| 1 |
Construction of Access Controlled Highway of 4-Lane with Paved Shoulders from Ranganathpura (Hassan) to Keresooragondanahalli in Hassan Hiriyur section (EC-20) in Karnataka on HAM under NH (O). |
Ministry of Road Transport and Highways (MoRTH) |
Karnataka |
Transport and Logistics |
Roads |
1,791.01 |
08.08.2025
|
132nd PPPAC
|
Final approval |
| 2 |
Six lane Acess Control Greenfield Capital Region Ring Road Bhubaneshwar Bypass from Rameshwar to Tangi in the state of Odisha on HAM |
Ministry of Road Transport and Highways (MoRTH) |
Odisha |
Transport and Logistics |
Roads |
4,945.28 |
29.04.2025
|
122nd PPPAC
|
Final approval |
| 3 |
Four-lane, Parmakudi to Ramanathapuram Section of NH-87 in the state of Tamil Nadu on HAM |
Ministry of Road Transport and Highways (MoRTH) |
Tamil Nadu |
Transport and Logistics |
Roads |
1,853.16 |
29.04.2025
|
122nd PPPAC
|
Final approval |
| 4 |
Development of Multi Modal Logistics Parks MMLP at Pune Maharashtra |
Ministry of Road Transport and Highways (MoRTH) |
Maharashtra |
Transport and Logistics |
Roads |
1,362.02 |
02.05.2025
|
123rd PPPAC
|
Final approval |
| 5 |
Revalidation of the proposal, Development of 4-lane from Badvel to Nellore (Guruvindapudi Vilage on NH-16) in the State of Andhra Pradesh on Built Operate Transfer (BOT) Toll mode. |
Ministry of Road Transport and Highways (MoRTH) |
Andhra Pradesh |
Transport and Logistics |
Roads |
2,841.38 |
17.05.2025
|
127th PPPAC
|
Final approval |
| 6 |
Development of 4-lane Access Controlled Sirhind – Sehna section of NH205AG in the State of Punjab under NH(O) on Hybrid Annuity Mode (Package I & II) |
Ministry of Road Transport and Highways (MoRTH) |
Punjab |
Transport and Logistics |
Roads |
5,082.10 |
10.05.2025
|
126th PPPAC
|
Final approval |
| 7 |
Development of 4-lane Access Controlled Marakkanam to Puducherry of NH332A in the State of Tamil Nadu under NH(O) on Hybrid Annuity Mode (Package - III). |
Ministry of Road Transport and Highways (MoRTH) |
Tamil Nadu |
Transport and Logistics |
Roads |
2,157.09 |
10.05.2025
|
126th PPPAC
|
Final approval |
| 8 |
4 Laning of Rajapalayam to Shenkottai Section of NH-744 from Km 71+600 to Km 139+900 (Design Chainage) in Tamil Nadu on Hybrid Annuity Mode (Project Length-68.3Km) |
Ministry of Road Transport and Highways (MoRTH) |
Tamil Nadu |
Transport and Logistics |
Roads |
0.00 |
29.04.2025
|
122nd PPPAC
|
Final approval |
| 9 |
4 laning of NH-167 from Gudebellur to Mahabubnagar of Hyderabad- Panaji section under NH(O) on HAM in the State of Telangana |
Ministry of Road Transport and Highways (MoRTH) |
Telangana |
Transport and Logistics |
Roads |
2,574.34 |
08.08.2025
|
132nd PPPAC
|
Final approval |
| 10 |
Considering the revalidation of the revised cost of the Development, Maintenance and Management of the New NH-06 from Existing 61.8KM, Mawlyngkhung (Barapani Near Shillong in Meghalaya) to existing Km.197.40 New NH-06 (Panchgram in Assam) in the State of Meghalaya and Assam by 4-Laning with paved Shoulder on Hybrid Annuity Mode (HAM) Basis under Public-Private Partnership (PPP) Mode reg: - |
Ministry of Road Transport and Highways (MoRTH) |
Meghalaya |
Transport and Logistics |
Roads |
22,863.93 |
21.02.2025
|
121st PPPAC
|
Final approval |
| 11 |
4-laning from Dhamasiya (Km132+32) to Bitada/Movi (Km 179+78) section of NH-56 (Pkg-IV) and 4-laning from Nasarpore (Km 208+90) to Malotha (Km 269+11) section of NH-56 (Pkg-VI) on HAM under NH(O) in the State of Gujarat. |
Ministry of Road Transport and Highways (MoRTH) |
Gujarat |
Transport and Logistics |
Roads |
2,822.69 |
30.08.2025
|
134th PPPAC
|
Final approval |
| 12 |
4-laning of Jagtial (Km 0.000) to Karimnagar (Km 58.866) section of NH- 563, Armoor (Km 29.100) to Jagtial (Km 92.700) section of NH-63, and Jagtial (Km 92.700) to Mancherial (Km 160.995) section of NH-63 under NH (O) on HAM in the State of Telangana. |
Ministry of Road Transport and Highways (MoRTH) |
