May 2002 | Rajasthan | 17 Dec 2018 |
50 | Design, Construction, Development, Finance,O&M (Salem)Start of proposed flyover on Namakkal Bypass | 41.5 | 253.55 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 16 Feb 2006 | Tamil Nadu | 15 Nov 2019 |
51 | Two laning of Shirur Tajband-Mukhed-Narsi & 2 laning with paved shoulder of Narsi-Biloli to State Border, sections of SH-225 | 105 | 318.00 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Maharashtra | 16 Jun 2011 | Maharashtra | 11 Nov 2019 |
52 | Six Laning of Surat-Dahisar Section of NH-8 (239 Km) in Gujarat and Maharashtra | 239 | 2,853.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 30 Apr 2008 | Multi State/ Centre | 18 Jul 2019 |
53 | Jam Warora-Chandrapur-Ballarpur-Bamni Road project | 64 | 688.62 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Maharashtra | 18 Mar 2010 | Maharashtra | 17 Jul 2019 |
54 | Design, engineering, construction, development, finance,O&M Palanpur-Swaroopganj section,NH-14 Gujarat & Rajasthan | 76 | 498.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 28 Mar 2006 | Multi State/ Centre | 19 Aug 2019 |
55 | Six Laning of Pimpalgaon-Nashik-Gonde section of NH-3 in the State of Maharashtra under NHDP Phase IIIA on BOT basis. | 60 | 1,691.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 08 Jul 2009 | Maharashtra | 18 Jul 2019 |
56 | Two laning with paved shoulders of Raibarelly-Jaunpur Section of NH-231 from Km 0 to Km 166.4 in UP on BoT (Annuity) basis | 166.4 | 993.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 09 Nov 2012 | Uttar Pradesh | 19 Jul 2019 |
57 | Four-laning of Rajkot-Jamnagar-Vadinar road | 131.7 | 1,096.00 | Transport | Roads and bridges | Operation and Maintenance Stage | Gujarat State Road Development Corporation Limited (GSRDC) | 17 Sep 2008 | Gujarat | 17 Jul 2019 |
58 | Design Engineering,Construction,Development, Finance and Operation and maintenance of MP/Maharashtra Border Dhule section of NH3 | 97 | 1,420.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 24 Jun 2009 | Maharashtra | 19 Jul 2019 |
59 | Four laning of Jam Warora-Chandrapur-Rajura-Asifabad Road section of SH 266 | 40 | 228.26 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Maharashtra | 24 Feb 2011 | Maharashtra | 17 Jul 2019 |
60 | Road Upgradation (Jhansi-Lalitpur) Project | 49.3 | 312.57 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 30 Sep 2006 | Uttar Pradesh | 20 Mar 2018 |
61 | Design construction development, finance,O&M,(Kadtal) (Armur) on NH7 (NHDP-2) on (BOT) basis | 31 | 272.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 04 May 2007 | Telangana | 17 Jun 2019 |
62 | Upgradation of Kanpur-Kabrai section in length of 122.7 km under NHDP-IV A | 123.9 | 429.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 11 Mar 2011 | Uttar Pradesh | 20 Mar 2018 |
63 | Two lane with paved shoulders from Sikar to Bikaner and Bikaner Bypass of NH-11 under DBFOT basis | 217.6 | 734.80 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | 29 Jun 2012 | Rajasthan | 09 Nov 2019 |
64 | "DCDF", O&M of Islam Nagar Nagpur-Hyderabad sec.NH7 Andhra Pradesh NHDP-2 on BOT (Annuity) basis | 53 | 518.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 01 Mar 2007 | Telangana | 09 Aug 2019 |
65 | Four Laning of Halol-Godhra-Shamlaji Road | 173 | 1,422.00 | Transport | Roads and bridges | Operation and Maintenance Stage | Gujarat State Road Development Corporation Limited (GSRDC) | 17 Sep 2008 | Gujarat | 17 Jul 2019 |
66 | Two laning of Deali - Kota section of NH 12 on Kota bypass in Rajasthan | 83.04 | 823.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 17 May 2010 | Multi State/ Centre | 18 Jul 2019 |
