Government Infrastructure Projects (PPP) that were either under 'Pre-construction Stage', 'Under Construction' or 'Operation and Maintenance Stage' as on April 1, 2011 or 'Awarded' thereafter and with Project Cost >INR 5 crore.
Government Infrastructure Projects (Traditional Procurement) that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore; and
Private Sector Projects that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore.
- No. of Projects in this Report: 9242
- Total Project Cost(in Rs Crore): 6813008.32
Sr No. | Project Name | Total Project Cost (In Rs.Crore) | Sector | Sub-Sector | Project Authority | Date Of Award | Location | Status |
---|---|---|---|---|---|---|---|---|
1 | Development of North Cargo Berth-III for handling bulk cargo,Thermal Coal and Rock Phosphate* | 420.00 | Transport | Ports (excluding captive) | V.O.CHIDAMBARANAR PORT TRUST | 31-Mar-2017 | Tamil Nadu | Under Construction |
2 | Setting up a 60 MW Tillari hydel power unit (Stage-II) at Chandgad in Kolhapur* | 279.23 | Energy | Renewable energy (grid) | Water Resources Department, Maharashtra | 25-May-2011 | Maharashtra | Pre-construction Stage |
3 | Storm Water Drainage Scheme (Gurgaon - Sector 81-98) * | 253.02 | Water Sanitation | Storm water drainage system | Haryana Urban Development Authority | 25-Mar-2013 | Haryana | Under Construction |
4 | Water Supply (Gurgaon Sector 58-115) Project - (Zone IV to VIII) * | 498.05 | Water Sanitation | Water supply pipeline | Haryana Urban Development Authority | 15-Dec-2012 | Haryana | Under Construction |
5 | Water Supply Scheme (Faridabad - Zone I) Project * | 55.30 | Water Sanitation | Water supply pipeline | Haryana Urban Development Authority | 29-Nov-2013 | Haryana | Under Construction |
6 | Construction of Hemodialysis unit at Zonal Hospital, Dharamshala | Not Available | Social and Commercial Infrastructure | Health Care | Department of Health and Family Welfare, Government of Himachal Pradesh | 10-Feb-2014 | Himachal Pradesh | Operation and Maintenance Stage |
7 | Four laning of Pharenda-Jarwal road in length of 46.4 km in Gonda district* | 385.06 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 30-Jun-2016 | Uttar Pradesh | Under Construction |
8 | High Power Short Circuit Test Facility* | 380.03 | Energy | Electricity transmission | NHPC Limited | 25-Nov-2010 | Madhya Pradesh | Under Construction |
9 | Kawas Gas Power Project - Renovation* | Not Available | Energy | Electricity generation (grid) | NTPC Limited | 23-Mar-2012 | Gujarat | Under Construction |
10 | Teesta IV Project - 520 MW | 5,878.00 | Energy | Renewable energy (grid) | NHPC Limited | 03-May-2016 | Sikkim | Under Construction |
11 | 2 laning with PSS of Salasar to Haryana border section of NH65 and capacity augmentation in 2021 for 4 laning on BOT(Toll) basis | 530.07 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 22-Feb-2013 | Rajasthan | Operation and Maintenance Stage |
12 | 24x7 Water Supply Scheme (South & North Guwahati) | 1,973.55 | Water Sanitation | Water supply pipeline | Guwahati Jal Board | 31-Mar-2011 | Assam | Completed |
13 | 4 laning of Patna-Muzaffarpur stretch of NH77 from 0-46.3 km and construction of Muzzafarpur bypass on BOT(Annuity) Basis | 570.06 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 21-Feb-2010 | Bihar | Operation and Maintenance Stage |
14 | 6 laning of Chenagapjalli to Start of Coimbatore bypass & 4 laning of end of Coimbatore bypass to TN/Kerala Boarder of NH 47 | 852.74 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 25-Mar-2010 | Multi State/ Centre | Operation and Maintenance Stage |
15 | Ahmednagar-Beed-Parli Vaijnath Railway Line | 1,410.00 | Transport | Railway track, tunnel, viaducts, bridges | Central Railway | 20-Jul-2015 | Maharashtra | Completed |
16 | Airport (Pakyong) Project | 264.29 | Transport | Airports | Airports Authority of India (AAI) | 29-Jun-2009 | Sikkim | Completed |
17 | Amarja Irrigation Project | 310.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | Not Available | Karnataka | Under Construction |
18 | Ambeohol Medium Irrigation Project | 230.52 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 02-May-2000 | Maharashtra | Under Construction |
19 | Andhra Pradesh and Telangana Rural Water Supply and Sanitation Project | 405.72 | Water Sanitation | Water supply pipeline | Rural Water Supply and Sanitation Department, Andhra Pradesh | 19-May-2010 | Multi State/ Centre | Completed |
20 | Anpara 'D' Coal Based Power Project | 7,000.00 | Energy | Electricity generation (grid) | Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited | 08-Feb-2008 | Uttar Pradesh | Completed |
21 | Approach Channel Deepening (Mormugao Port) Project | 380.00 | Transport | Ports (excluding captive) | Mormugao Port Trust | 29-Dec-2015 | Goa | Under Construction |
22 | Approaches (Delhi-Rewari ROB) Project* | 77.31 | Transport | Roads and bridges | Haryana Urban Development Authority | 18-Feb-2015 | Haryana | Under Construction |
23 | Arjun Sahayak Irrigation Project# | 2,593.93 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation Department, Uttar Pradesh | 31-Dec-2009 | Uttar Pradesh | Under Construction |
24 | Augmentation of 29 MLD water supply scheme at Kulgaon-Badlapur | 81.58 | Water Sanitation | Water supply pipeline | Maharashtra Jeevan Pradhikaran | 12-Aug-2013 | Maharashtra | Completed |
25 | Bamboo Park (Chaygaon) Project | 62.28 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Assam Industrial Development Corporation Limited | 01-Oct-2010 | Assam | Completed |
26 | Bangalore Metro Rail Project - Phase I | 13,845.00 | Transport | Urban public transport (except rolling stock) | Bangalore Metro Rail Corporation Limited | 31-Jan-2007 | Karnataka | Under Construction |
27 | Bansagar Canal Project# | 3,148.91 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation Department, Uttar Pradesh | 31-Mar-1997 | Uttar Pradesh | Completed |
28 | Baramati-Lonand Railway Line Project | 736.00 | Transport | Railway track, tunnel, viaducts, bridges | Central Railway | 30-Nov-2002 | Maharashtra | Completed |
29 | Bateshwarsthan Pump Canal Scheme | 100.31 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Jharkhand | 15-Jan-2011 | Multi State/ Centre | Completed |
30 | Bathnaha Hydel Power (Forbesganj) Project | 109.28 | Energy | Renewable energy (grid) | Bihar State Hydroelectric Power Corporation Limited | 05-Aug-2010 | Bihar | Completed |
31 | Berth No. 15 of New Western Dock for handling coal # | 376.52 | Transport | Ports (excluding captive) | New Mangalore Port Trust | 09-May-2008 | Karnataka | Operation and Maintenance Stage |
32 | Bhakhra Main Branch Canal System (Bathinda & Mansa) | 209.55 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Punjab Water Resources Management and Development Corporation Limited | 16-Nov-2010 | Punjab | Under Construction |
33 | Bhanupali-Bilaspur-Beri BG Railway Line | 2,967.00 | Transport | Railway track, tunnel, viaducts, bridges | Northern Railway | Not Available | Himachal Pradesh | Under Construction |
34 | Bhima Lift Irrigation Project | 615.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | Not Available | Karnataka | Completed |
35 | Biomass power project at Sattenapalli | 26.00 | Energy | Electricity generation (grid) | Andhra Pradesh Electricity Regulatory Commission | Not Available | Andhra Pradesh | Operation and Maintenance Stage |
36 | Bridge (Athwa-Adajan) Project | 143.64 | Transport | Roads and bridges | Surat Municipal Corporation | 30-Jul-2015 | Gujarat | Completed |
37 | Bridge (No.1017) Project* | Not Available | Transport | Railway track, tunnel, viaducts, bridges | South Central Railway | Not Available | Andhra Pradesh | Under Construction |
38 | Bridge (Rander-Katargam) Project | 190.81 | Transport | Roads and bridges | Surat Municipal Corporation | 21-Oct-2013 | Gujarat | Completed |
39 | BRTS Corridor (Anuvrat Dwar-St. Thomas School-Daksheswar Mahadev Temple) Project | 58.89 | Transport | Urban public transport (except rolling stock) | Surat Municipal Corporation | 18-Sep-2012 | Gujarat | Under Construction |
40 | BRTS Corridor (Katargam Darwaja-Kosad) Project | 86.47 | Transport | Urban public transport (except rolling stock) | Surat Municipal Corporation | 01-Mar-2013 | Gujarat | Under Construction |
41 | Bus Rapid Transit System (Ultadanga-Garia) | 252.91 | Transport | Urban public transport (except rolling stock) | Kolkata Metropolitan Development Authority | 16-Jun-2010 | West Bengal | Under Construction |
42 | Bus Terminal (Vadnagar) Project | 10.53 | Transport | Urban public transport (except rolling stock) | Gujarat State Road Development Corporation (GSRDC) | 19-Apr-2011 | Gujarat | Operation and Maintenance Stage |
43 | Bypass (Lakhisarai) Project | 60.00 | Transport | Roads and bridges | Road Construction Department, Bihar | 19-Nov-2013 | Bihar | Under Construction |
44 | Bypass (Mohanbari- Chabua) Project | 133.40 | Transport | Roads and bridges | Public Works Department, Assam | 08-Dec-2010 | Assam | Under Construction |
45 | Cable Stayed Bridge (Chambal) Project-RJ 5 | 281.31 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 30-Nov-2006 | Rajasthan | Under Construction |
46 | Cauvery Water Supply Scheme (Phase II-Stage IV) | 5,773.00 | Water Sanitation | Water supply pipeline | Bangalore Water Supply and Sewerage Board | Not Available | Karnataka | Completed |
47 | Coal Based Power (Ballari) Project | 4,686.20 | Energy | Electricity generation (grid) | Karnataka Power Corporation Limited | 05-Oct-2013 | Karnataka | Completed |
48 | Combined Water Supply Scheme (Cuddalore) | 198.64 | Water Sanitation | Water supply pipeline | Tamil Nadu Water Supply and Drainage Board | 29-Aug-2013 | Tamil Nadu | Completed |
49 | Combined Water Supply Scheme (Thanjavur) | 495.70 | Water Sanitation | Water supply pipeline | Tamil Nadu Water Supply and Drainage Board | 01-Mar-2014 | Tamil Nadu | Completed |
50 | Combined Water Supply Scheme (Theni Allinagaram) | 68.83 | Water Sanitation | Water supply pipeline | Tamil Nadu Water Supply and Drainage Board | 19-Feb-2014 | Tamil Nadu | Completed |
51 | Common Effluent Treatment Plant (IMT Manesar) Project | 81.75 | Water Sanitation | Sewage collection, treatment and disposal system | Haryana State Industrial and Infrastructure Development Corporation | 14-Feb-2014 | Haryana | Completed |
52 | Construction of 0.6 km ferry terminals for Roll-on-Roll off service between Gogha & Dahej | 509.00 | Transport | Ports (excluding captive) | Gujarat Maritime Board (GMB) | 09-Dec-2011 | Gujarat | Completed |
53 | Construction of 1.8 Km long high level bridges over Mahanadi river in Jagatsinghpur district | 62.32 | Transport | Roads and bridges | Public Works Department, Odisha | 12-Apr-2010 | Odisha | Completed |
54 | Construction of 12.0 acres international convention centre in Patna. | 490.00 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Building Construction Department, Bihar | 18-Nov-2013 | Bihar | Completed |
55 | Construction of 24.8 Km long Nira-Bhima link -5 tunnel at Indapur in Pune district#* | 1,281.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 31-Oct-2010 | Maharashtra | Under Construction |
56 | Construction of 400 kV DC line from Pugalur 400 kV SS to Kalivanthapttu 400 kV SS and from Kalivanthapattu to Sholinganallur | 1,284.40 | Energy | Electricity transmission | Tamil Nadu Generation and Distribution Corporation Limited | 12-Apr-2012 | Tamil Nadu | Completed |
57 | Construction of a New Multi-purpose Berth (Berth No. 18) for handling general cargo & containers at NMPT# | 137.44 | Transport | Ports (excluding captive) | New Mangalore Port Trust | 28-Oct-2013 | Karnataka | Under Construction |
58 | Construction of approaches of bridge over Mithi river at CST road in length of 0.2 km in Kurla (West) | 54.53 | Transport | Roads and bridges | Municipal Corporation of Greater Mumbai | 09-Jan-2017 | Maharashtra | Completed |
59 | Construction of bridge in length of 3.1 Km across river Mandovi at Panaji district | 403.00 | Transport | Roads and bridges | Goa State Infrastructure Development Corporation Limited | 27-Jul-2014 | Goa | Completed |
60 | Construction of Dhola-Sadia Ghats bridges in length of 9.15 km | 945.96 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 30-Nov-2010 | Assam | Operation and Maintenance Stage |
61 | Construction of Dibrugarh bypass in length of 15.4 km of NH-37 | 379.32 | Transport | Roads and bridges | National Highways and Infrastructure Development Corporation Limited | 02-Feb-2015 | Assam | Completed |
62 | Construction of EM-Bypass connector from Padmapukur to Kamalgazi in Kolkata district | 77.72 | Transport | Roads and bridges | Kolkata Metropolitan Development Authority | 28-Dec-2007 | West Bengal | Completed |
63 | Construction of four lane road over birdge on Jaipur-Ringus section | 60.20 | Transport | Roads and bridges | North Western Railway | 19-Jul-2017 | Rajasthan | Completed |
64 | Construction of multi chamber cold storage with a capacity of 4000 MT in Barmer# | 7.38 | Social and Commercial Infrastructure | Cold Chain | Rajasthan State Agriculture Marketing Board | 26-Sep-2014 | Rajasthan | Operation and Maintenance Stage |
65 | Construction of multilevel underground car parking at community hall, Subhash Nagar in West Zone | 73.42 | Transport | Urban public transport (except rolling stock) | South Delhi Municipal Corporation | 30-Dec-2009 | Delhi (UT) | Under Construction |
66 | Construction of new Brahmputra bridge (AS-28) in length of 0.05 km in Kamrup district | 346.00 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 01-Oct-2006 | Assam | Under Construction |
67 | Construction of Panniyankara railway over bridge in length of 1.1 Km in Kozhikode district | 40.00 | Transport | Roads and bridges | Kerala Road Fund Board | 30-Apr-2014 | Kerala | Completed |
68 | Construction of pedestrian skywalk at Dakshineswar temple area in Kolkata district | 65.00 | Transport | Roads and bridges | Kolkata Metropolitan Development Authority | 16-Mar-2015 | West Bengal | Completed |
69 | Construction of Six lane bridge at Motagaon-Mankoli road in length of 1.2 km# | 223.25 | Transport | Roads and bridges | Mumbai Metropolitan Region Development Authority (MMRDA) | 14-Mar-2016 | Maharashtra | Under Construction |
70 | Construction of six lane elevated road from Chalukya Circle to Hebbal Flyover in length of 6.9 Km in Bengaluru district | 1,791.00 | Transport | Roads and bridges | Bangalore Development Authority (BDA) | 17-Sep-2016 | Karnataka | Completed |
71 | Construction of Somanthali barrage on Nira river at Phaltan in Satara district # | 205.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 31-Oct-2010 | Maharashtra | Completed |
72 | Construction of three bridges of 380 meters at Dronagiri*# | 75.29 | Transport | Roads and bridges | City and Industrial Development Corporation of Maharashtra Limited | 31-Jan-2017 | Maharashtra | Under Construction |
73 | Construction of tunnel from Gundavali to Kapurbawadi section 'A' in length of 6.8 km | 1,543.20 | Water Sanitation | Water supply pipeline | Municipal Corporation of Greater Mumbai | 07-Dec-2009 | Maharashtra | Completed |
74 | Construction of tunnel from Kapurbawadi to Bhandup Complex, Section 'B' in length of 8.2 km | 1,488.50 | Water Sanitation | Water supply pipeline | Municipal Corporation of Greater Mumbai | 08-Dec-2009 | Maharashtra | Completed |
75 | Construction of tunnel from Powai-Veravali-Ghatkopar in length of 6.6 km | 181.83 | Water Sanitation | Water supply pipeline | Municipal Corporation of Greater Mumbai | 18-Jan-2012 | Maharashtra | Completed |
76 | Construction of Udhat barrage on Nira river at Indapur in Pune district # | 146.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 31-Oct-2010 | Maharashtra | Under Construction |
77 | Dandavati Irrigation Project | 272.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | 14-Oct-2009 | Karnataka | Under Construction |
78 | Daund-Gulbarga DL Railway Line Project - Phase I | 1,950.00 | Transport | Railway track, tunnel, viaducts, bridges | Rail Vikas Nigam Limited | 06-Jun-2012 | Multi State/ Centre | Under Construction |
79 | Daund-Gulbarga DL Railway Line Project - Phase II | 238.15 | Transport | Railway track, tunnel, viaducts, bridges | Rail Vikas Nigam Limited | 14-Jun-2012 | Multi State/ Centre | Under Construction |
80 | Development of Greenfield airport on 988.4 acres at Shirdi in Ahmedbagar | 320.54 | Transport | Airports | Airports Authority of India (AAI) | 31-Jul-2010 | Maharashtra | Completed |
81 | Development of 100 Acres food park at Wahegaon and Dhangaon village, Pathan taluka in Aurangabad | 124.56 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Ministry of Food Processing Industries | 08-Mar-2013 | Maharashtra | Completed |
82 | Development of 1000 TPD solid waste management in Ahmedabad # | 240.00 | Water Sanitation | Solid waste management | Ahmedabad Municipal Corporation | 01-Jul-2013 | Gujarat | Under Construction |
83 | Development of 3985 Acres special economic zone at Mangalore | 2,035.00 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Mangalore Special Economic Zone Limited | 31-Dec-2010 | Karnataka | Completed |
84 | Development of 400 kV substation at New Chanditala in Hooghly district | 154.40 | Energy | Electricity transmission | West Bengal State Electricity Transmission Company Limited | 10-Feb-2014 | West Bengal | Under Construction |
85 | Development of 500 MW Prototype Fast Breeder Reactor (PFBR) at Kalpakkam in Kancheepuram | 5,677.00 | Energy | Electricity generation (grid) | Bharatiya Nabhikiya Vidyut Nigam Limited | 31-Jan-2004 | Tamil Nadu | Completed |
86 | Development of 55 acres mega food park at Bhimavaram | 119.12 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Ministry of Food Processing Industries | 16-Dec-2013 | Andhra Pradesh | Completed |
87 | Development of 72 km Mumbai Urban Transport Project (MUTP) Phase II project | 8,087.00 | Transport | Railway track, tunnel, viaducts, bridges | Mumbai Railway Vikas Corporation Limited | 31-May-2008 | Maharashtra | Under Construction |
88 | Development of an industrial park on 433.2 acres at Kittur in Belagavi#* | 73.19 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Karnataka Industrial Area and Development Board | 28-May-2015 | Karnataka | Under Construction |
89 | Development of integrated multi level automatic car parking at Khilwat in Hyderabad district #* | 73.00 | Transport | Urban public transport (except rolling stock) | Greater Hyderabad Municipal Corporation | 20-Nov-2012 | Telangana | Pre-construction Stage |
90 | Development of Kishangarh airport in Ajmer | 181.00 | Transport | Airports | Airports Authority of India (AAI) | 31-Dec-2014 | Rajasthan | Completed |
91 | Development of monorail of 20 km from Chembur-Wadala-Gadge Maharaj Chowk | 2,460.00 | Transport | Urban public transport (except rolling stock) | Mumbai Metropolitan Region Development Authority (MMRDA) | 07-Nov-2008 | Maharashtra | Under Construction |
92 | Development of Offshore Multipurpose Cargo Berth at Mumbai Port in the State of Maharashtra on DBFOT basis* | 696.27 | Transport | Ports (excluding captive) | Ministry of Shipping | Not Available | Maharashtra | Pre-construction Stage |
93 | Dhamani Medium Irrigation Project | 320.71 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 29-Aug-2000 | Maharashtra | Under Construction |
94 | Dhukwan Small Hydro Project | 195.42 | Energy | Renewable energy (grid) | THDC India Limited | 19-Dec-2013 | Uttar Pradesh | Under Construction |
95 | Dongargaon Medium Irrigation Project# | 88.34 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Maharashtra | 31-Mar-1996 | Maharashtra | Under Construction |
96 | East West Metro Corridor Project | 4,874.58 | Transport | Urban public transport (except rolling stock) | Kolkata Metro Rail Corporation Limited | 30-Jul-2008 | West Bengal | Under Construction |
97 | Eco Tourism (Sabujdweep Island) Project | 54.00 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Department of Tourism, West Bengal | 14-Aug-2015 | West Bengal | Under Construction |
98 | Elevated Expressway Corridor (Jehangir Chowk-Rambagh-Natipura) Project | 258.32 | Transport | Roads and bridges | Jammu and Kashmir Economic Reconstruction Agency | 22-Jun-2013 | Jammu & Kashmir | Under Construction |
99 | Establishment of 230/110 kV Substation at Kinnimangalam in Madurai District | 56.40 | Energy | Electricity transmission | Tamil Nadu Transmission Corporation Limited | 19-Aug-2014 | Tamil Nadu | Completed |
100 | Establishment of 230/33/11 kV Substation at R.A.Puram in Chennai District | 56.99 | Energy | Electricity transmission | Tamil Nadu Generation and Distribution Corporation Limited | 24-Jul-2014 | Tamil Nadu | Under Construction |
101 | Establishment of 400 kV GIS Substation at Manali | 404.65 | Energy | Electricity transmission | Tamil Nadu Generation and Distribution Corporation Limited | 25-Mar-2015 | Tamil Nadu | Under Construction |
102 | Establishment of 400/230-110 kV substation at Sholinganallur in Kancheepuram district | 122.21 | Energy | Electricity transmission | Tamil Nadu Generation and Distribution Corporation Limited | 19-Mar-2014 | Tamil Nadu | Completed |
103 | Execution of 84.4 km Ahmedabad-Gandhinagar Metro Rail Project | 21,500.00 | Transport | Urban public transport (except rolling stock) | Metro Link Express for Gandhinagar Ahmedabad (MEGA) Company Limited | 07-Feb-2014 | Gujarat | Under Construction |
104 | Execution of common system with Costal Energen Pvt Ltd & Ind-Barath Power Ltd (LTOA) Generation Project in Tuticorin-B | 2,281.56 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 30-Sep-2011 | Multi State/ Centre | Completed |
105 | Execution of Eastern Region Strengthening Scheme-V | 1,364.52 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 31-Oct-2013 | Multi State/ Centre | Completed |
106 | Execution of Southern Region System Strengthening scheme - XIII in Andhra Pradesh & Karnataka* | 639.46 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 25-Jan-2012 | Multi State/ Centre | Under Construction |
107 | Execution of Southern Region System Strengthening scheme - XXIV in Tamil Nadu & Andhra Pradesh | 1,455.47 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 15-Mar-2016 | Multi State/ Centre | Completed |
108 | Execution of substation works associated with Maheshwaram Pooling Station in Telangana * | 550.06 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 31-Mar-2015 | Telangana | Completed |
109 | Execution of transmission system associated with IPPs of Nagapattinam & Cuddalore Area - Package A in Tamil Nadu | 1,025.00 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 16-May-2014 | Tamil Nadu | Completed |
110 | Execution of transmission system associated with Mauda Stage-II (2x660MW) Generation Projects | 1,575.30 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 30-Sep-2013 | Multi State/ Centre | Completed |
111 | Execution of transmission system associated with Solapur STPP (2x660MW) Generation Projects-Part A | 63.32 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 30-Oct-2013 | Maharashtra | Completed |
112 | Execution of transmission system for ultra mega solar park in Tumkur - Phase I | 810.48 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 30-Apr-2016 | Multi State/ Centre | Completed |
113 | Execution of transmission system in North/West part of Western Region for IPP Generation Projects in Chhattisgarh-E | 1,822.73 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 31-Dec-2011 | Multi State/ Centre | Completed |
114 | Expansion of Kolkata metro rail in length of 81.0 Km - Phase II | 11,000.00 | Transport | Urban public transport (except rolling stock) | Rail Vikas Nigam Limited | 21-Oct-2011 | West Bengal | Under Construction |
115 | Flyover & Rail Over Bridge (Vallarpadam) Project | 59.97 | Transport | Roads and bridges | Cochin Port Trust | 17-Jan-2015 | Kerala | Completed |
116 | Flyover (Amroli Junction-Mansarovar Junction) Project | 74.62 | Transport | Roads and bridges | Surat Municipal Corporation | 03-Sep-2015 | Gujarat | Completed |
117 | Flyover (Bikram Chowk) Project | 71.85 | Transport | Roads and bridges | Jammu and Kashmir Economic Reconstruction Agency | 15-May-2013 | Jammu & Kashmir | Completed |
118 | Flyover (Palarivattom) Project | 72.20 | Transport | Roads and bridges | Roads and Bridges Development Corporation of Kerala Limited | Not Available | Kerala | Completed |
119 | Flyover (Parama-Park Circus) Project | 291.66 | Transport | Roads and bridges | Kolkata Metropolitan Development Authority | 22-Jan-2009 | West Bengal | Completed |
120 | Flyover (Patna) Project | 167.85 | Transport | Roads and bridges | Bihar Rajya Pul Nirman Nigam Limited | 28-Jun-2013 | Bihar | Completed |
121 | Four laning from Dharamtul to Sonapur section (AS-20) of NH-37 in length of 22 km in Marigaon | 148.57 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 30-Apr-2005 | Assam | Under Construction |
122 | Four laning of Biswanath Chariali -Gohpur road in length of 57.5 km of NH-52 under SARDP-NE Phase-A | 1,307.50 | Transport | Roads and bridges | National Highways and Infrastructure Development Corporation Limited | 06-Apr-2015 | Assam | Under Construction |
123 | Four laning of Canacona bypass road in length of 17.7 km at Mashem | 280.16 | Transport | Roads and bridges | Public Works Department, Goa | 31-Mar-2015 | Goa | Under Construction |
124 | Four laning of Chikhali-Tarsod section in length of 62.7 km in Buldana | 1,071.61 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 04-Nov-2016 | Maharashtra | Operation and Maintenance Stage |
125 | Four laning of Dhavali bypass in length of 4 km on NH-17B | 61.38 | Transport | Roads and bridges | Public Works Department, Goa | 02-Apr-2015 | Goa | Completed |
126 | Four laning of Doraha-Ludhiana-Ferozepur Road (Southern Bypass) in length of 26.9 km Ludhiana district | 450.00 | Transport | Roads and bridges | Public Works Department, Chandigarh | 15-Feb-2010 | Punjab | Completed |
127 | Four laning of Gohpur-Holongi section road in length of 10 km under SARDP-NE Phase-A | 270.00 | Transport | Roads and bridges | National Highways and Infrastructure Development Corporation Limited | 31-Jan-2016 | Assam | Under Construction |
128 | Four laning of Islampur bypass in length of 10.3 km in North Dinajpur under NHDP-II | 361.15 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 15-Jan-2016 | West Bengal | Under Construction |
129 | Four laning of Itanagar to Holongi section road in length of 19.3 Km of NH-52A (New NH-415) | 536.70 | Transport | Roads and bridges | Public Works Department, Arunachal Pradesh | 15-Aug-2011 | Arunachal Pradesh | Completed |
130 | Four laning of Kazhakkootam to Mukkola Junction road in length of 26.5 km under NHDP-IIIA | 1,133.00 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 01-Jun-2015 | Kerala | Under Construction |
131 | Four laning of Loutolim road in length of 3.8 km | 184.05 | Transport | Roads and bridges | Public Works Department, Goa | 31-Jul-2016 | Goa | Under Construction |
132 | Four laning of NH-37A Kaliabor-Tiniali-Dolabari road junction in length of 17.3 km | 873.91 | Transport | Roads and bridges | National Highways and Infrastructure Development Corporation Limited | 15-Apr-2015 | Assam | Under Construction |
133 | Four laning of Silchar-Agartala section in length of 306.0 km | 3,060.00 | Transport | Roads and bridges | National Highways and Infrastructure Development Corporation Limited | 18-Oct-2016 | West Bengal | Completed |
134 | Four laning of Takoli-Kullu section in length of 29 Km in Kullu & Mandi districts | 328.00 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 08-Nov-2016 | Himachal Pradesh | Completed |
135 | Gagrin Medium Irrigation Project | 185.29 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Rajasthan | 29-Sep-2007 | Rajasthan | Under Construction |
136 | Green Energy Corridors - Inter State Transmission Scheme - Part A | 1,479.30 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 22-Apr-2015 | Multi State/ Centre | Completed |
137 | Green Energy Corridors - Inter State Transmission Scheme - Part B | 3,705.61 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 24-Apr-2015 | Multi State/ Centre | Completed |
138 | Green Energy Corridors - Inter State Transmission Scheme - Part D | 3,519.59 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 09-Aug-2016 | Multi State/ Centre | Under Construction |
139 | Guddada Mallapura Lift Irrigation Project | 115.40 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | 22-Sep-2011 | Karnataka | Under Construction |
140 | Gumti Medium Irrigation Project | 83.95 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Public Works Department, Tripura | 30-Nov-1981 | Tripura | Completed |
141 | Hanamapur Medium Lift Irrigation Scheme | 277.40 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Krishna Bhagya Jala Nigam Limited | 09-Nov-2012 | Karnataka | Completed |
142 | Haridwar-Laksar DL Railway Line Project | 219.00 | Transport | Railway track, tunnel, viaducts, bridges | Northern Railway | Not Available | Uttarakhand | Under Construction |
143 | High Level Bridge (Mattewara) Project# | 66.74 | Transport | Roads and bridges | Public Works Department, Chandigarh | 25-Oct-2011 | Punjab | Completed |
144 | Hindon Elevated Road (Ghaziabad) Project # | 1,125.00 | Transport | Roads and bridges | Ghaziabad Development Authority | 21-Aug-2014 | Uttar Pradesh | Completed |
145 | Hubli Airport Project - Modernisation#* | 141.44 | Transport | Airports | Airports Authority of India (AAI) | 16-Nov-2013 | Karnataka | Under Construction |
146 | IB-Meramundali Transmission Line Project | 112.37 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 12-Nov-2010 | Odisha | Completed |
147 | Implementation of 10 MLD water treatment plant on Maisal Dam | 52.99 | Water Sanitation | Water treatment plants | Public Works Department, Goa | 21-Dec-2010 | Goa | Completed |
148 | Implementation of 10 MW Bhavani Barrrage hydel power unit-I at Samayapuram | 185.81 | Energy | Renewable energy (grid) | Tamil Nadu Generation and Distribution Corporation Limited | 31-Jan-2010 | Tamil Nadu | Completed |
149 | Implementation of 1000 MW coal based power unit at Sagardighi | 5,340.00 | Energy | Electricity generation (grid) | West Bengal Power Development Corporation Limited | 22-Feb-2011 | West Bengal | Completed |
150 | Implementation of 120 MW hydel power unit at Vyasi# | 936.23 | Energy | Renewable energy (grid) | UJVN Limited | 20-Jan-2014 | Uttarakhand | Under Construction |
151 | Implementation of 121 MLD water supply scheme in Ratangarh-Sujangarh - Phase II | 841.15 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 17-Aug-2013 | Rajasthan | Completed |
152 | Implementation of 13.1 MLD water supply scheme at Simlapal in Bankura | 51.21 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, West Bengal | 22-Jan-2013 | West Bengal | Completed |
153 | Implementation of 13.5 MW Myntriang small hydel power unit (Stage I & II) | 145.96 | Energy | Renewable energy (grid) | Assam Power Generation Corporation Limited (APGCL) | 04-Feb-2009 | Assam | Completed |
154 | Implementation of 14.2 MLD combined water supply scheme in Nagapattinam | 105.70 | Water Sanitation | Water supply pipeline | Tamil Nadu Water Supply and Drainage Board | 03-Aug-2015 | Tamil Nadu | Completed |
155 | Implementation of 14.3 MLD underground piped sewerage in Dhoraji | 66.33 | Water Sanitation | Sewage collection, treatment and disposal system | Gujarat Water Supply and Sewerage Board | 16-Dec-2013 | Gujarat | Under Construction |
156 | Implementation of 140 MLD sewage treatment plant at Dinapur | 491.77 | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh Jal Nigam | 04-Jan-2015 | Uttar Pradesh | Completed |
157 | Implementation of 147 MLD piped water supply scheme at Habra-Gaighata* | 577.72 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, West Bengal | 22-Mar-2015 | West Bengal | Under Construction |
158 | Implementation of 15 MLD sewage system for Taleigao, Dona Paula & Caranzalem* | 144.25 | Water Sanitation | Sewage collection, treatment and disposal system | Public Works Department, Goa | 28-Apr-2012 | Goa | Completed |
159 | Implementation of 15.3 MLD water supply scheme at Bishnupur | 64.17 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, West Bengal | 14-May-2013 | West Bengal | Completed |
160 | Implementation of 16.2 CBM Shelarwadi minor irrigation scheme at Khed | 121.21 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 30-Nov-2001 | Maharashtra | Under Construction |
161 | Implementation of 16.8 MLD piped water supply scheme at Beldanga-I in Murshidabad* | 54.21 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, West Bengal | 09-Dec-2013 | West Bengal | Under Construction |
162 | Implementation of 17297.4 acres Sonpur medium irrigation scheme in Chhindwara | 127.46 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 01-Oct-2012 | Madhya Pradesh | Under Construction |
163 | Implementation of 19.3 MLD water supply scheme at Indus in Bankura | 68.36 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, West Bengal | 19-Dec-2012 | West Bengal | Completed |
164 | Implementation of 220 kV substation at Ghansali | 140.50 | Energy | Electricity transmission | Power Transmission Corporation of Uttarakhand Limited | 06-Nov-2013 | Uttarakhand | Under Construction |
165 | Implementation of 220 kV substation at Jafarpur in Udham Singh Nagar district | 74.60 | Energy | Electricity transmission | Power Transmission Corporation of Uttarakhand Limited | 15-Apr-2014 | Uttarakhand | Under Construction |
166 | Implementation of 220 kV substation at Rudrapur in Udham Singh Nagar district*# | 118.87 | Energy | Electricity transmission | Power Transmission Corporation of Uttarakhand Limited | 14-Dec-2011 | Uttarakhand | Pre-construction Stage |
167 | Implementation of 25.6 MLD rural water supply scheme at Mardanpur | 230.40 | Water Sanitation | Water supply pipeline | Madhya Pradesh Jal Nigam Maryadit | 23-Jan-2014 | Madhya Pradesh | Under Construction |
168 | Implementation of 26.2 CBM Korle Satandi medium irrigation scheme at Devgad in Sindhudurg# | 263.64 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 01-Jan-2004 | Maharashtra | Under Construction |
169 | Implementation of 27 MLD water treatment plant on Khandepar river at Opa | 75.19 | Water Sanitation | Water treatment plants | Public Works Department, Goa | 29-Jan-2014 | Goa | Under Construction |
170 | Implementation of 27.2 MW wind based power unit at Kombhalne | 136.00 | Energy | Renewable energy (grid) | SJVN Limited | 31-Dec-2013 | Maharashtra | Completed |
171 | Implementation of 29.04 MLD water supply scheme in Hingoli district under UIDSSMT scheme | 65.25 | Water Sanitation | Water supply pipeline | Hingoli Municipal Council | 28-Aug-2009 | Maharashtra | Completed |
172 | Implementation of 297.2 CBM Talamba major irrigation scheme at Kudal in Sindhudurg# | 1,772.34 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 30-Nov-2001 | Maharashtra | Under Construction |
173 | Implementation of 400/220 kV Grid Substation at Chittorgarh | 50.45 | Energy | Electricity transmission | Rajasthan Rajya Vidyut Prasaran Nigam Limited | 25-Feb-2011 | Rajasthan | Completed |
174 | Implementation of 400/220 kV Pooling Substation at Ramgarh in Jaisalmer district | 144.40 | Energy | Electricity transmission | Rajasthan Rajya Vidyut Prasaran Nigam Limited | 29-Oct-2014 | Rajasthan | Completed |
175 | Implementation of 41 MLD sewerage scheme in Satna* | 206.00 | Water Sanitation | Sewage collection, treatment and disposal system | Satna Municipal Corporation | 31-Dec-2016 | Madhya Pradesh | Pre-construction Stage |
176 | Implementation of 46.9 CBM Shirshinge minor irrigation scheme at Sawantwadi in Sindhudurg# | 402.14 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 30-Dec-2000 | Maharashtra | Under Construction |
177 | Implementation of 5.0 km storm water drain system at Irla Nalla at Ville Parle in Mumbai | 65.36 | Water Sanitation | Storm water drainage system | Municipal Corporation of Greater Mumbai | 27-Apr-2006 | Maharashtra | Completed |
178 | Implementation of 5.5 CBM Rangav minor irrigation scheme at Sangameshwar in Ratnagiri# | 57.52 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 30-Nov-1995 | Maharashtra | Completed |
179 | Implementation of 7.5 MLD water supply scheme at Nagda-Anta-Baldevpura in Baran district | 57.10 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 24-Sep-2012 | Rajasthan | Completed |
180 | Implementation of 7.6 CBM Otav minor irrigation scheme at Kankavli in Sindhudurg# | 79.79 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 30-Apr-1981 | Maharashtra | Under Construction |
181 | Implementation of 7.9 MLD Pali-Bhutavali minor irrigation project at Karjat#* | 111.45 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 30-Apr-1994 | Maharashtra | Under Construction |
182 | Implementation of 74.7 CBM Arjuna medium irrigation scheme at Rajapur in Ratnagiri# | 743.08 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 05-Jul-2001 | Maharashtra | Under Construction |
183 | Implementation of 8.7MLD water supply scheme at Ghatore, Kanasar, Baap in Jodhpur district | 76.44 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 28-Sep-2013 | Rajasthan | Completed |
184 | Implementation of 83.2 MLD Gadnadi medium irrigation project at Sangmeshwar# | 891.42 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 23-Mar-2001 | Maharashtra | Under Construction |
185 | Implementation of 87.3 MLD Jamada medium irrigation project at Rajapur# | 575.29 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 29-Jan-2005 | Maharashtra | Under Construction |
186 | Implementation of 9 MLD water supply scheme at Robertsonpet KGF and Bethamangala in Kolar district | 61.32 | Water Sanitation | Water supply pipeline | Karnataka Urban Water Supply and Drainage Board | 13-Oct-2016 | Karnataka | Completed |
187 | Implementation of 93.4 CBM Aruna medium irrigation scheme at Vaibhavwadi in Sindhudurg# | 1,107.95 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 30-May-2006 | Maharashtra | Under Construction |
188 | Implementation of 96.3 CBM Sarambala medium irrigation scheme at Sawantwadi in Sindhudurg# | 681.36 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 31-Mar-2006 | Maharashtra | Under Construction |
189 | Implementation of Amboli minor irrigation project of 10 MLD at Murud#* | 73.06 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 04-Mar-2006 | Maharashtra | Under Construction |
190 | Implementation of Babhali high level barrage with a capacity of 96.2 CBM | 706.32 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 08-Sep-2004 | Maharashtra | Completed |
191 | Implementation of Hetawane medium irrigation project of 144.5 MLD at Pen | 362.68 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 31-May-1985 | Maharashtra | Under Construction |
192 | Implementation of Kanhar irrigation scheme in Uttar Pradesh, Jharkhand & Chhattisgarh#* | 3,410.45 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation Department, Uttar Pradesh | 31-Dec-1980 | Multi State/ Centre | Under Construction |
193 | Implementation of Krishnarajasagara Irrigation Project on 26,640 acres * | 327.60 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Cauvery Neeravari Nigam Limited | 15-Jun-2013 | Karnataka | Under Construction |
194 | Implementation of Omkareshwar Irrigation scheme on 362.7 acres of land | 3,134.37 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Narmada Valley Development Authority | 03-May-2006 | Madhya Pradesh | Under Construction |
195 | Implementation of PPSP New 400 kV GIS substation in Purulia | 113.93 | Energy | Electricity transmission | West Bengal State Electricity Transmission Company Limited | 29-Sep-2015 | West Bengal | Completed |
196 | Implementation of rural electrification at Jalpaiguri, Uttar Dinajpur, Dhakshin Dinajpur etc in West Bengal under BRGF | 2,511.01 | Energy | Electricity transmission | West Bengal State Electricity Distribution Company Limited | 16-Mar-2012 | West Bengal | Completed |
197 | Implementation of rural electrification works at Amravati Urban - Infra Plan II - Phase A | 55.66 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 17-Jan-2015 | Maharashtra | Completed |
198 | Implementation of rural electrification works at Baramati - Infra Plan II - Phase A | 117.79 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 03-Dec-2013 | Maharashtra | Under Construction |
199 | Implementation of rural electrification works at Barshi - Infra Plan II - Phase A | 155.20 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 03-Dec-2013 | Maharashtra | Under Construction |
200 | Implementation of rural electrification works at Kedgaon - Infra Plan II - Phase A | 115.27 | Energy | Electricity transmission | Hongkong Bank Building, M.G. Road, Fort, Mumbai-400001 Maharashtra | 03-Dec-2013 | Maharashtra | Under Construction |
201 | Implementation of rural electrification works at Khamgaon, Buldhana & Malkapur - Infra Plan II - Phase A | 102.61 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 06-Sep-2014 | Maharashtra | Under Construction |
202 | Implementation of rural electrification works at Manchar - Infra Plan II - Phase A | 73.50 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 31-Oct-2013 | Maharashtra | Completed |
203 | Implementation of rural electrification works at Nerul Urban- Infra Plan II - Phase C* | 61.96 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 30-Jun-2014 | Maharashtra | Under Construction |
204 | Implementation of rural electrification works at Panvel Urban - Infra Plan II - Phase C* | 153.97 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 30-Jun-2014 | Maharashtra | Under Construction |
205 | Implementation of rural electrification works at Raipur city-I and II under IPDS | 75.54 | Energy | Electricity transmission | Chhattisgarh State Power Distribution Company Limited | 08-Mar-2017 | Chhattisgarh | Completed |
206 | Implementation of rural electrification works at Saswad - Infra Plan II - Phase A | 59.51 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 31-Oct-2013 | Maharashtra | Completed |
207 | Implementation of rural electrification works at Vashi Urban - Infra Plan II - Phase C* | 119.37 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 30-Jun-2014 | Maharashtra | Under Construction |
208 | Implementation of rural electrification works in Bilaspur under IPDS | 105.14 | Energy | Electricity transmission | Chhattisgarh State Power Distribution Company Limited | 08-Mar-2017 | Chhattisgarh | Completed |
209 | Implementation of rural electrification works in Dehradun under DDUGJY | 71.05 | Energy | Electricity transmission | Uttarakhand Power Corporation Limited | 11-Aug-2017 | Uttarakhand | Completed |
210 | Implementation of rural electrification works in Garhwal under DDUGJY | 51.32 | Energy | Electricity transmission | Uttarakhand Power Corporation Limited | 11-Aug-2017 | Uttarakhand | Completed |
211 | Implementation of rural electrification works in Haridwar under DDUGJY | 124.78 | Energy | Electricity transmission | Uttarakhand Power Corporation Limited | 11-Aug-2017 | Uttarakhand | Completed |
212 | Implementation of rural electrification works in Nainital & Bageshwar under DDUGJY | 57.19 | Energy | Electricity transmission | Uttarakhand Power Corporation Limited | 11-Aug-2017 | Uttarakhand | Completed |
213 | Implementation of rural electrification works in Nashik under RAPDRP-Part B | 85.68 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 21-Jan-2012 | Maharashtra | Completed |
214 | Implementation of rural electrification works in Udham Singh Nagar under DDUGJY | 149.12 | Energy | Electricity transmission | Uttarakhand Power Corporation Limited | 11-Aug-2017 | Uttarakhand | Completed |
215 | Implementation of sewage treatment plant of 15 MLD at Trombay in Mumbai | 200.00 | Water Sanitation | Sewage collection, treatment and disposal system | Rashtriya Chemicals and Fertilizers Limited | 31-Oct-2014 | Maharashtra | Under Construction |
216 | Implementation of sewerage scheme at C Block and G1 Block in Kerala#* | 64.86 | Water Sanitation | Sewage collection, treatment and disposal system | Local Self Government Department, Kerala | 11-Dec-2012 | Kerala | Under Construction |
217 | Implementation of sewerage scheme at E-2 and E-3 zone of Jodhpur | 54.81 | Water Sanitation | Sewage collection, treatment and disposal system | Jodhpur Development Authority | 07-Jul-2012 | Rajasthan | Completed |
218 | Implementation of Sewerage Scheme in Moradabad district | 279.91 | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh State Ganga River Conservation Agency | 21-Oct-2011 | Uttar Pradesh | Completed |
219 | Implementation of Sonthi lift irrigation scheme on 39536.9 acres in Gulbarga & Yadgir | 600.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Krishna Bhagya Jala Nigam Limited | 11-Oct-2006 | Karnataka | Under Construction |
220 | Implementation of water supply scheme at Karambakkam, Nolambur and Injambakkam in Chennai district | 60.86 | Water Sanitation | Water supply pipeline | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 09-May-2013 | Tamil Nadu | Completed |
221 | Implementation of water supply scheme at Kottivakkam, Palavakkam & Perungudi in Chennai district | 92.00 | Water Sanitation | Water supply pipeline | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 04-Mar-2014 | Tamil Nadu | Completed |
222 | Implementation of water supply scheme at Nanjangud in Mysore district | 253.58 | Water Sanitation | Water supply pipeline | Cauvery Neeravari Nigam Limited | 15-Feb-2012 | Karnataka | Completed |
223 | Implementation of water supply scheme at Ulhasnagar in Thane district under JNNURM district | 265.00 | Water Sanitation | Water supply pipeline | Ulhasnagar Municipal Corporation | 19-Dec-2008 | Maharashtra | Completed |
224 | Indi Branch Canal Project - Modernisation | 273.63 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Krishna Bhagya Jala Nigam Limited | 24-Feb-2014 | Karnataka | Completed |
225 | Integrated Kashang Hydro Electric Power Project - Stage I# | 478.02 | Energy | Renewable energy (grid) | Himachal Pradesh Power Corporation Limited | 13-Feb-2009 | Himachal Pradesh | Completed |
226 | Integrated Kashang Hydro Electric Power Project - Stage II & III# | 488.19 | Energy | Renewable energy (grid) | Himachal Pradesh Power Corporation Limited | 16-Feb-2010 | Himachal Pradesh | Under Construction |
227 | International Cricket Stadium (Lucknow) Project # | 360.00 | Social and Commercial Infrastructure | Tourism | Lucknow Development Authority | 08-Jul-2014 | Uttar Pradesh | Under Construction |
228 | Jambre Medium Irrigation Project | 146.77 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 15-Nov-2000 | Maharashtra | Completed |
229 | Kachchh Branch Canal Pumping Station 1 Project | 183.47 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Sardar Sarovar Narmada Nigam Limited | 03-Jul-2011 | Gujarat | Completed |
230 | Kachchh Branch Canal Pumping Station 2 & 3 Project | 331.26 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Sardar Sarovar Narmada Nigam Limited | 03-Jul-2011 | Gujarat | Completed |
231 | Kachnamandi Minor Irrigation Project | 74.54 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 20-May-2013 | Madhya Pradesh | Under Construction |
232 | Kashyapi Medium Irrigation Project#* | 50.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 10-Jun-1986 | Maharashtra | Under Construction |
233 | Khowai Medium Irrigation Project | 96.93 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Public Works Department, Tripura | 30-Apr-1981 | Tripura | Completed |
234 | Khurda-Barang Third Railway Line | 385.00 | Transport | Railway track, tunnel, viaducts, bridges | Rail Vikas Nigam Limited | 08-Aug-2006 | Odisha | Under Construction |
235 | Kikvi Water Supply Scheme (Brahmanwade)#* | 283.54 | Water Sanitation | Water supply pipeline | Godavari Marathwada Irrigation Development Corporation Limited | 13-Oct-2012 | Maharashtra | Under Construction |
236 | Kochi-Koottanad-Bangalore-Mangalore Gas Pipeline Project - Phase-II | 2,915.00 | Energy | Gas pipelines | GAIL (India) Limited | Not Available | Multi State/ Centre | Completed |
237 | Laying of New Coochbehar-Gumanihat DL railway line in length of 29.3 km | 451.00 | Transport | Railway track, tunnel, viaducts, bridges | Northeast Frontier Railway | 01-Apr-2015 | West Bengal | Completed |
238 | Laying of 132 kV Bhose-Karjat DC line in Sangli district | 59.75 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 27-Aug-2009 | Maharashtra | Under Construction |
239 | Laying of 220 kV DC line at Kalmeshwar-Warud in Nagpur district | 78.58 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 31-Aug-2010 | Maharashtra | Under Construction |
240 | Laying of 220 kV DC line from Deoli (PGCIL)- Ghatodi in Yavatmal district | 129.54 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 24-Feb-2010 | Maharashtra | Under Construction |
241 | Laying of 220 kV Pimpalgaon-Eklahare DC line for Pimpalgaon substation | 53.82 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 27-Aug-2009 | Maharashtra | Under Construction |
242 | Laying of 220kV Gavasad-Salejada D/C line | 51.11 | Energy | Electricity transmission | Gujarat Energy Transmission Corporation Limited | 23-Jan-2013 | Gujarat | Completed |
243 | Laying of 360.0 CKM Ramgarh-Bhadla transmission line | 114.03 | Energy | Electricity transmission | Rajasthan Rajya Vidyut Prasaran Nigam Limited | 16-Apr-2013 | Rajasthan | Under Construction |
244 | Laying of 400 kV Bhusawal II-Aurangabad I LILO line | 92.96 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 01-Nov-2013 | Maharashtra | Completed |
245 | Laying of 400 kV Charanka-Veloda (Sankhari) D/C line | 101.02 | Energy | Electricity transmission | Gujarat Energy Transmission Corporation Limited | 23-Jul-2013 | Gujarat | Completed |
246 | Laying of 400 kV DC line between Sagardighi TPS-Gokarna | 138.36 | Energy | Electricity transmission | West Bengal State Electricity Transmission Company Limited | 15-Jul-2013 | West Bengal | Completed |
247 | Laying of 400 KV Pugalur-Edayarpalayam & Edayarpalayam-Udumalpet D/C line | 107.56 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 27-Sep-2017 | Multi State/ Centre | Completed |
248 | Laying of 400kV Amreli-Kasor D/C line | 169.50 | Energy | Electricity transmission | Gujarat Energy Transmission Corporation Limited | 21-Apr-2011 | Gujarat | Completed |
249 | Laying of 400kV D/C Mundra - Zerda Line | 116.96 | Energy | Electricity transmission | Gujarat Energy Transmission Corporation Limited | 02-Jul-2011 | Gujarat | Completed |
250 | Laying of 400kV Varsana-Halvad D/C line | 239.68 | Energy | Electricity transmission | Gujarat Energy Transmission Corporation Limited | 16-Dec-2013 | Gujarat | Completed |
251 | Laying of 480.0 CKM Akal-Jodhpur (New) transmission line | 310.52 | Energy | Electricity transmission | Rajasthan Rajya Vidyut Prasaran Nigam Limited | 17-Nov-2014 | Rajasthan | Completed |
252 | Laying of Agartala - Subroom BG railway line in length of 110 km | 3,407.00 | Transport | Railway track, tunnel, viaducts, bridges | Northeast Frontier Railway | 31-Jan-2010 | Tripura | Under Construction |
253 | Laying of Ambari Falakata-New Moynaguri DL railway line in length of 36.5 km | 551.00 | Transport | Railway track, tunnel, viaducts, bridges | Northeast Frontier Railway | 07-Oct-2015 | West Bengal | Under Construction |
254 | Laying of Araria - Galgalia new railway line in length of 100 km | 2,145.00 | Transport | Railway track, tunnel, viaducts, bridges | North Eastern Railway | 30-Sep-2006 | Bihar | Under Construction |
255 | Laying of Bogibeel rail-cum-road bridge over Brahmaputra river | 5,920.00 | Transport | Railway track, tunnel, viaducts, bridges | Northeast Frontier Railway | 30-Apr-2008 | Assam | Completed |
256 | Laying of Hathua-Bhatni railway line in length of 79.6 km | 230.00 | Transport | Railway track, tunnel, viaducts, bridges | North Eastern Railway | 30-Apr-2005 | Multi State/ Centre | Under Construction |
257 | Laying of Kaliyaganj-Buniadpur railway line in length of 33.13 km | 380.00 | Transport | Railway track, tunnel, viaducts, bridges | Northeast Frontier Railway | 30-Apr-2010 | West Bengal | Under Construction |
258 | Laying of Kaptanganj-Thawe-Siwan-Chhapra GC railway line in length of 233.5 km* | 1,126.79 | Transport | Railway track, tunnel, viaducts, bridges | North Eastern Railway | 30-Apr-1999 | Multi State/ Centre | Under Construction |
259 | Laying of LILO transmission line at Thaptitanda in Aurangabad district | 80.90 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 01-Nov-2013 | Maharashtra | Completed |
260 | Laying of New Moynaguri-Jogighopa BG railway line in length of 245 km | 3,040.00 | Transport | Railway track, tunnel, viaducts, bridges | Northeast Frontier Railway | 30-Apr-2005 | Multi State/ Centre | Under Construction |
261 | Laying of pipeline from tunnel shaft to water treatment plant in length of 1.4 Km at Bhandup Complex | 160.28 | Water Sanitation | Water supply pipeline | Municipal Corporation of Greater Mumbai | 08-Sep-2014 | Maharashtra | Completed |
262 | Laying of Ranikhet-Bhageshwar transmission line in length of 60.0 CKM | 98.45 | Energy | Electricity transmission | Power Transmission Corporation of Uttarakhand Limited | 16-Feb-2015 | Uttarakhand | Under Construction |
263 | Laying of Rayadurg - Tumkur railway line via Kalyandurg in length of 213 km | 2,062.00 | Transport | Railway track, tunnel, viaducts, bridges | South Western Railway | 21-Jul-2009 | Multi State/ Centre | Under Construction |
264 | Laying of Transmission Lines of Karuvalur 230 KV Substation and Poiyur 230 KV Substation in Coimbatore district | 83.19 | Energy | Electricity transmission | Tamil Nadu Generation and Distribution Corporation Limited | 03-Sep-2015 | Tamil Nadu | Completed |
265 | Laying up of 220 kV DCDC Akola-Anjangaon transmission line | 51.04 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 09-Feb-2010 | Maharashtra | Completed |
266 | Laying up of 400 kV Jejuri-Hinjewadi DC transmission line (Jejuri-Wainjhar) Package II | 73.58 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 09-Jul-2012 | Maharashtra | Completed |
267 | Lignite Based Power (Bhavnagar) Project | 4,802.00 | Energy | Electricity generation (grid) | Bhavnagar Energy Company Limited | 31-May-2011 | Gujarat | Completed |
268 | Lower Mullamari Irrigation Project | 246.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | Not Available | Karnataka | Under Construction |
269 | Lower Pedhi Major Irrigation Project | 950.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
270 | Machilipatnam Port Development * # | 1,860.00 | Transport | Ports (excluding captive) | Department of Ports, Andhra Pradesh | 07-Jun-2010 | Andhra Pradesh | Under Construction |
271 | Madhya Ganga Canal Project - Stage II# | 2,865.11 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation Department, Uttar Pradesh | 31-Mar-2007 | Uttar Pradesh | Completed |
272 | Mechanism of Coal Handling facilities and upgradation of General Cargo Berth at Outer Harbour of Visakhapatnam Port | 640.40 | Transport | Ports (excluding captive) | Ministry of Shipping | 10-Jun-2010 | Andhra Pradesh | Operation and Maintenance Stage |
273 | Meerut-Muzaffarnagar DL Railway Line Project#* | 377.44 | Transport | Railway track, tunnel, viaducts, bridges | Northern Railway | Not Available | Uttar Pradesh | Under Construction |
274 | Mega Food Park (Fazilka) | 130.38 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Ministry of Food Processing Industries | 25-May-2011 | Punjab | Completed |
275 | Mega Food Park (Haridwar) | 95.08 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Ministry of Food Processing Industries | 27-Mar-2009 | Uttarakhand | Completed |
276 | Mega Food Park (Khargone) | 127.70 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Ministry of Food Processing Industries | 27-Sep-2012 | Madhya Pradesh | Completed |
277 | Mega Food Park (Nalbari) | 75.98 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Ministry of Food Processing Industries | 27-Mar-2009 | Assam | Completed |
278 | Mega Food Park (Tumkur) | 144.33 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Ministry of Food Processing Industries | 19-Mar-2011 | Karnataka | Completed |
279 | Meramundali-Duburi Transmission Line Projecr | 86.00 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 30-Apr-2006 | Odisha | Completed |
280 | Metro Rail Project (Chennai) | 14,600.00 | Transport | Urban public transport (except rolling stock) | Chennai Metro Rail Limited | 30-Apr-2009 | Tamil Nadu | Under Construction |
281 | Modern Bus Terminus Badambadi | 50.00 | Transport | Urban public transport (except rolling stock) | Department of Commerce and Transport, Odisha | Not Available | Odisha | Completed |
