| 1 |
Construction of Coastal Highway (Rameswar - Paradeep)- i. Construction of 4-lane Access Controlled Coastal Highway from Rameshwar to Konark (km.0 to km. 79.400) on Hybrid Annuity Mode in the State of Odisha (Package-I). ii. Construction of new 2-lane with paved shoulder coastal Highway from Konark to Paradeep (Km.79.400 to Km. 160.180) on Hybrid Annuity Mode in the state of Odisha (Package-II). |
Ministry of Road Transport and Highways (MoRTH) |
Odisha |
Transport and Logistics |
Roads |
4,961.60 |
06.11.2025
|
137th PPPAC
|
Final approval |
| 2 |
Development of 4-lane Access Controlled Marakkanam to Puducherry of NH332A in the State of Tamil Nadu under NH(O) on Hybrid Annuity Mode (Package - III). |
Ministry of Road Transport and Highways (MoRTH) |
Tamil Nadu |
Transport and Logistics |
Roads |
2,157.09 |
10.05.2025
|
126th PPPAC
|
Final approval |
| 3 |
4 laning of NH-167 from Gudebellur to Mahabubnagar of Hyderabad- Panaji section under NH(O) on HAM in the State of Telangana |
Ministry of Road Transport and Highways (MoRTH) |
Telangana |
Transport and Logistics |
Roads |
2,574.34 |
08.08.2025
|
132nd PPPAC
|
Final approval |
| 4 |
Construction of Access Controlled Highway of 4-Lane with Paved Shoulders from Ranganathpura (Hassan) to Keresooragondanahalli in Hassan Hiriyur section (EC-20) in Karnataka on HAM under NH (O). |
Ministry of Road Transport and Highways (MoRTH) |
Karnataka |
Transport and Logistics |
Roads |
1,791.01 |
08.08.2025
|
132nd PPPAC
|
Final approval |
| 5 |
4-laning from Dhamasiya (Km132+32) to Bitada/Movi (Km 179+78) section of NH-56 (Pkg-IV) and 4-laning from Nasarpore (Km 208+90) to Malotha (Km 269+11) section of NH-56 (Pkg-VI) on HAM under NH(O) in the State of Gujarat. |
Ministry of Road Transport and Highways (MoRTH) |
Gujarat |
Transport and Logistics |
Roads |
2,822.69 |
30.08.2025
|
134th PPPAC
|
Final approval |
| 6 |
4-laning of Jagtial (Km 0.000) to Karimnagar (Km 58.866) section of NH- 563, Armoor (Km 29.100) to Jagtial (Km 92.700) section of NH-63, and Jagtial (Km 92.700) to Mancherial (Km 160.995) section of NH-63 under NH (O) on HAM in the State of Telangana. |
Ministry of Road Transport and Highways (MoRTH) |
Telangana |
Transport and Logistics |
Roads |
4,459.48 |
30.08.2025
|
134th PPPAC
|
Final approval |
| 7 |
4-laning of NH-167 from Gudebellur at Design Km.182+930 to Mahabubnagar at Design Km 262+940 of Hyderabad-Panaji section (length 80.01km) under NH(O) on HAM in the state of Telangana |
Ministry of Road Transport and Highways (MoRTH) |
Telangana |
Transport and Logistics |
Roads |
2,394.68 |
30.08.2025
|
134th PPPAC
|
Final approval |
| 8 |
Widening from intermediate/two lane to 2-lane with paved shoulder from Hiwarkhedi (design km 0.000) to Roshni (design 90.010) section and Ashapur Village (design 114.000) to near Rudhy village (149.000) section of NH-347B of Betul - Khandwa corridor (Design length-125.010 km), and Up-gradation of existing 2 lane to 4 lane with paved shoulder from Deshgaon (design 0.000) to Julwaniya (design 108.643) section of NH- 347B in the State of Madhya Pradesh on HAM under NH (0). |
Ministry of Road Transport and Highways (MoRTH) |
Madhya Pradesh |
Transport and Logistics |
Roads |
4,378.25 |
17.09.2025
|
135th PPPAC
|
Final approval |
| 9 |
Construction of Greenfield Connectivity to Jewar International Airport from DND- Faridabad- Ballabhgarh Bypass KMP Link -Spur to Delhi Mumbai Expressway on Hybrid Annuity Mode under Bharatmala Pariyojana in the state of Uttar Pradesh & Haryana. (Design Length 31.425 Km - Access Controlled Highway). |
