Projects granted final approval under the Scheme for Financial Support to PPPs in Infrastructure (VGF Scheme)

Projects granted final approval under the Scheme for Financial Support to PPPs in Infrastructure (VGF Scheme)

This section contains list of PPP projects granted final approval by the Empowered Institution (EI) /Empowered Committee (EC) under the Scheme for Financial Support to PPPs in Infrastructure (VGF Scheme).
Export to Excel

Filters

Sr No. Project Name Location Sector Total Project Cost (In Rs. Crore) Total VGF Approved (In Rs. Crore) VGF Approved by DEA CAPEX (In Rs. Crore) VGF Approved by DEA OPEX (In Rs. Crore) VGF Released till date by DEA for CAPEX (In Rs. Crore) VGF Approved by State CAPEX (In Rs. Crore) VGF Approved by State OPEX (In Rs. Crore) In Principle Meeting Date In Principle Meeting Number Final Approval Meeting Date Final Approval Meeting Number Implementing Authority Latest Status
1 Development of Vizhinjam International Multipurpose Seaport Project Kerala Transport and Logistics 4089.00 1634.98 817.80 Not Applicable 0.00 817.18 Not Applicable 2014-12-2626.12.2014 (23rd EI) 27.07.2022 (41th EC) Vizhinjam International Seaport Limited Under Construction
2 Proposal for development of Food Grain Silos at Kaimur and Buxar (Bihar) on DBFOT basis under PPP mode by FCI Bihar Social and Commercial Infrastructure 65.28 7.65 7.65 Not Applicable 0 Not Applicable Not Applicable 2016-09-0101.09.2016 (73rd EI) 13.12.2021 (39th EC) Food Corporation of India Completed
3 Pune Metro Line- III   from Hinjewadi -Shivajinagar on DBFOT basis under PPP model Maharashtra Transport and Logistics 7420.31 2351 1224.80 Not Applicable 410.00 1126.2 Not Applicable 2018-03-0707.03.2018 (30th EC) 08.11.2021 (38th EC) Pune Metropolitan Region Development Authority Under Construction
4 Development of Gwalior Jhansi up to Ghonga village via Billua Road BOT (Toll) Madhya Pradesh Transport and Logistics 67.38 19.57 12.6 Not Applicable 12.60 6.97 Not Applicable 2016-12-0606.12.2016 (75th EI) 25.02.2020 (82nd EI) Madhya Pradesh Road Development Corporation Completed
5 Development of Silos for storage of wheat on DBFOT basis under PPP mode at Kotkapura, Punjab Punjab Social and Commercial Infrastructure 26.57 5.31 5.31 Not Applicable 4.64 Not Applicable Not Applicable 2015-11-0303.11.2015 (68th EI) 07.03.2019 (33rd EC) Ministry of Consumer Affairs, Food & Public Distribution, Government of India Under Construction
6 Development, O&M of Hanumangarh to Abohar section of SH-7A (up to Punjab border) on DBFOT Toll basis. Rajasthan Transport and Logistics 51.50 8.81 8.81 Not Applicable 8.81 Not Applicable Not Applicable 2016-10-0606.10.2016 (74th EI) 24.11.2017 (79th EI) Public Works Department, Government of Rajasthan Completed
7 Improvements of Road from Yelahanka to Karnataka/AP border Section of SH9 on DBFOT (Toll) basis Karnataka Transport and Logistics 380.85 152.33 76.17 Not Applicable 75.43 76.16 Not Applicable 2013-04-0909.04.2013 (46th EI) 16.05.2017 (77th EI) Karnataka Road Development Corporation Limited (KRDCL) Completed
8 4-laning of Muzaffarnagar - Saharanpur Road (SH-59) from Km.0.000 to Km.52.950 on DBFOT toll basis Uttar Pradesh Transport and Logistics 752.88 301.16 150.58 Not Applicable 150.57 150.58 Not Applicable 2014-12-2323.12.2014 (22 EC) 03.01.2017 (28th EC) Uttar Pradesh State Highways Authority Completed
