Viability Gap Funding (VGF) Scheme

Viability Gap Funding (VGF) Scheme

This section contains list of PPP projects granted final approval by the Empowered Institution (EI)/Empowered Committee (EC)under the Scheme for Financial Support to PPPs in Infrastructure (VGF Scheme).
Export to Excel
Sr No. Project Name Location Sector Total Project Cost (In Rs. Crore) Total VGF Approved (In Rs. Crore) VGF Approved by DEA CAPEX (In Rs. Crore) VGF Approved by DEA OPEX (In Rs. Crore) VGF Released till date by DEA for CAPEX (In Rs. Crore) VGF Approved by State CAPEX (In Rs. Crore) VGF Approved by State OPEX (In Rs. Crore) In Principle Meeting Date In Principle Meeting Number Final Approval Meeting Date Final Approval Meeting Number Implementing Authority Latest Status
1 Two lane with paved shoulders from Sikar to Bikaner and Bikaner Bypass of NH-11 under DBFOT basis Rajasthan Transport and Logistics 650.84 247.32 130.168 Not Applicable 130.16 117.152 Not Applicable 2011-11-0202.11.2011 (35th EI) 27.03.2014 (20th EC) Public Works Department, Government of Rajasthan Completed
2 Four laning of Ara-Mohania Road Bihar Transport and Logistics 917.12 298 183.40 Not Applicable 0 114.6 Not Applicable 2009-02-1818.02.2009 (7th EC) 14.03.2014 (20th EC) Bihar State Road Development Corporation Limited Terminated
3 Two laning with PSS of Guna-Ashoknagar-Ishagarh Project (SH 20) on BOT (toll) basis Madhya Pradesh Transport and Logistics 105.10 36.75 21.02 Not Applicable 21.02 Not Applicable Not Applicable 2010-11-1919.11.2010 (27th EI) 03.03.2014 (53rd EI) Madhya Pradesh Road Development Corporation(MPRDC) Completed
4 Development of 400 kV DCDS Sarni (Satpura)-Ashta transmission line project under DBFOT (Toll) Madhya Pradesh Energy 282.70 60.75 56.54 Not Applicable 56.54 Not Applicable Not Applicable 2012-06-1111.06.2012 (40th EI) 03.03.2014 (53rd EI) Madhya Pradesh Power Transmission Company Limited Completed
5 Four laning with paved side shoulder Delhi-Saharanpur-Yamunotri Road upto Uttrakhand Boarder (SH 57) on DBFOT (toll) basis Uttar Pradesh Transport and Logistics 1718.35 343.53 343.53 Not Applicable 0 Not Applicable Not Applicable 2012-08-2727.08.2012 (15th EC) 17.01.2014 (19th EC) Uttar Pradesh State Highways Authority Terminated
6 Four-laning of Varanasi-Shaktinagar road of SH-5A in UP under DBFOT basis Uttar Pradesh Transport and Logistics 1211.96 241.92 241.92 Not Applicable 241.92 Not Applicable Not Applicable 2012-08-2727.08.2012 (15th EC) 17.01.2014 (19th EC) Uttar Pradesh State Highways Authority Completed
7 Four laning with paved shoulder in Bareilly-Almora section of SH 37 in the State of Uttar Pradesh on DBFOT basis Uttar Pradesh Transport and Logistics 355.00 69.95 69.95 Not Applicable 69.95 Not Applicable Not Applicable 2011-01-3131.01.2011 (28th EI) 18.12.2013 (51st EI) Uttar Pradesh State Highways Authority Completed
8 Two laning with granular shoulder from km 1/5 to km 51/4 in Seoni and km 51/4 to km 24/10 in Balaghat of Seoni-Katangi section of SH 54 on DBFOT (Toll) basis Madhya Pradesh Transport and Logistics 152.55 59.5 30.5 Not Applicable 14.98 29 Not Applicable 2011-07-2020.07.2011 (33rd EI) 18.12.2013 (51st EI) Madhya Pradesh Road Development Corporation(MPRDC) Terminated
9 Hyderabad Metro Rail Project Telangana Transport and Logistics 12132 1458.0 1458.0 Not Applicable 1204.19 Not Applicable Not Applicable 2010-07-2929.07.2010 (12th EC) 06.05.2013 (17th EC) Hyderabad Metro Rail Limited Under Construction