List of all PPP Projects

List of all PPP Projects

This Report provides information on infrastructure projects implemented by the Government on PPP basis across pre-defined set of parameters and following coverage criteria:
Export to Excel

Projects that were either under 'Pre-construction Stage', 'Under Construction' or 'Operation and Maintenance Stage' as on April 1, 2011 or 'Awarded' thereafter and with Project Cost >INR 5 crore.

Please click on project name for more details of the project.

  • No. of Projects in this Report: 1825
  • Total Project Cost(in Rs Crore): 2,495,568.44
Sr No. Project Name Project Capacity Total Project Cost (In Rs.Crore) Sector Sub-Sector Status Project Authority Location Update Date
1 Construction of Hemodialysis unit at Zonal Hospital, Dharamshala 6.0 Machines 0.00 Social and Commercial Infrastructure Health Care Operation and Maintenance Stage Department of Health and Family Welfare, Government of Himachal Pradesh Himachal Pradesh 05-Dec-2019
2 Teesta IV Project - 520 MW 520.0 MW (Mega Watt) 5,878.00 Energy Renewable energy (grid) Under Construction NHPC Limited Sikkim 05-Dec-2019
3 2 laning with PSS of Salasar to Haryana border section of NH65 and capacity augmentation in 2021 for 4 laning on BOT(Toll) basis 154.1 KM (Kilometer) 530.07 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 04-Dec-2019
4 4 laning of Patna-Muzaffarpur stretch of NH77 from 0-46.3 km and construction of Muzzafarpur bypass on BOT(Annuity) Basis 46.3 KM (Kilometer) 570.06 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Bihar 04-Dec-2019
5 6 laning of Chenagapjalli to Start of Coimbatore bypass & 4 laning of end of Coimbatore bypass to TN/Kerala Boarder of NH 47 54.8 KM (Kilometer) 852.74 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 04-Dec-2019
6 Berth No. 15 of New Western Dock for handling coal # 3.0 MTPA (Metric Tonne Per Annum) 376.52 Transport Ports (excluding captive) Operation and Maintenance Stage New Mangalore Port Trust Karnataka 04-Dec-2019
7 Biomass power project at Sattenapalli 6.0 MW (Mega Watt) 26.00 Energy Electricity generation (grid) Operation and Maintenance Stage Andhra Pradesh Electricity Regulatory Commission Andhra Pradesh 04-Dec-2019
8 Bus Terminal (Vadnagar) Project Not Available 10.53 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Gujarat State Road Development Corporation (GSRDC) Gujarat 04-Dec-2019
9 Construction of Dhola-Sadia Ghats bridges in length of 9.15 km 9.1 KM (Kilometer) 945.96 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Assam 04-Dec-2019
10 Construction of multi chamber cold storage with a capacity of 4000 MT in Barmer# 4000.0 MT (Metric Tonne ) 7.38 Social and Commercial Infrastructure Cold Chain Operation and Maintenance Stage Rajasthan State Agriculture Marketing Board Rajasthan 04-Dec-2019
11 Development of 1000 TPD solid waste management in Ahmedabad # 1000.0 TPD (Tonne per day) 240.00 Water Sanitation Solid waste management Under Construction Ahmedabad Municipal Corporation Gujarat 04-Dec-2019
12 Development of integrated multi level automatic car parking at Khilwat in Hyderabad district #* 1.2 Acres 73.00 Transport Urban public transport (except rolling stock) Pre-construction Stage Greater Hyderabad Municipal Corporation Telangana 04-Dec-2019
13 Development of Offshore Multipurpose Cargo Berth at Mumbai Port in the State of Maharashtra on DBFOT basis* Not Available 696.27 Transport Ports (excluding captive) Pre-construction Stage Ministry of Shipping Maharashtra 04-Dec-2019
14 Eco Tourism (Sabujdweep Island) Project 75.0 Acres 54.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Department of Tourism, West Bengal West Bengal 04-Dec-2019
15 Four laning of Chikhali-Tarsod section in length of 62.7 km in Buldana 62.7 KM (Kilometer) 1071.61 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 04-Dec-2019
16 International Cricket Stadium (Lucknow) Project # Not Available 360 Social and Commercial Infrastructure Tourism Under Construction Lucknow Development Authority Uttar Pradesh 04-Dec-2019
17 Machilipatnam Port Development * # 17.0 MTPA (Metric Tonne Per Annum) 1,860.00 Transport Ports (excluding captive) Under Construction Department of Ports, Andhra Pradesh Andhra Pradesh 04-Dec-2019
18 Mechanism of Coal Handling facilities and upgradation of General Cargo Berth at Outer Harbour of Visakhapatnam Port 10.18 MMTPA (million metric tonnes per annum) 640.40 Transport Ports (excluding captive) Operation and Maintenance Stage Ministry of Shipping Andhra Pradesh 04-Dec-2019
19 Multipurpose Cargo Port (Redi) Project 53.0 MMTPA (million metric tonnes per annum) 4,413.70 Transport Ports (excluding captive) Pre-construction Stage Maharashtra Maritime Board (MMB) Maharashtra 04-Dec-2019
20 Operation and Maintenance of North East Tribal Museum and Cultural Centre at Nazirakhat, Sonapur, Kamrup (M), Assam * 90.0 Acres 50.00 Social and Commercial Infrastructure Tourism Under Construction Cultural Affairs Department, Government of Assam Assam 04-Dec-2019
21 Parule Airport Project 400.0 Passengers 520.00 Transport Airports Operation and Maintenance Stage Maharashtra Industrial Development Corporation Maharashtra 04-Dec-2019
22 Setting up 20 MW hydel based power unit at Telbeila in Pune 20.0 MW (Mega Watt) 115.44 Energy Renewable energy (grid) Pre-construction Stage Water Resources Department, Maharashtra Maharashtra 04-Dec-2019
23 Setting up of 10 TPD solid waste management unit at Pernem # 10.0 TPD (Tonne per day) 15.00 Water Sanitation Solid waste management Under Construction State Urban Development Agency, Goa Goa 04-Dec-2019
24 Setting up of 9 MW Fozal hydel power unit in Kullu district 9.0 MW (Mega Watt) 49.16 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 04-Dec-2019
25 Setting up of Iron ore handling facilities on BOT basis at New Mangalore Port * 9.0 MMTPA (million metric tonnes per annum) 277.11 Transport Ports (excluding captive) Pre-construction Stage New Mangalore Port Trust Karnataka 04-Dec-2019
26 Water Supply Scheme (Nanjangud) * 10.7 MLD (Millons Liter per day) 28.55 Water Sanitation Water supply pipeline Under Construction Town Municipal Council, Nanjangud Karnataka 04-Dec-2019
27 Dhamra Port # 25.0 MTPA (Metric Tonne Per Annum) 10,016.00 Transport Ports (excluding captive) Operation and Maintenance Stage Department of Commerce and Transport, Odisha Odisha 03-Dec-2019
28 Angre Port - Jaigad Not Available 431.00 Transport Ports (excluding captive) Operation and Maintenance Stage Maharashtra Maritime Board (MMB) Maharashtra 25-Nov-2019
29 Construction of central bus terminal on 6.3 acres at Makarpura in Vadodara 6.30 Acres 60.28 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Gujarat State Road Transport Corporation Gujarat 25-Nov-2019
30 Construction of Deep draught coal berth on BOT basis by Paradip Port Trust 10.0 MMTPA (million metric tonnes per annum) 656.00 Transport Ports (excluding captive) Under Construction Paradip Port Trust Odisha 25-Nov-2019
31 Production of CNG from Raw biogas at Delawas STP Unit-II Not Available 0.00 Energy Renewable energy (grid) Operation and Maintenance Stage Jaipur Municipal Corporation Rajasthan 25-Nov-2019
32 Setting up of Liquid Cargo Handling Jetty at Shalukkhali, Haldia Dock-II through PPP mode 2.43 MTPA (Metric Tonne Per Annum) 172.52 Transport Ports (excluding captive) Under Construction Kolkata Port Trust West Bengal 25-Nov-2019
33 Setting up of MSW Processing plant adopting Waste to Energy Technology with Sanitary landfill at Langdiyawas for jaipur 0 214.00 Water Sanitation Solid waste management Pre-construction Stage Jaipur Municipal Corporation Rajasthan 25-Nov-2019
34 Modernization of Delhi International Airport 119.0 MPPA (Million Passenger Per Annum) 12,508.94 Transport Airports Operation and Maintenance Stage Airports Authority of India (AAI) Delhi (UT) 24-Nov-2019
35 Conversion of Delhi-Gurgaon section of NH-8 into an access controlled eight/six lane highway 28.0 KM (Kilometer) 800.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 21-Nov-2019
36 Electricity Distribution Nagpur City Not Available 652.29 Energy Electricity Distribution Operation and Maintenance Stage Maharashtra State Electricity Distribution Company Limited Maharashtra 20-Nov-2019
37 Four laning of Narketpally-Addanki-Medarametla Road Project 212.5 KM (Kilometer) 1,760.53 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation Andhra Pradesh 20-Nov-2019
38 Six laning of Kishangarh -Udaipur- Ahmedabad section of NH 79A, NH79, NH 76 and NH 8 under NHDP Phase V, length 555.50 km 555.0 KM (Kilometer) 5,387.30 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Rajasthan 20-Nov-2019
39 Ambala - Zirakpur 35.09 KM (Kilometer) 298.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 15-Nov-2019
40 City side development of Udaipur Airport through PPP * Not Available 0.00 Transport Airports Pre-construction Stage Ministry of Civil Aviation Rajasthan 15-Nov-2019
41 Design, Construction, Development, Finance,O&M (Salem)Start of proposed flyover on Namakkal Bypass 41.5 KM (Kilometer) 253.55 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 15-Nov-2019
42 Development of Triangle portion of the Lakota lake 1.8 1.8 Km periphery 45,000 Sq.m paved area 45.00 Social and Commercial Infrastructure Tourism Operation and Maintenance Stage Jamnagar Municipal Corporation Gujarat 15-Nov-2019
43 Four laning of Chapra - Hazipur section on NH 19 in Bihar * 64.0 KM (Kilometer) 691.00 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Bihar 15-Nov-2019
44 Four/Six lanning of Patna - Bakhtiyarpur section from Km 176.60 to Km 230 of NH 30 in the State of Bihar 50.6 KM (Kilometer) 600.54 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Bihar 15-Nov-2019
45 Khambatki Ghat Project 8.0 KM (Kilometer) 45.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 15-Nov-2019
46 Operation and Maintenance of Bargawan-Waidhan road in length of 27.3 Km 28.0 KM (Kilometer) 39.41 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 15-Nov-2019
47 Road Upgradation (Farukhnagar - Kottakata) Project-Package-II 46.1 KM (Kilometer) 471.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 15-Nov-2019
48 Road Upgradation Project (Raipuriya-Paitalvad-Bamaniya) Project 18.18 KM (Kilometer) 25.73 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 15-Nov-2019
49 Road Upgradation Project (Tikamgarh-Orchha & Orchha Bypass) Project 10.0 KM (Kilometer) 58.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 15-Nov-2019
50 Upgradation of existing facility & creation of new facility at Visakhapatnam Port Trust, for Iron Ore Handling 23.0 MMTPA (million metric tonnes per annum) 845.41 Transport Ports (excluding captive) Under Construction Visakhapatnam Port Trust Andhra Pradesh 15-Nov-2019
51 Basin Bridge Diesel-Fired Power Plant * 200.0 MW (Mega Watt) 490.23 Energy Electricity generation (grid) Under Construction Tamil Nadu State Electricity Board Tamil Nadu 14-Nov-2019
52 Bulk Cargo Berth No.12 (New Mangalore Port) Project 6.73 MTPA (Metric Tonne Per Annum) 469.46 Transport Ports (excluding captive) Under Construction New Mangalore Port Trust Karnataka 14-Nov-2019
53 Development of Amusement park, Swimming pool, Water sports complex and Conventional hall at Wadeghar 14.0 Acres 7.00 Social and Commercial Infrastructure Tourism Under Construction Kalyan Dombivli Municipal Corporation Maharashtra 14-Nov-2019
54 Development of passenger ropeway from Bypass (TIC)-Lift Mall Road in length of 3.6 Km in Shimla district # 3.6 KM (Kilometer) 296.67 Social and Commercial Infrastructure Tourism Pre-construction Stage Shimla Municipal Corporation Himachal Pradesh 14-Nov-2019
55 Multilevel Parking (Vikasnagar) Project 174.0 ECS 15.00 Transport Urban public transport (except rolling stock) Under Construction Shimla Municipal Corporation Himachal Pradesh 14-Nov-2019
56 Multipurpose Cargo Port (Mankhurd) Project - Phase I 4.5 MMTPA (million metric tonnes per annum) 75.00 Transport Ports (excluding captive) Under Construction Maharashtra Maritime Board (MMB) Maharashtra 14-Nov-2019
57 Truck Terminal (First Avenue Business Park & Parking Plaza) (Kalyan) Project Not Available 10.16 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Kalyan Dombivli Municipal Corporation Maharashtra 14-Nov-2019
58 Approval for VGF Support for Construction of Silos by FCI at Sahnewal, Punjab - roposed by FPD 50000.0 MT (Metric Tonne ) 42.37 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Pre-construction Stage Food Corporation of India Punjab 13-Nov-2019
59 Construction of 4 laned ROB including its approach on Delhi Agra Railway Line near Bata Chowk Not Available 15.62 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Haryana Haryana 13-Nov-2019
60 Development of community centre and shopping complex at Kalyan 1.30 Acres 6.24 Social and Commercial Infrastructure Tourism Under Construction Kalyan Dombivli Municipal Corporation Maharashtra 13-Nov-2019
61 Development of Ganga Driveway and Riverfront Development from Digha to Didarganj at Patna on BOT (Toll) basis. 21.50 KM (Kilometer) 2,234.46 Transport Roads and bridges Under Construction Bihar State Road Development Corporation Limited Bihar 13-Nov-2019
62 Development of modern food silo for storage of wheat on DBFOT at Katihar (Bihar) - Proposed by FPD 50000.0 MT (Metric Tonne ) 44.62 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Under Construction Food Corporation of India Bihar 13-Nov-2019
63 Development of passenger ropeway of 2 Km from Kullu bypass to Bijili Mahadev Temple in kullu district 600.0 Passengers 94.19 Social and Commercial Infrastructure Tourism Under Construction Department of Tourism and Civil Aviation, Himachal Pradesh Himachal Pradesh 13-Nov-2019
64 Development of ropeway between Dharamshala to Mcleod Ganj with a capacity of 600 Passenger in Kangra district 600.0 Passengers 150.00 Social and Commercial Infrastructure Tourism Under Construction Department of Tourism and Civil Aviation, Himachal Pradesh Himachal Pradesh 13-Nov-2019
65 Electricity distribution Bharatpur City (BESL) Not Available 33.35 Energy Electricity Distribution Operation and Maintenance Stage Jaipur Vidyut Vitran Nigam Limited Rajasthan 13-Nov-2019
66 Electricity distribution Kota City (KEDL) Not Available 252.83 Energy Electricity Distribution Operation and Maintenance Stage Jaipur Vidyut Vitran Nigam Limited Rajasthan 13-Nov-2019
67 Gurgaon Metro South Extension (RMGSL) project 12.0 KM (Kilometer) 2,150.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Haryana Urban Development Authority Haryana 13-Nov-2019
68 Laying of ropeway at Hemkund in Chamoli district * 150000.0 Passengers 50.70 Social and Commercial Infrastructure Tourism Under Construction Uttarakhand Tourism Development Board Uttarakhand 13-Nov-2019
69 Laying of ropeway from Palchan to Gulaba, Gulaba to Marhi and Marhi to Rohtang in Kangra district 1500.0 Passengers 340.00 Social and Commercial Infrastructure Tourism Under Construction Department of Tourism and Civil Aviation, Himachal Pradesh Himachal Pradesh 13-Nov-2019
70 Passenger Ropeway (Solang Valley-Kullu) Project 1200.0 Passengers 36.57 Social and Commercial Infrastructure Tourism Operation and Maintenance Stage Department of Tourism and Civil Aviation, Himachal Pradesh Himachal Pradesh 13-Nov-2019
71 Re-development of Berth 8, 9 and Barge Berth at Port of Marmugao, Goa 19.2 MMTPA (million metric tonnes per annum) 1,145.00 Transport Ports (excluding captive) Pre-construction Stage Mormugao Port Trust Goa 13-Nov-2019
72 Ropeway (Himani-Chamunda) Project 1000.0 Passengers 289.24 Social and Commercial Infrastructure Tourism Under Construction Department of Tourism and Civil Aviation, Himachal Pradesh Himachal Pradesh 13-Nov-2019
73 Waste to Power Plant, 1000 TPD, Surat 1000.0 TPD (Tonne per day) 209.00 Energy Electricity generation (grid) Under Construction Surat Municipal Corporation Gujarat 13-Nov-2019
74 Delhi-Meerut Expressway Project [Package-III] 22.2 KM (Kilometer) 1,058.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 11-Nov-2019
75 Development of Delhi-Meerut Expressway in length of 8.7 Km in Delhi 8.7 KM (Kilometer) 841.50 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Delhi (UT) 11-Nov-2019
76 Development, O & M of Hanumangarh to Abohar section of SH-7A (up to Punjab border) on DBFOT Toll basis.* 42.6 KM (Kilometer) 61.67 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 11-Nov-2019
77 Four laning Indore-Ujjain Road Project 48.9 KM (Kilometer) 298.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 11-Nov-2019
78 Four Laning Nashik � Niphad � Vaijapur - Aurangabad Road 40.0 KM (Kilometer) 174.58 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 11-Nov-2019
79 Four laning of Bareilly-Sitapur section of NH 24 in the State of Uttar Pradesh on BOT basis under NHDP III 151.2 KM (Kilometer) 1,046.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 11-Nov-2019
80 Four laning of Hadapsar- Saswad- Belsar-Phata (SH-64) to Belha-Pabal-Uralikanchan-Jejuri-Nira (SH-61) road 41.1 KM (Kilometer) 358.40 Transport Roads and bridges Under Construction Public Works Department, Maharashtra Maharashtra 11-Nov-2019
81 Four Laning of Mahuva to Kagavadar section in 39.8 Km under NHDP-IV 40.02 KM (Kilometer) 763.23 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 11-Nov-2019
82 Four Laning of Stand Alone Ring Road/Bypass for Nagpur City 61.5 KM (Kilometer) 1,170.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 11-Nov-2019
83 Road Upgradation (Kodinar-Veraval) Project 41.74 KM (Kilometer) 829.97 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 11-Nov-2019
84 Six laning of Varanasi-Aurangabad section of NH 2from Km 786.00 to km 978.40 in the State of UP/Bihar under NHDP V on BOT basis 192.4 KM (Kilometer) 2,588.38 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 11-Nov-2019
85 Two laning of Chittorgarh-Neemach section of NH 79 and Nimbahera-Pratapgarh section of NH 113 under VGF Scheme 113.0 KM (Kilometer) 511.21 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 11-Nov-2019
86 Two laning of Shirur Tajband-Mukhed-Narsi & 2 laning with paved shoulder of Narsi-Biloli to State Border, sections of SH-225 105.0 KM (Kilometer) 318.00 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 11-Nov-2019
87 Two/Four laning of Nanded-Narsi Road sector of SH-6 77.7 KM (Kilometer) 238.79 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 11-Nov-2019
88 "DBFOMT" of existing state highway (SH-3 & 33) from Malavalli to Pavagada (Approx Length 193.344 Km) in Karnataka 193.34 KM (Kilometer) 559.75 Transport Roads and bridges Operation and Maintenance Stage Public Works, Ports and Inland Water Transport Department, Karnataka Karnataka 09-Nov-2019
89 "DBFOMT" of SH18 from Mudhol - Nippani - MH Border (Approx Length 107.937) in Karnataka 107.9 KM (Kilometer) 317.60 Transport Roads and bridges Operation and Maintenance Stage Public Works, Ports and Inland Water Transport Department, Karnataka Karnataka 09-Nov-2019
90 2 lane with paved shoulders of Bhopal Sanchi section under NHDP phase III* 53.77 KM (Kilometer) 305.00 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Madhya Pradesh 09-Nov-2019
91 2 laning with paved shoulder�of Jabalpur-Mandala-Chilpi section�from 3.4 to 192.4 km under NHDP - IV 177.75 KM (Kilometer) 811.74 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Madhya Pradesh 09-Nov-2019
92 2 laning with paved shoulders of Nagaur-Bikaner section of NH89 from km 171 to km 267.325 of NH 89 (including bypass at Nagaur) 108.3 KM (Kilometer) 378.07 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 09-Nov-2019
93 2 laning with Paved Side Shoulders of Nagaur-Jodhpur of NH-65 from km 166.26 to km 296.07 on DBFOT (Toll) basis.* 134.64 KM (Kilometer) 439.96 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Rajasthan 09-Nov-2019
94 2/4 laning of NH 12 from km 256.55 to km 346.539(Kota-Jhalwar section) on BOT(Toll) basis basis�* Not Available 530.01 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Rajasthan 09-Nov-2019
95 2/4 laning of section between Madurai to Ramanathapuram and 2 lane with paved shoulders from 79.34 - 118.795 km of NH 49 115.11 KM (Kilometer) 683.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Tamil Nadu 09-Nov-2019
96 24x7 Nagpur Water Supply Scheme * Not Available 387.86 Water Sanitation Water supply pipeline Under Construction Nagpur Municipal Corporation Maharashtra 09-Nov-2019
97 3 Star Hotel at Amritsar * Not Available 175.00 Social and Commercial Infrastructure Tourism Under Construction Punjab Urban Development Authority Punjab 09-Nov-2019
98 4 Laning of Rimuli Roxy Rajamunda Section of NH 215 from 163 -269 km in Orissa under NHDP Phase IIIA on BOT Basis. 106.0 KM (Kilometer) 654.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Odisha 09-Nov-2019
99 4 laning of Sahajahanpur-Hardoi-Lucknow Road (SH-25) on DBFOT toll basis* 162.4 KM (Kilometer) 1,161.62 Transport Roads and bridges Under Construction Public Works Department, Government of Uttar Pradesh Uttar Pradesh 09-Nov-2019
100 4 laning of Tirupati-Tiruthani-Chennai section of NH 205 from 274.8-341.6 km in AP and km 0 to 59.60 in Tamil Nadu on BOT Basis 124.7 KM (Kilometer) 801.80 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 09-Nov-2019
101 4 laning of Trichy Karaikkudi section of NH-210 (10-94 km) and Trichy Bypass (ch 109.558-ch 135.39) in Tamil Nadu on BOT basis. 110.9 KM (Kilometer) 374.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 09-Nov-2019
