1 |
Pune Metro Line III (Hinjewadi - Shivajinagar) Project |
Pune Metropolitian Region Development Authority |
Pune It City Metro Rail Limited |
Maharashtra |
Metro |
21 Sept 2019 |
|
2 |
MAHAVIR AWAS YOJANA AN IN-SITU SLUM REDEVELOPMENT PROJECT ON PPP MODEL |
BHUBANESWAR DEVELOPMENT AUTHORITY |
BMCNDION Developers Private Ltd. |
Odisha |
Housing |
31 Jul 2018 |
|
3 |
Development of Food Grain Silos at Kaimur and Buxar through PPP on Design , Build , Finance, Operate and Transfer (DBFOT) Basis |
Food Corporation of India |
NCML KB Private Limited |
Bihar |
Silos |
15 Jan 2018 |
|
4 |
Development of Greenfield International Airport on Public Private Partnership Basis at Mopa in Goa |
Directorate of Civil Aviation, Government of Goa |
GMR Goa International Airport Limited |
Goa |
Airport |
8 November 2016 |
|
5 |
DESIGN, CONSTRUCTION, DEVELOPMENT, FINANCE, OPERATION AND MAINTENANCE OF KM 270.00 ( THRISSUR ) TO KM 316.70 ( ANGAMALI ) IMPROVEMENT,OPERATION AND MAINTENANCE OF KM 316.700 ( ANGAMALI ) TO KM 342.00 ( EDAPALLI ) ON NH-47 TOGETHER CALLED THE PROJECT IN THE STATE OF KERALA ON BUILD OPERATE & TRANSFER ( BOT ) BASIS |
National Highways Authority of India |
Guruvayoor Infrastructure Private Limited |
Kerala |
Roads |
27 Mar 2016 |
|
6 |
Storage agreement for rice storage and management facility at Krushnaprasad (Puri) |
Odisha State Civil Supplies Corporation Limited |
Sri Rabi Narayan Mishra |
Odisha |
Post-harvest storage infrastructure |
03 Mar 2016 |
|
7 |
CONSTRUCTION OF ELEVATED HIGHWAY PROJECT FROM SILK BOARD JUNCTION TO ELECTRONIC CITY JUNCTION ( KM.8.765 TO KM.18.750) SECTION OF NH-7 ON BUILD,OPERATE AND TRANSFER (BOT) BASIS |
National Highways Authority of India |
BANGALORE ELEVATED TOLLWAY LIMITED |
Karnataka |
Roads |
25 Jan 2016 |
|
8 |
Four laning of Amravati to Chikhli section of NH-6 from km 166.000 to km 360.000 in the states of Maharashtra under NHDP Phase-IV on design, Build, Finance, Operate, Transfer (DBFOT) toll basis (Package-I) |
National Highways Authority of India (NHAI) |
Amrawati Chikhli Expressway Limited |
Maharashtra |
Roads |
08 Sep 2015 |
|
9 |
Four laning of Fagne- Guj-Maharashtra border section of NH6 from km 510.000 to km 650.794 in the states of Maharashtra under NHDP Phase-IV on Design, Build, Finance, Operate, Transfer (DBFOT) toll basis (Package-III) |
National Highways Authority of India (NHAI) |
Fagne Songadh Expressway Limited |
Maharashtra |
Roads |
08 Sep 2015 |
|
10 |
Improvement of road from Yelahanka-Andhra Pradesh state border of SH09 from km 13.8 to km 18.145 |
Public Works, Ports and Inland Water Transport Depactment & Karnataka Road |
Yelahanka - AP border tollways Private Limited |
Karnataka |
Roads |
03 Jun 2015 |
|
11 |
Operation and Maintenance of Organic Agriculture Produces Market at Sixmile, Khanapara, Guwahati |
Assam State Agricultural Marketing Board |
Anjaybee Green |
Assam |
Post-harvest storage infrastructure |
29 Apr 2015 |
|
12 |
Design, Financing, Development, Construction, Operation, Maintenance, Management and Transfer of a Regional Municipal Solid Waste to Energy and Landfill Facility at Patna in Bihar |
Bihar Urban Infrastructure Development Corporation Limited |
Patna Green Energy Private Limited |
Bihar |
Energy |
18 Dec 2014 |
|
13 |
Bulk Water Supply Project for IIT Bhubaneswar, NISER, Infocity-II |
Public Health Engineering Organization (Urban) |
MEIL (Bhubaneswar) Bulk Water Project Private Limited |
Odisha |
Water Supply & Sanitation |
27 Oct 2014 |
|
14 |
Operation and Maintenance of North East Tribal Museum and Cultural Centre at Nazirakhat, Sonapur, Kamrup |
Cultural Affairs Department, Government of Assam |
GAM Delicacy Private Limited |
Assam |
Tourism |
21 Oct 2014 |
|
15 |
Silo Project at Murli, Sehore |
Madhya Pradesh Warehousing and Logistics Corporation |
Sehore Agri Services Private Limited |
Madhya Pradesh |
Silos |
13 Jun 2014 |
|
16 |
Silo Project at Pathari Mouhari, Satna |
Madhya Pradesh Warehousing and Logistics Corporation |
Adani Agri Logistics (Satna) Limited |
Madhya Pradesh |
Silos |
06 Jun 2014 |
|
17 |
Silo Project at Pathari Juneta, Hoshangabad |
Madhya Pradesh Warehousing and Logistics Corporation |
Adani Agri Logistics (Hoshangabad) Limited |
Madhya Pradesh |
Silos |
06 Jun 2014 |
|
18 |
Silo Project at Durgapur, Dewas |
Madhya Pradesh Warehousing and Logistics Corporation |
Adani Agri Logistics (Dewas) Limited |
Madhya Pradesh |
Silos |
06 Jun 2014 |
|
19 |
Silo Project at Pathari Haweli, Vidisha |
Madhya Pradesh Warehousing and Logistics Corporation |
Adani Agri Logistics Limited |
Madhya Pradesh |
Silos |
06 Jun 2014 |
|
20 |
Development of a regional municipal solid waste management facility in Cuttack |
Cuttack Municipal Corporation |
Essel Bhubaneshwar MSW Limited |
Odisha |
Solid Waste Management |
29 May 2014 |
|
21 |
Development of a regional municipal solid waste management facility in Bhubaneswar |
Bhubaneswar Municipal Corporation |
Essel Bhubaneshwar MSW Limited |
Odisha |
Solid Waste Management |
29 May 2014 |
|
22 |
Silo Project at Barlai, Indore |
Madhya Pradesh Warehousing and Logistics Corporation |
Raghuvesh Agri Foods Private Limited |
Madhya Pradesh |
Silos |
28 May 2014 |
|
23 |
Silo Project at Mungalia Kot, Bhopal |
Madhya Pradesh Warehousing and Logistics Corporation |
Raghuvesh Agri Foods Private Limited |
Madhya Pradesh |
Silos |
28 May 2014 |
|
24 |
Construction, Operation and Maintenance of Multiuser Liquid Terminal at Puthuvypeen SEZ at Cochin Port |
Cochin Port Trust |
Indian Oil Corporation Limited |
Kerala |
Ports |
04 Apr 2014 |
|
25 |
Design, Build, Finance, Operate and Transfer of existing State Highway (SH-3&33) from Malavalli to Pavagada in the state of Karnataka |
Karnataka State Highway Improvement Project |
Mysore-Bellary Highway Private Limited |
Karnataka |
Roads |
24 Mar 2014 |
|
26 |
Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) of Existing State Highway (SH18) from Mudhol - Nippani — MH Border (Approx Length 107.937) in the State of Karnataka on DBFOMT Annuity Basis |
Karnataka State Highway Improvement Project |
Ashoka GVR Mudhol Nipani Roads Limited |
Karnataka |
Roads |
14 Mar 2014 |
|
27 |
Exploration, development, exploitation and processing of Black Galaxy Granite - supplementary agreement Pallava |
Andhra Pradesh Mineral Development Corporation Limited |
Pallava Granite Industries (I) Private Limited |
Andhra Pradesh |
Mining |
21 Feb 2014 |
|
28 |
Exploration, development, exploitation and processing of Black Galaxy Granite - supplementary agreement Midwest |
Andhra Pradesh Mineral Development Corporation Limited |
Midwest Granite Private Limited |
Andhra Pradesh |
Mining |
15 Feb 2014 |
|
29 |
Setting up of Hemodialysis Unit for Maintenance of Hemodialysis Unit in the State of Himachal Pradesh on PPP at Zonal Hospital, Dharamshala |
Department of Health and Family Welfare, Government of Himachal Pradesh |
Rahi Care Dharamshala Private Limited |
Himachal Pradesh |
Health |
10 Feb 2014 |
|
30 |
Upgradation of existing facility and creation of new facility at Visakhapatnam port trust for iron ore handling |
Visakhapatnam Port Trust |
Essar Vizag Terminals Limited |
Andhra Pradesh |
Ports |
13 Dec 2013 |
|
31 |
Development of oil jetty to handle liquid cargo and ship bunkering terminal at old Kandla |
Kandla Port Trust |
Kandla Oil Terminal Private Limited |
Gujarat |
Ports |
16 Nov 2013 |
|
32 |
Four Laning with paved shoulders of Sambalpur-Rourkela Section of SH-10 from km 4.90 to 167.90 |
Government of Odisha, Works Department |
L&T Sambalpur Rourkela Tollway Limited |
Odisha |
Roads |
08 Nov 2013 |
|
33 |
Energy Performance Contract for Bhubaneswar |
Bhubaneswar Municipal Corporation |
Super Wealth Financial Enterprises Private Limited |
Odisha |
Energy |
05 Oct 2013 |
|
34 |
Development of Ujjain-Simhastha bypass on BOT basis |
Madhya Pradesh Road Development Corporation Limited |
Ujjayini Highways Private Limited |
Madhya Pradesh |
Roads |
12 Jun 2013 |
|
35 |
Upgradation of mechanical handling infrastructure at V.O. Chidambaranar Port Trust (berths I to VI and IX) |
V.O. Chidambaranar Port Trust |
Imcola Crane Company Private Limited |
Tamil Nadu |
Ports |
24 May 2013 |
|
36 |
Development and Operation of an International Ship repair facility at W/Island |
Cochin Port Trust |
Cochin Shipyard Limited |
Kerala |
Ports |
24 Dec 2012 |