67 | Bhind-Mihona-Gopalpur Road project | 50.9 | 82.10 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 07 Aug 2009 | Madhya Pradesh | 17 Jul 2019 |
68 | Four laning of Armur-Adloor Yellareddy section of NH7 in the State of Andhra Pradesh | 60 | 491.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 27 May 2009 | Telangana | 18 Jul 2019 |
69 | 6 laning of Ahmedabad Vadodara Section of NH 8 and improvement of Ahmedabad Vadodara Expressway in Gujarat under NHDP Phase V | 102.3 | 4,880.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 25 Jul 2011 | Gujarat | 09 Nov 2019 |
70 | Four-laning of Ahmedabad – Viramgam - Maliya road | 180 | 1,397.00 | Transport | Roads and bridges | Operation and Maintenance Stage | Gujarat State Road Development Corporation Limited (GSRDC) | 17 Sep 2008 | Gujarat | 17 Jul 2019 |
71 | Conversion of Delhi-Gurgaon section of NH-8 into an access controlled eight/six lane highway | 28 | 800.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 18 Mar 2002 | Multi State/ Centre | 21 Nov 2019 |
72 | Bypass (Jaipur) NH-8 Road Project Phase II | 34.5 | 210.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 08 Oct 2001 | Rajasthan | 03 Oct 2017 |
73 | Yamuna Expressway Connecting Greater Noida to Agra | 165 | 14,000.00 | Transport | Roads and bridges | Operation and Maintenance Stage | Yamuna Expressway Industrial Development Authority (YEA) | 07 Feb 2003 | Uttar Pradesh | 14 Aug 2019 |
74 | Road Upgradation (Nasirabad-Mangliawas) Project | 24 | 21.52 | Transport | Roads and bridges | Operation and Maintenance Stage | Public Works Department, Rajasthan | 18 Jul 2008 | Rajasthan | 10 Dec 2018 |
75 | Strengthening of Chandpur-Alirajpur-Kukshi-Badwani State Highways in Madhya Pradesh | 99.1 | 144.00 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 30 Jun 2007 | Madhya Pradesh | 17 Jul 2019 |
76 | Strengthening of Mandsaur-Sitamau Road (Upto Rajasthan Border) State Highway in Madhya Pradesh | 44 | 42.30 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 10 Jul 2007 | Madhya Pradesh | 17 Jul 2019 |
77 | Four laning of Narketpally-Addanki-Medarametla Road Project | 212.5 | 1,760.53 | Transport | Roads and bridges | Operation and Maintenance Stage | Andhra Pradesh Road Development Corporation | 23 Jul 2010 | Andhra Pradesh | 20 Nov 2019 |
78 | Four laning of Hyderabad-Karimnagar-Ramagundam Road Project | 207 | 2,209.00 | Transport | Roads and bridges | Operation and Maintenance Stage | Andhra Pradesh Road Development Corporation | 20 Aug 2010 | Telangana | 17 Jul 2019 |
79 | Second Vivekanand Bridge Tollway Project, Kolkata | 6 | 642.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 02 Sep 2002 | West Bengal | 07 Jun 2019 |
80 | Four laning of Rewa to MP/UP Border of NH 7 in the State of Madhya Pradesh | 89.3 | 736.70 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 25 Jan 2012 | Madhya Pradesh | 19 Aug 2019 |
81 | Sagar-Damoh Road Project | 68.8 | 130.30 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 26 Feb 2010 | Madhya Pradesh | 12 Aug 2019 |
82 | Road Upgradation Project (Biaora- Rajasthan) Project | 61 | 221.00 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 26 Jul 2013 | Madhya Pradesh | 13 Aug 2019 |
83 | Two laning of Khandwa-Dehtala-Burhanpur section of SH 50 in MP on BOT (Toll) | 127.1 | 224.40 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 28 Jul 2011 | Madhya Pradesh | 17 Jul 2019 |
84 | Two laning of Jhabua-Jobat-Zeerpanya-Bagh-Kukshi section of SH 39 in MP on BOT(Toll) | 92.42 | 158.00 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 23 May 2011 | Madhya Pradesh | 17 Jul 2019 |