102 4-laning of Etah Sikohabad Road (SH-85) from km 0.000 to km 51.415 on DBFOT toll basis* 51.41 KM (Kilometer) 344.61 Transport Roads and bridges Under Construction Public Works Department, Government of Uttar Pradesh Uttar Pradesh 09-Nov-2019
103 4/6 laning of Dewas Bypass from Km 0/00 on sH-18 to km. to 19/800 on NH-3 on DBFOT basis. 19.8 KM (Kilometer) 267.30 Transport Roads and bridges Pre-construction Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
104 4/6 laning of Maharashtra/Goa Border to Panaji-Goa/Karnataka Border to be executed as BOT(Toll) on DBFO pattern* Not Available 2,078.00 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Goa 09-Nov-2019
105 5 Star Hotel at Amritsar * Not Available 250.00 Social and Commercial Infrastructure Tourism Under Construction Punjab Urban Development Authority Punjab 09-Nov-2019
106 5 Star Hotel at Bhatinda * Not Available 200.00 Social and Commercial Infrastructure Tourism Under Construction Not Available Punjab 09-Nov-2019
107 5 Star Hotel-cum-Convention Centre, Amritsar * Not Available 175.00 Social and Commercial Infrastructure Tourism Under Construction Punjab Urban Development Authority Punjab 09-Nov-2019
108 5 Star Hotel-cum-Convention Centre, Ludhiana * Not Available 175.00 Social and Commercial Infrastructure Tourism Under Construction Greater Ludhiana Area Development Authority Punjab 09-Nov-2019
109 5 Star Hotel-cum-Convention Centre, Mohali * Not Available 350.00 Social and Commercial Infrastructure Tourism Under Construction Greater Mohali Area Development Authority Punjab 09-Nov-2019
110 6 laning of Ahmedabad Vadodara Section of NH 8 and improvement of Ahmedabad Vadodara Expressway in Gujarat under NHDP Phase V 102.3 KM (Kilometer) 4,880.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 09-Nov-2019
111 6 laning(and Construction of additional 4 lane Bridge across River Narmada) of Vadodara-Surat Section of NH-8 on BOT(Toll) basis Not Available 473.24 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Gujarat 09-Nov-2019
112 6-laning of Indore-Dewas section of NH-3 Madhya Pradesh NHDP-V to be executed as BOT (Toll) project on"DBFOT" pattern 45.0 KM (Kilometer) 325.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Madhya Pradesh 09-Nov-2019
113 6-Laning(Chengapalli &4-Laning on end of TNKerala Border Sec.of NH47 Tamil Nadu under NHDP-11 on DBFOT(Toll)basi 54.80 KM (Kilometer) 852.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 09-Nov-2019
114 6/8 laning of JNPT Port Road Project at NH 4B (A1 - E section), NH-4B (D-G section), SH-54 and on Amra Marg 43.912 KM (Kilometer) 1,822.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Maharashtra 09-Nov-2019
115 8/6 Laning of Delhi Meerut Expressway from Km. 8.36- Km. 27.74 (UP Border to Dasna) oh NH-24 on HAM(Package II)* Not Available 1,989.00 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Uttar Pradesh 09-Nov-2019
116 Adityapur Water Supply Phase I * Not Available 150.00 Water Sanitation Water supply pipeline Not Available Department of Industries, Jharkhand Jharkhand 09-Nov-2019
117 Amusement Park at Gurgaon * 17.0 Acres 100.00 Social and Commercial Infrastructure Tourism Under Construction Haryana Urban Development Authority Haryana 09-Nov-2019
118 Augmentation of Parallel Water Supply Scheme in length of 1200.0 km in Aurangabad district * 1200.0 KM (Kilometer) 720.00 Water Sanitation Water supply pipeline Under Construction Aurangabad Municipal Corporation Maharashtra 09-Nov-2019
119 Badnagar - Sundarawad - Kharsodkalan - Unhel* 51.31 KM (Kilometer) 141.00 Transport Roads and bridges Not Available Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
120 Baretha - Ghoradongri 15.1 KM (Kilometer) 39.53 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
121 Batala - Beas (MDR-66)* Not Available 87.00 Transport Roads and bridges Under Construction Public Works Department, Punjab Punjab 09-Nov-2019
122 Berth (EQ 1A & EQ 1) Project * 7.3 MMTPA (million metric tonnes per annum) 313.39 Transport Ports (excluding captive) Under Construction Visakhapatnam Port Trust Andhra Pradesh 09-Nov-2019
123 Biotech Park (Andharua) * 64.0 Acres 100.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Odisha Industrial Infrastructure Development Corporation Odisha 09-Nov-2019
124 Border Check Posts (Madhya Pradesh) Project* 24.0 Numbers 1,350.00 Transport Roads and bridges Under Construction Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
125 Bridge (Haldwani-Ramnagar) Project* 1.075 KM (Kilometer) 26.00 Transport Roads and bridges Under Construction Public Works Department, Uttarakhand Uttarakhand 09-Nov-2019
126 Chandikole - Paradeep Section, km 0.000 to 76.618� of NH - 5A� under NHDP V on BOT (Toll)* 76.618 KM (Kilometer) 1,014.36 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Odisha 09-Nov-2019
127 City Development (Mankapur) Project * Not Available 48.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Nagpur Municipal Corporation Maharashtra 09-Nov-2019
128 Cold chain project for Fruit and vegetables * 512.0 MT (Metric Tonne ) 50.41 Social and Commercial Infrastructure Cold Chain Under Construction Ministry of Food Processing Industries Maharashtra 09-Nov-2019
129 Commercial Centre at Chinchwad * Not Available 20.94 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Pimpri Chinchwad Municipal Corporation Maharashtra 09-Nov-2019
130 Commercial development of Animal Husbandry and Veterinery Science land on Hebbal road * Not Available 250.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Not Available Department of Agriculture, Horticulture, Animal Husbandry and Fisheries, Karnataka Karnataka 09-Nov-2019
131 Common Effluent Treatment (Adityapur) Project * Not Available 12.00 Water Sanitation Sewage collection, treatment and disposal system Under Construction Adityapur Municipal Council Jharkhand 09-Nov-2019
132 Construction and area development under GMDA at Borsajal, Guwahati, Assam * Not Available 0.00 Social and Commercial Infrastructure Tourism Not Available Guwahati Metropolitan Development Authority Assam 09-Nov-2019
133 Construction of bus terminal on 6.5 acres at Adajan in Surat * 6.5 Acres 155.09 Transport Urban public transport (except rolling stock) Under Construction Gujarat State Road Transport Corporation Gujarat 09-Nov-2019
134 Construction of funicular railway at Haji Malang Gad in Thane district * 60.0 Passengers 45.91 Social and Commercial Infrastructure Tourism Under Construction Public Works Department, Maharashtra Maharashtra 09-Nov-2019
135 Construction of Gavanphata Interchange road 18.3 KM (Kilometer) 593.26 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
136 Construction of Gurgaon Recreation Park * Not Available 71.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Haryana State Industrial and Infrastructure Development Corporation Haryana 09-Nov-2019
137 Construction of KSRTC offices guest house and commercial complex on KSRTC Site at Mangaluru district * 1.10 Acres 20.70 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Karnataka State Road Transport Corporation (KSRTC) Karnataka 09-Nov-2019
138 Construction of NH-4B from km.21.200 to Km.27.270 and from km.0.000 to Km.4.492 of JNPT Phase-II (PKG-IV)* 10.60 KM (Kilometer) 590.00 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
139 Construction of Nimbahera bye-pass # 13.50 KM (Kilometer) 31.48 Transport Roads and bridges Completed Public Works Department, Rajasthan Rajasthan 09-Nov-2019
140 Construction of Pali Bye pass on Jodhpur - Sumerpur Road # 11.50 KM (Kilometer) 30.00 Transport Roads and bridges Completed Public Works Department, Rajasthan Rajasthan 09-Nov-2019
141 Construction of railway over bridge on Vadodara-Savli-Timba road in length of 60.0 Km in Vadodara district* 60.0 KM (Kilometer) 21.98 Transport Roads and bridges Pre-construction Stage Roads and Buildings Department, Gujarat Gujarat 09-Nov-2019
142 Container Terminal at Diamond Harbour (Kolkata Port) * Not Available 705.88 Transport Ports (excluding captive) Not Available Kolkata Port Trust West Bengal 09-Nov-2019
143 Delhi-Meerut Expressway and other connecting roads including 6/8 laning of NH24, NH58,NH235 on DBFOT(Toll) basis* 150.147 KM (Kilometer) 10,000.00 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Multi State/ Centre 09-Nov-2019
144 Design Construction finance O&M of 2 lane bridge across Musi river of Miryalguda Kodad Road including approa* 0.54 14.50 Transport Roads and bridges Under Construction Andhra Pradesh Road Development Corporation Andhra Pradesh 09-Nov-2019
145 Design Construction Finance Operation and Maintenance of Four Laning of Khammam Tallada Devarapalli Road under PPP* Not Available 660.00 Transport Roads and bridges Not Available Andhra Pradesh Road Development Corporation Andhra Pradesh 09-Nov-2019
146 Design Construction Finance Operation and Maintenance of Four Laning of Perecherla Thokapalli Road under PPP* Not Available 522.00 Transport Roads and bridges Not Available Andhra Pradesh Road Development Corporation Andhra Pradesh 09-Nov-2019
147 Design Construction Finance Operation and Maintenance of Four Laning of Warangal Khammam Road under PPP* Not Available 476.00 Transport Roads and bridges Not Available Andhra Pradesh Road Development Corporation Andhra Pradesh 09-Nov-2019
148 Development of 7 MLD water supply project at Bekal Kasargod Dist * 7.0 MLD (Millons Liter per day) 17.00 Water Sanitation Water supply pipeline Under Construction Bekal Resorts Development Corporation Limited Kerala 09-Nov-2019
149 Development of Adiquate Road Connectivity to Chennai -Ennore Port Connectivity* 29.0 KM (Kilometer) 600.00 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Tamil Nadu 09-Nov-2019
150 Development of CBD in South TT Nagar Bhopal * Not Available 1,500.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Not Available Madhya Pradesh Housing Board Madhya Pradesh 09-Nov-2019
151 Development of existing 4-lane road from Bangalore to Hunsur via Mysore and other Connecting roads into 6-lane roads* 201.12 KM (Kilometer) 621.46 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
152 Development of Four lane of Mangwan to MP/UP border section (km 98/2 to km 46/6) of NH 27 on DBFOT (Toll) basis 52.1 KM (Kilometer) 410.70 Transport Roads and bridges Under Construction Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
153 Development of Hoshiarpur - Phagwara Road Project* 35.5 KM (Kilometer) 32.53 Transport Roads and bridges Under Construction Public Works Department, Punjab Punjab 09-Nov-2019
154 Development of Integrated Solid Waste Treatment (100 TPD) and Landfill Facilities at Belgaum * 100.0 TPD (Tonne per day) 5.12 Water Sanitation Solid waste management Under Construction Belagavi City Corporation Karnataka 09-Nov-2019
155 Development of International Convention Centre at Devanahalli * Not Available 1,050.00 Social and Commercial Infrastructure Tourism Under Construction Department of Tourism, Karnataka Karnataka 09-Nov-2019
156 Development of logistic park at Batasingaram on 40 acres * 40.0 Acres 20.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Pre-construction Stage Hyderabad Metropolitan Development Authority Telangana 09-Nov-2019
157 Development of logistic park at Mangalpalli on 22 acres * 22.0 Acres 20.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Hyderabad Metropolitan Development Authority Telangana 09-Nov-2019
158 Development of minor sea port at vizhinjam on DBFOT basis * 600,000.0 TEU (Twenty-foot Equivalent Units) 4,089.00 Transport Ports (excluding captive) Under Construction Vizhinjam International Sea Port Limited Kerala 09-Nov-2019
159 Development of multi-cargo berth no. 13 at Deendayal Port * 100,000.0 TEU (Twenty-foot Equivalent Units) 0.00 Transport Ports (excluding captive) Not Available Deendayal Port Trust Gujarat 09-Nov-2019
160 Development of Navlakhi Port with a capacity of 4.5 MMTPA in Rajkot district * 4.5 MMTPA (million metric tonnes per annum) 450.00 Transport Ports (excluding captive) Under Construction Gujarat Maritime Board (GMB) Gujarat 09-Nov-2019
161 Development of Railway Over Bridges in Gujarat* Not Available 198.00 Transport Roads and bridges Pre-construction Stage Roads and Buildings Department, Gujarat Gujarat 09-Nov-2019
162 Development of resorts at Bekal in Kasaragod District * 9,999.00 55.00 Social and Commercial Infrastructure Tourism Under Construction Bekal Resorts Development Corporation Limited Kerala 09-Nov-2019
163 Development of road from Afzalpur-Ghattarga Sarasamba with Ribbanapalli and other connecting roads* 253.69 KM (Kilometer) 530.09 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
164 Development of road from Annigere-Navalgund-Datnal-Ron and other connecting roads* 241.95 KM (Kilometer) 505.65 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
165 Development of road from Arsikere-Gandasi-Channarayapatna-Kikkeri-K R Pet-Chinakurali-Pandavapur SH-07 * 159.72 KM (Kilometer) 334.62 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
166 Development of road from Badravathi-Shimoga-Honalli-Shikaripura SH-57 and other connecting roads* 312.61 KM (Kilometer) 653.17 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
167 Development of road from Bangalore-Magadi-Huliyuru Durga and other connecting roads* 177.54 KM (Kilometer) 732.92 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
168 Development of road from Bidar to Humnabad SH-105 and other connecting roads* 112.74 KM (Kilometer) 235.59 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
169 Development of road from Channagiri-Davanagere-Jaglur SH-65 and other connecting road SH-45* 154.8 KM (Kilometer) 320.34 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
170 Development of road from Chikkaballapur NH-7 Vijipur-Vemagal-Kolar-Nandi cross and other connecting roads* 152.91 KM (Kilometer) 319.64 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
171 Development of road from Chikkaballapura-Nandi-Doddaballapur-Maduray-Nelamangala-Taverekere-Kengeri-Jigani-Ane* 194.23 KM (Kilometer) 406.13 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
172 Development of road from Devangaon bridge-Afzalpur-Gulbarga and other connecting roads* 246.08 KM (Kilometer) 514.60 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
173 Development of road from Devangaon-Vibuthihal-Indi-Atharga-Bijapur SH-34 and other connecting roads* 145.0 KM (Kilometer) 302.51 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
174 Development of road from Gangavathi -NH-63 at Koppal-Mundargi and other connecting roads* 180.31 KM (Kilometer) 735.97 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
175 Development of road from Gangavathi-Karatgi-Sindanoor-Kalmali joining SH-20 SH-23 and other connecting roads* 229.49 KM (Kilometer) 480.58 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
176 Development of road from Gorabal on SH-23-Dhadesugur-Desanur-Sindegeri-Bellary and other connecting roads* 171.44 KM (Kilometer) 697.46 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
177 Development of road from Haveri-Hirekeruru-Thalagundi-Soraba-Sagar road and other connecting road* 185.05 KM (Kilometer) 387.11 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
178 Development of road from Hoskote-Mallur-Tekal-Bangarpet-Baythmangal-AP Border SH-95 and connecting roads* 143.1 KM (Kilometer) 585.33 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
179 Development of road from Huliyur-Tiptur-Nuggenahalli-Shravanabelagola road SH-47 and other connecting roads* 107.36 KM (Kilometer) 227.89 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
180 Development of road from Hunsur-Verajpet Madakeri-Somavarpet road and other connecting roads* 273.24 KM (Kilometer) 572.10 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
181 Development of road from Kadur-Chikkamangalur-Mudigere-Belthangadi-Bantwal road SH-64* 161.94 KM (Kilometer) 338.13 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
182 Development of road from Katak-Chincholi-Jalasangi from Maharashtra border near Kamlanagar-Sangam-AP Border ne* 214.15 KM (Kilometer) 447.83 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
183 Development of road from Kushalnagara-Madikere-Sampaji-Sulya-Puttur joining NH-48 SH-88 and other connecting roads* 174.67 KM (Kilometer) 365.09 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
184 Development of road from Lokapur to Mudhol SH-34 Mudhol-Sidapur-Kanakawadi-Nipani SH-18 and other connecting roads* 181.80 KM (Kilometer) 380.22 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
185 Development of road from Lokapura-Halki-Mallapur to join NH-4 near Gotur and other connecting roads* 164.11 KM (Kilometer) 340.55 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
186 Development of road from Lokapura-Varchagal-Govanakop and other connecting roads* 283.10 KM (Kilometer) 576.97 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
187 Development of road from Maharashtra border to Sankeshwara - Navalihal SH-12 and other connecting roads, Belgaum* 161.50 KM (Kilometer) 335.60 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
188 Development of road from Mandya-Dudda-Melukote-Santhebachalli-Sravanabelagola-Channarayapatha SH-47* 284.87 KM (Kilometer) 595.56 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
189 Development of road from Mangalore-Shimoga NH-13 to NH-48 via Belthangadi-Kokkada SH-37 and other connecting roads* 175.22 KM (Kilometer) 366.87 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
190 Development of road from Mysore-Bannur-Mallavali-Maddur-Huliyuru durga-Kunigal-Tumkur-Koratagere SH-33* 313.92 KM (Kilometer) 656.60 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
191 Development of road from Mysore-Manadwadi SH-33 road and other connecting roads* 114.10 KM (Kilometer) 238.25 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
192 Development of road from Nanjangud-Chamarajnagar and other connecting roads* 250.10 KM (Kilometer) 522.45 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
193 Development of road from NH-13 near Hungund-Mudagal SH-20 Sindhanur-Lingasugur-Maski-Chikmudbal to NH-218 at Jewargi* 224.46 KM (Kilometer) 469.02 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
194 Development of road from NH-17 Kundapura-Thirthhalli road SH-52* 81.81 KM (Kilometer) 171.27 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
195 Development of road from NH-218 to Mulawad- Babaleshwar-Mudhol and other connecting roads* 222.41 KM (Kilometer) 464.23 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
196 Development of road from Raichur to Bachi Bachi to Hungund SH-20* 199.37 KM (Kilometer) 416.71 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
197 Development of road from Ramdurga-Chunchur-Manoli-Sogal-Bailhongal-Chikkabagewadi-Bagewai and other connecting roads* 211.78 KM (Kilometer) 442.67 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
198 Development of road from SH-53 near Kudachi-Raibag-Bagewadi-Zangathaal SH-73 and other connecting roads, Belgaum* 130.52 KM (Kilometer) 272.89 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
199 Development of road from Shiraguppi-Molwad-Ainapur SH-72 and other connecting roads* 201.0 KM (Kilometer) 410.91 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
200 Development of road from Tadas-Mundgod-Sirsi-Sampakhand-Kumta road SH-69* 136.74 KM (Kilometer) 285.78 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
201 Development of road from Tawargere - Hulihyder-Kanakgeri-Gonal-Chikka Jantakal - Kuditheni SH-29* 146.26 KM (Kilometer) 598.09 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
202 Development of road from TN Border-Kodihalli-Kanakpura-Ramnagar-Magadi-Solur-Davaspet-Kottigere SH-03* 223.73 KM (Kilometer) 467.92 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
203 Development of road from Yaragatti-Thavalgeri-Maldinni near SH-31 Nesargi to AP Border near Ananthapur SH-31* 212.55 KM (Kilometer) 869.25 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
204 Development of road Hassan-Arakalgud-Ramnathpura-Piriyapatna and other connecting roads* 91.63 KM (Kilometer) 377.29 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
205 Development of road Shimoga-Honnalli-Harapanahalli-Kudligi-Sandur-Thoranagal and other connecting roads* 216.85 KM (Kilometer) 887.05 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
206 Development of road Sira-Madugiri-Gowribidanur-Chikkaballapura-Shidalgatta-Chithamani-Srinivasapur-Mulbagal SH-58* 358.1 KM (Kilometer) 1,464.82 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
207 Development of road Thamilnadu border to Attibele-Sarjapur-Hoskote-Jangamakote-Shidlgatta join SH-58 * 89.12 KM (Kilometer) 364.64 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
208 Development of Sirhind - Morinda - Ropar* 55.42 KM (Kilometer) 70.25 Transport Roads and bridges Under Construction Public Works Department, Punjab Punjab 09-Nov-2019
209 Development of Tourism Infrastructure Projects at Belur * 7.0 Acres 28.00 Social and Commercial Infrastructure Tourism Pre-construction Stage Department of Tourism, Karnataka Karnataka 09-Nov-2019
210 Development of Tourism Infrastructure Projects at Bijapur * 5.0 Acres 21.00 Social and Commercial Infrastructure Tourism Not Available Department of Tourism, Karnataka Karnataka 09-Nov-2019
211 Development of two lane carriageway to Dabadeh to Bhawan Mandi* Not Available 96.00 Transport Roads and bridges Under Construction Rajasthan State Road Development and Construction Corporation Limited Rajasthan 09-Nov-2019
212 Development of Various Tourism Facilities in Pilikula * Not Available 80.00 Social and Commercial Infrastructure Tourism Pre-construction Stage Department of Tourism, Karnataka Karnataka 09-Nov-2019