282 | Modernisation of Mirle and Ramasamudra anecut canals at Chunchanakatte in Mysuru district | 81.51 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Cauvery Neeravari Nigam Limited | 27-Feb-2013 | Karnataka | Completed |
283 | Mudbal Branch Canal Project - Remodeling | 105.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Krishna Bhagya Jala Nigam Limited | 01-Mar-2014 | Karnataka | Completed |
284 | Multilevel Flyovers (KBR Park) Project# | 510.00 | Transport | Roads and bridges | Greater Hyderabad Municipal Corporation | 02-Apr-2016 | Telangana | Under Construction |
285 | Multipurpose Cargo Port (Redi) Project | 4,413.70 | Transport | Ports (excluding captive) | Maharashtra Maritime Board (MMB) | 25-Feb-2009 | Maharashtra | Pre-construction Stage |
286 | Nira Deoghar Irrigation Project# | 3,166.79 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 09-Apr-1997 | Maharashtra | Under Construction |
287 | North Lakhimpur Bypass Project | 176.22 | Transport | Roads and bridges | Public Works Department, Assam | 29-Sep-2012 | Assam | Under Construction |
288 | Operation and Maintenance of North East Tribal Museum and Cultural Centre at Nazirakhat, Sonapur, Kamrup (M), Assam * | 50.00 | Social and Commercial Infrastructure | Tourism | Cultural Affairs Department, Government of Assam | 21-Oct-2014 | Assam | Under Construction |
289 | Parule Airport Project | 520.00 | Transport | Airports | Maharashtra Industrial Development Corporation | 05-Aug-2009 | Maharashtra | Operation and Maintenance Stage |
290 | Pogonda Reservoir Project | 85.51 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation and CAD Department, Telangana | 10-Sep-2008 | Andhra Pradesh | Under Construction |
291 | Power Transmission (Solapur) Project - Phase A - Part II | 106.24 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 03-Dec-2013 | Maharashtra | Under Construction |
292 | Punasi Reservoir Scheme | 185.82 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Jharkhand | 12-Jan-1982 | Jharkhand | Under Construction |
293 | Punpun Barrage Project | 658.12 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Bihar | 10-May-2005 | Bihar | Completed |
294 | R-O-B (Habibganj) Project | 64.80 | Transport | Roads and bridges | Bhopal Municipal Corporation | 10-Jun-2011 | Madhya Pradesh | Completed |
295 | R-O-B (Lucknow-Kanpur) Project | 62.49 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 15-Oct-2011 | Uttar Pradesh | Completed |
296 | R-O-B (Riktia Bhairon LC 22B) Project | 111.00 | Transport | Roads and bridges | Jodhpur Development Authority | 27-Aug-2013 | Rajasthan | Completed |
297 | R-O-B (Saran Nagar) Project | 73.77 | Transport | Roads and bridges | Jodhpur Development Authority | 05-Jun-2012 | Rajasthan | Completed |
298 | R-O-B (Sri Ganganagar LC 121) Project | 59.37 | Transport | Roads and bridges | Rajasthan Urban Drinking Water Sewerage and Infrastructure Corporation Limited | 16-Aug-2013 | Rajasthan | Completed |
299 | Railway Line (Mandar Hill-Dumka-Rampurhat) Project # | 703.00 | Transport | Railway track, tunnel, viaducts, bridges | Eastern Railway | 02-Jan-2013 | Multi State/ Centre | Under Construction |
300 | Rajanahalli Lift Irrigation Project | 112.70 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | 31-Dec-2007 | Karnataka | Completed |
301 | Ramanagaram-Mysore DL Railway Line Project#* | 290.00 | Transport | Railway track, tunnel, viaducts, bridges | South Western Railway | Not Available | Karnataka | Under Construction |
302 | Ramaswamy Anicut Project* | 89.74 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Cauvery Neeravari Nigam Limited | 02-Mar-2015 | Karnataka | Under Construction |
303 | Renovation of 1000 MW Obra coal based power unit in Sonbhadra district | 1,702.14 | Energy | Electricity generation (grid) | Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited | 31-Jul-2011 | Uttar Pradesh | Completed |
304 | Road Construction (Bhopalpatnam-Warangal-Hyderabad) Project | 97.89 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 24-Nov-2014 | Chhattisgarh | Under Construction |
305 | Road Upgradation (Akhir Chowk-Suraj Kund Road) Project*# | 85.05 | Transport | Roads and bridges | Haryana Urban Development Authority | 11-Apr-2013 | Haryana | Under Construction |
306 | Road Upgradation (Akkarai-Mahabalipuram) Project | 331.38 | Transport | Roads and bridges | Tamil Nadu Road Development Company Limited | 28-Feb-2014 | Tamil Nadu | Completed |
307 | Road Upgradation (Bagi-Barbigha Road) Project | 144.96 | Transport | Roads and bridges | Bihar State Road Development Corporation Limited | 09-Sep-2013 | Bihar | Completed |
308 | Road Upgradation (Barsoor-Geedam-Dantewada-Mariyagudam) Project | 105.98 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 08-Jun-2012 | Chhattisgarh | Under Construction |
309 | Road Upgradation (Bhanupratappur-Pakhanjur-Bande) Project | 97.99 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 09-Feb-2011 | Chhattisgarh | Under Construction |
310 | Road Upgradation (Bhawanipatna-Kashipur) Project | 51.85 | Transport | Roads and bridges | Public Works Department, Odisha | 16-May-2014 | Odisha | Under Construction |
311 | Road Upgradation (Bijapur-Awapalli-Basaguda-Jagargunda) Project | 120.75 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 22-Feb-2012 | Chhattisgarh | Under Construction |
312 | Road Upgradation (Birpur-Udakishunganj) Project | 592.00 | Transport | Roads and bridges | Bihar State Road Development Corporation Limited | 12-Oct-2011 | Bihar | Under Construction |
313 | Road Upgradation (Bishalgarh-Belonia) Project | 195.97 | Transport | Roads and bridges | Public Works Department, Tripura | 11-Dec-2008 | Tripura | Under Construction |
314 | Road Upgradation (Dharmanagar-Tilthai-Damcherra-Khedacherra) Project | 124.98 | Transport | Roads and bridges | Public Works Department, Tripura | 05-Dec-2013 | Tripura | Completed |
315 | Road Upgradation (Dhutaha River Bridge-Guabari-Phulwariya Ghat) Project | 255.53 | Transport | Roads and bridges | Road Construction Department, Bihar | 01-Jul-2013 | Bihar | Under Construction |
316 | Road Upgradation (Faridabad) Project#* | 391.77 | Transport | Roads and bridges | Haryana Urban Development Authority | 31-Mar-2012 | Haryana | Under Construction |
317 | Road Upgradation (Gammon Bridge-Gandhi More) Project | 77.82 | Transport | Roads and bridges | Asansol Durgapur Development Authority | 02-Aug-2012 | West Bengal | Completed |
318 | Road Upgradation (Gobuk-Mariyang-Sijhon Nallah) Project | 207.03 | Transport | Roads and bridges | Public Works Department, Arunachal Pradesh | 15-May-2012 | Arunachal Pradesh | Under Construction |
319 | Road Upgradation (Guava-Salai) Project* | 134.40 | Transport | Roads and bridges | Department of Road Construction, Jharkhand | 30-Sep-2014 | Jharkhand | Under Construction |
320 | Road Upgradation (Hangal-Tadas) Project | 97.87 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 04-Jul-2013 | Karnataka | Under Construction |
321 | Road Upgradation (Jatinga Junction - Harangajao) Project | 531.00 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 30-Oct-2011 | Assam | Under Construction |
322 | Road Upgradation (Jatinga-Nrimbanglo) Project [AS-22] | 497.00 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 03-Nov-2011 | Assam | Under Construction |
323 | Road Upgradation (Kanaktora-Jharsuguda) Project | 319.80 | Transport | Roads and bridges | Public Works Department, Odisha | 29-May-2014 | Odisha | Under Construction |
324 | Road Upgradation (Kuari-Sikti and Dhabeli-Fatehpur) Project | 53.13 | Transport | Roads and bridges | Road Construction Department, Bihar | 24-Jun-2013 | Bihar | Completed |
325 | Road Upgradation (Madanpur-Bhangaha & Bhangaha-Dhutaha) Project | 342.91 | Transport | Roads and bridges | Road Construction Department, Bihar | 31-Dec-2012 | Bihar | Under Construction |
326 | Road Upgradation (Meerganj-Kuari) Project | 140.29 | Transport | Roads and bridges | Road Construction Department, Bihar | 30-Jun-2013 | Bihar | Under Construction |
327 | Road Upgradation (Melli-Manpur-Namchi) Project | 182.28 | Transport | Roads and bridges | Roads and Bridges Department, Sikkim | 31-Mar-2013 | Sikkim | Under Construction |
328 | Road Upgradation (Melli-Nayabazar) Project | 95.39 | Transport | Roads and bridges | Roads and Bridges Department, Sikkim | 28-Mar-2013 | Sikkim | Under Construction |
329 | Road Upgradation (Mihona-Lahar-Daboh-Bhander-Chirgaon) Project | 137.26 | Transport | Roads and bridges | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 29-Jun-2011 | Madhya Pradesh | Completed |
330 | Road Upgradation (Mullanpur/UT boundary-Kurali-Siswan) Project | 71.02 | Transport | Roads and bridges | Greater Mohali Area Development Authority | 21-Sep-2010 | Multi State/ Centre | Under Construction |
331 | Road Upgradation (Nagpur-Hyderabad) Project | 353.15 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 01-Jan-2007 | Multi State/ Centre | Under Construction |
332 | Road Upgradation (Nayabazar-Legship) Project | 151.59 | Transport | Roads and bridges | Roads and Bridges Department, Sikkim | 30-Apr-2013 | Sikkim | Under Construction |
333 | Road Upgradation (Nemawar Road) Project* | 87.00 | Transport | Roads and bridges | Indore Municipal Corporation | 12-Mar-2013 | Madhya Pradesh | Under Construction |
334 | Road Upgradation (Phuti Kothi-Hawa Bangla) Project* | 87.00 | Transport | Roads and bridges | Indore Municipal Corporation | 12-Mar-2013 | Madhya Pradesh | Under Construction |
335 | Road Upgradation (Rameswaram-Dhanuskodi) Project | 52.00 | Transport | Roads and bridges | Public Works Department, Tamil Nadu | 04-Nov-2015 | Tamil Nadu | Completed |
336 | Road Upgradation (Saraiya -Motipur) Project | 187.06 | Transport | Roads and bridges | Bihar State Road Development Corporation Limited | 09-Sep-2013 | Bihar | Completed |
337 | Road Upgradation (Sidhi-Beohari) Project | 93.68 | Transport | Roads and bridges | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 04-Jul-2011 | Madhya Pradesh | Completed |
338 | Road Upgradation (Siwan-Siswan) Project | 149.90 | Transport | Roads and bridges | Bihar State Road Development Corporation Limited | 12-Aug-2013 | Bihar | Completed |
339 | Road Upgradation (Tarku-Damthang-Namchi) Project | 166.27 | Transport | Roads and bridges | Roads and Bridges Department, Sikkim | 30-Apr-2013 | Sikkim | Under Construction |
340 | Road Upgradation of 135 km including construction of paved shoulder and spot raising on NH-52 | 135.80 | Transport | Roads and bridges | Public Works Department, Assam | 01-Aug-2012 | Assam | Completed |
341 | Road upgradation of Amritsar-Tarn Taran-Harike in length of 286.9 Km under NHDP-IV | 576.15 | Transport | Roads and bridges | Public Works Department, Punjab | 28-Feb-2015 | Punjab | Completed |
342 | Road upgradation of Harangajo - Maibang road in length of 26 km Dima Hasao | 386.00 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 31-Mar-2008 | Assam | Under Construction |
343 | Road upgradation of Mandla-Pindrai Road in length of 33.1 km in Mandla | 258.93 | Transport | Roads and bridges | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 26-Aug-2015 | Madhya Pradesh | Completed |
344 | Road upgradation of Nalbari-Bijini NH-31 road in length of 27.3 km in East West Corridor under NHDP-II | 230.00 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 31-May-2005 | Assam | Under Construction |
345 | Road upgradation of Salimanabad-Vilayatkalan road in length of 73.18 km in Katni | 112.94 | Transport | Roads and bridges | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 26-Aug-2015 | Madhya Pradesh | Completed |
346 | Rural Electrification (Araria) Project - RGGVY 11th Plan Phase-II | 357.94 | Energy | Electricity transmission | North Bihar Power Distribution Company Limited | 03-Dec-2013 | Bihar | Under Construction |
347 | Rural Electrification (Banka) - RGGVY 11th Plan-Phase II | 247.80 | Energy | Electricity transmission | South Bihar Power Distribution Company Limited | 26-Aug-2013 | Bihar | Under Construction |
348 | Rural Electrification (Betul) - (RGGVY) | 81.97 | Energy | Electricity transmission | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | 18-May-2009 | Madhya Pradesh | Completed |
349 | Rural Electrification (Bhojpur) - RGGVY 11th Plan-Phase II | 188.28 | Energy | Electricity transmission | South Bihar Power Distribution Company Limited | 26-Nov-2013 | Bihar | Under Construction |
350 | Rural Electrification (Dewas) Project - RGGVY 11th Plan-Phase II | 54.15 | Energy | Electricity transmission | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited | 26-Mar-2012 | Madhya Pradesh | Under Construction |
351 | Rural Electrification (Gaya) - RGGVY 11th Plan-Phase II | 485.04 | Energy | Electricity transmission | South Bihar Power Distribution Company Limited | 26-Aug-2013 | Bihar | Under Construction |
352 | Rural Electrification (Gopalganj) Project [RGGVY-XII]#* | 383.63 | Energy | Electricity transmission | North Bihar Power Distribution Company Limited | 21-Aug-2014 | Bihar | Under Construction |
353 | Rural Electrification (Haryana) Project [R-APDRP] - Part-A | 107.92 | Energy | Electricity transmission | Uttar Haryana Bijli Vitran Nigam Limited | 23-Nov-2012 | Haryana | Completed |
354 | Rural Electrification (Kishanganj) Project - RGGVY 11th Plan Phase-II | 213.43 | Energy | Electricity transmission | North Bihar Power Distribution Company Limited | 21-Nov-2013 | Bihar | Under Construction |
355 | Rural Electrification (Morena) - (RGGVY) Phase 2 | 106.10 | Energy | Electricity transmission | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | 10-Sep-2014 | Madhya Pradesh | Under Construction |
356 | Rural Electrification (Nawada) - RGGVY 11th Plan-Phase II | 232.41 | Energy | Electricity transmission | South Bihar Power Distribution Company Limited | 11-Feb-2014 | Bihar | Under Construction |
357 | Rural Electrification (North Bihar) Project - R-APDRP Part-B | 343.54 | Energy | Electricity transmission | North Bihar Power Distribution Company Limited | 22-Nov-2013 | Bihar | Completed |
358 | Rural Electrification (Patna) - RGGVY 11th Plan Phase II | 2,350.60 | Energy | Electricity transmission | South Bihar Power Distribution Company Limited | 16-Aug-2013 | Bihar | Under Construction |
359 | Rural Electrification (Purnea) Project - RGGVY 11th Plan Phase-II | 354.42 | Energy | Electricity transmission | North Bihar Power Distribution Company Limited | 29-Nov-2013 | Bihar | Under Construction |
360 | Rural Electrification (Rohtas) - RGGVY 11th Plan-Phase II | 276.27 | Energy | Electricity transmission | South Bihar Power Distribution Company Limited | 16-Aug-2013 | Bihar | Under Construction |
361 | Rural Electrification (Saran) Project [RGGVY-XII]#* | 447.98 | Energy | Electricity transmission | North Bihar Power Distribution Company Limited | 21-Aug-2014 | Bihar | Under Construction |
362 | Rural Electrification (Shajapur) Project - RGGVY 11th Plan-Phase II | 55.08 | Energy | Electricity transmission | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited | 26-Mar-2012 | Madhya Pradesh | Under Construction |
363 | Rural Electrification (Shivpuri) - (RGGVY) Phase 1 | 60.13 | Energy | Electricity transmission | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | 31-Dec-2009 | Madhya Pradesh | Under Construction |
364 | Rural Electrification (Shivpuri) - (RGGVY) Phase 2 | 66.07 | Energy | Electricity transmission | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | 25-Sep-2014 | Madhya Pradesh | Under Construction |
365 | Rural Electrification (Siwan) Project - RGGVY 11th Plan Phase-II | 380.90 | Energy | Electricity transmission | North Bihar Power Distribution Company Limited | 19-Nov-2013 | Bihar | Under Construction |
366 | Rural Electrification (Vidisha) - (RGGVY) | 73.99 | Energy | Electricity transmission | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | 29-Dec-2015 | Madhya Pradesh | Under Construction |
367 | Sardar Sarovar Project (Narmada) | 39,240.45 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Sardar Sarovar Narmada Nigam Limited | Not Available | Gujarat | Under Construction |
368 | Satpura Thermal Power Project# | 3,514.00 | Energy | Electricity generation (grid) | Madhya Pradesh Power Generating Company Limited | 27-Feb-2009 | Madhya Pradesh | Completed |
369 | Setting up 20 MW hydel based power unit at Telbeila in Pune | 115.44 | Energy | Renewable energy (grid) | Water Resources Department, Maharashtra | 06-Jul-2013 | Maharashtra | Pre-construction Stage |
370 | Setting up a 1,200 MW coal based power plant Phase I (Unit 1 & 2) at Raghunathpur# | 8,781.30 | Energy | Electricity generation (grid) | Damodar Valley Corporation | 14-Dec-2007 | West Bengal | Completed |
371 | Setting up a 13.6 MW wind based power unit at Lodurva | 85.60 | Energy | Renewable energy (grid) | Oil India Limited | 10-Feb-2012 | Rajasthan | Completed |
372 | Setting up of 500 MW Barauni thermal power unit in Begusarai district | 5,308.07 | Energy | Electricity generation (grid) | Bihar State Power Generation Company Limited | 11-Mar-2011 | Bihar | Under Construction |
373 | Setting up of 10 MW solar based power unit at Paradip Port in Jagatsinghpur district | 100.00 | Energy | Renewable energy (grid) | Paradip Port Trust | 28-Nov-2016 | Odisha | Completed |
374 | Setting Up of 10 MW Solar Power Unit at Visakhapatnam Port Trust * | 60.00 | Energy | Renewable energy (grid) | Visakhapatnam Port Trust | 02-Nov-2015 | Andhra Pradesh | Under Construction |
375 | Setting up of 10 TPD solid waste management unit at Pernem # | 15.00 | Water Sanitation | Solid waste management | State Urban Development Agency, Goa | 12-Nov-2014 | Goa | Under Construction |
376 | Setting up of 100 MW Sainj hydel power unit at Kullu# | 676.29 | Energy | Renewable energy (grid) | Himachal Pradesh Power Corporation Limited | 02-Aug-2010 | Himachal Pradesh | Completed |
377 | Setting up of 100 MW Solar Power unit at Bhagwanpur | 700.00 | Energy | Renewable energy (grid) | Uttarakhand Renewable Energy Development Agency | 20-Sep-2016 | Uttarakhand | Completed |
378 | Setting up of 1000 MW coal based power unit at Chandrapur district | 7,004.42 | Energy | Electricity generation (grid) | Maharashtra State Power Generation Company Limited | 25-Jul-2008 | Maharashtra | Completed |
379 | Setting up of 1000 MW coal based power unit at Nabinagar# | 7,998.00 | Energy | Electricity generation (grid) | Bharatiya Rail Bijlee Company Limited | 22-Jan-2008 | Bihar | Completed |
380 | Setting up of 110 MW Pare hydel power unit in Papumpare# | 1,640.00 | Energy | Renewable energy (grid) | North Eastern Electric Power Corporation Limited | 01-Sep-2009 | Arunachal Pradesh | Under Construction |
381 | Setting up of 120 MW hydel power project at Pulichintala in Guntur and Nalgonda# | 563.50 | Energy | Renewable energy (grid) | Telangana State Power Generation Corporation Limited | 11-Jun-2007 | Telangana | Completed |
382 | Setting up of 120 MW Rammam III hydel power unit at Darjeeling | 1,592.34 | Energy | Renewable energy (grid) | NTPC Limited | 10-Sep-2014 | West Bengal | Under Construction |
383 | Setting up of 1320 MW Suratgarh thermal power station at Suratgarh - Stage-V | 6,192.37 | Energy | Electricity generation (grid) | Rajasthan Rajya Vidyut Utpadan Nigam Limited | 28-May-2013 | Rajasthan | Completed |
384 | Setting up of 171 MW Lata Tapovan hydel power unit at Chamoli# | 1,801.07 | Energy | Renewable energy (grid) | NTPC Limited | 07-Dec-2012 | Uttarakhand | Completed |
385 | Setting up of 1980 MW coal based power unit at Barh in Patna | 15,095.67 | Energy | Electricity generation (grid) | NTPC Limited | 14-Mar-2005 | Bihar | Under Construction |
386 | Setting up of 200 MW wind based power at Thoothukudi | 1,000.00 | Energy | Renewable energy (grid) | Solar Energy Corporation of India | 16-Oct-2017 | Tamil Nadu | Completed |
387 | Setting up of 21 MW wind based power unit at Nakhatrana Wind Farm in Kachchh district | 105.00 | Energy | Renewable energy (grid) | Gujarat Industries Power Company Limited | 30-Apr-2016 | Gujarat | Completed |
388 | Setting up of 220 kV substation at Anjangaon in Amravati district | 51.04 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 09-Feb-2010 | Maharashtra | Completed |
389 | Setting up of 240 MW Lower Jurala hydel power unit at Mahaboob Nagar | 1,969.14 | Energy | Renewable energy (grid) | Telangana State Power Generation Corporation Limited | 14-Jul-2008 | Telangana | Completed |
390 | Setting up of 25 MW biomass based co-generation power plant at Naraingarh | 116.09 | Energy | Renewable energy (grid) | Haryana Renewable Energy Development Agency | 12-Sep-2012 | Haryana | Completed |
391 | Setting up of 250 MW coal based power unit at Parli | 2,081.30 | Energy | Electricity generation (grid) | Maharashtra State Power Generation Company Limited | 20-Jan-2009 | Maharashtra | Completed |
392 | Setting up of 30 MW coal based power unit at Manapparai | 150.00 | Energy | Electricity generation (grid) | Tamil Nadu Newsprint and Papers Limited | 10-Apr-2015 | Tamil Nadu | Completed |
393 | Setting up of 400 kV Veloda substation at Sankhari# | 89.78 | Energy | Electricity transmission | Gujarat Energy Transmission Corporation Limited | 16-Aug-2013 | Gujarat | Completed |
394 | Setting up of 444 MW Vishnugad Pipalkoti hydel power project at Chamoli | 3,745.08 | Energy | Renewable energy (grid) | THDC India Limited | 19-Dec-2013 | Uttarakhand | Under Construction |
395 | Setting up of 450 MW Shongtong Karchham hydel power unit at Kinnaur# | 3,316.35 | Energy | Renewable energy (grid) | Himachal Pradesh Power Corporation Limited | 04-Aug-2012 | Himachal Pradesh | Under Construction |
396 | Setting up of 520 MW Tapovan Vishnugad hydel power unit at Chamoli | 3,846.30 | Energy | Renewable energy (grid) | NTPC Limited | 30-Nov-2006 | Uttarakhand | Completed |
397 | Setting up of 60 MW Tuirial hydel power unit in Aizwal | 1,422.47 | Energy | Renewable energy (grid) | North Eastern Electric Power Corporation Limited | 01-Aug-2011 | Mizoram | Completed |
398 | Setting up of 600 MW Kameng hydel power unit at West Kameng# | 5,269.00 | Energy | Renewable energy (grid) | North Eastern Electric Power Corporation Limited | 08-Apr-2004 | Arunachal Pradesh | Under Construction |
399 | Setting up of 800 MW Parbati hydel power unit (Stage II) at Kullu# | 8,398.75 | Energy | Renewable energy (grid) | NHPC Limited | 11-Sep-2002 | Himachal Pradesh | Under Construction |
400 | Setting up of 800 MW Yermarus thermal power station project in Raichur district. | 12,589.00 | Energy | Electricity generation (grid) | Karnataka Power Corporation Limited | 09-Apr-2010 | Karnataka | Completed |
401 | Setting up of 9 MW Fozal hydel power unit in Kullu district | 49.16 | Energy | Renewable energy (grid) | Directorate of Energy, Himachal Pradesh | 21-May-2000 | Himachal Pradesh | Under Construction |
402 | Setting up of Iron ore handling facilities on BOT basis at New Mangalore Port * | 277.11 | Transport | Ports (excluding captive) | New Mangalore Port Trust | 23-Sep-2009 | Karnataka | Pre-construction Stage |
403 | Setting up of mega food park project on 52 acres at Ranchi | 114.74 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Ministry of Food Processing Industries | 27-Mar-2009 | Jharkhand | Completed |
404 | Sewage Treatment Plant (Behrampur)# | 100.78 | Water Sanitation | Sewage collection, treatment and disposal system | Haryana Urban Development Authority | 22-Mar-2012 | Haryana | Completed |
405 | Sewage Treatment Plant (Dhanwapur)# | 94.40 | Water Sanitation | Sewage collection, treatment and disposal system | Haryana Urban Development Authority | 22-Mar-2012 | Haryana | Completed |
406 | Sewage Treatment Plant (Koyambedu) | 96.57 | Water Sanitation | Sewage collection, treatment and disposal system | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 15-Jun-2012 | Tamil Nadu | Completed |
407 | Sewage Treatment Plant (Puri) Project# | 80.45 | Water Sanitation | Sewage collection, treatment and disposal system | Odisha Water Supply and Sewerage Board | Not Available | Odisha | Completed |
408 | Sewerage Scheme (Ambattur Municipality) | 130.91 | Water Sanitation | Sewage collection, treatment and disposal system | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 06-May-2010 | Tamil Nadu | Completed |
409 | Sewerage Scheme (Chennai) - Improvement | 150.00 | Water Sanitation | Sewage collection, treatment and disposal system | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 08-Nov-2013 | Tamil Nadu | Completed |
410 | Sewerage Scheme (Gurgaon)*# | 351.48 | Water Sanitation | Sewage collection, treatment and disposal system | Haryana Urban Development Authority | 16-Jan-2013 | Haryana | Under Construction |
411 | Sewerage Scheme (North Nanded)* | 66.78 | Water Sanitation | Sewage collection, treatment and disposal system | Nanded Waghala City Municipal Corporation | Not Available | Maharashtra | Under Construction |
412 | Sewerage Scheme (Ranchi) | 359.25 | Water Sanitation | Sewage collection, treatment and disposal system | Ranchi Municipal Corporation | 01-Jan-2015 | Jharkhand | Completed |
413 | Sewerage Scheme (Tambaram Municipality) | 160.96 | Water Sanitation | Sewage collection, treatment and disposal system | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 10-May-2012 | Tamil Nadu | Completed |
414 | Sewerage Scheme (Thiruvottiyur) | 67.63 | Water Sanitation | Sewage collection, treatment and disposal system | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 27-Feb-2009 | Tamil Nadu | Completed |
415 | Sewerage Scheme (Varanasi) | 329.29 | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh Jal Nigam | 16-Nov-2009 | Uttar Pradesh | Under Construction |
416 | Sewerage Treatment Plant (Noor Nagar Morti) | 78.04 | Water Sanitation | Sewage collection, treatment and disposal system | Ghaziabad Development Authority | 21-Oct-2011 | Uttar Pradesh | Completed |
417 | Singareni Coal Based Power Project | 7,573.31 | Energy | Electricity generation (grid) | Singareni Collieries Company Limited | 11-Nov-2011 | Telangana | Completed |
418 | Singatalur Lift Irrigation Scheme | 63.62 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | 19-Sep-1992 | Karnataka | Under Construction |
419 | Singireddypalli Lift Irrigation Scheme * | 1,905.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Telangana State Irrigation Development Corporation Limited | 31-Dec-2013 | Telangana | Under Construction |
420 | Six laning of flyover near Bopal Junction in length of 1.4 km in Ahmedabad | 94.50 | Transport | Roads and bridges | Ahmedabad Urban Development Authority | 05-Aug-2014 | Gujarat | Completed |
421 | Six laning of link road adjoining NH-24 to NH-58 in Ghaziabad district | 121.79 | Transport | Roads and bridges | Ghaziabad Development Authority | 01-Jan-2013 | Uttar Pradesh | Completed |
422 | Six laning of Vadodara-Surat road in length of 6 km in Vadodara | 503.16 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | Not Available | Gujarat | Under Construction |
423 | Small Hydel Power (Kachchh Branch Canal) Project | 230.13 | Energy | Renewable energy (grid) | Sardar Sarovar Narmada Nigam Limited | 27-Aug-2014 | Gujarat | Under Construction |
424 | Small Hydro Electric (Bhoothathankettu) Project | 168.61 | Energy | Renewable energy (grid) | Kerala State Electricity Board | 07-Feb-2014 | Kerala | Under Construction |
425 | Solar Photovoltaic (Manmunda) Project | 160.00 | Energy | Renewable energy (grid) | Green Energy Development Corporation of Odisha Limited | 08-Aug-2014 | Odisha | Completed |
426 | Solar Photovoltaic Power (Singrauli) Project | 69.39 | Energy | Renewable energy (grid) | NTPC Limited | 26-Aug-2014 | Uttar Pradesh | Completed |
427 | Solar Photovoltaic Power Plant (Vadodara Branch Canal - Chainage 12.43 km to 31.63 km) Project | 111.00 | Energy | Renewable energy (grid) | Sardar Sarovar Narmada Nigam Limited | 12-Mar-2015 | Gujarat | Completed |
428 | Storm Water Drainage (Coimbatore) Project | 179.35 | Water Sanitation | Storm water drainage system | Coimbatore City Municipal Corporation | 07-Oct-2010 | Tamil Nadu | Completed |
429 | Storm Water Drainage (Madurai) Project | 251.81 | Water Sanitation | Storm water drainage system | Tamil Nadu Urban Finance and Infrastructure Development Corporation | Not Available | Tamil Nadu | Under Construction |
430 | Strategic Crude Oil Storage (Rajkot) Project - Phase-II* | 1,150.00 | Energy | Oil/ Gas/ LNG Storage | Indian Strategic Petroleum Reserves Limited | 08-Jun-2016 | Gujarat | Under Construction |
431 | Subarnarekha Multipurpose Barrage Project | 6,613.74 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Jharkhand | 21-Mar-1977 | Multi State/ Centre | Under Construction |
432 | Substation (Atri) & Narendrapur-Mendhasal Transmission Line Project | 51.12 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 21-Mar-2013 | Odisha | Completed |
433 | Substation (Chandaka) Project | 61.82 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 19-Mar-2013 | Odisha | Completed |
434 | Substation (Pratapsasan) & Cuttack-Pratapsasan Transmission Line Project | 83.26 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 18-Jun-2013 | Odisha | Under Construction |
435 | Substation (Sadaipur) Project | 60.87 | Energy | Electricity transmission | West Bengal State Electricity Transmission Company Limited | 29-Oct-2014 | West Bengal | Completed |
436 | Substation (Srinagar) Project | 168.78 | Energy | Electricity transmission | Power Transmission Corporation of Uttarakhand Limited | 09-Dec-2009 | Uttarakhand | Completed |
437 | Subways/R-U-Bs (Ankleshwar-Rajpipla) # | 58.27 | Transport | Roads and bridges | Western Railway | Not Available | Gujarat | Completed |
438 | Surfnalla Medium Irrigation Project | 145.70 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 26-May-2000 | Maharashtra | Under Construction |
439 | Suru Reservoir Scheme | 96.35 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Jharkhand | 06-Jan-1982 | Jharkhand | Under Construction |
440 | Teesta Low Dam-III (4X33=132MW) | 1,972.99 | Energy | Renewable energy (grid) | NHPC Limited | 31-Oct-2003 | West Bengal | Completed |
441 | Tertiary Treatment Plant#* | 55.51 | Water Sanitation | Water treatment plants | Haryana Urban Development Authority | 09-Dec-2013 | Haryana | Under Construction |
442 | Thermal Power (Bhusawal) Project | 6,730.00 | Energy | Electricity generation (grid) | Maharashtra State Power Generation Company Limited | 23-Jan-2007 | Maharashtra | Completed |
443 | Thermal Power (Khaperkheda) Project | 3,196.99 | Energy | Electricity generation (grid) | Maharashtra State Power Generation Company Limited | 23-Jan-2007 | Maharashtra | Completed |
444 | Three laning of Pali-Nadol-Gomati ka Choraha road in length of 107.0 Km | 193.95 | Transport | Roads and bridges | Rajasthan State Road Development and Construction Corporation Limited | 30-Sep-2010 | Rajasthan | Completed |
445 | Transmission Line (Bhadla-Bikaner) Project | 232.88 | Energy | Electricity transmission | Rajasthan Rajya Vidyut Prasaran Nigam Limited | 10-Apr-2013 | Rajasthan | Under Construction |
446 | Transmission Line (Gaya-Sonenagar) Project#* | 140.00 | Energy | Electricity transmission | Bihar State Power Transmission Company Limited | Not Available | Bihar | Under Construction |
447 | Transmission Line (Raghunathpur-Ranchi) Project | 434.90 | Energy | Electricity transmission | Damodar Valley Corporation | 14-May-2008 | Multi State/ Centre | Completed |
448 | Transmission Line (Raita-Jagdalpur) Project | 335.40 | Energy | Electricity transmission | Chhattisgarh State Power Transmission Company Limited | 11-May-2011 | Chhattisgarh | Completed |
449 | Transmission Line (Rangia-Salakati) Project | 96.96 | Energy | Electricity transmission | Assam Electricity Grid Corporation Limited | 25-Nov-2010 | Assam | Under Construction |
450 | Transmission Line (Rasipalayam-Palavadi) Project | 542.59 | Energy | Electricity transmission | Tamil Nadu Generation and Distribution Corporation Limited | 04-Oct-2013 | Tamil Nadu | Completed |
451 | Transmission Line (Srinagar-Simli) Project | 89.51 | Energy | Electricity transmission | Power Transmission Corporation of Uttarakhand Limited | 26-Oct-2005 | Uttarakhand | Completed |
452 | Two laning of Chas-Bokaro-Gola-Ramgarh road in length of 78.3 km under NHDP-IV | 341.61 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 31-Dec-2014 | Jharkhand | Under Construction |
453 | Two laning of Dumaria-Ranitalab road of SH-69 in length of 154.2 km | 318.75 | Transport | Roads and bridges | Bihar State Road Development Corporation Limited | 30-Dec-2008 | Bihar | Completed |
454 | Two laning of existing carriageway between Moledanga-Bashbandh in length of 27.4 KM | 135.94 | Transport | Roads and bridges | Public Works Department, West Bengal | 06-May-2015 | West Bengal | Completed |
455 | Two laning of Falakata-Pundibari section in length of 26.0 Km | 64.27 | Transport | Roads and bridges | Public Works Department, West Bengal | 18-Mar-2013 | West Bengal | Completed |
456 | Two laning of Hunli-Anini road in length of 39.0 Km in Dibang Valley district | 375.08 | Transport | Roads and bridges | National Highways and Infrastructure Development Corporation Limited | 27-Dec-2016 | Arunachal Pradesh | Completed |
457 | Two laning of Kota-Chhabra road in length of 94.5 Km in Kota district | 289.54 | Transport | Roads and bridges | Rajasthan State Road Development and Construction Corporation Limited | 26-Apr-2013 | Multi State/ Centre | Completed |
458 | Two laning of Ladnu-Nimbi Jodha-Degna-Merta City section road in length of 140 km under NHDP-IV | 378.46 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 31-Jul-2013 | Rajasthan | Under Construction |
459 | Two laning of Pasighat-Pangin road (NH-229) in length of 13.3 Km in East Siang district | 124.03 | Transport | Roads and bridges | Public Works Department, Arunachal Pradesh | 10-Jan-2011 | Arunachal Pradesh | Completed |
460 | Two laning of Pasighat-Pangin road (NH-229) in length of 14.6 Km in East Siang district | 117.58 | Transport | Roads and bridges | Public Works Department, Arunachal Pradesh | 10-Jan-2011 | Arunachal Pradesh | Completed |
461 | Two laning of Pasighat-Singer river section of NH-513 road in length of 19.9 Km in East Siang | 138.84 | Transport | Roads and bridges | Public Works Department, Arunachal Pradesh | 28-Oct-2010 | Arunachal Pradesh | Under Construction |
462 | Two laning of Rayachoti-Kadapa road in length of 51.3 Km in YSR district | 198.00 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 20-Nov-2016 | Andhra Pradesh | Completed |
463 | Two laning of Runnisaidpur-Bishwa road of SH-87 in length of 67.4 km | 378.28 | Transport | Roads and bridges | Bihar State Road Development Corporation Limited | 09-Sep-2013 | Bihar | Under Construction |
464 | Two laning of Shivganj-Baidrabad road of SH-68 in length of 83.1 km | 174.32 | Transport | Roads and bridges | Bihar State Road Development Corporation Limited | 15-Jul-2009 | Bihar | Completed |
465 | Two laning Rae Bareilly-Banda section of NH-232 road in length of 133.3 km in Rae Bareilly | 558.77 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 01-Feb-2014 | Uttar Pradesh | Under Construction |
466 | Underground Drainage Scheme (Okha)# | 80.96 | Water Sanitation | Storm water drainage system | Gujarat Water Supply and Sewerage Board | 30-Nov-2014 | Gujarat | Under Construction |
467 | Underground Sewerage Scheme (Bhiwandi-Nizampur) - Phase I | 71.80 | Water Sanitation | Sewage collection, treatment and disposal system | Bhiwandi Nizampur City Municipal Corporation | 31-May-2010 | Maharashtra | Completed |
468 | Underground Sewerage Scheme (Chandrapur) | 94.81 | Water Sanitation | Sewage collection, treatment and disposal system | Chandrapur City Municipal Corporation | 24-Aug-2009 | Maharashtra | Completed |
469 | Underground Sewerage Scheme (Cuddalore) | 65.14 | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu Water Supply and Drainage Board | 30-Aug-2006 | Tamil Nadu | Completed |
470 | Underground Sewerage Scheme (Kulgaon-Badlapur) | 226.43 | Water Sanitation | Sewage collection, treatment and disposal system | Kulgaon Badlapur Municipal Council | 15-Feb-2010 | Maharashtra | Completed |
471 | Underground Sewerage Scheme (Thoothukudi) | 95.00 | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu Water Supply and Drainage Board | 31-Oct-2007 | Tamil Nadu | Completed |
472 | Underground Sewerage Scheme (Udumalpet) | 56.07 | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu Water Supply and Drainage Board | 27-Mar-2013 | Tamil Nadu | Completed |
473 | Upgradation of Airport Gate-Duckbunglow More Road in length of 7.2 Km | 80.90 | Transport | Roads and bridges | Public Works Department, West Bengal | 10-Nov-2014 | West Bengal | Completed |
474 | Upgradation of Akajan-Likabali-Bame Road in length of 32 km | 263.39 | Transport | Roads and bridges | National Highways and Infrastructure Development Corporation Limited | 22-Jul-2015 | Arunachal Pradesh | Under Construction |
475 | Upgradation of Baramulla-Gulmarg in length of 39.0 km | 390.00 | Transport | Roads and bridges | National Highways and Infrastructure Development Corporation Limited | 11-Nov-2016 | Jammu & Kashmir | Completed |
476 | Upgradation of Bhandaria-Tihri road in length of 25.9 km | 53.29 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 26-Dec-2014 | Jharkhand | Completed |
477 | Upgradation of carriageway in length of 37 km in Birbhum | 97.38 | Transport | Roads and bridges | Public Works Department, West Bengal | 22-Nov-2011 | West Bengal | Completed |
478 | Upgradation of Fatehpur to Galgaliya road via Piltola in length of 79.5 km in Kishanganj district*# | 282.20 | Transport | Roads and bridges | Road Construction Department, Bihar | 13-Jun-2013 | Bihar | Pre-construction Stage |
479 | Upgradation of Hata-Patera-Kumhari and Raipura-Saliya-Bahuriband-Sehora road in length of 91.3 km | 132.48 | Transport | Roads and bridges | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 20-May-2013 | Madhya Pradesh | Completed |
480 | Upgradation of Hathnapur-Anwalighat-Salkanpur road in length of 28.2 km | 87.87 | Transport | Roads and bridges | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 24-Aug-2015 | Madhya Pradesh | Completed |
481 | Upgradation of Jammu-Akhnoor section in length of 35 km | 700.00 | Transport | Roads and bridges | National Highways and Infrastructure Development Corporation Limited | 08-Nov-2016 | Jammu & Kashmir | Completed |
482 | Upgradation of Kochigaon-Birpara road in length of 123.0 km | 1,230.00 | Transport | Roads and bridges | National Highways and Infrastructure Development Corporation Limited | 18-Oct-2016 | West Bengal | Completed |
483 | Upgradation of Magadi-Koratagere road in length of 68.2 km in Bengaluru | 116.78 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 02-Dec-2011 | Karnataka | Under Construction |
484 | Upgradation of Mahua-Chuwahi road in length of 48.9 km | 101.70 | Transport | Roads and bridges | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 11-Dec-2014 | Madhya Pradesh | Completed |
485 | Upgradation of Miramar Circle-NIO Circle road in length of 3.7 km | 72.60 | Transport | Roads and bridges | Goa State Infrastructure Development Corporation Limited | 27-Feb-2014 | Goa | Completed |
486 | Upgradation of Nalbari-Bijni road (AS-6) in length of 25 km of NH-31 | 195.22 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 18-Mar-2005 | Assam | Under Construction |
487 | Upgradation of Northern Bank approach of 8.6 KM to proposed Bogibeel rail cum bridge on NH-52 B near Dhemaji district | 111.02 | Transport | Roads and bridges | Public Works Department, Assam | 17-Jul-2010 | Assam | Completed |
488 | Upgradation of Pilathara- Pappinissery road in length of 20.9 km of SH-67 | 118.30 | Transport | Roads and bridges | Public Works Department, Kerala | 01-Apr-2013 | Kerala | Completed |
489 | Upgradation of Punch-Uri section in length of 67.0 km | 670.00 | Transport | Roads and bridges | National Highways and Infrastructure Development Corporation Limited | 11-Nov-2016 | Jammu & Kashmir | Completed |
490 | Upgradation of Rahatgarh-Khurai-Khimlasa Road in length of 47.5 km | 60.33 | Transport | Roads and bridges | Madhya Pradesh Road Development Corporation Limited (MPRDC) | 29-Jun-2011 | Madhya Pradesh | Completed |
491 | Upgradation of SH-54 (NH-348A) Amra Marg road in length of 12.2 km# | 758.40 | Transport | Roads and bridges | National Highways Authority of India (NHAI) | 06-Sep-2015 | Maharashtra | Under Construction |
492 | Upgradation of Shelvadi-Mundargi road in length of 63.4 km in Bengaluru | 121.25 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 02-Dec-2011 | Karnataka | Completed |
493 | Upgradation of Suket-Sitamau road in length of 102.8 Km | 313.85 | Transport | Roads and bridges | Rajasthan State Road Development and Construction Corporation Limited | 26-Apr-2013 | Multi State/ Centre | Completed |
494 | Upgradation of various roads in length of 46.3 km in Bihar Sharif | 57.12 | Transport | Roads and bridges | Road Construction Department, Bihar | 14-May-2015 | Bihar | Completed |
495 | Upgradation of Wadi-Hingna-Takalghat-Asola section in length of 39.2 km | 243.64 | Transport | Roads and bridges | Public Works Department, Maharashtra | 27-Jun-2017 | Maharashtra | Completed |
496 | Wasani Medium Irrigation Project # | 536.75 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 21-Aug-2008 | Maharashtra | Completed |
497 | Water Drainage System (Digha) | 63.98 | Water Sanitation | Storm water drainage system | Digha Sankarpur Development Authority | 01-Jan-2013 | West Bengal | Under Construction |
498 | Water Supply (Chikkanayakana Halli) Project | 98.15 | Water Sanitation | Water supply pipeline | Cauvery Neeravari Nigam Limited | 27-Feb-2013 | Karnataka | Under Construction |
499 | Water Supply (Kandi) Project * | 56.85 | Water Sanitation | Water supply pipeline | Department of Municipal Affairs, West Bengal | 30-Jun-2009 | West Bengal | Under Construction |
500 | Water Supply (Muchhu-III) Project | 60.75 | Water Sanitation | Water supply pipeline | Narmada Water Resources, Water Supply and Kalpsar Department | 31-Dec-2015 | Gujarat | Completed |
501 | Water Supply (Sahibganj) Project | 50.64 | Water Sanitation | Water supply pipeline | Drinking Water and Sanitation Department, Jharkhand | 16-Sep-2011 | Jharkhand | Completed |
502 | Water Supply Scheme (Avadi) | 103.84 | Water Sanitation | Water supply pipeline | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 09-Feb-2009 | Tamil Nadu | Completed |
503 | Water Supply Scheme (Badvel) | 88.81 | Water Sanitation | Water supply pipeline | Badvel Municipality | 30-May-2013 | Andhra Pradesh | Completed |
504 | Water Supply Scheme (Bakhtawarpur-Mhandipur-Machhola)#* | 68.55 | Water Sanitation | Water supply pipeline | Haryana Urban Development Authority | 01-Oct-2013 | Haryana | Under Construction |
505 | Water Supply Scheme (Bankura-I, Bankura-II & Barjora) BRGF - Phase I | 289.10 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, West Bengal | 11-Oct-2012 | West Bengal | Completed |
506 | Water Supply Scheme (Kanpur) - Phase-II | 475.15 | Water Sanitation | Water supply pipeline | Uttar Pradesh Jal Nigam | 18-Nov-2009 | Uttar Pradesh | Completed |
507 | Water Supply Scheme (Kaushalya Dam) | 207.32 | Water Sanitation | Water supply pipeline | Haryana Urban Development Authority | 18-Mar-2008 | Haryana | Completed |
508 | Water Supply Scheme (Kothapeta & Ravulapalem) | 55.00 | Water Sanitation | Water supply pipeline | Rural Water Supply and Sanitation Department, Andhra Pradesh | 23-Jan-2014 | Andhra Pradesh | Completed |
509 | Water Supply Scheme (Madhavaram) | 55.00 | Water Sanitation | Water supply pipeline | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 17-Oct-2012 | Tamil Nadu | Completed |
510 | Water Supply Scheme (Mehandipur)#* | 78.15 | Water Sanitation | Water supply pipeline | Haryana Urban Development Authority | 20-Jan-2014 | Haryana | Under Construction |
511 | Water Supply Scheme (Mira-Bhayandar) | 239.00 | Water Sanitation | Water supply pipeline | Mira Bhayandar Municipal Corporation | 31-Oct-2015 | Maharashtra | Under Construction |
512 | Water Supply Scheme (Nanjangud) * | 28.55 | Water Sanitation | Water supply pipeline | Town Municipal Council, Nanjangud | 26-Feb-2014 | Karnataka | Under Construction |
513 | Water Supply Scheme (Onda) BRGF - Phase I | 179.47 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, West Bengal | 13-Nov-2012 | West Bengal | Completed |
514 | Water Supply Scheme (Panchkula)# | 61.68 | Water Sanitation | Water supply pipeline | Haryana Urban Development Authority | 11-Jul-2012 | Haryana | Completed |
515 | Water Supply Scheme (Peechi Dam-Chembukkavu Reservoir) # | 63.92 | Water Sanitation | Water supply pipeline | Local Self Government Department, Kerala | 23-Aug-2012 | Kerala | Completed |
516 | Water Supply Scheme (Saltora-Chhatna) BRGF - Phase I | 159.31 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, West Bengal | 23-Nov-2012 | West Bengal | Completed |
517 | Water Supply Scheme (Singatarayankare) | 99.75 | Water Sanitation | Water supply pipeline | Gadag-Betageri City Municipal Council | 24-Jun-2013 | Karnataka | Under Construction |
518 | Water Supply Scheme (Sonipat)*# | 57.20 | Water Sanitation | Water supply pipeline | Haryana Urban Development Authority | 04-Mar-2014 | Haryana | Under Construction |
519 | Water Supply Scheme (Suraj Kund)*# | 144.40 | Water Sanitation | Water supply pipeline | Haryana Urban Development Authority | 28-Mar-2014 | Haryana | Under Construction |
520 | Water Supply Scheme (Surappatu-Puzhal) * | 59.12 | Water Sanitation | Water supply pipeline | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 30-May-2014 | Tamil Nadu | Under Construction |
521 | Water Supply Scheme (Thiruvottiyur Municipality) | 85.12 | Water Sanitation | Water supply pipeline | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 06-May-2010 | Tamil Nadu | Completed |
522 | Water Supply Scheme (Urvakonda, Kudair, Vajrakarur & Vidapankal) | 56.00 | Water Sanitation | Water supply pipeline | Rural Water Supply and Sanitation Department, Andhra Pradesh | 09-Nov-2013 | Andhra Pradesh | Under Construction |
523 | Water Supply Scheme in NIT Area*# | 141.07 | Water Sanitation | Water supply pipeline | Nagpur Municipal Corporation | Not Available | Maharashtra | Under Construction |
524 | Wind Based Power (Davangere) Project | Not Available | Energy | Renewable energy (grid) | Bharat Electronics Limited | 23-Nov-2012 | Karnataka | Completed |
525 | Wind Power (Bhanwad) Project | 305.32 | Energy | Renewable energy (grid) | Gujarat Mineral Development Corporation Limited | 30-Jun-2012 | Gujarat | Completed |
526 | Wind Power (Jaora) Project | 150.00 | Energy | Renewable energy (grid) | PTC India Limited | 28-Jan-2016 | Madhya Pradesh | Completed |
527 | 24x7 Water Supply (Basavakalyan) Project* | 87.82 | Water Sanitation | Water supply pipeline | Karnataka Urban Infrastructure Development and Finance Corporation | 30-Jan-2015 | Karnataka | Under Construction |
528 | 24x7 Water Supply (Bidar) Project* | 69.77 | Water Sanitation | Water supply pipeline | Karnataka Urban Infrastructure Development and Finance Corporation | 30-Jan-2015 | Karnataka | Under Construction |
529 | Ajay Barrage Project | 351.85 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Jharkhand | 13-Aug-1982 | Jharkhand | Completed |
530 | Amhata Small Hydel Power Project* | 107.20 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | 01-Mar-2014 | Madhya Pradesh | Under Construction |
531 | Angul Aluminium Park* | 130.00 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Odisha Industrial Infrastructure Development Corporation | 23-Aug-2015 | Odisha | Under Construction |
532 | Arunavati Major Irrigation Project#* | 331.18 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 06-Dec-1978 | Maharashtra | Under Construction |
533 | AVR Handri Niva Sujala Shravanthi Project - Phase I | 1,571.71 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 25-Feb-2005 | Andhra Pradesh | Completed |
534 | AVR Handri Niva Sujala Shravanthi Project - Phase II | 3,440.21 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 04-Dec-2006 | Andhra Pradesh | Completed |
535 | Barapullah Elevated Corridor Project [Phase-III] | 1,260.63 | Transport | Roads and bridges | Public Works Department, Delhi | 31-Mar-2015 | Delhi (UT) | Completed |
536 | Barnar Irrigation Scheme (Sono Causeway) | 590.98 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Bihar | Not Available | Bihar | Completed |
537 | Bawanthadi Irrigation Project | 813.85 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Completed |
538 | Bhadra Reservoir Project-Modernization | 1,324.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | 31-Dec-2007 | Karnataka | Completed |
539 | Bhakra Left Bank Power Project - Expansion | 490.00 | Energy | Renewable energy (grid) | Bhakra Beas Management Board | Not Available | Punjab | Completed |
540 | Bridge (Chennai-Trichy-Dindigul Road) Project | 62.53 | Transport | Roads and bridges | Public Works Department, Tamil Nadu | 06-Nov-2013 | Tamil Nadu | Completed |
541 | Bridge (Chitrakonda-Janbai-Papermetla) Project | 172.58 | Transport | Roads and bridges | Public Works Department, Odisha | 06-Sep-2014 | Odisha | Completed |
542 | Bridge (Gokulpur-Midnapur) Project * | 52.00 | Transport | Roads and bridges | South Eastern Railway | Not Available | West Bengal | Under Construction |
543 | Bridge (Kannangattu-Willington Island) Project | 72.55 | Transport | Roads and bridges | Public Works Department, Kerala | 10-Nov-2014 | Kerala | Completed |
544 | Bridge (Kuduchi-Ugarkhurd No.184) Project - Rebuilding * | 58.35 | Transport | Roads and bridges | South Western Railway | Not Available | Karnataka | Under Construction |
545 | Bridge (Nakatti) Project | 289.69 | Transport | Roads and bridges | Public Works Department, West Bengal | 21-Sep-2015 | West Bengal | Completed |
546 | Bridge (Pranhita River) Project | 168.30 | Transport | Roads and bridges | Public Works Department, Maharashtra | 23-Dec-2015 | Maharashtra | Completed |
547 | Bridge (Sundipur-Pansa) Project * | 89.11 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 26-Jun-2015 | Jharkhand | Under Construction |
548 | Bridge (Umra & Pal) Project * | 89.99 | Transport | Roads and bridges | Surat Municipal Corporation | 05-Dec-2015 | Gujarat | Under Construction |
549 | Bypass (Bhagalpur) Project | 200.78 | Transport | Roads and bridges | Road Construction Department, Bihar | 01-Nov-2015 | Bihar | Completed |
550 | Calicut Bypass (NH-17) Project | 152.75 | Transport | Roads and bridges | Public Works Department, Kerala | 04-Aug-2014 | Kerala | Completed |
551 | Cauvery Water Supply Scheme - Stage I & II | 148.01 | Water Sanitation | Water supply pipeline | Bangalore Water Supply and Sewerage Board | 27-Apr-2015 | Karnataka | Completed |
552 | City Gas Distribution (Dewas) Project* | 132.00 | Energy | City gas distribution | GAIL Gas Limited | Not Available | Madhya Pradesh | Under Construction |
553 | Coal Based Power (Meja) Project | 10,821.00 | Energy | Electricity generation (grid) | Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited | 02-Apr-2012 | Uttar Pradesh | Completed |
554 | Construction of a 3.3 Km Grade SeparatorDr. Nanjappa road-Chinnasamy road in Coimbatore | 162.00 | Transport | Roads and bridges | Public Works Department, Tamil Nadu | 11-Jul-2014 | Tamil Nadu | Completed |
555 | Construction of bridge over Katakhali river of 2.8 km at Hasnabad in North 24 Parganas* | 81.30 | Transport | Roads and bridges | Public Works Department, West Bengal | 01-Jun-2015 | West Bengal | Under Construction |
556 | Construction of Erach multipurpose dam at village Jujharpura in Jhansi district with a capacity of 60.4 CBM.* | 609.39 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation Department, Uttar Pradesh | 06-Feb-2015 | Uttar Pradesh | Under Construction |
557 | Construction of flyover in length of 0.6 km at Mankoli* | 82.51 | Transport | Roads and bridges | Mumbai Metropolitan Region Development Authority (MMRDA) | 10-May-2013 | Maharashtra | Under Construction |
558 | Construction of flyover in length of 0.6 km at Rajnoli* | 105.56 | Transport | Roads and bridges | Mumbai Metropolitan Region Development Authority (MMRDA) | 10-May-2013 | Maharashtra | Under Construction |
559 | Construction of flyovers at Kalanagar Junction, Bandra (East) Phase-I Project* | 277.00 | Transport | Roads and bridges | Mumbai Metropolitan Region Development Authority (MMRDA) | 21-Sep-2016 | Maharashtra | Under Construction |
560 | Construction of four lane road over bridge in length of 1 km at Mohkampur* | 71.93 | Transport | Roads and bridges | Public Works Department, Uttarakhand | 10-Aug-2016 | Uttarakhand | Under Construction |
561 | Construction of High Level Bridge across Campbell Canal at Bhavanipuram in Krishna district | 77.50 | Transport | Roads and bridges | Roads and Buildings Department, Andhra Pradesh | 01-Oct-2015 | Andhra Pradesh | Completed |
562 | Construction of high level major bridge on Hatania-Doania river in South 24 Parganas district | 225.93 | Transport | Roads and bridges | Public Works Department, West Bengal | 19-Dec-2014 | West Bengal | Completed |
563 | Construction of PEB godowns of 30450 Tonnes capacity under Patna Commisionary* | 60.45 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Bihar State Building Construction Corporation Limited | 13-Jul-2015 | Bihar | Under Construction |
564 | Construction of road under bridge between Jaipur-Sikar section | 68.65 | Transport | Roads and bridges | North Western Railway | 01-Apr-2016 | Rajasthan | Completed |
565 | Construction of sewerage network in length of 11.7 km at Thakurpara in Murshidabad district* | 82.41 | Water Sanitation | Sewage collection, treatment and disposal system | Kolkata Municipal Corporation | 16-Nov-2016 | West Bengal | Under Construction |
566 | Construction of sewerage network in length of 14.5 km at Mahatma Gandhi road in Kolkata district* | 69.48 | Water Sanitation | Sewage collection, treatment and disposal system | Kolkata Municipal Corporation | 17-Oct-2016 | West Bengal | Under Construction |
567 | Construction of sewerage network in length of 3.8 km along James Long Sarani in Kolkata district* | 98.71 | Water Sanitation | Sewage collection, treatment and disposal system | Kolkata Municipal Corporation | 17-Oct-2016 | West Bengal | Under Construction |
568 | Construction of two flyovers and 1.7 KM grade separator on Periyar EVR Salai - Nelson Manickam road | 300.00 | Transport | Roads and bridges | Public Works Department, Tamil Nadu | 18-Jun-2013 | Tamil Nadu | Completed |
569 | Construction of two lane tunnel road in length of 0.3 km on NH-72A | 71.92 | Transport | Roads and bridges | Public Works Department, Uttarakhand | 08-Mar-2016 | Uttarakhand | Completed |
570 | Construction of underpass in length of 0.7 km at the NTPC Chowk in Noida | 52.00 | Transport | Roads and bridges | New Okhla Industrial Development Authority (NOIDA) | 31-Jul-2015 | Uttar Pradesh | Completed |
571 | Construction of Vidisha bypass in length of 12.8 km in Bhopal | 91.99 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 28-Oct-2015 | Madhya Pradesh | Completed |
572 | Construction of water pipeline in length of 153 km at Cossipore Service zone, Ward No.1 to 6 in Kolkata | 212.40 | Water Sanitation | Water supply pipeline | Kolkata Municipal Corporation | 04-Oct-2016 | West Bengal | Completed |
573 | Dhamra Port # | 10,016.00 | Transport | Ports (excluding captive) | Department of Commerce and Transport, Odisha | 02-Apr-1998 | Odisha | Operation and Maintenance Stage |
574 | Dindigul Water Supply Scheme* | 70.50 | Water Sanitation | Water supply pipeline | Dindigul Municipal Corporation | 18-Feb-2015 | Tamil Nadu | Under Construction |
575 | Drainage Scheme (Howrah)* | 93.38 | Water Sanitation | Storm water drainage system | Kolkata Metropolitan Development Authority | 08-Jan-2007 | West Bengal | Under Construction |
576 | Dudhganga Major Irrigation Project* | 1,712.80 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 27-Sep-1965 | Maharashtra | Under Construction |
577 | Durgawati Reservoir Project | 1,064.28 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Bihar | 09-Apr-2012 | Bihar | Completed |
578 | Elevated Connector (Bandra-Kurla Complex) Project | 155.70 | Transport | Roads and bridges | Mumbai Metropolitan Region Development Authority (MMRDA) | 21-Apr-2015 | Maharashtra | Completed |
579 | Embankments & River Protection Project (Palasbari-Gumi-Kaziranga-Dibrugarh) | 990.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Flood and River Erosion Management Agency of Assam | 10-Aug-2011 | Assam | Completed |
