Viability Gap Funding (VGF) Scheme
This section contains list of PPP projects granted final approval by the Empowered Institution (EI)/Empowered Committee (EC)under the Scheme for Financial Support to PPPs in Infrastructure (VGF Scheme).
Export to Excel
Sr No. | Project Name | Location | Sector | Total Project Cost (In Rs. Crore) | Total VGF Approved (In Rs. Crore) | VGF Approved by DEA CAPEX (In Rs. Crore) | VGF Approved by DEA OPEX (In Rs. Crore) | VGF Released till date by DEA for CAPEX (In Rs. Crore) | VGF Approved by State CAPEX (In Rs. Crore) | VGF Approved by State OPEX (In Rs. Crore) | In Principle Meeting Date | In Principle Meeting Number | Final Approval Meeting Date | Final Approval Meeting Number | Implementing Authority | Latest Status |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Development of Vizhinjam International Multipurpose Seaport Project | Kerala | Transport and Logistics | 4089.00 | 1634.98 | 817.80 | Not Applicable | 0.00 | 817.18 | Not Applicable | 2014-12-2626.12.2014 | (23rd EI) | 27.07.2022 | (41th EC) | Vizhinjam International Seaport Limited | Under Construction |
2 | Pune Metro Line- III from Hinjewadi -Shivajinagar on DBFOT basis under PPP model | Maharashtra | Transport and Logistics | 7420.31 | 2351 | 1224.80 | Not Applicable | 410.00 | 1126.2 | Not Applicable | 2018-03-0707.03.2018 | (30th EC) | 08.11.2021 | (38th EC) | Pune Metropolitan Region Development Authority | Under Construction |
3 | Development of Gwalior Jhansi up to Ghonga village via Billua Road BOT (Toll) | Madhya Pradesh | Transport and Logistics | 67.38 | 19.57 | 12.6 | Not Applicable | 12.60 | 6.97 | Not Applicable | 2016-12-0606.12.2016 | (75th EI) | 25.02.2020 | (82nd EI) | Madhya Pradesh Road Development Corporation | Completed |
4 | Development, O&M of Hanumangarh to Abohar section of SH-7A (up to Punjab border) on DBFOT Toll basis. | Rajasthan | Transport and Logistics | 51.50 | 8.81 | 8.81 | Not Applicable | 8.81 | Not Applicable | Not Applicable | 2016-10-0606.10.2016 | (74th EI) | 24.11.2017 | (79th EI) | Public Works Department, Government of Rajasthan | Completed |
5 | Improvements of Road from Yelahanka to Karnataka/AP border Section of SH9 on DBFOT (Toll) basis | Karnataka | Transport and Logistics | 380.85 | 152.33 | 76.17 | Not Applicable | 75.43 | 76.16 | Not Applicable | 2013-04-0909.04.2013 | (46th EI) | 16.05.2017 | (77th EI) | Karnataka Road Development Corporation Limited (KRDCL) | Completed |
6 | 4-laning of Muzaffarnagar - Saharanpur Road (SH-59) from Km.0.000 to Km.52.950 on DBFOT toll basis | Uttar Pradesh | Transport and Logistics | 752.88 | 301.16 | 150.58 | Not Applicable | 150.57 | 150.58 | Not Applicable | 2014-12-2323.12.2014 | (22 EC) | 03.01.2017 | (28th EC) | Uttar Pradesh State Highways Authority | Completed |
7 | Development of Sinnar-Nashik section of NH-50 (from km 177.0001 to 201.350) with 4-lane through DBFOT IBOT (Toll)] basis. | Maharashtra | Transport and Logistics | 312.96 | 120.51 | 62.59 | Not Applicable | 56.35 | 57.918 | Not Applicable | 2011-12-0101.12.2011 | (36th EI) | 06.10.2016 | (74th EI) | Public Works Department, Government of Maharashtra | Under Construction |
8 | Development of road from NH-63 near Ginigere-Gangavathi to Sindhanur | Karnataka | Transport and Logistics | 190.16 | 4.59 | 4.59 | Not Applicable | 4.59 | Not Applicable | Not Applicable | 2012-01-0606.01.2012 | (37th EI) | 08.04.2016 | (70th EI) | Karnataka Road Development Corporation Limited (KRDCL) | Completed |
9 | Improvement of Nagaur-Bikaner section of NH-89 | Rajasthan | Transport and Logistics | 378.07 | 69.00 | 69.0 | Not Applicable | 44.99 | 91.21 | Not Applicable | 2012-01-0606.01.2012 | (37th EI) | 07.04.2015 | (64th EI) | Public Works Department, Government of Rajasthan | Terminated |