|
37 |
Service Provider Agreement for Rajkot BRTS |
Rajkot Municipal Corporation |
Mateshwari Travels |
Gujarat |
Urban Public Transport |
01 Oct 2012 |
|
38 |
Operation and Maintenance of 50 Skill Development Training Centres in 14 districts of Assam |
Directorate of Welfare of Tea and Ex-Tea Garden Tribes, Government of Assam |
H.P. Institute of Insurance |
Assam |
Education |
17 Sep 2012 |
|
39 |
Conversion of Eight berth as a Container terminal |
V.O. Chidambaranar Port Trust |
Dakshin Bharat Gateway Terminal Private Limited |
Tamil Nadu |
Ports |
04 Sep 2012 |
|
40 |
Development of road from Ginigere - Gangavathi to Sindhanur section, km 79.000 to km 162.000 (83 kms) on SH-23 |
Public Works, Ports and Inland Water Transport Depactment & Karnataka Road |
Sindhanur Gangavathi Tollway Private Limited |
Karnataka |
Roads |
17 Aug 2012 |
|
41 |
Development of dry bulk terminal off Tekra near Tuna outside Kandla creek at Kandla port |
Kandla Port Trust |
Adani Kandla Bulk Terminal Private Limited |
Gujarat |
Ports |
27 Jun 2012 |
|
42 |
Four laning of Rajauli-Bakhtiyarpur section of NH-31 in the state of Bihar on DBFOT (Toll) Basis |
Bihar State Road Development Corporation Limited |
Rajauli - Bakhtiyarpur Expressways Limited |
Bihar |
Roads |
14 Jun 2012 |
|
43 |
Installation of mechanised fertiliser handling facilities at East Quay - 7 (EQ-7) berth in the inner harbour of Visakhapatnam port |
Visakhapatnam Port Trust |
Vizag Agriport Private Limited |
Andhra Pradesh |
Ports |
18 May 2012 |
|
44 |
Development of Manawar-Singhana-Kukshi Road on BOT (Toll) basis |
Madhya Pradesh Road Development Corporation Limited |
Manawar Kukshi Tollways Private Limited |
Madhya Pradesh |
Roads |
14 Mar 2012 |
|
45 |
Development of Exhibition cum Convention Centre at Sitapur Industrial Area, Jaipur |
Rajasthan State Industrial Development and Investment Corporation Limited |
Diligent Pinkcity Centre Private Limited; Bhaskar Industries Limited |
Rajasthan |
Convention Centres |
10 Mar 2012 |
|
46 |
Development of East Quay-1A (EQ-1A) Berth on south side of EQ1 berth for handling thermal coal and steam coal in the inner harbour of Visakhapatnam port |
Visakhapatnam Port Trust |
SEW Vizag Coal Terminal Private Limited |
Andhra Pradesh |
Ports |
03 Feb 2012 |
|
47 |
Development of Sausr-Mohgaon-Mordongri, Sonapipari-Umrethmonari-Umbah And Gadarwara-Tendukheda Major District Roads on BOT (Annuity) basis |
Madhya Pradesh Road Development Corporation Limited |
BVSR SSG Road Projects Private Limited |
Madhya Pradesh |
Roads |
30 Jan 2012 |
|
48 |
Four Laning of Mohania-Ara section of NH-30 on DBFOT (Toll) Basis |
Bihar State Road Development Corporation Limited |
Mora Tollways Limited |
Bihar |
Roads |
10 Sep 2011 |
|
49 |
Development of East Quay-1 (EQ-1) Berth by replacing the existing EQ1 berth and part of EQ-2 berth for handling steam coal in the inner harbour of Visakhapatnam port |
Visakhapatnam Port Trust |
Adani Vizag Coal Terminal Private Limited |
Andhra Pradesh |
Ports |
01 Aug 2011 |
|
50 |
Development of Rau-Mhow-Mandleshwar Road on BOT basis |
Madhya Pradesh Road Development Corporation Limited |
Mhow Agroh Pathways Private Limited |
Madhya Pradesh |
Roads |
28 Jul 2011 |
|
51 |
Six laning of Ahmedabad to Vadodara section of NH-8 from km. 6.400 to km 108.700(length 102.300 km) in the state of Gujarat and improvement of existing Ahmedabad Vadodara expressway from km.0.000 to km 93.302 in the state of Gujarat (length 93.302 km.) under NHDP phase V on design build finance operate transfer (DBFOT) toll basis |
National Highways Authority of India (NHAI) |
IRB Ahmedabad Vadodara Super Express Tollway Pvt. Ltd. |
Gujarat |
Roads |
25 Jul 2011 |
|
52 |
Development of 5 MW Power Station at Port Blair |
Electricity Department, Andaman and Nicobar Administration |
NTPC Limited |
Andaman and Nicobar Islands |
Energy |
14 Jul 2011 |
|
53 |
Improvements to Chikkanayakanahalli -Tiptur -Hassan Road (Partly MDR and Partly SH) in the State of Karnataka |
Public Works, Ports and Inland Water Transport Depactment & Karnataka Road |
Abhijeet Infrastructure Limited & Corporate Ispat Alloys Limited |
Karnataka |
Roads |
03 Jun 2011 |
|
54 |
Development of Game Village - Phase II in Assam |
Guwahati Metropolitan Development Authority |
Simplex Infrastructures Limited |
Assam |
Tourism |
11 May 2011 |
|
55 |
Setting up of Barge jetty on captive use basis |
Kandla Port Trust |
Iffco Kisan Bazar and Logistics Limited |
Gujarat |
Ports |
17 Feb 2011 |
|
56 |
Four-laning of Jetpur-Somnath section (km 0.000 to 127.000) of NH8D in the state of Gujarat to executed as BOT (TOLL) project on DBFO pattern under NHDP Phase III |
National Highways Authority of India (NHAI) |
Jetpur Somnath Tollways Limited |
Gujarat |
Roads |
07 Feb 2011 |
|
57 |
Four laning of Ludhiana to Talwandi section of NH 95 from km 92.000 to km 170.000 (length - 78.00km) in the state of Punjab to be executed on BOT (toll) on DBFOT basis under NHDP phase III |
National Highways Authority of India (NHAI) |
ESSEL Ludhiana Talwandi Toll Roads Private Limited |
Punjab |
Roads |
20 Jan 2011 |
|
58 |
FOUR LANNING OF PANVEL-INDAPUR SECTION NH-17 FROM KM 0.000 TO KM 84.000 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE III ON BOT BASISI ( PACKAGE NO NHDP-III/DL4/05 ) |
National Highways Authority of India |
SUPREME PANVEL INDAPUR TOLLWAUS PRIVATE LIMITED |
Maharashtra |
Roads |
01 Jan 2011 |
|
59 |
Two laning with paved shoulders of Agra - Aligarh section of NH93 from km 0.000 to km 79.000 in the state of Uttar Pradesh on design, build, finance, operate and transfer (DBFOT) basis |
National Highways Authority of India (NHAI) |
Brij Bhoomi Expressway Pvt. Ltd. |
Uttar Pradesh |
Roads |
23 Dec 2010 |
|
60 |
Mrugavani National Park, Chilkur Eco-Tourism Project |
Andhra Pradesh Forest Development Corporation Limited |
Laxmi Jyothi Eco-Tourism & Jungle Resorts Private Limited |
Andhra Pradesh |
Tourism |
19 Nov 2010 |
|
61 |
Hyderabad Metro Rail (MRTS) Project |
Government of Andhra Pradesh |
L&T Hyderabad Metro Rail Private Limited |
Andhra Pradesh |
Urban Public Transport |
04 Nov 2010 |
|
62 |
Rehabilitation, strengthening and four laning of Srinagar to Banihal section from km 187.000 to km 189.350 (Banihal bypass) and km 220.700 to km 286.110 of NH-1A in the state of Jammu & Kashmir (package no. NHDP-Phase-/BOT/I/J&K) |
National Highways Authority of India (NHAI) |
Srinagar Banihal Expressway Limited |
Jammu & Kashmir |
Roads |
28 Oct 2010 |
|
63 |
Development of Greenfield Bridge across River Ganges and\r\nits approaches connecting Bakhtiyarpur Bypass of NH-31 near\r\nvillage Karjan & NH-28 at Tajpur in the State of Bihar on DBFOT (Toll) basis |
Bihar State Road Development Corporation Limited |
Navayuga Jahnavi Toll Bridge Private Limited |
Bihar |
Roads |
08 Oct 2010 |
|
64 |
Four laning of Belagum-Khanapur section (km 0+000 to km 30+000) and two laning with laning with paved shoulders of Khanapur Karnataka/ Goa border section (km 30+000 to km 84+120) of NH-4A in the state of Karnataka under NHDP phase-III through public private participation on Design, Build, Finance, Operate and Transfer (DBFOT) TOLL basis project |
National Highways Authority of India (NHAI) |
GVRMP Belgaum Khanapur Tollway Private Limited |
Karnataka |
Roads |
30 Sep 2010 |
|
65 |
Development of North Cargo Berth II for handling bulk cargoes at Tuticorin Port on DBFOT basis |
Tuticorin Port Trust |
Tuticorin Coal Terminal Private Limited |
Tamil Nadu |
Ports |
11 Sep 2010 |
|
66 |
Four laning of Barhi Hazaribagh section from km 0.00 to km 40.500 of NH 33 in the state of Jharkhand on design, built, finance, operate and transfer (DBFOT) toll basis under NHDP Phase III project |
National Highways Authority of India (NHAI) |
Abhijeet Hazaribagh Toll Road Limited |
Bihar |
Roads |
31 Aug 2010 |
|
67 |
Four laning Nagpur-Saoner-Betul section of NH-69 from km.3.000 to 59.30 in the state of Maharashtra and km. 137.00 to km. 257.400 in the state of Madhya Pradesh on DBFOT (Annuity) basis project |
National Highways Authority of India (NHAI) |
Oriental Nagpur Betul Highway Private Ltd |
Maharashtra |
Roads |
30 Aug 2010 |
|
68 |
Six laning of Tumkur- Chitradurga (excluding Tumkur & Chitradurga bypasses) section from km 75.00 to km 189.00 of NH 4 (approx. 114.00 km) in the state of Karnataka to be executed as BOT (TOLL) project on DBFOT pattern under NHDP phase V |