213 Development, Construction, Operation and Maintenance of An Integrated Municipal Waste Processing and Disposal Facility At Okhla* 950.0 TPD (Tonne per day) 65.00 Water Sanitation Solid waste management Under Construction New Delhi Municipal Council Delhi (UT) 09-Nov-2019
214 Development, O&M of Gadoj-Majri to Haryana/ Rajasthan Border and Majri to Neemrana under DBFOT (Toll) Basis* 46.4 KM (Kilometer) 88.01 Transport Roads and bridges Pre-construction Stage Public Works Department, Rajasthan Rajasthan 09-Nov-2019
215 District Central Library at Visakapatnam * Not Available 25.00 Social and Commercial Infrastructure Education Under Construction Andhra Pradesh Industrial Infrastructure Corporation Limited (APIIC) Andhra Pradesh 09-Nov-2019
216 Door to Door Collection of Solid waste Composting and Landfill at Dehradun * Not Available 24.56 Water Sanitation Solid waste management Under Construction Dehradun Nagar Nigam Uttarakhand 09-Nov-2019
217 Door to Door Collection of Solid waste Composting and Landfill at Nainital * Not Available 9.83 Water Sanitation Solid waste management Under Construction Nainital Municipality Uttarakhand 09-Nov-2019
218 Drama Theatre Complex Majiwada * 1.40 Acres 30.00 Social and Commercial Infrastructure Tourism Under Construction Thane Municipal Corporation Maharashtra 09-Nov-2019
219 Eastern Peripheral Expressway (NH No. NE-II) 134.95 KM (Kilometer) 6,588.90 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Haryana 09-Nov-2019
220 Eco Tourism Park - Rewa * 5.78 15.68 Social and Commercial Infrastructure Tourism Under Construction Madhya Pradesh Ecotourism Development Board Madhya Pradesh 09-Nov-2019
221 Establishment of 2 x 10 MWp SPV power plant at Atam Pahad, South Andaman * 20.0 MW (Mega Watt) 130.76 Energy Renewable energy (grid) Pre-construction Stage Andaman and Nicobar Administration Andaman & Nicobar Islands (UT) 09-Nov-2019
222 Four laining with PSS of Kaithal to Rajasthan Border section of NH 152/65 from km 33.250 to km 243.58 under NHDP IV 166.25 KM (Kilometer) 2,290.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Multi State/ Centre 09-Nov-2019
223 Four laning elevated road from Chennai Port gate No. 10 to Maduravoyal (NH 4) in the state of Tamil nadu 18.0 KM (Kilometer) 1,345.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 09-Nov-2019
224 Four laning of Ambala - Kaithal section of NH-65 including Ambala Bypass inHaryana on BOT (Toll) project on DBFOT (Toll) basis 95.383 KM (Kilometer) 878.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Haryana 09-Nov-2019
225 Four laning of Amravati to Chikhli Section of NH-6 from Km 166.00 to Km 360.00 in the state of Maharashtra under NHDP Phase IV 194.0 KM (Kilometer) 2,288.18 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
226 Four laning of Balance connectivity road from Visakhapatnam Port to NH5 4.2 KM (Kilometer) 100.32 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 09-Nov-2019
227 Four laning of Barasat-Krishnagar section of NH 34 in West Bengal under NHDP Phase III on BOT (Annuity) basis* 84.0 KM (Kilometer) 886.73 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) West Bengal 09-Nov-2019
228 Four laning of Barhi to Hazaribagh section of NH 33 in Jharkhand� 40.5 KM (Kilometer) 562.34 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Jharkhand 09-Nov-2019
229 Four laning of Bhavnagar-Talaja road in length of 46.5 km in Bhavnagar under NHDP-IV 48.04 KM (Kilometer) 998.18 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 09-Nov-2019
230 Four laning of Bhubaneshwar - Puri section of NH 203 in Orissa� 67.25 KM (Kilometer) 500.29 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Odisha 09-Nov-2019
231 Four laning of BRT Tiger Reserve Boundary-Bengaluru section in 174.1 Km in Bengaluru district 170.9 KM (Kilometer) 1,008.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 09-Nov-2019
232 Four laning of fagne to Gujarat-Maharashtra Border section of NH 6 from Km 510 to Km 650.79 in Maharashtra under NHDP Phase IV 140.79 KM (Kilometer) 1,885.74 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
233 Four laning of Farakka-Raiganj section of NH 34 from km 295 to km 398 inWest Bengal on DBFOT basis unde+B218r NHDP III 103.0 KM (Kilometer) 1,056.56 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) West Bengal 09-Nov-2019
234 Four laning of Goa/Karnataka Border-Kundapur road in length of 189.6 km under NHDP-IV 189.6 KM (Kilometer) 1,655.01 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 09-Nov-2019
235 Four laning of Goa/Karnataka border-Panaji, Goa stretch of NH 4A of Goa* Not Available 382.46 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Goa 09-Nov-2019
236 Four laning of Godhara to Gujarat/MP border section of NH 59 in the State of Gujarat under NHDP Phase III on DBFOT pattern Not Available 855.55 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Gujarat 09-Nov-2019
237 Four laning of Guna to Biaora section of NH 3 from Km 332.100 to Km 426.100 in the state of Madhya Pradesh under NHDP phase IV 93.5 KM (Kilometer) 1,081.90 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Madhya Pradesh 09-Nov-2019
238 Four laning of Gwalior - Shivpuri section of NH 3 from km 15.600 to NH 75 to km 236 inMadhya Pradesh on BOT (Toll) basis. 220.40 KM (Kilometer) 1,500.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Madhya Pradesh 09-Nov-2019
239 Four laning of Haridwar-Dehradun Section of NH 58 & 72 in the state of Uttarakhand-BOT(Annuity) basis 39.0 KM (Kilometer) 1,021.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttarakhand 09-Nov-2019
240 Four laning of Indore-Jhabua-Gujarat/MP border section of NH 59 in Madhya Pradesh on BOT (Toll) basis under NHDP III 155.15 KM (Kilometer) 1,297.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 09-Nov-2019
241 Four laning of Jalna-Deoulgaonraja-Berala Phata including Deoulgaonraja bypass* 77.41 KM (Kilometer) 125.80 Transport Roads and bridges Under Construction Public Works Department, Maharashtra Maharashtra 09-Nov-2019
242 Four laning of Jhansi-Khajuraho section in length of 85.4 km Package-II 85.40 KM (Kilometer) 1,184.71 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 09-Nov-2019
243 Four Laning of Jorabat-Barapani section from km 0 to 61.8 of NH 40 under SARDP NE Phase A on BOT Annuity basis.* 61.80 KM (Kilometer) 536.00 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Meghalaya 09-Nov-2019
244 Four laning of Kagavadar-Una section in length of 40.6 km in Bhavnagar district 40.98 KM (Kilometer) 723.64 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 09-Nov-2019
245 Four laning of Kalmath-Zarap section in length of 44.2 km in Sindhudurg district 44.20 KM (Kilometer) 914.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Maharashtra 09-Nov-2019
246 Four laning of Karaikkudi-Ramanathapuram section of NH-210 (101 kms)inTamil Nadu under NHDP Phase III on BOT basis. 100.0 KM (Kilometer) 599.41 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Tamil Nadu 09-Nov-2019
247 Four laning of Kashedi-Khavati to Parshuram Ghat in length in Ratnagiri district # * 43.8 KM (Kilometer) 579.50 Transport Roads and bridges Pre-construction Stage Ministry of Road Transport and Highways Maharashtra 09-Nov-2019
248 Four Laning of Kerala/ Tamil Nadu border, Kanyakumari section of NH 47 (Package II) 56.0 KM (Kilometer) 851.05 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 09-Nov-2019
249 Four laning of Khagaria-Bhaktiarpur section of NH31 in the state of Bihar* Not Available 1,703.82 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Bihar 09-Nov-2019
250 Four laning of Krishnanagar-Baharampur section of NH 34 from Km 115 to km 193 in the State of West Bengal�+B235 78.0 KM (Kilometer) 708.26 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) West Bengal 09-Nov-2019
251 Four Laning of Lucknow Sultanpur Section of NH-56 on Hybrid Annuity Mode Not Available 1,638.44 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Uttar Pradesh 09-Nov-2019
252 Four laning of Lucknow-Sultanpur Section of NH 56 from KM 11.5 to KM 135 under NHDP IV 125.90 KM (Kilometer) 1,276.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Uttar Pradesh 09-Nov-2019
253 Four laning of Ludhiana-Talwandi section of NH 95 from km 92 to km 170 inPunjab under BOT (Toll) NHDP III on DBFOT� 78.0 KM (Kilometer) 479.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Punjab 09-Nov-2019
254 Four laning of Mahagaon-Yavatmal section in length of 80 km under NHDP-IV 80.19 KM (Kilometer) 1,098.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
255 Four Laning of Maharashtra/Karnataka Border-Sangareddy Section from 348.0 km to 423.8 km on BOT (Toll) 145.0 KM (Kilometer) 1,544.18 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 09-Nov-2019
256 Four laning of Meerut-Karnal Road in SH 82 in the State of Uttar Pradesh* 87.15 KM (Kilometer) 583.23 Transport Roads and bridges Under Construction Uttar Pradesh State Highways Authority Uttar Pradesh 09-Nov-2019
257 Four laning of MP/Maharashtra border-Nagpur section of NH7 including Kamptee-Kahnan and Nagpur bypass in Maharashtra 34.0 KM (Kilometer) 1,133.84 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
258 Four laning of Muzaffarnagar-Haridwar section of NH 58 from km 131 to 211 of NH 58 in the state of UP and Uttarakhand 80.0 KM (Kilometer) 1,563.55 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 09-Nov-2019
259 Four laning of Nagapatnam-Thanjavur section of NH 67 from km 1.600 to km 80.00 in Tamil Nadu on BOT (Toll) basis 78.40 KM (Kilometer) 619.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Tamil Nadu 09-Nov-2019
260 Four laning of Nagina Kashipur Section of NH 74 from KM 71.614 to KM 170.407 under NHDP IV 98.793 KM (Kilometer) 2,536.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Multi State/ Centre 09-Nov-2019
261 Four laning of Orissa/Chhattisgarh Border - Aurang of NH-6 in length of 150.4 Km under NHDP-IV 150.4 KM (Kilometer) 1,232.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 09-Nov-2019
262 Four Laning of Osmanabad (Yedshi)- Latur- Nanded Road* Not Available 300.19 Transport Roads and bridges Under Construction Public Works Department, Maharashtra Maharashtra 09-Nov-2019
263 Four laning of Pandoh bypass to Takoli section in length of 20.7 km 20.7 KM (Kilometer) 2,600.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Himachal Pradesh 09-Nov-2019
264 Four laning of Parshuram Ghat-Arawali section in length of 35.9 km in Ratnagiri district # * 35.90 KM (Kilometer) 670.00 Transport Roads and bridges Pre-construction Stage Ministry of Road Transport and Highways Maharashtra 09-Nov-2019
265 Four laning of Ranchi Jamshedpur section of NH33 in the State of Bihar on BoT (Annuity) under NHDP Phase III 163.5 KM (Kilometer) 1,479.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Jharkhand 09-Nov-2019
266 Four laning of Sambalpur - Rourkela section of SH-10 from km 4.900 to to km 167.900 (Rourkela) under DBFOT* 163.0 KM (Kilometer) 1,564.94 Transport Roads and bridges Under Construction Public Works Department, Odisha Odisha 09-Nov-2019
267 Four laning of Shiroli-Sangli-Kolhapur Project in length of 40.11 KM in Kolhapur District* 40.1 KM (Kilometer) 330.00 Transport Roads and bridges Under Construction Public Works Department, Maharashtra Maharashtra 09-Nov-2019
268 Four laning of Shivpuri - Dewas section of NH3 from km 15.623 to km 566.45 in Madhya Pradesh on BOT (Toll) basis. Not Available 2,815.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Madhya Pradesh 09-Nov-2019
269 Four laning of Singhara-Bhinjhabal Section of NH6 from KM 310.806 to KM 414.982 under NHDP IV 103.79 KM (Kilometer) 1,288.07 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Odisha 09-Nov-2019
270 Four laning of Solapur-Bijapur section of� NH 13 under NHDP Phase III from 0 110.542km in Maharashtra and Karnataka 111.0 KM (Kilometer) 1,377.54 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
271 Four Laning of Solapur-Maharashtra/Karnataka border section in length of 99.8 km in Solapur under NHDP-III 100.06 KM (Kilometer) 923.04 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
272 Four laning of Sultanpur-Varanasi Section of NH-56 from km 134.700 to km 271.300 in Uttar Pradesh on DBFOT (Toll) basis. 146.225 KM (Kilometer) 1,778.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Uttar Pradesh 09-Nov-2019
273 Four laning of Tarsod-Fagne section of NH-6 in length of 87.3 Km in Jalgaon district 87.3 KM (Kilometer) 1,064.88 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
274 Four laning of Thanjavur-Trichy road in length of 56 km on NH-67 in Tiruchirappalli under NHDP -III 56.4 KM (Kilometer) 390.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 09-Nov-2019
275 Four Laning of Trichy city Junction with NH-45 B on NH-67 to Karur on NH-67 in Tamil Nadu under NHDP Phase III A on BOT basis 79.7 KM (Kilometer) 516.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 09-Nov-2019
276 Four laning of Tuljapur-Ausa road in length of 67 km under NHDP-IV 67.4 KM (Kilometer) 904.16 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
277 Four laning of Una-Kodinar road in length of 41.1 Km in Junagadh district 41.1 KM (Kilometer) 763.08 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 09-Nov-2019
278 Four Laning of Vijaywada-Machilipatnam section of NH 9 under NHDP Phase III, length 64.611 km Not Available 1,462.32 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Andhra Pradesh 09-Nov-2019
279 Four laning of Waranga-Mahagaon section in length of 66.9 km 66.90 KM (Kilometer) 1,059.73 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
280 Four laning of Wardha-Butibori section in length of 59.2 km 59.20 KM (Kilometer) 800.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
281 Four laning of Yavatmal-Wardha section in length of 64.9 km under NHDP-IV 64.9 KM (Kilometer) 988.34 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
282 Four laning of Zirakpur to Patiala section of NH 64 under VGF Scheme, length 50.70 km 50.70 KM (Kilometer) 536.25 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Punjab 09-Nov-2019
283 Four laning with paved shoulders of Bhopal to Biaora section in the state of Madhya Pradesh* 105.60 KM (Kilometer) 954.43 Transport Roads and bridges Under Construction Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
284 Four laning with paved side shoulders of a section betwwen Jharpokharia Baleshwar 80.60 KM (Kilometer) 705.88 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Odisha 09-Nov-2019
285 Four laning with PSS of Amritsar to Bathinda section� of NH - 15 from km 103 to km 287.5 in Punjab under NHDP - IV� 174.64 KM (Kilometer) 1,899.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Punjab 09-Nov-2019
286 Four laning with PSS of Aurangabad to Yedshi section on NH 211� from km 100 to km 290.2 in Maharashtra on DBFOT pattern 190.20 KM (Kilometer) 2,429.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
287 Four laning with PSS of Solapur to Yedshi section on NH 211� from km 0 to km 100 inMaharashtra on DBFOT pattern 100.0 KM (Kilometer) 972.50 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
288 Four lanning of Binjhabahal-Telebani section in length of 78.3 km in Keonjhar district 78.31 KM (Kilometer) 1,008.96 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Odisha 09-Nov-2019
289 Four-laning a section between Khed-Sinnar section of NH 50 from km 42 to km 177 in Maharashtra on BOT (Toll) basis.� 137.9 KM (Kilometer) 1,348.20 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
290 Four-laning a section between Yadgiri-Warangal section of NH 202 from km 54.000 to km 150.000 in AP on BOT (Toll) basis 99.103 KM (Kilometer) 1,905.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Andhra Pradesh 09-Nov-2019
291 Four-laning and Strengthening of the existing two lane stretches of NH5* Not Available 0.00 Transport Roads and bridges Not Available National Highways Authority of India (NHAI) Andhra Pradesh 09-Nov-2019
292 Four-laning Kiratpur- Ner Chowk Section from� Km 73.20 to Km 186.50 of NH-21 in Himachal Pradesh on BOT (Toll) basis 84.3 KM (Kilometer) 2,291.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Himachal Pradesh 09-Nov-2019
293 Four-laning of a section under NHDP-IV, between Hubli - Hospet section of NH 63 on BOT (Toll) basis. 143.29 KM (Kilometer) 2,119.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Karnataka 09-Nov-2019
294 Four-Laning of Hospet, Bellary Section of NH-63 under NHDP Phase IV, length 95.44 km 95.0 KM (Kilometer) 1,625.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Karnataka 09-Nov-2019
295 Four-laning of Kashipur-Sitarganj Section of NH-74 from km 175 to km 252.2 in Uttarakhand and UP on BOT (Toll) basis 77.20 KM (Kilometer) 605.85 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 09-Nov-2019
296 Four-laning of Meerut, Bulandshahar section of NH-235 from km 7.469 to km 73.156 in Uttar Pradesh on DBFOT (Toll) 65.7 KM (Kilometer) 869.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 09-Nov-2019
297 Four/six laning of Bodare-Dhule section in length of 62.8 km under NHDP-IV 67.23 KM (Kilometer) 1,315.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 09-Nov-2019
298 Four/Six laning of Gandhidham-Mundra Port section of NH8A in Gujarat under NHDP Phase III on DBFOT pattern* 71.4 KM (Kilometer) 1,315.00 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Gujarat 09-Nov-2019
299 Four/Six laning of Ghaziabad-Aligarh section of NH 91under NHDP Phase III on BOT Basis. 126.0 KM (Kilometer) 1,031.14 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 09-Nov-2019
300 Four/Six Laning of Gujarat/Maharashtra Border-Surat-Hazira Port Section of NH 6 under NHDP Phase III 133.0 KM (Kilometer) 1,509.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Multi State/ Centre 09-Nov-2019
301 Four/Six laning of Panvel Indapur section of NH 17 in the State of Maharashtra 84.0 KM (Kilometer) 1,206.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
302 Four/six laning of Raipur-Bilaspur section of NH 200 from km 0.000 to km 127.650 in Chhattisgarh on BoT (Toll) basis* 126.525 KM (Kilometer) 1,548.88 Transport Roads and bridges Pre-construction Stage Ministry of Road Transport and Highways Chhattisgarh 09-Nov-2019
303 Girls Polytechnic College (Baran) Project * 5.0 Acres 5.49 Social and Commercial Infrastructure Education Under Construction Directorate of Technical Education, Rajasthan Rajasthan 09-Nov-2019
304 Girls Polytechnic College (Jaisalmer) Project * 5.0 Acres 5.49 Social and Commercial Infrastructure Education Under Construction Directorate of Technical Education, Rajasthan Rajasthan 09-Nov-2019
305 Golf Course At Naya Quilla Hyderabad * Not Available 12.50 Social and Commercial Infrastructure Tourism Under Construction Andhra Pradesh Tourism Development Corporation Limited Telangana 09-Nov-2019
306 Grain Yard Project (Amravati) * Not Available 21.66 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Under Construction Agricultural Produce Market Committee (Amravati) Maharashtra 09-Nov-2019
307 Heritage Village Project (Amritsar) * Not Available 15.00 Social and Commercial Infrastructure Tourism Under Construction Punjab Heritage and Tourism Promotion Board Punjab 09-Nov-2019
308 High Level Bridge (Makhu) 0.72 KM (Kilometer) 60.00 Transport Roads and bridges Operation and Maintenance Stage Punjab Infrastrucrure Development Board Punjab 09-Nov-2019
309 Hop on Hop Tourist Bus Terminal * Not Available 25.00 Social and Commercial Infrastructure Tourism Under Construction Odisha Tourism Development Corporation (OTDC) Odisha 09-Nov-2019
310 Hospital (Dorando) Project # * 200.0 Beds 80.10 Social and Commercial Infrastructure Health Care Pre-construction Stage Ranchi Municipal Corporation Jharkhand 09-Nov-2019
311 Hospital (Wanjri) Project * Not Available 98.78 Social and Commercial Infrastructure Health Care Under Construction Nagpur Municipal Corporation Maharashtra 09-Nov-2019
312 Hubli-Dharwar Bypass* 30.0 KM (Kilometer) 68.00 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Karnataka 09-Nov-2019
313 I T Park (Parsodi) * Not Available 46.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Nagpur Municipal Corporation Maharashtra 09-Nov-2019
314 IGIAT Multi Skill Development Centre Pulivendula, Kadappa District of AP * Not Available 25.00 Social and Commercial Infrastructure Education Under Construction Directorate of Employment and Training, Andhra Pradesh Andhra Pradesh 09-Nov-2019
315 Implementation of 17 MLD sewage treatment plant at Dudhali Nallah in Kolhapur * 17.0 MLD (Millons Liter per day) 21.50 Water Sanitation Sewage collection, treatment and disposal system Under Construction Kolhapur Municipal Corporation Maharashtra 09-Nov-2019
316 Implementation of 50 MLD sewage treatment plant at Ramana * 50.0 MLD (Millons Liter per day) 156.00 Water Sanitation Sewage collection, treatment and disposal system Pre-construction Stage Uttar Pradesh Jal Nigam Uttar Pradesh 09-Nov-2019
317 Implementation of 500 TPD, solid waste management unit at Brahmapuram * 500.0 TPD (Tonne per day) 350.00 Water Sanitation Solid waste management Pre-construction Stage Local Self Government Department, Kerala Kerala 09-Nov-2019
318 Implementation of common municipal solid waste management facility with a capacity of 180 TPD at Kacchar * 180.0 TPD (Tonne per day) 25.41 Water Sanitation Solid waste management Pre-construction Stage Bilaspur Municipal Corporation Chhattisgarh 09-Nov-2019