10 | Four laning of Ajmer to Nagaur section on NH 89 from km 0.000 to km 161.000 in the State of Rajasthan | Rajasthan | Transport and Logistics | 377.15 | 45.00 | 45.0 | Not Applicable | 36.52 | Not Applicable | Not Applicable | 2011-07-2020.07.2011 | (33rd EI) | 27.01.2015 | (62nd EI) | Public Works Department, Government of Rajasthan | Under Construction |
11 | Development of Four lane of Sidhi to Singrauli section (km 83/4 to km 195/8) of NH 75E on DBFOT (Toll) basis | Madhya Pradesh | Transport and Logistics | 871.15 | 339.69 | 174.23 | Not Applicable | 135.02 | 165.46 | Not Applicable | 2011-07-2020.07.2011 | (33rd EI) | 29.10.2014 | (21st EC) | Madhya Pradesh Warehousing and Logistics Corporation | Under Construction |
12 | Four laning of Sambalpur - Rourkela section of SH-10 from km 4.900 to to km 167.900 (Rourkela) under DBFOT | Odisha | Transport and Logistics | 1292.56 | 465.3 | 258.51 | Not Applicable | 258.51 | Not Applicable | 206.79 | 2012-12-1212.12.2012 | (16th EC) | 29.10.2014 | (21st EC) | Public Works Department, Government of Odisha | Completed and Full VGF has been disbursed |
13 | Development of Four lane of Satna to Bela section (km 155/0 to km 203.04) of NH 75 on PPP basis following DBFOT (Toll) basis | Madhya Pradesh | Transport and Logistics | 320.48 | 31.97 | 31.97 | Not Applicable | Not Applicable | Not Applicable | 2011-07-2020.07.2011 | (33rd EI) | 19.06.2014 | (55th EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Terminated | |
14 | Development of Four lane of Mangwan to MP/UP border section (km 98/2 to km 46/6) of NH 27 on DBFOT (Toll) basis | Madhya Pradesh | Transport and Logistics | 381.86 | 46.97 | 46.97 | Not Applicable | 46.97 | Not Applicable | Not Applicable | 2011-07-2020.07.2011 | (33rd EI) | 19.06.2014 | (55th EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Completed |
15 | Two Laning of Bhopal - Berasia - Sironj Project (SH-23) on BoT basis | Madhya Pradesh | Transport and Logistics | 175.6 | 24.55 | 24.55 | Not Applicable | 0 | Not Applicable | Not Applicable | 2010-11-1919.11.2010 | (27th EI) | 19.06.2014 | (55th EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Terminated |
16 | Two lane with paved shoulders from Sikar to Bikaner and Bikaner Bypass of NH-11 under DBFOT basis | Rajasthan | Transport and Logistics | 650.84 | 247.32 | 130.168 | Not Applicable | 130.16 | 117.152 | Not Applicable | 2011-11-0202.11.2011 | (35th EI) | 27.03.2014 | (20th EC) | Public Works Department, Government of Rajasthan | Completed |
17 | Four laning of Ara-Mohania Road | Bihar | Transport and Logistics | 917.12 | 298 | 183.40 | Not Applicable | 0 | 114.6 | Not Applicable | 2009-02-1818.02.2009 | (7th EC) | 14.03.2014 | (20th EC) | Bihar State Road Development Corporation Limited | Terminated |
18 | Two laning with PSS of Guna-Ashoknagar-Ishagarh Project (SH 20) on BOT (toll) basis | Madhya Pradesh | Transport and Logistics | 105.10 | 36.75 | 21.02 | Not Applicable | 21.02 | Not Applicable | Not Applicable | 2010-11-1919.11.2010 | (27th EI) | 03.03.2014 | (53rd EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Completed |
19 | Four laning with paved side shoulder Delhi-Saharanpur-Yamunotri Road upto Uttrakhand Boarder (SH 57) on DBFOT (toll) basis | Uttar Pradesh | Transport and Logistics | 1718.35 | 343.53 | 343.53 | Not Applicable | 0 | Not Applicable | Not Applicable | 2012-08-2727.08.2012 | (15th EC) | 17.01.2014 | (19th EC) | Uttar Pradesh State Highways Authority | Terminated |
20 | Four-laning of Varanasi-Shaktinagar road of SH-5A in UP under DBFOT basis | Uttar Pradesh | Transport and Logistics | 1211.96 | 241.92 | 241.92 | Not Applicable | 241.92 | Not Applicable | Not Applicable | 2012-08-2727.08.2012 | (15th EC) | 17.01.2014 | (19th EC) | Uttar Pradesh State Highways Authority | Completed |