580 | Establishment of 400 kV substation at Anaikadavu* | 156.19 | Energy | Electricity transmission | Tamil Nadu Generation and Distribution Corporation Limited | 04-Sep-2013 | Tamil Nadu | Under Construction |
581 | Establishment of 400 kV substation at Rasipalayam* | 166.43 | Energy | Electricity transmission | Tamil Nadu Generation and Distribution Corporation Limited | 16-May-2014 | Tamil Nadu | Under Construction |
582 | Establishment of 400/230-110 kV substation at Palavadi in Dharmapuri* | 188.35 | Energy | Electricity transmission | Tamil Nadu Generation and Distribution Corporation Limited | 26-Sep-2014 | Tamil Nadu | Under Construction |
583 | Execution of power transmission works under R-APDRP Part-B scheme in Bazpur, Landhora, Manglour & Roorkee districts | 56.28 | Energy | Electricity transmission | Uttarakhand Power Corporation Limited | 12-Feb-2013 | Uttarakhand | Completed |
584 | Execution of transmission system strengthening associated with Vindhyachal- V | 1,050.00 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 23-Mar-2016 | Multi State/ Centre | Completed |
585 | Extension of Rampur lift irrigation scheme on 34404.5 acres at Lingasugur in Raichur | 179.87 | Energy | Electricity transmission | Krishna Bhagya Jala Nigam Limited | 30-Sep-2012 | Karnataka | Completed |
586 | Flyover & Bridge (Agartala) Project | 249.95 | Transport | Roads and bridges | Public Works Department, Tripura | 13-May-2015 | Tripura | Completed |
587 | Flyovers (Marthandam Junction & Parvathipuram Junction) Project | 307.70 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 08-Jul-2016 | Tamil Nadu | Completed |
588 | Four laning to six laning of Vandalur-Oragadam road in length of 16.6 Km in Chennai district * | 189.81 | Transport | Roads and bridges | Tamil Nadu Road Infrastructure Development Corporation | 24-Feb-2016 | Tamil Nadu | Under Construction |
589 | Fuel Fabrication Facility (Rawatbhatta) | 1,000.00 | Energy | Electricity generation (grid) | Nuclear Fuel Complex | Not Available | Rajasthan | Completed |
590 | Gandikota Lift Irrigation | 712.29 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 24-Oct-2004 | Andhra Pradesh | Completed |
591 | Gandikota Reservoir-CBR Lift System | 1,461.17 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 18-May-2007 | Andhra Pradesh | Completed |
592 | Ganol Hydel Power Project* | 356.43 | Energy | Renewable energy (grid) | Meghalaya Energy Corporation Limited | Not Available | Meghalaya | Under Construction |
593 | GIS Substation (Wangtoo) Project | 309.09 | Energy | Electricity transmission | Himachal Pradesh Power Transmission Corporation Limited | 24-Jul-2013 | Himachal Pradesh | Completed |
594 | Gondi Main Canal Project - Modernisation | 112.20 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | 05-Feb-2016 | Karnataka | Completed |
595 | Greens Food Park* | 79.43 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Ministry of Food Processing Industries | 19-Feb-2014 | Jammu & Kashmir | Under Construction |
596 | Hallon Irrigation (Mandla) Project | 245.61 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Narmada Valley Development Authority | 19-Mar-2013 | Madhya Pradesh | Completed |
597 | High Level Bridge (Belpahad & Rengali) Project | 117.49 | Transport | Roads and bridges | Public Works Department, Odisha | 04-Mar-2014 | Odisha | Completed |
598 | High Level Bridge (Cuttack-Nuapatana) Project* | 110.00 | Transport | Roads and bridges | Public Works Department, Odisha | 31-Oct-2015 | Odisha | Under Construction |
599 | High Level Bridge (Nelson Mandela Chowk) Project | 93.86 | Transport | Roads and bridges | Public Works Department, Odisha | 11-Nov-2014 | Odisha | Completed |
600 | Hydel power project | 496.44 | Energy | Renewable energy (grid) | Sikkim Hydro Power Ventures Limited | 29-Oct-2014 | Sikkim | Completed |
601 | Hydel Power Project (Phata-Byung)#* | 484.00 | Energy | Renewable energy (grid) | UJVN Limited | 01-Jun-2014 | Uttarakhand | Under Construction |
602 | Hydro Electric Power (Kumbhe) Project | 258.38 | Energy | Renewable energy (grid) | Water Resources Department, Maharashtra | 25-Mar-2011 | Maharashtra | Completed |
603 | Implementation of sewerage scheme in Buxar district* | 74.95 | Water Sanitation | Sewage collection, treatment and disposal system | Bihar Urban Infrastructure Development Corporation Limited | 12-Dec-2011 | Bihar | Under Construction |
604 | Implementation of Lower Indra irrigation scheme with a capacity of 321.6 CBM | 1,624.49 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 31-Mar-2000 | Odisha | Completed |
605 | Implementation of 132 kVsubstation in Bhageshwar district | 92.78 | Energy | Electricity transmission | Power Transmission Corporation of Uttarakhand Limited | 31-Dec-2015 | Uttarakhand | Completed |
606 | Implementation of 220 KV gas insulated substation at Infocity-II in Bhubaneswar | 58.12 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 22-Feb-2014 | Odisha | Completed |
607 | Implementation of 25.7 MLD underground sewerage scheme at Pallikaranai in Chennai* | 58.61 | Water Sanitation | Sewage collection, treatment and disposal system | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 07-Dec-2010 | Tamil Nadu | Under Construction |
608 | Implementation of 26.0 MLD Chambal-Bundi water supply scheme in Bundi district* | 53.76 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 23-Feb-2013 | Rajasthan | Under Construction |
609 | Implementation of 3 MLD sewerage scheme in Dholpur | 68.22 | Water Sanitation | Sewage collection, treatment and disposal system | Urban Development and Housing Department, Rajasthan | 23-May-2013 | Rajasthan | Completed |
610 | Implementation of 7.5 CBM Tide minor irrigation scheme at Manadangad in Ratnagiri | 81.10 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 07-Jun-2007 | Maharashtra | Completed |
611 | Implementation of 78 MLD sewage treatment plant at Rajivnagar in Vadodara district | 133.70 | Water Sanitation | Sewage collection, treatment and disposal system | Vadodara Municipal Corporation | 31-Dec-2015 | Gujarat | Completed |
612 | Implementation of Baghalati irrigation scheme spread over 14826.3 acres of land | 156.13 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 31-Dec-1997 | Odisha | Completed |
613 | Implementation of Bhella & Deodhar mega lift irrigation schemes on 4942.1 acres of land* | 63.19 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 26-Dec-2016 | Odisha | Under Construction |
614 | Implementation of Chambal-Dholpur-Bharatpur water supply scheme - Phase I* | 1,024.43 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 02-Oct-2013 | Rajasthan | Under Construction |
615 | Implementation of Damerkunta lift irrigation scheme at Kataram in Karimnagar | 887.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Telangana State Irrigation Development Corporation Limited | 31-Aug-2012 | Telangana | Completed |
616 | Implementation of Deo irrigation scheme spread over 22239.4 acres* | 375.75 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 30-Jun-1998 | Odisha | Under Construction |
617 | Implementation of Drinking Water Supply Scheme at Berhampur in Ganjam district* | 471.98 | Water Sanitation | Water supply pipeline | Berhampur Municipal Corporation | 17-Oct-2016 | Odisha | Under Construction |
618 | Implementation of Hadua medium irrigation scheme with a capacity of 33.1 CBM | 238.88 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 30-Jun-2005 | Odisha | Completed |
619 | Implementation of J Chokka Rao Lift Irrigation Scheme at Bommakur in Warrangal district | 1,800.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation and CAD Department, Telangana | 30-Nov-2005 | Telangana | Completed |
620 | Implementation of Mahatma Gandhi (Kalwakurthy) Lift Irrigation scheme in Mahaboob Nagar district* | 2,990.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation and CAD Department, Andhra Pradesh | 31-Mar-2005 | Telangana | Under Construction |
621 | Implementation of mega lift irrigation scheme in Balangir, Sonepur & Boudh districts* | 374.02 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 06-Aug-2013 | Odisha | Under Construction |
622 | Implementation of Ret irrigation scheme with a capacity of 67.7 CBM | 433.39 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 30-Jun-2004 | Odisha | Completed |
623 | Implementation of Rukura irrigation scheme spread over 14208.5 acres land* | 256.09 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 31-Dec-1999 | Odisha | Under Construction |
624 | Implementation of rural electrification works at Kalyan Rural - Infra Plan II - Phase A* | 64.91 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 26-Dec-2013 | Maharashtra | Under Construction |
625 | Implementation of rural electrification works in Ambernath, Badlapur & Ulhasnagar under RAPDRP-Part B* | 89.61 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 03-Feb-2012 | Maharashtra | Under Construction |
626 | Implementation of rural electrification works in Barpeta district under RGGVY XIIth Plan | 117.71 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 06-Feb-2015 | Assam | Completed |
627 | Implementation of rural electrification works in Cachar district under RGGVY XIIth Plan | 154.81 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 30-Jan-2015 | Assam | Completed |
628 | Implementation of rural electrification works in Darrang district under RGGVY XIIth Plan | 86.10 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 12-Feb-2015 | Assam | Completed |
629 | Implementation of rural electrification works in Dhemaji district under RGGVY XIIth Plan | 66.41 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 09-Feb-2015 | Assam | Completed |
630 | Implementation of rural electrification works in Dhubri district under DDUGJY | 63.97 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 22-Feb-2016 | Assam | Completed |
631 | Implementation of rural electrification works in Dibrugarh, Kamrup & Morigaon districts under DDUGJY* | 57.09 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 26-Feb-2016 | Assam | Under Construction |
632 | Implementation of rural electrification works in Dima Hasao district under DDUGJY* | 91.46 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 22-Feb-2016 | Assam | Under Construction |
633 | Implementation of rural electrification works in Hailakandi district under RGGVY XIIth Plan | 90.78 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 10-Feb-2015 | Assam | Completed |
634 | Implementation of rural electrification works in Karimganj district under RGGVY XIIth Plan | 75.27 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 02-Feb-2015 | Assam | Completed |
635 | Implementation of rural electrification works in Lakhimpur district under RGGVY XIIth Plan | 84.22 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 16-Feb-2015 | Assam | Completed |
636 | Implementation of rural electrification works in Nagaon district under RGGVY XIIth Plan | 110.86 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 21-Feb-2015 | Assam | Completed |
637 | Implementation of rural electrification works in Nuapada under RGGVY-12th Plan* | 107.86 | Energy | Electricity transmission | NTPC Electric Supply Company Limited | 14-Nov-2015 | Odisha | Under Construction |
638 | Implementation of rural electrification works in Ranchi under R-APDRP Part-B scheme* | 313.85 | Energy | Electricity transmission | Jharkhand Urja Utpadan Nigam Limited | 10-Jun-2016 | Jharkhand | Under Construction |
639 | Implementation of rural electrification works in Sonitpur district under RGGVY XIIth Plan | 80.99 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 13-Feb-2015 | Assam | Completed |
640 | Implementation of rural electrification works in Thane under RAPDRP-Part B* | 145.38 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 04-Jul-2013 | Maharashtra | Under Construction |
641 | Implementation of rural electrification works in Tikamgarh district under DDUGJY-12th plan* | 52.21 | Energy | Electricity transmission | Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited | 09-Sep-2014 | Madhya Pradesh | Under Construction |
642 | Implementation of Sewerage Scheme in district 'A' of Allahabad | 288.94 | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh State Ganga River Conservation Agency | 17-Apr-2015 | Uttar Pradesh | Completed |
643 | Implementation of Sewerage Scheme in district 'B' of Allahabad | 265.86 | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh State Ganga River Conservation Agency | 10-Jun-2016 | Uttar Pradesh | Completed |
644 | Implementation of Sewerage Scheme in Varanasi district - Phase II | 496.90 | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh State Ganga River Conservation Agency | 30-Jul-2010 | Uttar Pradesh | Completed |
645 | Implementation of Telengiri irrigation scheme spread over 24586.9 acres | 613.71 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 31-Dec-2003 | Odisha | Completed |
646 | Implementation of Titlagarh-II irrigation scheme spread over 4942.1 acres of land | 126.37 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 30-Jun-2000 | Odisha | Completed |
647 | Implementation of Upper Kundalika medium irrigation scheme with a capacity of 15.5 CBM* | 318.88 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 25-Sep-2006 | Maharashtra | Under Construction |
648 | Implementation of waste water treatment facility with capacity of 37 MLD at Colaba in Mumbai* | 564.00 | Water Sanitation | Water treatment plants | Municipal Corporation of Greater Mumbai | 31-May-2016 | Maharashtra | Under Construction |
649 | Implementation of water supply scheme in Golaghat istrict | 58.30 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Assam | 21-Nov-2012 | Assam | Completed |
650 | Implementation of water supply scheme and sewerage scheme at Ramapuram & Thuraipakkam in Chennai district* | 143.96 | Water Sanitation | Water supply pipeline | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 23-Oct-2013 | Tamil Nadu | Under Construction |
651 | Implementation of water supply scheme at Pallikaranai in Chennai district | 61.88 | Water Sanitation | Water supply pipeline | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 07-Sep-2016 | Tamil Nadu | Completed |
652 | Implementation Peddavagu diversion scheme in Adilabad district* | 124.64 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation and CAD Department, Telangana | 30-Jun-2009 | Telangana | Under Construction |
653 | Improvement of water supply scheme at Greater Barahampur in Ganjam district | 488.94 | Water Sanitation | Water supply pipeline | Public Health Engineering Organisation, Odisha | 12-Nov-2016 | Odisha | Completed |
654 | Integrated Power Development Scheme (Krishna, Guntur & Chittoor) Project | 208.00 | Energy | Electricity transmission | Southern Power Distribution Company of Andhra Pradesh Limited | 23-Dec-2015 | Andhra Pradesh | Completed |
655 | Inter-Regional System Strengthening Scheme [Northern & Western Region] | 6,517.36 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 05-Feb-2015 | Multi State/ Centre | Completed |
656 | Irrigation (Pulichintala) Project | 268.87 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 30-Sep-2004 | Andhra Pradesh | Completed |
657 | Irrigation (Somasila) Project | 177.61 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 25-Mar-2005 | Andhra Pradesh | Completed |
658 | Irrigation (Telugu Ganga) Project | 1,300.35 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 16-Feb-2005 | Andhra Pradesh | Completed |
659 | Jakhol Sankari Hydel Power Project* | 451.00 | Energy | Renewable energy (grid) | SJVN Limited | 31-Oct-2009 | Uttarakhand | Under Construction |
660 | Jigaon Major Irrigation Project | 13,874.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 24-Jun-2009 | Maharashtra | Under Construction |
661 | Kanpur Sewage Treatment Plant - Part I* | 248.30 | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh Jal Nigam | 04-Apr-2008 | Uttar Pradesh | Under Construction |
662 | Kochi Coimbatore Erode Salem LPG Pipeline | 1,063.00 | Energy | Gas pipelines | Kochi Salem Pipeline Limited | Not Available | Multi State/ Centre | Completed |
663 | Kothagudem Coal Based Power Project [Stage-VII] | 5,548.44 | Energy | Electricity generation (grid) | Telangana State Power Generation Corporation Limited | 01-Jan-2015 | Telangana | Completed |
664 | Krishna Delta Irrigation Project - Modernisation* | 1,897.18 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 17-May-2008 | Andhra Pradesh | Under Construction |
665 | Kundalia Irrigation Scheme | 313.40 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 13-Apr-2015 | Madhya Pradesh | Completed |
666 | Lakwa Replacement Power Project* | 233.10 | Energy | Electricity generation (grid) | Assam Power Generation Corporation Limited (APGCL) | 19-Jan-2016 | Assam | Under Construction |
667 | Lara Coal Based Power Project - Stage I | 11,846.00 | Energy | Electricity generation (grid) | NTPC Limited | 13-Dec-2012 | Chhattisgarh | Completed |
668 | Laying of 1114 km Kochi-Kanjirkkod-Mangalore-Bangalore Pipeline Project* | 3,700.00 | Energy | Gas pipelines | GAIL (India) Limited | 10-Jul-2012 | Multi State/ Centre | Under Construction |
669 | Laying of 280.0 CKM Barmer-Bhinmal transmission line | 95.68 | Energy | Electricity transmission | Rajasthan Rajya Vidyut Prasaran Nigam Limited | 22-Jan-2016 | Rajasthan | Completed |
670 | Laying of 400 kV Jejuri-Hinjewadi DC line in Pune district - Package I* | 73.03 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 09-Jul-2012 | Maharashtra | Under Construction |
671 | Laying of 400 kV QDC BBLR- Kudus upto Naneghat line in Thane district* | 371.04 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 04-Jun-2011 | Maharashtra | Under Construction |
672 | Laying of 66 kV D/C transmission line from 66 kV switching station at Urni to Wangtoo substation* | 150.00 | Energy | Electricity transmission | Himachal Pradesh Power Transmission Corporation Limited | 20-Dec-2013 | Himachal Pradesh | Under Construction |
673 | Laying of Kakching to Moreh transmission line in length of 41.1 km in Churachandpur district | 53.00 | Energy | Electricity transmission | Manipur State Power Company Limited | 12-Sep-2016 | Manipur | Completed |
674 | Laying of MC & DC lines between YTPS to BTPS in length of 33.3 CKM* | 99.14 | Energy | Electricity transmission | Karnataka Power Transmission Corporation Limited (KPTCL) | 09-Jul-2014 | Karnataka | Under Construction |
675 | Laying of Mehsana-Bathinda & Bathinda-Jammu-Srinagar natural gas pipeline in length of 2410 Km* | 6,500.00 | Energy | Gas pipelines | GSPL India Transco Limited | 07-Jul-2011 | Multi State/ Centre | Under Construction |
676 | Laying of transmission line for Gadarwara Super Thermal Power Station (STPS) - Part B in Narsimhapur district | 2,360.00 | Energy | Electricity transmission | Power Grid Parli Transmission Limited | 29-Feb-2016 | Madhya Pradesh | Completed |
677 | Lendi Major Irrigation Project* | 1,399.78 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 08-Feb-1987 | Maharashtra | Under Construction |
678 | LNG Terminal (Ennore) Project | 5,151.00 | Energy | Oil/ Gas/ LNG Storage | Indian Oil Corporation Limited | 09-Jul-2015 | Tamil Nadu | Completed |
679 | Lower Kalnai Hydroelectric Project* | 396.00 | Energy | Renewable energy (grid) | Jammu and Kashmir State Power Development Corporation Limited | 12-Sep-2013 | Jammu & Kashmir | Under Construction |
680 | LPG Storage Plant (Panagarh)* | 190.00 | Energy | Oil/ Gas/ LNG Storage | Hindustan Petroleum Corporation Limited | 17-Sep-2014 | West Bengal | Under Construction |
681 | Marshal Small Hydel PowerProject* | 198.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | 01-Mar-2014 | Madhya Pradesh | Under Construction |
682 | Mega Food Park (Khamrang) | 75.20 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Ministry of Food Processing Industries | 12-Aug-2016 | Mizoram | Completed |
683 | Mohanpura Major Multipurpose Irrigation Scheme | 3,633.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 31-Dec-2014 | Madhya Pradesh | Completed |
684 | Mounded Gas Storage Facility (Manali) | 279.00 | Energy | Oil/ Gas/ LNG Storage | Chennai Petroleum Corporation Limited | Not Available | Tamil Nadu | Completed |
685 | Mukarba Chowk-Wazirabad Corridor Project* | 442.96 | Transport | Roads and bridges | Public Works Department, Delhi | 21-May-2013 | Delhi (UT) | Under Construction |
686 | Mukerian Hydel Power Project Stage II | 302.00 | Energy | Renewable energy (grid) | Punjab State Power Corporation Limited | Not Available | Punjab | Completed |
687 | Nagarjunasagar Irrigation Project-Modernisation | 4,444.41 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation and CAD Department, Andhra Pradesh | 10-Sep-2010 | Multi State/ Centre | Completed |
688 | Narmada-Malwa-Gambhir Link Lift Irrigation Project | 1,842.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Narmada Valley Development Authority | 25-Feb-2015 | Madhya Pradesh | Completed |
689 | Navargaon Medium Irrigation Project | 70.70 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 21-Oct-1981 | Maharashtra | Completed |
690 | Nugu High level Canal Project | 109.11 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Cauvery Neeravari Nigam Limited | 16-Jun-2016 | Karnataka | Completed |
691 | Parichha Transmission Line | Not Available | Energy | Electricity transmission | Power Grid Corporation of India Limited | Not Available | Uttar Pradesh | Completed |
692 | Phulpur-Haldia Gas Pipeline Project* | 3,561.00 | Energy | Gas pipelines | GAIL (India) Limited | Not Available | Multi State/ Centre | Under Construction |
693 | Prembari Pul-Azadpur Corridor Project | 247.17 | Transport | Roads and bridges | Public Works Department, Delhi | 04-Apr-2013 | Delhi (UT) | Completed |
694 | Punand Irrigation Project#* | 462.17 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Tapi Irrigation Development Corporation | 21-Oct-2015 | Maharashtra | Under Construction |
695 | R-O-B (Bhedwad & Dindoli) Project | 82.57 | Transport | Roads and bridges | Surat Municipal Corporation | 20-Sep-2012 | Gujarat | Completed |
696 | Railway-Over-Bridge (Muradabad-Saharanpur) Project * | 50.00 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 30-Jun-2014 | Uttar Pradesh | Completed |
697 | Refurbishment of 20 MGD water supply scheme at Palta & Garden Reach in Kolkata | 80.56 | Water Sanitation | Water supply pipeline | Kolkata Municipal Corporation | 07-Nov-2014 | West Bengal | Completed |
698 | Rehi Small Hydel Power Project* | 144.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | 01-Mar-2014 | Madhya Pradesh | Under Construction |
699 | Renovation of existing 3x18 MW Sholayar hydel power unit at Sholayar in Thrissur district | 199.55 | Energy | Renewable energy (grid) | Kerala State Electricity Board | 30-Jun-2015 | Kerala | Completed |
700 | Road Upgradation (Andhra Pradesh - NH 219) Project * | 271.45 | Transport | Roads and bridges | Roads and Buildings Department, Andhra Pradesh | 26-Jun-2015 | Andhra Pradesh | Under Construction |
701 | Road Upgradation (Arambagh-Goghat-Ramjibanpur) Project | 96.67 | Transport | Roads and bridges | Public Works Department, West Bengal | 07-Jul-2014 | West Bengal | Completed |
702 | Road Upgradation (Araria NH-327-E) Project | 132.31 | Transport | Roads and bridges | Road Construction Department, Bihar | 22-Jun-2015 | Bihar | Completed |
703 | Road Upgradation (Atkot-Gondal) Project * | 114.00 | Transport | Roads and bridges | Roads and Buildings Department, Gujarat | 19-Sep-2015 | Gujarat | Under Construction |
704 | Road Upgradation (Atmakur-Nellore) Project | 329.57 | Transport | Roads and bridges | Roads and Buildings Department, Andhra Pradesh | 10-Dec-2014 | Andhra Pradesh | Completed |
705 | Road Upgradation (Babatpur-Varanasi) Project | 735.57 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 15-Sep-2015 | Uttar Pradesh | Completed |
706 | Road Upgradation (Bankibahal-Kanika Railway Siding) Project* | 200.00 | Transport | Roads and bridges | Public Works Department, Odisha | 08-Feb-2016 | Odisha | Under Construction |
707 | Road Upgradation (Barela-Mandla) Project* | 415.08 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 31-Aug-2015 | Madhya Pradesh | Under Construction |
708 | Road Upgradation (Bijapur-Tarlaguda) Project* | 80.12 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 26-Feb-2015 | Chhattisgarh | Under Construction |
709 | Road Upgradation (Bishnupur-Nungba) Project* | 108.80 | Transport | Roads and bridges | Public Works Department, Manipur | 03-Mar-2014 | Manipur | Under Construction |
710 | Road Upgradation (Bisunpur-Odgi) Project* | 58.16 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 10-Oct-2010 | Chhattisgarh | Under Construction |
711 | Road Upgradation (Bordumsa-Namchik) Project* | 189.91 | Transport | Roads and bridges | National Highways and Infrastructure Development Corporation Limited | 23-Oct-2015 | Arunachal Pradesh | Under Construction |
712 | Road Upgradation (Changrabandha-Mathabhanga-Coochbehar) Project | 175.27 | Transport | Roads and bridges | Public Works Department, West Bengal | 20-Jan-2015 | West Bengal | Completed |
713 | Road Upgradation (Channagiri-Birur) Project | 136.78 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 31-Aug-2015 | Karnataka | Completed |
714 | Road Upgradation (Cheech-Kalvana Canal) Project* | 67.20 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 30-Jun-2016 | Madhya Pradesh | Under Construction |
715 | Road Upgradation (Dankuni-Chandannagar) Project * | 318.45 | Transport | Roads and bridges | West Bengal Highway Development Corporation Limited | 03-Jan-2014 | West Bengal | Under Construction |
716 | Road Upgradation (Davulapally-Markapuram) Project | 170.21 | Transport | Roads and bridges | Roads and Buildings Department, Andhra Pradesh | Not Available | Andhra Pradesh | Completed |
717 | Road Upgradation (Dornala T-Junction-Atmakur) Project | 251.55 | Transport | Roads and bridges | Roads and Buildings Department, Andhra Pradesh | 23-Feb-2015 | Andhra Pradesh | Completed |
718 | Road Upgradation (Duhuria-Chandbali) Project | 170.43 | Transport | Roads and bridges | Public Works Department, Odisha | 04-Dec-2013 | Odisha | Completed |
719 | Road Upgradation (Duhuria-Nischintakoili) Project* | 205.29 | Transport | Roads and bridges | Public Works Department, Odisha | 01-Jan-2016 | Odisha | Under Construction |
720 | Road Upgradation (Dumka-Masalia-Kundhit Nala) Project * | 207.15 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 01-Feb-2016 | Jharkhand | Under Construction |
721 | Road Upgradation (Faizabad-Allahabad) Project | 227.74 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Dec-2014 | Uttar Pradesh | Completed |
722 | Road Upgradation (Faridkot-Kotkapura-Bhatinda) Project | 686.06 | Transport | Roads and bridges | Public Works Department, Punjab | 18-Jun-2016 | Punjab | Completed |
723 | Road Upgradation (Futisanko More-Palita More-Palitpur-Natunhat Road) Project | 65.02 | Transport | Roads and bridges | Public Works Department, West Bengal | 21-Apr-2015 | West Bengal | Completed |
724 | Road Upgradation (Garobadha-Dalu) Project | 186.52 | Transport | Roads and bridges | Public Works Department, Meghalaya | 06-Dec-2013 | Meghalaya | Completed |
725 | Road Upgradation (Ghaghra-Netarhat) Project * | 112.45 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 26-Jun-2015 | Jharkhand | Under Construction |
726 | Road Upgradation (Gogamukh-Ghilamara) Project* | 64.79 | Transport | Roads and bridges | Public Works Department, Assam | 20-Nov-2012 | Assam | Under Construction |
727 | Road Upgradation (Govindapalli-Salimi-Mahupadar) Project* | 74.48 | Transport | Roads and bridges | Public Works Department, Odisha | 15-Nov-2011 | Odisha | Under Construction |
728 | Road Upgradation (Gubbi-Beeragonahalli) Project | 122.38 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 05-Nov-2015 | Karnataka | Completed |
729 | Road Upgradation (Gujarat-NH-58) Project * | 50.10 | Transport | Roads and bridges | Roads and Buildings Department, Gujarat | 10-Mar-2016 | Gujarat | Under Construction |
730 | Road Upgradation (Harike-Zira-Faridkot) Project | 680.68 | Transport | Roads and bridges | Public Works Department, Punjab | 23-Feb-2016 | Punjab | Completed |
731 | Road Upgradation (Hazaribagh-Barkagaon-Tandwa-Bijupara) Project * | 441.88 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 27-Jun-2015 | Jharkhand | Under Construction |
732 | Road Upgradation (Ibrahimpatnam-Chandragudem-AP/Telangana Border) Project | 316.61 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 04-Jan-2016 | Andhra Pradesh | Completed |
733 | Road Upgradation (Jhukehi-Kymore-Bhatura) Project* | 57.00 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 30-Jun-2016 | Madhya Pradesh | Under Construction |
734 | Road Upgradation (Kahani-Palari) Project* | 87.00 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 31-May-2016 | Madhya Pradesh | Under Construction |
735 | Road Upgradation (Kakarvita-Banglabandha) Project* | 427.00 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 25-Jun-2015 | West Bengal | Under Construction |
736 | Road Upgradation (Kathipudi-Kakinada Bypass) Project | 312.66 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 09-Dec-2015 | Andhra Pradesh | Completed |
737 | Road Upgradation (Katni-Gumla) Project | 144.35 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 31-Mar-2015 | Chhattisgarh | Completed |
738 | Road Upgradation (Khairagarh-Dongararh-Tumadibod) Project* | 124.22 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 21-Apr-2015 | Chhattisgarh | Under Construction |
739 | Road Upgradation (Kharwandi Kasar-Ahmednagar Bypass) Project | 162.63 | Transport | Roads and bridges | Public Works Department, Maharashtra | 18-Jan-2014 | Maharashtra | Completed |
740 | Road Upgradation (Khawasa-Tirodi & Katedara-Tirodi-Khawasa) Project* | 69.31 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 01-May-2016 | Madhya Pradesh | Under Construction |
741 | Road Upgradation (Konta-Golapalli) Project* | 62.23 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 04-Nov-2015 | Chhattisgarh | Under Construction |
742 | Road Upgradation (Lunawada-Khedapa) Project * | 118.13 | Transport | Roads and bridges | Roads and Buildings Department, Gujarat | 18-Jan-2014 | Gujarat | Under Construction |
743 | Road Upgradation (Mahuwa-Hindaun-Karauli) Project* | 168.03 | Transport | Roads and bridges | Rajasthan State Road Development and Construction Corporation Limited | 10-Dec-2010 | Rajasthan | Under Construction |
744 | Road Upgradation (Muddanur-Jammalamadugu) Project | 144.00 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 23-Feb-2015 | Andhra Pradesh | Completed |
745 | Road Upgradation (Mumbai-Pune Express Highway-Bhakti Shakti Chowk) Project* | 67.45 | Transport | Roads and bridges | Pimpri Chinchwad Municipal Corporation | 31-Mar-2015 | Maharashtra | Under Construction |
746 | Road Upgradation (Mydukur-Dornala T-Junction) Project | 241.61 | Transport | Roads and bridges | Roads and Buildings Department, Andhra Pradesh | 23-Feb-2015 | Andhra Pradesh | Completed |
747 | Road Upgradation (Nagarjunasagar-Davulapally) Project * | 195.45 | Transport | Roads and bridges | Roads and Buildings Department, Andhra Pradesh | 23-May-2014 | Andhra Pradesh | Under Construction |
748 | Road Upgradation (Palamaneru-Krishnagiri Border Section) Project | 271.45 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 26-Jun-2015 | Andhra Pradesh | Completed |
749 | Road Upgradation (Pallhara-Pitri NH-149) Project* | 342.05 | Transport | Roads and bridges | Public Works Department, Odisha | 14-Jan-2015 | Odisha | Under Construction |
750 | Road Upgradation (Pune) Project* | 363.00 | Transport | Roads and bridges | Pune Municipal Corporation | 20-May-2011 | Maharashtra | Under Construction |
751 | Road Upgradation (Raipur-Visakhapatnam) Project* | 64.00 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 31-Mar-2015 | Andhra Pradesh | Under Construction |
752 | Road Upgradation (Ramdurga-Halgatti) Project | 138.25 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 28-Jul-2015 | Karnataka | Completed |
753 | Road Upgradation (Rudhauli-Ghagra) Project* | 397.50 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 31-Jan-2016 | Uttar Pradesh | Under Construction |
754 | Road Upgradation (Silchar-Badarpur) Project | 53.81 | Transport | Roads and bridges | National Highways and Infrastructure Development Corporation Limited | 01-Oct-2015 | Assam | Completed |
755 | Road Upgradation (Singimari-Naltoli) Project* | 67.77 | Transport | Roads and bridges | Public Works Department, Assam | 21-Apr-2015 | Assam | Under Construction |
756 | Road Upgradation (Tribeni-Kalna-Katwa) Project | 59.12 | Transport | Roads and bridges | Public Works Department, West Bengal | 27-Feb-2009 | West Bengal | Completed |
757 | Road Upgradation (Udaipur-Sabroom) Project | 455.19 | Transport | Roads and bridges | National Highways and Infrastructure Development Corporation Limited | 11-Aug-2014 | Tripura | Completed |
758 | Road Upgradation (Uttar Pradesh-NH-730) Project* | 138.44 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 03-Feb-2016 | Uttar Pradesh | Under Construction |
759 | Road Upgradation (Vaggampalle-Dornala T-Junction) Project | 258.99 | Transport | Roads and bridges | Roads and Buildings Department, Andhra Pradesh | 04-Jun-2014 | Andhra Pradesh | Completed |
760 | Road Upgradation (Wajidpur-Shadora Nai-Sarai Miyana) Project | 98.83 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 10-Feb-2016 | Madhya Pradesh | Completed |
761 | Rural Electrification (Bokaro) Project - DDUGJY - 12th Plan | 111.24 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 05-Feb-2016 | Jharkhand | Completed |
762 | Rural Electrification (Srikakulam-Vizianagaram-Visakhapatnam-East Godavari-West Godavari) DDUGJY | 120.78 | Energy | Electricity transmission | Andhra Pradesh Eastern Power Distribution Company Limited | Not Available | Andhra Pradesh | Completed |
763 | Rural electrification works at Achalpur & Akola Urban in Amravati zone - Infra Plan Part-II Phase B* | 53.57 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 17-Jan-2015 | Maharashtra | Under Construction |
764 | Rural electrification works at Amravati Rural & Morshi in Amravati zone - Infra Plan Part-II Phase B* | 60.17 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 17-Jan-2015 | Maharashtra | Under Construction |
765 | Rural Water Supply and Sanitation Project (Jalanidhi-II) | 1,022.00 | Water Sanitation | Water supply pipeline | Kerala Rural Water Supply and Sanitation Agency | 12-Feb-2012 | Kerala | Completed |
766 | Sangola Branch Canal Project | 964.69 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Maharashtra | Not Available | Maharashtra | Under Construction |
767 | Setting up a 10 MWp solar photovoltaic based power unit at Chharrah in Purulia district* | 60.75 | Energy | Renewable energy (grid) | West Bengal State Electricity Distribution Company Limited | 16-Aug-2016 | West Bengal | Under Construction |
768 | Setting up a 10 MWp solar photovoltaic based power unit at Mejia in Bankura district* | 60.85 | Energy | Renewable energy (grid) | West Bengal State Electricity Distribution Company Limited | 16-Aug-2016 | West Bengal | Under Construction |
769 | Setting up a 10 MWp solar photovoltaic based power unit at Santaldih in Purulia district* | 61.45 | Energy | Renewable energy (grid) | West Bengal State Electricity Distribution Company Limited | 16-Aug-2016 | West Bengal | Under Construction |
770 | Setting up a 750 MW Solar Power Project in Mandsaur District. | 4,230.00 | Energy | Renewable energy (grid) | NTPC Limited | 14-Apr-2016 | Madhya Pradesh | Completed |
771 | Setting up of 10 MW solar power unit at Chandapur in Haveri district | 112.00 | Energy | Renewable energy (grid) | Karnataka Power Corporation Limited | 02-Jul-2016 | Karnataka | Completed |
772 | Setting up of 100 MW solar based power unit at Gani-Sakunala Solar Park in Kurnool district | 1,000.00 | Energy | Renewable energy (grid) | NTPC Limited | 23-Dec-2015 | Andhra Pradesh | Completed |
773 | Setting up of 111 MW Sawra Kuddu hydel power unit in Shimla* | 1,181.90 | Energy | Renewable energy (grid) | Himachal Pradesh Power Corporation Limited | 18-Jun-2007 | Himachal Pradesh | Under Construction |
774 | Setting up of 132/33 kV grid substation at Chatra and Rajmahal | 72.05 | Energy | Electricity transmission | Jharkhand Urja Sancharan Nigam Limited | 30-Sep-2016 | Jharkhand | Completed |
775 | Setting up of 15 MWp solar photovoltaic power unit in the premises of Ordnance Factory in Medak district | 150.00 | Energy | Renewable energy (grid) | Bharat Electronics Limited | 13-Dec-2016 | Telangana | Completed |
776 | Setting up of 2- lane Tinsukia bypass with paved shoulders between 635.80 km to 653.40 km of NH-37.* | 70.71 | Transport | Roads and bridges | Public Works Department, Assam | 20-Jul-2009 | Assam | Under Construction |
777 | Setting up of 220/132/33 kV grid substation at Ratu in Ranchi district* | 72.00 | Energy | Electricity transmission | Jharkhand Urja Sancharan Nigam Limited | 30-Sep-2016 | Jharkhand | Under Construction |
778 | Setting up of 25.2 MW wind based power unit at Uchwas in Shajapur | 126.00 | Energy | Renewable energy (grid) | Oil India Limited | 16-Sep-2016 | Madhya Pradesh | Completed |
779 | Setting up of 27.3 MW wind based power unit at Kotiya in Bhavnagar | 136.50 | Energy | Renewable energy (grid) | Oil India Limited | 16-Sep-2016 | Gujarat | Completed |
780 | Setting up of 330 MW Kishenganga hydel power unit in Baramulla district* | 3,642.00 | Energy | Renewable energy (grid) | NHPC Limited | 23-Jan-2009 | Jammu & Kashmir | Under Construction |
781 | Setting up of 40 MW Solar Photovoltaic Power unit at Gujarat Solar Park in Patan district - Plot 1 | 400.00 | Energy | Renewable energy (grid) | Gujarat Industries Power Company Limited | 25-Oct-2016 | Gujarat | Completed |
782 | Setting up of 40 MW Solar Photovoltaic Power unit at Gujarat Solar Park in Patan district - Plot 3 | 400.00 | Energy | Renewable energy (grid) | Gujarat Industries Power Company Limited | 25-Oct-2016 | Gujarat | Completed |
783 | Setting up of 500 MW Solar Power Project at Panyam in Kurnool District | 7,000.00 | Energy | Renewable energy (grid) | NTPC Vidyut Vyapar Nigam Limited | 01-Oct-2016 | Andhra Pradesh | Completed |
784 | Setting up of 800 MW coal based power North Chennai-Stage III* | 6,376.00 | Energy | Electricity generation (grid) | Tamil Nadu Generation and Distribution Corporation Limited | 29-Jan-2016 | Tamil Nadu | Under Construction |
785 | Sewage Treatment Plant (Bhatpara) | 332.05 | Water Sanitation | Sewage collection, treatment and disposal system | Kolkata Metropolitan Development Authority | 24-Apr-2013 | West Bengal | Completed |
786 | Sewage Treatment Plant (Bingawan) | 141.96 | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh Jal Nigam | 31-Dec-2008 | Uttar Pradesh | Completed |
787 | Sewage Treatment Plant (Vasna) | 78.56 | Water Sanitation | Sewage collection, treatment and disposal system | Ahmedabad Municipal Corporation | 15-Jul-2016 | Gujarat | Completed |
788 | Sewerage Scheme (Alwar)* | 120.81 | Water Sanitation | Sewage collection, treatment and disposal system | Urban Improvement Trust, Alwar | 04-Jul-2016 | Rajasthan | Under Construction |
789 | Sewerage Scheme (Balotra) | 54.97 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Board, Balotra | 05-Feb-2013 | Rajasthan | Completed |
790 | Sewerage Scheme (Bhadra) | 114.08 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Board, Bhadra | 19-Feb-2016 | Rajasthan | Completed |
791 | Sewerage Scheme (Bhiwadi) | 142.90 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Board, Bhiwadi | 04-Jul-2016 | Rajasthan | Completed |
792 | Sewerage Scheme (Didwana) | 67.33 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Board, Didwana | 21-Mar-2013 | Rajasthan | Completed |
793 | Sewerage Scheme (Fatehpur) | 63.17 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Board, Fatehpur | 21-Feb-2013 | Rajasthan | Completed |
794 | Sewerage Scheme (Hanumangarh)* | 54.91 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Council, Hanumangarh | 08-Aug-2007 | Rajasthan | Under Construction |
795 | Sewerage Scheme (Kathivakkam) | 86.15 | Water Sanitation | Sewage collection, treatment and disposal system | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 09-May-2013 | Tamil Nadu | Completed |
796 | Sewerage Scheme (Laxmangarh) | 83.29 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Board, Laxmangarh | 23-Feb-2016 | Rajasthan | Completed |
797 | Sewerage Scheme (Makrana) | 72.89 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Board, Makrana | 25-Feb-2013 | Rajasthan | Completed |
798 | Sewerage Scheme (Sri Ganganagar) | 89.09 | Water Sanitation | Sewage collection, treatment and disposal system | Urban Improvement Trust, Sri Ganganagar | 04-Apr-2013 | Rajasthan | Completed |
799 | Sewerage Scheme (Suratgarh) | 103.96 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Board, Suratgarh | 19-Feb-2016 | Rajasthan | Completed |
800 | Shahpurkandi Hydro Electric Power Project* | 321.20 | Energy | Renewable energy (grid) | Punjab State Power Corporation Limited | 29-Jan-2014 | Punjab | Under Construction |
801 | Shree Singaji Thermal Power Project - Stage II | 6,500.00 | Energy | Electricity generation (grid) | Madhya Pradesh Power Generating Company Limited | 04-Sep-2014 | Madhya Pradesh | Completed |
802 | Sina Madha Lift Irrigation Scheme | 524.34 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | Not Available | Maharashtra | Completed |
803 | Singrauli Small Hydro Power Project | 83.26 | Energy | Renewable energy (grid) | NTPC Limited | 31-Mar-2011 | Uttar Pradesh | Completed |
804 | Sirhind Feeder Part - II* | 660.36 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Punjab Water Resources Management and Development Corporation Limited | 15-Feb-2008 | Punjab | Under Construction |
805 | Small Hydel Power (Bhoata & Sirmor) Projects* | 210.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | 01-Mar-2014 | Madhya Pradesh | Under Construction |
806 | Small Hydel Power (Saurashtra Branch Canal) Project | 421.77 | Energy | Renewable energy (grid) | Sardar Sarovar Narmada Nigam Limited | 27-Aug-2014 | Gujarat | Completed |
807 | Solar Photovoltaic Power (Rawal) Project* | 253.77 | Energy | Renewable energy (grid) | Sardar Sarovar Narmada Nigam Limited | 31-Jan-2016 | Gujarat | Under Construction |
808 | Solar Photovoltaic Power (Vadodara Branch Canal - 5 MW) Project | 50.89 | Energy | Renewable energy (grid) | Sardar Sarovar Narmada Nigam Limited | 12-Mar-2015 | Gujarat | Completed |
809 | Solar Power (Kunigal) Project | 100.00 | Energy | Renewable energy (grid) | Karnataka Renewable Energy Development Limited | 23-May-2016 | Karnataka | Completed |
810 | Sri Damodaram Sanjeevaiah Coal Based Power Project - Stage-II | 4,276.04 | Energy | Electricity generation (grid) | Andhra Pradesh Power Generation Corporation Limited | 15-Dec-2015 | Andhra Pradesh | Completed |
811 | Srisailam Right Branch Canal Irrigation Project | 544.97 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 31-Mar-2005 | Andhra Pradesh | Completed |
812 | Storm Water Drainage (Baruipur) Project | 64.01 | Water Sanitation | Storm water drainage system | Kolkata Metropolitan Development Authority | 29-Nov-2013 | West Bengal | Completed |
813 | Storm Water Pumping Station (Lovegrove-Haji Ali-Cleaveland Bunder-Irla Nalla) | 324.32 | Water Sanitation | Storm water drainage system | Municipal Corporation of Greater Mumbai | Not Available | Maharashtra | Completed |
814 | Strengthening of transmission system beyond Vemagiri in Andhra Pradesh | 6,300.00 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 19-Mar-2016 | Andhra Pradesh | Completed |
815 | Substation (Jagdalpur) Project* | 126.62 | Energy | Electricity transmission | Chhattisgarh State Power Transmission Company Limited | 31-Mar-2012 | Chhattisgarh | Under Construction |
816 | Substation (Mittemari) Project | 88.58 | Energy | Electricity transmission | Karnataka Power Transmission Corporation Limited (KPTCL) | 10-Jul-2015 | Karnataka | Completed |
817 | Subways/R-U-Bs (Virar-Surat) * | 53.03 | Transport | Roads and bridges | Western Railway | Not Available | Multi State/ Centre | Under Construction |
818 | Tanda-II Thermal Power Project | 9,188.98 | Energy | Electricity generation (grid) | NTPC Limited | 10-Sep-2014 | Uttar Pradesh | Completed |
819 | Tarakarama Thirtha Sagaram Reservoir Project (Package 1) | 130.20 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 24-May-2006 | Andhra Pradesh | Completed |
820 | The project involves widening of Shirsad-Ambadi road SH-40 with bridges in Thane district.* | 102.50 | Transport | Roads and bridges | Mumbai Metropolitan Region Development Authority (MMRDA) | 26-Mar-2012 | Maharashtra | Under Construction |
821 | Thermal Power (Chhabra) Project - Unit 5 & 6 | 7,920.00 | Energy | Electricity generation (grid) | Rajasthan Rajya Vidyut Utpadan Nigam Limited | 28-Mar-2013 | Rajasthan | Completed |
822 | Thotapalli Barrage Irrigation Scheme | 340.17 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 25-Oct-2004 | Andhra Pradesh | Completed |
823 | Tilaiya Dhadhar Irrigation Project | 301.79 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Bihar | 15-Dec-1998 | Bihar | Completed |
824 | Tillari Irrigation Project* | 1,612.15 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Goa | Not Available | Multi State/ Centre | Under Construction |
825 | Transmission Line (BTPS-Purnea-New GSS) Project | 66.69 | Energy | Electricity transmission | Bihar State Power Transmission Company Limited | 30-Dec-2015 | Bihar | Completed |
826 | Transmission Line (Darbhanga-Supaul) Project | 115.56 | Energy | Electricity transmission | Bihar State Power Transmission Company Limited | 31-Jul-2015 | Bihar | Completed |
827 | Transmission Line (Hatkoti-Pragti Nagar) Project | 62.03 | Energy | Electricity transmission | Himachal Pradesh Power Transmission Corporation Limited | 28-Sep-2012 | Himachal Pradesh | Completed |
828 | Transmission Line (Mejia-Gola-Ramgarh) Project* | 155.64 | Energy | Electricity transmission | Damodar Valley Corporation | 29-Dec-2006 | Multi State/ Centre | Under Construction |
829 | Transmission Line (Palatana-Bongaigaon) Project | Not Available | Energy | Electricity transmission | North East Transmission Company Limited | 23-Jul-2009 | Multi State/ Centre | Completed |
830 | Transmission Line (Srinagar-Kashipur) Project* | 530.62 | Energy | Electricity transmission | Power Transmission Corporation of Uttarakhand Limited | 24-Feb-2014 | Uttarakhand | Under Construction |
831 | Transmission System Strengthening Project - Mangdechhu HEP | 808.63 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 16-Mar-2016 | Multi State/ Centre | Completed |
832 | Two laning of Bankura-Purulia section in length of 84.0 Km in Bankura district | 340.34 | Transport | Roads and bridges | Public Works Department, West Bengal | 04-Sep-2015 | West Bengal | Completed |
833 | Two laning of Bhawanipatna-Kokasara road in length of 58.2 Km in Kalahandi district* | 102.00 | Transport | Roads and bridges | Public Works Department, Odisha | 17-Oct-2016 | Odisha | Under Construction |
834 | Two laning of Dehri-Banjari-Akbarpur road (existing NH-2C) in lenght of 40.0 km* | 172.05 | Transport | Roads and bridges | Road Construction Department, Bihar | 25-Mar-2017 | Bihar | Under Construction |
835 | Two laning of Doimukh-Harmuti road in length of 17.5 km | 68.54 | Transport | Roads and bridges | National Highways and Infrastructure Development Corporation Limited | 07-Mar-2017 | Assam | Completed |
836 | Two laning of Mahadevpur-Buri Dihing road in length of 25.1 km of NH-52B* | 136.60 | Transport | Roads and bridges | Public Works Department, Arunachal Pradesh | 28-Apr-2015 | Arunachal Pradesh | Under Construction |
837 | Two laning of Pileru to Rayachoty road from 57.0 km to 108.8 km in Chittoor district | 175.03 | Transport | Roads and bridges | Roads and Buildings Department, Andhra Pradesh | 23-Jun-2015 | Andhra Pradesh | Completed |
838 | Underground Drainage Scheme (Gondal) [Phase II]* | 59.99 | Water Sanitation | Storm water drainage system | Gujarat Water Supply and Sewerage Board | 01-Aug-2015 | Gujarat | Under Construction |
839 | Underground Drainage Scheme (Gondal) [Phase I]* | 54.98 | Water Sanitation | Storm water drainage system | Gujarat Water Supply and Sewerage Board | 01-Aug-2015 | Gujarat | Under Construction |
840 | Underground Sewerage Scheme (Puthagaram-Kathirvedu) | 60.00 | Water Sanitation | Sewage collection, treatment and disposal system | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 02-Mar-2015 | Tamil Nadu | Completed |
841 | Underground Sewerage Scheme (Sholinganallur-Karapakkam) | 110.90 | Water Sanitation | Sewage collection, treatment and disposal system | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 21-May-2015 | Tamil Nadu | Completed |
842 | Underground Sewerage Scheme (Sriperumbudur) | 77.11 | Water Sanitation | Sewage collection, treatment and disposal system | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 13-Apr-2015 | Tamil Nadu | Completed |
843 | Upgradation of Anuppur-Venkatnagar road in length of 40.6 km in Anuppur* | 57.44 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 30-Oct-2015 | Madhya Pradesh | Under Construction |
844 | Upgradation of Baihata Chariali-Goreswar-Deochunga & Bonda-Govali roads in length of 31 km* | 64.31 | Transport | Roads and bridges | Public Works Department, Assam | 05-Dec-2016 | Assam | Under Construction |
845 | Upgradation of Baihata Chariali-Goreswar-Deochunga road in length of 41.1 km* | 64.00 | Transport | Roads and bridges | Public Works Department, Assam | 17-Apr-2016 | Assam | Under Construction |
846 | Upgradation of Beliatore-Rasulpur road in length of 44.8 Km in Bankura district | 98.00 | Transport | Roads and bridges | Public Works Department, West Bengal | 25-Feb-2015 | West Bengal | Completed |
847 | Upgradation of Chand Khera to Kurti bridge section in length of 18 km on NH-208A | 67.00 | Transport | Roads and bridges | National Highways and Infrastructure Development Corporation Limited | 28-Nov-2016 | Assam | Completed |
848 | Upgradation of Chandrakona-Ghatal road in length of 12.2 Km in Paschim Medinipur district | 74.75 | Transport | Roads and bridges | Public Works Department, West Bengal | 22-Feb-2016 | West Bengal | Completed |
849 | Upgradation of Chouka-Issanagar & Chandla-Ajaigarh roads in length of 43.4 km in Chhatarpur* | 73.20 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 31-Jul-2015 | Madhya Pradesh | Under Construction |
850 | Upgradation of Dewas-Vijayaganjmandi road in length of 30.6 km in Dewas* | 59.83 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 04-Sep-2015 | Madhya Pradesh | Under Construction |
851 | Upgradation of Dhenkikote-Saharapada road in length of 29 km | 63.64 | Transport | Roads and bridges | Public Works Department, Odisha | 22-Feb-2017 | Odisha | Completed |
852 | Upgradation of existing substation for Puri Nabakalebar project in Puri district* | 138.00 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 21-Jun-2014 | Odisha | Under Construction |
853 | Upgradation of Govali-Bhaktagaon road in length of 28.9 km* | 59.42 | Transport | Roads and bridges | Public Works Department, Assam | 05-Dec-2016 | Assam | Under Construction |
854 | Upgradation of Kasargod-Kanhangad road in length of 27.8 km of SH-57* | 133.05 | Transport | Roads and bridges | Public Works Department, Kerala | 01-Apr-2013 | Kerala | Under Construction |
855 | Upgradation of Lowairpoa-Kanmun road in length of 27 km* | 62.12 | Transport | Roads and bridges | Public Works Department, Assam | 04-Mar-2016 | Assam | Under Construction |
856 | Upgradation of Lumbini-Duddhi road in length of 48 km in Jaunpur district | 136.23 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 30-Jun-2016 | Uttar Pradesh | Completed |
857 | Upgradation of Mandsaur-Sanjeet road in length of 32.9 km in Mandsaur* | 71.99 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 06-Aug-2015 | Madhya Pradesh | Under Construction |
858 | Upgradation of Markapuram-Vaggampalle road in length of 95.3 km under NHDP-IV | 417.61 | Transport | Roads and bridges | Roads and Buildings Department, Andhra Pradesh | 04-Jun-2014 | Andhra Pradesh | Completed |
859 | Upgradation of Mudigubba-Ananthapuramu district Border section from 134.0 km to 202.1 km | 266.00 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 23-Feb-2015 | Andhra Pradesh | Completed |
860 | Upgradation of NH-37 from Bogibeel Junction in length of 15.5 Km in Dibrugarh district* | 117.56 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 20-Feb-2015 | Assam | Under Construction |
861 | Upgradation of Pasighat-Pangin road in length of 28 Km in Lower Subansiri district* | 299.66 | Transport | Roads and bridges | Public Works Department, Arunachal Pradesh | 31-Mar-2015 | Arunachal Pradesh | Under Construction |
862 | Upgradation of Ratlam-Dhanasuta road in length of 30 km in Ratlam* | 56.91 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 01-Sep-2015 | Madhya Pradesh | Under Construction |
863 | Upgradation of road between Manas river to Beki river & Jania Bazar to Barpeta medical college in 14.7 km* | 69.77 | Transport | Roads and bridges | Public Works Department, Assam | 02-Mar-2016 | Assam | Under Construction |
864 | Upgradation of Sohela-Nuapada road in length of 16.9 Km in Nuapada district | 55.11 | Transport | Roads and bridges | Public Works Department, Odisha | 04-Apr-2016 | Odisha | Completed |
865 | Upgradation of Tarana-Mangliya-Vyaskhedi road in length of 32.6 km in Indore | 71.72 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 15-Mar-2016 | Madhya Pradesh | Completed |
866 | Upgradation of Taratala to Joka road on Eastern Flank in length of 7.5 Km in Kolkata district* | 66.32 | Transport | Roads and bridges | Public Works Department, West Bengal | 03-Sep-2015 | West Bengal | Under Construction |
867 | Upgradation of Tumkur-Honnavara section and construction of carriageway in length of 17.8 km | 95.82 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 09-Feb-2017 | Karnataka | Completed |
868 | Upgradation of various roads in length of 28.6 Km in Madhubani district* | 52.24 | Transport | Roads and bridges | Road Construction Department, Bihar | 25-Feb-2014 | Bihar | Under Construction |
869 | Upgradation of various roads in length of 38.9 Km in Darbhanga district* | 60.89 | Transport | Roads and bridges | Road Construction Department, Bihar | 14-Nov-2015 | Bihar | Under Construction |
870 | Upgradation of various roads in length of 73 km of NH-87 & NH-309A at Haldwani | 50.48 | Transport | Roads and bridges | Public Works Department, Uttarakhand | 25-Mar-2015 | Uttarakhand | Completed |
871 | Upgradation of various roads in length of 73.7 Km in Davanagere district | 69.40 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 17-Jun-2016 | Karnataka | Completed |
872 | Wanakbori Coal Based Power Project (Unit 8) | 4,465.00 | Energy | Electricity generation (grid) | Gujarat State Electricity Corporation Limited | 26-Sep-2014 | Gujarat | Completed |
873 | Water Supply Scheme (Borawas & Padampura)* | 90.47 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 24-Sep-2012 | Rajasthan | Under Construction |
874 | Water Supply (Bantwala) Project - UIDSSMT* | 52.79 | Water Sanitation | Water supply pipeline | Karnataka Urban Water Supply and Drainage Board | 20-Mar-2015 | Karnataka | Under Construction |
875 | Water Supply (Jammu) Project | 72.98 | Water Sanitation | Water supply pipeline | Jammu and Kashmir Economic Reconstruction Agency | 26-Feb-2015 | Jammu & Kashmir | Completed |
876 | Water Supply (Kalu) Project | 657.58 | Water Sanitation | Water supply pipeline | Water Resources Department, Maharashtra | 31-Aug-2009 | Maharashtra | Completed |
877 | Water Supply (Kharagpur) Project* | 84.63 | Water Sanitation | Water supply pipeline | Department of Municipal Affairs, West Bengal | Not Available | West Bengal | Under Construction |
878 | Water Supply (Ramdurga) Project* | 51.87 | Water Sanitation | Water supply pipeline | Karnataka Urban Water Supply and Drainage Board | 31-Oct-2014 | Karnataka | Under Construction |
879 | Water Supply (Sagar) Project* | 54.86 | Water Sanitation | Water supply pipeline | Karnataka Urban Water Supply and Drainage Board | 23-Apr-2012 | Karnataka | Under Construction |
880 | Water Supply (Trans-Varuna) Project* | 268.36 | Water Sanitation | Water supply pipeline | Uttar Pradesh Jal Nigam | 29-Sep-2009 | Uttar Pradesh | Under Construction |
881 | Water Supply (Varanasi) Project - Phase II* | 110.50 | Water Sanitation | Water supply pipeline | Uttar Pradesh Jal Nigam | 30-Oct-2008 | Uttar Pradesh | Under Construction |