Ministry of Road Transport and Highways (MoRTH) |
Uttar Pradesh |
Transport and Logistics |
Roads |
2,579.92 |
17.09.2025
|
135th PPPAC
|
Final approval |
| 10 |
Widening & Upgradation of exising highway from Khagaria (Design Ch. 270+000) to Purnea (Design Ch. 413+529) secƟon of NH- 31 & NH- 231 to 4 lane with paved shoulders under NH(O) on BOT (Toll) in the State of Bihar. |
Ministry of Road Transport and Highways (MoRTH) |
Bihar |
Transport and Logistics |
Roads |
3,973.12 |
01.10.2025
|
136th PPPAC
|
Final approval |
| 11 |
4 laning of Muzaffarpur-Sitamarhi-Sonbarsa secƟon of NH-22 (Design Ch. Km. 0+000 to Design Ch. Km. 82.578) under NH(O) on HAM in the State of Bihar |
Ministry of Road Transport and Highways (MoRTH) |
Bihar |
Transport and Logistics |
Roads |
3,590.73 |
01.10.2025
|
136th PPPAC
|
Final approval |
| 12 |
Construction of 2-Lane Major Bridge across River Gandak along with its both side approaches connecƟng Manuapul (Beƫah on NH-727) in Bihar at Km 0.00 and Tiwaripaƫ (Sewarhi on NH-730) in UƩar Pradesh at Km. 29+248 of NH-727AA |
Ministry of Road Transport and Highways (MoRTH) |
Bihar |
Transport and Logistics |
Roads |
1,976.77 |
01.10.2025
|
136th PPPAC
|
Final approval |
| 13 |
Development of 4-lane Access Controlled Sirhind – Sehna section of NH205AG in the State of Punjab under NH(O) on Hybrid Annuity Mode (Package I & II) |
Ministry of Road Transport and Highways (MoRTH) |
Punjab |
Transport and Logistics |
Roads |
5,082.10 |
10.05.2025
|
126th PPPAC
|
Final approval |
| 14 |
Construction of 4 -Lane Highways from Barabanki-Mustabad -Bahraich corridor in the State of Uttar Pradesh on HAM Mode |
Ministry of Road Transport and Highways (MoRTH) |
Uttar Pradesh |
Transport and Logistics |
Roads |
3,677.64 |
06.11.2025
|
137th PPPAC
|
Final approval |
| 15 |
Construction of 4-Lanning of Badnawar-Petlawad-Thandla-Timarwani section of (NH-752D) in the state of Madhya Pradesh on Hybrid Annuity Mode under NH(O)” in two package. |
Ministry of Road Transport and Highways (MoRTH) |
Madhya Pradesh |
Transport and Logistics |
Roads |
1,949.21 |
06.01.2026
|
138th PPPAC
|
Final approval |
| 16 |
Development of 6 lane access controlled Greenfield Regional Expressway on Northern side of Hyderabad from Girmapur Village (Design Ch. 1+518) to Tangad Palle Village (Design Ch. 160+000) for a Design length of 161.518 Km in the state of Telangana under HAM |
Ministry of Road Transport and Highways (MoRTH) |
Telangana |
Transport and Logistics |
Roads |
7,492.84 |
10.04.2026
|
143rd PPPAC
|
Final approval |
| 17 |
Package 1 – “Construction of Six lane Greenfield access-controlled Indore Eastern Bypass starting from design km 64+000 near Pirkaradiya village and ending at design km 113+000 on NH 347BG near village Simrol/Datoda (Package – 1) of Indore & Dewas district in the state of Madya Pradesh on HAM under NH(O) (Length – 49.00 Km)”. Package 2: “Construction of Six lane Greenfield access-controlled Indore Eastern Bypass starting from design km 113+000 on NH 347BG near village Simrol/Datoda village and ending at design km 139+630 near Nanded village (Package – 2) of Indore district in the state of Madya Pradesh on HAM under NH(O) (Length – 26.630 Km) & Rehabilitation & upgradation of existing NH-52 from Ex. km 18+000 near Khandwa Village to km 27+000 near Ahilyapur village from 4 lane to 6 lane configurations (Package – 2) of Indore district in the state of Madya Pradesh on HAM under NH(O); |