9 Development of Sinnar-Nashik section of NH-50 (from km 177.0001 to 201.350) with 4-lane through DBFOT IBOT (Toll)] basis. Maharashtra Transport and Logistics 312.96 120.51 62.59 Not Applicable 56.35 57.918 Not Applicable 2011-12-0101.12.2011 (36th EI) 06.10.2016 (74th EI) Public Works Department, Government of Maharashtra Under Construction
10 Development of a 400 kV Bikaner Sikar D/C Power Transmission Line for evacuation of power from wind & solar Rajasthan Energy 260.00 28.80 28.8 Not Applicable 28.80 Not Applicable Not Applicable 2014-12-1919.12.2014 (61th EI) 17.05.2016 (71st EI) Rajasthan Rajya Vidyut Prasaran Nigam Limited Completed
11 Development of road from NH-63 near Ginigere-Gangavathi to Sindhanur Karnataka Transport and Logistics 190.16 4.59 4.59 Not Applicable 4.59 Not Applicable Not Applicable 2012-01-0606.01.2012 (37th EI) 08.04.2016 (70th EI) Karnataka Road Development Corporation Limited (KRDCL) Completed
12 Bulk Water Supply Project for IIT Bhubaneshwar, NISAR, INFO City and adjoining areas, Bhubaneshwar Odisha Water and Sanitation 187.71 50 37.54 Not Applicable 37.54 12.46 Not Applicable 2013-07-2323.07.2013 (47th EI) 31.07.2015 (66th EI) Housing & Urban Development Department, Government of Odisha Completed
13 Improvement of Nagaur-Bikaner section of NH-89 Rajasthan Transport and Logistics 378.07 69.00 69.0 Not Applicable 44.99 91.21 Not Applicable 2012-01-0606.01.2012 (37th EI) 07.04.2015 (64th EI) Public Works Department, Government of Rajasthan Terminated
14 Four laning of Ajmer to Nagaur section on NH 89 from km 0.000 to km 161.000 in the State of Rajasthan Rajasthan Transport and Logistics 377.15 45.00 45.0 Not Applicable 36.52 Not Applicable Not Applicable 2011-07-2020.07.2011 (33rd EI) 27.01.2015 (62nd EI) Public Works Department, Government of Rajasthan Under Construction
15 Setting up of 50,000 MT modern food silo complex at Ujjain District Village Manpur Madhya Pradesh Social and Commercial Infrastructure 29.6 2.41 2.41 Not Applicable 1.71 Not Applicable Not Applicable 2013-10-0303.10.2013 (49th EI) 27.01.2015 (62nd EI) Madhya Pradesh Warehousing and Logistics Corporation Completed
16 Setting up of 50,000 MT modern food silo complex at Satna District Village Mohari Madhya Pradesh Social and Commercial Infrastructure 28.95 3.11 3.11 Not Applicable 2.52 Not Applicable Not Applicable 2013-10-0303.10.2013 (49th EI) 27.01.2015 (62nd EI) Madhya Pradesh Warehousing and Logistics Corporation Completed
17 Setting up of 50,000 MT modern food silo complex at Dewas District Village Durgapura Madhya Pradesh Social and Commercial Infrastructure 29.43 2.11 2.11 Not Applicable 1.64 Not Applicable Not Applicable 2013-10-0202.10.2013 (49th EI) 27.01.2015 (62nd EI) Madhya Pradesh Warehousing and Logistics Corporation Completed
18 Setting up of 50,000 MT modern food silo complex at Hoshangabad District Village Junheta Bankhedi Madhya Pradesh Social and Commercial Infrastructure 28.82 2.41 2.41 Not Applicable 2.03 Not Applicable Not Applicable 2013-10-0303.10.2013 (49th EI) 27.01.2015 (62nd EI) Madhya Pradesh Warehousing and Logistics Corporation Completed
19 Setting up of 50,000 MT modern food silo complex at Harda District Village Bhadawad Madhya Pradesh Social and Commercial Infrastructure 28.97 2.91 2.91 Not Applicable 2.48 Not Applicable Not Applicable 2013-10-0303.10.2013 (49th EI) 27.01.2015 (62nd EI) Madhya Pradesh Warehousing and Logistics Corporation Completed