Telangana |
Transport and Logistics |
Roads |
4,459.48 |
30.08.2025
|
134th PPPAC
|
Final approval |
| 13 |
4-laning of NH-167 from Gudebellur at Design Km.182+930 to Mahabubnagar at Design Km 262+940 of Hyderabad-Panaji section (length 80.01km) under NH(O) on HAM in the state of Telangana |
Ministry of Road Transport and Highways (MoRTH) |
Telangana |
Transport and Logistics |
Roads |
2,394.68 |
30.08.2025
|
134th PPPAC
|
Final approval |
| 14 |
Widening from intermediate/two lane to 2-lane with paved shoulder from Hiwarkhedi (design km 0.000) to Roshni (design 90.010) section and Ashapur Village (design 114.000) to near Rudhy village (149.000) section of NH-347B of Betul - Khandwa corridor (Design length-125.010 km), and Up-gradation of existing 2 lane to 4 lane with paved shoulder from Deshgaon (design 0.000) to Julwaniya (design 108.643) section of NH- 347B in the State of Madhya Pradesh on HAM under NH (0). |
Ministry of Road Transport and Highways (MoRTH) |
Madhya Pradesh |
Transport and Logistics |
Roads |
4,378.25 |
17.09.2025
|
135th PPPAC
|
Final approval |
| 15 |
Construction of Greenfield Connectivity to Jewar International Airport from DND- Faridabad- Ballabhgarh Bypass KMP Link -Spur to Delhi Mumbai Expressway on Hybrid Annuity Mode under Bharatmala Pariyojana in the state of Uttar Pradesh & Haryana. (Design Length 31.425 Km - Access Controlled Highway). |
Ministry of Road Transport and Highways (MoRTH) |
Uttar Pradesh |
Transport and Logistics |
Roads |
0.00 |
17.09.2025
|
135th PPPAC
|
Final approval |
| 16 |
Widening & Upgradation of exising highway from Khagaria (Design Ch. 270+000) to Purnea (Design Ch. 413+529) secƟon of NH- 31 & NH- 231 to 4 lane with paved shoulders under NH(O) on BOT (Toll) in the State of Bihar. |
Ministry of Road Transport and Highways (MoRTH) |
Bihar |
Transport and Logistics |
Roads |
3,973.12 |
01.10.2025
|
136th PPPAC
|
Final approval |
| 17 |
4 laning of Muzaffarpur-Sitamarhi-Sonbarsa secƟon of NH-22 (Design Ch. Km. 0+000 to Design Ch. Km. 82.578) under NH(O) on HAM in the State of Bihar |
Ministry of Road Transport and Highways (MoRTH) |
Bihar |
Transport and Logistics |
Roads |
3,590.73 |
01.10.2025
|
136th PPPAC
|
Final approval |
| 18 |
Construction of 2-Lane Major Bridge across River Gandak along with its both side approaches connecƟng Manuapul (Beƫah on NH-727) in Bihar at Km 0.00 and Tiwaripaƫ (Sewarhi on NH-730) in UƩar Pradesh at Km. 29+248 of NH-727AA |
Ministry of Road Transport and Highways (MoRTH) |
Bihar |
Transport and Logistics |
Roads |
1,976.77 |
01.10.2025
|
136th PPPAC
|
Final approval |
| 19 |
Four-lane, Parmakudi to Ramanathapuram Section of NH-87 in the state of Tamil Nadu on HAM |
Ministry of Road Transport and Highways (MoRTH) |
Tamil Nadu |
Transport and Logistics |
Roads |
32.09 |
04.02.2025
|
120th PPPAC
|
Final approval |
| 20 |
Development of 8- Lane Elevated Flyover at Tier 1 on Single Pier including upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed section of NH-60 in the state of Maharashtra under NH(O) Projects on Build, Operate and Transfer (BOT) Mode. |
Ministry of Road Transport and Highways (MoRTH) |
Maharashtra |
Transport and Logistics |
Roads |
7,807.76 |
02.03.2024
|
115th PPPAC
|
Final approval |
| 21 |
Construction of Six lane access-controlled Greenfield Expressway from Km 0.000 to Km 213.803 (Tharad to Ahmedabad-Design length 213.803 km) in 6 packages under Bharatmala Pariyojana in the State of Gujarat on Hybrid Annuity Mode. |
Ministry of Road Transport and Highways (MoRTH) |
Gujarat |
Transport and Logistics |
Roads |
10,578.97 |
02.03.2024
|
115th PPPAC
|
Final approval |
| 22 |
Greenfield Development, Maintenance and Management of a new alignment of National Highway-06 from Mawlyngkhung in Meghalaya (from 61.8 km on existing NH06) to Panchgram in Assam (to 197.4 km on the existing NH06) by 4 laning with paved shoulders. |