National Highways Authority of India (NHAI) |
IRB Tumkur Chitradurga Tollway Private Limited |
Karnataka |
Roads |
16 Aug 2010 |
|
69 |
Development of EQ-10 berth in the northern arm of inner harbour of Visakhapatnam port |
Visakhapatnam Port Trust |
AVR Infra Private Limited |
Andhra Pradesh |
Ports |
16 Aug 2010 |
|
70 |
Six laning of Chandikole-Jagatpur-Bhubaneshwar section of NH5 from km. 413.00 to km. 418.00 and from km. 0.000 to km. 62.000 in the state of Orissa as BOT (TOLL) on DBFO pattern under NHDP Phase V |
National Highways Authority of India (NHAI) |
Shree Jagannath Expressways Private Limited |
Odisha |
Roads |
06 Aug 2010 |
|
71 |
Development of WQ-6 berth in the northern arm of Inner harbour of Visakhapatnam port for handling dry bulk cargo |
Visakhapatnam Port Trust |
West Quay Multiport Private Limited |
Andhra Pradesh |
Ports |
31 Jul 2010 |
|
72 |
Six laning of Varanasi - Aurangabad section of NH2 from km 786.00 to km 978.400( length 192.400 km) in the state of Uttar Pradesh and Bihar on design, build, finance, operate and transfer (DBFOT) toll basis under NHDP Phase–V |
National Highways Authority of India (NHAI) |
Soma Isolux Varanasi Aurangabad Tollway Pvt. Ltd. |
Bihar |
Roads |
30 Jul 2010 |
|
73 |
Four laning of Bhubaneshwar - Puri section of NH - 203 from km.0.00 to km.59.00 in the state of Orissa to be executed as bot (TOLL) on DBFOT pattern under NHDP phase III |
National Highways Authority of India (NHAI) |
Bhubaneshwar Expressways Private Limited |
Maharashtra |
Roads |
30 Jul 2010 |
|
74 |
Upgrading to 4 lane divided carriage way configuration of six sections of NH stretches in Bihar under 10000 km (non NHDP) programme -Gopalganj-Chhapra - Hajipur section of NH-19 |
National Highways Authority of India (NHAI) |
Chhapra-Hajipur Expressways Limited |
Bihar |
Roads |
28 Jul 2010 |
|
75 |
2 lane with paved shoulders of Bhopal Sanchi section from km 0.00 to km 53.775 of NH 86 extn to be executed as BOT (Annuity) project on DBFO pattern under NHDP phase III in the state of Madhya Pradesh |
National Highways Authority of India (NHAI) |
Bhopal-Sanchi Highways Pvt Ltd |
Madhya Pradesh |
Roads |
22 Jul 2010 |
|
76 |
Rehabilitation, strengthening and four laning of Jammu to Udhampur section from km 15.000 (Jammu bypass) to km 67.00 of NH-1A in the state of Jammu & Kashmir |
National Highways Authority of India (NHAI) |
SP Jammu Udhampur Highway Private Limited |
Jammu & Kashmir |
Roads |
19 Jul 2010 |
|
77 |
Four laning of Farakka -Raiganj section of NH 34 from km 295.00 to km 398.000 in the states of west Bengal under NHDP phase III on DBFOT (toll) basis |
National Highways Authority of India (NHAI) |
Farakka-Raiganj Highways Limited |
West Bengal |
Roads |
19 Jul 2010 |
|
78 |
Six laning of Delhi - Agra section of NH 2 from km 20.500 to km 200.000 (length - km 179.500) in the state of Haryana/Uttar Pradesh under NHDP phase v as BOT (toll) on DBFO pattern |
National Highways Authority of India (NHAI) |
DA Toll Road Private Limited |
Uttar Pradesh |
Roads |
16 Jul 2010 |
|
79 |
Four laning of Jorbat-Shillong ( Barapani ) section of NH40 from km 0.000 to 61.800 in the state of Assam and Meghalaya on DBFOT pattern under SARDP-NE on BOT (Annuity) basis |
National Highways Authority of India (NHAI) |
Jorabat Shillong Expressway Limted |
Assam |
Roads |
16 Jul 2010 |
|
80 |
Four laning of Rohtak - Bawal section of NH71 from km 363.300 (design km 363.300) to 450.800 (design km 445.853) in the state of Haryana under NHDP Phase III on Design, Build, Finance, Operate and Transfer (DBFOT) basis |
National Highways Authority of India (NHAI) |
Kurukshetra Expressway Private Limited |
Haryana |
Roads |
13 Jul 2010 |
|
81 |
Two laning with paved shoulders of Mokama Munger section of NH80 from km 1.430 to km 70.00 in the state of Bihar under NHDPIII on design, build, finance, operate and transfer (DBFOT) Annuity basis project |
National Highways Authority of India (NHAI) |
Mokama Munger Highway Limited |
Bihar |
Roads |
12 Jul 2010 |
|
82 |
Rehabilitation and upgrading of existing intermediate lane roads to 2 lane with paved shoulders of Forbesganj - Jogbani (km 0.000 to km 9.258) on NH 57A in the state of Bihar under NHDP phase - III on DBFOT Annuity basis |
National Highways Authority of India (NHAI) |
Jogbani Highway Private Limited |
Bihar |
Roads |
12 Jul 2010 |
|
83 |
Four laning of Tirupati-Tirupati-Chennai section of NH205 from km 274.800 to km 341.600 in the state of Andhra Pradesh and from km 0.00 to km 59.600 in the state of Tamil Nadu on design build, finance, operate and transfer (DBFOT) toll basis |
National Highways Authority of India (NHAI) |
Transstroy Tirirpati - Tiruthani - Chennai-Tollways Private Limited |
Multiple State |
Roads |
12 Jul 2010 |
|
84 |
Two laning of Trichy-Karaikudi including Trichy bypass road section of NH-210 from (km 10.00 to km 94.00) and bypass (km 110.016 to km 135.930) in the state of Tamil Nadu under NHDP III on design, build, finance, operate and transfer ( DBFOT ) annuity basis |
National Highways Authority of India (NHAI) |
Transstroy Trichy-Karaikudi Tollways Private Limited |
Tamil Nadu |
Roads |
12 Jul 2010 |
|
85 |
Two laning with paved shoulder of Dindigul-Theni section km 2.750 to km 73.400 of NH-45 ( ext. ) and Theni-Kumili section from km 215.500 to km 273.600 of nh-220 in the state of Tamilnadu under NHDP phase-iii on design, build, finance, operate and transfer (DBFOT) annuity basis |
National Highways Authority of India (NHAI) |
Transstroy Dindigul-Theni-Kumli Tollways Private Limited |
Tamil Nadu |
Roads |
12 Jul 2010 |
|
86 |
Four laning of Rimuli-Roxy-Rajamunda section of NH - 215 from km.163.00 to km.269.00 in the state of Orissa to be executed as BOT (toll) on DBFOT pattern under NHDP Phase III |
National Highways Authority of India (NHAI) |
Orissa Expressway Private Limited |
Maharashtra |
Roads |
06 Jul 2010 |
|
87 |
Six lanning of Hosur-Krishnagiri section of NH7 from km 33.130 to km 93.000 ( length-km 59.87 ) in the state of Tamil Nadu under NHDP Phase V as BOT (toll) on DBFO pattern |
National Highways Authority of India (NHAI) |
HK Toll Road Private Limited |
Tamil Nadu |
Roads |
02 Jul 2010 |
|
88 |
Four laning of Sambalpur – Baragarh - Orissa/Chhatisgarh border section of NH6 from km.0.00 to km.88.00 in the state of Orissa to be executed as BOT (toll) on DBFOT pattern under NHDP phase III |
National Highways Authority of India (NHAI) |
Ashoka Sambalpur Baragarh Tollway Private Limited |
Odisha |
Roads |
29 Jun 2010 |
|
89 |
Six laning of Belgaum - Dharwad section of NH 4 from km 433.00 to km 515.00 (length - 79.36 km ) in the state of Karnataka to be executed as BOT (Toll) on DBFO pattern under NHDP Phase - V |
National Highways Authority of India (NHAI) |
Ashoka Belgaum Dharwad Tollway Private Limited |
Karnataka |
Roads |
29 Jun 2010 |
|
90 |
Rehabilitation, strengthening and four laning of Chenani to Nashri section of NH-1A from km 89.00 to 130.00 (new alignment) including 9 km long tunnel (2 lane) with parallel escape tunnel in the state of Jammu & Kashmir |
National Highways Authority of India (NHAI) |
Chenani Nashri Tunnelway Limited |
Jammu & Kashmir |
Roads |
28 Jun 2010 |
|
91 |
Four laning of Raiganj-Dalkhola section of NH 34 from km 398.000 to km 452.750 in the state of west Bengal under NHDP phase III on DBFOT (toll) basis |
National Highways Authority of India (NHAI) |
Raiganj-Dalkhola Highways Limited |
West Bengal |
Roads |
28 Jun 2010 |
|
92 |
Four laning of Baharampore - Farakka section of NH34 from km 191.416 to km 294.684 in the state of west Bengal under NHDP phase III on design, build, finance, operate and transfer (DBFOT) toll basis |
National Highways Authority of India (NHAI) |
Baharampore-Farakka Highways Limited |
West Bengal |
Roads |
28 Jun 2010 |
|
93 |
Four laning of Bareilly - Sitapur section on NH24, from km 263.000 to km 413.000 in the state of Uttar Pradesh under NHDP iii on design, build, finance, operate and transfer (DBFOT) basis |
National Highways Authority of India (NHAI) |
Bareilly Highways Project Limited |
Uttar Pradesh |
Roads |
22 Jun 2010 |
|
94 |
Mechanisation of coal handling facilities and upgradation of general cargo berth at outer harbour of Visakhapatnam port |
Visakhapatnam Port Trust |