Ministry of Road Transport and Highways (MoRTH) |
Madhya Pradesh |
Transport and Logistics |
Roads |
3,617.08 |
10.04.2026
|
143rd PPPAC
|
Final approval |
| 18 |
Construction of Road Tunnel with its approaches from Shiv Murti Interchange on NH-248BB/NH-48 to Nelson Mandela Marg (NH-148AE) in the State of Delhi on HAM mode (Ch. 0+000 to 4+974)” by Ministry of Road Transport & Highways (MoRTH) under PPP mode. |
Ministry of Road Transport and Highways (MoRTH) |
Delhi |
Transport and Logistics |
Roads |
3,549.34 |
16.03.2026
|
141st PPPAC
|
Final approval |
| 19 |
Construction of 4-Lane Highway from Baihata Chariali (Km 0+000), near Guwahati to Tezpur (Km 135+000) & excluding Mangaldoi Bypass (from Km 28+500 to 42+590) along NH-15 in the State of Assam in HAM mode. |
Ministry of Road Transport and Highways (MoRTH) |
Assam |
Transport and Logistics |
Roads |
6,108.83 |
09.03.2026
|
140th PPPAC
|
Final approval |
| 20 |
Construction of 4-Lane Thiruvananthapuram Outer Ring Road (ORR) from Navaikulam (Ch. 0+00) to Vizhinjam (Ch. 62+70) section of NH-866 in Kerala on BOT Mode. |
Ministry of Road Transport and Highways (MoRTH) |
Kerala |
Transport and Logistics |
Roads |
6,857.20 |
09.03.2026
|
140th PPPAC
|
Final approval |
| 21 |
I. Construction of 4-Lane Highway from Baihata Chariali (Km 0+000), near Guwahati to Tezpur (Km 135+000) & excluding Mangaldoi Bypass (from Km 28+500 to 42+590) along NH-15 in the State of Assam in HAM mode.II.Construction of 4-Lane Thiruvananthapuram Outer Ring Road (ORR) from Navaikulam (Ch. 0+00) to Vizhinjam (Ch. 62+70) section of NH-866 in Kerala on BOT Mode. |
Ministry of Road Transport and Highways (MoRTH) |
Across India |
Transport and Logistics |
Roads |
12,966.03 |
09.03.2026
|
140th PPPAC
|
Final approval |
| 22 |
i.Construction of a Link / Connector Corridor connecting National Highway-31 (NH-31) and Varanasi Ring Road, along River Varuna for decongestion of Varanasi City from Km 0+000 to Km 19+420 (Total Length: 43.218 Km including MCW/Flyover/Loop/Ramps/Link Roads) in the State of Uttar Pradesh on HAM basis. ii.Development of Link / Connector Corridor between National Highway-19 (NH-19) and Varanasi Ring Road with Riverbank Connectivity along River Ganga for decongestion of Varanasi City from Km 0+000 to Km 18+560 (Total Length: 46.039 Km including MCW/FOB/Loop/Ramps/Link Roads) in the State of Uttar Pradesh on HAM basis. |
Ministry of Road Transport and Highways (MoRTH) |
Uttar Pradesh |
Transport and Logistics |
Roads |
11,426.18 |
30.05.2026
|
146th PPPAC
|
Final approval |
| 23 |
(i) Construction of 4/6 Lane Greenfield Ludhiana – Rupnagar National Highway no. NH-205K from junction with NE-village near to Manewal (Ludhiana) to junction with NH-205 near Bheora Village (Rupnagar) including spur to Kharar with Ludhiana bypass under NH(O) in the State of Punjab on Hybrid Annuity Mode, Package-2 (Design Ch. 37.700 to Design Ch. 66.440 and Ludhiana Bypass Design Ch. 0.000 to Design Ch. 18.500, total length 47.240 km), (ii) Construction of Six Lane Access Controlled Amaravati Outer Ring Road including Spur from Chinakakani to Tenali-6 lane and Guntur to Narakodur-4 lane (Total length = 195.13Km) on Hybrid Annuity Mode in the state of Andhra Pradesh , and (iii) Six-laning of Hyderabad – Vijayawada – Machilipatnam Section of NH-65 [from design Ch. 39.850 to Ch. 266.150 (Hyderabad – Vijayawada Section) & from design Ch. 4.000 to Ch. 63.695 (Vijayawada – Machilipatnam Section), |