882 | Water Supply Scheme (Ambalapuzha)*# | 83.41 | Water Sanitation | Water supply pipeline | Kerala water Authority | 17-Apr-2008 | Kerala | Under Construction |
883 | Water Supply Scheme (Basantpur-Mahawatpur) | 198.50 | Water Sanitation | Water supply pipeline | Haryana Urban Development Authority | 25-Mar-2013 | Haryana | Completed |
884 | Water Supply Scheme (Chennai)* | 312.66 | Water Sanitation | Water supply pipeline | Tamil Nadu Urban Finance and Infrastructure Development Corporation | Not Available | Tamil Nadu | Under Construction |
885 | Water Supply Scheme (Kakinada)* | 186.46 | Water Sanitation | Water supply pipeline | Kakinada Municipal Corporation | 11-Dec-2013 | Andhra Pradesh | Under Construction |
886 | Water Supply Scheme (Komarambheem-Asifabad)* | 1,650.00 | Water Sanitation | Water supply pipeline | Rural Water Supply and Sanitation Department, Telangana | 27-Oct-2015 | Telangana | Under Construction |
887 | Water Supply Scheme (Korutla-Jagityal-Dharmapuri) | 1,300.00 | Water Sanitation | Water supply pipeline | Rural Water Supply and Sanitation Department, Telangana | 06-Nov-2015 | Telangana | Completed |
888 | Water Supply Scheme (Manthani & Bhupalpally) | 835.00 | Water Sanitation | Water supply pipeline | Rural Water Supply and Sanitation Department, Telangana | 07-Dec-2015 | Telangana | Completed |
889 | Water Supply Scheme (Mukane Dam) | 266.00 | Water Sanitation | Water supply pipeline | Nashik Municipal Corporation | 14-Jan-2016 | Maharashtra | Completed |
890 | Water Supply Scheme (Nagathan)* | 75.21 | Water Sanitation | Water supply pipeline | Rural Drinking Water Supply and Sanitation Department, Karnataka | 27-Jan-2015 | Karnataka | Under Construction |
891 | Water Supply Scheme (Nirmal & Mudhole) | 1,530.00 | Water Sanitation | Water supply pipeline | Rural Water Supply and Sanitation Department, Telangana | 28-Oct-2015 | Telangana | Completed |
892 | Water Supply Scheme (Palair & Madhira) | 315.00 | Water Sanitation | Water supply pipeline | Rural Water Supply and Sanitation Department, Telangana | 15-Apr-2015 | Telangana | Completed |
893 | Water Supply Scheme (Siricilla-Vemulawada-Choppadandi) | 1,585.00 | Water Sanitation | Water supply pipeline | Rural Water Supply and Sanitation Department, Telangana | 28-Oct-2015 | Telangana | Completed |
894 | Water Supply Scheme (Trichy)* | 225.61 | Water Sanitation | Water supply pipeline | Tiruchirappalli City Municipal Corporation | 02-Sep-2009 | Tamil Nadu | Under Construction |
895 | Water Treatment Plant (Kolkata)* | 69.92 | Water Sanitation | Water treatment plants | Kolkata Municipal Corporation | 28-Feb-2016 | West Bengal | Under Construction |
896 | Western Gandak Canal System Project - Restoration | 2,169.51 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Bihar | 23-Dec-2014 | Bihar | Completed |
897 | Wind Based Power (Tejuva) Project - Phase II | 370.00 | Energy | Renewable energy (grid) | Hindustan Petroleum Corporation Limited | 18-Jan-2016 | Rajasthan | Completed |
898 | Wind Power (Kotdapitha) Project | 255.00 | Energy | Renewable energy (grid) | Gujarat Industries Power Company Limited | Not Available | Gujarat | Completed |
899 | Yettinahole Diversion Scheme* | 2,766.15 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | 04-Mar-2014 | Karnataka | Under Construction |
900 | Ziro-Daporijo-Along Transmission Line | 53.17 | Energy | Electricity transmission | Power Grid Corporation of India Limited | Not Available | Arunachal Pradesh | Completed |
901 | Areo City Development Project - Left Side | 132.42 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Greater Mohali Area Development Authority | 13-Dec-2011 | Punjab | Completed |
902 | Bhadradri Coal Power Project | 7,296.00 | Energy | Electricity generation (grid) | Petronet LNG Limited | Not Available | Telangana | Completed |
903 | Bongaigaon Coal Based Power Project | 6,749.18 | Energy | Electricity generation (grid) | NTPC Limited | 29-Feb-2008 | Assam | Completed |
904 | Chainsa-Gurgaon-Jhajjar-Hissar Gas Pipeline Project | 1,315.00 | Energy | Gas pipelines | GAIL (India) Limited | Not Available | Multi State/ Centre | Completed |
905 | Chichdoh Barrage Project | 597.44 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Maharashtra | 30-Apr-2011 | Maharashtra | Completed |
906 | Coal Based Power (Kudgi) Project - Stage I | 15,166.00 | Energy | Electricity generation (grid) | NTPC Limited | 17-Feb-2012 | Karnataka | Completed |
907 | Construction of mega food park on 79 acres at Kozhippara in Palakkad | 121.92 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Kerala Industrial Infrastructure Development Corporation Limited | 31-Jul-2016 | Kerala | Completed |
908 | Dah Hydro Electric Power Project | 79.00 | Energy | Renewable energy (grid) | Jammu and Kashmir State Power Development Corporation Limited | 20-Oct-2012 | Jammu & Kashmir | Completed |
909 | Development of convention centre at Digha on 5.5 acres of land | 70.91 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Kolkata Metropolitan Development Authority | 21-Jul-2017 | West Bengal | Completed |
910 | Development of Orissa Integrated Sanitation Improvement Project in Cuttak & Bhubaneswar with a capacity of 501 km | 2,974.66 | Water Sanitation | Sewage collection, treatment and disposal system | Odisha Water Supply and Sewerage Board | 16-Jul-2016 | Odisha | Completed |
911 | Eastern Region Strengthening Scheme - XV | 454.11 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 13-Apr-2016 | Multi State/ Centre | Completed |
912 | Hosiery Park Project | 250.00 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | West Bengal Hosiery Park Infrastructure Limited | 31-Jan-2014 | West Bengal | Completed |
913 | Implementation of 132/33 kV grid substation in Simdega | 96.81 | Energy | Electricity transmission | Jharkhand Urja Sancharan Nigam Limited | 10-Jun-2009 | Jharkhand | Completed |
914 | Implementation of 18.8 MLD water supply scheme at Gangarampur | 145.02 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, West Bengal | 28-Jan-2016 | West Bengal | Completed |
915 | Implementation of 20.6 MLD water supply scheme at Tapan | 165.50 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, West Bengal | 28-Jan-2016 | West Bengal | Completed |
916 | Implementation of 200 MLD Bhama Askhed water supply scheme in Pune | 380.00 | Water Sanitation | Water supply pipeline | Pune Municipal Corporation | 10-Feb-2014 | Maharashtra | Completed |
917 | Implementation of 200 MLD water treatment plant at Kotarpur in Ahmedabad district | 63.87 | Water Sanitation | Water treatment plants | Ahmedabad Municipal Corporation | 31-Dec-2015 | Gujarat | Completed |
918 | Implementation of 220 kV substation at Gollahalli | 95.33 | Energy | Electricity transmission | Karnataka Power Transmission Corporation Limited (KPTCL) | 07-Sep-2016 | Karnataka | Completed |
919 | Implementation of 38 MLD Malegaon water supply scheme in Nashik | 78.32 | Water Sanitation | Water supply pipeline | Malegaon Municipal Corporation | 08-Nov-2016 | Maharashtra | Completed |
920 | Implementation of 5.5 MGD water supply system at Ashokenagar Kalyangarh | 110.67 | Water Sanitation | Water supply pipeline | Department of Municipal Affairs, West Bengal | 09-Jan-2017 | West Bengal | Completed |
921 | Implementation of 8.6 MLD water supply scheme at Aatpadi | 91.09 | Water Sanitation | Water supply pipeline | Maharashtra Jeevan Pradhikaran | 14-Aug-2014 | Maharashtra | Completed |
922 | Implementation of Agalpur mega lift irrigation scheme on 2471 acres of land | 51.49 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 08-Mar-2015 | Odisha | Completed |
923 | Implementation of Anandapur barrage with a capacity of 556.5 CBM | 1,603.40 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 31-Mar-2005 | Odisha | Completed |
924 | Implementation of Asalpur & Chatumari mega lift irrigation schemes on 6671.8 acres of land | 62.87 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 21-Dec-2015 | Odisha | Completed |
925 | Implementation of Belgaon mega lift irrigation scheme on 1235.53 acres of land | 52.45 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 06-Aug-2013 | Odisha | Completed |
926 | Implementation of Bharsuga mega lift irrigation scheme on 1235.5 acres of land | 102.98 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 08-Mar-2015 | Odisha | Completed |
927 | Implementation of Budlapali & Manapali mega lift irrigation schemes on 7413.2 acres of land | 68.65 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 08-Mar-2015 | Odisha | Completed |
928 | Implementation of Chakragarh-I, II & III mega lift irrigation schemes on 14826.3 acres of land | 57.44 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 21-Dec-2015 | Odisha | Completed |
929 | Implementation of Gobardhanpur, Deulatara & Dimiripal mega lift irrigation schemes on 6906.6 acres of land | 109.20 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 21-Dec-2015 | Odisha | Completed |
930 | Implementation of Gudvella mega lift irrigation scheme on 1853.29 acres of land | 51.24 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 06-Aug-2013 | Odisha | Completed |
931 | Implementation of Gunjimunda & Pandkimal mega lift irrigation schemes on 5930.5 acres of land | 72.06 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 06-Aug-2013 | Odisha | Completed |
932 | Implementation of Gurujibhata, Dunguripali & Bhuskimal mega lift irrigation schemes on 10378.4 acres of land | 61.19 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 06-Aug-2013 | Odisha | Completed |
933 | Implementation of Haripur mega lift irrigation scheme on 1729.74 acres of land | 57.84 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 26-Dec-2016 | Odisha | Completed |
934 | Implementation of Jangala & Biritola mega lift irrigation schemes on 6177.6 acres of land | 57.33 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 21-Dec-2015 | Odisha | Completed |
935 | Implementation of Jankdihi & Sairha mega lift irrigation schemes on 8154.5 acres of land | 65.35 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 08-Mar-2015 | Odisha | Completed |
936 | Implementation of Katikula mega lift irrigation scheme on 1976.8 acres of land | 64.36 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 08-Mar-2015 | Odisha | Completed |
937 | Implementation of Kudabaga mega lift irrigation scheme on 1235.5 acres of land | 102.98 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 08-Mar-2015 | Odisha | Completed |
938 | Implementation of Kulsara & Bhulkabahal mega lift irrigation schemes on 6795.4 acres of land | 54.05 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 21-Dec-2015 | Odisha | Completed |
939 | Implementation of Kusumura mega lift irrigation scheme on 1235.53 acres of land | 119.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 26-Dec-2016 | Odisha | Completed |
940 | Implementation of Laitara mega lift irrigation scheme on 1235.53 acres of land | 52.45 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 06-Aug-2013 | Odisha | Completed |
941 | Implementation of lift irrigation scheme on 254624.8 acres in Kustagi, Yelburga and Gangavathi in Koppal | 7,769.46 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Krishna Bhagya Jala Nigam Limited | 24-Feb-2014 | Karnataka | Completed |
942 | Implementation of Madhabarida & Kalingadola mega lift irrigation schemes on 4447.9 acres of land | 89.99 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 26-Dec-2016 | Odisha | Completed |
943 | Implementation of Mahajanpara & Brahmnipal mega lift irrigation schemes on 6918.9 acres of land | 67.25 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 06-Aug-2013 | Odisha | Completed |
944 | Implementation of Mahan Irrigation project on 49853.5 acres | 486.96 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 10-Sep-2015 | Madhya Pradesh | Completed |
945 | Implementation of Nuagaon & Chandnimal mega lift irrigation schemes on 8648.7 acres of land | 60.07 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 08-Mar-2015 | Odisha | Completed |
946 | Implementation of Patapur mega lift irrigation scheme on 1927.42 acres of land | 51.92 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 26-Dec-2016 | Odisha | Completed |
947 | Implementation of Rajapur, Rahapada & Tulsipur mega lift irrigation schemes on 10872.6 acres of land | 72.18 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 21-Dec-2015 | Odisha | Completed |
948 | Implementation of Rampila-I & Rampila-II mega lift irrigation schemes on 7907.4 acres of land | 64.61 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 08-Mar-2015 | Odisha | Completed |
949 | Implementation of Redama & Balma mega lift irrigation schemes on 8648.7 acres of land | 60.41 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 26-Dec-2016 | Odisha | Completed |
950 | Implementation of Renkuli mega lift irrigation scheme on 1235.5 acres of land | 102.97 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 08-Mar-2015 | Odisha | Completed |
951 | Implementation of rural electrification works in Aska & Bhanjanagar under Integrated Power Development Scheme | 71.19 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 20-Jul-2016 | Odisha | Completed |
952 | Implementation of rural electrification works in Betul under DDUGJY | 144.74 | Energy | Electricity transmission | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | 28-Dec-2016 | Madhya Pradesh | Completed |
953 | Implementation of rural electrification works in EDC Allahabad I & II under Integrated Power Development Scheme | 51.27 | Energy | Electricity transmission | Purvanchal Vidyut Vitran Nigam Limited | 20-Aug-2016 | Uttar Pradesh | Completed |
954 | Implementation of rural electrification works in EDC Mau, Sonbhadra & Azamgarh under Integrated Power Development Scheme | 76.54 | Energy | Electricity transmission | Purvanchal Vidyut Vitran Nigam Limited | 20-Aug-2016 | Uttar Pradesh | Completed |
955 | Implementation of rural electrification works in EDC Mirzapur, Deoria & Gorakhpur under Integrated Power Development Scheme | 76.33 | Energy | Electricity transmission | Purvanchal Vidyut Vitran Nigam Limited | 20-Aug-2016 | Uttar Pradesh | Completed |
956 | Implementation of rural electrification works in EDC Varanasi, Fatehpur & Gazipur under Integrated Power Development Scheme | 75.44 | Energy | Electricity transmission | Purvanchal Vidyut Vitran Nigam Limited | 20-Aug-2016 | Uttar Pradesh | Completed |
957 | Implementation of rural electrification works in EUDC Allahabad under Integrated Power Development Scheme | 250.03 | Energy | Electricity transmission | Purvanchal Vidyut Vitran Nigam Limited | 20-Aug-2016 | Uttar Pradesh | Completed |
958 | Implementation of rural electrification works in EUDC Gorakhpur under Integrated Power Development Scheme | 118.38 | Energy | Electricity transmission | Purvanchal Vidyut Vitran Nigam Limited | 20-Aug-2016 | Uttar Pradesh | Completed |
959 | Implementation of rural electrification works in Jalgaon under RAPDRP-Part B | 93.62 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 19-Jan-2012 | Maharashtra | Completed |
960 | Implementation of rural electrification works in Kalyan under RAPDRP-Part B | 93.77 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 19-Jan-2012 | Maharashtra | Completed |
961 | Implementation of rural electrification works in Nagpur Urban under IPDS scheme Phase-B (Part I) | 90.85 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 17-Nov-2016 | Maharashtra | Completed |
962 | Implementation of Samsingha mega lift irrigation scheme on 2471 acres of land | 51.49 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 08-Mar-2015 | Odisha | Completed |
963 | Implementation of Satkuta mega lift irrigation scheme on 1482.63 acres of land | 57.33 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 21-Dec-2015 | Odisha | Completed |
964 | Implementation of Siskela & Kusmal mega lift irrigation schemes on 4695 acres of land | 55.36 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 06-Aug-2013 | Odisha | Completed |
965 | Implementation of Sodamal mega lift irrigation scheme on 1976.8 acres of land | 64.36 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 08-Mar-2015 | Odisha | Completed |
966 | Implementation of Tamdei & Jamutpali mega lift irrigation schemes on 6424.7 acres of land | 79.69 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 08-Mar-2015 | Odisha | Completed |
967 | Implementation of Tantighai mega lift irrigation scheme on 1235.53 acres of land | 65.20 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 21-Dec-2015 | Odisha | Completed |
968 | Implementation of Tundla - I mega lift irrigation scheme on 1235.53 acres of land | 52.45 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 06-Aug-2013 | Odisha | Completed |
969 | Implementation of underground drainage scheme of 220 km in Surendranagar | 128.73 | Water Sanitation | Storm water drainage system | Gujarat Urban Development Company Limited | 01-Mar-2014 | Gujarat | Completed |
970 | Industrial Area Bagroda (Bhopal) | 75.00 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Madhya Pradesh Audyogik Kendra Vikas Nigam (Bhopal) Limited | 18-Sep-2013 | Madhya Pradesh | Completed |
971 | Krishna Koyna Lift Irrigation Project | 4,079.47 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 31-Mar-1984 | Maharashtra | Completed |
972 | Kudankulam Transmission Line | Not Available | Energy | Electricity transmission | Power Grid Corporation of India Limited | 01-Jan-2016 | Multi State/ Centre | Completed |
973 | Kurnool Ultra Mega Solar Park | 10,000.00 | Energy | Renewable energy (grid) | Andhra Pradesh Solar Power Corporation | 01-Oct-2015 | Andhra Pradesh | Completed |
974 | Laying of Bellary pooling station-Rampura MC line in length of 43 CKM | 341.90 | Energy | Electricity transmission | Karnataka Power Transmission Corporation Limited (KPTCL) | 25-Aug-2015 | Karnataka | Completed |
975 | Laying of BIAL (Begur) to Vidyanagar transmission line in length of 9.5 CKM | 59.48 | Energy | Electricity transmission | Karnataka Power Transmission Corporation Limited (KPTCL) | 15-Dec-2015 | Karnataka | Completed |
976 | Laying of Tumakuru-Rampura DC line in length of 182 CKM | 543.48 | Energy | Electricity transmission | Karnataka Power Transmission Corporation Limited (KPTCL) | 24-Dec-2014 | Karnataka | Completed |
977 | LPG Terminal (Paradip) Project Phase II | 600.00 | Energy | Oil/ Gas/ LNG Storage | Indian Oil Corporation Limited | Not Available | Odisha | Completed |
978 | Multimodal Logistic Park (Visakhapatnam) | 372.00 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Container Corporation of India Limited | Not Available | Andhra Pradesh | Completed |
979 | Nagan Irrigation Project | 154.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Tapi Irrigation Development Corporation | 01-Mar-2014 | Maharashtra | Completed |
980 | Raisa Reservoir Scheme | 67.68 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Jharkhand | 10-Jul-2009 | Jharkhand | Completed |
981 | Rural Electrification (Begusarai) Project - RGGVY 12th Plan | 250.95 | Energy | Electricity transmission | North Bihar Power Distribution Company Limited | 21-Aug-2014 | Bihar | Completed |
982 | Rural Electrification (Khagaria) Project - RGGVY 12th Plan | 153.09 | Energy | Electricity transmission | North Bihar Power Distribution Company Limited | 21-Aug-2014 | Bihar | Completed |
983 | Setting up of 10 MW solar photovoltaic based power unit at Patni | 58.00 | Energy | Renewable energy (grid) | West Bengal State Electricity Distribution Company Limited | 18-May-2017 | West Bengal | Completed |
984 | Setting up of 10 MW solar photovoltaic based power unit at Salboni | 57.12 | Energy | Renewable energy (grid) | West Bengal State Electricity Distribution Company Limited | 18-May-2017 | West Bengal | Completed |
985 | Setting up of 132/33 kV grid substation at Dhenkikote | 56.18 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 31-May-2014 | Odisha | Completed |
986 | Setting up of 132/33 kV substation at Muniguda & 220/33 kV substation at Kasipur in Rayagada | 57.40 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 22-Aug-2014 | Odisha | Completed |
987 | Setting up of a 1980 MW Coal Based Power Project at Nabinagar | 15,131.67 | Energy | Electricity generation (grid) | Nabinagar Power Generating Company | 05-Feb-2013 | Bihar | Completed |
988 | Siddapuram Lift Irrigation Scheme | 72.63 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 06-Dec-2007 | Andhra Pradesh | Completed |
989 | Solapur Coal Based Power Project | 9,395.18 | Energy | Electricity generation (grid) | NTPC Limited | 06-Apr-2012 | Maharashtra | Completed |
990 | Solar Photovoltaic Power (Neyveli) Project | 133.00 | Energy | Renewable energy (grid) | NLC India Limited | Not Available | Tamil Nadu | Completed |
991 | Somasila-Swarnamuki Link Canal Project | 336.74 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 18-May-2007 | Andhra Pradesh | Completed |
992 | Substation (Harrawala) Project | 51.00 | Energy | Electricity transmission | Power Transmission Corporation of Uttarakhand Limited | 16-Jun-2015 | Uttarakhand | Completed |
993 | Substation (Lapanga) Project | 78.40 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 30-May-2015 | Odisha | Completed |
994 | Tamil Nadu solar power project - 709 MW | 3,035.93 | Energy | Renewable energy (grid) | NLC Limited | 24-Jan-2018 | Tamil Nadu | Completed |
995 | Temghar Irrigation Project | 323.53 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 18-Mar-1997 | Maharashtra | Completed |
996 | Thermal Power (Neyveli) Project | 5,907.00 | Energy | Electricity generation (grid) | NLC India Limited | Not Available | Tamil Nadu | Completed |
997 | Transmission Line (Hindupur-Uravakonda) Project | 223.67 | Energy | Electricity transmission | Transmission Corporation of Andhra Pradesh Limited | 20-Apr-2016 | Andhra Pradesh | Completed |
998 | Upershankh Reservoir Scheme | 141.19 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Jharkhand | 18-Mar-1987 | Jharkhand | Completed |
999 | Water Supply Scheme (Gadwal & Alampur) | 700.00 | Water Sanitation | Water supply pipeline | Rural Water Supply and Sanitation Department, Telangana | 14-Oct-2015 | Telangana | Completed |
1000 | Water Supply Scheme (Kahalgaon & Pirpainti-Bhagalpur) | 219.00 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Bihar | 14-Aug-2015 | Bihar | Completed |
1001 | Water Supply Scheme (Kajauli-Mohali) | 155.87 | Water Sanitation | Water supply pipeline | Greater Mohali Area Development Authority | 01-Mar-2012 | Punjab | Completed |
1002 | Water Supply Scheme (Sindhanur) Project | 99.01 | Water Sanitation | Water supply pipeline | Sindhanur City Municipal Council | 17-Dec-2014 | Karnataka | Completed |
1003 | Abohar Branch Canal System (Bathinda, Ludhiana, Moga & Shri Muktsar Sahib)* | 192.17 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Punjab Water Resources Management and Development Corporation Limited | 01-Feb-2010 | Punjab | Under Construction |
1004 | Abohar Branch Canal System (Faridkot)* | 147.62 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Punjab Water Resources Management and Development Corporation Limited | 28-Sep-2009 | Punjab | Under Construction |
1005 | Adan Medium Irrigation Project#* | 93.96 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 23-Oct-1974 | Maharashtra | Under Construction |
1006 | Amdapur Minor Irrigation Project*# | 71.73 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 26-Sep-1991 | Maharashtra | Under Construction |
1007 | Augmentation of 100 MLD water supply scheme at Vasai-Virar* | 296.00 | Water Sanitation | Water supply pipeline | Vasai Virar City Municipal Corporation | 26-Feb-2014 | Maharashtra | Under Construction |
1008 | Augmentation of 150.6 km water supply scheme in Rampur* | 50.00 | Water Sanitation | Water supply pipeline | Uttar Pradesh Jal Nigam | 31-Jan-2013 | Uttar Pradesh | Under Construction |
1009 | Augmentation of 54 MLD underground sewerage scheme under JNNURM at Ambernath in Thane district* | 126.02 | Water Sanitation | Sewage collection, treatment and disposal system | Ambernath Municipal Council | 22-Nov-2013 | Maharashtra | Under Construction |
1010 | Augmentation of 7.2 MLD water supply scheme at Ambernath in Thane district* | 77.05 | Water Sanitation | Water supply pipeline | Maharashtra Jeevan Pradhikaran | 05-Apr-2013 | Maharashtra | Under Construction |
1011 | Augmentation of Chambal-Bhilwara urban water supply scheme (Phase-II) * | 1,421.97 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 28-Aug-2013 | Rajasthan | Under Construction |
1012 | Baglinga Larger Minor Irrigation Project* | 55.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 27-Jul-2009 | Maharashtra | Under Construction |
1013 | Bewartola Irrigation Project* | 69.75 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
1014 | Bhagadi Larger Minor Project*# | 119.68 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 02-Mar-2009 | Maharashtra | Under Construction |
1015 | Bhimani Minor Irrigation Project* | 52.52 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Rajasthan | 15-Jun-2009 | Rajasthan | Under Construction |
1016 | Bor Irrigation Project#* | 207.36 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 13-May-2009 | Maharashtra | Under Construction |
1017 | Bridge (Alipur-Barwala) Project* | 98.27 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 30-Jun-2015 | Uttar Pradesh | Under Construction |
1018 | Bridge (Balu Ghat) Project* | 60.29 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 28-Feb-2007 | Uttar Pradesh | Under Construction |
1019 | Bridge (Banda-Bahraich) Project* | 84.33 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Dec-2011 | Uttar Pradesh | Under Construction |
1020 | Bridge (Bareru-Marka) Project* | 56.45 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Oct-2011 | Uttar Pradesh | Under Construction |
1021 | Bridge (Bhatauli Ghat) Project* | 63.27 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Oct-2006 | Uttar Pradesh | Under Construction |
1022 | Bridge (Bighapur-Sarsaul) Project* | 55.54 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 30-Apr-2015 | Uttar Pradesh | Under Construction |
1023 | Bridge (Dhanapur-Chahnia) Project* | 92.18 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 30-Apr-2006 | Uttar Pradesh | Under Construction |
1024 | Bridge (Kakadva Ghat) Project* | 104.73 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Mar-2016 | Uttar Pradesh | Under Construction |
1025 | Bridge (Kalimitti-Fatehpur Chourasi-Shivrajpur) Project* | 50.47 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 28-Feb-2014 | Uttar Pradesh | Under Construction |
1026 | Bridge (Kusumkhor Ghat) Project* | 74.54 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-May-2015 | Uttar Pradesh | Under Construction |
1027 | Bridge (Mahal Badshah) Project* | 98.33 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 30-Nov-2014 | Uttar Pradesh | Under Construction |
1028 | Bridge (Mau-Sarai Akil) Project* | 50.00 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Oct-2011 | Uttar Pradesh | Under Construction |
1029 | Bridge (Nawabganj-Dhemwaghat) Project* | 137.83 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Oct-2015 | Uttar Pradesh | Under Construction |
1030 | Bridge (Pal Sarani Ghat) Project* | 50.18 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Jan-2010 | Uttar Pradesh | Under Construction |
1031 | Bridge (Parsia Dewar-Barhaj) Project* | 95.57 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Jan-2015 | Uttar Pradesh | Under Construction |
1032 | Bridge (Ramnagar Road) Project* | 97.72 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 30-Sep-2006 | Uttar Pradesh | Under Construction |
1033 | Bridge (Rapti-Bhakhla) Project* | 52.89 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 30-Sep-2015 | Uttar Pradesh | Under Construction |
1034 | Bridge (Saidpur) Project* | 108.84 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-May-2000 | Uttar Pradesh | Under Construction |
1035 | Bridge (Shamsabad-Dhai Gaon-Jalalabad) Project* | 59.71 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 30-Nov-2014 | Uttar Pradesh | Under Construction |
1036 | Bridge (Sikariganj-Loharia-Shankarpur) Project* | 172.23 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Mar-2014 | Uttar Pradesh | Under Construction |
1037 | Bridge (Sitapur-Bahraich) Project* | 349.22 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Dec-2011 | Uttar Pradesh | Under Construction |
1038 | Bridge (Srirampur Ghat) Project* | 246.08 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 30-Jun-2015 | Uttar Pradesh | Under Construction |
1039 | Bridge (Thane Creek) Project* | 183.00 | Transport | Roads and bridges | Thane Municipal Corporation | 12-Sep-2014 | Maharashtra | Under Construction |
1040 | Bridge (Utrahtia Station) Project* | 61.62 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 30-Nov-2014 | Uttar Pradesh | Under Construction |
1041 | Bungi Rajgarh Water Supply Scheme* | 366.66 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 22-Nov-2012 | Rajasthan | Under Construction |
1042 | Chandrabhaga Barrage Larger Minor Project* | 236.83 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 26-Aug-2009 | Maharashtra | Under Construction |
1043 | Chondhi Irrigation Project* | 57.14 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 29-Aug-2009 | Maharashtra | Under Construction |
1044 | Combined Cycle Gas Based Power (Ramgarh) Project Stage IV*# | 640.00 | Energy | Electricity generation (grid) | Rajasthan Rajya Vidyut Utpadan Nigam Limited | 25-Apr-2012 | Rajasthan | Under Construction |
1045 | Combined Water Supply Scheme (Erode-Tiruppur)* | 91.40 | Water Sanitation | Water supply pipeline | Tamil Nadu Water Supply and Drainage Board | 27-Dec-2013 | Tamil Nadu | Under Construction |
1046 | Combined Water Supply Scheme (Kolar-Bangarpet-Malur)* | 97.00 | Water Sanitation | Water supply pipeline | Karnataka Urban Water Supply and Drainage Board | 19-Jan-2009 | Karnataka | Under Construction |
1047 | Combined Water Supply Scheme (Perambalur)* | 61.11 | Water Sanitation | Water supply pipeline | Tamil Nadu Water Supply and Drainage Board | 08-Jan-2008 | Tamil Nadu | Under Construction |
1048 | Common Effluent Treatment Plant (Bawal) Project * | 61.80 | Water Sanitation | Sewage collection, treatment and disposal system | Haryana State Industrial and Infrastructure Development Corporation | 19-Feb-2014 | Haryana | Under Construction |
1049 | Construction of 400 kV DC Line from Manali to Korattur in Chennai District* | 172.26 | Energy | Electricity transmission | Tamil Nadu Transmission Corporation Limited | 15-Sep-2014 | Tamil Nadu | Under Construction |
1050 | Construction of 400 kV DC Line with Quad Moose from Kamuthi 400 KV SS to Karaikudi 400 kV SS in Sivaganga District* | 366.85 | Energy | Electricity transmission | Tamil Nadu Transmission Corporation Limited | 30-Jun-2015 | Tamil Nadu | Under Construction |
1051 | Construction of 400 kV SC Line from Abishekapatti to Kanarpatti and 400 kV DC Line from Kanarapatti to Kayathar* | 56.18 | Energy | Electricity transmission | Tamil Nadu Transmission Corporation Limited | 05-Sep-2014 | Tamil Nadu | Under Construction |
1052 | Construction of 6 dams in 353.1 CBM under Upper Godavari Irrigation Project in Nashik,Ahmednagar & Aurangabad* | 1,016.08 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 01-Apr-1997 | Maharashtra | Under Construction |
1053 | Construction of 954 meter bridge over river Mansai at Sagardighighat in Coochbehar* | 112.75 | Transport | Roads and bridges | Public Works Department, West Bengal | 21-Feb-2012 | West Bengal | Under Construction |
1054 | Construction of bridge over Bhagirathi-Hooghly river in West Bengal* | 96.01 | Transport | Roads and bridges | Not Available | 30-Oct-2012 | West Bengal | Under Construction |
1055 | Construction of dam & canal network to provide irrigation in Chittapur and Sedam of Kalaburagi district* | 174.15 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | 12-Feb-2016 | Karnataka | Under Construction |
1056 | Construction of Digras high level barrage with a capacity of 63.3 CBM* | 375.48 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 03-Oct-2006 | Maharashtra | Under Construction |
1057 | Construction of high level bridge parallel to Kota barrage in length of 0.7 km* | 58.35 | Transport | Roads and bridges | Urban Improvement Trust, Kota | 31-Dec-2016 | Rajasthan | Under Construction |
1058 | Construction of Jamrar dam Phase-II near village Keolari in Lalitpur district with a capacity of 22.5 CBM. * | 329.15 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation Department, Uttar Pradesh | 28-Feb-2009 | Uttar Pradesh | Under Construction |
1059 | Construction of road over bridge in length of 1.3 km at Khejuria* | 65.58 | Transport | Roads and bridges | West Bengal Highway Development Corporation Limited | 27-Mar-2017 | West Bengal | Under Construction |
1060 | Construction of Singhpur barrage on 30823.9 acres in Panna * | 260.63 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 30-Apr-2011 | Madhya Pradesh | Under Construction |
1061 | Construction of Sonari to Sakat link canal in length of 12.1 km * | 81.06 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 02-Mar-2009 | Maharashtra | Under Construction |
1062 | Deep Tubewells (Kandi Area) Project* | 130.06 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Punjab Water Resources Management and Development Corporation Limited | 27-Oct-2009 | Punjab | Under Construction |
1063 | Development of 48926.8 acres, Uderasthan barrage on Falgu River in Jahanabad* | 637.20 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Bihar | 10-Apr-2007 | Bihar | Under Construction |
1064 | Development of Gokarna substation of 400 kV in Murshidabad district.* | 83.07 | Energy | Electricity transmission | West Bengal State Electricity Transmission Company Limited | 20-Mar-2014 | West Bengal | Under Construction |
1065 | Dhaleswari Bypass Project* | 64.42 | Transport | Roads and bridges | Public Works Department, Assam | 17-Oct-2011 | Assam | Under Construction |
1066 | Eastern Kosi Canal Irrigation Project * | 750.75 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Bihar | 23-Mar-2010 | Bihar | Under Construction |
1067 | Establishment of 400 /230-110 kV substation at Kanarpatty in Tirunelveli district* | 171.88 | Energy | Electricity transmission | Tamil Nadu Generation and Distribution Corporation Limited | 11-Mar-2014 | Tamil Nadu | Under Construction |
1068 | Establishment of 400 kV substation at Thappagundu* | 125.59 | Energy | Electricity transmission | Tamil Nadu Generation and Distribution Corporation Limited | 04-Sep-2013 | Tamil Nadu | Under Construction |
1069 | Establishment of 400/230 - 110 kV substation at Thervoykandigai* | 90.85 | Energy | Electricity transmission | Tamil Nadu Generation and Distribution Corporation Limited | 04-Sep-2012 | Tamil Nadu | Under Construction |
1070 | Execution of Northern Region System Strengthening Scheme-XXIV in Uttarakhand, Himachal Pradesh, Jammu & Kashmir * | 723.63 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 30-Nov-2011 | Multi State/ Centre | Completed |
1071 | Execution of Northern Regional System Strengthening Scheme - XVI in Jammu & Kashmir * | 689.03 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 31-Jul-2010 | Jammu & Kashmir | Under Construction |
1072 | Execution of Southern Region system strengthening scheme - XII * | 237.09 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 28-Feb-2010 | Karnataka | Completed |
1073 | Execution of Southern Region system strengthening scheme - XIV * | 346.79 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 31-Dec-2011 | Multi State/ Centre | Completed |
1074 | Execution of transmission system for ultra mega solar park in Anantapur - Phase II-Part B * | 99.09 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 31-Jan-2016 | Andhra Pradesh | Completed |
1075 | Execution of transmission system in Raipur-Wardha Corridor for IPP Projects in Chhattisgarh- part 6 * | 1,721.72 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 31-Jan-2012 | Multi State/ Centre | Completed |
1076 | Execution of transmission system in Western Region for IPP Generation Projects in Chhattisgarh-D * | 2,525.03 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 30-Nov-2011 | Maharashtra | Completed |
1077 | Execution of Western Region Strengthening Scheme-V in Gujarat, Maharashtra & Dadra and Nagar Haveli * | 721.81 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 31-Dec-2007 | Multi State/ Centre | Completed |
1078 | Feeder Separation Scheme (Shivpuri - I)* | 102.36 | Energy | Electricity transmission | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | 29-Aug-2011 | Madhya Pradesh | Under Construction |
1079 | Flyover (Ali Jauhar Univesity-Ekta Chaurah) Project* | 125.25 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 30-Nov-2013 | Uttar Pradesh | Under Construction |
1080 | Four laning to six laning of Singaperumalkoil-Sriperumpudur road from 0.6 to 12.6 Km in Chennai district* | 115.00 | Transport | Roads and bridges | Tamil Nadu Road Infrastructure Development Corporation | 03-Jun-2015 | Tamil Nadu | Under Construction |
1081 | Gangtok Bypass Project* | 195.22 | Transport | Roads and bridges | Roads and Bridges Department, Sikkim | 31-Jan-2011 | Sikkim | Under Construction |
1082 | Garga Medium Irrigation Project*# | 435.02 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 17-Feb-2009 | Maharashtra | Under Construction |
1083 | Hallon Minor Irrigation Project * | 68.15 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 29-Sep-2013 | Madhya Pradesh | Under Construction |
1084 | Haripura Minor Irrigation Project*# | 55.47 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Tapi Irrigation Development Corporation | 30-Nov-2002 | Maharashtra | Under Construction |
1085 | High Level Bridge (Hanumantpura-Bhind) Project* | 61.43 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 30-Apr-2016 | Uttar Pradesh | Under Construction |
1086 | High Level Bridge (Kota)* | Not Available | Transport | Roads and bridges | Urban Improvement Trust, Kota | 09-Mar-2012 | Rajasthan | Under Construction |
1087 | Hydel Power (Rellichu) Project * | 111.81 | Energy | Renewable energy (grid) | Sikkim Power Development Corporation Limited | 31-Oct-2004 | Sikkim | Under Construction |
1088 | Implementation of Tadipudi lift irrigation scheme on 206.6 acres* | 467.70 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 04-Oct-2004 | Andhra Pradesh | Under Construction |
1089 | Implementation of 10 MLD sewerage scheme at Shamsabad in Agra* | 97.78 | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh Jal Nigam | 30-Apr-2013 | Uttar Pradesh | Under Construction |
1090 | Implementation of 10.1 CBM Tarandale minor irrigation scheme at Kankavli in Sindhudurg * | 114.16 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 31-Dec-2005 | Maharashtra | Under Construction |
1091 | Implementation of 10.2 CBM Dendonwadi minor irrigation scheme at Kankavli in Sindhudurg * | 62.15 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 31-Jan-1998 | Maharashtra | Under Construction |
1092 | Implementation of 10.7 CBM Chavanwadi minor irrigation scheme at Rajapur * | 51.30 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 30-Nov-2001 | Maharashtra | Under Construction |
1093 | Implementation of 100.4 CBM Devghar medium irrigation scheme at Kankavli in Sindhudurg * | 716.54 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 31-Mar-1987 | Maharashtra | Under Construction |
1094 | Implementation of 10687.3 acres Surajpura medium irrigation scheme in Surajpura * | 70.61 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 16-Mar-2015 | Madhya Pradesh | Under Construction |
1095 | Implementation of 11.8 Km Kawara Nalla irrigation project at Dharni taluk in Amravati district * | 50.19 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 20-Mar-2006 | Maharashtra | Under Construction |
1096 | Implementation of 117 km of sewerage scheme in South East zone of Jodhpur * | 53.67 | Water Sanitation | Sewage collection, treatment and disposal system | Jodhpur Development Authority | 14-Aug-2013 | Rajasthan | Under Construction |
1097 | Implementation of 120 MLD underground sewerage scheme in Thane * | 229.25 | Water Sanitation | Sewage collection, treatment and disposal system | Thane Municipal Corporation | 04-Jun-2007 | Maharashtra | Under Construction |
1098 | Implementation of 123.7 CBM Nardave medium irrigation scheme at Kankavli in Sindhudurg * | 782.78 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 28-Feb-2001 | Maharashtra | Under Construction |
1099 | Implementation of 134 km Barmer-Rawatsar-Kharantiya drinking water supply scheme * | 128.07 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 26-May-2013 | Rajasthan | Under Construction |
1100 | Implementation of 14.1 MLD Lendi minor irrigation project at Jawhar*# | 190.82 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 12-Aug-2004 | Maharashtra | Under Construction |
1101 | Implementation of 14.6 MLD sewerage scheme in Ballia* | 52.23 | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh Jal Nigam | 30-Apr-2006 | Uttar Pradesh | Under Construction |
1102 | Implementation of 14.8 CBM Virdi minor irrigation scheme at Dodamarg in Sindhudurg * | 145.99 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 06-Dec-2007 | Maharashtra | Under Construction |
1103 | Implementation of 144 km of sewerage scheme at Vivek Vihar in E-4 zone of Jodhpur * | 64.42 | Water Sanitation | Sewage collection, treatment and disposal system | Jodhpur Development Authority | 09-Aug-2013 | Rajasthan | Under Construction |
1104 | Implementation of 1500 km rural water supply scheme Bisalpur-Dudu-Phagi in Jaipur * | 205.12 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 03-Aug-2013 | Rajasthan | Under Construction |
1105 | Implementation of 156 MLD water supply scheme at Sikar, Jhunjhunu & Khetri* | 1,064.23 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 15-Jul-2013 | Rajasthan | Under Construction |
1106 | Implementation of 168.5 km water supply scheme in Etawah* | 87.45 | Water Sanitation | Water supply pipeline | Uttar Pradesh Jal Nigam | 30-Apr-2013 | Uttar Pradesh | Under Construction |
1107 | Implementation of 20.4 CBM New Mandve minor irrigation scheme at Khed * | 131.65 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 30-Nov-1995 | Maharashtra | Under Construction |
1108 | Implementation of 21.7 CBM Berdewadi minor irrigation scheme at Lanja in Ratnagiri * | 129.59 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 31-Dec-1987 | Maharashtra | Under Construction |
1109 | Implementation of 220 KV substation at Kuppam in Chittoor * | 114.79 | Energy | Electricity transmission | Transmission Corporation of Andhra Pradesh Limited | 15-Feb-2016 | Andhra Pradesh | Under Construction |
1110 | Implementation of 224.8 km water supply scheme in Farrukhabad* | 50.00 | Water Sanitation | Water supply pipeline | Uttar Pradesh Jal Nigam | 31-Jul-2011 | Uttar Pradesh | Under Construction |
1111 | Implementation of 236 CBM (Million Cubic Meter) lift irrigation scheme from Upper Pravara project at Akole#* | 760.21 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 01-Apr-1992 | Maharashtra | Under Construction |
1112 | Implementation of 24 MLD sewerage scheme in Bijnor* | 115.93 | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh Jal Nigam | 31-Dec-2010 | Uttar Pradesh | Under Construction |
1113 | Implementation of 24.4 CBM Muchkundi minor irrigation scheme at Lanja in Ratnagiri * | 280.19 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 13-Oct-2005 | Maharashtra | Under Construction |
1114 | Implementation of 27 MLD piped water supply scheme in Khatra, Hirbandh and Ranibandh blocks of Bankura* | 179.47 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, West Bengal | 27-Nov-2012 | West Bengal | Under Construction |
1115 | Implementation of 27.9 CBM Poynar minor irrigation scheme at Khed * | 127.78 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 30-Apr-2001 | Maharashtra | Under Construction |
1116 | Implementation of 30 MLD water supply scheme for Panskura-II in Purba Medinipur* | 219.68 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, West Bengal | 27-Mar-2015 | West Bengal | Under Construction |
1117 | Implementation of 34 CBM (Million Cubic Meter) Pimpalgaon Khand Akole Minor Irrigation Tank project in Sangamner* | 50.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 07-Nov-2011 | Maharashtra | Under Construction |
1118 | Implementation of 39.3 km Sapan irrigation scheme at Achalpur in Amravati * | 413.10 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 19-Oct-2000 | Maharashtra | Under Construction |
1119 | Implementation of 4.4 CBM Talere minor irrigation scheme at Kankavli in Sindhudurg * | 50.79 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 31-Mar-2005 | Maharashtra | Under Construction |
1120 | Implementation of 4.5 MLD rural water supply scheme at Mohkhed* | 54.89 | Water Sanitation | Water supply pipeline | Madhya Pradesh Jal Nigam Maryadit | 20-Jul-2015 | Madhya Pradesh | Under Construction |
1121 | Implementation of 41.4 km Chandrabhaga medium irrigation scheme at Achalpur in Amravati * | 200.29 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 30-Jun-1991 | Maharashtra | Under Construction |
1122 | Implementation of 41.8 CBM Purna Medium Irrigation scheme at Chandur Bazar in Amravati * | 334.67 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 31-Aug-2007 | Maharashtra | Under Construction |
1123 | Implementation of 417 CBM Nandur Madhmeshwar major irrigation project in Nashik#* | 1,821.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 15-Jun-1978 | Maharashtra | Under Construction |
1124 | Implementation of 5.1 km water drainage scheme at Gorwa A.P.S. to Shrenikpark Junction in Vadodara.* | 121.05 | Water Sanitation | Sewage collection, treatment and disposal system | Vadodara Municipal Corporation | 08-May-2015 | Gujarat | Under Construction |
1125 | Implementation of 5.7 CBM Hasol minor irrigation scheme at Lanja * | 51.72 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 30-Nov-2006 | Maharashtra | Under Construction |
1126 | Implementation of 54.5 CBM (Million Cubic Meter) Kadwa major irrigation scheme at Igatpuri#* | 142.22 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 09-Jul-1979 | Maharashtra | Under Construction |
1127 | Implementation of 6.5 CBM Kakyewadi minor irrigation scheme at Rajapur * | 68.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 30-Nov-2006 | Maharashtra | Under Construction |
1128 | Implementation of 6.7 CBM Talwat minor irrigation scheme at Khed * | 56.35 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 28-Feb-1996 | Maharashtra | Under Construction |
1129 | Implementation of 6780.5 Acres Tajanapur lift irrigation scheme at Shevgaon taluka in Ahmadnagar.#* | 438.70 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 01-Apr-1988 | Maharashtra | Under Construction |
1130 | Implementation of 7.9 MLD Padale minor irrigation project at Karjat*# | 104.35 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 09-May-2006 | Maharashtra | Under Construction |
1131 | Implementation of 71 km regional rural water supply scheme at Newasa in Ahmadnagar* | 74.57 | Water Sanitation | Water supply pipeline | Maharashtra Jeevan Pradhikaran | 12-Sep-2013 | Maharashtra | Under Construction |
1132 | Implementation of 8 MLD rural water supply scheme in Ahmednagar* | 67.25 | Water Sanitation | Water supply pipeline | Maharashtra Jeevan Pradhikaran | 10-Sep-2013 | Maharashtra | Under Construction |
1133 | Implementation of 8.2 CBM Nadhvade minor irrigation scheme at Vaibhavvadi in Sindhudurg * | 93.85 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 31-Jan-1998 | Maharashtra | Under Construction |
1134 | Implementation of 82 MLD water supply scheme in Fatehpur & Laxmangarh* | 832.00 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 25-May-2013 | Rajasthan | Under Construction |
1135 | Implementation of 95.6 MLD Deharji medium irrigation project at Vikramgad#* | 158.25 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Konkan Irrigation Development Corporation | 27-Jun-2006 | Maharashtra | Under Construction |
1136 | Implementation of barrage at Kharda in Wardha district#* | 107.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 31-Jan-2012 | Maharashtra | Under Construction |
1137 | Implementation of Chikkanandi lift irrigation scheme in Belgaum district* | 50.73 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Cauvery Neeravari Nigam Limited | 12-Jun-2015 | Karnataka | Under Construction |
1138 | Implementation of Deogaon Rangari medium irrigation scheme with a capacity of 10.3 CBM* | 128.21 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 22-Dec-2008 | Maharashtra | Under Construction |
1139 | Implementation of high level barrage on Penganga river at Kinwat taluka in Nanded district*# | 131.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 12-Apr-2010 | Maharashtra | Under Construction |
1140 | Implementation of Karajgaon irrigation scheme in Amravati district.#* | 194.66 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 01-Jan-2010 | Maharashtra | Under Construction |
1141 | Implementation of lift irrigation scheme on 22849.8 acres for Herkal (South) in Bagalkot * | 339.04 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Krishna Bhagya Jala Nigam Limited | 24-Feb-2014 | Karnataka | Under Construction |
1142 | Implementation of Lower Terna major irrigation scheme with a capacity of 126.3 CBM* | 658.82 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 02-Sep-2009 | Maharashtra | Under Construction |
1143 | Implementation of Mahi irrigation scheme on 65.2 acres* | 590.75 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 09-Jan-2012 | Madhya Pradesh | Under Construction |
1144 | Implementation of Maniramkhed large irrigation scheme with a capacity of 10.9 CBM* | 102.72 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 04-May-2007 | Maharashtra | Under Construction |
1145 | Implementation of Manjara major irrigation scheme with a capacity of 261 CBM* | 1,351.25 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 22-May-2007 | Maharashtra | Under Construction |
1146 | Implementation of Palaskhedea large irrigation scheme with a capacity of 8 CBM* | 53.29 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 29-Mar-2016 | Maharashtra | Under Construction |
1147 | Implementation of Patharwala high level barrage with a capacity of 6.7 CBM* | 78.45 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 16-Jan-2013 | Maharashtra | Under Construction |
1148 | Implementation of Peddakopperla lift irrigation scheme at Koilakuntla mandal in Kurnool district* | 867.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh State Irrigation Development Corporation Limited | 30-Sep-2013 | Andhra Pradesh | Under Construction |
1149 | Implementation of Phulambi large irrigation scheme with a capacity of 5.3 CBM* | 65.05 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 04-May-2011 | Maharashtra | Under Construction |
1150 | Implementation of Polavaram irrigation on 720000 acres at West Godavari*# | 20,000.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 20-Oct-2004 | Andhra Pradesh | Under Construction |
1151 | Implementation of Poola Subbaiah-Veligonda irrigation scheme in Prakasam district * | 4,477.30 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 20-Aug-2005 | Andhra Pradesh | Under Construction |
1152 | Implementation of Rajiv Sagar lift irrigation scheme at Dummugudem in Khammam district#* | 1,681.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation and CAD Department, Telangana | 31-Mar-2008 | Telangana | Under Construction |
1153 | Implementation of rural electrification works at Akola Rural - Infra Plan II - Phase A* | 73.19 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 17-Jan-2015 | Maharashtra | Under Construction |
1154 | Implementation of rural electrification works at Bapgaon Urban - Infra Plan II - Phase C* | 56.17 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 30-Jun-2014 | Maharashtra | Under Construction |
1155 | Implementation of rural electrification works at Beed & Ambejogai - Infra Plan II - Phase B* | 105.23 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 21-Feb-2014 | Maharashtra | Under Construction |
1156 | Implementation of rural electrification works at Bhosari Urban - Infra Plan II - Phase C* | 100.14 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 30-Jun-2014 | Maharashtra | Under Construction |
1157 | Implementation of rural electrification works at Bhosari, Kothrud & Bundgarden - Infra Plan II - Phase VI* | 151.82 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 24-Feb-2011 | Maharashtra | Under Construction |
1158 | Implementation of rural electrification works at Deori & Brahmapuri - Infra Plan II - Phase B* | 72.63 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 06-Sep-2014 | Maharashtra | Under Construction |
1159 | Implementation of rural electrification works at Dhule - Infra Plan II - Phase IV* | 58.18 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 08-Apr-2010 | Maharashtra | Under Construction |
1160 | Implementation of rural electrification works at Hinganghat & Bhandara - Infra Plan II - Phase B* | 101.82 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 06-Feb-2014 | Maharashtra | Under Construction |
1161 | Implementation of rural electrification works at Ichalkaranji & Jaysingpur - Infra Plan II - Phase A* | 117.76 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 25-Nov-2013 | Maharashtra | Under Construction |
1162 | Implementation of rural electrification works at Jalgaon Rural - Infra Plan II - Phase A* | 92.78 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 06-Sep-2014 | Maharashtra | Under Construction |
1163 | Implementation of rural electrification works at Kalwan & Satana - Infra Plan II - Phase B* | 88.29 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 30-Dec-2013 | Maharashtra | Under Construction |
1164 | Implementation of rural electrification works at Katol - Infra Plan II - Phase VI* | 162.74 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 02-Mar-2009 | Maharashtra | Under Construction |
1165 | Implementation of rural electrification works at Kavathe Mahakal - Infra Plan II - Phase A* | 105.94 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 18-Nov-2014 | Maharashtra | Under Construction |
1166 | Implementation of rural electrification works at Kolhapur Rural-I & Gadhinglaj - Infra Plan II - Phase A* | 78.21 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 12-Nov-2013 | Maharashtra | Under Construction |
1167 | Implementation of rural electrification works at Kolhapur Rural-II - Infra Plan II - Phase A* | 55.95 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 12-Nov-2013 | Maharashtra | Under Construction |
1168 | Implementation of rural electrification works at Latur, Nilanga & Udagir - Infra Plan II - Phase B* | 88.99 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 07-Feb-2014 | Maharashtra | Under Construction |
1169 | Implementation of rural electrification works at Manmad & Chandawad - Infra Plan II - Phase B* | 122.88 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 30-Dec-2013 | Maharashtra | Under Construction |
1170 | Implementation of rural electrification works at Mulshi & Rajgurunagar - Infra Plan II - Phase A* | 99.71 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 13-Dec-2013 | Maharashtra | Under Construction |
1171 | Implementation of rural electrification works at Nagpur Rural - Infra Plan II - Phase A* | 112.68 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 06-Sep-2014 | Maharashtra | Under Construction |
1172 | Implementation of rural electrification works at Nandurbar - Infra Plan II - Phase IV* | 61.21 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 08-Apr-2010 | Maharashtra | Under Construction |
1173 | Implementation of rural electrification works at Nashik Rural - Infra Plan II - Phase A* | 73.41 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 01-Jul-2014 | Maharashtra | Under Construction |
1174 | Implementation of rural electrification works at Nashik Urban - Infra Plan II - Phase C* | 59.82 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 30-Jun-2014 | Maharashtra | Under Construction |
1175 | Implementation of rural electrification works at Osmanabad & Tuljapur - Infra Plan II - Phase B* | 57.38 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 06-Feb-2014 | Maharashtra | Under Construction |
1176 | Implementation of rural electrification works at Padmavati Urban - Infra Plan II - Phase C* | 57.87 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 30-Jun-2014 | Maharashtra | Under Construction |