Ministry of Road Transport and Highways (MoRTH) |
Meghalaya |
Transport and Logistics |
Roads |
24,804.82 |
09.11.2024
|
117th PPPAC
|
Final approval |
| 23 |
Six-Lane Greenfield Highway from Pagote to Chowk of NH 348B in Maharashtra on Built Operate Transfer (BOT) mode. |
Ministry of Road Transport and Highways (MoRTH) |
Maharashtra |
Transport and Logistics |
Roads |
3,653.09 |
03.12.2024
|
118th PPPAC
|
Final approval |
| 24 |
Four-Lane Patna – Arrah - Sasaram Access Controlled Greenfield Corridor’ as a new National Highway NH-119A on Hybrid Annuity Model (HAM) |
Ministry of Road Transport and Highways (MoRTH) |
Bihar |
Transport and Logistics |
Roads |
0.00 |
03.12.2024
|
118th PPPAC
|
Final approval |
| 25 |
Ropeway Project between Sonprayag and Kedarnath on Design, Build, Finance, Operate and Transfer (DBFOT) model |
Ministry of Road Transport and Highways (MoRTH) |
Uttarakhand |
Transport and Logistics |
Roads |
0.00 |
03.12.2024
|
118th PPPAC
|
Final approval |
| 26 |
Ropeway project between Govindghat and Hemkund Sahib in the State of Uttarakhand on DBFOT model. |
Ministry of Road Transport and Highways (MoRTH) |
Uttarakhand |
Transport and Logistics |
Roads |
2,589.04 |
01.01.2025
|
119th PPPAC
|
Final approval |
| 27 |
Six-lane Zirakpur Bypass in the state of Punjab & Haryana on Hybrid Annuity Mode |
Ministry of Road Transport and Highways (MoRTH) |
Punjab |
Transport and Logistics |
Roads |
1,878.31 |
01.01.2025
|
119th PPPAC
|
Final approval |
| 28 |
Four-lane STRR, NH948A - Obalapura to S.Mudugadapalli in Karnataka & Tamil Nadu on HAM. |
Ministry of Road Transport and Highways (MoRTH) |
Karnataka |
Transport and Logistics |
Roads |
8,834.08 |
01.01.2025
|
119th PPPAC
|
Final approval |
| 29 |
Four-lane, Badvel to Nellore section of NH-67 in the state of Andhra Pradesh on HAM |
Ministry of Road Transport and Highways (MoRTH) |
Andhra Pradesh |
Transport and Logistics |
Roads |
4,377.38 |
04.02.2025
|
120th PPPAC
|
Final approval |
| 30 |
Two-lane with Paved shoulder from Basnaghat (Morigaon) to Bhuragaon (in Darrang district) including new 2 lane Major Bridge over river Brahmaputra in the State of Assam on HAM |
Ministry of Road Transport and Highways (MoRTH) |
Assam |
Transport and Logistics |
Roads |
0.00 |
04.02.2025
|
120th PPPAC
|
Final approval |
| 31 |
Six-lane Access Control Greenfield Capital Region Ring Road (Bhubaneswar Bypass) from Rameshwar to Tangi in the State of Odisha on HAM |
Ministry of Road Transport and Highways (MoRTH) |
Odisha |
Transport and Logistics |
Roads |
0.00 |
04.02.2025
|
120th PPPAC
|
Final approval |
| 32 |
Development of 4-lane access-controlled Pathalgaon-Kunkuri-CG/JH border-Gumla-Bharda section as part of Raipur-Dhanbad Economic Corridor under Bharatmala Pariyojana in the state of Chhattisgarh and Jharkhand on HAM model |
Ministry of Road Transport and Highways (MoRTH) |
Jharkhand |
Transport and Logistics |
Roads |
4,472.78 |
21.02.2024
|
114th PPPAC
|
Final approval |
| 33 |
Development of 4 lane access-controlled Economic Corridor from Kharagpur to Moregram Section Km 0.000 to Km 230.957 of NH 116A divided into 5 packages in the state of West Bengal under Bharatmala Pariyojana on HAM model |
Ministry of Road Transport and Highways (MoRTH) |
West Bengal |
Transport and Logistics |
Roads |
1,024.70 |
21.02.2024
|
114th PPPAC
|
Final approval |
| 34 |
Development of 6 lane access-controlled Agra-Gwalior greenfield highway in the state of Uttar Pradesh, Rajasthan and Madhya Pradesh on BOT(Toll) Mode |
Ministry of Road Transport and Highways (MoRTH) |
Uttar Pradesh |
Transport and Logistics |
Roads |
4,262.78 |
21.02.2024
|
114th PPPAC
|
Final approval |
| 35 |
Construction of Guwahati Ring Road in the state of Assam on DBFOT (Toll) |
Ministry of Road Transport and Highways (MoRTH) |
Assam |
Transport and Logistics |
Roads |
5,729.47 |
20.02.2024
|
113th PPPAC
|
Final approval |