20 Setting up of 50,000 MT modern food silo complex at Vidisha District Village Patheri Haveli Madhya Pradesh Social and Commercial Infrastructure 30.96 2.21 2.21 Not Applicable 1.79 Not Applicable Not Applicable 2013-10-0303.10.2013 (49th EI) 27.01.2015 (62nd EI) Madhya Pradesh Warehousing and Logistics Corporation Completed
21 Development of Four lane of Sidhi to Singrauli section (km 83/4 to km 195/8) of NH 75E on DBFOT (Toll) basis Madhya Pradesh Transport and Logistics 871.15 339.69 174.23 Not Applicable 135.02 165.46 Not Applicable 2011-07-2020.07.2011 (33rd EI) 29.10.2014 (21st EC) Madhya Pradesh Warehousing and Logistics Corporation Under Construction
22 Four laning of Sambalpur - Rourkela section of SH-10 from km 4.900 to to km 167.900 (Rourkela) under DBFOT Odisha Transport and Logistics 1292.56 465.3 258.51 Not Applicable 258.51 Not Applicable 206.79 2012-12-1212.12.2012 (16th EC) 29.10.2014 (21st EC) Public Works Department, Government of Odisha Completed and Full VGF has been disbursed
23 Development of Four lane of Satna to Bela section (km 155/0 to km 203.04) of NH 75 on PPP basis following DBFOT (Toll) basis Madhya Pradesh Transport and Logistics 320.48 31.97 31.97 Not Applicable Not Applicable Not Applicable 2011-07-2020.07.2011 (33rd EI) 19.06.2014 (55th EI) Madhya Pradesh Road Development Corporation(MPRDC) Terminated
24 Development of Four lane of Mangwan to MP/UP border section (km 98/2 to km 46/6) of NH 27 on DBFOT (Toll) basis Madhya Pradesh Transport and Logistics 381.86 46.97 46.97 Not Applicable 46.97 Not Applicable Not Applicable 2011-07-2020.07.2011 (33rd EI) 19.06.2014 (55th EI) Madhya Pradesh Road Development Corporation(MPRDC) Completed
25 Two Laning of Bhopal - Berasia - Sironj Project (SH-23) on BoT basis Madhya Pradesh Transport and Logistics 175.6 24.55 24.55 Not Applicable 0 Not Applicable Not Applicable 2010-11-1919.11.2010 (27th EI) 19.06.2014 (55th EI) Madhya Pradesh Road Development Corporation(MPRDC) Terminated
26 Two lane with paved shoulders from Sikar to Bikaner and Bikaner Bypass of NH-11 under DBFOT basis Rajasthan Transport and Logistics 650.84 247.32 130.168 Not Applicable 130.16 117.152 Not Applicable 2011-11-0202.11.2011 (35th EI) 27.03.2014 (20th EC) Public Works Department, Government of Rajasthan Completed
27 Four laning of Ara-Mohania Road Bihar Transport and Logistics 917.12 298 183.40 Not Applicable 0 114.6 Not Applicable 2009-02-1818.02.2009 (7th EC) 14.03.2014 (20th EC) Bihar State Road Development Corporation Limited Terminated
28 Two laning with PSS of Guna-Ashoknagar-Ishagarh Project (SH 20) on BOT (toll) basis Madhya Pradesh Transport and Logistics 105.10 36.75 21.02 Not Applicable 21.02 Not Applicable Not Applicable 2010-11-1919.11.2010 (27th EI) 03.03.2014 (53rd EI) Madhya Pradesh Road Development Corporation(MPRDC) Completed
29 Development of 400 kV DCDS Sarni (Satpura)-Ashta transmission line project under DBFOT (Toll) Madhya Pradesh Energy 282.70 60.75 56.54 Not Applicable 56.54 Not Applicable Not Applicable 2012-06-1111.06.2012 (40th EI) 03.03.2014 (53rd EI) Madhya Pradesh Power Transmission Company Limited Completed
30 Four laning with paved side shoulder Delhi-Saharanpur-Yamunotri Road upto Uttrakhand Boarder (SH 57) on DBFOT (toll) basis Uttar Pradesh Transport and Logistics 1718.35 343.53 343.53 Not Applicable 0 Not Applicable Not Applicable 2012-08-2727.08.2012 (15th EC) 17.01.2014 (19th EC) Uttar Pradesh State Highways Authority Terminated