319 Implementation of integrated solid waste management project at Katni * 150.0 MTPA (Metric Tonne Per Annum) 35.40 Water Sanitation Solid waste management Under Construction Katni Municipal Corporation Madhya Pradesh 09-Nov-2019
320 Implementation of solid waste management unit in Badaun district * 55.0 TPD (Tonne per day) 13.02 Water Sanitation Solid waste management Under Construction Uttar Pradesh Jal Nigam Uttar Pradesh 09-Nov-2019
321 Implementation of solid waste management unit in Firozabad district * 130.0 TPD (Tonne per day) 13.69 Water Sanitation Solid waste management Under Construction Uttar Pradesh Jal Nigam Uttar Pradesh 09-Nov-2019
322 Implementation of solid waste management unit in Jaunpur district * 80.0 TPD (Tonne per day) 13.85 Water Sanitation Solid waste management Under Construction Uttar Pradesh Jal Nigam Uttar Pradesh 09-Nov-2019
323 Implementation of solid waste management unit in Mirzapur district * 100.0 TPD (Tonne per day) 18.10 Water Sanitation Solid waste management Under Construction Uttar Pradesh Jal Nigam Uttar Pradesh 09-Nov-2019
324 Improvements of Road from Yelahanka to Karnataka/AP border Section of SH9 on DBFOT (Toll) basis* 74.35 KM (Kilometer) 380.85 Transport Roads and bridges Under Construction Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
325 Info Park (Bhubaneswar) * 54.0 Acres 500.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Odisha Industrial Infrastructure Development Corporation Odisha 09-Nov-2019
326 Input Based Urban Electric Distribution Moradabad * Not Available 0.00 Energy Electricity Distribution Under Construction Paschimanchal Vidyut Vitran Nigam Limited Uttar Pradesh 09-Nov-2019
327 Installation of 100 Reverse Osmosis Plants in 100 villages * 100.0 Numbers 11.25 Water Sanitation Water treatment plants Under Construction Water Supply and Sanitation Department, Haryana Haryana 09-Nov-2019
328 Integrated Border Check Post (Maharashtra) Project - Modernisation* 22.0 Numbers 1,000.00 Transport Roads and bridges Under Construction Maharashtra State Road Development Corporation Limited (MSRDC) Maharashtra 09-Nov-2019
329 Integrated Disposal & Landfill Facility (Mysuru) Project - JNNURM * 34.5 Acres 34.85 Water Sanitation Solid waste management Under Construction Mysuru City Corporation Karnataka 09-Nov-2019
330 Integrated Municipal Solid Waste Management Facility for Madurai City * 350.0 TPD (Tonne per day) 300.00 Water Sanitation Solid waste management Under Construction Madurai Municipal Corporation Tamil Nadu 09-Nov-2019
331 Integrated Municipal solid waste treatment Kannahalli * 500.0 MT (Metric Tonne ) 25.00 Water Sanitation Solid waste management Under Construction Bruhat Bengaluru Mahanagara Palike Karnataka 09-Nov-2019
332 Integrated Municipal solid waste treatment Mavalipura * 70.0 MTPD 40.00 Water Sanitation Solid waste management Under Construction Bruhat Bengaluru Mahanagara Palike Karnataka 09-Nov-2019
333 Integrated Solid Waste Management (Sambhal) Project * 75.0 TPD (Tonne per day) 12.23 Water Sanitation Solid waste management Under Construction Uttar Pradesh Jal Nigam Uttar Pradesh 09-Nov-2019
334 International Convention Centre in Orissa * 18.75 Acres 480.00 Social and Commercial Infrastructure Tourism Pre-construction Stage Odisha Industrial Infrastructure Development Corporation Odisha 09-Nov-2019
335 IT City (Lucknow) Project * 100.0 Acres 1,500.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Uttar Pradesh Electronics Corporation Limited Uttar Pradesh 09-Nov-2019
336 Jagraon Nakodar Road Project* 38.9 KM (Kilometer) 52.23 Transport Roads and bridges Under Construction Public Works Department, Punjab Punjab 09-Nov-2019
337 Jaipur City ring road project phase I* 47.0 KM (Kilometer) 890.00 Transport Roads and bridges Under Construction Jaipur development Authority Rajasthan 09-Nov-2019
338 Jal Mahal Tourism Project on 100 acres in Jaipur * 100.0 Acres 200.00 Social and Commercial Infrastructure Tourism Under Construction Rajasthan Tourism Development Coorporation Rajasthan 09-Nov-2019
339 Karnataka Urban Water Sector Improvement Project * Not Available 70.00 Water Sanitation Water supply pipeline Under Construction Karnataka Urban Infrastructure Development and Finance Corporation Karnataka 09-Nov-2019
340 Latur - Ausa - Lamjana Road 19.0 KM (Kilometer) 54.00 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 09-Nov-2019
341 Luxury Tourist Train Project * Not Available 32.00 Social and Commercial Infrastructure Tourism Under Construction Karnataka State Tourism Development Corporation Karnataka 09-Nov-2019
342 Modern Bus Terminus along with Commercial Facilities * Not Available 200.00 Transport Urban public transport (except rolling stock) Not Available Department of Commerce and Transport, Odisha Odisha 09-Nov-2019
343 Mrugavani National Park, Chilkur Eco-Tourism Project * Not Available 0.00 Social and Commercial Infrastructure Tourism Not Available Andhra Pradesh Forest Development Corporation Limited Andhra Pradesh 09-Nov-2019
344 Multiplex & Shopping Mall at Secunderabad * Not Available 26.74 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Andhra Pradesh Tourism Development Corporation Limited Telangana 09-Nov-2019
345 National Games Housing Complex at Ranchi * Not Available 250.00 Social and Commercial Infrastructure Tourism Under Construction Department of Arts, Culture, Sports and Youth Affairs, Jharkhand Jharkhand 09-Nov-2019
346 Neyveli Lignite Fired Power Plant * 1000.0 MW (Mega Watt) 4,256.00 Energy Electricity generation (grid) Under Construction Not Available Tamil Nadu 09-Nov-2019
347 Operation and Maintenance of 50 Skill Development Training Centres in 14 districts of Assam * Not Available 0.00 Social and Commercial Infrastructure Education Not Available Directorate of Welfare of Tea and Ex-Tea Garden Tribes, Assam Assam 09-Nov-2019
348 Package II Development of Tourism Infrastructure Projects at Badami Pattadakal & Aihole * 5.0 Acres 21.00 Social and Commercial Infrastructure Tourism Not Available Department of Tourism, Karnataka Karnataka 09-Nov-2019
349 Parking cum Logistics Hub at Mandideep for 500 trucks, Bhopal * 18.5 Acres 140.00 Transport Urban public transport (except rolling stock) Under Construction MP Audyogik Kendra Vikas Nigam (Indore) Limited Madhya Pradesh 09-Nov-2019
350 Parwanoo-Solan section of NH 22 in the State of Himachal Pradesh on BOT (Annuity) under NHDP Phase III 39.41 KM (Kilometer) 934.46 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Himachal Pradesh 09-Nov-2019
351 Polytechnic at Sultanpur Lodhi * Not Available 15.00 Social and Commercial Infrastructure Education Not Available Department of Technical Education and Industrial Training, Punjab Punjab 09-Nov-2019
352 Positra Port Project * Not Available 0.00 Transport Ports (excluding captive) Under Construction Gujarat Maritime Board (GMB) Gujarat 09-Nov-2019
353 Raisen- Gairatganj- Rahatgarh Road 101.4 KM (Kilometer) 57.70 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
354 Rajpura Power Project 1400.0 MW (Mega Watt) 9,600.00 Energy Electricity generation (grid) Operation and Maintenance Stage Punjab State Power Corporation Ltd. Punjab 09-Nov-2019
355 Reuse of Recycled Water Tertiary Treatment Water Plant, at Jaipur * Not Available 200.00 Water Sanitation Sewage collection, treatment and disposal system Not Available Public Health Engineering Department, Rajasthan Rajasthan 09-Nov-2019
356 Rice storage and management facility project at Krushnaprasad (Puri) * 2500.0 MTC 0.00 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Not Available Odisha State Civil Supplies Corporation Limited Odisha 09-Nov-2019
357 Road from AP border near Kothadoddi-Yaragara-Purthipalli to join SH-23 near Kapgal and other connecting roads* 234.34 KM (Kilometer) 488.60 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
358 Road from SH-17 Srirangapatana-Padavapura-Nagamandala-Chikkanayakanahalli-Hiriyuru-Challakere-Bellary-A P Border* 345.45 KM (Kilometer) 1,413.06 Transport Roads and bridges Not Available Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
359 Road Upgradation of Chakeri-Allahabad section of 145.3 km 145.3 KM (Kilometer) 3,691.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 09-Nov-2019
360 Road Upgradation (Ahmednagar-Kopergaon) Project* 42.0 KM (Kilometer) 110.40 Transport Roads and bridges Under Construction Public Works Department, Maharashtra Maharashtra 09-Nov-2019
361 Road Upgradation (Arawali-Kante) Project # * 40.0 KM (Kilometer) 594.33 Transport Roads and bridges Pre-construction Stage National Highways Authority of India (NHAI) Maharashtra 09-Nov-2019
362 Road Upgradation (Bar-Bilara-Jodhpur) Project # 15.0 KM (Kilometer) 8.93 Transport Roads and bridges Completed Public Works Department, Rajasthan Rajasthan 09-Nov-2019
363 Road Upgradation (Chutmalpur-Ganeshpur) Project 53.0 KM (Kilometer) 1,443.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 09-Nov-2019
364 Road Upgradation (Dausa-Lalsot-Kauthun) Project 83.5 KM (Kilometer) 688.70 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 09-Nov-2019
365 Road Upgradation (Gagalheri-Saharanpur-Yamunanagar) Project 51.0 KM (Kilometer) 1,668.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 09-Nov-2019
366 Road Upgradation (Greater Noida-Ballia) Project* 1047.0 KM (Kilometer) 29,825.00 Transport Roads and bridges Under Construction Uttar Pradesh Expressways Industrial Development Authority Uttar Pradesh 09-Nov-2019
367 Road Upgradation (Gwalior-Jhansi NH-75) Project 80.0 KM (Kilometer) 604.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Madhya Pradesh 09-Nov-2019
368 Road Upgradation (Hoshangabad-Piparia-Pachmarhi) Project 126.0 KM (Kilometer) 57.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
369 Road Upgradation (Jinzira Bazzar-Batanagar) Project 6.8 KM (Kilometer) 24.30 Transport Roads and bridges Operation and Maintenance Stage Kolkata Metropolitan Development Authority West Bengal 09-Nov-2019
370 Road Upgradation (Kasaragod-Kannur) Project* 48.2 KM (Kilometer) 150.40 Transport Roads and bridges Under Construction Road Infrastructure Company Kerala Limited Kerala 09-Nov-2019
371 Road Upgradation (Kottayam-Thiruvananthapuram) Project* 58.0 KM (Kilometer) 128.91 Transport Roads and bridges Under Construction Road Infrastructure Company Kerala Limited Kerala 09-Nov-2019
372 Road Upgradation (MP/Maharashtra Border-Nagpur) Project 95.0 KM (Kilometer) 1,920.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 09-Nov-2019
373 Road Upgradation (Patna-Hajipur-Muzaffarpur) Project 63.0 KM (Kilometer) 672.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Bihar 09-Nov-2019
374 Road Upgradation (Potin-Pangin) Project # * 407.0 KM (Kilometer) 1,985.00 Transport Roads and bridges Pre-construction Stage Ministry of Road Transport and Highways Arunachal Pradesh 09-Nov-2019
375 Road Upgradation (Rau-Pithampur) Project* 13.83 KM (Kilometer) 73.00 Transport Roads and bridges Pre-construction Stage Madhya Pradesh Audyogik Kendra Vikas Nigam (Indore) Limited Madhya Pradesh 09-Nov-2019
376 Road Upgradation (Rewa-Shahdol-Amarkantak) Project 242.7 KM (Kilometer) 111.30 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
377 Road Upgradation (Shivpuri-Guna) Project 97.7 KM (Kilometer) 830.36 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Madhya Pradesh 09-Nov-2019
378 Road Upgradation (Talaja-Mahuva) Project 45.46 KM (Kilometer) 834.64 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 09-Nov-2019
379 Road Upgradation (Thrissur-Angamali NH-47) Project (KL-I) 40.0 KM (Kilometer) 604.40 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Kerala 09-Nov-2019
380 Road Upgradation (Udaipur-Rajasthan/Gujarat Border) Project 113.80 KM (Kilometer) 2,100.00 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Rajasthan 09-Nov-2019
381 Road upgradation of Raebareilly-Allahabad section of NH-24B in length of 106.6 Km under NHDP-IV 119.0 KM (Kilometer) 291.36 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 09-Nov-2019
382 Road Upgradation Project (Tikamgarh-Orchha) Project 9.34 KM (Kilometer) 47.56 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
383 Ropar-Phagwara Road Project 80.66 KM (Kilometer) 70.00 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Punjab Punjab 09-Nov-2019
384 Saoner - Bypass Road* Not Available 125.00 Transport Roads and bridges Under Construction Public Works Department, Maharashtra Maharashtra 09-Nov-2019
385 School Building (Solapur) Project * 1.10 Acres 6.27 Social and Commercial Infrastructure Education Under Construction Solapur Municipal Corporation Maharashtra 09-Nov-2019
386 Second Adityapur Toll Bridge over River Kharkali* 0.27 KM (Kilometer) 55.00 Transport Roads and bridges Under Construction Department of Industries, Jharkhand Jharkhand 09-Nov-2019
387 Secured Engineered Landfill Facility (Vadodara) * Not Available 30.98 Water Sanitation Solid waste management Under Construction Vadodara Municipal Corporation Gujarat 09-Nov-2019
388 Setting up of 60 MW Tidong-II Hydel Power Project # * 60.0 MW (Mega Watt) 420.00 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 09-Nov-2019
389 Setting up of 15 MW Pitgong-I hydel power unit in Arunachal Pradesh # * 15.0 MW (Mega Watt) 112.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 09-Nov-2019
390 Setting up of 51 MW Bhasmey hydel power unit in East Sikkim district * 51.0 MW (Mega Watt) 297.76 Energy Renewable energy (grid) Under Construction Sikkim Power Development Corporation Limited Sikkim 09-Nov-2019
391 Setting up of Iron ore handling facilities on BOT basis at New Mangalore Port * Not Available 119.66 Transport Ports (excluding captive) Under Construction Ministry of Shipping Karnataka 09-Nov-2019
392 Setting up of Medical College and Hospital in Bolangir * 25.0 Acres 326.40 Social and Commercial Infrastructure Health Care Pre-construction Stage Department of Health & Family Welfare, Odisha Odisha 09-Nov-2019
393 Shopping-cum-Commercial Complex (Parola Road) Project * Not Available 12.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Dhule Municipal Corporation Maharashtra 09-Nov-2019
394 Six laning from 90.0 km to 214.9 km of Kishangarh-Udaipur-Ahmedabad section under NHDP Phase-V 124.90 KM (Kilometer) 1,239.82 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 09-Nov-2019
395 Six laning of Kishangarh-Gulabpura section in length of 90.0 Km NHDP-V 90.0 KM (Kilometer) 1,031.95 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 09-Nov-2019
396 Six laning of Agra-Etawah Section of NH 2 from Km 199/660 to km 323.525 on BoT (Toll) in Uttar Pradesh under NHDP Phase V. 124.5 KM (Kilometer) 1,657.20 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 09-Nov-2019
397 Six laning of Barwa-Adda-Panagarh section of NH 2 inJharkhand and West Bengal under NHDP PhaseV on BOT (Toll) basis 122.8 KM (Kilometer) 2,434.50 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 09-Nov-2019
398 Six laning of Chandikol-Jagatpur-Bhubhaneshwar section of NH 5 from Km 413 to 418 and Km 0 to Km 62 in Orissa on BOT basis 67.0 KM (Kilometer) 1,047.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Odisha 09-Nov-2019
399 Six laning of Chilkaluripet-Nellore section of NH 5 from km 1182.802 to km 1366.547 in AP on BOT (Toll) project on DBFO pattern 183.5 KM (Kilometer) 2,163.90 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 09-Nov-2019
400 Six laning of Chitradurga-Davanagere section in length of 72.7 km 72.7 KM (Kilometer) 993.16 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 09-Nov-2019
401 Six laning of Chittorgarh - Udaipur section of NH-76 PKG-III 93.5 KM (Kilometer) 1,245.75 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 09-Nov-2019
402 Six laning of Delhi-Agra section of NH 2 from Km 20.500 to Km 199.600 in the States of Haryana/UP under NHDP V on BOT basis 179.5 KM (Kilometer) 2,960.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 09-Nov-2019
403 Six laning of Dhankuni-Kharagpur section in length of 111.4 km on NH-6 under NHDP-V 111.4 KM (Kilometer) 1,396.20 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) West Bengal 09-Nov-2019
404 Six laning of Etawah Chakeri (Kanpur) section of NH 2� under NHDP Phase V, length 160.21 km 160.2 KM (Kilometer) 1,573.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 09-Nov-2019
405 Six Laning of Gurgaon-Kotputli-Jaipur Section of NH-8 in Haryana/Rajasthan on BOT (Toll) basis following by DBFO pattern. 225.6 KM (Kilometer) 1,896.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 09-Nov-2019
406 Six Laning of Handia Varanasi Section of NH-2 from KM 713.146 to KM 785.544 in Uttar Pradesh on Hybrid Annuity Mode 72.4 KM (Kilometer) 2,356.16 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 09-Nov-2019
407 Six laning of Indore-Dewas section of NH 3 from Km 577.55 to km 610.00 and Km 0.00 to Km 12.60 inMP under NHDP V on BOT basis 45.0 KM (Kilometer) 410.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Madhya Pradesh 09-Nov-2019
408 Six Laning of Kharar-Ludhiana Section of NH-95 (New NH-05) from Kharar Km 10.185 to Samrala Chowk Ludhiana Km 86.199 on HAM Mode 86.19 KM (Kilometer) 1,388.34 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 09-Nov-2019
409 Six laning of Krishnagiri-Walahjpet section of NH 46 from Km 0 to km 148.30 in the State of Tamil Nadu under NHDP V on BOT basis 148.3 KM (Kilometer) 1,489.55 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 09-Nov-2019
410 Six laning of NH-8 in length of 93.2 k m of Shamlaji-Chiloda section* 93.2 KM (Kilometer) 1,251.00 Transport Roads and bridges Pre-construction Stage National Highways Authority of India (NHAI) Gujarat 09-Nov-2019
411 Six Laning of Panipat - Jalandhar Section of NH-1 (291 Km) in Haryana and Punjab. 291.0 KM (Kilometer) 2,748.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 09-Nov-2019
412 Six laning of Udaipur bypass in length of 23.9 km under NHDP-V 23.88 KM (Kilometer) 891.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 09-Nov-2019
413 Six Laning of Vadakkancherry to Thrissur Section (Package No.NS-2/BOT/KL-3 30.0 KM (Kilometer) 910.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Kerala 09-Nov-2019
414 Six-laning of Vijayawada-Gundugolanu section of NH-5 section from km 1076.48 to km 1022.48 on BOT (Toll) basis 103.5 KM (Kilometer) 1,684.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 09-Nov-2019
415 Solid Waste Management (700 TPD) at Asansol UA * 700.0 TPD (Tonne per day) 44.00 Water Sanitation Solid waste management Under Construction Asansol Durgapur Development Authority West Bengal 09-Nov-2019
416 Solid Waste Management (Allahabad) * Not Available 30.41 Water Sanitation Solid waste management Under Construction Allahabad Municipal Corporation Uttar Pradesh 09-Nov-2019
417 Solid Waste Management (Dehradun) * Not Available 24.60 Water Sanitation Solid waste management Under Construction Dehradun Nagar Nigam Uttarakhand 09-Nov-2019
418 Solid Waste Management (Lucknow) * Not Available 42.92 Water Sanitation Solid waste management Under Construction Lucknow Municipal Corporation Uttar Pradesh 09-Nov-2019
419 Solid Waste Management (Meerut) * Not Available 22.59 Water Sanitation Solid waste management Under Construction Meerut Nagar Nigam Uttar Pradesh 09-Nov-2019
420 Solid Waste Management (PCMC) * Not Available 70.44 Water Sanitation Solid waste management Under Construction Pimpri Chinchwad Municipal Corporation Maharashtra 09-Nov-2019
421 Solid Waste Management (Shahdara) Project * 500.0 TPD (Tonne per day) 18.00 Water Sanitation Solid waste management Under Construction East Delhi Municipal Corporation Delhi (UT) 09-Nov-2019
422 Solid Waste Management (Varanasi) * 600.0 TPD (Tonne per day) 68.80 Water Sanitation Solid waste management Under Construction Uttar Pradesh Jal Nigam Uttar Pradesh 09-Nov-2019
423 Solid Waste Management Project (Kanjur) * 1000.0 TPD (Tonne per day) 4,116.65 Water Sanitation Solid waste management Under Construction Municipal Corporation of Greater Mumbai Maharashtra 09-Nov-2019
424 Sport Complex-cum-Commercial Complex (Mouje-Navsari) * 4.1 Acres 12.37 Social and Commercial Infrastructure Tourism Under Construction Amravati Municipal Corporation Maharashtra 09-Nov-2019
425 Sports City at Village Satgarhi, Bhopal * Not Available 900.00 Social and Commercial Infrastructure Tourism Not Available Directorate of Institutional Finance, Govt. of Madhya Pradesh Madhya Pradesh 09-Nov-2019
426 Sports City cum International Convention Centre cum Star Hotel cum Shopping Complex cum Residential Complex * 172.0 Acres 900.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Food, Civil Supplies and Consumer Affairs Department, Karnatak Karnataka 09-Nov-2019
427 Srinagar-banihal section of NH1A from 187-189.35km, km 220.7-286.11km and 187 to 220.7 on DBFOT (Annuity) in Jammu and Kashmir 67.7 KM (Kilometer) 1,625.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Jammu & Kashmir 09-Nov-2019
428 Sundarabad - Runija - Khachrod - Runija - Satrunda 43.79 KM (Kilometer) 65.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
429 Terminal Market Complex (Coimbatore) * Not Available 13.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Tamil Nadu State Agricultural Marketing Board Tamil Nadu 09-Nov-2019
430 Transport nagar at Ahmedabad for 600 trucks * Not Available 150.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Gujarat State Road Transport Corporation Gujarat 09-Nov-2019
431 Two lane road project from KM 24.800 of NH-75 (Gwalior - Jhansi Section) to KM 19.000 upto Ghongha 5.8 KM (Kilometer) 67.38 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
432 Two lane with hard shoulder of State Highway 2 between Dausa-Dadu Road on BOT (Toll) basis Not Available 164.70 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 09-Nov-2019