1177 | Implementation of rural electrification works at Palghar, Vasai & Virar - Infra Plan II - Phase A* | 158.70 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 27-Dec-2013 | Maharashtra | Under Construction |
1178 | Implementation of rural electrification works at Pandharpur - Infra Plan II - Phase A* | 116.29 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 31-Jan-2014 | Maharashtra | Under Construction |
1179 | Implementation of rural electrification works at Panvel Rural & Alibaug - Infra Plan II - Phase A* | 81.31 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 13-Dec-2013 | Maharashtra | Under Construction |
1180 | Implementation of rural electrification works at Panvel Urban - Infra Plan II - Phase A* | 64.58 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 26-Dec-2013 | Maharashtra | Under Construction |
1181 | Implementation of rural electrification works at Parbhani - Infra Plan II - Phase A* | 56.99 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 06-Sep-2014 | Maharashtra | Under Construction |
1182 | Implementation of rural electrification works at Pimpri Urban- Infra Plan II - Phase C* | 89.85 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 30-Jun-2014 | Maharashtra | Under Construction |
1183 | Implementation of rural electrification works at Ratnagiri & Khed - Infra Plan II - Phase B* | 68.63 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 06-Feb-2014 | Maharashtra | Under Construction |
1184 | Implementation of rural electrification works at Roha & Goregaon - Infra Plan II - Phase A* | 83.28 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 14-Feb-2014 | Maharashtra | Under Construction |
1185 | Implementation of rural electrification works at Sangmaner - Infra Plan II - Phase B* | 93.57 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 30-Dec-2013 | Maharashtra | Under Construction |
1186 | Implementation of rural electrification works at Satara, Wai & Karad - Infra Plan II - Phase A* | 85.31 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 06-Jan-2014 | Maharashtra | Under Construction |
1187 | Implementation of rural electrification works at Shivajinagar Urban - Infra Plan II - Phase C* | 74.98 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 23-Jul-2014 | Maharashtra | Under Construction |
1188 | Implementation of rural electrification works at Shrirampur - Infra Plan II - Phase B* | 116.35 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 12-Feb-2014 | Maharashtra | Under Construction |
1189 | Implementation of rural electrification works at Solapur - Infra Plan II - Phase A* | 79.28 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 06-Feb-2014 | Maharashtra | Under Construction |
1190 | Implementation of rural electrification works at Vaduj & Phaltan - Infra Plan II - Phase A* | 64.84 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 31-Oct-2013 | Maharashtra | Under Construction |
1191 | Implementation of rural electrification works at Vita - Infra Plan II - Phase A* | 109.92 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 18-Dec-2013 | Maharashtra | Under Construction |
1192 | Implementation of rural electrification works at Washim - Infra Plan II - Phase A* | 95.20 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 06-Sep-2014 | Maharashtra | Under Construction |
1193 | Implementation of rural electrification works at Yavatmal, Pusad & Pandharkawada - Infra Plan II - Phase A* | 92.49 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 06-Sep-2014 | Maharashtra | Under Construction |
1194 | Implementation of sewerage scheme at West Kochi-Zone 4,6 in Kerala* | 74.02 | Water Sanitation | Sewage collection, treatment and disposal system | Local Self Government Department, Kerala | 22-Nov-2013 | Kerala | Under Construction |
1195 | Implementation of Sewerage Scheme in Allahabad district* | 305.34 | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh State Ganga River Conservation Agency | 08-Dec-2010 | Uttar Pradesh | Under Construction |
1196 | Implementation of sewerage scheme in Davanagere district* | 66.01 | Water Sanitation | Sewage collection, treatment and disposal system | Karnataka Urban Infrastructure Development and Finance Corporation | 17-Feb-2014 | Karnataka | Under Construction |
1197 | Implementation of sewerage scheme Zone B-Part A&B project#* | 63.85 | Water Sanitation | Sewage collection, treatment and disposal system | Local Self Government Department, Kerala | 19-Oct-2011 | Kerala | Under Construction |
1198 | Implementation of sewerage scheme Zone Part 1 & 2 in Kerala#* | 60.36 | Water Sanitation | Sewage collection, treatment and disposal system | Local Self Government Department, Kerala | 20-Jun-2012 | Kerala | Under Construction |
1199 | Implementation of Sindphana medium irrigation scheme with a capacity of 21.7 CBM* | 54.75 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 16-Nov-2005 | Maharashtra | Under Construction |
1200 | Implementation of solid waste management project in Hooghly district* | 170.00 | Water Sanitation | Solid waste management | Kolkata Metropolitan Development Authority | 31-Mar-2006 | West Bengal | Under Construction |
1201 | Implementation of Teesta Barrage irrigation scheme on 1318.3 of land#* | 695.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation and Waterways Department, West Bengal | 31-Dec-1976 | West Bengal | Under Construction |
1202 | Implementation of Underground Sewerage Scheme at Jetpur in Rajkot district* | 93.30 | Water Sanitation | Sewage collection, treatment and disposal system | Gujarat Water Supply and Sewerage Board | 16-Dec-2013 | Gujarat | Under Construction |
1203 | Implementation of Wakod medium irrigation scheme with a capacity of 11.4 CBM* | 90.22 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 13-Jan-2000 | Maharashtra | Under Construction |
1204 | Implementation of water supply scheme for Ingaleshwar in Bijapur district* | 72.70 | Water Sanitation | Water supply pipeline | Rural Development and Panchayat Raj Department, Karnataka | 09-Apr-2015 | Karnataka | Under Construction |
1205 | Implementation of water supply scheme for Tikota in Bijapur district* | 66.28 | Water Sanitation | Water supply pipeline | Rural Development and Panchayat Raj Department, Karnataka | 10-Jul-2015 | Karnataka | Under Construction |
1206 | Implementation of water supply scheme in Kurnool* | 68.25 | Water Sanitation | Water supply pipeline | Public Health and Municipal Engineering Department, Andhra Pradesh | 07-Dec-2017 | Andhra Pradesh | Under Construction |
1207 | Implementation of water supply scheme in Tirupathi* | 93.71 | Water Sanitation | Water supply pipeline | Public Health and Municipal Engineering Department, Andhra Pradesh | 16-Jan-2017 | Andhra Pradesh | Under Construction |
1208 | Improvement of Ghojadanga-Sangrampur road in length of 8.7 km in North 24 Parganas* | 81.89 | Transport | Roads and bridges | Public Works Department, West Bengal | 02-Apr-2015 | West Bengal | Under Construction |
1209 | Improvement of Kandi River Embankment project in Murshidabad * | 438.38 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation and Waterways Department, West Bengal | 08-Jan-2015 | West Bengal | Under Construction |
1210 | Improvement of Upper Bagjola Canal with a capacity of 19.5 Km * | 51.31 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation and Waterways Department, West Bengal | 31-Aug-2013 | West Bengal | Under Construction |
1211 | Irrigation (Mewat) Project* | 81.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation and Water Resources Department, Haryana | 02-Jun-2014 | Haryana | Under Construction |
1212 | Jam Irrigation Project* | 161.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
1213 | Kalpathri Irrigation Project* | 82.27 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
1214 | Kar Irrigation Project* | 226.51 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
1215 | Karajkheda Lift Irrigation Scheme* | 143.97 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
1216 | Katangi Irrigation Project* | 67.70 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
1217 | Kiniye Irrigation Project#* | 79.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | 22-Sep-2006 | Karnataka | Under Construction |
1218 | Lal Nalla Irrigation Project* | 202.51 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
1219 | Laying of 139.6 CKM D/C & M/C overhead Kharagpur-Chanditala transmission line* | 243.22 | Energy | Electricity transmission | West Bengal State Electricity Transmission Company Limited | 10-Feb-2014 | West Bengal | Under Construction |
1220 | Laying of 170 CKM D/C & M/C overhead Gokarna-Chanditala transmission line* | 299.76 | Energy | Electricity transmission | West Bengal State Electricity Transmission Company Limited | 27-Sep-2014 | West Bengal | Under Construction |
1221 | Laying of 34 CKM Jullandhur-Hamirpur LILO line at Hamirpur * | 100.55 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 30-Oct-2012 | Himachal Pradesh | Completed |
1222 | Laying of 41 CKM Jharsuguda-Darlipalli transmission line * | 187.04 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 25-Jan-2016 | Odisha | Completed |
1223 | Laying of 800 CKM Angul-Jharsuguda & Jharsuguda-Dharamjaygarh D/C line in Odisha & Chhattisgarh * | 2,514.88 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 31-Mar-2013 | Multi State/ Centre | Completed |
1224 | Limdi-Bhogavo Irrigation Project (Link 2) * | 1,294.61 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Gujarat | 25-Feb-2014 | Gujarat | Under Construction |
1225 | Lower Chulband Lift Irrigation Project* | 120.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
1226 | Lower Dnyanganga Irrigation Project* | 99.94 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 17-Aug-2009 | Maharashtra | Under Construction |
1227 | Lower Sakhli Medium Irrigation Project* | 160.40 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 25-Jul-2013 | Maharashtra | Under Construction |
1228 | Madan Irrigation Project* | 90.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
1229 | Mandagere Right Bank Canal Project* | 132.26 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Cauvery Neeravari Nigam Limited | 11-Jan-2012 | Karnataka | Under Construction |
1230 | Modernisation of 16.3 CBM, Pahuj Dam with water supply scheme in Jhansi district * | 106.84 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation Department, Uttar Pradesh | 25-Jun-2009 | Uttar Pradesh | Under Construction |
1231 | Modernisation of 737 CBM, Mula irrigation scheme at Baragaon Nandur in Ahmednagar*# | 262.31 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 01-Jan-1958 | Maharashtra | Under Construction |
1232 | Modernisation of Pahari Dam on Dhasan river in Jhansi district with a capacity of 46 CBM. * | 354.20 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation Department, Uttar Pradesh | 01-Mar-2009 | Uttar Pradesh | Under Construction |
1233 | Mohgaon Irrigation Project * | 83.33 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 11-Sep-2013 | Madhya Pradesh | Under Construction |
1234 | Mundkheda Minor Irrigation Project* | 72.85 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Tapi Irrigation Development Corporation | 29-May-2000 | Maharashtra | Under Construction |
1235 | Network For Spectrum#* | 13,334.00 | Communication | Telecommunication towers | Department of Telecommunications, Ministry of Communications | 03-Jul-2012 | Multi State/ Centre | Under Construction |
1236 | Niranthara Jyoti Yojana (Karnataka) Phase I * | 264.28 | Energy | Electricity transmission | Hubli Electricity Supply Company Limited | 31-May-2011 | Karnataka | Under Construction |
1237 | Niranthara Jyoti Yojana (Karnataka) Phase II * | 219.51 | Energy | Electricity transmission | Hubli Electricity Supply Company Limited | 10-Jan-2012 | Karnataka | Under Construction |
1238 | Nirmali Hydel Power Project* | 79.51 | Energy | Renewable energy (grid) | Bihar State Hydroelectric Power Corporation Limited | 04-Oct-2010 | Bihar | Under Construction |
1239 | Northern Region System Strengthening Scheme - XXX * | 539.82 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 30-Jun-2016 | Multi State/ Centre | Under Construction |
1240 | Northern Region System Strengthening Scheme - XXXII * | 908.08 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 28-Feb-2014 | Multi State/ Centre | Completed |
1241 | Northern Region System Strengthening Scheme - XXXIV * | 148.76 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 30-Mar-2015 | Multi State/ Centre | Completed |
1242 | Obra A Power Station - Refurbishment * | 330.00 | Energy | Electricity generation (grid) | Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited | Not Available | Uttar Pradesh | Under Construction |
1243 | P.M-3 A Regional Water Supply Scheme (Panchmahal)* | 53.45 | Water Sanitation | Water supply pipeline | Gujarat Water Supply and Sewerage Board | 14-Sep-2006 | Gujarat | Under Construction |
1244 | Pak River Irrigation Scheme*# | 116.64 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 21-Sep-2007 | Maharashtra | Under Construction |
1245 | Pandhari Irrigation Project#* | 987.02 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 11-Jan-2008 | Maharashtra | Under Construction |
1246 | Popatkhed Irrigation Scheme (Phase-II) * | 60.47 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
1247 | Power Transmission (Darbhanga-Madhubani) Project - BRGF Phase I* | 115.38 | Energy | Electricity transmission | North Bihar Power Distribution Company Limited | 05-Dec-2013 | Bihar | Under Construction |
1248 | Power Transmission (Garhwa) Project* | 141.74 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 30-Dec-2006 | Jharkhand | Under Construction |
1249 | Power Transmission (Latehar) Project* | 160.98 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 30-Dec-2006 | Jharkhand | Under Construction |
1250 | Power Transmission (North Cachar Hills) Project - RGGVY* | 97.65 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 30-Jan-2009 | Assam | Under Construction |
1251 | Power Transmission (Palamu) Project* | 200.70 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 30-Dec-2006 | Jharkhand | Under Construction |
1252 | Power Transmission (Purnea-Katihar-Araria) Project - BRGF Phase I* | 114.75 | Energy | Electricity transmission | North Bihar Power Distribution Company Limited | 09-Dec-2013 | Bihar | Under Construction |
1253 | Power Transmission (Samastipur-Begusarai) Project - BRGF Phase I* | 112.80 | Energy | Electricity transmission | North Bihar Power Distribution Company Limited | 09-Dec-2013 | Bihar | Under Construction |
1254 | Power Transmission (Saran-Siwan-Gopalganj) Project - BRGF Phase I* | 107.73 | Energy | Electricity transmission | North Bihar Power Distribution Company Limited | 21-Oct-2013 | Bihar | Under Construction |
1255 | Prayagraj Power (Bara) Project * | 12,000.00 | Energy | Electricity generation (grid) | Uttar Pradesh Power Corporation Limited | Not Available | Uttar Pradesh | Under Construction |
1256 | Purna Medium Irrigation Project#* | 241.66 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 31-Jan-1995 | Maharashtra | Under Construction |
1257 | R-O-B (Surendranagar-Bhavnagar-Dhola-Dhasa-Mahuva) Project* | 279.00 | Transport | Roads and bridges | Western Railway | Not Available | Gujarat | Under Construction |
1258 | R-O-B (Vyasarpadi) Project* | 80.68 | Transport | Roads and bridges | Public Works Department, Tamil Nadu | 27-Mar-2010 | Tamil Nadu | Under Construction |
1259 | R-U-Bs (Ahmedabad)* | 81.08 | Transport | Roads and bridges | Western Railway | Not Available | Gujarat | Under Construction |
1260 | R-U-Bs (Palanpur-Khodiyar)* | 62.18 | Transport | Roads and bridges | Western Railway | Not Available | Gujarat | Under Construction |
1261 | Raigarh Irrigation Project*# | 116.50 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 29-Nov-2008 | Maharashtra | Under Construction |
1262 | Railway-Over-Bridge (Chata-Barsana LC No. 544-A) Project* | 68.75 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Jan-2016 | Uttar Pradesh | Under Construction |
1263 | Railway-Over-Bridge (Dadri-Surajpur LC No. 147-B) Project* | 82.80 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Mar-2015 | Uttar Pradesh | Under Construction |
1264 | Railway-Over-Bridge (Ghaziabad-Loni) Project* | 65.46 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Dec-2013 | Uttar Pradesh | Under Construction |
1265 | Railway-Over-Bridge (Ghaziabad-Tundla LC No. 134-B) Project* | 52.26 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Mar-2014 | Uttar Pradesh | Under Construction |
1266 | Railway-Over-Bridge (Jhansi-Kanpur-Lucknow-Delhi) Project* | 86.19 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-May-2014 | Uttar Pradesh | Under Construction |
1267 | Railway-Over-Bridge (Khalilabad-Gorakhpur) Project* | 70.51 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Aug-2013 | Uttar Pradesh | Under Construction |
1268 | Railway-Over-Bridge (Mauda-Mohan) Project* | 55.46 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Dec-2011 | Uttar Pradesh | Under Construction |
1269 | Railway-Over-Bridge (Rohi LC No. 12-C/E-3) Project* | 51.15 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Jan-2014 | Uttar Pradesh | Under Construction |
1270 | Railway-Over-Bridge (Rudrapur-Gauri Bazar LC No. 139-A) Project* | 52.24 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Aug-2013 | Uttar Pradesh | Under Construction |
1271 | Railway-Over-Bridge (Tundla-Yamuna Bridge) Project* | 146.20 | Transport | Roads and bridges | Uttar Pradesh State Bridge Corporation Limited | 31-Dec-2014 | Uttar Pradesh | Under Construction |
1272 | Rajegaon Kati Lift Irrigation Project* | 87.43 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
1273 | Rajura Larger Minor Irrigation Project#* | 179.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 28-Aug-2009 | Maharashtra | Under Construction |
1274 | Regional Water Supply Scheme (Hafeshwar)* | 96.50 | Water Sanitation | Water supply pipeline | Gujarat Water Supply and Sewerage Board | 06-Jul-2011 | Gujarat | Under Construction |
1275 | Regional Water Supply Scheme (Narmadabara) - Augmentation* | 60.03 | Water Sanitation | Water supply pipeline | Gujarat Water Supply and Sewerage Board | 19-Jan-2015 | Gujarat | Under Construction |
1276 | Regional Water Supply Scheme (Tapi)* | 290.92 | Water Sanitation | Water supply pipeline | Gujarat Water Supply and Sewerage Board | 18-Oct-2014 | Gujarat | Under Construction |
1277 | Regional Water Supply Scheme (Uttarbara) - Augmentation * | 58.33 | Water Sanitation | Water supply pipeline | Gujarat Water Supply and Sewerage Board | 26-Dec-2014 | Gujarat | Under Construction |
1278 | Renovation of existing 27 MW Jaldhaka-I hydel power project in Darjeeling district#* | 88.62 | Energy | Renewable energy (grid) | West Bengal State Electricity Distribution Company Limited | 31-Oct-2011 | West Bengal | Under Construction |
1279 | Road Upgradation (Assam NH-154) Project* | 82.59 | Transport | Roads and bridges | Public Works Department, Assam | 29-Dec-2008 | Assam | Under Construction |
1280 | Road Upgradation (Barrackpore-Kalyani-Dum Dum) Project* | 314.57 | Transport | Roads and bridges | Public Works Department, West Bengal | 12-Nov-2010 | West Bengal | Under Construction |
1281 | Road Upgradation (Berhampur NH-59) Project* | 162.50 | Transport | Roads and bridges | Public Works Department, Odisha | 03-Sep-2014 | Odisha | Under Construction |
1282 | Road Upgradation (Berhampur-Taptapani) Project* | 96.87 | Transport | Roads and bridges | Public Works Department, Odisha | 24-Jan-2013 | Odisha | Under Construction |
1283 | Road Upgradation (Bhanupratappur- Narayanpur-Kondagaon) Project* | 107.09 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 28-Dec-2006 | Chhattisgarh | Under Construction |
1284 | Road Upgradation (Bhawanipatna-Khariar) Project* | 84.50 | Transport | Roads and bridges | Public Works Department, Odisha | 06-Aug-2013 | Odisha | Under Construction |
1285 | Road Upgradation (Bogibeel-Dibrugarh) Project* | 100.29 | Transport | Roads and bridges | Public Works Department, Assam | 22-Feb-2011 | Assam | Under Construction |
1286 | Road Upgradation (BSF Camp-Nagaland Secretariat) Project#* | 50.42 | Transport | Roads and bridges | Urban Development Department, Nagaland | 08-Mar-2010 | Nagaland | Under Construction |
1287 | Road Upgradation (Chakradharpur-Sonua-Goelkera) Project* | 121.73 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 10-Sep-2014 | Jharkhand | Under Construction |
1288 | Road Upgradation (Chandannagar-Kalyani More-Mogra) Project* | 320.27 | Transport | Roads and bridges | West Bengal Highway Development Corporation Limited | 04-Mar-2014 | West Bengal | Under Construction |
1289 | Road Upgradation (Chatra-Chouparan) Project* | 125.35 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 01-Feb-2016 | Jharkhand | Under Construction |
1290 | Road Upgradation (Chhattarpur-Japla) Project* | 115.22 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 26-Jun-2015 | Jharkhand | Under Construction |
1291 | Road Upgradation (Deoghar-Madhupur) Project* | 124.00 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 28-Feb-2016 | Jharkhand | Under Construction |
1292 | Road Upgradation (Durg Road-Lanji-Saletekri Road) Project * | 92.09 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 28-Jul-2012 | Madhya Pradesh | Under Construction |
1293 | Road Upgradation (Ghatakpukur-Malancha-Sarberia) Project* | 189.66 | Transport | Roads and bridges | West Bengal Highway Development Corporation Limited | 05-Sep-2014 | West Bengal | Under Construction |
1294 | Road Upgradation (Kesinga NH-26) Project* | 58.93 | Transport | Roads and bridges | Public Works Department, Odisha | 09-Jul-2014 | Odisha | Under Construction |
1295 | Road Upgradation (Kesinga NH-59) Project* | 191.50 | Transport | Roads and bridges | Public Works Department, Odisha | 06-Sep-2014 | Odisha | Under Construction |
1296 | Road Upgradation (Khamtarai-Bhanpuri Chowk-Dhaneli)* | 99.98 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 18-Apr-2012 | Chhattisgarh | Under Construction |
1297 | Road Upgradation (Kharagpur-Kesiary-Nayagram-Dhumsai) Project* | 169.49 | Transport | Roads and bridges | Public Works Department, West Bengal | 09-May-2012 | West Bengal | Under Construction |
1298 | Road Upgradation (Koderma-Domchanch-Khorimahua-Jamua) Project* | 148.42 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 09-May-2014 | Jharkhand | Under Construction |
1299 | Road Upgradation (Kota Bypass) Project* | 121.61 | Transport | Roads and bridges | Urban Improvement Trust, Kota | 25-Jun-2015 | Rajasthan | Under Construction |
1300 | Road Upgradation (Makum-Rupai) Project* | 94.90 | Transport | Roads and bridges | Public Works Department, Assam | 08-Dec-2010 | Assam | Under Construction |
1301 | Road Upgradation (Naigaon-Juichandra-Bapane) Project* | 108.05 | Transport | Roads and bridges | Mumbai Metropolitan Region Development Authority (MMRDA) | 20-Dec-2013 | Maharashtra | Under Construction |
1302 | Road Upgradation (Parlakhemundi-Udayagiri-Mohana) Project* | 199.14 | Transport | Roads and bridges | Public Works Department, Odisha | 18-Aug-2010 | Odisha | Under Construction |
1303 | Road Upgradation (Pratapgarh-Padi) Project#* | 269.26 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 26-Feb-2014 | Rajasthan | Under Construction |
1304 | Road Upgradation (Ratacherra - Churaibari) Project* | 117.66 | Transport | Roads and bridges | Public Works Department, Assam | 27-Feb-2011 | Assam | Under Construction |
1305 | Road Upgradation (Sambalpur NH-57) Project* | 97.81 | Transport | Roads and bridges | Public Works Department, Odisha | 17-Sep-2014 | Odisha | Under Construction |
1306 | Road Upgradation (Siliguri-Jalpaiguri) Project* | 168.27 | Transport | Roads and bridges | Public Works Department, West Bengal | 03-Mar-2014 | West Bengal | Under Construction |
1307 | Road Upgradation (Simrahi-Dumari Chowk) Project* | 50.00 | Transport | Roads and bridges | Road Construction Department, Bihar | 28-Feb-2014 | Bihar | Under Construction |
1308 | Road Upgradation (Sitamarhi) Project* | 68.74 | Transport | Roads and bridges | Road Construction Department, Bihar | 01-Jan-2013 | Bihar | Under Construction |
1309 | Road Upgradation (Tena-Khade) Project* | 83.86 | Transport | Roads and bridges | Roads and Buildings Department, Gujarat | 16-Jan-2014 | Gujarat | Under Construction |
1310 | Road Upgradation (Turki Chowk-Pakki Sarai Chowk) project* | 55.98 | Transport | Roads and bridges | Road Construction Department, Bihar | 19-Jan-2013 | Bihar | Under Construction |
1311 | Road Upgradation (Udaipur-Melaghar) Project * | 88.88 | Transport | Roads and bridges | Public Works Department, Tripura | 30-Dec-2013 | Tripura | Under Construction |
1312 | Road Upgradation (Vikash-Booty More-Katatoli-Rampur) Project* | 117.80 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 01-Feb-2016 | Jharkhand | Under Construction |
1313 | Road Upgradation (Yingkiong-Gobuk) Project * | 233.98 | Transport | Roads and bridges | Public Works Department, Arunachal Pradesh | 17-Apr-2012 | Arunachal Pradesh | Under Construction |
1314 | Road upgradation Nagarnausa-Chhatighat-Kalyan Bigha Chero-Bahadur section road NH-30A in length of 21.1 Km in Nalanda* | 50.09 | Transport | Roads and bridges | Road Construction Department, Bihar | 04-Mar-2015 | Bihar | Under Construction |
1315 | Road upgradation of NCPA-Tambe Chowk road in length of 4.5 km* | 110.00 | Transport | Roads and bridges | Municipal Corporation of Greater Mumbai | 31-Jan-2014 | Maharashtra | Under Construction |
1316 | Road upgradation of Taroda in length of 37.8 km in Nanded * | 88.23 | Transport | Roads and bridges | Nanded Waghala City Municipal Corporation | 13-Sep-2011 | Maharashtra | Under Construction |
1317 | Rural Electrification (Dewas) Project - RAPDRP-B* | 58.50 | Energy | Electricity transmission | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited | 17-Dec-2011 | Madhya Pradesh | Under Construction |
1318 | Rural Electrification (Indore) Project - RAPDRP-B* | 281.63 | Energy | Electricity transmission | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited | 16-Jun-2011 | Madhya Pradesh | Under Construction |
1319 | Rural Electrification (Jharkhand) Project - R-APDRP Part A * | 225.72 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 01-Mar-2011 | Jharkhand | Under Construction |
1320 | Rural Electrification (Karnataka) Project - R-APDRP [Part B] * | 290.28 | Energy | Electricity transmission | Bangalore Electricity Supply Company Limited | 10-Feb-2011 | Karnataka | Under Construction |
1321 | Rural Electrification (Ujjain) Project - RAPDRP-B* | 83.80 | Energy | Electricity transmission | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited | 27-Feb-2012 | Madhya Pradesh | Under Construction |
1322 | Rural Water Supply Scheme (Majholi)* | 69.94 | Water Sanitation | Water supply pipeline | Madhya Pradesh Jal Nigam Maryadit | 01-Feb-2014 | Madhya Pradesh | Under Construction |
1323 | Samada Larger Minor Irrigation Project#* | 155.31 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 13-Aug-2009 | Maharashtra | Under Construction |
1324 | Sardar Vallabhbhai Patel River Bridge Project - Modernisation* | 80.75 | Transport | Roads and bridges | Surat Municipal Corporation | 03-Sep-2015 | Gujarat | Under Construction |
1325 | Saryu Nahar Irrigation Project * | 7,270.32 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation Department, Uttar Pradesh | 31-Mar-1978 | Uttar Pradesh | Under Construction |
1326 | Service Road (Eastern Kosi Main Canal) Project* | 56.21 | Transport | Roads and bridges | Water Resources Department, Bihar | 18-Mar-2016 | Bihar | Under Construction |
1327 | Service Road (Saran Canal System) Project * | 142.08 | Transport | Roads and bridges | Water Resources Department, Bihar | 22-Jun-2012 | Bihar | Under Construction |
1328 | Setting up a 12 MW wind based power unit at Deogad in Sindhudurg district* | 100.00 | Energy | Renewable energy (grid) | Maharashtra State Electricity Distribution Company Limited | 02-Jun-2014 | Maharashtra | Under Construction |
1329 | Setting up a 60 MW Pallivasal hydro electric power project in Idukki*# | 284.69 | Energy | Renewable energy (grid) | Kerala State Electricity Board | 30-Sep-2006 | Kerala | Under Construction |
1330 | Setting up of 100 MW gas based power unit in Dibrugarh* | 693.73 | Energy | Electricity generation (grid) | Assam Power Generation Corporation Limited (APGCL) | 31-Dec-2008 | Assam | Under Construction |
1331 | Setting up of 100 MW Uhl hydel power unit (Stage III) at Mandi#* | 940.84 | Energy | Renewable energy (grid) | Himachal Pradesh State Electricity Board Limited | 15-Feb-2007 | Himachal Pradesh | Under Construction |
1332 | Setting up of 30 MLD underground sewerage system at Vasai-Virar* | 138.03 | Water Sanitation | Sewage collection, treatment and disposal system | Vasai Virar City Municipal Corporation | 26-Mar-2013 | Maharashtra | Under Construction |
1333 | Setting up of 5.0 MTPA , Bio-mithanation-cum Electric energy generation plant at Barasat* | 121.20 | Energy | Renewable energy (grid) | Barasat Municipality | 26-Feb-2015 | West Bengal | Under Construction |
1334 | Setting up of 600 MW Rayalaseema coal power unit 6 (Stage IV) in YSR district * | 3,781.86 | Energy | Electricity generation (grid) | Andhra Pradesh Power Generation Corporation Limited | 30-Oct-2010 | Andhra Pradesh | Under Construction |
1335 | Sewage Treatment Plant (Mothorowala-Kaulagarh) Project* | 170.46 | Water Sanitation | Sewage collection, treatment and disposal system | Uttarakhand Peyjal Nigam | 01-Apr-2013 | Uttarakhand | Under Construction |
1336 | Sewerage (Indore) Project * | 633.00 | Water Sanitation | Sewage collection, treatment and disposal system | Indore Municipal Corporation | 21-Jun-2008 | Madhya Pradesh | Under Construction |
1337 | Sewerage Pipeline (Leg No. V) Project#* | 116.50 | Water Sanitation | Sewage collection, treatment and disposal system | Haryana Urban Development Authority | 30-Mar-2012 | Haryana | Under Construction |
1338 | Sewerage Scheme (Faridabad)#* | 54.75 | Water Sanitation | Sewage collection, treatment and disposal system | Haryana Urban Development Authority | 01-Apr-2012 | Haryana | Under Construction |
1339 | Sewerage Scheme (Kota)* | 59.82 | Water Sanitation | Sewage collection, treatment and disposal system | Urban Improvement Trust, Kota | 12-May-2010 | Rajasthan | Under Construction |
1340 | Sewerage Scheme (Mussoorie)* | 81.72 | Water Sanitation | Sewage collection, treatment and disposal system | Uttarakhand Peyjal Nigam | 01-Dec-2009 | Uttarakhand | Under Construction |
1341 | Sewerage Scheme (Ujjain)* | 75.00 | Water Sanitation | Sewage collection, treatment and disposal system | Water Resources Department, Madhya Pradesh | 18-Nov-2014 | Madhya Pradesh | Under Construction |
1342 | Sewerage Scheme (West Kochi-Zone 3,8,9)* | 91.17 | Water Sanitation | Sewage collection, treatment and disposal system | Local Self Government Department, Kerala | 29-Nov-2013 | Kerala | Under Construction |
1343 | Shirala Lift Irrigation Project* | 106.28 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 20-Jun-1993 | Maharashtra | Under Construction |
1344 | Sina Kolegaon Irrigation Project* | 455.28 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 20-Jan-1993 | Maharashtra | Under Construction |
1345 | Sone High Level Canal Project - Restoration Project* | 170.46 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Bihar | 25-May-2012 | Bihar | Under Construction |
1346 | Songaon (Shivani) Irrigation Project#* | 119.60 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 27-Aug-2008 | Maharashtra | Under Construction |
1347 | Substation (Central-CMRL) Project* | 70.75 | Energy | Electricity transmission | Tamil Nadu Generation and Distribution Corporation Limited | 20-Aug-2014 | Tamil Nadu | Under Construction |
1348 | Substation (Kahilipara-Tinsukia-Mariani) Project * | 52.00 | Energy | Electricity transmission | Assam Electricity Grid Corporation Limited | 20-Jul-2012 | Assam | Under Construction |
1349 | Substation (Kamalpur-Bihiating-Rupai) Project * | 69.26 | Energy | Electricity transmission | Assam Electricity Grid Corporation Limited | 10-Feb-2011 | Assam | Under Construction |
1350 | Sundarban Embankments Reconstruction Project* | 5,032.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation and Waterways Department, West Bengal | 28-Jan-2010 | West Bengal | Under Construction |
1351 | Surewada Irrigation Project* | 124.60 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
1352 | Takli Kalan Irrigation Project#* | 90.32 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 30-Oct-2009 | Maharashtra | Under Construction |
1353 | Tunga Lift Irriation Scheme* | 87.71 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | 24-Oct-2013 | Karnataka | Under Construction |
1354 | Two laning of Chanditala-Shiakhala-Champadanga Section with paved shoulder in length of 36 km* | 155.35 | Transport | Roads and bridges | West Bengal Highway Development Corporation Limited | 22-Oct-2014 | West Bengal | Under Construction |
1355 | Two laning of Dumka-Hansdiha road in length of 44.2 km* | 211.49 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 23-Feb-2016 | Jharkhand | Under Construction |
1356 | Two laning of Hazaribagh-Katkamsandi-Chatra road in length of 54 Km in Hazaribagh district* | 173.11 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 24-Oct-2016 | Jharkhand | Under Construction |
1357 | Two laning of Indo Nepal Border-Rudhauli section in length of 65.9 Km in Lucknow district * | 393.00 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 20-Oct-2014 | Uttar Pradesh | Under Construction |
1358 | Two laning of Lalpul-Manmao-Changlang in length of 68.3 km of NH-52B * | 305.49 | Transport | Roads and bridges | Public Works Department, Arunachal Pradesh | 07-Mar-2011 | Arunachal Pradesh | Under Construction |
1359 | Two laning of Longding-Tissa-Khonsa bypass section in length of 42.5 km at Tirap * | 276.24 | Transport | Roads and bridges | Public Works Department, Arunachal Pradesh | 27-Feb-2012 | Arunachal Pradesh | Under Construction |
1360 | Two laning of Nakrekal-Nagarjunsagar Dam section in length of 85.1 Km under NHDP-IV * | 270.00 | Transport | Roads and bridges | Roads and Buildings Department, Telangana | 26-Feb-2014 | Telangana | Under Construction |
1361 | Two laning of Rupai-Talap section & construction of Makum bypass in length of 13.2 km * | 63.65 | Transport | Roads and bridges | Public Works Department, Assam | 09-Mar-2011 | Assam | Under Construction |
1362 | Underground Drainage Scheme (Sagar)* | 71.00 | Water Sanitation | Storm water drainage system | Karnataka Urban Water Supply and Drainage Board | 05-Jan-2012 | Karnataka | Under Construction |
1363 | Underground Drainage Scheme (Sangli & Miraj) - Phase II [Stage II]* | 174.00 | Water Sanitation | Sewage collection, treatment and disposal system | Sangli Miraj Kupwad Municipal Corporation | 30-Apr-2013 | Maharashtra | Under Construction |
1364 | Underground Drainage Scheme (Shivamogga)* | 115.00 | Water Sanitation | Storm water drainage system | Karnataka Urban Water Supply and Drainage Board | 06-Feb-2013 | Karnataka | Under Construction |
1365 | Underground Sewerage Scheme (Mumbra) - Phase III* | 69.98 | Water Sanitation | Sewage collection, treatment and disposal system | Thane Municipal Corporation | 27-Feb-2009 | Maharashtra | Under Construction |
1366 | Upgradation of Akola-Deori-Akot-Anjangaon-Achalpur-Betul State Border Road in length of 41.3 km* | 285.71 | Transport | Roads and bridges | Public Works Department, Maharashtra | 26-Apr-2017 | Maharashtra | Under Construction |
1367 | Upgradation of Amravati-(Nandgaon)-Morshi-Warud-Pandhurna Road in length of 52.3 km* | 338.60 | Transport | Roads and bridges | Public Works Department, Maharashtra | 13-Apr-2017 | Maharashtra | Under Construction |
1368 | Upgradation of Badi-Pahari road in length of 122.5 km* | 306.53 | Transport | Roads and bridges | Rajasthan State Road Development and Construction Corporation Limited | 26-Apr-2013 | Multi State/ Centre | Under Construction |
1369 | Upgradation of Chandrakona-Ghatal road in length of 13.0 Km in Paschim Medinipur district* | 89.16 | Transport | Roads and bridges | Public Works Department, West Bengal | 29-Feb-2016 | West Bengal | Under Construction |
1370 | Upgradation of Chatra- Chauparan road in length of 49.2 km in Chatra & Hazaribagh districts* | 130.70 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 19-Jan-2016 | Jharkhand | Under Construction |
1371 | Upgradation of Chiniya-Ranpura-Khuthuwa road in length of 32.9 km* | 80.11 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 15-Sep-2016 | Jharkhand | Under Construction |
1372 | Upgradation of Darbhanga-Shobhna Village Road in length of 9.6 km* | 72.66 | Transport | Roads and bridges | Road Construction Department, Bihar | 13-Dec-2013 | Bihar | Under Construction |
1373 | Upgradation of Ettumanoor-Muvattupuzha road in length of 40.6 km of SH-1 * | 171.49 | Transport | Roads and bridges | Public Works Department, Kerala | 30-Dec-2013 | Kerala | Under Construction |
1374 | Upgradation of Kanubari-Bogibeel bridge on NH-52B of 63.4 km in Assam.* | 268.00 | Transport | Roads and bridges | Public Works Department, Assam | 05-Feb-2011 | Assam | Under Construction |
1375 | Upgradation of Nagaruntari-Bhawanathpur-Kharuandhi-Dala road in length of 37.3 km* | 64.18 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 21-Sep-2016 | Jharkhand | Under Construction |
1376 | Upgradation of Nalanda-Islampur road in length of 31.2 km in Nalanda * | 94.00 | Transport | Roads and bridges | Road Construction Department, Bihar | 20-Jun-2014 | Bihar | Under Construction |
1377 | Upgradation of Punsia-Dhoraiya & Bounsi-Chandan dam road in length of 38.1 km* | 51.83 | Transport | Roads and bridges | Road Construction Department, Bihar | 26-Feb-2014 | Bihar | Under Construction |
1378 | Upgradation of Ranchi-Muri & Bundu-Sonahtu- Jmaudag road in length of 39.5 km in Ranchi rural division* | 57.19 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 15-Jan-2016 | Jharkhand | Under Construction |
1379 | Upgradation of Rangasirsa-Karmatand & Rohini-Daburgram road in length of 35 km in Deoghar* | 53.33 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 05-Feb-2016 | Jharkhand | Under Construction |
1380 | Upgradation of Sahebganj bypass road & Dighra chowk to Batlar chowk in length of 10.0 Km in Muzaffarpur district* | 56.31 | Transport | Roads and bridges | Road Construction Department, Bihar | 22-Jan-2013 | Bihar | Under Construction |
1381 | Upgradation of Saraikela Rajnagar-Chakradharpur road in length of 22.0 km in Seraikela Kharsawan district* | 68.57 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 30-May-2015 | Jharkhand | Under Construction |
1382 | Upgradation of Sikursai-Chandankheri & Dhansari-Paramsada road in length of 30.3 km* | 60.53 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 25-Jun-2015 | Jharkhand | Under Construction |
1383 | Upgradation of Sisai-Ghaghra road in length of 35.1 km in Ranchi district* | 84.00 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 19-Sep-2016 | Jharkhand | Under Construction |
1384 | Upgradation of Telaiya Post Office-Balyogeshwar Ashram and Doranda-Shankh-Vendro road in Koderma* | 51.36 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 01-Jul-2016 | Jharkhand | Under Construction |
1385 | Upgradation of Torpa to Karra road in length of 34.6 km in Khunti* | 77.82 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 13-Jan-2016 | Jharkhand | Under Construction |
1386 | Upgradation of various road in length of 20.5 Km at Motihari in East Champaran district* | 54.70 | Transport | Roads and bridges | Road Construction Department, Bihar | 12-Mar-2015 | Bihar | Under Construction |
1387 | Upgradation of various road in length of 33.9 Km in Khagaria district* | 63.25 | Transport | Roads and bridges | Road Construction Department, Bihar | 30-Apr-2015 | Bihar | Under Construction |
1388 | Upgradation of various road in length of 34.6 Km in Siwan district* | 69.58 | Transport | Roads and bridges | Road Construction Department, Bihar | 28-Feb-2014 | Bihar | Under Construction |
1389 | Upgradation of various road in length of 40.2 Km in Khagaria district* | 50.52 | Transport | Roads and bridges | Road Construction Department, Bihar | 24-Feb-2014 | Bihar | Under Construction |
1390 | Upgradation of various road in length of 41.7 Km at Motihari in East Champaran district* | 62.40 | Transport | Roads and bridges | Road Construction Department, Bihar | 04-Sep-2015 | Bihar | Under Construction |
1391 | Upgradation of various roads in length of 15.5 km in Lakhisarai* | 56.52 | Transport | Roads and bridges | Road Construction Department, Bihar | 01-Apr-2015 | Bihar | Under Construction |
1392 | Upgradation of various roads in length of 152.9 Km in Mandya district* | 110.76 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 29-Jun-2016 | Karnataka | Under Construction |
1393 | Upgradation of various roads in length of 20.3 Km in Muzaffarpur district* | 54.50 | Transport | Roads and bridges | Road Construction Department, Bihar | 22-Jan-2013 | Bihar | Under Construction |
1394 | Upgradation of various roads in length of 25.1 km in Samastipur* | 67.38 | Transport | Roads and bridges | Road Construction Department, Bihar | 21-Jan-2016 | Bihar | Under Construction |
1395 | Upgradation of various roads in length of 28.7 Km in Samastipur district* | 58.08 | Transport | Roads and bridges | Road Construction Department, Bihar | 20-Mar-2015 | Bihar | Under Construction |
1396 | Upgradation of various roads in length of 31.3 Km in Araria district* | 52.25 | Transport | Roads and bridges | Road Construction Department, Bihar | 04-Sep-2015 | Bihar | Under Construction |
1397 | Upgradation of various roads in length of 31.3 km in Surat* | 60.99 | Transport | Roads and bridges | Roads and Buildings Department, Gujarat | 15-Jan-2016 | Gujarat | Under Construction |
1398 | Upgradation of various roads in length of 32.2 Km in Madhubani district* | 64.70 | Transport | Roads and bridges | Road Construction Department, Bihar | 10-Apr-2015 | Bihar | Under Construction |
1399 | Upgradation of various roads in length of 32.6 km at Motihari* | 56.57 | Transport | Roads and bridges | Road Construction Department, Bihar | 01-Sep-2016 | Bihar | Under Construction |
1400 | Upgradation of various roads in length of 33.3 km in Nalanda* | 82.07 | Transport | Roads and bridges | Road Construction Department, Bihar | 20-Apr-2015 | Bihar | Under Construction |
1401 | Upgradation of various roads in length of 35.4 km in Aurangabad* | 62.97 | Transport | Roads and bridges | Road Construction Department, Bihar | 31-Oct-2016 | Bihar | Under Construction |
1402 | Upgradation of various roads in length of 35.4 km in Medak* | 223.35 | Transport | Roads and bridges | Roads and Buildings Department, Telangana | 31-Dec-2016 | Telangana | Under Construction |
1403 | Upgradation of various roads in length of 38.5 Km in Purnea district* | 50.00 | Transport | Roads and bridges | Road Construction Department, Bihar | 14-May-2015 | Bihar | Under Construction |
1404 | Upgradation of various roads in length of 39.6 Km at Rosera in Samastipur district* | 58.79 | Transport | Roads and bridges | Road Construction Department, Bihar | 25-Mar-2015 | Bihar | Under Construction |
1405 | Upgradation of various roads in length of 41.2 Km at Chhapra division in Saran district* | 62.95 | Transport | Roads and bridges | Road Construction Department, Bihar | 22-Apr-2015 | Bihar | Under Construction |
1406 | Upgradation of various roads in length of 44 km in Jehanabad* | 58.58 | Transport | Roads and bridges | Road Construction Department, Bihar | 26-Aug-2016 | Bihar | Under Construction |
1407 | Upgradation of various roads in length of 59.3 Km in Araria district* | 68.88 | Transport | Roads and bridges | Road Construction Department, Bihar | 05-Jan-2013 | Bihar | Under Construction |
1408 | Upgradation of various roads in length of 64.0 Km in Champawat district * | 74.90 | Transport | Roads and bridges | Public Works Department, Uttarakhand | 25-Mar-2015 | Uttarakhand | Under Construction |
1409 | Upgradation of various roads in length of 89.4 Km in Tumkur district* | 89.00 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 30-Jun-2016 | Karnataka | Under Construction |
1410 | Upgradation of various roads in length of 93.9 Km at Hunsur division in Mysore district* | 101.52 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 13-Jun-2016 | Karnataka | Under Construction |
1411 | Upgradation of Vidhan Sabha-Nayasarai & Lalganj-Tatisilwey road in length of 9.4 km in Ranchi* | 54.28 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 31-Jul-2015 | Jharkhand | Under Construction |
1412 | Upgradation of Walidad Lock-Bhusaula road in length of 64.5 km in Patna* | 189.08 | Transport | Roads and bridges | Water Resources Department, Bihar | 28-Feb-2017 | Bihar | Under Construction |
1413 | Upper Bhadra Irrigation Project#* | 12,340.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | 15-Oct-2008 | Karnataka | Under Construction |
1414 | Upper Tilwara Canal Irrigation Project * | 120.02 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 05-Nov-2013 | Madhya Pradesh | Under Construction |
1415 | Varahi Irrigation Project* | 569.29 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | 27-Mar-1979 | Karnataka | Under Construction |
1416 | Waghadi Barrage Minor Irrigation Project*# | 109.96 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 30-Jun-2009 | Maharashtra | Under Construction |
1417 | Warna Major Irrigation Project* | 1,678.71 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 29-Sep-1976 | Maharashtra | Under Construction |
1418 | Water Supply (Ajmer-Pushkar) Project * | 188.85 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | Not Available | Rajasthan | Under Construction |
1419 | Water Supply (Balganga) Project * | 1,970.72 | Water Sanitation | Water supply pipeline | Water Resources Department, Maharashtra | 31-May-2009 | Maharashtra | Under Construction |
1420 | Water Supply (Balurghat) Project * | 74.88 | Water Sanitation | Water supply pipeline | Department of Municipal Affairs, West Bengal | 21-Nov-2011 | West Bengal | Under Construction |
1421 | Water Supply (Chas) Project* | 50.25 | Water Sanitation | Water supply pipeline | Drinking Water and Sanitation Department, Jharkhand | 22-Dec-2008 | Jharkhand | Under Construction |
1422 | Water Supply (English Bazar) Project * | 91.25 | Water Sanitation | Water supply pipeline | Englishbazar Municipality | 30-Apr-2011 | West Bengal | Under Construction |
1423 | Water Supply (Gadag-Betageri) Project* | 99.75 | Water Sanitation | Water supply pipeline | Karnataka Urban Infrastructure Development and Finance Corporation | 24-Jun-2013 | Karnataka | Under Construction |
1424 | Water Supply (Jalukbari) Project* | 389.53 | Water Sanitation | Water supply pipeline | Guwahati Metropolitan Development Authority | 30-Apr-2009 | Assam | Under Construction |
1425 | Water Supply (Jodhpur) Project* | 131.97 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 21-Sep-2012 | Rajasthan | Under Construction |
1426 | Water Supply (Kabini) Project* | 108.81 | Water Sanitation | Water supply pipeline | Karnataka Urban Water Supply and Drainage Board | 16-Sep-2009 | Karnataka | Under Construction |
1427 | Water Supply (Nabadwip) Project * | 112.15 | Water Sanitation | Water supply pipeline | Department of Municipal Affairs, West Bengal | 30-Jun-2014 | West Bengal | Under Construction |
1428 | Water Supply (Purulia) Project * | 70.01 | Water Sanitation | Water supply pipeline | Department of Municipal Affairs, West Bengal | 30-Apr-2012 | West Bengal | Under Construction |
1429 | Water Supply (Raiganj) Project * | 61.84 | Water Sanitation | Water supply pipeline | Department of Municipal Affairs, West Bengal | 01-Feb-2014 | West Bengal | Under Construction |
1430 | Water Supply (Shai) Project * | 452.75 | Water Sanitation | Water supply pipeline | Water Resources Department, Maharashtra | 30-Jun-2010 | Maharashtra | Under Construction |
1431 | Water Supply (Susari) Project* | 389.49 | Water Sanitation | Water supply pipeline | Water Resources Department, Maharashtra | 30-Apr-2011 | Maharashtra | Under Construction |
1432 | Water Supply (Varanasi) Project - Phase I* | 139.79 | Water Sanitation | Water supply pipeline | Uttar Pradesh Jal Nigam | 06-Aug-2007 | Uttar Pradesh | Under Construction |
1433 | Water Supply Project (Bolangir)* | 55.00 | Water Sanitation | Water supply pipeline | Public Health Engineering Organisation, Odisha | Not Available | Odisha | Under Construction |
1434 | Water Supply Project (Keonjhar)* | 50.00 | Water Sanitation | Water supply pipeline | Public Health Engineering Organisation, Odisha | Not Available | Odisha | Under Construction |
1435 | Water Supply Project (Thiruvananthapuram)* | 87.16 | Water Sanitation | Water supply pipeline | Local Self Government Department, Kerala | 08-Apr-2010 | Kerala | Under Construction |
1436 | Water Supply Reorganization Scheme (Dehradun) Phase - I* | 70.02 | Water Sanitation | Water supply pipeline | Uttarakhand Peyjal Nigam | 01-Apr-2008 | Uttarakhand | Under Construction |
1437 | Water Supply Scheme (Agartala-North Zone) * | 78.26 | Water Sanitation | Water supply pipeline | Agartala Municipal Corporation | 27-Jan-2009 | Tripura | Under Construction |
1438 | Water Supply Scheme (Ahmadnagar) - Phase II* | 73.00 | Water Sanitation | Water supply pipeline | Ahmednagar Municipal Corporation | 30-Jun-2010 | Maharashtra | Under Construction |
1439 | Water Supply Scheme (Buldana) * | 81.31 | Water Sanitation | Water supply pipeline | Maharashtra Jeevan Pradhikaran | 22-May-2013 | Maharashtra | Under Construction |
1440 | Water Supply Scheme (Buxar)* | 100.50 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Bihar | 08-Jun-2009 | Bihar | Under Construction |
1441 | Water Supply Scheme (Chamarajanagar)#* | 145.50 | Water Sanitation | Water supply pipeline | Kerala Rural Water Supply and Sanitation Agency | 03-Mar-2014 | Karnataka | Under Construction |
1442 | Water Supply Scheme (Falta-Mathurapur)* | 1,332.41 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, West Bengal | 24-Dec-2014 | West Bengal | Under Construction |
1443 | Water Supply Scheme (Faridabad) - Augmentation* | 493.10 | Water Sanitation | Water supply pipeline | Municipal Corporation, Faridabad | 31-Jul-2009 | Haryana | Under Construction |
1444 | Water Supply Scheme (Gondia)* | 79.58 | Water Sanitation | Water supply pipeline | Maharashtra Jeevan Pradhikaran | 06-Aug-2009 | Maharashtra | Under Construction |
1445 | Water Supply Scheme (Gundlupet)#* | 115.55 | Water Sanitation | Water supply pipeline | Kerala Rural Water Supply and Sanitation Agency | 03-Mar-2014 | Karnataka | Under Construction |
1446 | Water Supply Scheme (Kalyandurg, Rayadurg & Uravakonda) - Phase IV* | 190.00 | Water Sanitation | Water supply pipeline | Rural Water Supply and Sanitation Department, Andhra Pradesh | 30-Nov-2009 | Andhra Pradesh | Under Construction |
1447 | Water Supply Scheme (Kerimeri, Jainoor, Sirpur & Narnoor)* | 70.00 | Water Sanitation | Water supply pipeline | Rural Water Supply and Sanitation Department, Telangana | 27-Aug-2010 | Telangana | Under Construction |
1448 | Water Supply Scheme (Mahabubnagar, Hanwada & Koilakonda)* | 80.00 | Water Sanitation | Water supply pipeline | Rural Water Supply and Sanitation Department, Telangana | 01-Oct-2014 | Telangana | Under Construction |
1449 | Water Supply Scheme (Mudhole)* | 168.00 | Water Sanitation | Water supply pipeline | Rural Water Supply and Sanitation Department, Telangana | 13-Dec-2013 | Telangana | Under Construction |
1450 | Water Supply Scheme (MUM-059) - Expansion* | 232.65 | Water Sanitation | Water supply pipeline | Kalyan Dombivli Municipal Corporation | 01-Oct-2009 | Maharashtra | Under Construction |
1451 | Water Supply Scheme (Pallavapuram)* | 99.95 | Water Sanitation | Water supply pipeline | Pallavaram Municipality | 23-Apr-2013 | Tamil Nadu | Under Construction |
1452 | Water Supply Scheme (Parbhani)-Augmentation * | 104.00 | Water Sanitation | Water supply pipeline | Parbhani City Municipal Corporation | 02-Feb-2012 | Maharashtra | Under Construction |
1453 | Water Supply Scheme (Patna)* | 62.00 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Bihar | 10-Jun-2009 | Bihar | Under Construction |
1454 | Water Supply Scheme (Salem)* | 296.80 | Water Sanitation | Water supply pipeline | Salem Municipal Corporation | 27-Aug-2010 | Tamil Nadu | Under Construction |
1455 | Water Supply Scheme (Sawai Madhopur-Nadoti) Phase-I* | 269.30 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 03-Oct-2005 | Rajasthan | Under Construction |
1456 | Water Supply Scheme (Sultanganj & Nathnagar-Bhagalpur)* | 71.28 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Bihar | 10-Jan-2013 | Bihar | Under Construction |
1457 | Water Supply Scheme (Tambaram) * | 97.95 | Water Sanitation | Water supply pipeline | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 04-Oct-2013 | Tamil Nadu | Under Construction |
1458 | Water Supply Scheme (Tuticorin)#* | 266.01 | Water Sanitation | Water supply pipeline | Tuticorin Municipal Corporation | 02-Aug-2013 | Tamil Nadu | Under Construction |
1459 | Water Supply Scheme (Vaishali)* | 136.50 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Bihar | 08-Jun-2009 | Bihar | Under Construction |
1460 | Zashinagar Lift Irrigation Project* | 114.11 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
1461 | Bhagpur Lift Irrigation Scheme * | 667.77 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Tapi Irrigation Development Corporation | 16-Jun-2002 | Maharashtra | Under Construction |
1462 | Bordi Nalla Medium Irrigation Project * | 449.60 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
1463 | Bridge (Graminchira-Parechal-Thiruvathukkal) Project* | 53.96 | Transport | Roads and bridges | Public Works Department, Kerala | 02-Jul-2013 | Kerala | Under Construction |
1464 | Bridge (Kanhan River) Project* | 50.63 | Transport | Roads and bridges | Public Works Department, Maharashtra | 29-Jul-2013 | Maharashtra | Under Construction |
1465 | Bridge (Narmada River) Project* | 309.10 | Transport | Roads and bridges | Roads and Buildings Department, Gujarat | 10-Dec-2015 | Gujarat | Under Construction |
1466 | Bridges (Kashedi-Turau) Project* | 53.24 | Transport | Roads and bridges | Public Works Department, Maharashtra | 09-Dec-2014 | Maharashtra | Under Construction |
1467 | Carriageway (SH-340) Project* | 204.69 | Transport | Roads and bridges | Public Works Department, Maharashtra | 24-Sep-2015 | Maharashtra | Under Construction |
1468 | Combined Water Supply Scheme (Pudukkottai-Vallam) * | 236.54 | Water Sanitation | Water supply pipeline | Tamil Nadu Water Supply and Drainage Board | 29-Aug-2013 | Tamil Nadu | Under Construction |
1469 | Combined Water Supply Scheme (Sivagangai) * | 236.54 | Water Sanitation | Water supply pipeline | Tamil Nadu Water Supply and Drainage Board | 18-Dec-2013 | Tamil Nadu | Under Construction |
1470 | Combined Water Supply Scheme (Vellore) * | 1,295.00 | Water Sanitation | Water supply pipeline | Tamil Nadu Water Supply and Drainage Board | 30-Dec-2011 | Tamil Nadu | Under Construction |
1471 | Combined Water Supply Scheme (Villupuram) * | 52.45 | Water Sanitation | Water supply pipeline | Tamil Nadu Water Supply and Drainage Board | 17-Dec-2014 | Tamil Nadu | Under Construction |
1472 | Construction of 0.4 km road over bridge on NH-72 at Ajabpur* | 54.08 | Transport | Roads and bridges | Public Works Department, Uttarakhand | 24-Aug-2016 | Uttarakhand | Under Construction |
1473 | Construction of 0.6 km grade separator at the junction of N.S. Phadake Marg and Telli Galli * | 101.00 | Transport | Roads and bridges | Municipal Corporation of Greater Mumbai | 19-Mar-2016 | Maharashtra | Under Construction |
1474 | Construction of 2.3 km subway at Jessal Park in Bhayander * | 58.00 | Transport | Roads and bridges | Mira Bhayandar Municipal Corporation | 26-May-2011 | Maharashtra | Under Construction |
1475 | Construction of 2.5 km flyovers at Savita * | 155.96 | Transport | Roads and bridges | Mumbai Metropolitan Region Development Authority (MMRDA) | 13-Mar-2015 | Maharashtra | Under Construction |
1476 | Construction of bypass around Gumla Town in length of 12.8 Km* | 83.55 | Transport | Roads and bridges | Public Works Department, Jharkhand | 15-Dec-2015 | Jharkhand | Under Construction |
1477 | Construction of bypass at Bareilly-Mathura road in length of 8 km* | 110.03 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Jan-2016 | Uttar Pradesh | Under Construction |