31 Four-laning of Varanasi-Shaktinagar road of SH-5A in UP under DBFOT basis Uttar Pradesh Transport and Logistics 1211.96 241.92 241.92 Not Applicable 241.92 Not Applicable Not Applicable 2012-08-2727.08.2012 (15th EC) 17.01.2014 (19th EC) Uttar Pradesh State Highways Authority Completed
32 Four laning with paved shoulder in Bareilly-Almora section of SH 37 in the State of Uttar Pradesh on DBFOT basis Uttar Pradesh Transport and Logistics 355.00 69.95 69.95 Not Applicable 69.95 Not Applicable Not Applicable 2011-01-3131.01.2011 (28th EI) 18.12.2013 (51st EI) Uttar Pradesh State Highways Authority Completed
33 Two laning with granular shoulder from km 1/5 to km 51/4 in Seoni and km 51/4 to km 24/10 in Balaghat of Seoni-Katangi section of SH 54 on DBFOT (Toll) basis Madhya Pradesh Transport and Logistics 152.55 59.5 30.5 Not Applicable 14.98 29 Not Applicable 2011-07-2020.07.2011 (33rd EI) 18.12.2013 (51st EI) Madhya Pradesh Road Development Corporation(MPRDC) Terminated
34 Hyderabad Metro Rail Project Telangana Transport and Logistics 12132 1458.0 1458.0 Not Applicable 1204.19 Not Applicable Not Applicable 2010-07-2929.07.2010 (12th EC) 06.05.2013 (17th EC) Hyderabad Metro Rail Limited Under Construction
35 Manawar-Singhan-Kukshi Madhya Pradesh Transport and Logistics 94.57 27.32 18.91 Not Applicable 18.90 8.41 Not Applicable 2011-12-0101.12.2011 (36th EI) 11.01.2013 (45th EI) Madhya Pradesh Road Development Corporation(MPRDC) Completed
36 Upgradation of Jaipur to Bhilwara State Highway, Rajasthan Rajasthan Transport and Logistics 220 88 44 Not Applicable 44 44 Not Applicable 2009-07-0202.07.2009 (18th EI) 31.12.2012 (44th EI) Rajasthan State Road Development and Construction Corporation Limited Completed
37 Two laning of Rau-Mhow-Jamghat-Mandleshwar section of SH 38 in MP on BOT(Toll) Madhya Pradesh Transport and Logistics 176.06 66.33 35.21 Not Applicable 35.02 31.12 Not Applicable 2011-03-1616.03.2011 (29th EI) 25.09.2012 (42nd EI) Madhya Pradesh Road Development Corporation(MPRDC) Completed
38 Two laning of Jhabua-Jobat-Zeerpanya-Bagh-Kukshi section of SH 39 in MP on BOT(Toll) Madhya Pradesh Transport and Logistics 157.44 49 31.49 Not Applicable 30.85 17.51 Not Applicable 2011-03-1616.03.2011 (29th EI) 25.09.2012 (42nd EI) Madhya Pradesh Road Development Corporation(MPRDC) Completed
39 Two laning of Sarangpur-Akodia-Shujalpur section of SH 41 in MP on BOT (Toll) Madhya Pradesh Transport and Logistics 50 10 10 Not Applicable 6.47 Not Applicable Not Applicable 2011-03-1616.03.2011 (29th EI) 25.09.2012 (42nd EI) Madhya Pradesh Road Development Corporation(MPRDC) Terminated
40 Two laning of Khandwa-Dehtala-Burhanpur section of SH 50 in MP on BOT (Toll) Madhya Pradesh Transport and Logistics 227.08 66.36 45.41 Not Applicable 45.11 20.95 Not Applicable 2011-03-1616.03.2011 (29th EI) 25.09.2012 (42nd EI) Madhya Pradesh Road Development Corporation(MPRDC) Completed
41 Four laning of Hyderabad-Karimnagar-Ramagundam Road Project Andhra Pradesh Transport and Logistics 1358.19 454 271.64 Not Applicable 271.64 182.36 Not Applicable 2010-02-2323.02.2010 (9th EC) 27.08.2012 (15th EC) Andhra Pradesh Road Development Corporation Limited Completed
42 Four laning of Narketpally-Addanki-Medarametla Road Project Andhra Pradesh Transport and Logistics 1196.84 467.02 239.36 Not Applicable 223.04 227.66 Not Applicable 2009-02-1818.02.2009 (16th EI) 27.08.2012 (15th EC) Andhra Pradesh Road Development Corporation Limited Completed