433 Two lane with paved shoulders from Sikar to Bikaner and Bikaner Bypass of NH-11 under DBFOT basis 217.6 KM (Kilometer) 734.80 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 09-Nov-2019
434 Two laning Nechipu to Hoj via Seppa, Saggali in length of 311 km* 311.0 KM (Kilometer) 1,486.00 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Arunachal Pradesh 09-Nov-2019
435 Two laning of Hata-Fatehpur-Bajna-Dargawon road in length of 64.4 km* 64.4 KM (Kilometer) 74.25 Transport Roads and bridges Under Construction Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
436 Two Laning of proposed Shimla Bypass (Kaithalighat to Shimla Section) of NH-22 under NHDP Phase III on Hybrid Annuity Mode 27.45 KM (Kilometer) 1,583.18 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Himachal Pradesh 09-Nov-2019
437 Two laning of Rau-Mhow-Jamghat-Mandleshwar section of SH 38 in MP on BOT(Toll)* 74.4 KM (Kilometer) 176.06 Transport Roads and bridges Under Construction Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
438 Two laning of Zojila Tunnel of 14.083 km length on NH - 1D in the State of Jammu & Kashmir on BOT annuity basis* 14.083 KM (Kilometer) 9,090.13 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Jammu & Kashmir 09-Nov-2019
439 Two laning with Pave shoulder from Varanasi to Gorakhpur section Km 2 to Km 208 of NH 29 in the State of UP�* Not Available 538.88 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Uttar Pradesh 09-Nov-2019
440 Two laning with pave shoulder on Raigarh - Saraipalli from 3.800 to Km 90.460 on NH 216 in the State of Chattisgarh* Not Available 189.19 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Chhattisgarh 09-Nov-2019
441 Two laning with paved shoulder of Dindigul - Theni and Theni - Kumili in Tamil Nadu under NHDP III� 134.0 KM (Kilometer) 501.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 09-Nov-2019
442 Two laning with paved shoulder of Tindivam Krishnagiri section of NH 66 from km 38.150 to km 214 in the state of Tamil Nadu 176.5 KM (Kilometer) 828.26 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 09-Nov-2019
443 Two laning with paved shoulders of Jhansi-Khajuraho section of NH 75 in UP and MP 76.6 KM (Kilometer) 1,373.28 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 09-Nov-2019
444 Two laning with PSS of Kotkapura to Muktsar Road to on SH-16 Road on BOT (Toll) 30.0 KM (Kilometer) 66.21 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Punjab Punjab 09-Nov-2019
445 Two laning Z-Morh Tunnel section of NH-I on BOT (Annuity) in Sonamarg, Srinagar, Jammu and Kashmir�* 34.0 KM (Kilometer) 3,289.00 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Jammu & Kashmir 09-Nov-2019
446 Two-lanning of 68.7 km, Motihari-Raxaul Road on NH-28A 68.70 KM (Kilometer) 375.09 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Bihar 09-Nov-2019
447 Two/ Four laning of Bellary to AP Border section of SH 132 in Karnataka on BOT (Toll) basis 25.67 KM (Kilometer) 169.33 Transport Roads and bridges Operation and Maintenance Stage Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
448 Upgradation of Abhor-Bali-Mundara road in length of 28.5 km* 29.42 KM (Kilometer) 65.13 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 09-Nov-2019
449 Upgradation of Alot-Gangdhar-Suwansara (MP) highway road in length of 24.6 km* 24.6 KM (Kilometer) 36.12 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 09-Nov-2019
450 Upgradation of Bagewadi (NH-4)-Bailhongal-Saundatti road in length of 63.8 km in Bengaluru 63.8 KM (Kilometer) 238.00 Transport Roads and bridges Operation and Maintenance Stage Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
451 Upgradation of Bameetha-Panna-Nagod-Satna road on NH-75 in length of 97.6 km* 97.6 KM (Kilometer) 275.60 Transport Roads and bridges Under Construction Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
452 Upgradation of Banner-Sindari-Jalore road in length of 149.8 km* 149.8 KM (Kilometer) 281.64 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 09-Nov-2019
453 Upgradation of Bidar-NH-9 (Ekhelli)-Chincholi road in length of 60 km in Bengaluru district* 60.0 KM (Kilometer) 226.00 Transport Roads and bridges Pre-construction Stage Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
454 Upgradation of Churu-Bhaleri road in length of 35 km* 35.0 KM (Kilometer) 63.59 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 09-Nov-2019
455 Upgradation of Deoli-Kanwas road in length of 14.8 km* 14.80 KM (Kilometer) 45.97 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 09-Nov-2019
456 Upgradation of Hassan-Ramanathapura-Piriyapatna road in length of 73.5 Km in in Bengaluru district 73.5 KM (Kilometer) 274.00 Transport Roads and bridges Operation and Maintenance Stage Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
457 Upgradation of Hoshangabad-Harda-Khandwa road in length of 185.6 km in Khandwa & Hoshangabad 185.0 KM (Kilometer) 81.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
458 Upgradation of Hungund-Muddebihal-Talikot road in length of 56.8 km in Bengaluru 56.8 KM (Kilometer) 205.00 Transport Roads and bridges Operation and Maintenance Stage Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
459 Upgradation of Jaipur to Bhilwara State Highway, Rajasthan 212.0 KM (Kilometer) 322.00 Transport Roads and bridges Operation and Maintenance Stage Rajasthan State Road Development and Construction Corporation Limited Rajasthan 09-Nov-2019
460 Upgradation of Kanwas-Khanpur-Aklera road in length of 73.12 km* 73.12 KM (Kilometer) 136.80 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 09-Nov-2019
461 Upgradation of Khedali-Pahadi road in length of 59 km* 59.0 KM (Kilometer) 116.01 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 09-Nov-2019
462 Upgradation of Madurai ring road in length of 27.2 Km 27.2 KM (Kilometer) 213.69 Transport Roads and bridges Operation and Maintenance Stage Tamil Nadu Road Infrastructure Development Corporation Tamil Nadu 09-Nov-2019
463 Upgradation of Mundaragi-Hadagali-Harapanahalli road in length of 53.7 Km in Bengaluru district 53.7 KM (Kilometer) 203.00 Transport Roads and bridges Operation and Maintenance Stage Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
464 Upgradation of Nagaur-Mukundgarh road in length of 196 km* 196.0 KM (Kilometer) 557.92 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 09-Nov-2019
465 Upgradation of of Hirekerur-Ranibennur road in length of 58.3 Km in Bengaluru district 58.3 KM (Kilometer) 257.00 Transport Roads and bridges Operation and Maintenance Stage Karnataka Road Development Corporation Limited (KRDCL) Karnataka 09-Nov-2019
466 Upgradation of Peelibanga-Lukhuwali road in length of 35.5 km* 34.5 KM (Kilometer) 71.99 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 09-Nov-2019
467 Upgradation of Salasar-Nagaur section of NH-65 under NHDP-IV 119.6 KM (Kilometer) 637.18 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 09-Nov-2019
468 Upgradation of Sanju-Tarnau road in length of 16.7 km* 16.7 KM (Kilometer) 34.80 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 09-Nov-2019
469 Upgradation of Sardarshashar-Lunkaransar road in length of 76.5 km* 76.5 KM (Kilometer) 123.58 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 09-Nov-2019
470 Upgradation of Sawai Madhopur to Bharatpur State Highway in Rajasthan* 111.0 KM (Kilometer) 350.00 Transport Roads and bridges Under Construction Rajasthan State Road Development and Construction Corporation Limited Rajasthan 09-Nov-2019
471 Upgradation of Seoni-Balaghat-Gondia road in length of 114 Km in Seoni and Balaghat districts 114.0 KM (Kilometer) 59.80 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
472 Upgradation of Ujjain-Jhalawad road in length of 134 Km in Shajapur district # 134.0 KM (Kilometer) 66.70 Transport Roads and bridges Completed Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Nov-2019
473 Useful Conversion of Solid Waste in Ajmer * Not Available 5.16 Water Sanitation Solid waste management Under Construction Ajmer Municipal Corporation Rajasthan 09-Nov-2019
474 Useful Conversion of Solid Waste in Bikaner * Not Available 6.79 Water Sanitation Solid waste management Under Construction Bikaner Nagar Parishad Rajasthan 09-Nov-2019
475 Waste to Energy Project Mandur * 8.0 MW (Mega Watt) 73.00 Water Sanitation Solid waste management Under Construction Bruhat Bengaluru Mahanagara Palike Karnataka 09-Nov-2019
476 Waste Water Recycling Plant (Nagpur) # 130.0 MLD (Millons Liter per day) 275.00 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Nagpur Municipal Corporation Maharashtra 09-Nov-2019
477 Water Supply Improvement (Malviya Nagar) Pilot Project # * Not Available 519.07 Water Sanitation Water supply pipeline Under Construction Delhi Jal Board Delhi (UT) 09-Nov-2019
478 Water Supply Improvement Scheme (Nangloi) * 40.0 MGD (Million Gallon per Day) 652.32 Water Sanitation Water supply pipeline Under Construction Delhi Jal Board Delhi (UT) 09-Nov-2019
479 Water Supply Scheme (Mysore) * Not Available 194.54 Water Sanitation Water supply pipeline Under Construction Mysuru City Corporation Karnataka 09-Nov-2019
480 Water Treatment Plant (Vijayapura) Project * 2.66 MLD (Millons Liter per day) 9.99 Water Sanitation Water treatment plants Under Construction Zilla Panchayat, Vijayapura Karnataka 09-Nov-2019
481 Widening and Strengthening of Bikaner - Phalodi section of NH - 15 to 4 lane and two lane with paved shoulderon BOT (Toll) mode 159.0 KM (Kilometer) 844.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 09-Nov-2019
482 Women Polytechnic College (Bhilwara) Project * 5.0 Acres 5.49 Social and Commercial Infrastructure Education Under Construction Directorate of Technical Education, Rajasthan Rajasthan 09-Nov-2019
483 Angul-Sukinda New Railway Line Project * 100.0 KM (Kilometer) 1,202.70 Transport Railway track, tunnel, viaducts, bridges Under Construction Rail Vikas Nigam Limited Odisha 08-Nov-2019
484 Astaranga Port Project * 70.0 MMTPA (million metric tonnes per annum) 6,500.00 Transport Ports (excluding captive) Pre-construction Stage Department of Commerce and Transport, Odisha Odisha 08-Nov-2019
485 Augumentation of Existing Water Supply Scheme including Service Reservoirs at Bhiwandi * 275.0 KM (Kilometer) 50.00 Water Sanitation Water supply pipeline Under Construction Bhiwandi Nizampur City Municipal Corporation Maharashtra 08-Nov-2019
486 Bus Rapid Transport System (Visakhapatnam) * 43.36 KM (Kilometer) 454.73 Transport Urban public transport (except rolling stock) Under Construction Greater Vishakhapatnam Municipalicy Andhra Pradesh 08-Nov-2019
487 Bus Stand Property (Gandhi Road) * Not Available 25.00 Transport Urban public transport (except rolling stock) Under Construction Uttarakhand Transport Corporation Uttarakhand 08-Nov-2019
488 Bus Terminal (Kashipur) Project - Redevelopment * 3.3 Acres 10.00 Transport Urban public transport (except rolling stock) Under Construction Uttarakhand Transport Corporation Uttarakhand 08-Nov-2019
489 Bus Terminal (Rudrapur) Project - Redevelopment * 3.5 Acres 10.00 Transport Urban public transport (except rolling stock) Under Construction Uttarakhand Transport Corporation Uttarakhand 08-Nov-2019
490 Bus Terminal (Srinagar) Project - Redevelopment * 2.9 Acres 10.00 Transport Urban public transport (except rolling stock) Under Construction Uttarakhand Transport Corporation Uttarakhand 08-Nov-2019
491 Chudamani Port * 10.0 MTPA (Metric Tonne Per Annum) 1,500.00 Transport Ports (excluding captive) Under Construction Odisha Maritime Board Odisha 08-Nov-2019
492 City side development of Amritsar Airport through PPP * Not Available 0.00 Transport Airports Under Construction Ministry of Civil Aviation Punjab 08-Nov-2019
493 Clinker handling jetty at Azhicode/Kodungallur Port * Not Available 50.00 Transport Ports (excluding captive) Pre-construction Stage Ports Department, Kerala Kerala 08-Nov-2019
494 Construction of Digni-Jaigarh Port Railway Line in length of 33.70 km in Ratnagiri * 33.7 KM (Kilometer) 771.51 Transport Railway track, tunnel, viaducts, bridges Under Construction Konkan Railway Corporation Limited Maharashtra 08-Nov-2019
495 Construction of Haridaspur-Paradip BG railway line in length of 82 km in Cuttack and Jagatsingpur * 82.0 KM (Kilometer) 1,800.00 Transport Railway track, tunnel, viaducts, bridges Under Construction Rail Vikas Nigam Limited Odisha 08-Nov-2019
496 Construction of Offshore Container Berths & Development of Container Terminal in Mumbai Harbour # 9.6 MTPA (Metric Tonne Per Annum) 2,098.00 Transport Ports (excluding captive) Under Construction Mumbai Port Trust Maharashtra 08-Nov-2019
497 Construction of State of Art Bus Stands in Haryana * Not Available 130.00 Transport Urban public transport (except rolling stock) Under Construction Transport Department, Haryana Haryana 08-Nov-2019
498 Construction, operation and Maintenance of a multi-user liquid terminal at Puthuvypeen SEZ at Cochin Port * 4.1 MMTPA (million metric tonnes per annum) 240.00 Transport Ports (excluding captive) Under Construction Cochin Port Trust Kerala 08-Nov-2019
499 Development and Operation of an International Ship repair facility at W/Island with private sector participation * Not Available 970.00 Transport Ports (excluding captive) Under Construction Cochin Port Trust Kerala 08-Nov-2019
500 Development of 250 Bus Queue shelters (BQS) * Not Available 37.50 Transport Urban public transport (except rolling stock) Under Construction Transport Department, GNCTD Delhi (UT) 08-Nov-2019
501 Development of a 7.2 MMTPA Iron Ore Export Terminal at Waterfront West of the Breakwater on DBFOT basis (Mormugao Port Trust) * 7.2 MMTPA (million metric tonnes per annum) 721.00 Transport Ports (excluding captive) Under Construction Ministry of Shipping Goa 08-Nov-2019
502 Development of a multipurpose Berth and a Mechanised Berth at Haldia Dock -II (North), Haldia Dock Complex, Kolkata Port Trust * 1.177 MT (Metric Tonne ) 821.40 Transport Ports (excluding captive) Under Construction Ministry of Shipping West Bengal 08-Nov-2019
503 Development of a Municipal Solid Waste Management Facity for treating MSW collected from Cuttack * 800.0 TPD (Tonne per day) 200.00 Water Sanitation Solid waste management Under Construction Cuttack Municipal Corporation Odisha 08-Nov-2019
504 Development of a regional municipal solid waste management facility in Bhubaneswar * 800.0 MT (Metric Tonne ) 0.00 Water Sanitation Solid waste management Not Available Bhubaneswar Municipal Corporation Odisha 08-Nov-2019
505 Development of Bus Station with Passenger Amenities and Commercial Complex on NEKRTC site at Gulbarga * 1.72 Acres 20.20 Transport Urban public transport (except rolling stock) Under Construction North Eastern Karnataka Road Transport Corporation (NEKRTC) Karnataka 08-Nov-2019
506 Development of bus terminal and commercial development at Musheerabad * Not Available 250.00 Transport Urban public transport (except rolling stock) Under Construction Andhra Pradesh State Road Transport Corporation Telangana 08-Nov-2019
507 Development of Bus Terminal cum Commercial Complex (C and C Mohali Junction) at Mohali # * 7.0 Acres 530.00 Transport Urban public transport (except rolling stock) Under Construction Greater Mohali Area Development Authority Punjab 08-Nov-2019
508 Development of Bus Terminal cum Commercial Complex at Patiala * 13.13 Acres 175.00 Transport Urban public transport (except rolling stock) Under Construction Punjab Road Transport Corporation Punjab 08-Nov-2019
509 Development of bus terminal on 2.5 acres at Jagnade Square in Nagpur district * 2.5 Acres 46.80 Transport Urban public transport (except rolling stock) Under Construction Nagpur Municipal Corporation Maharashtra 08-Nov-2019
510 Development of Honnavar port in UK District of Karnataka Maritime State * Not Available 1,100.00 Transport Ports (excluding captive) Pre-construction Stage Public Works, Ports and Inland Water Transport Department, Karnataka Karnataka 08-Nov-2019
511 Development of Integrated Multilevel Parking Infrastructure at 3 sites in NDMC Area * Not Available 8.00 Transport Urban public transport (except rolling stock) Under Construction New Delhi Municipal Council Delhi (UT) 08-Nov-2019
512 Development of parking & commercial complex on 9 acres at Takheda in Amravati district * 9.0 Acres 14.26 Transport Urban public transport (except rolling stock) Under Construction Nagpur Improvement Trust Maharashtra 08-Nov-2019
513 Development of parking complex with a capacity of 160 ECS Palampur in Kangra # 160.0 ECS 7.00 Transport Urban public transport (except rolling stock) Pre-construction Stage Municipal Council, Palampur Himachal Pradesh 08-Nov-2019
514 Development of parking complex with a capacity of 225 vehicles at Jail Road in Mandi # 225.0 ECS 20.00 Transport Urban public transport (except rolling stock) Pre-construction Stage Municipal Council, Mandi Himachal Pradesh 08-Nov-2019
515 Hyderabad Metro Rail Project # 71.0 KM (Kilometer) 16,375.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Hyderabad Metro Rail Limited Telangana 08-Nov-2019
516 Hyderabad Multi-Modal Suburban Transportation Project - Phase II * 101.05 KM (Kilometer) 1,800.00 Transport Railway track, tunnel, viaducts, bridges Under Construction Rail Vikas Nigam Limited Telangana 08-Nov-2019
517 Implementation of solid waste management facility of 500 TPD at Keru dumping station * 500.0 TPD (Tonne per day) 100.00 Water Sanitation Solid waste management Pre-construction Stage Jodhpur Municipal Corporation Rajasthan 08-Nov-2019
518 Integrated Solid Waste Management (3800 TPD) for Hyderabad * 3800.0 TPD (Tonne per day) 508.00 Water Sanitation Solid waste management Under Construction Greater Hyderabad Municipal Corporation Telangana 08-Nov-2019
519 Jakhau Port * Not Available 46.00 Transport Ports (excluding captive) Under Construction Gujarat Maritime Board (GMB) Gujarat 08-Nov-2019
520 Kirtania Port Subarnarekha Mouth * 10.0 MTPA (Metric Tonne Per Annum) 2,187.00 Transport Ports (excluding captive) Under Construction Department of Commerce and Transport, Odisha Odisha 08-Nov-2019
521 LNG Terminal (Jafrabad) Project * 4.5 MMTPA (million metric tonnes per annum) 5,000.00 Transport Ports (excluding captive) Under Construction Gujarat Pipavav Port Limited Gujarat 08-Nov-2019
522 Multilevel Automated car parking cum commercial complex Kamla Nagar, New Delhi * Not Available 109.39 Transport Urban public transport (except rolling stock) Under Construction Municipal Corporation of Delhi Delhi (UT) 08-Nov-2019
523 Multipurpose Berth (Visakhapatnam Port) Project # 2.0 MTPA (Metric Tonne Per Annum) 317.00 Transport Ports (excluding captive) Operation and Maintenance Stage Visakhapatnam Port Trust Andhra Pradesh 08-Nov-2019
524 Multipurpose Cargo Port (Rewas) Project # 198.0 MMTPA (million metric tonnes per annum) 5,200.00 Transport Ports (excluding captive) Pre-construction Stage Maharashtra Maritime Board (MMB) Maharashtra 08-Nov-2019
525 Office cum Institutional cum Commercial Complex at Salt Lake * 4.0 Acres 500.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Under Construction Kolkata Metropolitan Development Authority West Bengal 08-Nov-2019
526 Oil Jetty (Kandla) Project # Not Available 233.50 Transport Ports (excluding captive) Pre-construction Stage Deendayal Port Trust Gujarat 08-Nov-2019
527 Package IA Development of Tourism Infrastructure Projects at Jog and Banavasi Package IB Development of Tourism Infrastructure* 5.0 Acres 67.50 Social and Commercial Infrastructure Tourism Not Available Department of Tourism, Karnataka Karnataka 08-Nov-2019
528 Parking Complex (Bilaspur) Project * 194.0 ECS 8.00 Transport Urban public transport (except rolling stock) Under Construction Municipal Council, Bilashpur Himachal Pradesh 08-Nov-2019
529 Parking Complex (Jainchu-Ka-Naun) Project * 200.0 ECS 15.00 Transport Urban public transport (except rolling stock) Pre-construction Stage Municipal Council, Mandi Himachal Pradesh 08-Nov-2019
530 Ponnani Port Project - Phase I * 4.0 MMTPA (million metric tonnes per annum) 763.00 Transport Ports (excluding captive) Under Construction Kerala State Maritime Development Corporation Limited Kerala 08-Nov-2019
531 Purnagiri Ropeway Project * 800.0 Passengers 60.00 Social and Commercial Infrastructure Tourism Under Construction Uttarakhand Tourism Development Board Uttarakhand 08-Nov-2019
532 Redevelopment of New delhi Railway station * Not Available 8,500.00 Transport Railway track, tunnel, viaducts, bridges Pre-construction Stage Ministry of Railways Delhi (UT) 08-Nov-2019
533 Riverine Multipurpose Jetty at Haldia Port * Not Available 278.90 Transport Ports (excluding captive) Pre-construction Stage Kolkata Port Trust West Bengal 08-Nov-2019
534 Ropeway (Kaddukhal-Surkanda Devi Temple) Project * 0.5 KM (Kilometer) 15.00 Social and Commercial Infrastructure Tourism Under Construction Uttarakhand Tourism Development Board Uttarakhand 08-Nov-2019
535 Ropeway (Yamunotri-Kharsali) Project * 3.8 KM (Kilometer) 70.00 Social and Commercial Infrastructure Tourism Under Construction Uttarakhand Tourism Development Board Uttarakhand 08-Nov-2019
536 Setting up of 1.75 MW hydel based power unit at Bhima in Solapur 1.75 MW (Mega Watt) 6.97 Energy Renewable energy (grid) Pre-construction Stage Water Resources Department, Maharashtra Maharashtra 08-Nov-2019
537 Tornagallu Truck Terminal * Not Available 29.90 Transport Urban public transport (except rolling stock) Pre-construction Stage Bellary Urban Development Authority (BUDA) Karnataka 08-Nov-2019