21 | Four laning with paved shoulder in Bareilly-Almora section of SH 37 in the State of Uttar Pradesh on DBFOT basis | Uttar Pradesh | Transport and Logistics | 355.00 | 69.95 | 69.95 | Not Applicable | 69.95 | Not Applicable | Not Applicable | 2011-01-3131.01.2011 | (28th EI) | 18.12.2013 | (51st EI) | Uttar Pradesh State Highways Authority | Completed |
22 | Two laning with granular shoulder from km 1/5 to km 51/4 in Seoni and km 51/4 to km 24/10 in Balaghat of Seoni-Katangi section of SH 54 on DBFOT (Toll) basis | Madhya Pradesh | Transport and Logistics | 152.55 | 59.5 | 30.5 | Not Applicable | 14.98 | 29 | Not Applicable | 2011-07-2020.07.2011 | (33rd EI) | 18.12.2013 | (51st EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Terminated |
23 | Hyderabad Metro Rail Project | Telangana | Transport and Logistics | 12132 | 1458.0 | 1458.0 | Not Applicable | 1204.19 | Not Applicable | Not Applicable | 2010-07-2929.07.2010 | (12th EC) | 06.05.2013 | (17th EC) | Hyderabad Metro Rail Limited | Under Construction |
24 | Manawar-Singhan-Kukshi | Madhya Pradesh | Transport and Logistics | 94.57 | 27.32 | 18.91 | Not Applicable | 18.90 | 8.41 | Not Applicable | 2011-12-0101.12.2011 | (36th EI) | 11.01.2013 | (45th EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Completed |
25 | Upgradation of Jaipur to Bhilwara State Highway, Rajasthan | Rajasthan | Transport and Logistics | 220 | 88 | 44 | Not Applicable | 44 | 44 | Not Applicable | 2009-07-0202.07.2009 | (18th EI) | 31.12.2012 | (44th EI) | Rajasthan State Road Development and Construction Corporation Limited | Completed |
26 | Two laning of Rau-Mhow-Jamghat-Mandleshwar section of SH 38 in MP on BOT(Toll) | Madhya Pradesh | Transport and Logistics | 176.06 | 66.33 | 35.21 | Not Applicable | 35.02 | 31.12 | Not Applicable | 2011-03-1616.03.2011 | (29th EI) | 25.09.2012 | (42nd EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Completed |
27 | Two laning of Jhabua-Jobat-Zeerpanya-Bagh-Kukshi section of SH 39 in MP on BOT(Toll) | Madhya Pradesh | Transport and Logistics | 157.44 | 49 | 31.49 | Not Applicable | 30.85 | 17.51 | Not Applicable | 2011-03-1616.03.2011 | (29th EI) | 25.09.2012 | (42nd EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Completed |
28 | Two laning of Sarangpur-Akodia-Shujalpur section of SH 41 in MP on BOT (Toll) | Madhya Pradesh | Transport and Logistics | 50 | 10 | 10 | Not Applicable | 6.47 | Not Applicable | Not Applicable | 2011-03-1616.03.2011 | (29th EI) | 25.09.2012 | (42nd EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Terminated |
29 | Two laning of Khandwa-Dehtala-Burhanpur section of SH 50 in MP on BOT (Toll) | Madhya Pradesh | Transport and Logistics | 227.08 | 66.36 | 45.41 | Not Applicable | 45.11 | 20.95 | Not Applicable | 2011-03-1616.03.2011 | (29th EI) | 25.09.2012 | (42nd EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Completed |
30 | Four laning of Hyderabad-Karimnagar-Ramagundam Road Project | Andhra Pradesh | Transport and Logistics | 1358.19 | 454 | 271.64 | Not Applicable | 271.64 | 182.36 | Not Applicable | 2010-02-2323.02.2010 | (9th EC) | 27.08.2012 | (15th EC) | Andhra Pradesh Road Development Corporation Limited | Completed |
31 | Four laning of Narketpally-Addanki-Medarametla Road Project | Andhra Pradesh | Transport and Logistics | 1196.84 | 467.02 | 239.36 | Not Applicable | 223.04 | 227.66 | Not Applicable | 2009-02-1818.02.2009 | (16th EI) | 27.08.2012 | (15th EC) | Andhra Pradesh Road Development Corporation Limited | Completed |