43 Construction of green field bridge across river Ganga connecting Bakhtiyarpur Bihar Transport and Logistics 1502.74 555 277.5 Not Applicable 145.83 277.5 Not Applicable 2010-02-2323.02.2010 (9th EC) 27.08.2012 (15th EC) Bihar State Road Development Corporation Limited Terminated. Request for revival is under consideration
44 Two/Four laning of Nanded-Narsi Road section to Narsi -Degloor section of SH-6 Maharashtra Transport and Logistics 238.79 95.52 47.76 Not Applicable 47.74 47.76 Not Applicable 2009-08-1212.08.2009 (19th EI) 17.07.2012 (41st EI) Public Works Department, Government of Maharashtra Completed
45 Two laning of Shirur Tajband-Mukhed-Narsi & 2 laning with paved shoulder of Narsi-Biloli to State Border sections of SH-225 Maharashtra Transport and Logistics 190.18 76.08 38.04 Not Applicable 38.04 38.04 Not Applicable 2009-08-1212.08.2009 (19th EI) 17.07.2012 (41st EI) Public Works Department, Government of Maharashtra Completed
46 Improvement in Chikkanaya Kanahalli Tiptur Hassan Road Karnataka Transport and Logistics 238.45 92.99 47.69 Not Applicable 0 45.30 Not Applicable 2008-03-0505.03.2008 (12th EI) 11.06.2012 (40th EI) Karnataka Road Development Corporation Limited (KRDCL) Terminated
47 Improvement of Karanji-Chandrapur Road section of MSH - 6 & 7 on DBFOT basis Maharashtra Transport and Logistics 498.77 199.50 99.75 Not Applicable 97.76 99.75 Not Applicable 2009-12-1414.12.2009 (20th EI) 11.06.2012 (40th EI) Public Works Department, Government of Maharashtra Under Construction
48 Four laning of Jam Warora-Chandrapur-Rajura-Asifabad Road section of SH 266 Maharashtra Transport and Logistics 223.61 89.44 44.72 Not Applicable 44.72 44.72 Not Applicable 2009-12-1414.12.2009 (20th EI) 06.03.2012 (38th EI) Public Works Department, Government of Maharashtra Completed
49 Jam Warora-Chandrapur-Ballarpur-Bamni Road project Maharashtra Transport and Logistics 449.25 89.85 89.85 Not Applicable 89.85 Not Applicable Not Applicable 2009-02-0202.02.2009 (16th EI) 06.03.2012 (38th EI) Public Works Department, Government of Maharashtra Completed
50 Improvement of Dharwad- Ramnagar Stretch Karnataka Transport and Logistics 230.29 92.12 46.06 Not Applicable 44.86 46.06 Not Applicable 2008-03-0505.03.2008 (12th EI) 16.01.2012 (37th EI) Karnataka Road Development Corporation Limited (KRDCL) Completed
51 Two laning of Whaghari- Ribbanpally stretch Karnataka Transport and Logistics 238.58 47.71 47.71 Not Applicable 47.71 Not Applicable Not Applicable 2008-03-0505.03.2008 (12th EI) 16.01.2012 (37th EI) Karnataka Road Development Corporation Limited (KRDCL) Completed
52 Development of Satna-Chitrakoot (SH 11) Madhya Pradesh Transport and Logistics 121.78 24.36 24.36 Not Applicable 17.81 Not Applicable Not Applicable 2009-12-1414.12.2009 (20th EI) 20.07.2011 (33rd EI) Madhya Pradesh Road Development Corporation(MPRDC) Terminated
53 Four laning of Berala Phata-Chikhali-Khamgaon Maharashtra Transport and Logistics 213.50 85.4 18.58 Not Applicable 0 66.82 Not Applicable 2007-01-2222.01.2007 (8th EI) 16.03.2011 (29th EI) Public Works Department, Government of Maharashtra Terminated
54 Four Laning Nashik – Niphad – Vaijapur - Aurangabad Road Maharashtra Transport and Logistics 157.50 43.5 31.50 Not Applicable 31.50 12 Not Applicable 2006-03-1717.03.2006 (3rd EI) 16.03.2011 (29th EI) Public Works Department, Government of Maharashtra Completed