Vizag General Cargo Berth Private Limited |
Andhra Pradesh |
Ports |
10 Jun 2010 |
|
95 |
Improvements to Dharwad-Ramnagar road (SH-34) |
Public Works, Ports and Inland Water Transport Depactment & Karnataka Road |
GVRMP Dharwad Ramnagar Tollway Private Limited |
Karnataka |
Roads |
04 Jun 2010 |
|
96 |
Improvements to Whaghari to Ribbanpally road (SH10) in the state of Karnataka |
Public Works, Ports and Inland Water Transport Depactment & Karnataka Road |
GVRMP Whaghdhari Ribbanpally Tollway Private Limited |
Karnataka |
Roads |
04 Jun 2010 |
|
97 |
Jhajjar Power Transmission Project |
Haryana Vidyut Prasaran Nigam Limited |
Jhajjar KT Transco Private Limited |
Haryana |
Energy |
27 May 2010 |
|
98 |
Six laning of Indore - Dewas section of NH3 from km 577.550 to km 610.000 and km 0.000 to km 12.600 (approx. length 45.05 km) in the state of Madhya Pradesh under NHDP phase V to be executed as BOT (TOLL) project on Design, Build, Finance, Operate and Transfer \"DBFOT\" pattern |
National Highways Authority of India (NHAI) |
Indore Dewas Tollways Limited |
Madhya Pradesh |
Roads |
17 May 2010 |
|
99 |
Design, engineering, construction, development, finance, operation and maintenance of four laning of Deoli-Kota section of NH 12 from km 165.00 to junction of NH - 76 on Kota bypass (approx. length 83.04km) in the state of Rajasthan on bot (toll) project , on DBFOT pattern under NHDP phase III |
National Highways Authority of India (NHAI) |
GKV Deoli Kota Expressway Private Limited |
Rajasthan |
Roads |
17 May 2010 |
|
100 |
Six lanning of Krishnagiri-Walajaphet section of NH46 from km 0.000 to km 148.3000 (length 148.3000) in the state of Tamil Nadu under NHDP Phase-V to be executed as BOT (toll ) project on DBFO pattern |
National Highways Authority of India (NHAI) |
L&T Krishnagiri-Walajahpet Tollway Private Limited |
Tamil Nadu |
Roads |
13 May 2010 |
|
101 |
Upgradation, operation and maintenance of km 534.720 to km 556.840 of Hyderabad Bangalore section of NH7 in Karnataka under NHDP Phase VII |
National Highways Authority of India (NHAI) |
Navayuga Devanahalli Tollway Private Limited |
Karnataka |
Roads |
30 Apr 2010 |
|
102 |
Four laning of Ahmedabad to Godhra section of NH59 from km 4.200 to km 122.420 in state of Gujarat on Design, Build, Finance, Operate and Transfer (DBOFTO) basis under NHDP phase III |
National Highways Authority of India (NHAI) |
Essel Ahmedabad Godhra Toll Roads Limited |
Gujarat |
Roads |
25 Mar 2010 |
|
103 |
Six laning from km 102.035 to km 144.680 on the Chengapali to start Coimbatore bypass and four Lanning from km 170.880 to km 183.010 on end of Coimbatore bypass to TN/Kerala border section of NH47 in the state of Tamil Nadu NHDP phase-II on DBFOT (toll) basis (package no NS-II/BOT/TN-8) |
National Highways Authority of India (NHAI) |
IVRCL Chengapalli Tollways Limited |
Tamil Nadu |
Roads |
25 Mar 2010 |
|
104 |
Four laning of Hungund-Hospet section oh NH-13 from km 202.000 to km 299.000 in the state of Karnataka on Design Build Finance Operate and Transfer (DBFOT) basis under NHDP II |
National Highways Authority of India (NHAI) |
GMR OSE Hungund Hospet Highways Pvt Ltd |
Karnataka |
Roads |
22 Mar 2010 |
|
105 |
Six laning of Samakhiali Gandhidham section of NH8A from km 306.00 to km 362.16 (length km 56.16) Gujarat |
National Highways Authority of India (NHAI) |
L&T Samakhlall Gandhidham Tollway Private Limited |
Gujarat |
Roads |
17 Mar 2010 |
|
106 |
Six laning of Pune-Satara section of NH-4 from km. 725.000 to 865.350 (length -140.350 km) in the state of Maharashtra to be executed as BOT (TOLL) on DBFO pattern under NHDP phase-v (Package no. NHDP-V/MC-II/14) |
National Highways Authority of India (NHAI) |
PS Toll Road Private Limited |
Maharashtra |
Roads |
10 Mar 2010 |
|
107 |
Four laning of Bijapur Hungund section of NH13 from km 102.000 to km 202.000 in the state of Karnataka under NHDP phase III on Design, Build, Finance, Operate and Transfer (DBFOT) toll basis |
National Highways Authority of India (NHAI) |
Bijapur Hungund Tollway Private Limited |
Karnataka |
Roads |
09 Mar 2010 |
|
108 |
Four laning of Rohtak - Panipat section of NH71A from km 0.000 (km 63.300 of NH10) to km 80.858 (km 83.500 of NH1) in the states of Haryana under NHDP phase III on design, build, finance, operate and transfer (DBFOT) basis |
National Highways Authority of India (NHAI) |
Rohtak-Panipat Tollway Private Limited |
Haryana |
Roads |
09 Mar 2010 |
|
109 |
FOUR LANING KUNDAPUR SURATHKAL SECTION OF NH 17 AND MANGALORE - KERALA BORDER TOTAL LENGTH 90.08 IN THE STATE OF KARNATAKA UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (THE DBFOT) BASIS. |
National Highways Authority of India |
NAVAYUGA UDUlPl TOLLWAYS PRIVATE LIMITED |
Karnataka |
Roads |
09 Mar 2010 |
|
110 |
FOUR (SIX) LANING OF GANDHIDHAM (KALDLA) MUNDRA PORT SECTION OF NH - 8A (EXTENSION) (APPROX. LENGTH 71.400 KM) IN THE STATE OF GUJARAT UNDER NHDP PHASE III THROUGH PUBLIC - PRIVATE/PUBLIC SECTOR PARTNERSHIP (PPP) ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS |
National Highways Authority of India |
M/s KM Toll Road Private Limited |
Gujarat |
Roads |
01 Mar 2010 |
|
111 |
Four laning of Godhra to Gujarat / Madhya Pradesh border section of NH59 from km 129.300 to km 215.900 in the state of Gujarat under NHDP phase III on Design, Build, Finance, Operate and Transfer (DBFOT) basis |
National Highways Authority of India (NHAI) |
BSCPL Godhra Tollways Limited |
Gujarat |
Roads |
25 Feb 2010 |
|
112 |
Up gradation of Hajipur - Muzaffarpur section of the existing NH77 to four lane dual carriageway configuration of the section starting from km 0.00 (Ramashish Chowk) to km 46.300 and connecting NH28 of East-West corridor at km 515.045 in the state of Bihar on BOT (Annuity) basis under NHDP Phase III |
National Highways Authority of India (NHAI) |
Patna Highway Projects Limited |
Bihar |
Roads |
24 Feb 2010 |
|
113 |
Design, engineering, finance, procurement, construction, operation and maintenance of 4 laning of Kannur-Vengalam-Kuttipuram section of NH17 (package-II) from km 230.00 to km 318.00 in the state of Kerala on design, build, finance, operate and transfer (DBFOT) (toll) basis under NHDP Phase-III |
National Highways Authority of India (NHAI) |
South Malabar Expressway Private Limited |
Kerala |
Roads |
24 Feb 2010 |
|
114 |
Design, engineering, finance, procurement, construction, operation and maintenance of 4 laning of Kannur-Vengalam-Kuttipuram section of NH-17 ( package i ) from km 148.00 to km 230.00 in the of Kerala on Design, Build, Finance, Operate and Transfer ( DBFOT ) (toll) basis under NHDP phase III |
National Highways Authority of India (NHAI) |
North Malabar Expressway Private Limited |
Kerala |
Roads |
24 Feb 2010 |
|
115 |
Four laning of Haridwar - Dehradun section from km 211.000 to km 218.200 of NH 58 and km 165.000 to km 196.825 of NH 72 in the state of Uttarakhand under NHDP phase iii as bot (annuity) on DBFOT pattern |
National Highways Authority of India (NHAI) |
Dehradun Highways Project Limited |
Uttar Pradesh |
Roads |
24 Feb 2010 |
|
116 |
Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Indore to Gujarat-MP border section of NH59 (km 9.500 to km 171.100) in the state Madhya Pradesh under NHDP phase III on build, operate and transfer (BOT) (DBFOT) basis |
National Highways Authority of India (NHAI) |
IVRCL Indore Gujarat Tollways Ltd. |
Madhya Pradesh |
Roads |
22 Feb 2010 |
|
117 |
Design, engineering, finance, construction, operation and maintenance of the four laning of Goa/Karnataka border to Panaji Goa section of NH4A from km 84.000 to km 153.070 in the state of Goa under NHDP phase III on, build, operate and transfer (BOT) toll basis |
National Highways Authority of India (NHAI) |
IRB Goa Tollway Private Limited |
Goa |
Roads |
19 Feb 2010 |
|
118 |
design, engineering, construction, Development, finance, operation and maintenance of Jaipur to Reengus section of NH - 11 (km 246.300 to km 298.075) in the state of Rajasthan under NHDP phase III on design , build , finance, operate and transfer (DBFOT) basis |
National Highways Authority of India (NHAI) |
J R Toll Road Private Limited |
Rajasthan |
Roads |
19 Feb 2010 |
|
119 |
Operation and maintenance of the four laning of Goa/Karnataka border to Panaji Goa Section of NH4A KM 84.000 to KM 153.070 in the state of Goa under NHDP Phase -III on, build, operate and transfer (BOT) toll basis |