538 Hurla Hydel Power Project - Stage I # 9.40 MW (Mega Watt) 62.00 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 04-Nov-2019
539 Alaknanda Hydro Power Co Ltd 330.0 MW (Mega Watt) 4,573.00 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Uttarakhand 01-Nov-2019
540 Biomass Power Project, Patiala 12.0 MW (Mega Watt) 100.00 Energy Renewable energy (grid) Operation and Maintenance Stage Punjab Energy Development Agency Punjab 01-Nov-2019
541 Chanju Hydel Power Project - Stage I 36.0 MW (Mega Watt) 295.09 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
542 Chitaura Small Hydel Power Project * 3.0 MW (Mega Watt) 59.80 Energy Renewable energy (grid) Pre-construction Stage Uttar Pradesh Jal Vidyut Nigam Limited Uttar Pradesh 01-Nov-2019
543 Development of 400 kV Babai (Jhunjhunu) - Jaipur (North) Double Circuit Twin Moose Power Transmission line * 85.58 KM (Kilometer) 294.00 Energy Electricity transmission Under Construction Rajasthan Rajya Vidyut Prasaran Nigam Limited Rajasthan 01-Nov-2019
544 Development of 400 kV Suratgarh-Bikaner Double Circuit of Super Critical Thermal Power Plant at Suratgarh 400.0 KV (Kilo Volt) 160.00 Energy Electricity transmission Under Construction Rajasthan Rajya Vidyut Prasaran Nigam Limited Rajasthan 01-Nov-2019
545 Development of a 400 kV Bikaner Sikar D/C Power Transmission Line for evacuation of power from wind and solar power in Rajasthan 400.0 KM (Kilometer) 244.00 Energy Electricity transmission Operation and Maintenance Stage Rajasthan Rajya Vidyut Prasaran Nigam Limited Rajasthan 01-Nov-2019
546 Dikchu Hydro Power Plant * 96.0 MW (Mega Watt) 499.00 Energy Renewable energy (grid) Under Construction Sikkim Power Development Corporation Limited Sikkim 01-Nov-2019
547 Dunda Small Hydel Power Project # * 3.5 MW (Mega Watt) 28.04 Energy Renewable energy (grid) Pre-construction Stage Uttar Pradesh Jal Vidyut Nigam Limited Uttar Pradesh 01-Nov-2019
548 Electricity Distribution Bhiwandi Not Available 311.00 Energy Electricity Distribution Operation and Maintenance Stage Maharashtra State Electricity Distribution Company Limited Maharashtra 01-Nov-2019
549 Haindaun-Alwar Transmission line project 400.0 KV (Kilo Volt) 188.32 Energy Electricity transmission Operation and Maintenance Stage Rajasthan Rajya Vidyut Prasaran Nigam Limited Rajasthan 01-Nov-2019
550 Hydel Power (Darna) Project 4.9 MW (Mega Watt) 23.52 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
551 Hydel Power (Kasari) Project 2.5 MW (Mega Watt) 12.00 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
552 Hydel Power (Khodashi) Project 4.9 MW (Mega Watt) 23.52 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
553 Hydel Power (Kutehr) Project 240.0 MW (Mega Watt) 105.08 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
554 Hydel Power (Palchan Bhang) Project 9.0 MW (Mega Watt) 65.36 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
555 Hydel Power (Radhanagari) Project 10.0 MW (Mega Watt) 48.00 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
556 Hydel Power (Sarsadi-II) Project 9.0 MW (Mega Watt) 62.46 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
557 Hydel Power (Telling) Project 94.0 MW (Mega Watt) 658.00 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
558 Hydel Power (Tinget) Project # 81.0 MW (Mega Watt) 567.00 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
559 Hydel Power (Uhl Khad) Project 14.0 MW (Mega Watt) 115.00 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
560 Hydel Power (Vajra - III) Project 1.5 MW (Mega Watt) 7.20 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
561 Hydro Electric Power (Akole) Project 7.0 MW (Mega Watt) 43.20 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
562 Hydro Electric Power (Bhor) Project 4.8 MW (Mega Watt) 23.04 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
563 Hydro Electric Power (Bhusaval) Project 2.0 MW (Mega Watt) 10.56 Energy Renewable energy (grid) Under Construction Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
564 Hydro Electric Power (Chikotra) Project 1.8 MW (Mega Watt) 10.50 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
565 Hydro Electric Power (Chitri) Project 2.0 MW (Mega Watt) 9.60 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
566 Hydro Electric Power (Dhom Balkawadi) Project 4.0 MW (Mega Watt) 19.20 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
567 Hydro Electric Power (Gautami Godavari) Project 1.2 MW (Mega Watt) 5.76 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
568 Hydro Electric Power (Ghataprabha) Project 8.0 MW (Mega Watt) 38.40 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
569 Hydro Electric Power (Hetawane) Project 1.50 MW (Mega Watt) 6.80 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
570 Hydro Electric Power (Jambre) Project 2.0 MW (Mega Watt) 14.32 Energy Renewable energy (grid) Under Construction Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
571 Hydro Electric Power (Junnar) Project 3.0 MW (Mega Watt) 15.62 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
572 Hydro Electric Power (Kadavi) Project 1.5 MW (Mega Watt) 7.20 Energy Renewable energy (grid) Completed Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
573 Hydro Electric Power (Kumbhi) Project 2.5 MW (Mega Watt) 12.00 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
574 Hydro Electric Power (Mukane) Project 1.45 MW (Mega Watt) 7.32 Energy Renewable energy (grid) Completed Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
575 Hydro Electric Power (Nisare) Project 2.25 MW (Mega Watt) 10.80 Energy Renewable energy (grid) Pre-construction Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
576 Hydro Electric Power (Parseoni) Project - Package 1 1.4 MW (Mega Watt) 6.72 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
577 Hydro Electric Power (Parseoni) Project - Package 2 4.4 MW (Mega Watt) 32.94 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
578 Hydro Electric Power (Patgaon) Project 2.5 MW (Mega Watt) 12.00 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
579 Hydro Electric Power (Satara) Project 1.20 MW (Mega Watt) 7.50 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
580 Hydro Electric Power (Temghar) Project 4.0 MW (Mega Watt) 26.24 Energy Renewable energy (grid) Completed Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
581 Hydro Electric Power (Urmodi) Project 3.0 MW (Mega Watt) 14.40 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
582 Hydro Electric Power (Waghur) Project 1.5 MW (Mega Watt) 7.89 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
583 Hydro Electric Power (Waki) Project 1.15 MW (Mega Watt) 6.54 Energy Renewable energy (grid) Under Construction Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
584 Kilhi-Bahl Hydel Power Project # 7.5 MW (Mega Watt) 21.00 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
585 Kurhed Hydel Power Project - Stage II # 7.5 MW (Mega Watt) 58.27 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
586 Kurpan Hydel Power Project - Stage III # 14.6 MW (Mega Watt) 122.14 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
587 Kuwarsi Hydel Power Project - Stage II 15.0 MW (Mega Watt) 95.79 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
588 Laxman Mandwa Small Hydro Power Project * 5.0 MW (Mega Watt) 25.00 Energy Renewable energy (grid) Not Available Narmada Valley Development Authority Madhya Pradesh 01-Nov-2019
589 Madho-I Small Hydel Power Project # * 3.7 MW (Mega Watt) 45.97 Energy Renewable energy (grid) Pre-construction Stage Uttar Pradesh Jal Vidyut Nigam Limited Uttar Pradesh 01-Nov-2019
590 Madho-II Small Hydel Power Project # * 2.5 MW (Mega Watt) 23.05 Energy Renewable energy (grid) Pre-construction Stage Uttar Pradesh Jal Vidyut Nigam Limited Uttar Pradesh 01-Nov-2019
591 Malana Hydel Power Project - Stage III # 30.0 MW (Mega Watt) 212.66 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
592 Mandsaur Wind Power Project in Madhya Pradesh 55.2 MW (Mega Watt) 326.00 Energy Renewable energy (grid) Operation and Maintenance Stage Marut-Shakti Energy India Limited Madhya Pradesh 01-Nov-2019
593 Miyar Hydel Power Project # 120.0 MW (Mega Watt) 1,125.16 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
594 Muzaffarpur -Sursand Transmission Line * 87.0 CKM (Circuit Kilo Meter) 210.70 Energy Electricity transmission Under Construction Power Grid Corpn. of India Ltd. Bihar 01-Nov-2019
595 Nazeerabad Wind Farm, Mytrah 100.0 MW (Mega Watt) 795.00 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Telangana 01-Nov-2019
596 Nesang Hydel Power Project # 20.0 MW (Mega Watt) 70.00 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
597 Nirgajini Small Hydel Power Project * 5.0 MW (Mega Watt) 108.43 Energy Renewable energy (grid) Pre-construction Stage Uttar Pradesh Jal Vidyut Nigam Limited Uttar Pradesh 01-Nov-2019
598 Northern Region System Strengthening Scheme (NRSS-XXXI (Part-B) * Not Available 200.00 Energy Electricity transmission Under Construction REC Transmission Projects Company Limited Multi State/ Centre 01-Nov-2019
599 Panan Hydro Power project # * 300.0 MW (Mega Watt) 2,021.90 Energy Renewable energy (grid) Pre-construction Stage Sikkim Power Development Corporation Limited Sikkim 01-Nov-2019
600 Parbati Hydel Power Project # 12.0 MW (Mega Watt) 78.35 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
601 Power Plant Hetwane, Raigarh * 1.5 MW (Mega Watt) 6.80 Energy Electricity generation (grid) Under Construction Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
602 PPP-10:5 No. transmisson line of 132 kV at various places 132.0 KV (Kilo Volt) 117.70 Energy Electricity transmission Operation and Maintenance Stage Rajasthan Rajya Vidyut Prasaran Nigam Limited Rajasthan 01-Nov-2019
603 PPP-8:1 No. transmission line of 220 kV and 5 No. 132 kV GSS at various places 220.0 KV (Kilo Volt) 149.00 Energy Electricity transmission Operation and Maintenance Stage Rajasthan Rajya Vidyut Prasaran Nigam Limited Rajasthan 01-Nov-2019
604 PPP-9:6 No. transmisson line of 132 kV at various places 132.0 KV (Kilo Volt) 128.81 Energy Electricity transmission Operation and Maintenance Stage Rajasthan Rajya Vidyut Prasaran Nigam Limited Rajasthan 01-Nov-2019
605 Ram Ganga Small Hydel Power Project # * 3.2 MW (Mega Watt) 30.41 Energy Renewable energy (grid) Pre-construction Stage Uttar Pradesh Jal Vidyut Nigam Limited Uttar Pradesh 01-Nov-2019
606 Rewa Ultra Mega Solar Ltd 750.0 MW (Mega Watt) 4,000.00 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Madhya Pradesh 01-Nov-2019
607 Rongnichu Stroage Hydro Power Plant * 96.0 MW (Mega Watt) 544.00 Energy Renewable energy (grid) Under Construction Sikkim Power Development Corporation Limited Sikkim 01-Nov-2019
608 Rupin Hydel Power Project # 45.0 MW (Mega Watt) 292.61 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
609 Salawa Small Hydel Power Project * 3.0 MW (Mega Watt) 54.55 Energy Renewable energy (grid) Pre-construction Stage Uttar Pradesh Jal Vidyut Nigam Limited Uttar Pradesh 01-Nov-2019
610 Sarsadi Hydel Power Project - Stage I # 9.6 MW (Mega Watt) 88.30 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
611 Setting up a 120 MW Rangit-IV Hydel Power Project # 120.0 MW (Mega Watt) 726.16 Energy Renewable energy (grid) Under Construction Sikkim Power Development Corporation Limited Sikkim 01-Nov-2019
612 Setting up of 66 MW Rangit-II Hydel Power Project * 66.0 MW (Mega Watt) 497.17 Energy Renewable energy (grid) Under Construction Sikkim Power Development Corporation Limited Sikkim 01-Nov-2019
613 Setting up of 0.9 MW Dham hydro electric power unit at Arvi in Wardha district 0.95 MW (Mega Watt) 6.59 Energy Renewable energy (grid) Under Construction Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
614 Setting up of 1.5 MW hydel based power unit at Bor in Wardha district # 1.5 MW (Mega Watt) 7.55 Energy Renewable energy (grid) Pre-construction Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
615 Setting up of 1.5 MW hydel based power unit at Karwand in Dhule 1.5 MW (Mega Watt) 5.67 Energy Renewable energy (grid) Pre-construction Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
616 Setting up of 10 MW Konal hydel power unit in Sindhudurga district 10.0 MW (Mega Watt) 67.00 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
617 Setting up of 11 MW hydel based power unit at Mokhada in Thane 11.0 MW (Mega Watt) 8.57 Energy Renewable energy (grid) Pre-construction Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
618 Setting up of 15 MW co-generation power unit at Fazilka Sugar Mill in Ferozepur district * 15.0 MW (Mega Watt) 80.00 Energy Renewable energy (grid) Under Construction Punjab State Federation of Co-operative Sugar Mills Limited Punjab 01-Nov-2019
619 Setting up of 15 MW co-generation power unit at Morinda Sugar Mill in Rupnagar district * 15.0 MW (Mega Watt) 100.00 Energy Renewable energy (grid) Under Construction Punjab State Federation of Co-operative Sugar Mills Limited Punjab 01-Nov-2019
620 Setting up of 15 MW Taramchu small hydel based power unit in North Sikkim # * 15.0 MW (Mega Watt) 240.00 Energy Renewable energy (grid) Pre-construction Stage Sikkim Power Development Corporation Limited Sikkim 01-Nov-2019
621 Setting up of 2 MW hydel based power unit at Gunjawani in Pune 2.0 MW (Mega Watt) Not Available Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
622 Setting up of 24 MW hydel based power unit at Gosikhurd in Bhandara district 24.0 MW (Mega Watt) Not Available Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
623 Setting up of 2x50 MW Tidong-I hydel power unit in Kinnaur district 100.0 MW (Mega Watt) Not Applicable Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
624 Setting up of 3 MW hydel based power unit at Nardave in Sindhudurg 3.0 MW (Mega Watt) Not Applicable Energy Renewable energy (grid) Pre-construction Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
625 Setting up of 4 MW hydel power unit at Mula right bank canal in Rahuri district 4.0 MW (Mega Watt) 19.00 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
626 Setting up of 4.5 MW Tembhu barrage hydro electric power project in Satara district 4.5 MW (Mega Watt) 34.31 Energy Renewable energy (grid) Operation and Maintenance Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
627 Setting up of 44 MW Tangnu Romai-I hydel power unit in Shimla district 44.0 MW (Mega Watt) 255.00 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
628 Setting up of 5 MW hydel based power unit at Tarali in Satara 5.0 MW (Mega Watt) 39.18 Energy Renewable energy (grid) Pre-construction Stage Water Resources Department, Maharashtra Maharashtra 01-Nov-2019
629 Setting up of 500 MW Teesta-VI hydel power unti in Southern Sikkim # 500.0 MW (Mega Watt) 5,400.00 Energy Renewable energy (grid) Under Construction Sikkim Power Development Corporation Limited Sikkim 01-Nov-2019
630 Setting up of 850 MW hydel power unit at Kishtwar in Doda district * 850.0 MW (Mega Watt) 5,500.00 Energy Renewable energy (grid) Under Construction Jammu and Kashmir State Power Development Corporation Limited Jammu & Kashmir 01-Nov-2019
631 Setting up of 99 MW Singoli Bhatwari hydroelectric power plant in Rudraprayag district # 99.0 MW (Mega Watt) 666.47 Energy Renewable energy (grid) Under Construction Uttar Pradesh Jal Vidyut Nigam Limited Uttarakhand 01-Nov-2019
632 Shangling Hydel Power Project # 44.0 MW (Mega Watt) 308.00 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
633 Sharni Hydel Power Project # 9.6 MW (Mega Watt) 87.02 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
634 Small Hydel Power (Kareri) Project 5.0 MW (Mega Watt) 34.16 Energy Renewable energy (grid) Under Construction Himachal Pradesh Energy Development Agency Himachal Pradesh 01-Nov-2019
635 Small Hydel Power (Lower Sumej) Project 5.0 MW (Mega Watt) 42.38 Energy Renewable energy (grid) Pre-construction Stage Himachal Pradesh Energy Development Agency Himachal Pradesh 01-Nov-2019
636 Small Hydel Power (Tauhak ) Project 4.5 MW (Mega Watt) 28.60 Energy Renewable energy (grid) Pre-construction Stage Himachal Pradesh Energy Development Agency Himachal Pradesh 01-Nov-2019
637 Solar Power (Shivajinagar) Project * 25.0 MW (Mega Watt) 200.00 Energy Renewable energy (grid) Under Construction Maharashtra State Power Generation Company Limited Maharashtra 01-Nov-2019
638 Suil Hydel Power Project # 13.0 MW (Mega Watt) 91.00 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
639 Tangnu Romai Hydel Power Project - Stage II 6.0 MW (Mega Watt) 31.50 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
640 Tashiding Hydro Electric Power Project 97.0 MW (Mega Watt) 494.44 Energy Renewable energy (grid) Operation and Maintenance Stage Sikkim Power Development Corporation Limited Sikkim 01-Nov-2019
641 Transmission Line (Bara-Mainpuri) Project * 765.0 KM (Kilometer) 5,158.91 Energy Electricity transmission Under Construction Uttar Pradesh Power Transmission Corporation Limited Uttar Pradesh 01-Nov-2019
642 Transmission Line (Bikaner-Deedwana-Ajmer) Project 400.0 KV (Kilo Volt) 285.00 Energy Electricity transmission Operation and Maintenance Stage Rajasthan Rajya Vidyut Prasaran Nigam Limited Rajasthan 01-Nov-2019
643 Transmission Line (Mainpuri-Hapur) Project * 764.0 KM (Kilometer) 4,706.49 Energy Electricity transmission Under Construction Uttar Pradesh Power Transmission Corporation Limited Uttar Pradesh 01-Nov-2019
644 Walipura Small Hydel Power Project * 0.4 MW (Mega Watt) 7.00 Energy Renewable energy (grid) Under Construction Uttar Pradesh New and Renewable Energy Development Agency Uttar Pradesh 01-Nov-2019
645 Youngthang Khab Hydel Power Project # 261.0 MW (Mega Watt) 2,500.00 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 01-Nov-2019
646 Adani Power Maharashtra Limited 3300.0 MW (Mega Watt) 19,003.00 Energy Electricity generation (grid) Operation and Maintenance Stage Maharashtra State Electricity Distribution Company Limited Maharashtra 30-Oct-2019
647 Adani Power Rajasthan Limited 1320.0 MW (Mega Watt) 8,323.00 Energy Electricity generation (grid) Operation and Maintenance Stage Jaipur Vidyut Vitran Nigam Ltd, Jodhpur Vidyut Vitran Nigam Ltd, Ajmer Vidyut Vitran Nigam Ltd Rajasthan 30-Oct-2019
648 Bara Bangahal Hydel Power Project - Stage I # 92.0 MW (Mega Watt) 644.00 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
649 Bara Bangahal Hydel Power Project - Stage II # 108.0 MW (Mega Watt) 756.00 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
650 Baspa Hydel Power Project - Stage II 300.0 MW (Mega Watt) 1,629.84 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
651 Bhang Hydel Power Project # 9.0 MW (Mega Watt) 81.78 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
652 Bharmour Hydel Power Project - Stage I Bharmour Hydel Power Project - Stage I # 24.0 MW (Mega Watt) 254.20 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
653 Bharmour Hydel Power Project - Stage II # 21.0 MW (Mega Watt) 167.50 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
654 Bina thermal power project 500.0 MW (Mega Watt) 3,518.83 Energy Electricity generation (grid) Operation and Maintenance Stage Madhya Pradesh Electricity Regulatory Commission Madhya Pradesh 30-Oct-2019
655 Brua Hydel Power Project 9.0 MW (Mega Watt) 70.18 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
656 Chango-Yangthang Hydel Power Project # 180.0 MW (Mega Watt) 2,077.29 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
657 Chanju Hydel Power Project - Stage II # 19.8 MW (Mega Watt) 161.00 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
658 Chatru Hydel Power Project # 126.0 MW (Mega Watt) 540.33 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
659 Dhancho Hydel Power Project # 18.0 MW (Mega Watt) 135.51 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
660 Electricity Distribution Ahmedabad, Surat, Gandhinagar and Dahej cities Not Available 4,632.54 Energy Electricity Distribution Operation and Maintenance Stage Gujarat Urja Vikas Nigam Limited Gujarat 30-Oct-2019
661 Electricity distribution Ajmer City (TPADL) Not Available 208.10 Energy Electricity Distribution Operation and Maintenance Stage Ajmer Vidyut Vitran Nigam Limited Rajasthan 30-Oct-2019
662 Electricity distribution Bikaner City Circle (BkESL) Not Available 114.61 Energy Electricity Distribution Operation and Maintenance Stage Jodhpur Vidyut Vitran Nigam Limited Rajasthan 30-Oct-2019
663 Electricity Distribution Delhi (TPDDL) Not Available 5,836.02 Energy Electricity Distribution Operation and Maintenance Stage Tata Power Delhi Distribution Limited (TPDDL) Delhi (UT) 30-Oct-2019
664 Electricity Distribution Delhi city (BYPL) Not Available 3,080.50 Energy Electricity Distribution Operation and Maintenance Stage BSES YAMUNA POWER LIMITED (BYPL) Delhi (UT) 30-Oct-2019
665 Electricity Distribution in various parts of Odisha (Khurda, Balugaon, Puri and Nayagarh) Not Available 80.47 Energy Electricity Distribution Operation and Maintenance Stage Orissa Electricity Regulatory Commission Odisha 30-Oct-2019
666 Electricity Distribution Jamshedpur city Not Available 181.43 Energy Electricity Distribution Operation and Maintenance Stage Jamshedpur Utility Services Company Limited(JUSCO) Jharkhand 30-Oct-2019
667 Electricity Distribution New Delhi city (BRPL) Not Available 6,021.00 Energy Electricity Distribution Operation and Maintenance Stage BSES RajdhaniPowerLimited (BRPL) Delhi (UT) 30-Oct-2019
668 Electricity Distribution Noida city (NPCL) Not Available 1,457.10 Energy Electricity Distribution Operation and Maintenance Stage NOIDA POWER COMPANY LIMITED (NPCL) Uttar Pradesh 30-Oct-2019