1478 | Construction of combined flyover for Kuranguchavadi and AVR roundana junction in length of 1.3 km in Salem* | 114.40 | Transport | Roads and bridges | Public Works Department, Tamil Nadu | 26-Feb-2016 | Tamil Nadu | Under Construction |
1479 | Construction of Dunlop Interchange B.T. road in length of 0.2 km* | 57.09 | Transport | Roads and bridges | Public Works Department, West Bengal | 30-Dec-2016 | West Bengal | Under Construction |
1480 | Construction of high level bridge across Godavari river at Km 166 of NH-221 in Warangal district* | 65.00 | Transport | Roads and bridges | Roads and Buildings Department, Telangana | 11-Jul-2014 | Telangana | Under Construction |
1481 | Construction of high level bridge on Karimnagar-Kamareddy road in length of 100 meter at Boinpally* | 89.00 | Transport | Roads and bridges | Roads and Buildings Department, Telangana | 27-Jul-2015 | Telangana | Under Construction |
1482 | Construction of Jeur tunnel in length of 27.0 Km at Karmala in Solapur district * | 472.08 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 24-Aug-2009 | Maharashtra | Under Construction |
1483 | Construction of Parwan Gravity dam of 490 million cubic metre (MCM) and tunnel in Khanpur * | 673.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Rajasthan | 22-May-2017 | Rajasthan | Under Construction |
1484 | Construction of road over bridge on Kamptee-Lihigaon road in length of 2 km in Nagpur district* | 65.29 | Transport | Roads and bridges | Public Works Department, Maharashtra | 31-Mar-2015 | Maharashtra | Under Construction |
1485 | Construction of road over bridge on Ramtek-Bhandara road in length of 1 km in Nagpur district* | 71.54 | Transport | Roads and bridges | Public Works Department, Maharashtra | 31-Mar-2015 | Maharashtra | Under Construction |
1486 | Construction of road over bridge on Umred-Butibori road in length of 1 km in Nagpur* | 76.00 | Transport | Roads and bridges | Public Works Department, Maharashtra | 30-Jun-2014 | Maharashtra | Under Construction |
1487 | Construction of road over bridges on Ramtek-Amgaon road in length of1.9 km in Gondia district* | 75.90 | Transport | Roads and bridges | Public Works Department, Maharashtra | 31-Mar-2015 | Maharashtra | Under Construction |
1488 | Construction of ROB on Mehsana bypass in length of 2.0 Km* | 60.00 | Transport | Roads and bridges | Roads and Buildings Department, Gujarat | 23-Apr-2015 | Gujarat | Under Construction |
1489 | Construction of three flyovers in total length of 1.8 km at Thane * | 221.00 | Transport | Roads and bridges | Thane Municipal Corporation | 31-Jul-2015 | Maharashtra | Under Construction |
1490 | Construction of two lane bypass in length of 7 Km at Sonepur Bazari * | 60.93 | Transport | Roads and bridges | Public Works Department, West Bengal | 25-Feb-2016 | West Bengal | Under Construction |
1491 | Construction of two lane carriageway in length of 62.9 Km on NH-57* | 226.31 | Transport | Roads and bridges | Public Works Department, Odisha | 19-Oct-2015 | Odisha | Under Construction |
1492 | Dehradun Sewerage Scheme (Zone H) * | 62.46 | Water Sanitation | Sewage collection, treatment and disposal system | Uttarakhand Peyjal Nigam | 01-Sep-2009 | Uttarakhand | Under Construction |
1493 | Development of 11.9 km Goverdhan bypass road in Mathura* | 88.29 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 30-Jun-2015 | Uttar Pradesh | Under Construction |
1494 | Development of convention centre on 6.5 acres at Rajarhat * | 364.04 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | West Bengal Housing Infrastructure Development Corporation Limited | 16-Jun-2014 | West Bengal | Under Construction |
1495 | Development of three lane road from Lucknow Faizabad Road to Lucknow Sultanpur Road in 14 km in Lucknow district* | 252.08 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 28-Mar-2016 | Uttar Pradesh | Under Construction |
1496 | Execution of 100 MLD Underground Sewerage Scheme for Kalwa-Ghodbunder in Thane * | 244.58 | Water Sanitation | Sewage collection, treatment and disposal system | Thane Municipal Corporation | 27-Feb-2009 | Maharashtra | Under Construction |
1497 | Four laning of Agra-Shamshabad road in length of 12.8 km in Agra* | 58.08 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 11-Mar-2013 | Uttar Pradesh | Under Construction |
1498 | Four laning of Bijnor-Noorpur-Chhajlet road in length of 71.1 km in Bijnor district* | 200.80 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Mar-2016 | Uttar Pradesh | Under Construction |
1499 | Four laning of Bilrayan-Panwari road in length of 18 km in Hardoi district* | 144.29 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 30-Jun-2016 | Uttar Pradesh | Under Construction |
1500 | Four laning of Birsa Chowk-Tupudana Chowk Road in length of 7.6 km* | 57.85 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 01-Oct-2013 | Jharkhand | Under Construction |
1501 | Four laning of Devaliya-Rajpipla road in length of 24 km in Kachchh* | 223.67 | Transport | Roads and bridges | Roads and Buildings Department, Gujarat | 14-Sep-2016 | Gujarat | Under Construction |
1502 | Four laning of Etawah-Mainpuri road in length of 22 km in Etawah district* | 224.06 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 11-Mar-2016 | Uttar Pradesh | Under Construction |
1503 | Four laning of Gorakhpur-Mahrajganj-Nichlaul road in length of 11 km in Gorakhapur & Mahrajganj districts* | 118.38 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Mar-2016 | Uttar Pradesh | Under Construction |
1504 | Four laning of Gorakhpur-Mahrajganj-Nichlaul road in length of 19.4 km in Gorakhapur & Mahrajganj districts* | 183.33 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-May-2016 | Uttar Pradesh | Under Construction |
1505 | Four laning of Hagari-Jadacherla section in length of 6.3 Km* | 57.00 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 05-Mar-2016 | Karnataka | Under Construction |
1506 | Four laning of Hamirpur-Kalpi road in length of 21 km in Hamirpur district* | 134.22 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 06-Jan-2016 | Uttar Pradesh | Under Construction |
1507 | Four laning of Hamirpur-Kalpi road in length of 29.9 km in Hamirpur district* | 216.67 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 15-Jul-2013 | Uttar Pradesh | Under Construction |
1508 | Four laning of Huzurabad-Parkala road in length of 30.5 km* | 100.00 | Transport | Roads and bridges | Roads and Buildings Department, Telangana | 30-Jun-2016 | Telangana | Under Construction |
1509 | Four laning of Jhansi-Banda-Mirzapur road in length of 70 km in Banda district* | 114.62 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 27-Jul-2016 | Uttar Pradesh | Under Construction |
1510 | Four laning of Kadi-Thol-Sanand road in length of 21.2 Km in Mahesana district* | 70.00 | Transport | Roads and bridges | Roads and Buildings Department, Gujarat | 08-Jun-2016 | Gujarat | Under Construction |
1511 | Four laning of Kakravita-Panitanki-Phulbari section in length of 37.3 Km* | 600.87 | Transport | Roads and bridges | Public Works Department, West Bengal | 28-May-2015 | West Bengal | Under Construction |
1512 | Four laning of Kota-Darah road in length of 34.3 Km on NH-12* | 621.43 | Transport | Roads and bridges | Public Works Department, Rajasthan | 10-Aug-2016 | Rajasthan | Under Construction |
1513 | Four laning of Lucknow-Ballia road in length of 15 km in Ballia district* | 197.54 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 20-Feb-2013 | Uttar Pradesh | Under Construction |
1514 | Four laning of Lucknow-Ballia road in length of 31.5 km in Lucknow district* | 237.07 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Mar-2016 | Uttar Pradesh | Under Construction |
1515 | Four laning of Lumbini-Duddhi road in length of 24.3 km in Bhadoi district* | 152.78 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Mar-2016 | Uttar Pradesh | Under Construction |
1516 | Four laning of Mahudha-Alina Road in length of 12.9 Km on SH-60 in Kheda district* | 89.00 | Transport | Roads and bridges | Roads and Buildings Department, Gujarat | 03-May-2016 | Gujarat | Under Construction |
1517 | Four laning of Mathura-Deeg road in length of 25 km* | 113.00 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 21-Dec-2016 | Uttar Pradesh | Under Construction |
1518 | Four laning of Naraini-Kalinjar road in length of 26 km* | 112.50 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Jan-2017 | Uttar Pradesh | Under Construction |
1519 | Four laning of NH-34 in length of 5.3 km in North 24-Parganas* | 58.25 | Transport | Roads and bridges | Public Works Department, West Bengal | 14-Feb-2017 | West Bengal | Under Construction |
1520 | Four laning of NH-4A in length of 7 km in North Goa * | 297.00 | Transport | Roads and bridges | Public Works Department, Goa | 02-Apr-2015 | Goa | Under Construction |
1521 | Four laning of Palia-Shahjahanpur-Hardoi-Lucknow road in length of 35 km in Hardoi district* | 202.06 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Aug-2016 | Uttar Pradesh | Under Construction |
1522 | Four laning of Palia-Shahjahanpur-Hardoi-Lucknow road in length of 41 km in Hardoi district* | 227.63 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 30-Jun-2016 | Uttar Pradesh | Under Construction |
1523 | Four laning of Palwal-Tappal-Aligarh Road (SH-22A) and bypass to Jattari Abadi and Khair Abadi * | 417.00 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Dec-2016 | Uttar Pradesh | Under Construction |
1524 | Four laning of Pharenda-Jarwal road in length of 38 km in Gonda district* | 140.80 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 28-Feb-2016 | Uttar Pradesh | Under Construction |
1525 | Four laning of Pilibhit-Bareilly-Mathura-Bharatpur road in length of 20 km in Budaun district* | 123.89 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 19-Dec-2013 | Uttar Pradesh | Under Construction |
1526 | Four laning of Shikohabad-Bhogaon road in length of 17.6 km* | 140.00 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Dec-2016 | Uttar Pradesh | Under Construction |
1527 | Four laning of Shikohabad-Bhogaon road in length of 36.8 km in Firozabad* | 292.44 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 30-Aug-2016 | Uttar Pradesh | Under Construction |
1528 | Four laning of Sonauli-Ballia road in length of 19 km in Gorakhpur district* | 128.26 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Mar-2016 | Uttar Pradesh | Under Construction |
1529 | Four laning of Sonauli-Ballia road in length of 26.1 km in Gorakhpur district* | 151.84 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-May-2016 | Uttar Pradesh | Under Construction |
1530 | Four laning of Triuchengode-Namakkal road (SH-94) in length of 30 Km in Namakkal * | 126.00 | Transport | Roads and bridges | Public Works Department, Tamil Nadu | 27-Dec-2015 | Tamil Nadu | Under Construction |
1531 | Four lanning of NH-12 in length of 8.7 km in Jhalawar * | 80.68 | Transport | Roads and bridges | Public Works Department, Rajasthan | 02-Mar-2017 | Rajasthan | Under Construction |
1532 | Hatwan Irrigation Project * | 284.11 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Maharashtra | 13-Aug-2009 | Maharashtra | Under Construction |
1533 | High Level Bridge (Ramnagar-Bahakuda-Musadiha) Project* | 117.00 | Transport | Roads and bridges | Public Works Department, Odisha | 06-Mar-2013 | Odisha | Under Construction |
1534 | Implementation of 10 MLD sewerage scheme in Burhanpur * | 82.63 | Water Sanitation | Sewage collection, treatment and disposal system | Burhanpur Municipal Corporation | 17-Aug-2017 | Madhya Pradesh | Under Construction |
1535 | Implementation of 100 MLD water supply scheme at Vasai-Virar * | 127.65 | Water Sanitation | Water supply pipeline | Maharashtra Jeevan Pradhikaran | 15-Dec-2008 | Maharashtra | Under Construction |
1536 | Implementation of 12.9 MLD water supply scheme at Bisalpur, Dudu & Chaksu * | 234.95 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 23-Aug-2013 | Rajasthan | Under Construction |
1537 | Implementation of 125 MLD water supply scheme at Pokaran, Falsoond, & Balotra * | 1,367.07 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 28-Sep-2013 | Rajasthan | Under Construction |
1538 | Implementation of 13.5 MLD water supply scheme at Ajmer * | 247.80 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 31-Aug-2013 | Rajasthan | Under Construction |
1539 | Implementation of 130 km water sewerage scheme at Porvorim * | 285.00 | Water Sanitation | Sewage collection, treatment and disposal system | Public Works Department, Goa | 20-Jun-2015 | Goa | Under Construction |
1540 | Implementation of 17 MLD rural water supply scheme at Baori Kallan, Khara & Jalora * | 124.51 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 28-Sep-2013 | Rajasthan | Under Construction |
1541 | Implementation of 17.7 MLD sewage treatment plants at Margao, Mapusa and North Coastal Belt * | 52.00 | Water Sanitation | Sewage collection, treatment and disposal system | Public Works Department, Goa | 29-Jan-2013 | Goa | Under Construction |
1542 | Implementation of 20 MLD Sewerage Scheme and allied works at Gangashehar Zone * | 220.00 | Water Sanitation | Sewage collection, treatment and disposal system | Rajasthan Urban Infrastructure Development Project | 30-Oct-2017 | Rajasthan | Under Construction |
1543 | Implementation of 20.2 MLD rural water supply scheme at Udaipura * | 147.95 | Water Sanitation | Water supply pipeline | Madhya Pradesh Jal Nigam Maryadit | 24-Jan-2014 | Madhya Pradesh | Under Construction |
1544 | Implementation of 22.1 MLD Bhadakha-Chokhala-Bandra East drinking water supply scheme * | 167.99 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 02-Sep-2012 | Rajasthan | Under Construction |
1545 | Implementation of 22.1 MLD water supply scheme at Bisalpur, Dudu & Bassi * | 284.81 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 28-Sep-2013 | Rajasthan | Under Construction |
1546 | Implementation of 220 kV substation at Piran Kaliyar in Haridwar district * | 50.00 | Energy | Electricity transmission | Power Transmission Corporation of Uttarakhand Limited | 31-Jan-2016 | Uttarakhand | Under Construction |
1547 | Implementation of 23.9 MLD water supply scheme at Gagreen * | 308.59 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 01-Sep-2013 | Rajasthan | Under Construction |
1548 | Implementation of 25 MLD water treatment plant on Madai river * | 99.00 | Water Sanitation | Water treatment plants | Public Works Department, Goa | 29-Mar-2014 | Goa | Under Construction |
1549 | Implementation of 26.1 MLD water supply scheme at Banswara & Pratapgarh * | 566.98 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 03-Oct-2013 | Rajasthan | Under Construction |
1550 | Implementation of 28 MLD water supply scheme at Ramsar and Sheo * | 639.50 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 10-Nov-2013 | Rajasthan | Under Construction |
1551 | Implementation of 28.0 MLD water supply scheme at Shiv & Gudamalani in Barmer district * | 639.50 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 10-Nov-2013 | Rajasthan | Under Construction |
1552 | Implementation of 28.2 MLD Panchala-Ghewara-Cherai rural water supply scheme at Osian * | 379.96 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 14-Oct-2013 | Rajasthan | Under Construction |
1553 | Implementation of 30 MLD Nandyal water supply improvement scheme * | 137.34 | Water Sanitation | Water supply pipeline | Public Health and Municipal Engineering Department, Andhra Pradesh | 28-Jul-2017 | Andhra Pradesh | Under Construction |
1554 | Implementation of 30 MLD sewage treatment plant at Ralawata in Jipur district * | 93.90 | Water Sanitation | Sewage collection, treatment and disposal system | Jaipur Development Authority | 21-Dec-2009 | Rajasthan | Under Construction |
1555 | Implementation of 32 MLD sewage treatment plant at Taloja Panchanand Nagar * | 50.00 | Water Sanitation | Sewage collection, treatment and disposal system | City and Industrial Development Corporation of Maharashtra Limited | 21-Aug-2014 | Maharashtra | Under Construction |
1556 | Implementation of 33 kV substation at Ulwe (Phase I) * | 51.00 | Energy | Electricity transmission | City and Industrial Development Corporation of Maharashtra Limited | 29-Jan-2013 | Maharashtra | Under Construction |
1557 | Implementation of 33/11 kV substation at Kharghar (Phase I) * | 70.00 | Energy | Electricity transmission | City and Industrial Development Corporation of Maharashtra Limited | 30-Aug-2012 | Maharashtra | Under Construction |
1558 | Implementation of 400/220 kV Grid Substation at Babai * | 143.08 | Energy | Electricity transmission | Rajasthan Rajya Vidyut Prasaran Nigam Limited | 09-Aug-2009 | Rajasthan | Under Construction |
1559 | Implementation of 400/220 kV Grid Substation at Jodhpur * | 100.38 | Energy | Electricity transmission | Rajasthan Rajya Vidyut Prasaran Nigam Limited | 27-Feb-2013 | Rajasthan | Under Construction |
1560 | Implementation of 45.0 MLD water supply scheme at Gudamalani in Barmer district * | 121.48 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 04-Apr-2013 | Rajasthan | Under Construction |
1561 | Implementation of Narmada FR Cluster Water Supply Project * | 525.40 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 01-Oct-2013 | Rajasthan | Under Construction |
1562 | Implementation of Narmada FR Transmission Main Project * | 347.13 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 02-Aug-2007 | Rajasthan | Under Construction |
1563 | Implementation of rural electrification works in Dhanbad under Integrated Power Development Scheme * | 126.38 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 05-Jul-2017 | Jharkhand | Under Construction |
1564 | Implementation of rural electrification works in Dumka under Integrated Power Development Scheme * | 149.40 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 25-Oct-2017 | Jharkhand | Under Construction |
1565 | Implementation of sewerage scheme & water supply scheme in Sehore * | 57.24 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Council, Sehore | 30-Jun-2016 | Madhya Pradesh | Under Construction |
1566 | Implementation of sewerage scheme at Singrauli * | 119.57 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Corporation, Singrauli | 10-Mar-2017 | Madhya Pradesh | Under Construction |
1567 | Implementation of sewerage scheme in Guna * | 75.34 | Water Sanitation | Sewage collection, treatment and disposal system | Guna Municipal Corporation | 21-Nov-2016 | Madhya Pradesh | Under Construction |
1568 | Implementation of sewerage scheme in Gwalior * | 350.00 | Water Sanitation | Sewage collection, treatment and disposal system | Gwalior Municipal Corporation | 04-Sep-2017 | Madhya Pradesh | Under Construction |
1569 | Implementation of sewerage scheme in Katni * | 86.32 | Water Sanitation | Sewage collection, treatment and disposal system | Katni Municipal Corporation | 16-Feb-2017 | Madhya Pradesh | Under Construction |
1570 | Implementation of sewerage scheme in Neemuch * | 60.25 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Council, Neemuch | 24-Nov-2016 | Madhya Pradesh | Under Construction |
1571 | Implementation of sewerage scheme in Ratlam * | 120.54 | Water Sanitation | Sewage collection, treatment and disposal system | Ratlam Municipal Corporation | 28-Dec-2016 | Madhya Pradesh | Under Construction |
1572 | Implementation of solid waste management scheme with a capacity of 500 MT at Dum Dum * | 55.73 | Water Sanitation | Solid waste management | Kolkata Metropolitan Development Authority | 10-Aug-2017 | West Bengal | Under Construction |
1573 | Implementation of surface water base water supply scheme with capacity of 30 MLD for Panskura-II block * | 219.68 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, West Bengal | 27-Mar-2015 | West Bengal | Under Construction |
1574 | Implementation of water supply scheme in Mandsaur * | 55.26 | Water Sanitation | Water supply pipeline | Municipal Council, Mandsaur | 03-Jun-2016 | Madhya Pradesh | Under Construction |
1575 | Laying of 200.0 CKM Ramgarh-Akal transmission line * | 74.05 | Energy | Electricity transmission | Rajasthan Rajya Vidyut Prasaran Nigam Limited | 27-Oct-2014 | Rajasthan | Under Construction |
1576 | Laying of 213 CKM Phagi-Ajmer transmission line * | 84.00 | Energy | Electricity transmission | Rajasthan Rajya Vidyut Prasaran Nigam Limited | 02-Feb-2015 | Rajasthan | Under Construction |
1577 | Laying of 220 KV Buttibori-Ambazari MC line in Nagpur district * | 57.59 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 27-Aug-2009 | Maharashtra | Under Construction |
1578 | Laying of 25.0 CKM transmission lines in Uttarakhand * | 103.14 | Energy | Electricity transmission | Power Transmission Corporation of Uttarakhand Limited | 09-Sep-2011 | Uttarakhand | Under Construction |
1579 | Laying of 320.4 CKM Bhilwara-Ajmer transmission line * | 55.63 | Energy | Electricity transmission | Rajasthan Rajya Vidyut Prasaran Nigam Limited | 26-Sep-2012 | Rajasthan | Under Construction |
1580 | Laying of 400 kV Babhaleshwar-Kudus-Padghe DCQ line * | 371.04 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 11-Apr-2011 | Maharashtra | Under Construction |
1581 | Laying of 480.0 CKM Suratgarh TPS-Babai transmission line * | 223.24 | Energy | Electricity transmission | Rajasthan Rajya Vidyut Prasaran Nigam Limited | 21-Jan-2011 | Rajasthan | Under Construction |
1582 | Laying of Joshimath-Pipalkoti transmission line in length of 20.3 CKM * | 88.25 | Energy | Electricity transmission | Power Transmission Corporation of Uttarakhand Limited | 14-Oct-2011 | Uttarakhand | Under Construction |
1583 | Major Bridge (Kolmandala-Veshvi) Project* | 181.30 | Transport | Roads and bridges | Public Works Department, Maharashtra | 14-May-2013 | Maharashtra | Under Construction |
1584 | Manu Medium Irrigation Project * | 98.71 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Public Works Department, Tripura | 31-Dec-1986 | Tripura | Under Construction |
1585 | Micro & Macro Drainage (Central Basin) Project * | 51.00 | Water Sanitation | Storm water drainage system | Tamil Nadu Urban Finance and Infrastructure Development Corporation | Not Available | Tamil Nadu | Under Construction |
1586 | Micro & Macro Drainage (Southern Basin) Project * | 227.35 | Water Sanitation | Storm water drainage system | Tamil Nadu Urban Finance and Infrastructure Development Corporation | Not Available | Tamil Nadu | Under Construction |
1587 | Paved Shoulders (Aurangabad-Nagar Naka- Ellora) Project* | 50.00 | Transport | Roads and bridges | Public Works Department, Maharashtra | 30-Apr-2015 | Maharashtra | Under Construction |
1588 | Power Transmission (Ahamadnagar Rural) Project - Phase B - Part II * | 147.66 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 30-Dec-2013 | Maharashtra | Under Construction |
1589 | R-O-B (Kamarkundu) Project* | 52.57 | Transport | Roads and bridges | Public Works Department, West Bengal | 24-Jul-2015 | West Bengal | Under Construction |
1590 | R-O-B (Renigunta -Tirupathi) Project* | 57.51 | Transport | Roads and bridges | South Central Railway | Not Available | Andhra Pradesh | Under Construction |
1591 | R-O-B (Trichirapalli) Project* | 52.51 | Transport | Roads and bridges | Public Works Department, Tamil Nadu | 28-Feb-2014 | Tamil Nadu | Under Construction |
1592 | Road Upgradation (Ambah Branch Canal) Project* | 152.17 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 31-Aug-2016 | Madhya Pradesh | Under Construction |
1593 | Road Upgradation (Anantapur-Mudigubba) Project* | 61.96 | Transport | Roads and bridges | Roads and Buildings Department, Andhra Pradesh | 12-Nov-2014 | Andhra Pradesh | Under Construction |
1594 | Road Upgradation (Ankleshwar-Zagadia-Rajpipla) Project* | 239.00 | Transport | Roads and bridges | Roads and Buildings Department, Gujarat | 22-Jun-2016 | Gujarat | Under Construction |
1595 | Road Upgradation (Anne Ghat-Ahmednagar Bypass) Project* | 163.64 | Transport | Roads and bridges | Public Works Department, Maharashtra | 10-Nov-2014 | Maharashtra | Under Construction |
1596 | Road Upgradation (Antagarh-Bedma) Project * | 52.38 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 23-Sep-2010 | Chhattisgarh | Under Construction |
1597 | Road Upgradation (AP Boarder to Anantapur) Project* | 309.01 | Transport | Roads and bridges | Roads and Buildings Department, Andhra Pradesh | 31-Mar-2015 | Andhra Pradesh | Under Construction |
1598 | Road Upgradation (Arang-Nayapara-Kurud) Project* | 132.98 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 14-Apr-2015 | Chhattisgarh | Under Construction |
1599 | Road Upgradation (Aundipatty-Theni) Project * | 60.70 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 24-Dec-2014 | Tamil Nadu | Under Construction |
1600 | Road Upgradation (Azamgarh-Doharighat) Project* | 133.66 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 30-Apr-2016 | Uttar Pradesh | Under Construction |
1601 | Road Upgradation (Baliguda-Barakhama-Khamankhole-Sindhiguda) Project* | 52.44 | Transport | Roads and bridges | Public Works Department, Odisha | 28-Dec-2015 | Odisha | Under Construction |
1602 | Road Upgradation (Banda-Baberu-Kamasin-Rajapur) Project* | 60.70 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Dec-2015 | Uttar Pradesh | Under Construction |
1603 | Road Upgradation (Bankura-Durgapur) Project* | 70.92 | Transport | Roads and bridges | Public Works Department, West Bengal | 31-May-2015 | West Bengal | Under Construction |
1604 | Road Upgradation (Bareilly-NH-730A) Project* | 134.11 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Mar-2014 | Uttar Pradesh | Under Construction |
1605 | Road Upgradation (Bewar-Etawah-Gwalior) Project* | 110.96 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Jan-2015 | Uttar Pradesh | Under Construction |
1606 | Road Upgradation (Bhagalpur-Hansdia) Project* | 52.61 | Transport | Roads and bridges | Road Construction Department, Bihar | 25-Feb-2016 | Bihar | Under Construction |
1607 | Road Upgradation (Bharatpur-Bayana-Gangapur-Bhadoti) Project* | 339.99 | Transport | Roads and bridges | Rajasthan State Road Development and Construction Corporation Limited | 31-Dec-2015 | Rajasthan | Under Construction |
1608 | Road Upgradation (Bheemunipatnam-Visakhapatnam) Project* | 65.00 | Transport | Roads and bridges | Roads and Buildings Department, Andhra Pradesh | 05-Aug-2015 | Andhra Pradesh | Under Construction |
1609 | Road Upgradation (Bhitoura-Baheri) Project* | 77.00 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 30-Apr-2016 | Uttar Pradesh | Under Construction |
1610 | Road Upgradation (Bhokardan-Jalna-Partur) Project* | 53.25 | Transport | Roads and bridges | Public Works Department, Maharashtra | 28-Sep-2015 | Maharashtra | Under Construction |
1611 | Road Upgradation (Bilrayan-Panwari & Nepalapur-Bijwar) Project* | 158.00 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 30-Apr-2016 | Uttar Pradesh | Under Construction |
1612 | Road Upgradation (Biswan-Laharpur-Hargaon) Project* | 53.60 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Mar-2016 | Uttar Pradesh | Under Construction |
1613 | Road Upgradation (Burdwan-Katwa) Project* | 83.06 | Transport | Roads and bridges | Public Works Department, West Bengal | 22-Dec-2014 | West Bengal | Under Construction |
1614 | Road Upgradation (Chakauti Bazar-Dumara Road) Project* | 51.77 | Transport | Roads and bridges | Road Construction Department, Bihar | 17-Jun-2015 | Bihar | Under Construction |
1615 | Road Upgradation (Chakia-Madhuban-Sheohar) Project* | 109.07 | Transport | Roads and bridges | Road Construction Department, Bihar | 23-Aug-2014 | Bihar | Under Construction |
1616 | Road Upgradation (Chandbali-Bhadrak-Anandpur) Project* | 248.12 | Transport | Roads and bridges | Public Works Department, Odisha | 01-Nov-2013 | Odisha | Under Construction |
1617 | Road Upgradation (Chandi-Chhabilapur) Project* | 50.14 | Transport | Roads and bridges | Road Construction Department, Bihar | 14-Mar-2015 | Bihar | Under Construction |
1618 | Road Upgradation (Chiraiyakot-Mohamdabad-Ghosi-Madhuban) Project* | 86.00 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 03-Nov-2015 | Uttar Pradesh | Under Construction |
1619 | Road Upgradation (Dahikonda-Jagdalpur) Project* | 175.99 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 24-Mar-2015 | Chhattisgarh | Under Construction |
1620 | Road Upgradation (Dausa-Dudu) Project* | 80.00 | Transport | Roads and bridges | Public Works Department, Rajasthan | 22-May-2016 | Rajasthan | Under Construction |
1621 | Road Upgradation (Didarganj-Bakhtiyarpur) Project* | 95.02 | Transport | Roads and bridges | Road Construction Department, Bihar | 30-Sep-2015 | Bihar | Under Construction |
1622 | Road Upgradation (Dighwara-Amnour-Taraiya) Project* | 56.01 | Transport | Roads and bridges | Road Construction Department, Bihar | 22-Aug-2014 | Bihar | Under Construction |
1623 | Road Upgradation (Etah-Shikohabad) Project* | 122.00 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Mar-2016 | Uttar Pradesh | Under Construction |
1624 | Road Upgradation (Etawah-Mainpuri-Kurawali) Project* | 203.70 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Mar-2013 | Uttar Pradesh | Under Construction |
1625 | Road Upgradation (Etawah-NH-92) Project* | 66.29 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 30-Sep-2015 | Uttar Pradesh | Under Construction |
1626 | Road Upgradation (Halgatti-Ramdurga-Badami) Project* | 146.05 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 23-Jun-2015 | Karnataka | Under Construction |
1627 | Road Upgradation (Harsud-Chharkheda) Project* | 58.16 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 02-Dec-2015 | Madhya Pradesh | Under Construction |
1628 | Road Upgradation (Hyderabad-Tokapalli) Project * | 52.11 | Transport | Roads and bridges | Roads and Buildings Department, Andhra Pradesh | 22-Apr-2015 | Telangana | Under Construction |
1629 | Road Upgradation (Igatpuri-Bhaali Wasali-Taked-Bhandardarawadi) Project* | 50.00 | Transport | Roads and bridges | Public Works Department, Maharashtra | 20-Oct-2015 | Maharashtra | Under Construction |
1630 | Road Upgradation (Jairamnagar-Masturi- Malhar-J0ndhara-Lawan) Project* | 129.76 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 20-Apr-2015 | Chhattisgarh | Under Construction |
1631 | Road Upgradation (Jalaun-Orai) Project* | 166.07 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Jan-2016 | Uttar Pradesh | Under Construction |
1632 | Road Upgradation (Jaleswar-Batagram-Chandaneswar) Project* | 63.43 | Transport | Roads and bridges | Public Works Department, Odisha | 11-Feb-2016 | Odisha | Under Construction |
1633 | Road Upgradation (Jaora-Sitamau) Project* | 64.20 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 29-Sep-2015 | Madhya Pradesh | Under Construction |
1634 | Road Upgradation (Jojindernagar - Sarkaghat - Ghumarwim) Project * | 98.30 | Transport | Roads and bridges | Public Works Department, Himachal Pradesh | 29-Nov-2013 | Himachal Pradesh | Under Construction |
1635 | Road Upgradation (Kalpi-Rath) Project* | 53.07 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Jan-2016 | Uttar Pradesh | Under Construction |
1636 | Road Upgradation (Karad-Malkapur-Dhebewadi) Project* | 82.00 | Transport | Roads and bridges | Public Works Department, Maharashtra | 31-Aug-2014 | Maharashtra | Under Construction |
1637 | Road Upgradation (Katangi-Pola-Manjholi-Abhana-Bachaiya) Project* | 53.70 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 10-Jun-2016 | Madhya Pradesh | Under Construction |
1638 | Road Upgradation (Khairaghat-Jhulnipur-Patlawa) Project* | 132.01 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Jan-2014 | Uttar Pradesh | Under Construction |
1639 | Road Upgradation (Khamaarpani-Sabarni-Lodhikheda-Reymond Chowk) Project* | 50.00 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 31-Jul-2016 | Madhya Pradesh | Under Construction |
1640 | Road Upgradation (Khara Pathar-Hatkoti-Rohru) Project * | 185.16 | Transport | Roads and bridges | Public Works Department, Himachal Pradesh | 19-Nov-2013 | Himachal Pradesh | Under Construction |
1641 | Road Upgradation (Kharwandi Kasar-NH-211) Project* | 191.65 | Transport | Roads and bridges | Public Works Department, Maharashtra | 20-Nov-2014 | Maharashtra | Under Construction |
1642 | Road Upgradation (Lalganj-Haliya-Andawa-Manigaraha-MP Border) Project* | 93.75 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 01-Aug-2016 | Uttar Pradesh | Under Construction |
1643 | Road Upgradation (Lauria-Sugauli) Project* | 53.12 | Transport | Roads and bridges | Road Construction Department, Bihar | 16-Mar-2015 | Bihar | Under Construction |
1644 | Road Upgradation (Madhepura NH-327-E) Project* | 57.00 | Transport | Roads and bridges | Road Construction Department, Bihar | 27-Mar-2015 | Bihar | Under Construction |
1645 | Road Upgradation (Majhwe-Narhat-Fatehpur-Akbarpur-Thali) Project* | 53.73 | Transport | Roads and bridges | Road Construction Department, Bihar | 27-Jun-2015 | Bihar | Under Construction |
1646 | Road Upgradation (Makoda-Bagwai-Kariyawati-Dhoomeshwar) Project* | 65.00 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 31-Mar-2016 | Madhya Pradesh | Under Construction |
1647 | Road Upgradation (Malshej Ghat-Anne Ghat) Project* | 210.91 | Transport | Roads and bridges | Public Works Department, Maharashtra | 10-Nov-2014 | Maharashtra | Under Construction |
1648 | Road Upgradation (Maniya-Lawa) Project* | 139.60 | Transport | Roads and bridges | Road Construction Department, Bihar | 27-Aug-2011 | Bihar | Under Construction |
1649 | Road Upgradation (Memari-Manteswar) Project* | 59.14 | Transport | Roads and bridges | Public Works Department, West Bengal | 16-Mar-2015 | West Bengal | Under Construction |
1650 | Road Upgradation (Mungeli-Lormi-Pandariya) Project* | 129.76 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 12-Apr-2016 | Chhattisgarh | Under Construction |
1651 | Road Upgradation (Nagaur bypass-Netra) Project* | 148.00 | Transport | Roads and bridges | Public Works Department, Rajasthan | 01-Dec-2014 | Rajasthan | Under Construction |
1652 | Road Upgradation (Nashik Peth-Gujarat Border) Project* | 289.60 | Transport | Roads and bridges | Public Works Department, Maharashtra | 22-Mar-2016 | Maharashtra | Under Construction |
1653 | Road Upgradation (Netra-Mandore) Project* | 184.00 | Transport | Roads and bridges | Public Works Department, Rajasthan | 01-Dec-2014 | Rajasthan | Under Construction |
1654 | Road Upgradation (NH-211-Manwath) Project* | 327.07 | Transport | Roads and bridges | Public Works Department, Maharashtra | 08-Dec-2014 | Maharashtra | Under Construction |
1655 | Road Upgradation (NH-28B) Project* | 80.90 | Transport | Roads and bridges | Road Construction Department, Bihar | 03-Sep-2015 | Bihar | Under Construction |
1656 | Road Upgradation (NH-3 Choudhary Dhaba-Vicky Factory) Project* | 50.00 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 31-Oct-2015 | Madhya Pradesh | Under Construction |
1657 | Road Upgradation (North 24 Parganas- NH-34) Project* | 66.45 | Transport | Roads and bridges | Public Works Department, West Bengal | 10-Nov-2014 | West Bengal | Under Construction |
1658 | Road Upgradation (Palia-Shahjahanpur-Hardoi-Lucknow) Project* | 74.89 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 08-Mar-2016 | Uttar Pradesh | Under Construction |
1659 | Road Upgradation (Parra) Project* | 118.93 | Transport | Roads and bridges | Public Works Department, Goa | Not Available | Goa | Under Construction |
1660 | Road Upgradation (Phoop-Chaurela) Project* | 55.25 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 19-Sep-2015 | Uttar Pradesh | Under Construction |
1661 | Road Upgradation (Pushp Vihar-Sheikh Sarai) Project* | 163.20 | Transport | Roads and bridges | South Delhi Municipal Corporation | 08-Sep-2012 | Delhi (UT) | Under Construction |
1662 | Road Upgradation (Rajnandgaon-Kachhe) Project* | 172.76 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 11-Aug-2015 | Chhattisgarh | Under Construction |
1663 | Road Upgradation (Ramaswamy Circle-Bannimantap) Project* | 54.84 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 12-Aug-2015 | Karnataka | Under Construction |
1664 | Road Upgradation (Ranchi-Chaibasa-Jaintgarh) Project* | 93.60 | Transport | Roads and bridges | Public Works Department, Jharkhand | 21-Sep-2010 | Jharkhand | Under Construction |
1665 | Road Upgradation (Ratlam-Malwasa-Khachrod) Project* | 64.00 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 31-Oct-2015 | Madhya Pradesh | Under Construction |
1666 | Road Upgradation (Sagar-Chhatarpur) Project* | 170.00 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 28-Feb-2015 | Madhya Pradesh | Under Construction |
1667 | Road Upgradation (Sarangpur-Sandawta) Project* | 62.74 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 01-Oct-2015 | Madhya Pradesh | Under Construction |
1668 | Road Upgradation (Saundane-Kalwan-Umbarthan-Bardipada) Project* | 82.90 | Transport | Roads and bridges | Public Works Department, Maharashtra | 20-Apr-2015 | Maharashtra | Under Construction |
1669 | Road Upgradation (Simga-Tilda-Kharora-Arang) Project* | 136.96 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 14-Apr-2015 | Chhattisgarh | Under Construction |
1670 | Road Upgradation (Sonauli-Nautanwa-Gorakhpur-Deoriaballia) Project* | 167.02 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Mar-2016 | Uttar Pradesh | Under Construction |
1671 | Road Upgradation (Sultanganj-Belhar-Katoria-Dardmara) Project* | 50.26 | Transport | Roads and bridges | Road Construction Department, Bihar | 01-Sep-2015 | Bihar | Under Construction |
1672 | Road Upgradation (Tatibandh-Khamtarai) Project * | 92.18 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 15-Oct-2014 | Chhattisgarh | Under Construction |
1673 | Road Upgradation (Theog-Kotkhai-Khara Pathar) Project * | 179.44 | Transport | Roads and bridges | Public Works Department, Himachal Pradesh | 19-Nov-2013 | Himachal Pradesh | Under Construction |
1674 | Road Upgradation (Vicky Factory Tiraha-NH-75) Project* | 55.40 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 31-Aug-2015 | Madhya Pradesh | Under Construction |
1675 | Road upgradation of Haggari-Raichur-Jadcharla road in length 55.4 km in Hyderabad * | 99.00 | Transport | Roads and bridges | Roads and Buildings Department, Telangana | 07-Jan-2015 | Telangana | Under Construction |
1676 | Road upgradation of Thakurgarh-Jagannathpur road in length of 41.1 km* | 50.22 | Transport | Roads and bridges | Public Works Department, Odisha | 26-Oct-2015 | Odisha | Under Construction |
1677 | Rural Electrification (Uttar Pradesh) Project [RGGVY 11th Plan-Phase II] #* | 2,625.04 | Energy | Electricity transmission | Madhyanchal Vidyut Vitaran Nigam Limited | 01-Aug-2013 | Uttar Pradesh | Under Construction |
1678 | Setting up a 10 MMTPA second LNG terminal at Dahej in Bharuch district * | 5,060.00 | Energy | Oil/ Gas/ LNG Storage | Petronet LNG Limited | 07-Jan-2014 | Gujarat | Under Construction |
1679 | Setting up of 220 kV Substation at Butibori II in Nagpur district * | 57.59 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 27-Aug-2009 | Maharashtra | Under Construction |
1680 | Setting up of 220 KV substation at Kudus in Thane district * | 119.83 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 27-Aug-2014 | Maharashtra | Under Construction |
1681 | Setting up of 400 kV substation at Aurangabad-II & Kudus-II * | 198.75 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 07-Apr-2011 | Maharashtra | Under Construction |
1682 | Setting up of 51 MW Wind Power Project at Kazhuneerkulam * | 365.00 | Energy | Renewable energy (grid) | NLC India Limited | 02-Sep-2013 | Tamil Nadu | Under Construction |
1683 | Setting up of 60 MLD water treatment plant at Panjrapur * | 71.75 | Water Sanitation | Water supply pipeline | Municipal Corporation of Greater Mumbai | 26-Sep-2012 | Maharashtra | Under Construction |
1684 | Sewage Treatment Plant (Kadugodi & Chikkabanavara) * | 98.00 | Water Sanitation | Sewage collection, treatment and disposal system | Bangalore Water Supply and Sewerage Board | 10-Mar-2014 | Karnataka | Under Construction |
1685 | Sewerage Scheme (Agartala) * | 102.21 | Water Sanitation | Sewage collection, treatment and disposal system | Agartala Municipal Corporation | 27-Jan-2011 | Tripura | Under Construction |
1686 | Sewerage Scheme (Ajmer-Pushkar) * | 112.08 | Water Sanitation | Sewage collection, treatment and disposal system | Ajmer Development Authority | Not Available | Rajasthan | Under Construction |
1687 | Sewerage Scheme (Avadi Municipality) * | 158.05 | Water Sanitation | Sewage collection, treatment and disposal system | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 25-Mar-2010 | Tamil Nadu | Under Construction |
1688 | Sewerage Scheme (Chennai Maduravoyal Municipality) * | 57.45 | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu Urban Finance and Infrastructure Development Corporation | Not Available | Tamil Nadu | Under Construction |
1689 | Sewerage Scheme (Jodhpur) * | 71.97 | Water Sanitation | Sewage collection, treatment and disposal system | Jodhpur Municipal Corporation | Not Available | Rajasthan | Under Construction |
1690 | Special Education Zone (Acharpura) * | 72.50 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Madhya Pradesh Audyogik Kendra Vikas Nigam (Bhopal) Limited | 18-Sep-2013 | Madhya Pradesh | Under Construction |
1691 | Storm Water Drainage (Digiana-Gangyal) Project * | 88.33 | Water Sanitation | Storm water drainage system | Jammu and Kashmir Economic Reconstruction Agency | 14-Oct-2014 | Jammu & Kashmir | Under Construction |
1692 | Storm Water Drainage (Eastern Basin) Project * | 445.81 | Water Sanitation | Storm water drainage system | Tamil Nadu Urban Finance and Infrastructure Development Corporation | Not Available | Tamil Nadu | Under Construction |
1693 | Storm Water Drainage (Northern Basin) Project * | 335.05 | Water Sanitation | Storm water drainage system | Tamil Nadu Urban Finance and Infrastructure Development Corporation | Not Available | Tamil Nadu | Under Construction |
1694 | Storm Water Drainage Scheme (Gurgaon - Sector 58-67) * | 66.92 | Water Sanitation | Storm water drainage system | Haryana Urban Development Authority | 21-Jan-2013 | Haryana | Under Construction |
1695 | Substation (Sonapur and Sonabil) Project * | 107.98 | Energy | Electricity transmission | Assam Electricity Grid Corporation Limited | 20-Jul-2012 | Assam | Under Construction |
1696 | Three laning of Agra-Bah-Kachora Ghat section in length of 56.5 km in Agra* | 205.45 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 03-Nov-2015 | Uttar Pradesh | Under Construction |
1697 | Two laning of 19 km road on NH-150 in Kalaburagi* | 57.47 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 28-Dec-2015 | Karnataka | Under Construction |
1698 | Two laning of Belur-Banavara road in length of 46.6 km in Hassan district* | 160.25 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 16-Sep-2011 | Karnataka | Under Construction |
1699 | Two laning of Bijapur-Hubli section in length of 47.0 Km in Hubli district* | 165.67 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 01-Jan-2016 | Karnataka | Under Construction |
1700 | Two laning of Birpara-Falakata road in length of 24.5 km* | 117.73 | Transport | Roads and bridges | Public Works Department, West Bengal | 01-Mar-2017 | West Bengal | Under Construction |
1701 | Two laning of carriageway in length of 28.9 Km of NH-26* | 95.57 | Transport | Roads and bridges | Public Works Department, Odisha | 18-Sep-2015 | Odisha | Under Construction |
1702 | Two laning of carriageway in length of 52.3 Km* | 239.91 | Transport | Roads and bridges | Public Works Department, Odisha | 26-Oct-2015 | Odisha | Under Construction |
1703 | Two laning of Chopan to MP Border section in length of 33.7 Km in Sonbhadra district* | 90.98 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 30-Sep-2016 | Uttar Pradesh | Under Construction |
1704 | Two laning of Fatehpur-Pali section in length of 23.2 km of NH-65* | 53.99 | Transport | Roads and bridges | Public Works Department, Rajasthan | 28-Oct-2015 | Rajasthan | Under Construction |
1705 | Two laning of Godabhanga-Turum road (SH-54) in length of 39.3 Km in Barugarh district* | 50.37 | Transport | Roads and bridges | Public Works Department, Odisha | 31-Dec-2015 | Odisha | Under Construction |
1706 | Two laning of Gulbarga-Wadi-Yadgir section in length of 15.2 Km in Kalaburagi district* | 66.74 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 01-Jan-2016 | Karnataka | Under Construction |
1707 | Two laning of Gulbarga-Wadi-Yadgir section in length of 19.0 km in Kalaburagi district* | 57.47 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 28-Dec-2015 | Karnataka | Under Construction |
1708 | Two laning of Hasimara-Salsabari road in length of 46.0 Km in Alipurduar district* | 176.00 | Transport | Roads and bridges | Public Works Department, West Bengal | 18-Oct-2016 | West Bengal | Under Construction |
1709 | Two laning of Javaragi-Chamrajnagar section in length of 15.0 Km* | 57.58 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 04-Mar-2016 | Karnataka | Under Construction |
1710 | Two laning of Kaprada-Rajbari road in length of 29.3 km in Valsad* | 208.34 | Transport | Roads and bridges | Roads and Buildings Department, Gujarat | 29-Sep-2016 | Gujarat | Under Construction |
1711 | Two laning of Lakhimpur-Sisiya road in length of 48.8 km* | 225.27 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Mar-2017 | Uttar Pradesh | Under Construction |
1712 | Two laning of Nagaur bypass in length of 19.2 Km of NH-65* | 155.76 | Transport | Roads and bridges | Public Works Department, Rajasthan | 07-Sep-2016 | Rajasthan | Under Construction |
1713 | Two laning of Palia-Shahjahanpur-Hardoi-Lucknow road in length of 65 km in Hardoi district* | 117.51 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Mar-2016 | Uttar Pradesh | Under Construction |
1714 | Two laning of Rairangpur to Joshipur section in length of 35.4 Km* | 92.50 | Transport | Roads and bridges | Public Works Department, Odisha | 27-Aug-2016 | Odisha | Under Construction |
1715 | Two laning of Sevoke-Chalsa section in length of 36.0 Km in Jalpaiguri district* | 89.53 | Transport | Roads and bridges | Public Works Department, West Bengal | 01-Mar-2016 | West Bengal | Under Construction |
1716 | Two laning with paved shoulders of NH-60 in length of 28.6 Km* | 103.45 | Transport | Roads and bridges | Public Works Department, West Bengal | 25-Feb-2016 | West Bengal | Under Construction |
1717 | Two lanning of Bhawanipatna to Koksara road in length of 58.3 km* | 165.06 | Transport | Roads and bridges | Public Works Department, Odisha | 01-Dec-2016 | Odisha | Under Construction |
1718 | Two lanning of NH-89 in length of 27.2 km in Ajmer * | 52.00 | Transport | Roads and bridges | Public Works Department, Rajasthan | 02-Mar-2016 | Rajasthan | Under Construction |
1719 | Underground Sewerage Scheme (Coimbatore) * | 377.13 | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu Urban Finance and Infrastructure Development Corporation | Not Available | Tamil Nadu | Under Construction |
1720 | Underground Sewerage Scheme (Kanyakumari) * | 76.04 | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu Water Supply and Drainage Board | 27-Dec-2012 | Tamil Nadu | Under Construction |
1721 | Underground Sewerage Scheme (Madurai) * | 229.34 | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu Urban Finance and Infrastructure Development Corporation | Not Available | Tamil Nadu | Under Construction |
1722 | Underground Sewerage Scheme (Nagapattinam) * | 79.31 | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu Water Supply and Drainage Board | 26-Jul-2010 | Tamil Nadu | Under Construction |
1723 | Upgradation of Chengannoor-Ettumanoor road in length of 45.8 km of SH-1* | 293.58 | Transport | Roads and bridges | Public Works Department, Kerala | 15-Sep-2014 | Kerala | Under Construction |
1724 | Upgradation of Cherupuzha-Arangom & Koomanthodu-Vallithodu roads in Kannur district* | 191.54 | Transport | Roads and bridges | Public Works Department, Kerala | 03-Mar-2016 | Kerala | Under Construction |
1725 | Upgradation of Aamgachi-Kalyanpur & Dumka Airport-Chaklata road in length of 37.8 km in Giridih* | 72.91 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 10-Feb-2016 | Jharkhand | Under Construction |
1726 | Upgradation of Ahilyapur More to Dakbangla More section in length of 42.2 km* | 51.93 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 02-Nov-2016 | Jharkhand | Under Construction |
1727 | Upgradation of Amba-Gaya road in length of 43.6 km in Banka* | 53.01 | Transport | Roads and bridges | Road Construction Department, Bihar | 04-Sep-2015 | Bihar | Under Construction |
1728 | Upgradation of Ankola-Gooty section in length of 32.4 km* | 51.07 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 17-Jan-2017 | Karnataka | Under Construction |
1729 | Upgradation of Ara-Barhara-Ekuna & Ara-Gothaula-Bhusaula road in length of 28.9 km* | 54.70 | Transport | Roads and bridges | Road Construction Department, Bihar | 03-Mar-2014 | Bihar | Under Construction |
1730 | Upgradation of Asanbani-Haripur & Murabahal-Makrampur road in length of 32.6 km in Dumka* | 59.26 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 19-Jan-2016 | Jharkhand | Under Construction |
1731 | Upgradation of Asansol-Barakar road in length of 21.4 Km in Burdwan district* | 56.40 | Transport | Roads and bridges | Public Works Department, West Bengal | 05-Aug-2015 | West Bengal | Under Construction |
1732 | Upgradation of Aurad-Sadashivgadh road of SH-34 in length of 147.7 km in Kalaburagi & Bidar* | 70.10 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 30-Jun-2016 | Karnataka | Under Construction |
1733 | Upgradation of Bagalkot-Biligiri Rangana Betta Road of SH-57 & Kadur-Srirampura via Maravangi of SH-15* | 64.37 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 29-Jun-2016 | Karnataka | Under Construction |
1734 | Upgradation of Bakutoli-Kurkura-Bano road in length of 34.6 km* | 56.61 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 17-Mar-2016 | Jharkhand | Under Construction |
1735 | Upgradation of Banapur-Gaddanakeri cross & Mangalore-Tiruvannamalai road in length of 30.1 km* | 81.10 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 08-Jan-2016 | Karnataka | Under Construction |
1736 | Upgradation of Bangalore-Mangalore section in length of 33.4 Km* | 85.28 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 23-Nov-2015 | Karnataka | Under Construction |
1737 | Upgradation of Bankhedi-Sandiya road in length of 33.8 km in Hoshangabad* | 56.00 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 30-Jun-2016 | Madhya Pradesh | Under Construction |
1738 | Upgradation of Barabhum-Bandoyan & Jadugora-Sundernagar road in length of 29.9 km in Jamshedpur* | 58.61 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 19-May-2015 | Jharkhand | Under Construction |
1739 | Upgradation of Barasat-Basirhat road in length of 20 Km in North 24 Parganas district* | 106.30 | Transport | Roads and bridges | Public Works Department, West Bengal | 26-Feb-2016 | West Bengal | Under Construction |
1740 | Upgradation of Barked-Biligi Road, Aurad-Sadhashivagad Road & Tikota-Kanmadagi Road in Vijayapura* | 134.45 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 24-Jun-2016 | Karnataka | Under Construction |
1741 | Upgradation of Bellary-Badanahatti,Hagari Farm-Rayapura, Ekkumbi-Molakalmuru and Mylar-Toranagal Road in Bellary* | 58.80 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 30-Jun-2016 | Karnataka | Under Construction |
1742 | Upgradation of Belsand-Chitauni road in length of 4 km* | 66.79 | Transport | Roads and bridges | Road Construction Department, Bihar | 25-Nov-2016 | Bihar | Under Construction |
1743 | Upgradation of Betul to Khandara Aamla-Bordehi road in length of 73 km in Betul* | 129.60 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 27-Jun-2016 | Madhya Pradesh | Under Construction |
1744 | Upgradation of Bhagalpur-Pirpaiti section in length of 23.9 km in Bhagalpur* | 66.90 | Transport | Roads and bridges | Road Construction Department, Bihar | 14-Jun-2012 | Bihar | Under Construction |
1745 | Upgradation of Bhojpur to Chhatabar section in length of 61.0 Km on NH-200* | 251.92 | Transport | Roads and bridges | Public Works Department, Odisha | 26-Oct-2015 | Odisha | Under Construction |
1746 | Upgradation of Bilrayan-Panwari road in length of 86.6 km in Hardoi district* | 132.32 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 28-Feb-2013 | Uttar Pradesh | Under Construction |
1747 | Upgradation of Bishrampur More-Utari & Chainpur-Ramkanda road in length of 41.1 km in Daltanganj* | 63.92 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 16-Apr-2015 | Jharkhand | Under Construction |
1748 | Upgradation of Bokaro-Bermo & Petarwar-Gomia road in length of 37.6 km in Bokaro* | 62.28 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 20-Feb-2014 | Jharkhand | Under Construction |
1749 | Upgradation of Bolangir-Sonepur section in length of 45.8 Km of NH-57* | 157.30 | Transport | Roads and bridges | Public Works Department, Odisha | 16-Nov-2016 | Odisha | Under Construction |
1750 | Upgradation of Chakradharpur-Kuchai & Baraiburu-Saidal road in length of 56.2 km in Manoharpur* | 51.34 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 20-Apr-2015 | Jharkhand | Under Construction |
1751 | Upgradation of Chandur-Rajura road, Pusad-Risod road & Dhamangaon-Yavatmal road in 32.4 km in Amravati* | 51.04 | Transport | Roads and bridges | Public Works Department, Maharashtra | 21-Aug-2014 | Maharashtra | Under Construction |
1752 | Upgradation of Charichhak-Bhanjanagar in length of 106.2 km* | 287.70 | Transport | Roads and bridges | Public Works Department, Odisha | 15-Feb-2017 | Odisha | Under Construction |
1753 | Upgradation of Chatti to Kuru (Tati Chouk) & Kairo Naya Toli to Zingi More Road in length of 36.5 km * | 86.08 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 06-Jun-2016 | Jharkhand | Under Construction |
1754 | Upgradation of Chhendipada Jarapada road & Thakurgarh-Tapdhol road in length of 41 Km in Angul district* | 67.75 | Transport | Roads and bridges | Public Works Department, Odisha | 26-Oct-2015 | Odisha | Under Construction |
1755 | Upgradation of Chipat Junction to Baghara road in length of 25.0 Km in Mayurbhanj district* | 52.43 | Transport | Roads and bridges | Public Works Department, Odisha | 18-Jan-2016 | Odisha | Under Construction |
1756 | Upgradation of Chirki (NH 114-A)-Palma-Rajganj (N.H-2) Road in length of 13.3 km * | 65.03 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 06-Apr-2017 | Jharkhand | Under Construction |
1757 | Upgradation of Coimbatore-Gundlupet section in length of 26.1 Km of NH-67* | 61.40 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 16-Aug-2016 | Karnataka | Under Construction |
1758 | Upgradation of Dhadhakia chowk-Baskichak & Dalahi-Murgimore road in length of 32 km in Dumka* | 58.40 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 23-Apr-2016 | Jharkhand | Under Construction |
1759 | Upgradation of Dhenkanal-Sankarpur & Kankadahad-Mohabirod road in Dhenkanal district* | 50.02 | Transport | Roads and bridges | Public Works Department, Odisha | 30-Sep-2015 | Odisha | Under Construction |
1760 | Upgradation of Domanpur to Kolharm & Tetulmari to Bhuli road in length of 32.3 km in Dhanbad* | 57.53 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 23-Nov-2015 | Jharkhand | Under Construction |
1761 | Upgradation of Ekmighat-Sobhangram road in length of 9.6 Km in Darbhanga district* | 72.66 | Transport | Roads and bridges | Road Construction Department, Bihar | 13-Dec-2013 | Bihar | Under Construction |
1762 | Upgradation of Erach-Mauranipur road in length of 50 km in Jhansi district* | 100.25 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 10-Jan-2014 | Uttar Pradesh | Under Construction |
1763 | Upgradation of Firozabad-Kamalpur Road & Sannati-Sangam & Hunsagi-Kembhavi Road* | 54.29 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 15-Jun-2016 | Karnataka | Under Construction |
1764 | Upgradation of G.P. road-Khairatikar & Boarijore to Ghorichak road in length of 30.8 km in Gumla* | 83.43 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 21-Feb-2016 | Jharkhand | Under Construction |
1765 | Upgradation of Gajendragada-Sorab Road of SH-136 and Karwar-Kaiga-IIkal Road of SH-06 in Gadag & Haveri District* | 78.88 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 17-Jun-2016 | Karnataka | Under Construction |
1766 | Upgradation of Galudih-Narsinghpur & Telco Dhobi more-Barabanki road in length of 22.3 km in Jamshedpur* | 51.59 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 18-Dec-2015 | Jharkhand | Under Construction |