85 | Manawar-Singhan-Kukshi | 38.23 | 96.73 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 12 Mar 2012 | Madhya Pradesh | 13 Aug 2019 |
86 | Establishment of 20 MW DG power plant at Bambooflat, South Andaman District | 20 | 74.96 | Energy | Electricity generation (grid) | Completed | Andaman and Nicobar Administration | 20 Nov 1997 | Andaman & Nicobar Islands (UT) | 25 Oct 2019 |
87 | Six laning of Chittorgarh - Udaipur section of NH-76 PKG-III | 93.5 | 1,245.75 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 01 Oct 2016 | Rajasthan | 09 Nov 2019 |
88 | Road Upgradation of Chakeri-Allahabad section of 145.3 km | 145.3 | 3,691.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 31 Mar 2017 | Uttar Pradesh | 09 Nov 2019 |
89 | Four laning of Nagina Kashipur Section of NH 74 from KM 71.614 to KM 170.407 under NHDP IV | 98.793 | 2,536.00 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | 15 Jun 2016 | Multi State/ Centre | 09 Nov 2019 |
90 | Development of Four lane of Mangwan to MP/UP border section (km 98/2 to km 46/6) of NH 27 on DBFOT (Toll) basis | 52.1 | 410.70 | Transport | Roads and bridges | Operation and Maintenance Stage | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 27 Apr 2012 | Madhya Pradesh | 09 Nov 2019 |
91 | Four-laning of a section under NHDP-IV, between Hubli - Hospet section of NH 63 on BOT (Toll) basis. | 143.29 | 2,119.00 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | 01 Aug 2016 | Karnataka | 09 Nov 2019 |
92 | Four laning of Barhi to Hazaribagh section of NH 33 in Jharkhand | 40.5 | 562.34 | Transport | Roads and bridges | Operation and Maintenance Stage | Ministry of Road Transport and Highways | 31 Aug 2010 | Jharkhand | 09 Nov 2019 |
93 | Six laning of Udaipur bypass in length of 23.9 km under NHDP-V | 23.88 | 891.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 29 Apr 2017 | Rajasthan | 09 Nov 2019 |
94 | Operation & maintenance of Garamore to Samakhiyali section in length of 52 km of NH-8A (New NH-27) | 52 | 339.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 01 Apr 2017 | Gujarat | 21 Jun 2019 |
95 | Two laning with paved shoulder of Dindigul - Theni and Theni - Kumili in Tamil Nadu under NHDP III | 134 | 501.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 12 Jul 2010 | Tamil Nadu | 09 Nov 2019 |
96 | 4 laning of Trichy Karaikkudi section of NH-210 (10-94 km) and Trichy Bypass (ch 109.558-ch 135.39) in Tamil Nadu on BOT basis. | 110.9 | 374.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 12 Jul 2010 | Tamil Nadu | 09 Nov 2019 |
97 | Six Laning of Vadakkancherry to Thrissur Section (Package No.NS-2/BOT/KL-3 | 30 | 910.00 | Transport | Roads and bridges | Operation and Maintenance Stage | National Highways Authority of India (NHAI) | 24 Aug 2009 | Kerala | 09 Nov 2019 |
98 | Setting up of MSW Processing plant adopting Waste to Energy Technology with Sanitary landfill at Langdiyawas for jaipur | 0 | 214.00 | Water Sanitation | Solid waste management | Pre-construction Stage | Jaipur Municipal Corporation | 19 Apr 2017 | Rajasthan | 25 Nov 2019 |
99 | Development, O&M of Gadoj-Majri to Haryana/ Rajasthan Border and Majri to Neemrana under DBFOT (Toll) Basis | 46.4 | 88.01 | Transport | Roads and bridges | Pre-construction Stage | Public Works Department, Rajasthan | 11 Oct 2017 | Rajasthan | 09 Nov 2019 |
100 | Multipurpose Cargo Port (Redi) Project | 53 | 4,413.70 | Transport | Ports (excluding captive) | Pre-construction Stage | Maharashtra Maritime Board (MMB) | 25 Feb 2009 | Maharashtra | 04 Dec 2019 |