669 ESSAR Power-Hazira, Power Plant Project 515.0 MW (Mega Watt) 1,600.00 Energy Electricity generation (grid) Operation and Maintenance Stage Energy & Petrochemicals Department, Gujarat Gujarat 30-Oct-2019
670 Gas based power plants and Thermal based power plants in Vadodara and Surat 815.0 MW (Mega Watt) 2,037.00 Energy Electricity generation (grid) Operation and Maintenance Stage Gujarat Industries Power Company Limited Gujarat 30-Oct-2019
671 Gujarat Paguthan Energy Corporation Power Plant Project 655.0 MW (Mega Watt) 2,247.00 Energy Electricity generation (grid) Completed Gujarat Urja Vikas Nigam Limited Gujarat 30-Oct-2019
672 Gurha Lignite Power Project * 70.0 MW (Mega Watt) 0.00 Energy Electricity generation (grid) Under Construction Rajasthan Rajya Vidyut Prasaran Nigam Limited Rajasthan 30-Oct-2019
673 Haldia Coal based power project 600.0 MW (Mega Watt) 3,307.00 Energy Electricity generation (grid) Operation and Maintenance Stage India Power Corpn (Haldia) Limited West Bengal 30-Oct-2019
674 Hydel Power (Sachkhas) Project 267.0 MW (Mega Watt) 2,845.75 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
675 Hydel Power (Bharari) Project 6.0 MW (Mega Watt) 41.62 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
676 Hydel Power (Chirchind-II) Project 12.9 MW (Mega Watt) 67.46 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
677 Hydel Power (Choned) Project 15.0 MW (Mega Watt) 114.72 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
678 Hydel Power (Harsar Stage-I) Project 28.5 MW (Mega Watt) 199.50 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
679 Hydel Power (Harsar Stage-II) Project 22.5 MW (Mega Watt) 212.31 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
680 Hydel Power (Harsar Stage-III) Project 19.0 MW (Mega Watt) 178.57 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
681 Hydel Power (Holi-II) Project 7.0 MW (Mega Watt) 64.90 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
682 Hydel Power (Shirikhand) Project 8.0 MW (Mega Watt) 45.90 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
683 Hydel Power (Uhl) Project 14.0 MW (Mega Watt) 140.00 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
684 Hydel Power (Umli) Project 10.0 MW (Mega Watt) 99.62 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
685 Jegurupadu Combined Cycle Power Project 445.0 MW (Mega Watt) 1,025.00 Energy Electricity generation (grid) Operation and Maintenance Stage Andhra Pradesh State Electricity Board Andhra Pradesh 30-Oct-2019
686 Jobrie Hydel Power Project 12.0 MW (Mega Watt) 84.00 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
687 Krishnapatnam Ultra Mega Power Project # * 4000.0 MW (Mega Watt) 1,015.00 Energy Electricity generation (grid) Under Construction Power Finance Corporation Ltd Andhra Pradesh 30-Oct-2019
688 KSK Mahanadi Power Co Limited 3600.0 MW (Mega Watt) 14,969.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Chhattisgarh 30-Oct-2019
689 Kudgi TPS Transmission Line Project * 482.0 KM (Kilometer) 1350.00 Energy Electricity transmission Under Construction Kudgi Transmission Limited Karnataka 30-Oct-2019
690 Malana Hydel Power Project - Stage I 86.0 MW (Mega Watt) 341.91 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
691 Masrang Selti Hydel Power Project 24.0 MW (Mega Watt) 215.74 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
692 Mundra Ultra Mega Power Project 4000.0 MW (Mega Watt) 17,900.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Gujarat 30-Oct-2019
693 Nagarjuna Power Project 1015.0 MW (Mega Watt) 5,496.00 Energy Electricity Distribution Operation and Maintenance Stage Karnataka Power Transmission Corporation Limited (KPTCL) Karnataka 30-Oct-2019
694 Nardana coal based thermal power plant # 300.0 MW (Mega Watt) 2,485.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Maharashtra 30-Oct-2019
695 Natural Gas based 220 MW, Kakinada Power project 220.0 MW (Mega Watt) 600.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Andhra Pradesh 30-Oct-2019
696 Nawapara coal based power project, Raigarh 600.0 MW (Mega Watt) 2,844.00 Energy Electricity generation (grid) Operation and Maintenance Stage Chhattisgarh State Electricity Board Chhattisgarh 30-Oct-2019
697 Nigrie Super Thermal Power Project 1320.0 MW (Mega Watt) 12,350.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Madhya Pradesh 30-Oct-2019
698 Reoli Dugli Hydel Power Project # * 429.0 MW (Mega Watt) 2,132.19 Energy Renewable energy (grid) Pre-construction Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
699 Sasan Ultra Mega Power Project 3960.0 MW (Mega Watt) 25,186.00 Energy Electricity generation (grid) Operation and Maintenance Stage Central Electricity Regulatory Commission Madhya Pradesh 30-Oct-2019
700 Setting up of 45 MW Saskangrong hydel power unit in West Kameng # * 45.0 MW (Mega Watt) 25,186.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
701 Setting up of 10 MW Pein hydel power unit in Lower Subansiri# * 10.0 MW (Mega Watt) 71.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
702 Setting up of 10 MW Pitgong-II hydel power unit in Arunachal Pradesh # * 10.0 MW (Mega Watt) 77.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
703 Setting up of 100 MW Malana II hydel power unit in Kullu district 100.0 MW (Mega Watt) 981.91 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
704 Setting up of 100 MW Sissiri hydel power unit in Lower Dibang Valley # * 100.0 MW (Mega Watt) 699.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
705 Setting up of 100 MW Sorang hydel power unit in Kinnaur district 100.0 MW (Mega Watt) 586.00 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
706 Setting up of 1000 MW Karchham Wangtoo hydel power unit in Kinnaur district # 1000.0 MW (Mega Watt) 6,900.00 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
707 Setting up of 1000 MW Naba hydel power unit in Arunachal Pradesh # * 1000.0 MW (Mega Watt) 6,500.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
708 Setting up of 1000 MW Naying hydel power unit in West Siang # * 1000.0 MW (Mega Watt) 9,301.10 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
709 Setting up of 1000 MW Siyom hydel power unit in West Siang district # * 1000.0 MW (Mega Watt) 12,100.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
710 Setting up of 1080 MW Upper Demwe hydel power unit in Lohit # * 1080.0 MW (Mega Watt) 5,000.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
711 Setting up of 111 MW Lower Yamne-I hydel power unit in Upper Siang # * 111.0 MW (Mega Watt) 540.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
712 Setting up of 111 MW Yamne Stage-I hydel power unit in Upper Siang* 111.0 MW (Mega Watt) 775.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
713 Setting up of 12 MW Pichang hydel power unit in East Kameng # * 12.0 MW (Mega Watt) 84.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
714 Setting up of 12 MW Raura hydel power unit in Kinnaur district * 12.0 MW (Mega Watt) 65.95 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
715 Setting up of 12 MW Tenga hydel power unit in West Kameng # * 12.0 MW (Mega Watt) 84.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
716 Setting up of 12 MW Upper Joiner hydel power unit in Chamba district # 12.0 MW (Mega Watt) 72.25 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
717 Setting up of 120 MW Bhareli-II hydel power unit in West Kameng # * 120.0 MW (Mega Watt) 4,200.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
718 Setting up of 120 MW Dibbin hydel power unit in West Kameng district # * 120.0 MW (Mega Watt) 900.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
719 Setting up of 1200 MW Hutong- II hydel power unit in Anjaw district* 1200.0 MW (Mega Watt) 15,167.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
720 Setting up of 1200 MW Kalai-II hydel power unit in Anjaw district# * 1200.0 MW (Mega Watt) 6,955.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
721 Setting up of 13 MW Nyikong hydel power unit in Upper Siang # * 13.0 MW (Mega Watt) 94.90 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
722 Setting up of 13 MW Pith hydel power unit at Yazali# * 13.0 MW (Mega Watt) 91.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
723 Setting up of 13 MW Rala hydel power unit in Kinnaur district 13.0 MW (Mega Watt) 58.04 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
724 Setting up of 13.5 MW Upper Nanti hydel power unit in Shimla 13.5 MW (Mega Watt) 80.66 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
725 Setting up of 1304 MW Kalai-I hydel power unit in Anjaw district # * 1304.0 MW (Mega Watt) 13,444.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
726 Setting up of 14 MW Kaying hydel power unit in West Siang# * 14.0 MW (Mega Watt) 115.50 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
727 Setting up of 14 MW nanti hydel power unit in Shimla district # 14.0 MW (Mega Watt) 66.94 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
728 Setting up of 14 MW Sumez hydel power unit in Shimla district # 14.0 MW (Mega Watt) 92.08 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
729 Setting up of 141 MW Raigam hydel power unit in Lohit# * 141.0 MW (Mega Watt) 1,609.38 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
730 Setting up of 144 MW Gongri hydel power unit in West Kameng # * 144.0 MW (Mega Watt) 1,436.27 Energy Renewable energy (grid) Under Construction Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
731 Setting up of 145 MW Pauk hydel power unit in West Siang # * 145.0 MW (Mega Watt) 1,015.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
732 Setting up of 15 MW Neogal hydel power unit in Kangra district # 15.0 MW (Mega Watt) 61.74 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
733 Setting up of 15 MW Pakke Bung-II hydel power unit in East Kameng # * 15.0 MW (Mega Watt) 105.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
734 Setting up of 15 MW Pakke Bung-IV hydel power unit in East Kameng # * 15.0 MW (Mega Watt) 105.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
735 Setting up of 15 MW Palin hydel power unit in Kra Daadi # * 15.0 MW (Mega Watt) 106.50 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
736 Setting up of 16 MW Jongini hydel power unit in Shimla district # 16.0 MW (Mega Watt) 79.06 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
737 Setting up of 16 MW Patikari hydel power unit in Mandi district 16.0 MW (Mega Watt) 115.63 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
738 Setting up of 1750 MW Lower Demwe hydel power unit in Lohit # * 1750.0 MW (Mega Watt) 10,000.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
739 Setting up of 18 MW Ankaling hydel power unit in West kameng # * 18.0 MW (Mega Watt) 126.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
740 Setting up of 18 MW Lower Ngorgum hydel power unit in Arunachal Pradesh # * 18.0 MW (Mega Watt) 127.80 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
741 Setting up of 18 MW Pacha hydel power unit in East Kameng # * 18.0 MW (Mega Watt) 126.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
742 Setting up of 180 MW Bajoli Holi hydel power unit in Chamba district * 180.0 MW (Mega Watt) 1,681.82 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
743 Setting up of 1800 MW Kamala hydel power unit in Lower Subansiri district # * 1800.0 MW (Mega Watt) 20,140.77 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
744 Setting up of 1800 MW Oju hydel power unit in Upper Subansiri # * 1800.0 MW (Mega Watt) 10,800.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
745 Setting up of 186 MW Tato-I hydel power unit in West Siang # * 186.0 MW (Mega Watt) 1,302.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
746 Setting up of 192 MW Allain Duhangan hydel power unit in Kullu district # 192.0 MW (Mega Watt) 2,021.00 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
747 Setting up of 21 MW Panyor Lepa Middle hydel power unit on Ranganadi river in Arunachal Pradesh* 21.0 MW (Mega Watt) 153.30 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
748 Setting up of 21 MW Papumpam hydel power unit in Papum Pare # * 21.0 MW (Mega Watt) 157.50 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
749 Setting up of 21 MW Sepla hydel power unit in East Kameng # * 21.0 MW (Mega Watt) 147.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
750 Setting up of 22 MW Ithipani-II hydel power unit in Lower Dibang Valley # * 22.0 MW (Mega Watt) 154.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
751 Setting up of 225 MW Talong hydel power unit in East Kameng # * 225.0 MW (Mega Watt) 2,172.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
752 Setting up of 23 MW Keyi hydel power unit in Lower Subansiri # * 23.0 MW (Mega Watt) 161.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
753 Setting up of 24 MW Baragaon hydel power unit in Kullu district 24.0 MW (Mega Watt) 174.81 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
754 Setting up of 24 MW Dikshi hydel power unit in West kameng # * 24.0 MW (Mega Watt) 168.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
755 Setting up of 24 MW Kamlang hydel power unit in Lohit # * 24.0 MW (Mega Watt) 182.40 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
756 Setting up of 24 MW Kut hydel power unit in Shimla district 24.0 MW (Mega Watt) 189.50 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
757 Setting up of 24 MW Pakke Bung-III hydel power unit in East Kameng # * 24.0 MW (Mega Watt) 168.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
758 Setting up of 24 MW Palsi-I hydel power unit in Upper Siang # * 24.0 MW (Mega Watt) 168.00 Energy Renewable energy (grid) Under Construction Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
759 Setting up of 24 MW Panyi hydel power unit # * 24.0 MW (Mega Watt) 168.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
760 Setting up of 24 MW Paudital hydel power unit in Shimla district 24.0 MW (Mega Watt) 210.00 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
761 Setting up of 24 MW Phudung hydel power unit in West Kameng # * 24.0 MW (Mega Watt) 172.80 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
762 Setting up of 24 MW Roura-II hydel power unit in Kinnaur district 24.0 MW (Mega Watt) 159.20 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
763 Setting up of 24 MW Sichi hydel power unit # * 24.0 MW (Mega Watt) 175.20 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
764 Setting up of 24.6 MW Wanger-Homte hydel power unit in Kinnaur district 24.6 MW (Mega Watt) 274.50 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
765 Setting up of 240 MW Heo hydel power unit in West Siang # * 240.0 MW (Mega Watt) 1,680.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
766 Setting up of 25 MW Adum Panyor hydel power unit on Ranganadi River in Arunachal Pradesh # * 25.0 MW (Mega Watt) 175.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
767 Setting up of 25 MW Lambadug hydel power unit in Kangra district 25.0 MW (Mega Watt) 149.81 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
768 Setting up of 252 MW Dinchang hydel power unit near Bomdila in West Kameng district # * 252.0 MW (Mega Watt) 1,980.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
769 Setting up of 27.5 MW Tagurshit-II hydel power unit in West Siang # * 27.5 MW (Mega Watt) 192.50 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
770 Setting up of 270 MW hydel power unit in Anjaw * 270.0 MW (Mega Watt) 1,890.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
771 Setting up of 2700 MW Lower Siang hydel power unit in East Siang # * 2700.0 MW (Mega Watt) 20,000.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
772 Setting up of 275 MW Emra-I hydel power unit in Arunachal Pradesh # * 275.0 MW (Mega Watt) 1,925.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
773 Setting up of 30 MW Ashupani hydel power unit in Arunachal Pradesh # * 30.0 MW (Mega Watt) 210.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
774 Setting up of 3097 MW Etalin hydel power unit in Dibang Valley district # * 3097.0 MW (Mega Watt) 25.296.95 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
775 Setting up of 360 MW Nalo hydel power unit in Upper Subansiri # * 360.0 MW (Mega Watt) 2,520.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
776 Setting up of 38 MW Meyong hydel power unit in Kameng basin # * 38.0 MW (Mega Watt) 266.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
777 Setting up of 390 MW Emra-II hydel power unit in Arunachal Pradesh * 390.0 MW (Mega Watt) 2,730.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
778 Setting up of 40 MW Pakke Bung-I hydel power unit in Arunachal Pradesh # * 40.0 MW (Mega Watt) 280.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
779 Setting up of 40 MW Rapum hydel power unit in West Siang # * 40.0 MW (Mega Watt) 280.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
780 Setting up of 420 MW Amulin hydel power unit in Anini district # * 420.0 MW (Mega Watt) 2,940.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
781 Setting up of 45 MW Lower Pachuk-II hydel power unit in Kameng # * 45.0 MW (Mega Watt) 315.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
782 Setting up of 45 MW Tirap hydel power unit in Changlang # * 45.0 MW (Mega Watt) 315.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
783 Setting up of 46 MW Digin hydel power unit in West Kameng # * 46.0 MW (Mega Watt) 322.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
784 Setting up of 46 MW Sepia hydel power unit in Arunachal Pradesh # * 46.0 MW (Mega Watt) 322.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
785 Setting up of 48 MW Ithun-II hydel power unit in Lower Dibang Valley # * 48.0 MW (Mega Watt) 336.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
786 Setting up of 48 MW Lower Marjingla hydel power unit in East Kameng # * 48.0 MW (Mega Watt) 336.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
787 Setting up of 48 MW Papu Valley hydel power unit in East Kameng # * 48.0 MW (Mega Watt) 345.60 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
788 Setting up of 5.4 MW Sarbari-II small hydel power unit in Kullu district 5.4 MW (Mega Watt) 46.00 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
789 Setting up of 50 MW Tsa Chu-ILower hydel power unit in Tawang # * 50.0 MW (Mega Watt) 350.00 Energy Electricity transmission Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
790 Setting up of 500 MW Emini hydel power unit in Dibang Valley district # * 500.0 MW (Mega Watt) 3,500.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
791 Setting up of 55 MW Para hydel power unit in Kameng # * 55.0 MW (Mega Watt) 385.00 Energy Electricity transmission Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
792 Setting up of 552 MW Dengser hydel power unit in Upper Subansiri # * 552.0 MW (Mega Watt) 3,864.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
793 Setting up of 56 MW Taiyong hydel power unit in West Siang # * 56.0 MW (Mega Watt) 392.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
794 Setting up of 6 MW Baner hydel power unit in Kangra district 6.0 MW (Mega Watt) 54.59 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
795 Setting up of 60 MW Marjingla hydel power unit in East Kameng # * 60.0 MW (Mega Watt) 432.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
796 Setting up of 60 MW Pachuk-II hydel power unit in Kameng # * 60.0 MW (Mega Watt) 420.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
797 Setting up of 600 MW Kameng-II hydel power unit in West Kameng district # * 600.0 MW (Mega Watt) 4,200.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
798 Setting up of 63 MW Dardu hydel power unit in Papum Pare# * 60.0 MW (Mega Watt) 463.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
799 Setting up of 66 MW Simang-II hydel power unit in East Siang # * 66.0 MW (Mega Watt) 475.20 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
800 Setting up of 67 MW Simang-I hydel power unit in East Siang # * 67.0 MW (Mega Watt) 469.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
801 Setting up of 68 MW Tidding-II hydel power unit in Arunachal Pradesh # * 68.0 MW (Mega Watt) 496.40 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
802 Setting up of 680 MW Attunli hydel power unit in Dibang Valley district # * 680.0 MW (Mega Watt) 7,158.84 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
803 Setting up of 70 MW Badao hydel power unit in Kameng # * 70.0 MW (Mega Watt) 490.00 Energy Electricity transmission Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
804 Setting up of 70 MW Budhil hydel power unit in Chamba district # 70.0 MW (Mega Watt) 418.80 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
805 Setting up of 700 MW Tato-II hydel power unit in West Siang district# * 700.0 MW (Mega Watt) 6,000.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
806 Setting up of 74 MW Tagurshit hydel power unit at Tado Gitu in West Siang # * 74.0 MW (Mega Watt) 518.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
807 Setting up of 75 MW Chela hydel power unit in Arunachal Pradesh # * 75.0 MW (Mega Watt) 525.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
808 Setting up of 780 MW Nyamjang Chhu hydel power unit in Tawang # * 780.0 MW (Mega Watt) 6,852.28 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
809 Setting up of 8 MW hydel power unit at Kurmi in Shimla district # 8.0 MW (Mega Watt) 68.49 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