National Highways Authority of India (NHAI) |
IRB Goa Tollway Private Limited |
Maharashtra |
Roads |
19 Feb 2010 |
|
120 |
Development of Engineering College at Tezpur, Assam |
Department of Technical Education, Government of Assam |
Shrimanta Shankar Academy |
Assam |
Education |
30 Dec 2009 |
|
121 |
Design, engineering, construction, development, finance, operation and maintenance of Jaipur to Deoli section of NH 12 (km 18.700 to km 165.000) in the state of Rajasthan under NHDP phase III on design , build, finance, operate and transfer (DBFOT) basis |
National Highways Authority of India (NHAI) |
IRB Jaipur Deoli Tollway Private Limited |
Rajasthan |
Roads |
16 Dec 2009 |
|
122 |
Development of multi-cargo berth no. 13 at Kandla port |
Kandla Port Trust |
RAS Infraport Private Limited |
Gujarat |
Ports |
03 Dec 2009 |
|
123 |
Design, Engineering, Finance, Procurement, Construction, Operation and Maintenance of the 4 laning of Talegaon-Amravati section of NH-6 from km 100.00 to km 166.725 in the state of Maharashtra under NHDP Phase III on Design, Build, Finance, Operate & Transfer (BOT) basis |
National Highways Authority of India (NHAI) |
IRB Talegaon Amravati Tollway |
Maharashtra |
Roads |
18 Nov 2009 |
|
124 |
Design, engineering, finance, construction, operation and maintenance of Pathankot - Amritsar section of NH 15 from km 6.082 to km 108.502 in the state of Punjab under NHDP phase III on Design, Build, Finance, Operate and Transfer (DBFOT) basis |
National Highways Authority of India (NHAI) |
IRB Pathankot Amritsar Toll Road Private Limited |
Punjab |
Roads |
16 Nov 2009 |
|
125 |
Design, construction, development, finance, operation and maintenance of 4/6 laning of Hyderabad-Vijaywada section from km 40.000 to km 221.500 on NH9 in the state of Andhra Pradesh |
National Highways Authority of India (NHAI) |
GMR Hyderabad Viyayawada Expressways Pvt. Ltd |
Andhra Pradesh |
Roads |
09 Oct 2009 |
|
126 |
4 LANING OF MADHYA PRADESH / MAHARASHTRA BORDER - NAGPUR SECTION OF NH 7 FROM KM 652.000 (NEW KM 653.225) TO KM 729.000 INCLUDING CONSTRUCTION OF KAMPTEE-KANHAN AND NAGPUR BYPASS AND MAINTENANCE OF ALREADY 4 LANED SECTION FROM KM 14.585 TO KM 36.6000 OF NH 7 (NAGPUR - HYDERABAD SECTION) IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE II ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS |
National Highways Authority of India |
Oriental Nagpur Bye Pass Construction Pvt. Ltd |
Maharashtra |
Roads |
01 Oct 2009 |
|
127 |
Development of a Coal Handling Terminal at Berth No.7 in the Port of Mormugao |
Mormugao Port Trust |
Adani Murmugao Port Terminal Private Limited |
Goa |
Ports |
22 Sep 2009 |
|
128 |
Four laning of Hazaribagh - Ranchi section of NH33 from km 40.500 to km 114.000 in the state of Jharkhand under NHDP Phase III on BOT (Annuity) basis |
National Highways Authority of India (NHAI) |
Ranchi Hazaribagh Expressway Limited |
Bihar |
Roads |
09 Sep 2009 |
|
129 |
Design, construction, development, finance, operation and maintenance of 6 lanning of Vadakanchery-Thrissur section of NH47 (km 240.00 to 270.000) in the state of Kerala on Design, Build, Finance, Operate and Transfer (DBFOT) basis |
National Highways Authority of India (NHAI) |
Thrissur Expressway Private Limited |
Kerala |
Roads |
24 Aug 2009 |
|
130 |
Design, engineering, finance, construction, operation and maintenance of 4 laning of Armur-Adloor Yellareddy section of Nagpur Hyderabad of NH7 from km 308.000 to km 367.000 in the state of Andhra Pradesh under NHDP Phase-II on design, build, finance, operate and transfer (DBFOT) basis |
National Highways Authority of India (NHAI) |
Navayuga Dichpally Tollway Private Limited |
Andhra Pradesh |
Roads |
05 Aug 2009 |
|
131 |
Design, Engineering, Finance, Construction, Development, Operation and Maintenance of 6 laning of Pimpalgaon-Nashik-Gonde section on NH3 from km 380.00 to km 440.00 in the state of Maharashtra under NHDP Phase III on Design Build Finance Operate and Transfer |
National Highways Authority of India (NHAI) |
L&T PNG Tollway Private Limited |
Maharashtra |
Roads |
08 Jul 2009 |
|
132 |
Exploitation of Iron Ore and establishment of beneficiation Plant |
Andhra Pradesh Mineral Development Corporation Limited |
GIMPEX Limited |
Andhra Pradesh |
Mining |
02 Jul 2009 |
|
133 |
Design, Engineering, Finance, Construction, Development, Operation and Maintenance of the 4 laning MP/Maharashtra border - Dhule section on NH3 from km 168.500 to km 265.000 in the state of Maharashtra under NHDP phase III on Design, Build, Finance, Operate and Transfer (DBFOT) basis |
National Highways Authority of India (NHAI) |
Dhule Palesner Tollway Limited |
Maharashtra |
Roads |
24 Jun 2009 |
|
134 |
Six laning of the existing road from km 364.125 to km 58.245 (approx. 93.56 km ) on the Kishangarh - Ajmer - Beawar section of NH 8 in the state of Rajasthan under build, finance, operate and transfer ( DBFOT) basis |
National Highways Authority of India (NHAI) |
Soma -Isolux Kishangarh Beawar Tollway Private Limited |
Rajasthan |
Roads |
18 May 2009 |
|
135 |
Four laning of Gujarat Maharashtra border Surat - Hazira port section of NH 6 (approx. length 132.913 km) in the state of Gujarat under NHDP phase iii through public – private-public sector partnership (PPP) on Design, Build, Finance, Operate and Transfer (DBFOT) basis |
National Highways Authority of India (NHAI) |
Soma - Isolux Surat- Hazira Tollway Privet Limited |
Gujarat |
Roads |
18 May 2009 |
|
136 |
DESIGN, ENGINEERING,FINANANCE,CONSTRUCTION OPERATION AND MAINTENANCE OF 4 LANINNG OF PUNE - SOLAPUR SECTION OF NH-9 FROM KM.40.000 TO KM 144.400 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE-III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS. |
National Highways Authority of India |
M/s Pune Solapur Expressways Private Limited |
Maharashtra |
Roads |
01 May 2009 |
|
137 |
Project of LNG Port and Terminal Facilities in the Puthuvypeen SEZ at Cochin Port |
Cochin Port Trust |
Petronet LNG Limited |
Kerala |
Ports |
12 Mar 2009 |
|
138 |
Five Star Hotel at Guwahati |
Department of Tourism, Government of Assam |
The Indian Hotels Company Limited |
Assam |
Tourism |
06 Oct 2008 |
|
139 |
Four laning of Indore-Ujjain Road in Madhya Pradesh |
Madhya Pradesh Road Development Corporation Limited |
Mahakaleshwar Tollways Private Limited |
Madhya Pradesh |
Roads |
17 Sep 2008 |
|
140 |
(Badarpur elevated highway) Design, engineering, finance construction, operation and maintenance of 6 lane elevated highway from km 16.100 to 20.500 on Delhi-Agra section of NH2 in the states of Delhi/Haryana on Build Operate and Transfer (BOT) basis |
National Highways Authority of India (NHAI) |
Badarpur Faridabad Tollway Limited |
Delhi |
Roads |
04 Sep 2008 |
|
141 |
Airport Metro Express Line - IGI Airport to Sector 21, Dwarka, New Delhi |
Delhi Metro Rail Corporation Limited |
Delhi Airport Metro Express Private Limited |
Delhi |
Urban Public Transport |
25 Aug 2008 |
|
142 |
Six laning of Gurgaon - Kotputli - Jaipur section of NH 8 from km 42.70 to km 273.00 in the state of Haryana and Rajasthan to be executed as BOT(toll) on DBFO pattern under pattern under NHDP phase V |
National Highways Authority of India (NHAI) |
Pink City Expressway Private Limited |
Rajasthan |
Roads |
06 Jun 2008 |
|
143 |
Six laning of Chilkaluripet-Vijaywada section of NH5 from km 355.00 to km 434.15 (length-82.5 km) in the state of Andhra Pradesh to be executed as BOT (toll) on DBFO pattern under NHDP Phase V |
National Highways Authority of India (NHAI) |
Vijayawada Tollway Private Limited |
Andhra Pradesh |
Roads |
04 Jun 2008 |
|
144 |
Six laning of Panipat - Jalandhar section of NH 1 from km 96.00 to km 387.10 (length - 291.10 km) in the state of Haryana and Punjab to be executed as BOT (toll) on DBFO pattern under NHDP phase V |
National Highways Authority of India (NHAI) |
Soma-Isolux NH One Tollway Private Limited |
Punjab |
Roads |
09 May 2008 |
|
145 |
Six laning of Surat - Dahisar section of NH - 8 from km 263.00 to km 502.00 ( length - 239 km ) in the state of Gujarat and Maharashtra to be executed as bot (TOLL) on DBFO pattern under NHDP Phase V |
National Highways Authority of India (NHAI) |
IRB Surat Dahisar Tollway Private Limited |
Gujarat |
Roads |
30 Apr 2008 |
|
146 |