1767 | Upgradation of Gola-Muri Road in length of 11.9 km * | 79.64 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 16-Jan-2017 | Jharkhand | Under Construction |
1768 | Upgradation of Gopiballavpur-Hatibari road in length of 35.0 Km in Paschim Medinipur district* | 56.80 | Transport | Roads and bridges | Public Works Department, West Bengal | 26-May-2014 | West Bengal | Under Construction |
1769 | Upgradation of Gulbarga-Sholapur & Jewargi-Chamarajanagar roads in length of 62.6 km* | 79.37 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 30-Dec-2015 | Karnataka | Under Construction |
1770 | Upgradation of Gurundia-Jarda road in length of 29.8 Km in Sundargarh district* | 53.34 | Transport | Roads and bridges | Public Works Department, Odisha | 16-Oct-2015 | Odisha | Under Construction |
1771 | Upgradation of Holenarasipura-K.R Nagara of SH-108,Hirisave-Chattahalli Road of SH-08 * | 50.00 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 23-Jun-2016 | Karnataka | Under Construction |
1772 | Upgradation of Hospet-Shimoga Road, Bhatkal-Soraba Road & Halagerei-Hulikal Road in Devanagere & Shimoga* | 54.73 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 15-Jun-2016 | Karnataka | Under Construction |
1773 | Upgradation of Jagdispur-Sanhaula & Bihpur-Gopalpur roads in length of 35.8 km Bhagalpur* | 55.27 | Transport | Roads and bridges | Road Construction Department, Bihar | 09-Sep-2015 | Bihar | Under Construction |
1774 | Upgradation of Jamsuli-Langaleswar & Basta-Baliapal roads in length of 11.9 km* | 63.32 | Transport | Roads and bridges | Public Works Department, Odisha | 15-May-2017 | Odisha | Under Construction |
1775 | Upgradation of Jamtara to Nirsa & Jharia-Katras road in length of 31.8 km in Dhanbad* | 85.16 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 15-Jun-2016 | Jharkhand | Under Construction |
1776 | Upgradation of Japla-Navinagar & Padma-Chak Via Manatu road in length of 37.6 km in Daltanganj* | 52.03 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 04-Feb-2015 | Jharkhand | Under Construction |
1777 | Upgradation of Kagawadi-Kaladagi, Mangasuli-Laxmeshwar, Badami-Godachi-Godak Road & Jambooti-Rabakavi Road* | 51.24 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 29-Jun-2016 | Karnataka | Under Construction |
1778 | Upgradation of Kajaldaha-Pakuriya & Maheshpur-Pakuriya road in length of 34.3 km in Pakur* | 66.41 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 21-Jan-2016 | Jharkhand | Under Construction |
1779 | Upgradation of Kamdara-Bero & Banari-Banalat road in length of 37.7 km in Gumla* | 60.55 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 16-Feb-2016 | Jharkhand | Under Construction |
1780 | Upgradation of Kanderbera-Dumuhani bypass & Adityapur Kandra main road in length of 17 km in Saraikela* | 62.94 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 26-Jun-2015 | Jharkhand | Under Construction |
1781 | Upgradation of Karthua-Chitrangi road in length of 36 km in Singrauli* | 63.62 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 05-Sep-2016 | Madhya Pradesh | Under Construction |
1782 | Upgradation of Kharsawan-Rargaon & Ukari-Akarshani-Gaundpur road in length of 44.4 km in Saraikela* | 74.18 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 26-Aug-2015 | Jharkhand | Under Construction |
1783 | Upgradation of Khmarpani-Raymond Chowk section in length of 31.1 km in Chhindwara* | 56.90 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 22-Apr-2016 | Madhya Pradesh | Under Construction |
1784 | Upgradation of Kholapota-Habra road in length of 32.1 Km in North 24 Parganas district* | 58.90 | Transport | Roads and bridges | Public Works Department, West Bengal | 18-Mar-2015 | West Bengal | Under Construction |
1785 | Upgradation of Kudligere-Kammarghatta Road of SH-115,Tumkur-Honnavar Road of SH-116 and Haranahalli-Kumsi Road* | 59.51 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 10-Jun-2016 | Karnataka | Under Construction |
1786 | Upgradation of Lalitpur-Devgarh road in length of 32.3 km* | 50.30 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 18-Nov-2016 | Uttar Pradesh | Under Construction |
1787 | Upgradation of Lucknow-Ballia road in length of 15 km in Lucknow district* | 122.94 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Mar-2016 | Uttar Pradesh | Under Construction |
1788 | Upgradation of Lucknow-Ballia road in length of 43 km in Lucknow district* | 114.53 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 31-Jul-2016 | Uttar Pradesh | Under Construction |
1789 | Upgradation of Malpe-Malkalmur Road, Arabhavi-Challakere Road & Davanagere-Holalu Road in Davanagere* | 63.55 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 15-Jun-2016 | Karnataka | Under Construction |
1790 | Upgradation of Managuli-Bichal Road, Deodurg-Bellary Road and Raravi-Belur Road in Raichur* | 52.88 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 30-Jun-2016 | Karnataka | Under Construction |
1791 | Upgradation of Manika Block Head Quarter Road to Herhanj Road via Matlong in length of 32.5 Km in Latehar district* | 70.39 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 26-Sep-2015 | Jharkhand | Under Construction |
1792 | Upgradation of Manjhatoli-Birkera-Kondra & Sisai-Bhandra road in length of 48 km in Gumla* | 88.99 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 17-Feb-2016 | Jharkhand | Under Construction |
1793 | Upgradation of Maricha-Soude road in length of 35.7 km in Ranchi district* | 75.97 | Transport | Roads and bridges | State Highways Authority of Jharkhand | 07-Oct-2016 | Jharkhand | Under Construction |
1794 | Upgradation of Mesra-Pithoria & Chama Chowk-Damodar Bridge road in length of 29.4 km in Ranchi* | 74.37 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 07-Oct-2015 | Jharkhand | Under Construction |
1795 | Upgradation of Mudugal-Kudithini Road of SH-29, Sandur-Sriguppa Road of SH-49 & Raravi-Belur Road of SH-63* | 57.58 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 30-Jun-2016 | Karnataka | Under Construction |
1796 | Upgradation of Nalhati-Rajgram road in length of 16.0 Km in Birbhum district* | 56.51 | Transport | Roads and bridges | Public Works Department, West Bengal | 25-Feb-2016 | West Bengal | Under Construction |
1797 | Upgradation of Namkum-Doranda & Karamtoli chowk to Potpoto river section in length of 10.9 km in Ranchi* | 59.50 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 26-Jun-2014 | Jharkhand | Under Construction |
1798 | Upgradation of NH-13 in length of 8.2 Km in Chitradurga district* | 76.00 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 03-Aug-2016 | Karnataka | Under Construction |
1799 | Upgradation of NH-167 in length of 55.4 Km in Hyderabad* | 75.89 | Transport | Roads and bridges | Roads and Buildings Department, Telangana | 07-Jan-2015 | Telangana | Under Construction |
1800 | Upgradation of NH-206 and Mudigere hand post to Belur section in length of 56.7 km* | 60.35 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 05-Jan-2017 | Karnataka | Under Construction |
1801 | Upgradation of NH-209 in length of 5.0 Km in Harohally, Halagur & Kaggalipura towns* | 50.00 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 25-Aug-2016 | Karnataka | Under Construction |
1802 | Upgradation of NH-326 in length of 71.0 Km under LWE (KLR section)* | 229.29 | Transport | Roads and bridges | Public Works Department, Odisha | 02-Nov-2015 | Odisha | Under Construction |
1803 | Upgradation of NH-326 in length of 86.0 Km under LWE* | 277.05 | Transport | Roads and bridges | Public Works Department, Odisha | 18-Nov-2015 | Odisha | Under Construction |
1804 | Upgradation of NH-326 with paved shoulder in length of 29.8 Km* | 114.03 | Transport | Roads and bridges | Public Works Department, Odisha | 02-Nov-2015 | Odisha | Under Construction |
1805 | Upgradation of NH-367 and NH-150E in length of 22.9 km* | 72.63 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 31-Dec-2015 | Karnataka | Under Construction |
1806 | Upgradation of NH-55 in length of 1.3 Km at Tindharia* | 137.53 | Transport | Roads and bridges | Public Works Department, West Bengal | 17-Nov-2016 | West Bengal | Under Construction |
1807 | Upgradation of NH-60 in length of 33.0 Km in Bankura district* | 149.55 | Transport | Roads and bridges | Public Works Department, West Bengal | 10-May-2016 | West Bengal | Under Construction |
1808 | Upgradation of Nivari-Sendri road in length of 22.4 km in Tikamgarh* | 57.00 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 30-Jun-2016 | Madhya Pradesh | Under Construction |
1809 | Upgradation of Pachgaon-Kuhi-Ambhora road in length of 26.8 km in Nagpur district* | 58.00 | Transport | Roads and bridges | Public Works Department, Maharashtra | 18-Aug-2016 | Maharashtra | Under Construction |
1810 | Upgradation of Palsa-Bareilly road and NH-31 Town portion in length of 16.3 Km in Purnea district* | 69.21 | Transport | Roads and bridges | Road Construction Department, Bihar | 24-Feb-2014 | Bihar | Under Construction |
1811 | Upgradation of Panchkathiya-Rakshi Barhet & Jojodari-Mohabbatpur road in length of 30.2 km in Sahebganj* | 78.90 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 10-Jun-2016 | Jharkhand | Under Construction |
1812 | Upgradation of Pasakha-Changrabandha road in length of 90.6 km* | 971.40 | Transport | Roads and bridges | Public Works Department, West Bengal | 18-Nov-2014 | West Bengal | Under Construction |
1813 | Upgradation of Pathna-Hiranpur & Mirzachouki-Simra road in length of 34.5 km in Sahebganj* | 61.92 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 09-Sep-2015 | Jharkhand | Under Construction |
1814 | Upgradation of Pilibhit-Basti road in length of 27.9 km in Balrampur district* | 102.00 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 11-Mar-2016 | Uttar Pradesh | Under Construction |
1815 | Upgradation of Ratlam-Kushalgarh road in length of 56 km in Ratlam* | 97.81 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 10-Aug-2016 | Madhya Pradesh | Under Construction |
1816 | Upgradation of road from Gulbarga to Maharashtra Border in length of 46.2 km* | 76.37 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 28-Oct-2014 | Karnataka | Under Construction |
1817 | Upgradation of road in length of 139.8 km on NH-707A & NH-72B in Uttarakhand* | 108.61 | Transport | Roads and bridges | Public Works Department, Uttarakhand | 16-Mar-2017 | Uttarakhand | Under Construction |
1818 | Upgradation of road in length of 5.9 km at Bidadi town and Channapatna town* | 59.49 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 01-Mar-2017 | Karnataka | Under Construction |
1819 | Upgradation of road in length of 6 km at Ramanagara town* | 52.08 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 01-Mar-2017 | Karnataka | Under Construction |
1820 | Upgradation of roads at various locations in Alipurduar district* | 65.96 | Transport | Roads and bridges | Public Works Department, West Bengal | 07-Jan-2015 | West Bengal | Under Construction |
1821 | Upgradation of roads at various locations in Bankura district* | 92.34 | Transport | Roads and bridges | Public Works Department, West Bengal | 20-Feb-2015 | West Bengal | Under Construction |
1822 | Upgradation of roads in length of 39.0 Km at various locations in Darjeeling district* | 56.17 | Transport | Roads and bridges | Public Works Department, West Bengal | 27-Apr-2015 | West Bengal | Under Construction |
1823 | Upgradation of roads in length of 45.1 Km at various locations in Birbhum district* | 114.49 | Transport | Roads and bridges | Public Works Department, West Bengal | 04-Jan-2015 | West Bengal | Under Construction |
1824 | Upgradation of roads in length of 52.2 Km at various locations in Paschim Medinipur district* | 53.99 | Transport | Roads and bridges | Public Works Department, West Bengal | 28-Aug-2014 | West Bengal | Under Construction |
1825 | Upgradation of roads in length of 56.8 Km at various locations in Purulia district* | 57.32 | Transport | Roads and bridges | Public Works Department, West Bengal | 23-Mar-2015 | West Bengal | Under Construction |
1826 | Upgradation of Sagada-Bhedaghat & Sihora-Khadara roads in length of 20.5 km* | 54.60 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 29-Feb-2016 | Madhya Pradesh | Under Construction |
1827 | Upgradation of Sankeshwar-Sangam Road of SH-44 & Kagawadi-Kaladagi Road of SH-53 in Bagalkot District* | 75.37 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 24-Jun-2016 | Karnataka | Under Construction |
1828 | Upgradation of Saraikela-Kharsawan-Adardih Road (MDR-025) in length of 15.4 km * | 102.00 | Transport | Roads and bridges | Road Construction Department, Jharkhand | 21-Aug-2017 | Jharkhand | Under Construction |
1829 | Upgradation of service road along Kazi Nazrul Islam Avenue in length of 2.1 Km in North 24 Parganas district* | 52.60 | Transport | Roads and bridges | Public Works Department, West Bengal | 12-Feb-2016 | West Bengal | Under Construction |
1830 | Upgradation of Shahapur-Shivarampur road in length of 145.8 km in Kalaburagi* | 50.00 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 29-Jun-2016 | Karnataka | Under Construction |
1831 | Upgradation of Shivpuri Loop-Sitlamata-Chinorr road in length of 50.6 km in Gwalior* | 87.84 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 30-Jun-2016 | Madhya Pradesh | Under Construction |
1832 | Upgradation of Sindhanur-Hemmadaga Road, Munoli-Sapatla-Sattigeri Road & Yargatti-Mudhol Road in Belagavi* | 75.65 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 17-Jun-2016 | Karnataka | Under Construction |
1833 | Upgradation of Sonepur to Adenigarh road in length of 89.8 km* | 295.67 | Transport | Roads and bridges | Public Works Department, Odisha | 15-Feb-2017 | Odisha | Under Construction |
1834 | Upgradation of Tadighat-Bara-Chausa-Kumharraj road in length of 38.4 Km in Ghazipur district* | 228.75 | Transport | Roads and bridges | Public Works Department, Uttar Pradesh | 30-Jun-2016 | Uttar Pradesh | Under Construction |
1835 | Upgradation of Taratala to Joka road on Western Flank in length of 8.3 Km in Kolkata district* | 111.45 | Transport | Roads and bridges | Public Works Department, West Bengal | 24-Feb-2016 | West Bengal | Under Construction |
1836 | Upgradation of Thalassery-Kalarode road in length of 28.8 km in Kannur* | 156.33 | Transport | Roads and bridges | Public Works Department, Kerala | 20-May-2016 | Kerala | Under Construction |
1837 | Upgradation of Umarga Border-Putpak Bhosaga,Balki-Chincholli Section and Maharashtra Border-Murki Section in Bidar* | 70.88 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 30-Jun-2016 | Karnataka | Under Construction |
1838 | Upgradation of various roads in length of 109.1 Km in Bagalkot district* | 57.65 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 30-Jun-2016 | Karnataka | Under Construction |
1839 | Upgradation of various roads in length of 112.2 Km in Bidar district* | 58.45 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 30-Jun-2016 | Karnataka | Under Construction |
1840 | Upgradation of various roads in length of 113.3 Km in Kalaburagi district* | 57.05 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 30-Jun-2016 | Karnataka | Under Construction |
1841 | Upgradation of various roads in length of 119.4 Km in Belagavi district* | 81.41 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 29-Jun-2016 | Karnataka | Under Construction |
1842 | Upgradation of various roads in length of 120.9 Km in Koppal district* | 68.38 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 30-Jun-2016 | Karnataka | Under Construction |
1843 | Upgradation of various roads in length of 122.7 Km in Kalaburagi district* | 64.82 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 10-Jun-2016 | Karnataka | Under Construction |
1844 | Upgradation of various roads in length of 132.6 Km in Raichur district* | 60.39 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 29-Jun-2016 | Karnataka | Under Construction |
1845 | Upgradation of various roads in length of 144.8 Km in Chitradurga district* | 82.07 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 20-Jun-2016 | Karnataka | Under Construction |
1846 | Upgradation of various roads in length of 18.4 km in South 24 Parganas* | 52.49 | Transport | Roads and bridges | Public Works Department, West Bengal | 01-Mar-2016 | West Bengal | Under Construction |
1847 | Upgradation of various roads in length of 21.2 km in Baharampur* | 50.88 | Transport | Roads and bridges | Public Works Department, West Bengal | 22-Feb-2016 | West Bengal | Under Construction |
1848 | Upgradation of various roads in length of 24.3 km in Nadia* | 50.62 | Transport | Roads and bridges | Public Works Department, West Bengal | 07-Jan-2016 | West Bengal | Under Construction |
1849 | Upgradation of various roads in length of 26.2 km at Sinnar in Nashik* | 60.40 | Transport | Roads and bridges | Public Works Department, Maharashtra | 19-Nov-2015 | Maharashtra | Under Construction |
1850 | Upgradation of various roads in length of 30.9 km in Midnapore* | 52.39 | Transport | Roads and bridges | Public Works Department, West Bengal | 23-Feb-2016 | West Bengal | Under Construction |
1851 | Upgradation of various roads in length of 31.5 km in Bardhaman* | 55.07 | Transport | Roads and bridges | Public Works Department, West Bengal | 07-Aug-2015 | West Bengal | Under Construction |
1852 | Upgradation of various roads in length of 31.6 km at Barasat* | 88.46 | Transport | Roads and bridges | Public Works Department, West Bengal | 02-Jan-2015 | West Bengal | Under Construction |
1853 | Upgradation of various roads in length of 36 km at Haldwani* | 55.06 | Transport | Roads and bridges | Public Works Department, Uttarakhand | 11-Mar-2016 | Uttarakhand | Under Construction |
1854 | Upgradation of various roads in length of 36.1 km in Malda* | 54.01 | Transport | Roads and bridges | Public Works Department, West Bengal | 26-Feb-2016 | West Bengal | Under Construction |
1855 | Upgradation of various roads in length of 36.3 km at Asansol* | 51.39 | Transport | Roads and bridges | Public Works Department, West Bengal | 30-Dec-2015 | West Bengal | Under Construction |
1856 | Upgradation of various roads in length of 37.5 km in Bardhaman* | 54.27 | Transport | Roads and bridges | Public Works Department, West Bengal | 25-Feb-2016 | West Bengal | Under Construction |
1857 | Upgradation of various roads in length of 40.5 km in Bardhaman* | 58.80 | Transport | Roads and bridges | Public Works Department, West Bengal | 22-Dec-2015 | West Bengal | Under Construction |
1858 | Upgradation of various roads in length of 42.1 km in Howrah* | 50.61 | Transport | Roads and bridges | Public Works Department, West Bengal | 26-Jun-2015 | West Bengal | Under Construction |
1859 | Upgradation of various roads in length of 45.7 km in Cooch Behar* | 55.12 | Transport | Roads and bridges | Public Works Department, West Bengal | 03-Feb-2016 | West Bengal | Under Construction |
1860 | Upgradation of various roads in length of 45.8 km in Midnapore* | 61.30 | Transport | Roads and bridges | Public Works Department, West Bengal | 04-Feb-2016 | West Bengal | Under Construction |
1861 | Upgradation of various roads in length of 46.5 km in Ganjam* | 55.11 | Transport | Roads and bridges | Public Works Department, Odisha | 26-May-2016 | Odisha | Under Construction |
1862 | Upgradation of various roads in length of 49.7 Km in Hassan district* | 52.75 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 30-Jun-2016 | Karnataka | Under Construction |
1863 | Upgradation of various roads in length of 51.3 Km at Balliguda in Kandhamal district* | 99.08 | Transport | Roads and bridges | Public Works Department, Odisha | 25-Feb-2014 | Odisha | Under Construction |
1864 | Upgradation of various roads in length of 53.4 Km in Yadgir district* | 51.02 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 18-Jun-2016 | Karnataka | Under Construction |
1865 | Upgradation of various roads in length of 53.9 Km in Keonjhar district* | 76.38 | Transport | Roads and bridges | Public Works Department, Odisha | 17-Dec-2014 | Odisha | Under Construction |
1866 | Upgradation of various roads in length of 58.2 km in Murshidabad* | 61.30 | Transport | Roads and bridges | Public Works Department, West Bengal | 27-Jan-2016 | West Bengal | Under Construction |
1867 | Upgradation of various roads in length of 58.7 Km in Khordha & Puri districts* | 71.89 | Transport | Roads and bridges | Public Works Department, Odisha | 04-Jul-2014 | Odisha | Under Construction |
1868 | Upgradation of various roads in length of 63.1 km at Diamond Harbour* | 53.37 | Transport | Roads and bridges | Public Works Department, West Bengal | 24-Feb-2016 | West Bengal | Under Construction |
1869 | Upgradation of various roads in length of 63.7 Km in Dakshina Kannada district* | 52.32 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 17-Jun-2016 | Karnataka | Under Construction |
1870 | Upgradation of various roads in length of 64 km in Ganjam* | 54.47 | Transport | Roads and bridges | Public Works Department, Odisha | 26-Dec-2016 | Odisha | Under Construction |
1871 | Upgradation of various roads in length of 67.3 km in Purulia* | 63.05 | Transport | Roads and bridges | Public Works Department, West Bengal | 14-Jan-2016 | West Bengal | Under Construction |
1872 | Upgradation of various roads in length of 68 km in Uttar Dinajpur* | 54.61 | Transport | Roads and bridges | Public Works Department, West Bengal | 29-Feb-2016 | West Bengal | Under Construction |
1873 | Upgradation of various roads in length of 69.5 Km at Madhugiri division in Tumkur district* | 61.29 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 05-Aug-2016 | Karnataka | Under Construction |
1874 | Upgradation of various roads in length of 69.9 km at Barasat* | 54.50 | Transport | Roads and bridges | Public Works Department, West Bengal | 24-Feb-2016 | West Bengal | Under Construction |
1875 | Upgradation of various roads in length of 75.9 Km in Kolar district* | 53.65 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 30-Jun-2016 | Karnataka | Under Construction |
1876 | Upgradation of various roads in length of 87.1 Km in Mysore district* | 75.11 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 29-Jun-2016 | Karnataka | Under Construction |
1877 | Upgradation of various roads in length of 88.3 Km in Chikkamagaluru district* | 55.98 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 10-Jun-2016 | Karnataka | Under Construction |
1878 | Upgradation of various roads in length of 91.8 Km in Chamarajanagar district* | 74.55 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 10-Jun-2016 | Karnataka | Under Construction |
1879 | Upgradation of various roads in length of 92.4 Km in Belagavi district* | 60.98 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 24-Jun-2016 | Karnataka | Under Construction |
1880 | Upgradation of various roads in length of 99.5 Km in Gadag district* | 63.41 | Transport | Roads and bridges | Public Works, Ports and Inland Water Transport Department, Karnataka | 27-Jun-2016 | Karnataka | Under Construction |
1881 | Upgradation Patipukur-Rajarhat road in length of 7.3 km in North 24 Paraganas * | 67.74 | Transport | Roads and bridges | Public Works Department, West Bengal | 23-Dec-2015 | West Bengal | Under Construction |
1882 | Water Supply (Gurgaon Sector 58-80-81-115) Project - (Zone ? VII & VIII) * | 235.80 | Water Sanitation | Water supply pipeline | Haryana Urban Development Authority | 01-May-2013 | Haryana | Under Construction |
1883 | Water Supply (Ranaghat) Project * | 92.39 | Water Sanitation | Water supply pipeline | Department of Municipal Affairs, West Bengal | 09-Dec-2013 | West Bengal | Under Construction |
1884 | Water Supply Scheme (Coimbatore) * | 58.82 | Water Sanitation | Water supply pipeline | Tamil Nadu Urban Finance and Infrastructure Development Corporation | Not Available | Tamil Nadu | Under Construction |
1885 | Water Supply Scheme (Madurai) * | 201.41 | Water Sanitation | Water supply pipeline | Tamil Nadu Urban Finance and Infrastructure Development Corporation | Not Available | Tamil Nadu | Under Construction |
1886 | 220 MW Barauni Thermal Power Project* | 581.20 | Energy | Electricity generation (grid) | Bihar State Power Generation Company Limited | 16-Nov-2009 | Bihar | Under Construction |
1887 | 24x7 Water Supply Scheme (Budge Budge)* | 81.64 | Water Sanitation | Water supply pipeline | Kolkata Metropolitan Water and Sanitation Authority | 26-Feb-2009 | West Bengal | Under Construction |
1888 | 24x7 Water Supply Scheme (Hospet)* | 79.46 | Water Sanitation | Water supply pipeline | Karnataka Urban Infrastructure Development and Finance Corporation | 05-Feb-2015 | Karnataka | Under Construction |
1889 | 4/6 laning of NH-17 in length of 4.4 km in Goa* | 773.98 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 08-Jun-2016 | Goa | Under Construction |
1890 | 4/6/8 laning of NH-17 in length of 8.3 km in Goa* | 819.95 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 08-Jun-2016 | Goa | Under Construction |
1891 | 71.4 MW Wind Power (Kachchh) Project* | 499.80 | Energy | Renewable energy (grid) | Gujarat Industries Power Company Limited | 12-Feb-2016 | Gujarat | Under Construction |
1892 | Angre Port - Jaigad | 431.00 | Transport | Ports (excluding captive) | Maharashtra Maritime Board (MMB) | 28-Mar-2008 | Maharashtra | Operation and Maintenance Stage |
1893 | Ashti Lift Irrigation Scheme* | 142.06 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 01-Nov-2010 | Maharashtra | Under Construction |
1894 | Augmentation of 113 km water supply scheme at Shikohabad in Firozabad* | 97.17 | Water Sanitation | Water supply pipeline | Uttar Pradesh Jal Nigam | 31-Aug-2015 | Uttar Pradesh | Under Construction |
1895 | Augmentation of 116.5 km water supply scheme in Gautam Buddha Nagar and Ghaziabad districts* | 56.23 | Water Sanitation | Water supply pipeline | Uttar Pradesh Jal Nigam | 31-Mar-2015 | Uttar Pradesh | Under Construction |
1896 | Augmentation of 119 km water supply scheme at Tanda, Suar & Bilaspur in Rampur* | 50.06 | Water Sanitation | Water supply pipeline | Uttar Pradesh Jal Nigam | 30-Sep-2015 | Uttar Pradesh | Under Construction |
1897 | Augmentation of 150.8 km water supply scheme in Bulandshahr* | 61.63 | Water Sanitation | Water supply pipeline | Uttar Pradesh Jal Nigam | 31-Oct-2015 | Uttar Pradesh | Under Construction |
1898 | Augmentation of 186.8 km water supply scheme at Chhibramau, Tirvaganj & Saurikh in Kannauj* | 60.62 | Water Sanitation | Water supply pipeline | Uttar Pradesh Jal Nigam | 31-Dec-2014 | Uttar Pradesh | Under Construction |
1899 | Augmentation of 19 MLD water supply scheme in Surendranagar * | 53.10 | Water Sanitation | Water supply pipeline | Gujarat Urban Development Company Limited | 10-Jul-2015 | Gujarat | Under Construction |
1900 | Augmentation of 85.9 km at Robertsganj in Sonbhadra* | 96.02 | Water Sanitation | Water supply pipeline | Uttar Pradesh Jal Nigam | 30-Sep-2015 | Uttar Pradesh | Under Construction |
1901 | Augmentation of water supply scheme in Hamirpur district* | 64.85 | Water Sanitation | Water supply pipeline | Irrigation and Public Health Department, Himachal Pradesh | 28-Feb-2014 | Himachal Pradesh | Under Construction |
1902 | Bagasse Cogeneration project* | 173.00 | Energy | Renewable energy (grid) | Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited | 14-Mar-2014 | Uttar Pradesh | Under Construction |
1903 | Baroh Small Hydel Power Project* | 80.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | 01-Mar-2014 | Madhya Pradesh | Under Construction |
1904 | Barshi Lift Irrigation Scheme* | 230.50 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 10-Oct-1996 | Maharashtra | Under Construction |
1905 | Bhima (Ujjani) Irrigation Project* | 2,118.98 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 17-Jan-2004 | Maharashtra | Under Construction |
1906 | Bisalpur-Tonk-Uniyara Drinking Water Supply Scheme* | 443.80 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 03-Aug-2013 | Rajasthan | Under Construction |
1907 | Borghat Lift Irrigation Scheme* | 121.46 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Maharashtra | 31-Jul-2009 | Maharashtra | Under Construction |
1908 | Bridge (Pathalam) Project* | 59.92 | Water Sanitation | Water supply pipeline | Department of Irrigation, Kerala | 13-Feb-2011 | Kerala | Under Construction |
1909 | Bridge (Purapillikkavu) Project* | 100.00 | Water Sanitation | Water supply pipeline | Department of Irrigation, Kerala | 24-Apr-2014 | Kerala | Under Construction |
1910 | Bridges (New NH-63) Project* | 55.08 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 27-Nov-2015 | Chhattisgarh | Under Construction |
1911 | Bypass (Rajnandgaon) Project* | 56.60 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 28-Apr-2011 | Chhattisgarh | Under Construction |
1912 | Chandi River Minor Irrigation Project* | 151.69 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
1913 | City Gas Distribution (Hyderabad & Vijayawada) Project* | Not Available | Energy | City gas distribution | Bhagyanagar Gas Limited | Not Available | Multi State/ Centre | Under Construction |
1914 | Cogeneration power project (Solapur)* | 105.84 | Energy | Electricity generation (grid) | Maharashtra Energy Development Agency | 04-Aug-2014 | Maharashtra | Under Construction |
1915 | Combined Water Supply Scheme (Kanyakumari)* | 84.35 | Water Sanitation | Water supply pipeline | Tamil Nadu Water Supply and Drainage Board | 19-Aug-2015 | Tamil Nadu | Under Construction |
1916 | Combined Water Supply Scheme (Koodankulam)* | 68.10 | Water Sanitation | Water supply pipeline | Tamil Nadu Water Supply and Drainage Board | 30-Mar-2015 | Tamil Nadu | Under Construction |
1917 | Combined Water Supply Scheme (Tiruppur)* | 54.14 | Water Sanitation | Water supply pipeline | Tamil Nadu Water Supply and Drainage Board | 04-Dec-2014 | Tamil Nadu | Under Construction |
1918 | Combined Water Supply Scheme (Trichy) Natham* | 438.98 | Water Sanitation | Water supply pipeline | Tamil Nadu Water Supply and Drainage Board | 30-Mar-2015 | Tamil Nadu | Under Construction |
1919 | Common Effluent Treatment Plant (Nonand)* | 50.76 | Water Sanitation | Sewage collection, treatment and disposal system | Haryana State Industrial and Infrastructure Development Corporation | 30-Sep-2014 | Haryana | Under Construction |
1920 | Construction of 11 kV feeders for Scheme of Nirantara Jyothi Yojana Phase-I in Bidar,Yadgir & Koppal districts* | 89.87 | Energy | Electricity transmission | Gulbarga Electricity Supply Company Limited | 01-Oct-2010 | Karnataka | Under Construction |
1921 | Construction of 11 kV feeders under the scheme of Nirantara Jyothi Yojana Phase-I in Ballari district* | 78.89 | Energy | Electricity transmission | Gulbarga Electricity Supply Company Limited | 01-Oct-2010 | Karnataka | Under Construction |
1922 | Construction of 11 kV feeders under the scheme of Nirantara Jyothi Yojana Phase-I in Gulbarga district* | 56.60 | Energy | Electricity transmission | Gulbarga Electricity Supply Company Limited | 01-Oct-2010 | Karnataka | Under Construction |
1923 | Construction of 11 kV feeders under the scheme of Nirantara Jyothi Yojana Phase-I in Raichur district* | 108.54 | Energy | Electricity transmission | Gulbarga Electricity Supply Company Limited | 01-Oct-2010 | Karnataka | Under Construction |
1924 | Construction of 11 kV feeders under the scheme of Nirantara Jyothi Yojana Phase-II in Bidar district* | 50.00 | Energy | Electricity transmission | Gulbarga Electricity Supply Company Limited | 16-Aug-2011 | Karnataka | Under Construction |
1925 | Construction of 4.8 km, Elevated Road Vishwa Bharti-Sector 61 at Noida in Gautam Budh Nagar* | 500.00 | Transport | Roads and bridges | New Okhla Industrial Development Authority (NOIDA) | 10-Feb-2015 | Uttar Pradesh | Under Construction |
1926 | Construction of Basantpur barrage with a capacity of 50.6 CBM in Janjgir-Champa district* | 255.55 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Chhattisgarh | 02-Oct-2011 | Chhattisgarh | Under Construction |
1927 | Construction of central bus terminal on 6.3 acres at Makarpura in Vadodara | 60.28 | Transport | Urban public transport (except rolling stock) | Gujarat State Road Transport Corporation | 26-Aug-2010 | Gujarat | Operation and Maintenance Stage |
1928 | Construction of Deep draught coal berth on BOT basis by Paradip Port Trust | 656.00 | Transport | Ports (excluding captive) | Paradip Port Trust | 10-Nov-2009 | Odisha | Under Construction |
1929 | Construction of High Level Bridge at Hajipur-Sankharisahi Road in length of 1239.40 meters * | 54.06 | Transport | Roads and bridges | Public Works Department, Odisha | 01-Sep-2017 | Odisha | Under Construction |
1930 | Construction of Kalma barrage with a capacity of 50.4 CBM in Janjgir-Champa district* | 259.45 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Chhattisgarh | 26-Nov-2009 | Chhattisgarh | Under Construction |
1931 | Construction of Lawan branch canal in length of 54 km in Raipur district* | 72.35 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Chhattisgarh | 12-Apr-2013 | Chhattisgarh | Under Construction |
1932 | Construction of pre-engineered warehouses in Naya Raipur* | 207.00 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Container Corporation of India Limited | 08-Jul-2016 | Chhattisgarh | Under Construction |
1933 | Construction of pre-stressed bridge over Ravi river of 1.2 km at Keerian-Gandial* | 135.78 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 27-Jun-2017 | Jammu & Kashmir | Under Construction |
1934 | Construction of Saradih barrage with a capacity of 54.2 CBM in Janjgir-Champa district* | 634.33 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Chhattisgarh | 01-Aug-2011 | Chhattisgarh | Under Construction |
1935 | Construction of Sukha Nalla barrage with a capacity of 12.3 CBM in Raipur district* | 109.20 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Chhattisgarh | 25-Jun-2005 | Chhattisgarh | Under Construction |
1936 | Construction of Wardha barrage at Hadgaon in Yavatmal district* | 340.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 28-Feb-2011 | Maharashtra | Under Construction |
1937 | Development of 12.6 CBM, Bandai Dam in Lalitpur district* | 336.13 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation Department, Uttar Pradesh | 28-Feb-2014 | Uttar Pradesh | Under Construction |
1938 | Development of Biotechnology Park at Gaati SIDCO Phase-III in Kathua District* | 80.00 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Ministry of Science & Technology | 10-Oct-2016 | Jammu & Kashmir | Under Construction |
1939 | Development of multimodal logistics park on 16 acres at Nagulapalli* | 120.00 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Container Corporation of India Limited | 04-Feb-2014 | Chhattisgarh | Under Construction |
1940 | Development of multipurpose storage yards at Chennai Port on 21.3 acres* | 54.00 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Chennai Port Trust | 01-Jan-2017 | Tamil Nadu | Under Construction |
1941 | Development of sub transmission system for Bolpur-Midnapur-Kolkata-Burdwan under NEF Scheme * | 204.21 | Energy | Electricity transmission | West Bengal State Electricity Distribution Company Limited | 14-Aug-2014 | West Bengal | Under Construction |
1942 | Ekrukh Lift Irrigation Scheme* | 280.40 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 20-Dec-1996 | Maharashtra | Under Construction |
1943 | Execution of Eastern Region Strengthening Scheme-XIII* | 121.38 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 12-Dec-2014 | West Bengal | Completed |
1944 | Execution of power transmission works under R-APDRP Part-B scheme in Dehradun district* | 240.89 | Energy | Electricity transmission | Uttarakhand Power Corporation Limited | 26-Feb-2014 | Uttarakhand | Under Construction |
1945 | Execution of power transmission works under R-APDRP Part-B scheme in Haridwar district* | 65.87 | Energy | Electricity transmission | Uttarakhand Power Corporation Limited | 12-Feb-2013 | Uttarakhand | Under Construction |
1946 | Execution of power transmission works under R-APDRP Part-B scheme in Laksar, Kashipur & Jaspur districts* | 55.44 | Energy | Electricity transmission | Uttarakhand Power Corporation Limited | 12-Feb-2013 | Uttarakhand | Under Construction |
1947 | Execution of power transmission works under R-APDRP Part-B scheme in Rudrapur, Gadarpur & Ramnagar districts* | 87.39 | Energy | Electricity transmission | Uttarakhand Power Corporation Limited | 12-Feb-2013 | Uttarakhand | Under Construction |
1948 | Execution of Southern Region system strengthening scheme -XXII* | 243.53 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 28-Feb-2014 | Multi State/ Centre | Completed |
1949 | Execution of transmission system for connectivity for NCC Power Projects Limited* | 188.75 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 31-Aug-2014 | Andhra Pradesh | Completed |
1950 | Execution of transmission system with contingency plan for Evacuation of Power from IL&FS (2x600MW)* | 97.95 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 31-Jan-2014 | Tamil Nadu | Completed |
1951 | Extension of 195 km long transmission line from Rasipalayam 400 KV SS to Dharmapuri (Palavadi) 400 KV SS* | 770.00 | Energy | Electricity transmission | Tamil Nadu Generation and Distribution Corporation Limited | 12-Dec-2015 | Tamil Nadu | Under Construction |
1952 | Feeder Separation Project (Barwani & Sendhwa)* | 43.64 | Energy | Electricity transmission | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited | 04-Dec-2010 | Madhya Pradesh | Under Construction |
1953 | Feeder Separation Project (Khargone I & II)* | 55.27 | Energy | Electricity transmission | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited | 30-Nov-2010 | Madhya Pradesh | Under Construction |
1954 | Feeder Separation Scheme (Datia)* | 52.92 | Energy | Electricity transmission | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | 20-Feb-2016 | Madhya Pradesh | Under Construction |
1955 | Feeder Separation Scheme (Morena)* | 65.45 | Energy | Electricity transmission | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | 03-May-2016 | Madhya Pradesh | Under Construction |
1956 | Feeder Separation Scheme (Rajgarh-I)* | 60.40 | Energy | Electricity transmission | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | 19-Feb-2016 | Madhya Pradesh | Under Construction |
1957 | Flood Banks (Vamsadhara) Project* | 167.21 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 19-Jun-2007 | Andhra Pradesh | Under Construction |
1958 | Flyover (Kummaripalem-Rajiv Gandhi Park) Project* | 447.00 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 06-Feb-2016 | Andhra Pradesh | Under Construction |
1959 | Gas Based Power (Auraiya) Project - Renovation* | Not Available | Energy | Electricity generation (grid) | NTPC Limited | 12-Dec-2012 | Uttar Pradesh | Under Construction |
1960 | Gas Terminal & Pipeline (Konaban) Project* | 253.00 | Energy | Gas pipelines | Oil and Natural Gas Corporation Limited (ONGC) | 18-Aug-2010 | Tripura | Under Construction |
1961 | Ghungshi Barrage Medium Irrigation Project* | 431.60 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
1962 | Hemavathy Left Bank Canal Project - Remodeling* | 620.61 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Cauvery Neeravari Nigam Limited | 29-Oct-2015 | Karnataka | Under Construction |
1963 | Hullahalli Canal Project - Modernisation* | 120.41 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Cauvery Neeravari Nigam Limited | 06-Dec-2015 | Karnataka | Under Construction |
1964 | Implementation of Dr B R Ambedkar Pranahitha-Chevella Sujala Sravanthi lift irrigation scheme on 316 acres * | 40,300.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation and CAD Department, Telangana | 30-Jun-2008 | Telangana | Under Construction |
1965 | Implementation of Pangra Bandi Lift Minor Irrigation Project on 3825 acres at Malegaon in Washim district* | 111.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 01-Feb-2009 | Maharashtra | Under Construction |
1966 | Implementation of Tarped medium irrigation scheme in Chhatarpur district* | 82.74 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 16-Aug-2013 | Madhya Pradesh | Under Construction |
1967 | Implementation of 10 MLD sewage treatment plant at Bodhgaya* | 95.94 | Water Sanitation | Sewage collection, treatment and disposal system | Bihar Urban Infrastructure Development Corporation Limited | 31-Jan-2012 | Bihar | Under Construction |
1968 | Implementation of 11 MLD sewerage scheme at Navelim * | 293.00 | Water Sanitation | Sewage collection, treatment and disposal system | Sewerage & Infrastructural Development Corporation of Goa Limited | 30-Oct-2013 | Goa | Under Construction |
1969 | Implementation of 132/33 kV gas insulated substation at Mancheswar-B in Bhubaneswar* | 74.91 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 30-Dec-2015 | Odisha | Under Construction |
1970 | Implementation of 132/33 kV gas insulated substation at Unit-VIII in Bhubaneswar* | 81.75 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 04-Nov-2015 | Odisha | Under Construction |
1971 | Implementation of 19.5 MLD Sagad-Hinotiya Mali rural water supply scheme * | 126.79 | Water Sanitation | Water supply pipeline | Madhya Pradesh Jal Nigam Maryadit | 10-Apr-2017 | Madhya Pradesh | Under Construction |
1972 | Implementation of 21.7 MLD Bansujara (Bada Malhera) multi villages rural water supply scheme * | 187.00 | Water Sanitation | Water supply pipeline | Madhya Pradesh Jal Nigam Maryadit | 18-Apr-2017 | Madhya Pradesh | Under Construction |
1973 | Implementation of 21.9 MLD Majhgain (Block Ajaigrh) multi village rural water supply scheme * | 195.73 | Water Sanitation | Water supply pipeline | Madhya Pradesh Jal Nigam Maryadit | 10-Apr-2017 | Madhya Pradesh | Under Construction |
1974 | Implementation of 220 kV substation and transmission line near Bhuban in Dhenkanal* | 56.34 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 19-Sep-2015 | Odisha | Under Construction |
1975 | Implementation of 220 kV substation at Hariawala in Dehradun district* | 131.14 | Energy | Electricity transmission | Power Transmission Corporation of Uttarakhand Limited | 31-Jan-2016 | Uttarakhand | Under Construction |
1976 | Implementation of 220 kV substation at Mahua Kheraganj* | 111.22 | Energy | Electricity transmission | Power Transmission Corporation of Uttarakhand Limited | 18-Nov-2009 | Uttarakhand | Under Construction |
1977 | Implementation of 35 MLD tertiary sewage treatment plant at Bamroli in Surat * | 95.00 | Water Sanitation | Sewage collection, treatment and disposal system | Surat Municipal Corporation | 31-Jul-2017 | Gujarat | Under Construction |
1978 | Implementation of 43.9 km sewerage scheme at Ayodhya in Faizabad* | 62.56 | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh Jal Nigam | 31-Mar-2014 | Uttar Pradesh | Under Construction |
1979 | Implementation of 45 MLD sewage treatment plant in Bhavnagar* | 51.00 | Water Sanitation | Sewage collection, treatment and disposal system | Bhavnagar Municipal Corporation | 30-May-2015 | Gujarat | Under Construction |
1980 | Implementation of 48 MLD sewerage scheme in Rourkela * | 340.40 | Water Sanitation | Sewage collection, treatment and disposal system | Odisha Water Supply and Sewerage Board | 09-Jan-2017 | Odisha | Under Construction |
1981 | Implementation of 5.5 MLD multi villages rural water supply scheme at Kirgi * | 60.33 | Water Sanitation | Water supply pipeline | Madhya Pradesh Jal Nigam Maryadit | 08-Feb-2017 | Madhya Pradesh | Under Construction |
1982 | Implementation of 54 MLD sewage treatment plant at Sholinganallur in Chennai district* | 68.70 | Water Sanitation | Sewage collection, treatment and disposal system | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | 03-Mar-2016 | Tamil Nadu | Under Construction |
1983 | Implementation of 61776.3 acres Pagra reservoir in Gwalior * | 674.90 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 31-Jan-2017 | Madhya Pradesh | Under Construction |
1984 | Implementation of 64 km, water supply scheme at Agra Nagar, Kalindi Vihar and Firozabad Municipality* | 58.80 | Water Sanitation | Water supply pipeline | Uttar Pradesh Jal Nigam | 28-Feb-2015 | Uttar Pradesh | Under Construction |
1985 | Implementation of 7.5 MLD sewerage scheme at Navelim (Phase I) * | 95.00 | Water Sanitation | Sewage collection, treatment and disposal system | Sewerage & Infrastructural Development Corporation of Goa Limited | 30-Nov-2013 | Goa | Under Construction |
1986 | Implementation of 8.0 MLD multi villages rural water supply scheme at Badonkalan * | 65.43 | Water Sanitation | Water supply pipeline | Madhya Pradesh Jal Nigam Maryadit | 08-Feb-2017 | Madhya Pradesh | Under Construction |
1987 | Implementation of 9.5 MLD Siddhghat/Sakri-Morchaghat multi village rural water supply scheme * | 89.27 | Water Sanitation | Water supply pipeline | Madhya Pradesh Jal Nigam Maryadit | 28-Mar-2017 | Madhya Pradesh | Under Construction |
1988 | Implementation of a reservoir on Sakri river in Hazaribagh district* | 141.19 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 06-Apr-2016 | Madhya Pradesh | Under Construction |
1989 | Implementation of Alampur lift irrigation scheme in Mahaboob Nagar district* | 2,347.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Telangana State Irrigation Development Corporation Limited | 30-Nov-2013 | Telangana | Under Construction |
1990 | Implementation of an Irrigation for Manjarpada Diversion Scheme at Surgana taluka in Nashik district* | 336.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 31-Dec-2009 | Maharashtra | Under Construction |
1991 | Implementation of drainage scheme of 89.9 km in Dahod * | 54.72 | Water Sanitation | Storm water drainage system | Gujarat Urban Development Company Limited | 01-Feb-2014 | Gujarat | Under Construction |
1992 | Implementation of Gandhigram lift irrigation scheme in Mysuru district* | 70.45 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Cauvery Neeravari Nigam Limited | 19-Nov-2015 | Karnataka | Under Construction |
1993 | Implementation of integrated power development scheme in Berhampur City* | 51.61 | Energy | Electricity transmission | Southern Electricity Supply Company of Odisha Limited | 25-Oct-2016 | Odisha | Under Construction |
1994 | Implementation of integrated power development scheme in Jaypore district* | 54.72 | Energy | Electricity transmission | Southern Electricity Supply Company of Odisha Limited | 25-Oct-2016 | Odisha | Under Construction |
1995 | Implementation of integrated power development scheme in Rayagada district* | 54.40 | Energy | Electricity transmission | Southern Electricity Supply Company of Odisha Limited | 25-Oct-2016 | Odisha | Under Construction |
1996 | Implementation of irrigation scheme at Bhoira, Mohal in Solapur district* | 79.49 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 31-Dec-2010 | Maharashtra | Under Construction |
1997 | Implementation of Kasipet lift irrigation scheme in Karimnagar district* | 52.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh State Irrigation Development Corporation Limited | 31-Jan-2014 | Telangana | Under Construction |
1998 | Implementation of Katghora Diversion Scheme on 4919.9 acres* | 56.08 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Chhattisgarh | 26-Feb-2008 | Chhattisgarh | Under Construction |
1999 | Implementation of Katriki lift irrigation scheme in Kurnool district* | 559.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh State Irrigation Development Corporation Limited | 30-Nov-2013 | Andhra Pradesh | Under Construction |
2000 | Implementation of Khutpali Diversion Scheme 7541.7 acres* | 86.47 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Chhattisgarh | 01-Oct-2011 | Chhattisgarh | Under Construction |
2001 | Implementation of lift irrigation scheme in Cluster No-XV in Balangir, Subernpur & Boudh districts* | 384.30 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 06-Aug-2013 | Odisha | Under Construction |
2002 | Implementation of Majhgaon medium irrigation scheme in Panna district* | 358.89 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 15-Jan-2016 | Madhya Pradesh | Under Construction |
2003 | Implementation of Mohar reservoir with a capacity of 33.6 CBM in Balod district* | 228.23 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Chhattisgarh | 12-Mar-2012 | Chhattisgarh | Under Construction |
2004 | Implementation of Paraghat Feeder Diversion scheme on 4200.8 acres* | 54.37 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Chhattisgarh | 12-Mar-2013 | Chhattisgarh | Under Construction |
2005 | Implementation of Phina Singh medium irrigation project at Nurpur in Kangra district* | 204.51 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation and Public Health Department, Himachal Pradesh | 18-Mar-2011 | Himachal Pradesh | Under Construction |
2006 | Implementation of power transmission system in Bengaluru * | 563.00 | Energy | Electricity transmission | Bangalore Electricity Supply Company Limited | 31-May-2008 | Karnataka | Under Construction |
2007 | Implementation of power transmission system in Bhopal * | 82.69 | Energy | Electricity transmission | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | 03-Feb-2014 | Madhya Pradesh | Under Construction |
2008 | Implementation of power transmission system in Jabalpur * | 81.46 | Energy | Electricity transmission | Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited | 01-Feb-2014 | Madhya Pradesh | Under Construction |
2009 | Implementation of power transmission system in Rewa * | 50.40 | Energy | Electricity transmission | Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited | 01-Feb-2014 | Madhya Pradesh | Under Construction |
2010 | Implementation of Rehti medium irrigation project in Vidisha district* | 53.41 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 30-Jun-2008 | Madhya Pradesh | Under Construction |
2011 | Implementation of rural electrification works at Bungarden & Parvati in Pune zone - Infra Plan Part-II Phase C* | 78.24 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 30-Jun-2014 | Maharashtra | Under Construction |
2012 | Implementation of rural electrification works at Chas in Bokaro under R-APDRP Part-B scheme* | 52.99 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 01-Sep-2016 | Jharkhand | Under Construction |
2013 | Implementation of rural electrification works in Bargarh and Kalahandi under DDUGJY * | 93.86 | Energy | Electricity transmission | Western Electricity Supply Company of Orissa Limited | 09-Sep-2016 | Odisha | Under Construction |
2014 | Implementation of rural electrification works in Baska district under RGGVY XIIth Plan* | 117.34 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 06-Feb-2015 | Assam | Under Construction |
2015 | Implementation of rural electrification works in Berhampur under Integrated Power Development Scheme * | 51.61 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 25-Oct-2016 | Odisha | Under Construction |
2016 | Implementation of rural electrification works in Bolangir,Bargarh and Kalahani under Integrated Power Development Scheme* | 93.71 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 25-Oct-2016 | Odisha | Under Construction |
2017 | Implementation of rural electrification works in Chirang district under RGGVY XIIth Plan* | 79.82 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 03-Feb-2015 | Assam | Under Construction |
2018 | Implementation of rural electrification works in Dhanbad under R-APDRP Part-B scheme* | 183.72 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 01-Sep-2016 | Jharkhand | Under Construction |
2019 | Implementation of rural electrification works in Jajpur district - DDUGJY* | 90.88 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 09-Sep-2016 | Odisha | Under Construction |
2020 | Implementation of rural electrification works in Jamshedpur under R-APDRP Part-B scheme* | 282.04 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 24-Jun-2016 | Jharkhand | Under Construction |
2021 | Implementation of rural electrification works in Jeypore under Integrated Power Development Scheme * | 54.72 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 25-Oct-2016 | Odisha | Under Construction |
2022 | Implementation of rural electrification works in Nalbari & Udalguri districts under RGGVY XIIth Plan* | 60.57 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 06-Feb-2015 | Assam | Under Construction |
2023 | Implementation of rural electrification works in Rampur under RGGVY-12th Plan Phase II * | 112.66 | Energy | Electricity transmission | Paschimanchal Vidyut Vitran Nigam Limited | 19-Jan-2016 | Uttar Pradesh | Under Construction |
2024 | Implementation of rural electrification works in Rayagada under Integrated Power Development Scheme * | 54.40 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 25-Oct-2016 | Odisha | Under Construction |
2025 | Implementation of rural electrification works in Rourkela under Integrated Power Development Scheme * | 70.70 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 25-Oct-2016 | Odisha | Under Construction |
2026 | Implementation of rural electrification works in Sambalpur under Integrated Power Development Scheme * | 95.05 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 25-Oct-2016 | Odisha | Under Construction |
2027 | Implementation of sewage treatment plants with a capacity of 5 MLD and 7 MLD in Sahibganj district* | 132.59 | Water Sanitation | Sewage collection, treatment and disposal system | Jharkhand Urban Infrastructure Development Company Limited | 04-Mar-2016 | Jharkhand | Under Construction |
2028 | Implementation of sewerage scheme at Borough-XIII (Ward-122) in Kolkata* | 90.76 | Water Sanitation | Sewage collection, treatment and disposal system | Kolkata Municipal Corporation | 12-Dec-2015 | West Bengal | Under Construction |
2029 | Implementation of Sewerage Scheme at Anupshahr in Bulandshahr district* | 75.79 | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh State Ganga River Conservation Agency | 30-Dec-2015 | Uttar Pradesh | Under Construction |
2030 | Implementation of sewerage scheme at Beur with a capacity of 180 km of sewage pipeline * | 398.00 | Water Sanitation | Sewage collection, treatment and disposal system | Bihar Urban Infrastructure Development Corporation Limited | 01-Mar-2017 | Bihar | Under Construction |
2031 | Implementation of Sewerage Scheme in district 'C' of Allahabad* | 146.87 | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh State Ganga River Conservation Agency | 23-Mar-2015 | Uttar Pradesh | Under Construction |
2032 | Implementation of sewerage scheme in Rewa * | 196.56 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Council, Rewa | 18-Nov-2016 | Madhya Pradesh | Under Construction |
2033 | Implementation of sewerage scheme in Sagar * | 282.62 | Water Sanitation | Sewage collection, treatment and disposal system | Sagar Municipal Corporation | 08-Jul-2016 | Madhya Pradesh | Under Construction |
2034 | Implementation of sub-transmission network in Bhubneswar * | 113.74 | Energy | Electricity transmission | Central Electricity Supply Utility of Odisha | 01-Mar-2016 | Odisha | Under Construction |
2035 | Implementation of Tarugavan High Level Barrage with a capacity of 15.4 CBM at Pathri taluka in Parbhani district* | 112.64 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Godavari Marathwada Irrigation Development Corporation Limited | 15-Nov-2010 | Maharashtra | Under Construction |
2036 | Implementation of transmission system in Araria, Kishanganj & Purnea under BRGF Phase II * | 130.55 | Energy | Electricity transmission | North Bihar Power Distribution Company Limited | 25-Feb-2015 | Bihar | Under Construction |
2037 | Implementation of transmission system in different districts of West Bengal * | 808.78 | Energy | Electricity transmission | West Bengal State Electricity Distribution Company Limited | 27-Dec-2011 | West Bengal | Under Construction |
2038 | Implementation of transmission system in Indore & Ujjain under SSTD-I * | 209.89 | Energy | Electricity transmission | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited | 11-Apr-2013 | Madhya Pradesh | Under Construction |
2039 | Implementation of transmission system in Indore & Ujjain under SSTD-II * | 143.02 | Energy | Electricity transmission | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited | 03-Nov-2014 | Madhya Pradesh | Under Construction |
2040 | Implementation of transmission system in Indore (ADB III) * | 264.95 | Energy | Electricity transmission | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited | 13-Jan-2014 | Madhya Pradesh | Under Construction |