Ministry of Road Transport and Highways (MoRTH) |
Across India |
Transport and Logistics |
Roads |
20,431.07 |
08.08.2026
|
150th PPPAC
|
Final approval |
| 24 |
Revalidation of the proposal, Development of 4-lane from Badvel to Nellore (Guruvindapudi Vilage on NH-16) in the State of Andhra Pradesh on Built Operate Transfer (BOT) Toll mode. |
Ministry of Road Transport and Highways (MoRTH) |
Andhra Pradesh |
Transport and Logistics |
Roads |
2,841.38 |
17.05.2025
|
127th PPPAC
|
Final approval |
| 25 |
Development of 8- Lane Elevated Flyover at Tier 1 on Single Pier including upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed section of NH-60 in the state of Maharashtra under NH(O) Projects on Build, Operate and Transfer (BOT) Mode. |
Ministry of Road Transport and Highways (MoRTH) |
Maharashtra |
Transport and Logistics |
Roads |
7,807.76 |
02.03.2024
|
115th PPPAC
|
Final approval |
| 26 |
Construction of Six lane access-controlled Greenfield Expressway from Km 0.000 to Km 213.803 (Tharad to Ahmedabad-Design length 213.803 km) in 6 packages under Bharatmala Pariyojana in the State of Gujarat on Hybrid Annuity Mode. |
Ministry of Road Transport and Highways (MoRTH) |
Gujarat |
Transport and Logistics |
Roads |
10,578.97 |
02.03.2024
|
115th PPPAC
|
Final approval |
| 27 |
Greenfield Development, Maintenance and Management of a new alignment of National Highway-06 from Mawlyngkhung in Meghalaya (from 61.8 km on existing NH06) to Panchgram in Assam (to 197.4 km on the existing NH06) by 4 laning with paved shoulders. |
Ministry of Road Transport and Highways (MoRTH) |
Meghalaya |
Transport and Logistics |
Roads |
24,804.82 |
09.11.2024
|
117th PPPAC
|
Final approval |
| 28 |
Six-Lane Greenfield Highway from Pagote to Chowk of NH 348B in Maharashtra on Built Operate Transfer (BOT) mode. |
Ministry of Road Transport and Highways (MoRTH) |
Maharashtra |
Transport and Logistics |
Roads |
3,653.09 |
03.12.2024
|
118th PPPAC
|
Final approval |
| 29 |
Four-Lane Patna – Arrah - Sasaram Access Controlled Greenfield Corridor’ as a new National Highway NH-119A on Hybrid Annuity Model (HAM) |
Ministry of Road Transport and Highways (MoRTH) |
Bihar |
Transport and Logistics |
Roads |
0.00 |
03.12.2024
|
118th PPPAC
|
Final approval |
| 30 |
Ropeway Project between Sonprayag and Kedarnath on Design, Build, Finance, Operate and Transfer (DBFOT) model |
Ministry of Road Transport and Highways (MoRTH) |
Uttarakhand |
Transport and Logistics |
Roads |
0.00 |
03.12.2024
|
118th PPPAC
|
Final approval |
| 31 |
Ropeway project between Govindghat and Hemkund Sahib in the State of Uttarakhand on DBFOT model. |
Ministry of Road Transport and Highways (MoRTH) |
Uttarakhand |
Transport and Logistics |
Roads |
2,589.04 |
01.01.2025
|
119th PPPAC
|
Final approval |
| 32 |
Six-lane Zirakpur Bypass in the state of Punjab & Haryana on Hybrid Annuity Mode |
Ministry of Road Transport and Highways (MoRTH) |
Punjab |
Transport and Logistics |
Roads |
1,878.31 |
01.01.2025
|
119th PPPAC
|
Final approval |
| 33 |
Four-lane STRR, NH948A - Obalapura to S.Mudugadapalli in Karnataka & Tamil Nadu on HAM. |
Ministry of Road Transport and Highways (MoRTH) |
Karnataka |
Transport and Logistics |
Roads |
8,834.08 |
01.01.2025
|
119th PPPAC
|
Final approval |
| 34 |
Four-lane, Badvel to Nellore section of NH-67 in the state of Andhra Pradesh on HAM |
Ministry of Road Transport and Highways (MoRTH) |
Andhra Pradesh |
Transport and Logistics |
Roads |
4,377.38 |
04.02.2025
|
120th PPPAC
|