Design, Construction, Finance, Operation & Maintenance of Khalghat - MP / Maharashtra border section on NH 3 from km 84.700 to km 167.500 in Madhya Pradesh under NHDP Phase III on BOT basis |
National Highways Authority of India (NHAI) |
SEW Navayuga Barwani Tollways Pvt Ltd |
Madhya Pradesh |
Roads |
16 Apr 2008 |
|
147 |
Exploration, development, exploitation and processing of Black Galaxy Granite - PallavaRed |
Andhra Pradesh Mineral Development Corporation Limited |
Pallava RED |
Andhra Pradesh |
Mining |
03 Mar 2008 |
|
148 |
Design, Engineering, Finance, Construction, Operation and Maintenance of end of Durg bypass - Chhattisgarh/Maharashtra border section from km 322.400 to km 405.000 of NH6 under NHDP Phase IIIA on Build, Operate and Transfer (BOT) basis |
National Highways Authority of India (NHAI) |
Ashoka Highways (Durg) Limited |
Madhya Pradesh |
Roads |
23 Jan 2008 |
|
149 |
Design, Engineering, Finance, Construction, Operation and Maintenance of end of Durg bypass-Chattisgarh/Maharashtra border section from km 322.400 to km 405.00 of NH6 under NHDP phase IIIA on build, operate and transfer (BOT) basis |
National Highways Authority of India (NHAI) |
Ashoka Highways (Durg) Limited |
Maharashtra |
Roads |
23 Jan 2008 |
|
150 |
Design, engineering, finance, construction, operation and maintenance of Amritsar - Wagah border section of NH 1 from km 455.400 to km 491.620 in the state of Punjab under NHDP phase iiia on BOT (annuity) basis |
National Highways Authority of India (NHAI) |
Rohan Rajdeep Toll Road Private Limited |
Punjab |
Roads |
18 Dec 2007 |
|
151 |
Construction of Offshore Container Berths and development of Container Terminal on BOT basis in Mumbai harbour |
Port of Mumbai |
Indira Container Terminal Private Limited |
Maharashtra |
Ports |
30 Nov 2007 |
|
152 |
Integrated Municipal Solid Waste Management Project (IMSWMP) for Coimbatore |
Coimbatore Municipal Corporation |
BEIL-UPL |
Tamil Nadu |
Solid Waste Management |
19 Nov 2007 |
|
153 |
Design Engineering, Finance, Construction, Operation and Maintenance of Chattisgarh Maharashtra border- Waiganga bridge section from km 405.000 to km 485.00 of NH6 in the state of Maharashtra under NHDP phase IIIA on build operate and transfer (BOT) basis of NH6 in the state of Maharashtra under NHDP phase IIIA on build operate and transfer (BOT) basis |
National Highways Authority of India (NHAI) |
Ashoka Highways (Bhandara) Limited |
Maharashtra |
Roads |
18 Sep 2007 |
|
154 |
Design, construction, development, finance, operation and maintenance of Islam Nagar (km 230.00) to Kadtal (km 278.00) of Nagpur-Hyderabad section on NH7 in the state of Andhra Pradesh , under North-South Corridor (NHDP Phase-II) on BOT (Annuity) basis |
National Highways Authority of India (NHAI) |
Patel KNR Heavy Infrastructures Pvt. Ltd. |
Andhra Pradesh |
Roads |
05 Sep 2007 |
|
155 |
Design, engineering, finance, construction, operation and maintenance of Zirakpur - Parwanoo section including Injore - Kalka - Parwanoo bypass on NH 22 from km 39.860 to km 67.000 in the states of Punjab, Haryana and Himachal Pradesh under NHDP phase III A on build, operate and transfer (BOT) basis |
National Highways Authority of India (NHAI) |
Himalyan Expressway Limited |
Multiple State |
Roads |
31 Aug 2007 |
|
156 |
Four laning of Lebad-Jaora Road Projects in Madhya Pradesh |
Madhya Pradesh Road Development Corporation Limited |
Western MP Infrastructure & Toll 5 Private Limited |
Madhya Pradesh |
Roads |
30 Aug 2007 |
|
157 |
Design, Engineering, Finance Construction, Operation and Maintenance of Trichy-Karur section from km.135.800 (excluding Lalapet ROB) to km 218.000 of NH67 in the state of Tamil Nadu under NHDP phase IIIA on build, operate and transfer (BOT) basis |
National Highways Authority of India (NHAI) |
TK Toll Road Private Limited |
Tamil Nadu |
Roads |
19 Jul 2007 |
|
158 |
Design, Engineering, Finance, Construction, Operation and Maintenance of Salem-Ulundurpet section from km 0.313 to km 136.670 of NH68 in the state of Tamil Nadu under NHDP phase IIIA on build, operate and transfer (BOT) basis |
National Highways Authority of India (NHAI) |
SU Toll Road Private Limited |
Tamil Nadu |
Roads |
19 Jul 2007 |
|
159 |
Design, Engineering, Finance, Construction, Operation and Maintenance of Pondicherry-Tindivanam section from km 0.000 to km 37.920 of NH66 in the state of Tamil Nadu under NHDP phase III A on build, operate and transfer (BOT) basis |
National Highways Authority of India (NHAI) |
Pondicherry Tindivanam Tollway Limited |
Tamil Nadu |
Roads |
19 Jul 2007 |
|
160 |
Design, engineering, construction, development, finance, operation and maintenance of Neelmangala junction on NH4 with NH48 Devihalli from km 28.200 to km 110.000 of NH48 in the state of Karnataka under NHDP phase IIIA on Build Operate and Transfer (BOT) basis |
National Highways Authority of India (NHAI) |
Lanco Devihalli Highways Private Limited |
Karnataka |
Roads |
09 Jul 2007 |
|
161 |
DESIGN,ENGINEERING,FINANCE,CONSTRUCTION,OPERATION AND MAINTENANCE OF TRICHY-DINDIGUL SECTION FROM KM 333.000 TO KM 421.600 OF NH-45 IN THE STATE OF TAMILNADU UNDER NHDP PHASE IIIA ON BUILD, OPERATE AND TRANSFER ( BOT ) BASIS |
National Highways Authority of India |
TD Toll Road Private Limited |
Tamil Nadu |
Roads |
01 Jul 2007 |
|
162 |
Four laning of Bhopal-Dewas Road |
Madhya Pradesh Road Development Corporation Limited |
Dewas Bhopal Corridor Private Limited |
Madhya Pradesh |
Roads |
30 Jun 2007 |
|
163 |
Design, engineering, finance, construction, operation and maintenance of Kurali - Kiratpur section from km 28.600 to km 73.200 of NH 21 in the state of Punjab under NHDP phase IIIA on build, operate and transfer (BOT) basis |
National Highways Authority of India (NHAI) |
BSC-C and C-Kurali Toll Road Limited |
Punjab |
Roads |
25 Jun 2007 |
|
164 |
Exploration, development, exploitation and processing of Black Galaxy Granite - Midwest |
Andhra Pradesh Mineral Development Corporation Limited |
Midwest Granite Private Limited |
Andhra Pradesh |
Mining |
04 Jun 2007 |
|
165 |
Design, construction, development, finance, operation and maintenance of km 175.000 to km 230.000 on NH7 in the state of Andhra Pradesh under North South Corridor (NHDP Phase II ) on Build, Operate and Transfer (Annuity) basis |
National Highways Authority of India (NHAI) |
Adilabad Expressway Private Limited |
Andhra Pradesh |
Roads |
07 May 2007 |
|
166 |
Design construction development, finance, operation and maintenance of km 278.00 (Kadtal) to 308.00 (Armur) on NH7 in the state of Andhra Pradesh under North-South corridor (NHDP) Phase II) on Build Operate and Transfer (Annuity) basis |
National Highways Authority of India (NHAI) |
Nirmal BOT Limited |
Andhra Pradesh |
Roads |
04 May 2007 |
|
167 |
Champamati Power Project, Kokrajhar |
Bodoland Territorial Council |
Hayen Hydel Power Company Limited |
Assam |
Energy |
07 Mar 2007 |
|
168 |
DESIGN,CONSTRUCTION,DEVELOPMENT,FINANCE,OPERATION AND MAINTENANCE OF KM 16.00 TO KM 96.127 ON NATIONAL HIGHWAY-75 ( NH-75 ) IN THE STATES OF UTTAR PRADESH AND MADHYA PRADESH |
National Highways Authority of India |
GWAUOR JHANSI EXPRESWAYS LIMITED |
Madhya Pradesh |
Roads |
01 Dec 2006 |
|
169 |
Design, construction, finance, operation & maintenance of 4 lane bridge across river Kosi includes its approaches and guide bund & afflux bund from km 155.00 to km 165.00 on NH57 in the state of Bihar on Annuity basis |
National Highways Authority of India (NHAI) |
Kosi Bridge Infrastructure Company Limited |
Bihar |
Roads |
06 Oct 2006 |
|
170 |
DESIGN, CONSTRUCTION, DEVELOPMENT, FINANCE, OPERATION AND MAINTENANCE OF THE WORK OF CONSTRUCTION OF NEW FOUR LANE GWALIOR BYPASS OF THE LENGTH 42.033 KM FROM KM 103.00 OF NH 2 TO KM 16.00 ON NH 75 IN THE STATE OF MADHYA PRADESH |
National Highways Authority of India |
GWALIOR BYPASS PROJECT PRIVATE LIMITED |
Madhya Pradesh |
Roads |
01 Oct 2006 |
|
171 |
Design, construction, finance, operation and maintenance of km 0.00 to km 32.27 of Gorakhpur bypass on nh-28 in the of Uttar Pradesh on annuity basis |
National Highways Authority of India (NHAI) |
Gorakhpur Insfrastructure Company Limited |
Uttar Pradesh |
Roads |
01 Oct 2006 |
|
172 |
Design, Construction, Development, Finance, Operation and Maintenance of km 596.750 to km 653.225 on NH7) in the state of Madhya Pradesh |