2041 | Implementation of underground drainage scheme at Hosur & Ekalaspur zones in Raichur district* | 83.65 | Water Sanitation | Storm water drainage system | City Municipal Council, Raichur | 28-Dec-2015 | Karnataka | Under Construction |
2042 | Implementation of underground sewerage scheme at Mira-Bhayandar city in Thane district* | 491.95 | Water Sanitation | Sewage collection, treatment and disposal system | Mira Bhayandar Municipal Corporation | 27-Feb-2009 | Maharashtra | Under Construction |
2043 | Implementation of Upper Indravati lift irrigation scheme with a capacity of 2300 CBM* | 986.71 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Odisha | 31-Mar-2014 | Odisha | Under Construction |
2044 | Implementation of Water Supply Scheme at Jamshedpur in East Singhbhum District* | 272.00 | Water Sanitation | Water supply pipeline | Drinking Water and Sanitation Department, Jharkhand | 31-May-2015 | Jharkhand | Under Construction |
2045 | Implementation of water supply scheme in Chhindwara * | 75.71 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Corporation, Chhindwara | 07-Jul-2017 | Madhya Pradesh | Under Construction |
2046 | Implementation of water supply scheme to Vijayapura city under AMRUT scheme* | 201.83 | Water Sanitation | Water supply pipeline | Karnataka Urban Water Supply and Drainage Board | 03-Oct-2016 | Karnataka | Under Construction |
2047 | Industrial Park (Sitapur Pahadi)* | 85.00 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Industrial Infrastructure Development Corporation (Gwalior) M.P. Limited | 07-Sep-2015 | Madhya Pradesh | Under Construction |
2048 | Kamasamudram Branch Canal Project* | 71.07 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Cauvery Neeravari Nigam Limited | 08-Jun-2015 | Karnataka | Under Construction |
2049 | Kohal Minor Irrigation (Ner) Project* | 55.30 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
2050 | Laying of 132 kV transmission lines at Dehradun* | 57.32 | Energy | Electricity transmission | Power Transmission Corporation of Uttarakhand Limited | 11-May-2011 | Uttarakhand | Under Construction |
2051 | Laying of 176 km sewer network in Hospet district* | 53.59 | Water Sanitation | Sewage collection, treatment and disposal system | Karnataka Urban Infrastructure Development and Finance Corporation | 29-Sep-2010 | Karnataka | Under Construction |
2052 | Laying of 190 CKM Kurukshetra-Jind D/C line in Haryana* | 5,151.37 | Energy | Electricity transmission | Power Grid Corporation of India Limited | 31-Jul-2014 | Haryana | Completed |
2053 | Laying of 260.0 CKM Jaisalmer 2-Barmer transmission line* | 96.32 | Energy | Electricity transmission | Rajasthan Rajya Vidyut Prasaran Nigam Limited | 25-May-2016 | Rajasthan | Under Construction |
2054 | Laying of 52.5 km DC Transmission line at Jatni * | 81.66 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 15-May-2013 | Odisha | Under Construction |
2055 | Laying of Mallavaram-Bhilwara natural gas pipeline in length 2040 Km* | 7,225.00 | Energy | Gas pipelines | GSPL India Transco Limited | 07-Jul-2011 | Multi State/ Centre | Under Construction |
2056 | Laying of sewer lines in length of 58 km in part of Borough XIV-Ward Nos. 128 & 132 in Kolkata district* | 129.42 | Water Sanitation | Sewage collection, treatment and disposal system | Kolkata Municipal Corporation | 17-Oct-2016 | West Bengal | Under Construction |
2057 | Laying of Surat- Paradip natural gas pipeline in length of 2112 Km in Surat & Jagatsingpur districts* | 10,281.00 | Energy | Gas pipelines | GAIL (India) Limited | 24-Apr-2012 | Multi State/ Centre | Under Construction |
2058 | Laying of transmission line between Kuppam to Palamaneru SS in length of 67.7 km * | 61.21 | Energy | Electricity transmission | Transmission Corporation of Andhra Pradesh Limited | 15-Feb-2016 | Andhra Pradesh | Under Construction |
2059 | LILO Transmission Line (Motipur) Project* | 148.14 | Energy | Electricity transmission | Bihar State Power Transmission Company Limited | 31-Jan-2014 | Bihar | Under Construction |
2060 | Lower Chargarh Minor Irrigation Project* | 134.73 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
2061 | LPG Storage Plant (Karimnagar)* | 94.95 | Energy | Oil/ Gas/ LNG Storage | Hindustan Petroleum Corporation Limited | 25-Sep-2014 | Telangana | Under Construction |
2062 | Mitigation of flood in Veeyapuram on 47621.8 acres* | 1,212.45 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Department of Irrigation, Kerala | 28-Nov-2013 | Kerala | Under Construction |
2063 | Modernisation of 120 MW Bhaba hydel power unit in Kinnaur district * | 76.03 | Energy | Renewable energy (grid) | Himachal Pradesh State Electricity Board Limited | 09-Jun-2015 | Himachal Pradesh | Under Construction |
2064 | Nadaun-Bhumpal-Jalari Medium Irrigation Scheme* | 122.59 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Irrigation and Public Health Department, Himachal Pradesh | 31-Dec-2014 | Himachal Pradesh | Under Construction |
2065 | Nalla Chanelization (K.M.C Limit)* | 75.58 | Water Sanitation | Storm water drainage system | Kolhapur Municipal Corporation | 02-Nov-2011 | Maharashtra | Under Construction |
2066 | Nalla Improvement (Vikroli S Ward) Project* | 82.07 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Corporation of Greater Mumbai | Not Available | Maharashtra | Under Construction |
2067 | Narmada DR Cluster Water Supply Project* | 255.00 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 01-Oct-2013 | Rajasthan | Under Construction |
2068 | Narmada ER Water Supply Project* | 372.70 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 24-Sep-2013 | Rajasthan | Under Construction |
2069 | Nehru Nagar Nalla System* | 51.21 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Corporation of Greater Mumbai | Not Available | Maharashtra | Under Construction |
2070 | Offshore Reservoir (Mahendra Tanaya) Project* | 123.25 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 18-Feb-2008 | Andhra Pradesh | Under Construction |
2071 | Paghora Lift Irrigation Project* | 1,276.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | 31-Oct-2006 | Maharashtra | Under Construction |
2072 | Pandwan Small Hydel Power Project* | 80.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | 01-Mar-2014 | Madhya Pradesh | Under Construction |
2073 | Parichha Coal Based Power Project [Unit-1] - Renovation* | 93.89 | Energy | Electricity generation (grid) | Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited | Not Available | Uttar Pradesh | Under Construction |
2074 | Pimpalgaon Irrigation Project* | 131.26 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 18-Mar-2010 | Maharashtra | Under Construction |
2075 | Plastic Park (Tinsukia) Project* | 93.65 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Assam Industrial Development Corporation Limited | 21-Feb-2014 | Assam | Under Construction |
2076 | Plastic Polymer Park (Tamot)* | 87.00 | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Madhya Pradesh Audyogik Kendra Vikas Nigam (Bhopal) Limited | Not Available | Madhya Pradesh | Under Construction |
2077 | Power Sector Invesment Programme Tranche-V - (Bareli)* | 67.67 | Energy | Electricity transmission | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | 04-Sep-2009 | Madhya Pradesh | Under Construction |
2078 | Power Sector Invesment Programme Tranche-V - (Bhopal) - Phase 1* | 61.18 | Energy | Electricity transmission | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | 04-Sep-2009 | Madhya Pradesh | Under Construction |
2079 | Power Sector Invesment Programme Tranche-V - (Bhopal) - Phase 2* | 85.52 | Energy | Electricity transmission | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | 04-Sep-2009 | Madhya Pradesh | Under Construction |
2080 | Power Transmission (Bhagalpur-Banka) Project Phase II (Part C)* | 51.70 | Energy | Electricity transmission | South Bihar Power Distribution Company Limited | 06-May-2015 | Bihar | Under Construction |
2081 | Power Transmission (Bihar) Project - N-1 Scheme* | 291.84 | Energy | Electricity transmission | Bihar State Power Transmission Company Limited | 31-Jan-2014 | Bihar | Under Construction |
2082 | Power Transmission (Bokaro) Project* | 88.07 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 25-Jun-2006 | Jharkhand | Under Construction |
2083 | Power Transmission (Chatra) Project* | 228.32 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 10-Mar-2008 | Jharkhand | Under Construction |
2084 | Power Transmission (Deoghar) Project* | 84.87 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 01-Mar-2007 | Jharkhand | Under Construction |
2085 | Power Transmission (Dhanbad) Project* | 95.52 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 25-Jun-2006 | Jharkhand | Under Construction |
2086 | Power Transmission (East Singhbhum) Project* | 166.50 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 30-Dec-2006 | Jharkhand | Under Construction |
2087 | Power Transmission (Gaya-Rohtas) Project - Phase II* | 170.00 | Energy | Electricity transmission | South Bihar Power Distribution Company Limited | 25-Feb-2014 | Bihar | Under Construction |
2088 | Power Transmission (Giridih) Project* | 291.10 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 10-Mar-2008 | Jharkhand | Under Construction |
2089 | Power Transmission (Gumla) Project* | 200.38 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 01-Oct-2007 | Jharkhand | Under Construction |
2090 | Power Transmission (Hazaribagh-Ramgarh) Project* | 180.64 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 10-Mar-2008 | Jharkhand | Under Construction |
2091 | Power Transmission (Jalgaon) Project - Phase A - Part II* | 144.79 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 17-Jan-2015 | Maharashtra | Under Construction |
2092 | Power Transmission (Jamtara) Project* | 109.37 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 01-May-2007 | Jharkhand | Under Construction |
2093 | Power Transmission (Karimnagar) Project* | 54.38 | Energy | Electricity transmission | Northern Power Distribution Company of Telangana Limited | 01-Oct-2013 | Telangana | Under Construction |
2094 | Power Transmission (Koderma) Project* | 79.23 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 25-Jun-2006 | Jharkhand | Under Construction |
2095 | Power Transmission (Lohardaga) Project* | 117.90 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 10-Sep-2008 | Jharkhand | Under Construction |
2096 | Power Transmission (Pakur) Project* | 165.26 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 10-Sep-2008 | Jharkhand | Under Construction |
2097 | Power Transmission (Patna-Bhojpur) Project - Phase II* | 207.30 | Energy | Electricity transmission | South Bihar Power Distribution Company Limited | 25-Feb-2014 | Bihar | Under Construction |
2098 | Power Transmission (Ranchi-Khunti) Project* | 69.91 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 10-Sep-2008 | Jharkhand | Under Construction |
2099 | Power Transmission (Rohtas-Kaimur) Project Phase II (Part C)* | 167.83 | Energy | Electricity transmission | South Bihar Power Distribution Company Limited | 11-Feb-2015 | Bihar | Under Construction |
2100 | Power Transmission (Saharsa-Madhepura-Khagaria) Project - BRGF Phase II (Part C)* | 58.81 | Energy | Electricity transmission | North Bihar Power Distribution Company Limited | 07-Feb-2015 | Bihar | Under Construction |
2101 | Power Transmission (Saharsa-Supaul-Madhepura-Khagaria) Project - BRGF Phase II* | 170.23 | Energy | Electricity transmission | North Bihar Power Distribution Company Limited | 07-Feb-2015 | Bihar | Under Construction |
2102 | Power Transmission (Sahibganj) Project* | 188.32 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 10-Sep-2008 | Jharkhand | Under Construction |
2103 | Power Transmission (Saraikela-Kharsawan) Project* | 135.49 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 30-Dec-2006 | Jharkhand | Under Construction |
2104 | Power Transmission (Simdega) Project* | 139.46 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 03-Oct-2007 | Jharkhand | Under Construction |
2105 | Power Transmission (Sinnar, Ozar, Peinth, Surgana & Igatpuri) Project - Phase B - Part II* | 74.95 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 15-Sep-2015 | Maharashtra | Under Construction |
2106 | Power Transmission (Tumkuru) Project* | 403.00 | Energy | Electricity transmission | Karnataka Solar Power Development Corporation Limited | 06-Jun-2016 | Karnataka | Under Construction |
2107 | Power Transmission (West Singhbhum - I & II) Project* | 325.08 | Energy | Electricity transmission | Jharkhand Bijli Vitran Nigam Limited | 15-Jan-2007 | Jharkhand | Under Construction |
2108 | Production of CNG from Raw biogas at Delawas STP Unit-II | Not Available | Energy | Renewable energy (grid) | Jaipur Municipal Corporation | 06-May-2013 | Rajasthan | Operation and Maintenance Stage |
2109 | Providing Combined Water Supply Scheme to Nangavalli and Mecheri Unions in Salem District* | 106.11 | Water Sanitation | Water supply pipeline | Tamil Nadu Water Supply and Drainage Board | 18-Aug-2015 | Tamil Nadu | Under Construction |
2110 | Providing Combined Water Supply Scheme to Thondamuthur in Coimbatore District* | 99.84 | Water Sanitation | Water supply pipeline | Tamil Nadu Water Supply and Drainage Board | 19-Aug-2015 | Tamil Nadu | Under Construction |
2111 | Providing CPWS Scheme to Payakaraopeta, Nakkapalli & S.Rayavaram Mandals (Phase-IV) of Visakhapatnam district* | 51.00 | Water Sanitation | Water supply pipeline | Rural Water Supply and Sanitation Department, Andhra Pradesh | 12-Apr-2016 | Andhra Pradesh | Under Construction |
2112 | Pukti-Nimiaghat Transmission Line* | Not Available | Energy | Electricity transmission | Damodar Valley Corporation | Not Available | Jharkhand | Under Construction |
2113 | R-O-B (Raipur-Titlagharh-Vishakhapatnam) Project* | 61.31 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 19-Jan-2015 | Chhattisgarh | Under Construction |
2114 | R-U-B (Rajasthan Udyog Nagar) Project* | 113.58 | Transport | Roads and bridges | Northern Railway | Not Available | Delhi (UT) | Under Construction |
2115 | Rajadera Reservoir Irrigation Scheme* | 52.45 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Chhattisgarh | 23-Feb-2016 | Chhattisgarh | Under Construction |
2116 | Rajasthan Atomic Power Project Stage III* | 3,072.00 | Energy | Electricity generation (grid) | Nuclear Power Corporation of India Limited | Not Available | Rajasthan | Under Construction |
2117 | Rajghat Canal Irrigation Project* | 645.66 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Madhya Pradesh | 31-Mar-2009 | Madhya Pradesh | Under Construction |
2118 | Ramagundam Power Project Stage I - Modernisation* | 176.00 | Energy | Electricity generation (grid) | NTPC Limited | Not Available | Telangana | Under Construction |
2119 | Reconstruction of approaches of 0.6 km for existing ROB at Nahur railway station in Mumbai* | 89.11 | Transport | Roads and bridges | Municipal Corporation of Greater Mumbai | 30-Dec-2016 | Maharashtra | Under Construction |
2120 | Regional Water Supply Scheme (Dhrol & Kothadhar)* | 51.23 | Water Sanitation | Water supply pipeline | Gujarat Water Supply and Sewerage Board | 22-Jan-2016 | Gujarat | Under Construction |
2121 | Rehabilitation 17.3 MLD water supply scheme in Bhagalpur* | 289.35 | Water Sanitation | Water supply pipeline | Bihar Urban Infrastructure Development Corporation Limited | 14-Aug-2014 | Bihar | Under Construction |
2122 | Renovation of 24 MW Chiplima Hydro Electric Power Project in Sambalpur district* | 65.67 | Energy | Renewable energy (grid) | Odisha Hydro Power Corporation Limited | 15-Oct-2015 | Odisha | Under Construction |
2123 | Renovation of 360 MW Balimela Hydro Electric Power Project in Malkangiri district* | 382.91 | Energy | Renewable energy (grid) | Odisha Hydro Power Corporation Limited | 05-Aug-2016 | Odisha | Under Construction |
2124 | Renovation of canal based rural water supply scheme of capacity of 107.1 MLD at 51 locations in Sri Ganganagar* | 57.18 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 10-Nov-2015 | Rajasthan | Under Construction |
2125 | Renovation of canal based rural water supply scheme of capacity of 157.5 MLD at 75 locations in Hanumangarh* | 75.87 | Water Sanitation | Water supply pipeline | Public Health Engineering Department, Rajasthan | 27-Oct-2015 | Rajasthan | Under Construction |
2126 | Renovation of existing 300 MW hydel power project in Sonbhadra district* | 132.20 | Energy | Renewable energy (grid) | Uttar Pradesh Jal Vidyut Nigam Limited | 27-Jul-2012 | Uttar Pradesh | Under Construction |
2127 | Renovation of existing 70 MW Sholayar hydel power project in Tamil Nadu - Power House I* | 120.00 | Energy | Renewable energy (grid) | Tamil Nadu Generation and Distribution Corporation Limited | 21-Jul-2015 | Tamil Nadu | Under Construction |
2128 | Renovation of Tala tunk with a capacity of 9 MGD * | 80.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Kolkata Municipal Corporation | 30-Jun-2017 | West Bengal | Under Construction |
2129 | Replacement of old crude oil pipeline between Chennai Port and Manali Refinery in length of 16.7 km in Chennai* | 258.00 | Energy | Oil pipelines | Chennai Petroleum Corporation Limited | 01-Aug-2016 | Tamil Nadu | Under Construction |
2130 | Reverse Osmosis Treatment Plant (Koyali)* | 160.00 | Water Sanitation | Water treatment plants | Indian Oil Corporation Limited | 27-Mar-2015 | Gujarat | Under Construction |
2131 | Road Upgradation (Anda-Funda) Project* | 63.34 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 11-Aug-2015 | Chhattisgarh | Under Construction |
2132 | Road Upgradation (Andhra Pradesh NH-9) Project* | 333.21 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 07-Oct-2015 | Andhra Pradesh | Under Construction |
2133 | Road Upgradation (Baikunthpur-Ratanpur) Project* | 50.00 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 28-Aug-2014 | Chhattisgarh | Under Construction |
2134 | Road Upgradation (Balod-Dhamtari) Project* | 57.65 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 10-Aug-2015 | Chhattisgarh | Under Construction |
2135 | Road Upgradation (Balodabazar-Gidhoury) Project* | 124.07 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 08-Aug-2015 | Chhattisgarh | Under Construction |
2136 | Road Upgradation (Bhainsa-Balodabazar) Project* | 93.79 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 14-Apr-2015 | Chhattisgarh | Under Construction |
2137 | Road Upgradation (Birpur-Bihpur) Project* | 675.00 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 29-Jul-2016 | Bihar | Under Construction |
2138 | Road Upgradation (Bodla-Taregaon-Daldali) Project* | 129.63 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 17-Jul-2015 | Chhattisgarh | Under Construction |
2139 | Road Upgradation (Chandkhuri-Maro-Umariya) Project* | 101.71 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 12-Apr-2016 | Chhattisgarh | Under Construction |
2140 | Road Upgradation (Chintalnar-Marigudam) Project* | 80.12 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 04-Nov-2015 | Chhattisgarh | Under Construction |
2141 | Road Upgradation (Dudhnoi-Goalpara-Pancharatna) Project* | 115.67 | Transport | Roads and bridges | Public Works Department, Assam | 30-Nov-2012 | Assam | Under Construction |
2142 | Road Upgradation (Ghilamara - Dhakuakhana) Project* | 50.70 | Transport | Roads and bridges | Public Works Department, Assam | 21-Nov-2012 | Assam | Under Construction |
2143 | Road Upgradation (Jharkhand NH-114A) Project* | 166.44 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 31-Mar-2015 | Jharkhand | Under Construction |
2144 | Road Upgradation (Jharkhand NH-133) Project* | 184.00 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 31-Mar-2015 | Jharkhand | Under Construction |
2145 | Road Upgradation (Jorhat-Morioni) Project* | 56.27 | Transport | Roads and bridges | Public Works Department, Assam | 18-Nov-2012 | Assam | Under Construction |
2146 | Road Upgradation (Jowai-Natrang-Khanduli-Baithalangso) Project* | 71.00 | Transport | Roads and bridges | Public Works Department, Assam | 14-Oct-2011 | Assam | Under Construction |
2147 | Road Upgradation (Kanker-Bedam) Project* | 308.77 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 10-Feb-2016 | Chhattisgarh | Under Construction |
2148 | Road Upgradation (Katlicherra) Project* | 63.57 | Transport | Roads and bridges | Public Works Department, Assam | 15-Oct-2011 | Assam | Under Construction |
2149 | Road Upgradation (Khamtarai) Project* | 67.60 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 15-Oct-2014 | Chhattisgarh | Under Construction |
2150 | Road Upgradation (Khurda-Nayagarh) Project* | 226.31 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 04-Mar-2015 | Odisha | Under Construction |
2151 | Road Upgradation (Lambra-Shahkot) Project* | 351.00 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 11-Feb-2015 | Punjab | Under Construction |
2152 | Road Upgradation (Morigaon-Nagaon) Project* | 71.30 | Transport | Roads and bridges | Public Works Department, Assam | 03-Dec-2012 | Assam | Under Construction |
2153 | Road Upgradation (MP Border-Simga) Project* | 394.20 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 23-Mar-2015 | Chhattisgarh | Under Construction |
2154 | Road Upgradation (Nagaon-Singimari) Project* | 54.13 | Transport | Roads and bridges | Public Works Department, Assam | 17-Dec-2014 | Assam | Under Construction |
2155 | Road Upgradation (Nandghat-Balodabazar) Project* | 122.62 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 14-Apr-2015 | Chhattisgarh | Under Construction |
2156 | Road Upgradation (Navrangpur-Koksara) Project* | 265.35 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 09-Jul-2013 | Odisha | Under Construction |
2157 | Road Upgradation (Nelasnar-Kodoli-Mirtur-Gangaloor) Project* | 86.81 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 30-Nov-2015 | Chhattisgarh | Under Construction |
2158 | Road Upgradation (Nuapada-Bango Munda) Project* | 171.97 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 13-Aug-2013 | Odisha | Under Construction |
2159 | Road Upgradation (Odisha NH-59) Project* | 326.62 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 13-Jan-2015 | Odisha | Under Construction |
2160 | Road Upgradation (Raipur-Bhainsa) Project* | 102.89 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 14-Apr-2015 | Chhattisgarh | Under Construction |
2161 | Road Upgradation (Raipur-Urla-Patharidih-Berla-Kodwa) Project* | 97.04 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 21-Apr-2015 | Chhattisgarh | Under Construction |
2162 | Road Upgradation (Ratanpur-Kota-Lormi) Project* | 106.95 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 12-Apr-2016 | Chhattisgarh | Under Construction |
2163 | Road Upgradation (Rudrampur-Sarapaka) Project* | 216.00 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 14-Oct-2014 | Telangana | Under Construction |
2164 | Road Upgradation (Shahkot-Moga) Project* | 766.36 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 12-Mar-2015 | Punjab | Under Construction |
2165 | Road Upgradation (Sheorinarayan-Birra-Champa) Project* | 119.07 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 20-Apr-2015 | Chhattisgarh | Under Construction |
2166 | Road Upgradtion (Nagaland) Project* | 1,131.00 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 01-Apr-2010 | Nagaland | Under Construction |
2167 | Rognichu River Pollution Abetment Scheme (Gangtok)* | 66.78 | Water Sanitation | Sewage collection, treatment and disposal system | Water Security and Public Health Engineering Department, Sikkim | 24-Sep-2013 | Sikkim | Under Construction |
2168 | Rural Electrification (Assam) Project - R-APDRP* | 955.52 | Energy | Electricity transmission | Assam Power Distribution Company Limited | 31-Jul-2011 | Assam | Under Construction |
2169 | Rural Electrification (Ganjam) Project - RGGVY* | 179.06 | Energy | Electricity transmission | Southern Electricity Supply Company of Odisha Limited | 31-Dec-2015 | Odisha | Under Construction |
2170 | Rural Electrification (Magadha) Project - R-APDRP* | 199.00 | Energy | Electricity transmission | South Bihar Power Distribution Company Limited | 31-Dec-2014 | Bihar | Under Construction |
2171 | Rural Electrification (Meerut) Project - R-APDRP Part-B* | 487.51 | Energy | Electricity transmission | Paschimanchal Vidyut Vitran Nigam Limited | 16-Feb-2015 | Uttar Pradesh | Under Construction |
2172 | Rural Electrification (Nuzividu-Macherla-Gooty) Project* | 313.70 | Energy | Renewable energy (grid) | Southern Power Distribution Company of Andhra Pradesh Limited | 10-Oct-2014 | Andhra Pradesh | Under Construction |
2173 | Rural Electrification (Orissa) Project* | Not Available | Energy | Electricity transmission | NTPC Electric Supply Company Limited | Not Available | Odisha | Under Construction |
2174 | Rural electrification in Gulbarga district under R-APDRP Part B* | 50.13 | Energy | Electricity transmission | Gulbarga Electricity Supply Company Limited | 19-Mar-2010 | Karnataka | Under Construction |
2175 | Rural electrification in Raichur, Koppal & Bellary districts under R-APDRP Part B* | 84.90 | Energy | Electricity transmission | Gulbarga Electricity Supply Company Limited | 19-Mar-2010 | Karnataka | Under Construction |
2176 | Rural electrification in Yadgir & Bidar districts under R-APDRP Part B* | 65.76 | Energy | Electricity transmission | Gulbarga Electricity Supply Company Limited | 19-Mar-2010 | Karnataka | Under Construction |
2177 | Rural electrification works at Kothrud & Kolhapur Urban in Pune zone - Infra Plan Part-II Phase C* | 85.51 | Energy | Electricity transmission | Maharashtra State Electricity Distribution Company Limited | 30-Jun-2014 | Maharashtra | Under Construction |
2178 | Rural Water Supply (Barwani) Project* | 63.53 | Water Sanitation | Water supply pipeline | Madhya Pradesh Jal Nigam Maryadit | 16-Jul-2014 | Madhya Pradesh | Under Construction |
2179 | Rural Water Supply Scheme (Dhanbad)* | 137.45 | Water Sanitation | Water supply pipeline | Drinking Water and Sanitation Department, Jharkhand | 28-Feb-2016 | Jharkhand | Under Construction |
2180 | Rural Water Supply Scheme (Narhela)* | 77.66 | Water Sanitation | Water supply pipeline | Madhya Pradesh Jal Nigam Maryadit | 14-Aug-2014 | Madhya Pradesh | Under Construction |
2181 | Rural Water Supply Scheme (Niwadi)* | 79.92 | Water Sanitation | Water supply pipeline | Madhya Pradesh Jal Nigam Maryadit | 14-Aug-2014 | Madhya Pradesh | Under Construction |
2182 | Rural Water Supply Scheme (Udgawan)* | 230.40 | Water Sanitation | Water supply pipeline | Madhya Pradesh Jal Nigam Maryadit | 06-Dec-2014 | Madhya Pradesh | Under Construction |
2183 | Savanur Lift Irrigation Scheme* | 690.00 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | 04-May-2015 | Karnataka | Under Construction |
2184 | Setting up of 10 MW solar photovoltaic power unit at Bandel, Kolaghat & Bakreswar * | 70.00 | Energy | Renewable energy (grid) | West Bengal Power Development Corporation Limited | 21-Mar-2017 | West Bengal | Under Construction |
2185 | Setting up of 132 KV GIS substation at Jat Tarodi in Nagpur district* | 120.00 | Energy | Electricity transmission | Maharashtra State Electricity Transmission Company Limited | 01-Jul-2016 | Maharashtra | Under Construction |
2186 | Setting up of 220 kV GIS substation at Sagardighi in Murshidabad district* | 56.68 | Energy | Electricity transmission | West Bengal State Electricity Transmission Company Limited | 07-Jun-2016 | West Bengal | Under Construction |
2187 | Setting up of 300 MW captive coal based power unit at Jharia Coalfields in Dhanbad district* | 1,800.00 | Energy | Electricity generation (grid) | Steel Authority of India Limited | 31-Jul-2013 | Jharkhand | Under Construction |
2188 | Setting up of 33/132 V Substation at Chambi in Kangra district* | 50.00 | Energy | Electricity transmission | Himachal Pradesh Power Transmission Corporation Limited | 31-Dec-2015 | Himachal Pradesh | Under Construction |
2189 | Setting up of 37.5 MW Parnai hydel power unit at Poonch * | 640.41 | Energy | Renewable energy (grid) | Jammu and Kashmir State Power Development Corporation Limited | 25-Oct-2013 | Jammu & Kashmir | Under Construction |
2190 | Setting up of 400/220 kV GSS at Jaisalmer-2* | 121.34 | Energy | Electricity transmission | Rajasthan Rajya Vidyut Prasaran Nigam Limited | 16-Oct-2015 | Rajasthan | Under Construction |
2191 | Setting up of 50.4 MW wind power unit at Yellapur in Uttara Kannada district* | 355.13 | Energy | Renewable energy (grid) | National Aluminium Company Limited | 18-Jan-2016 | Karnataka | Under Construction |
2192 | Setting up of Liquid Cargo Handling Jetty at Shalukkhali, Haldia Dock-II through PPP mode | 172.52 | Transport | Ports (excluding captive) | Kolkata Port Trust | 15-Feb-2018 | West Bengal | Under Construction |
2193 | Setting up of MSW Processing plant adopting Waste to Energy Technology with Sanitary landfill at Langdiyawas for jaipur | 214.00 | Water Sanitation | Solid waste management | Jaipur Municipal Corporation | 19-Apr-2017 | Rajasthan | Pre-construction Stage |
2194 | Setting up of substation & DC line between Balangir-Kesinga * | 57.26 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 27-Jul-2012 | Odisha | Under Construction |
2195 | Setting up of substation and laying of 400 kV transmission line at Jagalur in Davanagere district* | 350.00 | Energy | Electricity transmission | Karnataka Power Transmission Corporation Limited (KPTCL) | 31-Aug-2016 | Karnataka | Under Construction |
2196 | Sewage Treatment Plant (Raja Canal)* | 51.00 | Water Sanitation | Sewage collection, treatment and disposal system | Bangalore Water Supply and Sewerage Board | 07-Mar-2014 | Karnataka | Under Construction |
2197 | Sewerage Scheme (Panipat)* | 50.00 | Water Sanitation | Sewage collection, treatment and disposal system | Haryana Urban Development Authority | 28-Feb-2016 | Haryana | Under Construction |
2198 | Sewerage Scheme (Sindhanur) Project* | 55.75 | Water Sanitation | Sewage collection, treatment and disposal system | Sindhanur City Municipal Council | 10-Mar-2015 | Karnataka | Under Construction |
2199 | Sewerage Scheme (Budge Budge)* | 145.98 | Water Sanitation | Sewage collection, treatment and disposal system | Kolkata Metropolitan Development Authority | 18-Jan-2016 | West Bengal | Under Construction |
2200 | Sewerage Scheme (Gangtok - Zone IV)* | 76.92 | Water Sanitation | Sewage collection, treatment and disposal system | Water Security and Public Health Engineering Department, Sikkim | 17-Dec-2010 | Sikkim | Under Construction |
2201 | Sewerage Scheme (Halisahar)* | 274.76 | Water Sanitation | Sewage collection, treatment and disposal system | Kolkata Metropolitan Development Authority | 18-Feb-2015 | West Bengal | Under Construction |
2202 | Sewerage Scheme (Harmu River) Project* | 85.43 | Water Sanitation | Sewage collection, treatment and disposal system | Jharkhand Urban Infrastructure Development Company Limited | 24-Feb-2015 | Jharkhand | Under Construction |
2203 | Sewerage Scheme (Hubballi)* | 113.55 | Water Sanitation | Sewage collection, treatment and disposal system | Karnataka Urban Infrastructure Development and Finance Corporation | 10-Mar-2011 | Karnataka | Under Construction |
2204 | Sewerage Scheme (Indra Nagar, Gomti Nagar, Chinhat, Takroho & Faldi Nagar)* | 287.63 | Water Sanitation | Sewage collection, treatment and disposal system | Lucknow Nagar Nigam | 31-Dec-2008 | Uttar Pradesh | Under Construction |
2205 | Sewerage Scheme (Jammu)* | 57.75 | Water Sanitation | Sewage collection, treatment and disposal system | Jammu and Kashmir Economic Reconstruction Agency | 20-Jun-2014 | Jammu & Kashmir | Under Construction |
2206 | Shirapur Lift Irrigation Scheme* | 310.20 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra Krishna Valley Development Corporation | 10-Oct-1996 | Maharashtra | Under Construction |
2207 | Shivan Irrigation Project* | 86.85 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Tapi Irrigation Development Corporation | 28-Jul-2014 | Maharashtra | Under Construction |
2208 | Shivpuri Small Hydel Power Projects* | 57.60 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | 01-Mar-2014 | Madhya Pradesh | Under Construction |
2209 | Small Hydel (Banas & Mahan) Power Projects* | 80.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | 01-Mar-2014 | Madhya Pradesh | Under Construction |
2210 | Small Hydel Power (Bhadbhada & Odda) Projects* | 80.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | 01-Mar-2014 | Madhya Pradesh | Under Construction |
2211 | Small Hydel Power (Satna) Projects* | 96.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | 01-Mar-2014 | Madhya Pradesh | Under Construction |
2212 | Small Hydel Power (Seoni) Projects* | 80.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | 01-Mar-2014 | Madhya Pradesh | Under Construction |
2213 | Small Hydel Power (Upper Temur & Lower Temur) Projects* | 80.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | 01-Mar-2014 | Madhya Pradesh | Under Construction |
2214 | Small Hydel Power (Vanganga Tanwar-Vanganga Down Stream) Projects* | 80.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | 01-Mar-2014 | Madhya Pradesh | Under Construction |
2215 | Solar Photovoltaic Power (Kolkata) Project* | 87.63 | Energy | Renewable energy (grid) | Airports Authority of India (AAI) | 20-Feb-2016 | West Bengal | Under Construction |
2216 | Solar Power (Barda Barkera) Project* | 50.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | Not Available | Madhya Pradesh | Under Construction |
2217 | Solar Power (Bhusundi Jagir) Project* | 240.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | Not Available | Madhya Pradesh | Under Construction |
2218 | Solar Power (Bid Pipalya) Project* | 50.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | Not Available | Madhya Pradesh | Under Construction |
2219 | Solar Power (Dharkhedi & Suryakhedi) Project* | 140.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | Not Available | Madhya Pradesh | Under Construction |
2220 | Solar Power (Hattipura Jhalra) Project* | 50.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | Not Available | Madhya Pradesh | Under Construction |
2221 | Solar Power (Jahangeerpura) Project* | 100.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | Not Available | Madhya Pradesh | Under Construction |
2222 | Solar Power (Kankdel) Project* | 200.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | Not Available | Madhya Pradesh | Under Construction |
2223 | Solar Power (Karva Kheri) Project* | 100.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | Not Available | Madhya Pradesh | Under Construction |
2224 | Solar Power (Kododiya) Project* | 100.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | Not Available | Madhya Pradesh | Under Construction |
2225 | Solar Power (Maliyatal) Project* | 420.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | Not Available | Madhya Pradesh | Under Construction |
2226 | Solar Power (Nataram) Project* | 200.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | 16-Jun-2014 | Madhya Pradesh | Under Construction |
2227 | Solar Power (Neyveli) Project* | 1,300.00 | Energy | Renewable energy (grid) | NLC India Limited | 29-Jul-2016 | Tamil Nadu | Under Construction |
2228 | Solar Power (Nonukheri) Project* | 50.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | Not Available | Madhya Pradesh | Under Construction |
2229 | Solar Power (Sundeepura) Project* | 250.00 | Energy | Renewable energy (grid) | New and Renewable Energy Department, Madhya Pradesh | Not Available | Madhya Pradesh | Under Construction |
2230 | Solid Waste Management (Kochi)* | 88.12 | Water Sanitation | Solid waste management | Local Self Government Department, Kerala | 02-Apr-2007 | Kerala | Under Construction |
2231 | Storm Water Drainage (Rawalpora Chowk-Channapora Bridge) Project* | 114.09 | Water Sanitation | Storm water drainage system | Jammu and Kashmir Economic Reconstruction Agency | 31-May-2014 | Jammu & Kashmir | Under Construction |
2232 | Storm Water Drainage (Shravan Yashwant Chowk-S.S.Rao Road) Project* | 76.59 | Water Sanitation | Storm water drainage system | Municipal Corporation of Greater Mumbai | Not Available | Maharashtra | Under Construction |
2233 | Storm Water Drainage Scheme (Bengaluru) - Remodelling* | 56.00 | Water Sanitation | Storm water drainage system | Karnataka Neeravari Nigam Limited | 19-Dec-2015 | Karnataka | Under Construction |
2234 | Storm Water Drainage Scheme (Faridabad) Project* | 144.40 | Water Sanitation | Storm water drainage system | Haryana Urban Development Authority | 11-Apr-2013 | Haryana | Under Construction |
2235 | Storm Water Drainage Scheme (Gurgaon)* | 164.98 | Water Sanitation | Storm water drainage system | Haryana Urban Development Authority | 24-Dec-2014 | Haryana | Under Construction |
2236 | Storm Water Pumping Station (Britania Outfall) Project* | 106.27 | Water Sanitation | Storm water drainage system | Municipal Corporation of Greater Mumbai | 21-Jan-2014 | Maharashtra | Under Construction |
2237 | Storm Water Pumping Station (Gazdarband & Mogra Nalla) Project* | 121.43 | Water Sanitation | Storm water drainage system | Municipal Corporation of Greater Mumbai | Not Available | Maharashtra | Under Construction |
2238 | Strategic Crude Oil Storage (Chandikhol) Project* | 3,800.00 | Energy | Oil/ Gas/ LNG Storage | Indian Strategic Petroleum Reserves Limited | 08-Jun-2016 | Odisha | Under Construction |
2239 | Substation (Aska) & Bhanjanagar-Aska Transmission Line Project* | 71.19 | Energy | Electricity transmission | Odisha Power Transmission Corporation Limited | 10-Feb-2015 | Odisha | Under Construction |
2240 | Substation (Badnawar) Project* | 125.56 | Energy | Electricity transmission | Madhya Pradesh Power Transmission Company Limited | 28-Feb-2014 | Madhya Pradesh | Under Construction |
2241 | Substation (Charor) Project* | 70.98 | Energy | Electricity transmission | Himachal Pradesh Power Transmission Corporation Limited | 31-Oct-2013 | Himachal Pradesh | Under Construction |
2242 | Substation (Doni) Project* | 180.00 | Energy | Electricity transmission | Karnataka Power Transmission Corporation Limited (KPTCL) | 31-Aug-2016 | Karnataka | Under Construction |
2243 | Substation (Ghani) Project* | 114.10 | Energy | Electricity transmission | Transmission Corporation of Andhra Pradesh Limited | 03-Aug-2015 | Andhra Pradesh | Under Construction |
2244 | Substation (Julurupada) Project* | 114.00 | Energy | Electricity transmission | Transmission Corporation of Telangana Limited | 24-Nov-2015 | Telangana | Under Construction |
2245 | Substation (Kandukur) Project* | 81.54 | Energy | Electricity transmission | Transmission Corporation of Andhra Pradesh Limited | 09-Mar-2016 | Andhra Pradesh | Under Construction |
2246 | Substation (Kirnapur) Project* | 83.48 | Energy | Electricity transmission | Madhya Pradesh Power Transmission Company Limited | 28-Feb-2014 | Madhya Pradesh | Under Construction |
2247 | Substation (Nuziveedu) Project* | 61.31 | Energy | Electricity transmission | Transmission Corporation of Andhra Pradesh Limited | 10-Mar-2016 | Andhra Pradesh | Under Construction |
2248 | Substation (Supaul) Project* | 56.92 | Energy | Electricity transmission | Bihar State Power Transmission Company Limited | 21-Mar-2015 | Bihar | Under Construction |
2249 | Substation (Thanion) Project* | 66.16 | Energy | Electricity transmission | Manipur State Power Company Limited | 31-Jan-2015 | Manipur | Under Construction |
2250 | Substation (Thennampatti) Project* | 151.59 | Energy | Electricity transmission | Tamil Nadu Transmission Corporation Limited | 25-Jan-2016 | Tamil Nadu | Under Construction |
2251 | Substation (Waghchhipa) Project* | 67.54 | Energy | Electricity transmission | DNH Power Distribution Corporation Limited | 13-Oct-2015 | Dadra & Nagar Haveli (UT) | Under Construction |
2252 | Substations (Ananthapur) Project* | 106.98 | Energy | Electricity transmission | Transmission Corporation of Andhra Pradesh Limited | 07-Dec-2013 | Andhra Pradesh | Under Construction |
2253 | Substations (Kadapa) Project* | 61.97 | Energy | Electricity transmission | Transmission Corporation of Andhra Pradesh Limited | 31-Oct-2013 | Andhra Pradesh | Under Construction |
2254 | Substations (Kishanganj) Project - BRGF Phase III (Part II)* | 356.10 | Energy | Electricity transmission | Bihar State Power Transmission Company Limited | 31-Jul-2014 | Bihar | Under Construction |
2255 | Substations (Rosera, Pupri, Benipatti & Mahnar) Project* | 80.20 | Energy | Electricity transmission | Bihar State Power Transmission Company Limited | 30-Sep-2015 | Bihar | Under Construction |
2256 | Substations (Sonenagar-Samastipur-Motipur-Lokhi) Project - BRGF Phase III (Part I)* | 1,370.02 | Energy | Electricity transmission | Bihar State Power Transmission Company Limited | 25-Feb-2014 | Bihar | Under Construction |
2257 | Substations (Visakhapatnam) Project* | 63.90 | Energy | Electricity transmission | Transmission Corporation of Andhra Pradesh Limited | 30-Aug-2012 | Andhra Pradesh | Under Construction |
2258 | Substations (Vizianagaram) Project* | 63.47 | Energy | Electricity transmission | Transmission Corporation of Andhra Pradesh Limited | 19-Mar-2016 | Andhra Pradesh | Under Construction |
2259 | Surface Water Supply Scheme (Howrah)* | 90.69 | Water Sanitation | Water supply pipeline | Kolkata Metropolitan Water and Sanitation Authority | 18-May-2007 | West Bengal | Under Construction |
2260 | SWD & Nalla Improvement (Dahisar River) Project* | 62.46 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Corporation of Greater Mumbai | Not Available | Maharashtra | Under Construction |
2261 | SWD & Nalla Improvement (Poisar River) Project* | 211.14 | Water Sanitation | Sewage collection, treatment and disposal system | Municipal Corporation of Greater Mumbai | Not Available | Maharashtra | Under Construction |
2262 | Takli Dolhari Medium Irrigation Scheme* | 233.87 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Vidarbha Irrigation Development Corporation | Not Available | Maharashtra | Under Construction |
2263 | Talcher Super Thermal Power Station Project- Stage-II - Renovation* | 107.40 | Energy | Electricity generation (grid) | NTPC Limited | Not Available | Odisha | Under Construction |
2264 | Tarakarama Thirtha Sagaram Reservoir Project (Package 2)* | 172.23 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Water Resources Department, Andhra Pradesh | 18-Oct-2013 | Andhra Pradesh | Under Construction |
2265 | Tarapur Transmission Line - Extension* | Not Available | Energy | Electricity transmission | Power Grid Corporation of India Limited | Not Available | Multi State/ Centre | Under Construction |
2266 | Transmission Line (Belgaum) Project* | 281.94 | Energy | Electricity transmission | Hubli Electricity Supply Company Limited | 10-Jun-2015 | Karnataka | Under Construction |
2267 | Transmission Line (Chichli-Udaipura) Project* | 53.16 | Energy | Electricity transmission | Madhya Pradesh Power Transmission Company Limited | 01-Mar-2014 | Madhya Pradesh | Under Construction |
2268 | Transmission Line (Hubli) Project* | 284.19 | Energy | Electricity transmission | Hubli Electricity Supply Company Limited | 10-Jun-2015 | Karnataka | Under Construction |
2269 | Transmission Line (Jammalamadugu-Uravakonda) Project* | 167.67 | Energy | Electricity transmission | Transmission Corporation of Andhra Pradesh Limited | 23-Jan-2014 | Andhra Pradesh | Under Construction |
2270 | Transmission Line (Jhakri-Abdullapur) Project* | 143.06 | Energy | Electricity transmission | Himachal Pradesh Power Transmission Corporation Limited | 25-Oct-2013 | Himachal Pradesh | Under Construction |
2271 | Transmission Line (Julwaniya-Kukshi) Project* | 69.37 | Energy | Electricity transmission | Madhya Pradesh Power Transmission Company Limited | 01-Mar-2014 | Madhya Pradesh | Under Construction |
2272 | Transmission Line (Kishanganj-Madhepura) Project* | 102.31 | Energy | Electricity transmission | Bihar State Power Transmission Company Limited | 01-Mar-2015 | Bihar | Under Construction |
2273 | Transmission Line (Maradam) Project* | 226.63 | Energy | Electricity transmission | Transmission Corporation of Andhra Pradesh Limited | 25-Aug-2014 | Andhra Pradesh | Under Construction |
2274 | Transmission Line (Narnoor-Ghani) Project* | 82.76 | Energy | Electricity transmission | Transmission Corporation of Andhra Pradesh Limited | 03-Aug-2015 | Andhra Pradesh | Under Construction |
2275 | Transmission Line (Podili-Kandukur) Project* | 52.10 | Energy | Electricity transmission | Transmission Corporation of Andhra Pradesh Limited | 31-Mar-2016 | Andhra Pradesh | Under Construction |
2276 | Transmission Line (Podili-Sattenapalli) Project* | 148.83 | Energy | Electricity transmission | Transmission Corporation of Andhra Pradesh Limited | 03-Aug-2015 | Andhra Pradesh | Under Construction |
2277 | Tripura Gas Pipeline Project* | Not Available | Energy | Gas pipelines | Tripura Natural Gas Company Limited | Not Available | Tripura | Under Construction |
2278 | Tunga Anicut Project-Modernisation* | 132.98 | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka Neeravari Nigam Limited | 23-Mar-2016 | Karnataka | Under Construction |
2279 | Two laning of Barasgaon-Rahatee section in length of 56.8 km* | 289.11 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 20-Dec-2016 | Maharashtra | Under Construction |
2280 | Two laning of Sitamarhi-Jaynagar-Narahia road in Bihar under NHIIP* | 474.30 | Transport | Roads and bridges | Ministry of Road Transport and Highways | 19-Oct-2015 | Bihar | Under Construction |
2281 | Umtru Hydel Power Project* | 599.00 | Energy | Renewable energy (grid) | Meghalaya Energy Corporation Limited | 20-Dec-2007 | Meghalaya | Under Construction |
2282 | Underground Drainage Scheme (Arsikere)* | 64.15 | Water Sanitation | Storm water drainage system | Karnataka Urban Water Supply and Drainage Board | 16-Mar-2013 | Karnataka | Under Construction |
2283 | Underground Drainage Scheme (Bailhongal)* | 54.85 | Water Sanitation | Storm water drainage system | Karnataka Urban Water Supply and Drainage Board | 25-Jun-2014 | Karnataka | Under Construction |
2284 | Underground Drainage Scheme (Chikkamagaluru)* | 87.00 | Water Sanitation | Storm water drainage system | Karnataka Urban Water Supply and Drainage Board | 04-Nov-2011 | Karnataka | Under Construction |
2285 | Underground Sewerage Project - II* | 171.82 | Water Sanitation | Sewage collection, treatment and disposal system | Nashik Municipal Corporation | 30-Nov-2010 | Maharashtra | Under Construction |
2286 | Underground Sewerage Scheme (Namakkal)* | 55.42 | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu Water Supply and Drainage Board | 30-Mar-2015 | Tamil Nadu | Under Construction |
2287 | Underground Sewerage Scheme (Salem)* | 73.08 | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu Water Supply and Drainage Board | 11-Sep-2014 | Tamil Nadu | Under Construction |
2288 | Underground Sewerage Scheme (Theni)* | 71.10 | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu Water Supply and Drainage Board | 30-Mar-2015 | Tamil Nadu | Under Construction |
2289 | Underground Sewerage Scheme (Thirupattur)* | 104.01 | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu Water Supply and Drainage Board | 30-Mar-2015 | Tamil Nadu | Under Construction |
2290 | Underground Sewerage System (Zone Salim Ali - Zone I to VI)* | 464.00 | Water Sanitation | Sewage collection, treatment and disposal system | Aurangabad Municipal Corporation | 01-Jul-2014 | Maharashtra | Under Construction |
2291 | Upgradation of Sidhi-Kamarji & Rewa-Naiken roads in length of 39.6 km * | 75.31 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 25-Jul-2016 | Madhya Pradesh | Under Construction |
2292 | Upgradation of Andia-Pachma-Basoda & Baisnagar-Bagri roads in length of 22.2 km * | 56.07 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 29-Jul-2015 | Madhya Pradesh | Under Construction |
2293 | Upgradation of Ashapuri-Chiklod, Baktra-Mankapur & Bagumganj-Jhiriya Mandir roads in length of 33.1 km * | 55.78 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 31-Jul-2013 | Madhya Pradesh | Under Construction |
2294 | Upgradation of Ashapuri-Goharganj & Chandan Pipaliya-Jyothari-Pratapgarh roads in length of 25.9 km * | 53.93 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 25-May-2016 | Madhya Pradesh | Under Construction |
2295 | Upgradation of Baktara-Bharkachh & Mangrol-Bagalwada roads in length of 31.5 km in Raisen * | 57.01 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 23-Jun-2016 | Madhya Pradesh | Under Construction |
2296 | Upgradation of Balotra-Sanderao road in length of 24.7 km * | 113.31 | Transport | Roads and bridges | Public Works Department, Rajasthan | 20-Jul-2017 | Rajasthan | Under Construction |
2297 | Upgradation of Beelwara Mata-Unchi Barod & Khaniyadhana-Kadwaya roads in length of 32.7 km * | 51.12 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 18-May-2016 | Madhya Pradesh | Under Construction |
2298 | Upgradation of Beohari-Manpur & Burhar-Hardi-Kathotiya roads in length of 34.6 km * | 63.38 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 21-Apr-2016 | Madhya Pradesh | Under Construction |
2299 | Upgradation of Bhabanipur-Barpeta & Chamata-Nagaon Bazar roads in length of 37.6 km* | 71.14 | Transport | Roads and bridges | Public Works Department, Assam | 29-Feb-2016 | Assam | Under Construction |
2300 | Upgradation of Bhopal Naka-Jherkheda to NH-12 section in length of 38.3 km * | 50.33 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 18-May-2016 | Madhya Pradesh | Under Construction |
2301 | Upgradation of Bidasar-Nokha road in length of 93 km * | 111.62 | Transport | Roads and bridges | Public Works Department, Rajasthan | 24-Aug-2017 | Rajasthan | Under Construction |
2302 | Upgradation of Chambal-Girota-Chikli road in length of 26.1 km * | 60.09 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 07-Sep-2015 | Madhya Pradesh | Under Construction |
2303 | Upgradation of Chhote Dongar (Palli)-Orchha road in length of 31 km under LWE* | 58.74 | Transport | Roads and bridges | Public Works Department, Chhattisgarh | 18-Nov-2015 | Chhattisgarh | Under Construction |
2304 | Upgradation of Gazole-Samsi carriageway in length of 23 km * | 95.41 | Transport | Roads and bridges | Public Works Department, West Bengal | 21-Sep-2015 | West Bengal | Under Construction |
2305 | Upgradation of Ghatera-Udaipur & Dhaturiya-Dholkhedi road in length of 21.5 km * | 55.00 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 08-Oct-2015 | Madhya Pradesh | Under Construction |
2306 | Upgradation of Gotegaon-Chhota Kunda & Karakbel-Basanpani roads in length of 27.4 km * | 53.56 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 11-Mar-2016 | Madhya Pradesh | Under Construction |
2307 | Upgradation of Itarsi-Damdam-Maroda & Borkunda-Somalwada Aipa roads in length of 36.4 km * | 59.03 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 23-May-2016 | Madhya Pradesh | Under Construction |
2308 | Upgradation of Jahajpura, Mailbaya-Veerpur & Raiugaon-Sawalkheda roads in length of 44.1 km * | 65.73 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 07-Feb-2014 | Madhya Pradesh | Under Construction |
2309 | Upgradation of Kajlas-Jolay & Soya Chopal to Housing Board Colany section in length of 13.5 km * | 52.21 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 31-May-2016 | Madhya Pradesh | Under Construction |
2310 | Upgradation of Kajlikheda-Kolar dam section & Bangrasia-Bilkhiriya road in length of 35.4 km * | 65.75 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 22-Jun-2016 | Madhya Pradesh | Under Construction |
2311 | Upgradation of Linga-Bhourjhir-Sihora road in length of 31.4 km * | 57.96 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 17-Jun-2016 | Madhya Pradesh | Under Construction |
2312 | Upgradation of Lukwasa-Chandanpur-Ongar & Magroni-Shubhashpura roads in length of 31.6 km * | 52.06 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 14-Jul-2016 | Madhya Pradesh | Under Construction |
2313 | Upgradation of Manawar-Semalda road in length of 37.1 * | 64.40 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 17-Mar-2016 | Madhya Pradesh | Under Construction |
2314 | Upgradation of Matkhaniya-Kudariya to Jowa road in length of 18.8 km * | 50.39 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 27-Dec-2015 | Madhya Pradesh | Under Construction |
2315 | Upgradation of Meghnagar-Morjhiri & Khawasa-Bajana roads in length of 27.7 km * | 56.27 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 27-May-2016 | Madhya Pradesh | Under Construction |
2316 | Upgradation of Sailana-Ranisingh & Birmawal-Rainmau roads in length of 40.6 km in Ratlam * | 55.78 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 28-Sep-2015 | Madhya Pradesh | Under Construction |
2317 | Upgradation of Sanchi-Udaigiri & Teyonda-Pathari road * | 51.02 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 27-Nov-2014 | Madhya Pradesh | Under Construction |
2318 | Upgradation of Seoni-Babrighat to Gadariya-Harpalpur road in length of 33.5 km * | 50.20 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 28-Sep-2015 | Madhya Pradesh | Under Construction |
2319 | Upgradation of Sikar-Ganeri-Jaswantgarh road in length of 75.1 km * | 140.27 | Transport | Roads and bridges | Public Works Department, Rajasthan | 24-Aug-2017 | Rajasthan | Under Construction |
2320 | Upgradation of Singhana-Buhana-Haryana border section in length of 34 km * | 53.99 | Transport | Roads and bridges | Public Works Department, Rajasthan | 24-Aug-2017 | Rajasthan | Under Construction |
2321 | Upgradation of various junctions in length of 2.2 km in Mumbai* | 287.50 | Transport | Roads and bridges | Municipal Corporation of Greater Mumbai | 21-Aug-2014 | Maharashtra | Under Construction |
2322 | Upgradation of various roads in length of 1.1 km at K/West & R/South wards in Mumbai* | 100.90 | Transport | Roads and bridges | Municipal Corporation of Greater Mumbai | 06-Apr-2015 | Maharashtra | Under Construction |
2323 | Upgradation of various roads in length of 12.7 km in Bhopal * | 52.18 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 03-May-2016 | Madhya Pradesh | Under Construction |
2324 | Upgradation of various roads in length of 20.2 km in Barwani * | 59.58 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 01-Dec-2015 | Madhya Pradesh | Under Construction |
2325 | Upgradation of various roads in length of 3.1 km of P & R Wards in Mumbai* | 65.70 | Transport | Roads and bridges | Municipal Corporation of Greater Mumbai | 22-Mar-2016 | Maharashtra | Under Construction |
2326 | Upgradation of various roads in length of 31.6 km in Datia * | 60.32 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 05-Aug-2015 | Madhya Pradesh | Under Construction |
2327 | Upgradation of various roads in length of 32.1 km in Shivpuri * | 54.38 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 22-Jun-2016 | Madhya Pradesh | Under Construction |
2328 | Upgradation of various roads in length of 33.9 km in Khandwa * | 53.03 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 05-Oct-2015 | Madhya Pradesh | Under Construction |
2329 | Upgradation of various roads in length of 33.9 km in Rewa * | 51.50 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 18-Nov-2015 | Madhya Pradesh | Under Construction |
2330 | Upgradation of various roads in length of 35.7 km in Bhopal * | 53.02 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 04-Jan-2016 | Madhya Pradesh | Under Construction |
2331 | Upgradation of various roads in length of 35.8 km in Indore * | 65.86 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 08-Sep-2015 | Madhya Pradesh | Under Construction |
2332 | Upgradation of various roads in length of 36 km in Tikamgarh * | 58.90 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 29-Sep-2015 | Madhya Pradesh | Under Construction |
2333 | Upgradation of various roads in length of 36.7 km in Bhind * | 72.81 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 03-Dec-2015 | Madhya Pradesh | Under Construction |
2334 | Upgradation of various roads in length of 37.3 km in Raisen * | 55.97 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 16-May-2016 | Madhya Pradesh | Under Construction |
2335 | Upgradation of various roads in length of 37.6 km in Barwani * | 59.24 | Transport | Roads and bridges | Public Works Department, Madhya Pradesh | 04-Jun-2016 | Madhya Pradesh | Under Construction |
2336 | Upgradation of various roads in length of 37.6 km in Nagaon* | 57.42 | Transport | Roads and bridges | Public Works Department, Assam | 03-Mar-2016 | Assam | Under Construction |
2337 | Upgradation of various roads in length of 39.9 km in Jhabua * | 55.29 | Transport | Roads and bridges | Public Works Department, Mad |