Final approval |
| 35 |
Two-lane with Paved shoulder from Basnaghat (Morigaon) to Bhuragaon (in Darrang district) including new 2 lane Major Bridge over river Brahmaputra in the State of Assam on HAM |
Ministry of Road Transport and Highways (MoRTH) |
Assam |
Transport and Logistics |
Roads |
0.00 |
04.02.2025
|
120th PPPAC
|
Final approval |
| 36 |
Six-lane Access Control Greenfield Capital Region Ring Road (Bhubaneswar Bypass) from Rameshwar to Tangi in the State of Odisha on HAM |
Ministry of Road Transport and Highways (MoRTH) |
Odisha |
Transport and Logistics |
Roads |
0.00 |
04.02.2025
|
120th PPPAC
|
Final approval |
| 37 |
Four-lane, Parmakudi to Ramanathapuram Section of NH-87 in the state of Tamil Nadu on HAM |
Ministry of Road Transport and Highways (MoRTH) |
Tamil Nadu |
Transport and Logistics |
Roads |
32.09 |
04.02.2025
|
120th PPPAC
|
Final approval |
| 38 |
Considering the revalidation of the revised cost of the Development, Maintenance and Management of the New NH-06 from Existing 61.8KM, Mawlyngkhung (Barapani Near Shillong in Meghalaya) to existing Km.197.40 New NH-06 (Panchgram in Assam) in the State of Meghalaya and Assam by 4-Laning with paved Shoulder on Hybrid Annuity Mode (HAM) Basis under Public-Private Partnership (PPP) Mode reg: - |
Ministry of Road Transport and Highways (MoRTH) |
Meghalaya |
Transport and Logistics |
Roads |
22,863.93 |
21.02.2025
|
121st PPPAC
|
Final approval |
| 39 |
Six lane Acess Control Greenfield Capital Region Ring Road Bhubaneshwar Bypass from Rameshwar to Tangi in the state of Odisha on HAM |
Ministry of Road Transport and Highways (MoRTH) |
Odisha |
Transport and Logistics |
Roads |
4,945.28 |
29.04.2025
|
122nd PPPAC
|
Final approval |
| 40 |
Four-lane, Parmakudi to Ramanathapuram Section of NH-87 in the state of Tamil Nadu on HAM |
Ministry of Road Transport and Highways (MoRTH) |
Tamil Nadu |
Transport and Logistics |
Roads |
1,853.16 |
29.04.2025
|
122nd PPPAC
|
Final approval |
| 41 |
Development of Multi Modal Logistics Parks MMLP at Pune Maharashtra |
Ministry of Road Transport and Highways (MoRTH) |
Maharashtra |
Transport and Logistics |
Roads |
1,362.02 |
02.05.2025
|
123rd PPPAC
|
Final approval |
| 42 |
Development of 4-lane access-controlled Pathalgaon-Kunkuri-CG/JH border-Gumla-Bharda section as part of Raipur-Dhanbad Economic Corridor under Bharatmala Pariyojana in the state of Chhattisgarh and Jharkhand on HAM model |
Ministry of Road Transport and Highways (MoRTH) |
Jharkhand |
Transport and Logistics |
Roads |
4,472.78 |
21.02.2024
|
114th PPPAC
|
Final approval |
| 43 |
Development of 4 lane access-controlled Economic Corridor from Kharagpur to Moregram Section Km 0.000 to Km 230.957 of NH 116A divided into 5 packages in the state of West Bengal under Bharatmala Pariyojana on HAM model |
Ministry of Road Transport and Highways (MoRTH) |
West Bengal |
Transport and Logistics |
Roads |
1,024.70 |
21.02.2024
|
114th PPPAC
|
Final approval |
| 44 |
Development of 6 lane access-controlled Agra-Gwalior greenfield highway in the state of Uttar Pradesh, Rajasthan and Madhya Pradesh on BOT(Toll) Mode |
Ministry of Road Transport and Highways (MoRTH) |
Uttar Pradesh |
Transport and Logistics |
Roads |
4,262.78 |
21.02.2024
|
114th PPPAC
|
Final approval |
| 45 |
Construction of Guwahati Ring Road in the state of Assam on DBFOT (Toll) |
Ministry of Road Transport and Highways (MoRTH) |
Assam |
Transport and Logistics |
Roads |
5,729.47 |
20.02.2024
|
113th PPPAC
|
Final approval |