National Highways Authority of India (NHAI) |
Malaxmi Highway Private Limited |
Madhya Pradesh |
Roads |
29 Sep 2006 |
|
173 |
Design, Construction, Development, Finance, Operation and Maintenance of \"Km 463.6 (AP/Karnataka border) to Km 524.0 (Avathi Village), covering 60.4 Kms\" and Improvement, Operation and Maintenance of Km 524 (Avathi Village) to Km 527 (Nandi Hills Crossing and Km 535 (Devanhalli Village) to Km 539 (Meenukunte Village) on NH-7 in the state of Karnataka on Build Operate and Transfer (BOT) Annuity Basis |
National Highways Authority of India (NHAI) |
Patel KNR Infrastructures Pvt. Ltd. |
Karnataka |
Roads |
28 Sep 2006 |
|
174 |
Design, construction, development, finance, operation and maintenance of km 463.6 (AP/Karnataka border) to km 524.0 (Avathi village), covering 60.4 kms and improvement, operation and maintenance of km 524 (Avathi village) to km 527 (Nandi hills crossing and km 535 (Devanhalli Village) to km 539 (Meenukunte village) on NH7 in the state of Karnataka on build, operate and transfer (BOT) annuity basis |
National Highways Authority of India (NHAI) |
Patel KNR Infrastructures Pvt. Ltd. |
Karnataka |
Roads |
28 Sep 2006 |
|
175 |
DESIGN,CONSTRUC TION,DEVELOPMENT,FINANCE,OPERATION AND MAINTENANCE OF KM 547.400 TO KM 596.750 ON NATIONAL HIGHWAY NO.7 NH-7 IN THE STATE OF MADHYA PRADESH ( PACKAGE NO:NS1/BOT/MP-2) |
National Highways Authority of India |
MALAXMI HIGHWAY PRIVATE LIMITED |
Madhya Pradesh |
Roads |
01 Sep 2006 |
|
176 |
Six laning of km 108.700 to km 192.000 Vadodara to Bharuch section of NH 8 in Gujarat on build , operate and transfer (BOT) basis - package BOT-1 |
National Highways Authority of India (NHAI) |
L&T Vadodara Bharuch Tollway limited |
Rajasthan |
Roads |
12 Jul 2006 |
|
177 |
Six/four laning of km 198.000 to km 263.000 Bharuch to Surat section of NH 8 in Gujarat on Build, Operate and Transfer (BOT) basis - Package BOT 2 |
National Highways Authority of India (NHAI) |
IDAA Infrastructure Private Limited |
Gujarat |
Roads |
07 Jul 2006 |
|
178 |
Design, Engineering, Construction, Development, Finance, Operation and Maintenance of 4 laning the existing 2 lane section from km 192.25 (near Ulundurpet) to km 285.00 (near Padalur) of NH45 in the state of Tamil Nadu on build operate transfer (BOT) basis |
National Highways Authority of India (NHAI) |
Trichy Tollway Private Limited |
Tamil Nadu |
Roads |
30 Jun 2006 |
|
179 |
DESIGN,ENGINEERING,FINANCE,CONSTRUCTION,OPERATION AND MAINTENANCE OF THANJAVUR-TRICHY SECTION FROM KM 80.000 TO KM 135.750 OF NH-67 IN THE STATE OF TAMILNADU UNDER NHDP PHASE IIIA ON BUILD,OPERATE AND TRANSFER (BOT) BASIS |
National Highways Authority of India |
M/ s Trichy-Thanjavur Expressways Limited |
Tamil Nadu |
Roads |
15 Jun 2006 |
|
180 |
Design, Engineering, Construction, Development, Finance, Operation and Maintenance of 4 laning the existing 2 lane section from km 285 ( near Padalur ) to km 325 (near Trichy) on NH-45 in the state of Tamil Nadu on build operate transfer (BOT) basis |
National Highways Authority of India (NHAI) |
Indu Navayuga Infra Projects Private Limited |
Tamil Nadu |
Roads |
30 May 2006 |
|
181 |
Design, Engineering, Construction, Development, Finance, Operation and Maintenance of km 220.00 to km 255.00 on Orai - Bhognipur section on national highway no. 25 (NH 25) and km 421.20 to km 449.00 on Bhognipur - Barah section on national highway no.2 (NH 2) in the state of Uttar Pradesh on BOT basis |
National Highways Authority of India (NHAI) |
O. B. Infrastructure Limited |
Uttar Pradesh |
Roads |
27 Apr 2006 |
|
182 |
Design, Construction, Development, Finance Operation and Maintenance of km 305.600 (end of Karur bypass ) to km 373.725 (Dindigul) and improvement operation and maintenance of km 292.600 (start of Karur bypass) on NH7 in the state of Tamil Nadu under north-south corridor (NHDP phase II) on build operate and transfer (BOT) basis |
National Highways Authority of India (NHAI) |
TN (DK) expressways limited |
Tamil Nadu |
Roads |
20 Apr 2006 |
|
183 |
DESIGN,CONSTRUCTION,DEVELOPMENT,FINANACE,OPERATION AND MAINTENANCE OF KM 367.000 ( ADLOOR YELLAREDDY ) TO KM 447.000 AND II ) IMPROVEMENT, OPERATION & MAINTENANCE OF KM 447.000 TO KM 464.000 ( GUNDLA POCHAMAPALLI ) ON NH-7 IN THE STATE OF ANDHRA PRADESH |
National Highways Authority of India |
MIS GMR POCHANPALLI EXPRESSWAYS PVT LTD |
Andhra Pradesh |
Roads |
31 Mar 2006 |
|
184 |
Design, engineering, construction, development, finance, operation & maintenance of km 340.00 to km 264.00 on Palanpur-Swaroopganj section on National Highway no -14 (NH-14) in the state of Gujarat & Rajasthan |
National Highways Authority of India (NHAI) |
L&T Interstate Road Corridor Limited |
Gujarat |
Roads |
28 Mar 2006 |
|
185 |
Design, construction, development, finance, operation and maintenance of km 135.469 (end of proposed Kotakatta bypass) to km 211 (Kurnool) on NH7 in the state of Andhra Pradesh under north-south corridor (NHDP phase ii) on BOT (Annuity) basis |
National Highways Authority of India (NHAI) |
Andhra Pradesh Expressway Limited |
Andhra Pradesh |
Roads |
20 Mar 2006 |
|
186 |
Improvement, Operation and Maintenance including strengthening and widening of existing 2 lane road to 4 lane dual carriageway from km 12.600 - km 84.700 of NH3 (Indore - Khalighat section) in the state of Madhya Pradesh on Build, Operate and Transfer (BOT) basis |
National Highways Authority of India (NHAI) |
Oriental Pathways [Indore] Pvt. Ltd. |
Madhya Pradesh |
Roads |
10 Mar 2006 |
|
187 |
Improvement, operation and maintenance including strengthening and widening of existing 2 lane road to 4 lane dual carriageway from km 17.756 - km 62.295 of NH - 11 (Agra - Bharatpur section) in the states of Uttar Pradesh & Rajasthan on build, operate and transfer (BOT) basis |
National Highways Authority of India (NHAI) |
Oriental Pathways [AGRA] Pvt. Ltd. |
Uttar Pradesh |
Roads |
10 Mar 2006 |
|
188 |
International competitive bidding under single stage bidding process for design engineering finance construction operation and maintenance of access controlled highway project of Bangalore Neelmangala section of NH-4 from km 10.000 to km 29.5000 in the state of Karnataka of build operate and transfer (BOT) basis |
National Highways Authority of India (NHAI) |
Navayuga Bengalooru Tollway Pvt. Ltd. |
Karnataka |
Roads |
25 Feb 2006 |
|
189 |
Design, Construction, Development, Finance, Operation and Maintenance of km 80.050 (Jadcherla) to km 135.469 (end of proposed Kotakatta bypass) on NH7 in the state of Andhra Pradesh together called the \"project\" in the state of Andhra Pradesh on build operate & transfer (BOT) basis |
National Highways Authority of India (NHAI) |
L&T Western Andhra Tollways Private Limited |
Andhra Pradesh |
Roads |
21 Feb 2006 |
|
190 |
Design, construction, development, finance, operation and maintenance of km 34.1 (Farukhnagar) to km 80.00 (Jadcherla) and (II) improvement, operation & maintenance of km 22.3 (Thondapalli) to km 34.1 (Farukhnagar) on NH7 in the state of Andhra Pradesh under North-South Corridor ( NHDP Phase II) on Build, Operate and Transfer (BOT) basis |
National Highways Authority of India (NHAI) |
GMR Jadcherla Expressways Pvt. Ltd. |
Andhra Pradesh |
Roads |
20 Feb 2006 |
|
191 |
Consultancy services for the preparation of feasibility study and detailed project report for four/six laning of Salem Karur (NH7) in Tamil Nadu |
National Highways Authority of India (NHAI) |
M.V.R Infrastructure and Tollways Pvt. Ltd |
Tamil Nadu |
Roads |
16 Feb 2006 |
|
192 |
Design, Construction, Development, Finance, Operation and Maintenance of km 207.050 ( Salem ) to km 248.625 (start of proposed flyover on Namakkal bypass ) and improvement, operation and maintenance of km 199.2 (start of Salem bypass on NH70 to km 207.050 (Salem) on NH7 in the state of Tamil Nadu under north-south corridor (NHDP phase II) on build, operate and transfer (BOT) basis |
National Highways Authority of India (NHAI) |
NK Toll Road Limited |
Tamil Nadu |
Roads |
30 Jan 2006 |
|
193 |
DESIGN,CONSTRUCTION,DEVELOPMENT,FINANCE,OPERATION AND MAINTENANCE OF KM 373.275 ( START OF PROPOSED FLYOVER AT DINDIGUL BYPASS ) TO KM 426.6 ( SAMYANALOORE ) ON NH-7 IN THE STATE OF TAMILNADU ON BUILD OPERATE & TRANSFER ( BOT ) BASIS |
National Highways Authority of India |