55 Four laning of Baramati-Phaltan-Lonand-Shirwal Highway Maharashtra Transport and Logistics 355.65 122.09 67.8 Not Applicable 37.14 54.29 Not Applicable 2009-02-0202.02.2009 (16th EI) 16.03.2011 (29th EI) Public Works Department, Government of Maharashtra Terminated
56 HVPNL 400 KV Jhajjar Power Transmission Project in Haryana on DBFOT basis Haryana Energy 382.00 76.40 76.40 Not Applicable 76.40 Not Applicable Not Applicable 2010-03-0404.03.2010 (22 EI) 16.03.2011 (29th EI) Haryana Vidyut Prasaran Nigam Limited Completed
57 Bina-Khimalsa-Malthon Road Project Madhya Pradesh Transport and Logistics 69.11 13.82 13.82 Not Applicable 13.82 Not Applicable Not Applicable 2009-02-0202.02.2009 (16th EI) 28.09.2010 (26th EI) Madhya Pradesh Road Development Corporation(MPRDC) Completed
58 Bhind-Mihona-Gopalpur Road project Madhya Pradesh Transport and Logistics 82.89 16.58 16.58 Not Applicable 16.58 Not Applicable Not Applicable 2009-02-0202.02.2009 (16th EI) 30.09.2010 (26th EI) Madhya Pradesh Road Development Corporation(MPRDC) Completed
59 Damoh- Jabalpur Road Project Madhya Pradesh Transport and Logistics 212.13 42.43 42.43 Not Applicable 42.43 Not Applicable Not Applicable 2009-02-0202.02.2009 (16th EI) 30.09.2010 (26th EI) Madhya Pradesh Road Development Corporation(MPRDC) Completed
60 Sagar-Damoh Road Project Madhya Pradesh Transport and Logistics 116.50 23.30 23.30 Not Applicable 23.30 Not Applicable Not Applicable 2009-02-0202.02.2009 (16th EI) 30.09.2010 (26th EI) Madhya Pradesh Road Development Corporation(MPRDC) Completed
61 Four laning of Jalna-Deoulgaonraja-Berala Phata including Deoulgaonraja bypass Maharashtra Transport and Logistics 95.91 38.36 19.18 Not Applicable 19.18 19.18 Not Applicable 2008-06-1818.06.2008 (14th EI) 16.04.2010 (23rd EI) Public Works Department, Government of Maharashtra Completed
62 Development of two lane Road of Beawer- Gomti section of NH 8 Rajasthan Transport and Logistics 195.00 39.00 39.00 Not Applicable 39.00 Not Applicable Not Applicable 2009-07-0202.07.2009 (18th EI) 14.12.2009 (20th EI) Ministry of Road Transport & Highways Completed
63 Construction of Bridge across river Godavari Andhra Pradesh Transport and Logistics 593.00 118.60 118.60 Not Applicable 118.60 Not Applicable Not Applicable 2008-03-0505.03.2008 (12th EI) 02.07.2009 (18th EI) Andhra Pradesh Road Development Corporation Limited Completed
64 Four Laning of following State Highways in Madhya Pradesh : Bhopal, Devas Madhya Pradesh Transport and Logistics 426.64 81.00 81 Not Applicable 81 Not Applicable Not Applicable 2006-11-1414.11.2006 (7th EI) 05.03.2008 (12th EI) Madhya Pradesh Road Development Corporation(MPRDC) Completed
65 Strengthening of Mandsaur-Sitamau Road (Upto Rajasthan Border) State Highway in Madhya Pradesh Madhya Pradesh Transport and Logistics 25.25 25.25 5.05 Not Applicable 5.05 Not Applicable Not Applicable 2006-09-2121.09.2006 (5th EI) 05.03.2008 (12th EI) Madhya Pradesh Road Development Corporation(MPRDC) Completed
66 Strengthening of Matkuli-Tamia-Chindwara State Highways in Madhya Pradesh Madhya Pradesh Transport and Logistics 98.43 19.69 19.69 Not Applicable 19.66 Not Applicable Not Applicable 2006-09-2121.09.2006 (5th EI) 05.03.2008 (12th EI) Madhya Pradesh Road Development Corporation(MPRDC) Completed
67 Strengthening of Chandpur-Alirajpur-Kukshi-Badwani State Highways in Madhya Pradesh Madhya Pradesh Transport and Logistics 63.02 13.2 12.6 Not Applicable 12.54 Not Applicable Not Applicable 2006-09-2121.09.2006 (5th EI) 05.03.2008 (12th EI) Madhya Pradesh Road Development Corporation(MPRDC) Completed