32 | Construction of green field bridge across river Ganga connecting Bakhtiyarpur | Bihar | Transport and Logistics | 1502.74 | 555 | 277.5 | Not Applicable | 145.83 | 277.5 | Not Applicable | 2010-02-2323.02.2010 | (9th EC) | 27.08.2012 | (15th EC) | Bihar State Road Development Corporation Limited | Terminated. Request for revival is under consideration |
33 | Two/Four laning of Nanded-Narsi Road section to Narsi -Degloor section of SH-6 | Maharashtra | Transport and Logistics | 238.79 | 95.52 | 47.76 | Not Applicable | 47.74 | 47.76 | Not Applicable | 2009-08-1212.08.2009 | (19th EI) | 17.07.2012 | (41st EI) | Public Works Department, Government of Maharashtra | Completed |
34 | Two laning of Shirur Tajband-Mukhed-Narsi & 2 laning with paved shoulder of Narsi-Biloli to State Border sections of SH-225 | Maharashtra | Transport and Logistics | 190.18 | 76.08 | 38.04 | Not Applicable | 38.04 | 38.04 | Not Applicable | 2009-08-1212.08.2009 | (19th EI) | 17.07.2012 | (41st EI) | Public Works Department, Government of Maharashtra | Completed |
35 | Improvement in Chikkanaya Kanahalli Tiptur Hassan Road | Karnataka | Transport and Logistics | 238.45 | 92.99 | 47.69 | Not Applicable | 0 | 45.30 | Not Applicable | 2008-03-0505.03.2008 | (12th EI) | 11.06.2012 | (40th EI) | Karnataka Road Development Corporation Limited (KRDCL) | Terminated |
36 | Improvement of Karanji-Chandrapur Road section of MSH - 6 & 7 on DBFOT basis | Maharashtra | Transport and Logistics | 498.77 | 199.50 | 99.75 | Not Applicable | 97.76 | 99.75 | Not Applicable | 2009-12-1414.12.2009 | (20th EI) | 11.06.2012 | (40th EI) | Public Works Department, Government of Maharashtra | Under Construction |
37 | Four laning of Jam Warora-Chandrapur-Rajura-Asifabad Road section of SH 266 | Maharashtra | Transport and Logistics | 223.61 | 89.44 | 44.72 | Not Applicable | 44.72 | 44.72 | Not Applicable | 2009-12-1414.12.2009 | (20th EI) | 06.03.2012 | (38th EI) | Public Works Department, Government of Maharashtra | Completed |
38 | Jam Warora-Chandrapur-Ballarpur-Bamni Road project | Maharashtra | Transport and Logistics | 449.25 | 89.85 | 89.85 | Not Applicable | 89.85 | Not Applicable | Not Applicable | 2009-02-0202.02.2009 | (16th EI) | 06.03.2012 | (38th EI) | Public Works Department, Government of Maharashtra | Completed |
39 | Improvement of Dharwad- Ramnagar Stretch | Karnataka | Transport and Logistics | 230.29 | 92.12 | 46.06 | Not Applicable | 44.86 | 46.06 | Not Applicable | 2008-03-0505.03.2008 | (12th EI) | 16.01.2012 | (37th EI) | Karnataka Road Development Corporation Limited (KRDCL) | Completed |
40 | Two laning of Whaghari- Ribbanpally stretch | Karnataka | Transport and Logistics | 238.58 | 47.71 | 47.71 | Not Applicable | 47.71 | Not Applicable | Not Applicable | 2008-03-0505.03.2008 | (12th EI) | 16.01.2012 | (37th EI) | Karnataka Road Development Corporation Limited (KRDCL) | Completed |
41 | Development of Satna-Chitrakoot (SH 11) | Madhya Pradesh | Transport and Logistics | 121.78 | 24.36 | 24.36 | Not Applicable | 17.81 | Not Applicable | Not Applicable | 2009-12-1414.12.2009 | (20th EI) | 20.07.2011 | (33rd EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Terminated |
42 | Four laning of Berala Phata-Chikhali-Khamgaon | Maharashtra | Transport and Logistics | 213.50 | 85.4 | 18.58 | Not Applicable | 0 | 66.82 | Not Applicable | 2007-01-2222.01.2007 | (8th EI) | 16.03.2011 | (29th EI) | Public Works Department, Government of Maharashtra | Terminated |
43 | Four Laning Nashik – Niphad – Vaijapur - Aurangabad Road | Maharashtra | Transport and Logistics | 157.50 | 43.5 | 31.50 | Not Applicable | 31.50 | 12 | Not Applicable | 2006-03-1717.03.2006 | (3rd EI) | 16.03.2011 | (29th EI) | Public Works Department, Government of Maharashtra | Completed |