DS TOLL ROAD LIMITED |
Tamil Nadu |
Roads |
30 Jan 2006 |
|
194 |
Design, Construction, Development, Finance, Operation and Maintenance of km 203.96 (Salem) to km 53.00 (Kumarpalyam) on NH-47 in the state of Tamil Nadu on build, operate and transfer (BOT) basis |
National Highways Authority of India (NHAI) |
Salem tollways limited |
Tamil Nadu |
Roads |
20 Jan 2006 |
|
195 |
Design, Construction, Development, Finance, Operation and Maintenance of km 53.00 (Kumarpalyam ) to km 100 (after Chengapali) on NH47 in the state of Tamil Nadu on build operate and transfer (BOT) basis |
National Highways Authority of India (NHAI) |
Kumarapalayam Tollways Limited |
Tamil Nadu |
Roads |
20 Jan 2006 |
|
196 |
Improvement, operation and maintenance including strengthening and widening of existing 2 lane road to 4 lane dual carriageway from km 488.270 to km 413.200 of NH 24 (Lucknow - Sitapur section) in the state of Uttar Pradesh on build, operate and transfer (BOT) basis |
National Highways Authority of India (NHAI) |
Lucknow Sitapur Expressways Limited |
Uttar Pradesh |
Roads |
23 Dec 2005 |
|
197 |
Improvement, operation and maintenance including strengthening and widening of existing 2 lane road to 4 lane duel carriageway from km 407.100 to km 456.100 of NH 1 (Jalandhar - Amritsar section) in the state of Punjab on build, operate and transfer (BOT) basis |
National Highways Authority of India (NHAI) |
Jalandhar Amritsar Tollways Limited |
Punjab |
Roads |
30 Nov 2005 |
|
198 |
Improvement, operation and maintenance including strengthening and widening of existing 2 lane road to 4 lane dual carriageway from i) km 5+735 - km 39+960 on NH 22 and ii ) km 0+000 - km 0+871 on NH21 (Ambala - Chandigarh section ) in the states of Haryana & Punjab on build, operate and transfer (BOT) basis |
National Highways Authority of India (NHAI) |
GMR Ambala-Chandigarh Expressways Private Limited |
Punjab |
Roads |
16 Nov 2005 |
|
199 |
4 laning of Vadape to Gonde section in the state of Maharashtra |
National Highways Authority of India (NHAI) |
Mumbai Nasik Expressway Limited |
Maharashtra |
Roads |
14 Oct 2005 |
|
200 |
Improvement, operation and maintenance of rehabilitation and strengthening of existing 2-lane road and widening to 4-lane divided highway of km 63.000 to km 120.000 of NH11 (Bharatpur-Mahua section) in the state of Rajasthan on build, operate and transfer (BOT) basis under NHDP phase-III A |
National Highways Authority of India (NHAI) |
Madhucon Agra-Jaipur Expressways Limited |
Rajasthan |
Roads |
13 Oct 2005 |
|
201 |
Improvement, operation and maintenance of rehabilitation and strengthening of existing 2 lane road and widening to 4 lane divided highway of Mahua - Jaipur section of NH11 from km 120.000 to km 228.000 in the state of Rajasthan on build, operate and transfer (BOT) basis under NHDP phase IIIA |
National Highways Authority of India (NHAI) |
Jaipur -Mahua Tollway Private Limited |
Rajasthan |
Roads |
23 Sep 2005 |
|
202 |
Improvement, operation and maintenance of rehabilitation and strengthening of existing 2 lane road and widening to 4 lane divided highway of km 52.250 to km 131.000 of NH 58 (Meerut - Muzzafarnagar section) in the state of Uttar Pradesh on bot basis under NHDP phase III A |
National Highways Authority of India (NHAI) |
Western UP Tollway Limited |
Uttar Pradesh |
Roads |
09 Sep 2005 |
|
203 |
IMPROVEMENT,OPERATION AND MAINTENANCE REHABILITATION AND STRENGTHENING OF EXISTING 2-LANE ROAD AND WIDENING TO-4 LANE DIVIDED HIGHWAY FROM KM.380.00 TO KM.265.00 OF NH-3 ( PIMPALGAON -DHULE SECTION) IN THE STATE MAHARASHTRA ON BUILD, OPERATE & TRANSFER (BOT) BASIS. |
National Highways Authority of India |
M/s IRCON - SOMA Tollway Private Limited |
Maharashtra |
Roads |
01 Sep 2005 |
|
204 |
Construction, Operation and Maintenance of a new 2-lane road from km 319.700 - km 332.100 of NH3 (Guna - bypass section) in the state of Madhya Pradesh |
National Highways Authority of India (NHAI) |
Guna Infrastructure Limited |
Madhya Pradesh |
Roads |
08 Jul 2005 |
|
205 |
Widening of the existing Jetpur-Gondal section ( km 117.0 to km 143.0 ) from two lane to four lane making improvements in the existing four lane Gondal Rajkot section (km 143.0 to km 175.0) and widening of the existing Rajkot bypass (km 175.0 to km 185.0) from two lane to four lane National Highways no.8 (NH8B) in Gujarat, India on BOT basis |
National Highways Authority of India (NHAI) |
West Gujarat Expressway Limited |
Gujarat |
Roads |
22 Mar 2005 |
|
206 |
Operation and Maintenance of Indira Gandhi Container Terminal and Development and Operation of International Container Transhipment Terminal |
Cochin Port Trust |
India Gateway Terminal Private Limited |
Kerala |
Ports |
31 Jan 2005 |
|
207 |
Establishment of Container Terminal and to operate, maintain and manage the same on BOT basis including supply, installation and operation of container handling equipment of multipurpose berth |
Visakhapatnam Port Trust |
Visakha Container Terminal (Private) Limited |
Andhra Pradesh |
Ports |
11 Sep 2002 |
|
208 |
Second Vivekanand Bridge Tollway Project, Kolkata |
National Highways Authority of India (NHAI) |
Second Vivekanand Bridge Tollway Company Private Limited |
Delhi |
Roads |
02 Sep 2002 |
|
209 |
Widening of existing 2 lanes to 6 lanes divided carriageway facility including rehabilitation of existing 2 lanes from km 273.500 to km 363.885 on Jaipur-Kishangarh section of NH8 in Rajasthan |
National Highways Authority of India (NHAI) |
GVK - Jaipur Kishangarh Expressway Private Limited |
Rajasthan |
Roads |
08 May 2002 |
|
210 |
Conversion of Delhi-Gurgaon section of NH-8 into an access controlled eight/six lane highway from km 14.30 to km 42.00 |
National Highways Authority of India (NHAI) |
Jaypee DSC Ventures Limited |
Delhi |
Roads |
18 Apr 2002 |
|
211 |
Nellore Bypass |
National Highways Authority of India (NHAI) |
Nyse Infrastructure Private Limited |
Andhra Pradesh |
Roads |
27 Mar 2002 |
|
212 |
Stretch of national highway from km.581 to km 646 on the existing Durgapur expressway (Dankuni-Palsit section) of NH 2 in the state of West Bengal |
National Highways Authority of India (NHAI) |
EMAS Expressway Private Limited |
West Bengal |
Roads |
27 Mar 2002 |
|
213 |
Section of NH4A in the state of Goa strengthening of existing 2 lanes from km 592/240 to km 725 on the Satara Kagal section of NH4 in the state of Maharashtra |
National Highways Authority of India (NHAI) |
Maharashtra State Road Development Corporation Limited |
Maharashtra |
Roads |
04 Jan 2002 |
|
214 |
STRECH OF NATIONAL HIGHWAY FROM KM.516 TO KM 67O IN PANAGARH - CALCUTTA SECTION ON NH 2 IN THE STATE OF WEST BENGAL |
National Highways Authority of India |
MAPEX INFRASTRUCTURE PRIVATE LIMITED |
West Bengal |
Roads |
21 Nov 2001 |
|
215 |
consulting services as independent engineer during operation & maintenance of 4-lane divided carriageway facility of Tuni –Ankapalli (km 300 to km 359.20) section on NH5 in the states of Andhra Pradesh on BOT (annuity) basis |
National Highways Authority of India (NHAI) |
GMR Tuni Anakapalli Expressways Private Limited |
Andhra Pradesh |
Roads |
09 Oct 2001 |
|
216 |
Design, Engineering, Construction, Development, finance of Neelmangala-Tumkur project from km 29.500 to km. 62.000 of NH4 state of Karnataka |
National Highways Authority of India (NHAI) |
JAS Toll Road Company Limited |
Karnataka |
Roads |
28 Jun 2001 |
|
217 |
Four-laning and Strengthening of the existing two lane stretches of NH5 (Construction Supervision Consultancy Package no. GQ/GM(E)/SC AP-2) |
National Highways Authority of India (NHAI) |
Sheladia Associates Inc., USA, & RITES (India) Ltd. |
Andhra Pradesh |
Roads |
25 Jun 2001 |
|
218 |
Construction and Operation of Two Multipurpose Bulk Cargo Berths (5A & 6A) at the Port of Mormugao, Goa |
Mormugao Port Trust |
ABG Goa Port Private Limited |
Goa |
Ports |
11 May 1999 |
|
219 |
Development of 20 MW Power Station at BambooFlat, Port Blair |
Electricity Department, Andaman and Nicobar Administration |
Suryachakra Power Corporation Limited |
Andaman and Nicobar Islands |
Energy |
20 Nov 1997 |
|
220 |
Construction, Maintenance & Operation of Durg bypass on NH6 in Madhya Pradesh on BOT basis |
National Highways Authority of India (NHAI) |
Shaktikumar M. Sancheti Limited, Nagpur |
Madhya Pradesh |
Roads |
05 Nov 1997 |
|