44 | Four laning of Baramati-Phaltan-Lonand-Shirwal Highway | Maharashtra | Transport and Logistics | 355.65 | 122.09 | 67.8 | Not Applicable | 37.14 | 54.29 | Not Applicable | 2009-02-0202.02.2009 | (16th EI) | 16.03.2011 | (29th EI) | Public Works Department, Government of Maharashtra | Terminated |
45 | Bina-Khimalsa-Malthon Road Project | Madhya Pradesh | Transport and Logistics | 69.11 | 13.82 | 13.82 | Not Applicable | 13.82 | Not Applicable | Not Applicable | 2009-02-0202.02.2009 | (16th EI) | 28.09.2010 | (26th EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Completed |
46 | Bhind-Mihona-Gopalpur Road project | Madhya Pradesh | Transport and Logistics | 82.89 | 16.58 | 16.58 | Not Applicable | 16.58 | Not Applicable | Not Applicable | 2009-02-0202.02.2009 | (16th EI) | 30.09.2010 | (26th EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Completed |
47 | Damoh- Jabalpur Road Project | Madhya Pradesh | Transport and Logistics | 212.13 | 42.43 | 42.43 | Not Applicable | 42.43 | Not Applicable | Not Applicable | 2009-02-0202.02.2009 | (16th EI) | 30.09.2010 | (26th EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Completed |
48 | Sagar-Damoh Road Project | Madhya Pradesh | Transport and Logistics | 116.50 | 23.30 | 23.30 | Not Applicable | 23.30 | Not Applicable | Not Applicable | 2009-02-0202.02.2009 | (16th EI) | 30.09.2010 | (26th EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Completed |
49 | Four laning of Jalna-Deoulgaonraja-Berala Phata including Deoulgaonraja bypass | Maharashtra | Transport and Logistics | 95.91 | 38.36 | 19.18 | Not Applicable | 19.18 | 19.18 | Not Applicable | 2008-06-1818.06.2008 | (14th EI) | 16.04.2010 | (23rd EI) | Public Works Department, Government of Maharashtra | Completed |
50 | Development of two lane Road of Beawer- Gomti section of NH 8 | Rajasthan | Transport and Logistics | 195.00 | 39.00 | 39.00 | Not Applicable | 39.00 | Not Applicable | Not Applicable | 2009-07-0202.07.2009 | (18th EI) | 14.12.2009 | (20th EI) | Ministry of Road Transport & Highways | Completed |
51 | Construction of Bridge across river Godavari | Andhra Pradesh | Transport and Logistics | 593.00 | 118.60 | 118.60 | Not Applicable | 118.60 | Not Applicable | Not Applicable | 2008-03-0505.03.2008 | (12th EI) | 02.07.2009 | (18th EI) | Andhra Pradesh Road Development Corporation Limited | Completed |
52 | Four Laning of following State Highways in Madhya Pradesh : Bhopal, Devas | Madhya Pradesh | Transport and Logistics | 426.64 | 81.00 | 81 | Not Applicable | 81 | Not Applicable | Not Applicable | 2006-11-1414.11.2006 | (7th EI) | 05.03.2008 | (12th EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Completed |
53 | Strengthening of Mandsaur-Sitamau Road (Upto Rajasthan Border) State Highway in Madhya Pradesh | Madhya Pradesh | Transport and Logistics | 25.25 | 25.25 | 5.05 | Not Applicable | 5.05 | Not Applicable | Not Applicable | 2006-09-2121.09.2006 | (5th EI) | 05.03.2008 | (12th EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Completed |
54 | Strengthening of Matkuli-Tamia-Chindwara State Highways in Madhya Pradesh | Madhya Pradesh | Transport and Logistics | 98.43 | 19.69 | 19.69 | Not Applicable | 19.66 | Not Applicable | Not Applicable | 2006-09-2121.09.2006 | (5th EI) | 05.03.2008 | (12th EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Completed |
55 | Strengthening of Chandpur-Alirajpur-Kukshi-Badwani State Highways in Madhya Pradesh | Madhya Pradesh | Transport and Logistics | 63.02 | 13.2 | 12.6 | Not Applicable | 12.54 | Not Applicable | Not Applicable | 2006-09-2121.09.2006 | (5th EI) | 05.03.2008 | (12th EI) | Madhya Pradesh Road Development Corporation(MPRDC) | Completed |