810 Setting up of 8 MW Rima hydel power unit in Changlang # * 8.0 MW (Mega Watt) 57.60 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
811 Setting up of 8.0 MW Upper Joiner (Stage II) hydel power unit in Chamba 8.0 MW (Mega Watt) 50.44 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
812 Setting up of 80 MW Chomi hydel power unit in Arunachal Pradesh # * 80.0 MW (Mega Watt) 584.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
813 Setting up of 80 MW Gimliang hydel power unit in Lohit # * 80.0 MW (Mega Watt) 870.39 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
814 Setting up of 80 MW Kangtangshiri hydel power unit in West Siang # * 80.0 MW (Mega Watt) 245.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
815 Setting up of 80 MW Panyor hydel power unit at Yazali in Lower Subansiri # * 80.0 MW (Mega Watt) 820.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
816 Setting up of 800 MW Niare hydel power unit in upper reaches of Subansiri river, Arunachal Pradesh # * 800.0 MW (Mega Watt) 5,600.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
817 Setting up of 84 MW Ithun-I hydel power unit in Lower Dibang Valley # * 84.0 MW (Mega Watt) 588.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
818 Setting up of 84 MW Pachuk I hydel power project in Kameng # * 84.0 MW (Mega Watt) 588.00 Energy Electricity transmission Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
819 Setting up of 9 MW Beas Kund hydel power unit in Kullu district # 9.0 MW (Mega Watt) 75.84 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
820 Setting up of 9 MW Upper Ngorgum hydel power unit in Arunachal Pradesh # * 9.0 MW (Mega Watt) 63.90 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
821 Setting up of 9.6 MW Jeori hydel power unit in Shimla district 9.6 MW (Mega Watt) 74.16 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
822 Setting up of 9.9 MW Rajpur hydel power unit in Shimla district 9.9 MW (Mega Watt) 42.03 Energy Renewable energy (grid) Under Construction Directorate of Energy, Himachal Pradesh Himachal Pradesh 30-Oct-2019
823 Setting up of 90 MW Papu hydel power unit in Kameng # * 90.0 MW (Mega Watt) 620.00 Energy Electricity transmission Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
824 Setting up of 92 MW Jidu hydel power unit in Upper Siang # * 92.0 MW (Mega Watt) 644.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
825 Setting up of 93 MW Rho hydel power unit in Tawang # * 93.0 MW (Mega Watt) 1,160.75 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
826 Setting up of 96 MW Mago Chu hydel power unit in Tawang # * 96.0 MW (Mega Watt) 1,048.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
827 Setting up of 96 MW Nyukcharong Chu hydel power unit in Tawang # * 96.0 MW (Mega Watt) 995.90 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
828 Setting up of 96 MW Pango hydel power unit in Upper Siang # * 96.0 MW (Mega Watt) 672.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
829 Setting up of 96 MW Pema Selphu hydel power unit in West Siang # * 96.0 MW (Mega Watt) 672.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
830 Setting up of 96 MW Sippi hydel power unit in Upper Siang # * 96.0 MW (Mega Watt) 672.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
831 Setting up of 98 MW Tidding-I hydel power unit in Arunachal Pradesh # * 98.0 MW (Mega Watt) 686.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
832 Setting up of Nafra 96 MW hydel power unit in West Kameng # * 96.0 MW (Mega Watt) 672.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 30-Oct-2019
833 Teesta III-Kishanganj Transmission Line # * 211.0 CKM (Circuit Kilo Meter) 1,032.00 Energy Electricity transmission Under Construction Power Grid Corpn. of India Ltd. Multi State/ Centre 30-Oct-2019
834 Wardha Power Company (WPCL) - Coal based power plant 540.0 MW (Mega Watt) 2,811.00 Energy Electricity generation (grid) Operation and Maintenance Stage Maharashtra Electricity Regulatory Commission Maharashtra 30-Oct-2019
835 Waste Based Power (Ranchi) Project * 11.0 MW (Mega Watt) 77.00 Energy Electricity generation (grid) Pre-construction Stage Ranchi Municipal Corporation Jharkhand 30-Oct-2019
836 "DCFOMT" of a Regional Municipal Solid Waste to Energy & Land fill facility at Patna in Bihar * 11.5 MW (Mega Watt) 15.00 Energy Renewable energy (grid) Under Construction Bihar Urban Infrastructure Development Corporation Limited Bihar 25-Oct-2019
837 Balighat Small Hydro Power Project * 5.5 MW (Mega Watt) 41.32 Energy Renewable energy (grid) Under Construction Department of Energy, Uttarakhand Uttarakhand 25-Oct-2019
838 Burthing Small Hydro Power Project * 5.0 MW (Mega Watt) 34.99 Energy Renewable energy (grid) Under Construction Department of Energy, Uttarakhand Uttarakhand 25-Oct-2019
839 Desang Small Hydro Power (Dillighat) Project # * 9.0 MW (Mega Watt) 73.80 Energy Renewable energy (grid) Pre-construction Stage Assam Power Project Development Company Limited Assam 25-Oct-2019
840 Development of 20 MW Power Station at Port Blair * 20.0 MW (Mega Watt) 0.00 Energy Renewable energy (grid) Not Available Andaman and Nicobar Administration Andaman & Nicobar Islands (UT) 25-Oct-2019
841 Establishment of 20 MW DG power plant at Bambooflat, South Andaman District # 20.0 MW (Mega Watt) 74.96 Energy Electricity generation (grid) Completed Andaman and Nicobar Administration Andaman & Nicobar Islands (UT) 25-Oct-2019
842 Establishment of 5 MWp SPV power plant at Garacharama, South Andaman 5.0 MW (Mega Watt) 60.00 Energy Renewable energy (grid) Operation and Maintenance Stage Andaman and Nicobar Administration Andaman & Nicobar Islands (UT) 25-Oct-2019
843 Hinduja National Power Corp Ltd (HNPCL) - Thermal Power plant at Visakhapatnam 1040.0 MW (Mega Watt) 7,987.00 Energy Electricity generation (grid) Operation and Maintenance Stage Andhra Pradesh Electricity Regulatory Commission Andhra Pradesh 25-Oct-2019
844 Implementation of 11.5 MW municipal solid waste based power unit at Giddenahalli in Bengaluru district * 11.5 MW (Mega Watt) 233.06 Energy Renewable energy (grid) Under Construction Bruhat Bengaluru Mahanagara Palike Karnataka 25-Oct-2019
845 Khutani Small Hydro Power Project * 21.0 MW (Mega Watt) 189.53 Energy Renewable energy (grid) Under Construction Department of Energy, Uttarakhand Uttarakhand 25-Oct-2019
846 Phulibagar Small Hydro Power Project * 5.0 MW (Mega Watt) 29.02 Energy Renewable energy (grid) Under Construction Department of Energy, Uttarakhand Uttarakhand 25-Oct-2019
847 Setting up of 18 MW Dengzi hydel power unit at Kalaktang # * 18.0 MW (Mega Watt) 133.20 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
848 Setting up of 2000 MW Upper Subansiri hydel power unit at Menga village * 2000.0 MW (Mega Watt) 16,100.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
849 Setting up of 31 MW Rebby hydel power unit in Kameng # * 31.0 MW (Mega Watt) 217.00 Energy Electricity transmission Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
850 Setting up of 36 MW Tarang Warang hydel power unit in Kameng # * 36.0 MW (Mega Watt) 252.00 Energy Electricity transmission Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
851 Setting up of 400 MW Mihumdon hydel power unit in Arunachal Pradesh * 400.0 MW (Mega Watt) 2,800.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
852 Setting up of 41 MW Lachung hydel power unit in Kameng # * 41.0 MW (Mega Watt) 287.00 Energy Electricity transmission Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
853 Setting up of 45 MW Phanchung hydel power unit in Kameng # * 45.0 MW (Mega Watt) 415.00 Energy Electricity transmission Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
854 Setting up of 52 MW Par hydel power unit in Papum Pare # * 65.0 MW (Mega Watt) 461.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
855 Setting up of 60 MW New Melling hydel power unit in Tawang # * 60.0 MW (Mega Watt) 1,086.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
856 Setting up of 63 MW Turu hydel power unit in Papum Pare# * 90.0 MW (Mega Watt) 630.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
857 Setting up of 66 MW Khuitam hydel power unit in West Kameng # * 66.0 MW (Mega Watt) 462.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
858 Setting up of 75 MW Lower Yamne-II hydel power unit in Upper Siang # * 75.0 MW (Mega Watt) 609.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
859 Setting up of 80 MW Rapum hydel power unit in West Siang # * 80.0 MW (Mega Watt) 560.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
860 Setting up of 90 MW Jameri hydel power unit in Kameng # * 90.0 MW (Mega Watt) 355.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
861 Setting up of 90 MW Tsa Chu-II hydel power unit in Tawang * 90.0 MW (Mega Watt) 630.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
862 Setting up of 96 MW Barpu hydel power unit in Arunachal Pradesh# * 96.0 MW (Mega Watt) 490.00 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
863 Setting up of 96 MW Lower Yamne-II hydel power unit in Upper Siang # * 96.0 MW (Mega Watt) 681.60 Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arunachal Pradesh 25-Oct-2019
864 Electricity Distribution Agra City Not Available 400.00 Energy Electricity Distribution Operation and Maintenance Stage Torrent Power Limited Uttar Pradesh 24-Oct-2019
865 Hydro Electric Power (Hetavane) Project 0.35 MW (Mega Watt) 5.16 Energy Renewable energy (grid) Pre-construction Stage Water Resources Department, Maharashtra Maharashtra 22-Oct-2019
866 Bangalore International Airport (Expanded Terminal) 17.2 MPPA (Million Passenger Per Annum) 1,547.00 Transport Airports Operation and Maintenance Stage Airports Authority of India (AAI) Karnataka 03-Oct-2019
867 Bangalore International Airport Project 11.5 MPPA (Million Passenger Per Annum) 2,353.00 Transport Airports Operation and Maintenance Stage Airports Authority of India (AAI) Karnataka 03-Oct-2019
868 Cochin International Airport Not Available 303.00 Transport Airports Operation and Maintenance Stage Kochi International Airport Society (KIAS) Kerala 03-Oct-2019
869 Development of Common user Coal Terminal 10.0 MMTPA (million metric tonnes per annum) 351.08 Transport Ports (excluding captive) Operation and Maintenance Stage Kamarajar Port Limited Tamil Nadu 03-Oct-2019
870 International Airport (Mopa) Project 13.1 MPPA (Million Passenger Per Annum) 3,100.00 Transport Airports Under Construction Government of Goa Goa 03-Oct-2019
871 2nd Container Terminal (NSICT) JNPT 15.0 MTPA (Metric Tonne Per Annum) 750.00 Transport Ports (excluding captive) Operation and Maintenance Stage Jawaharlal Nehru Port Trust Maharashtra 01-Oct-2019
872 3rd Container Terminal (GTIPL) JNPT 22.5 MTPA (Metric Tonne Per Annum) 1,078.00 Transport Ports (excluding captive) Operation and Maintenance Stage Jawaharlal Nehru Port Trust Maharashtra 01-Oct-2019
873 Aircraft Maintenance Hangar (Kochi) Not Available 42.00 Transport Airports Operation and Maintenance Stage Cochin International Airport Limited Kerala 01-Oct-2019
874 Airport Metro Express Line - New Delhi Railway Station to IGI Airport to Sector 21, Dwarka, New Delhi 23.0 KM (Kilometer) 5,700.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Delhi Metro Rail Corporation Limited, Delhi (UT) 01-Oct-2019
875 Bus cum Truck Terminal at Alisha PS & District Burdwan Not Available 65.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Burdwan Development Authority West Bengal 01-Oct-2019
876 Bus cum Truck Terminal at Nababhat Not Available 35.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Burdwan Development Authority West Bengal 01-Oct-2019
877 Bus Rapid Transport System (Ahmedabad) Phase IA 12.0 KM (Kilometer) 87.60 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Gujarat Infrastructure Development Board Gujarat 01-Oct-2019
878 Bus Terminal (Alambagh) Project 50.0 Numbers 201.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Uttar Pradesh State Road Transport Corporation Uttar Pradesh 01-Oct-2019
879 Chhara Port Project - Phase I 5.5 MMTPA (million metric tonnes per annum) 1,200.00 Transport Ports (excluding captive) Under Construction Gujarat Maritime Board (GMB) Gujarat 01-Oct-2019
880 Construction and Operation of Two Multipurpose Bulk Cargo Berths (5A & 6A) at the Port of Mormugao 5.0 MMTPA (million metric tonnes per annum) 250.00 Transport Ports (excluding captive) Operation and Maintenance Stage Mormugao Port Trust Goa 01-Oct-2019
881 Construction of bus terminal on 2.8 acres of land in Rajkot 2.80 Acres 128.01 Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation Gujarat 01-Oct-2019
882 Construction of bus terminal on 3.1 acres of land in Bhuj 3.10 Acres 28.85 Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation Gujarat 01-Oct-2019
883 Construction of bus terminal on 4.2 acres of land in Amreli 4.20 Acres 40.43 Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation Gujarat 01-Oct-2019
884 Construction of bus terminal on 5 acres of land at Nadiad 5.0 Acres 50.71 Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation Gujarat 01-Oct-2019
885 Construction of bus terminal on 5.3 acres of land in Bharuch 5.30 Acres 74.49 Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation Gujarat 01-Oct-2019
886 Construction of bus terminal on 7.3 acres of land at Palanpur 7.30 Acres 75.80 Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation Gujarat 01-Oct-2019
887 Construction of bus terminal on 7.3 acres of land in Navsari 7.30 Acres 64.64 Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation Gujarat 01-Oct-2019
888 Construction of bus terminal on 7.4 acres of land at Modasa 7.40 Acres 60.47 Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation Gujarat 01-Oct-2019
889 Construction of bus terminal on 7.7 acres of land in Patan 7.70 Acres 52.50 Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation Gujarat 01-Oct-2019
890 Construction of central bus terminal on 14.9 acres at Geeta Mandir in Ahmedabad 14.90 Acres 186.67 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Gujarat State Road Transport Corporation Gujarat 01-Oct-2019
891 Construction of central bus terminal on 21.6 acres at Modhera cross road in Mehsana 21.60 Acres 57.16 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Gujarat State Road Transport Corporation Gujarat 01-Oct-2019
892 Construction of central bus terminal on 5.4 acres at Subhash bridge in Ahmedabad 5.40 Acres 77.91 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Gujarat State Road Transport Corporation Gujarat 01-Oct-2019
893 Construction of Deep draught iron ore berth on BOT basis by Paradip Port Trust 10.0 MMTPA (million metric tonnes per annum) 740.00 Transport Ports (excluding captive) Under Construction Ministry of Shipping Odisha 01-Oct-2019
894 DCDFO&M of eight Lane access controlled expressway under Phase II A Programme, in Telangana 11.7 KM (Kilometer) 502.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Hyderabad Metropolitan Development Authority Telangana 01-Oct-2019
895 Development of a Coal Terminal at Port of Mormugao, Goa on Design, Build, Finance, Operate and Transfer (DBFOT) Basis 4.61 MMTPA (million metric tonnes per annum) 404.97 Transport Ports (excluding captive) Operation and Maintenance Stage Mormugao Port Trust Goa 01-Oct-2019
896 Development of a Container Terminal at Tuna Tekra in Kandla Port Kutch region in the State of Gujarat on DBFOT basis 14.11 MTPA (Metric Tonne Per Annum) 5,991.71 Transport Ports (excluding captive) Pre-construction Stage Ministry of Shipping Gujarat 01-Oct-2019
897 Development of a multipurpose Berth and a Mechanised Berth at Haldia Dock -II (South), Haldia Dock Complex, Kolkata Port Trust Not Available 886.10 Transport Ports (excluding captive) Operation and Maintenance Stage Ministry of Shipping West Bengal 01-Oct-2019
898 Development of a new terminal termed as the extension of the existing container terminal, Outer Harbour at Visakhapatnam Port Not Available 635.11 Transport Ports (excluding captive) Operation and Maintenance Stage Ministry of Shipping Andhra Pradesh 01-Oct-2019
899 Development of an integrated bus station-cum-commercial complex at KSRTC Bus Station, Puttur in Dakshina Kannada district 2.4 Acres 33.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Karnataka State Road Transport Corporation (KSRTC) Karnataka 01-Oct-2019
900 Development of Container Terminal at Ennore Port, Tiruvallur District in the State of Tamil Nadu 16.8 MTPA (Metric Tonne Per Annum) 1,436.00 Transport Ports (excluding captive) Operation and Maintenance Stage Kamarajar Port Limited Tamil Nadu 01-Oct-2019
901 Development of Dry Bulk Terminal at Tekra near Tuna on BOT basis 14.0 MMTPA (million metric tonnes per annum) 1,410.00 Transport Ports (excluding captive) Operation and Maintenance Stage Ministry of Shipping Gujarat 01-Oct-2019
902 Development of Eighth Berth as Container Terminal on Build Operate & Transfer (BOT) basis at Tuticorin Port 7.20 MMTPA (million metric tonnes per annum) 312.23 Transport Ports (excluding captive) Operation and Maintenance Stage V.O. Chidambaranar Port Trust Tamil Nadu 01-Oct-2019
903 Development of EQ-10 berth in the northern arm of inner harbour of Visakhapatnam port 1.8 MTPA (Metric Tonne Per Annum) 55.38 Transport Ports (excluding captive) Operation and Maintenance Stage Visakhapatnam Port Trust Andhra Pradesh 01-Oct-2019
904 Development of Fourth Container Terminal at Jawahar Lal Nehru Port Trust 60.0 MMTPA (million metric tonnes per annum) 7,915.00 Transport Ports (excluding captive) Operation and Maintenance Stage Ministry of Shipping Maharashtra 01-Oct-2019
905 Development of Modern Bus Terminal at Amritsar 90000.0 Passengers 12.75 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Director State Transport / Government of Punjab Punjab 01-Oct-2019
906 Development of Modern Bus Terminal at Jalandhar 100000.0 Passengers 12.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Director State Transport / Government of Punjab Punjab 01-Oct-2019
907 Development of multilevel car parking on 0.6 acres of land at Nungambakkam Not Available 43.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Greater Chennai Corporation Tamil Nadu 01-Oct-2019
908 Development of Multipurpose Berth to handle clean cargo including containers on BOT basis at Paradip Port 5.0 MMTPA (million metric tonnes per annum) 431.00 Transport Ports (excluding captive) Operation and Maintenance Stage Paradip Port Trust Odisha 01-Oct-2019
909 Development of North Cargo Berth II for handling bulk cargo at Tuticorin Port on DBFOT basis 7.0 MMTPA (million metric tonnes per annum) 335.00 Transport Ports (excluding captive) Operation and Maintenance Stage V.O. Chidambaranar Port Trust Tamil Nadu 01-Oct-2019
910 Development of North Cargo Berth-IV to handle bulk cargo, Thermal Coal and Copper Concentrate at V.O Chidambaranar Port on DBFOT Not Available 355.00 Transport Ports (excluding captive) Under Construction Ministry of Shipping Tamil Nadu 01-Oct-2019
911 Development of Standalone container handling facility with a quay length of 300m towards North at Jahawar Lal Nehru Port Trust 10.0 MTPA (Metric Tonne Per Annum) 600.00 Transport Ports (excluding captive) Operation and Maintenance Stage Jawaharlal Nehru Port Trust Maharashtra 01-Oct-2019
912 Development of WQ-6 berth in the northern arm of inner harbour of Vishakhapatnam Port for handling dry bulk cargo on DBFOT basis 2.08 MMTPA (million metric tonnes per annum) 139.90 Transport Ports (excluding captive) Operation and Maintenance Stage Visakhapatnam Port Trust Andhra Pradesh 01-Oct-2019
913 Dholera Port Not Available 551.00 Transport Ports (excluding captive) Under Construction Gujarat Maritime Board (GMB) Gujarat 01-Oct-2019
914 Establishment of Container Terminal and O & M of handling equipment at multipurpose berth, Visakhapatnam Port Not Available 108.00 Transport Ports (excluding captive) Operation and Maintenance Stage Visakhapatnam Port Trust Andhra Pradesh 01-Oct-2019
915 Hazira LNG Terminal 5.0 MMTPA (million metric tonnes per annum) 1,150.00 Transport Ports (excluding captive) Operation and Maintenance Stage Gujarat Maritime Board (GMB) Gujarat 01-Oct-2019
916 Krishnapatnam Port Project - Phase I 13.5 MTPA (Metric Tonne Per Annum) 1,200.00 Transport Ports (excluding captive) Operation and Maintenance Stage Department of Ports, Andhra Pradesh Andhra Pradesh 01-Oct-2019
917 Mechanization of EQ 1,2,3 Berths at Paradip Port on BOT basis under PPP Mode Not Available 1,437.76 Transport Ports (excluding captive) Under Construction Ministry of Shipping Odisha 01-Oct-2019
918 Multi Cargo Terminal (Tamil Nadu) Project 2.0 MMTPA (million metric tonnes per annum) 151.00 Transport Ports (excluding captive) Operation and Maintenance Stage Kamarajar Port Limited Tamil Nadu 01-Oct-2019
919 Multi Level Parking (Ashok Marg) Project 400.0 PCU (Passenger Car Unit) 30.00 Transport Urban public transport (except rolling stock) Under Construction Jaipur Municipal Corporation Rajasthan 01-Oct-2019
920 Multi purpose berth 4A at HDC Kolkata Port Trust 3.1 MTPA (Metric Tonne Per Annum) 150.00 Transport Ports (excluding captive) Operation and Maintenance Stage Kolkata Port Trust West Bengal 01-Oct-2019
921 Multilevel Parking at Sector 17 Not Available 60.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Chandigarh Municipal Corporation Haryana 01-Oct-2019
922 Multipurpose Berth No. 12 at HDC KoPT 1.12 MTPA (Metric Tonne Per Annum) 37.00 Transport Ports (excluding captive) Operation and Maintenance Stage Kolkata Port Trust West Bengal 01-Oct-2019
923 Multipurpose Cargo Port (Dighi) Project 7.5 MTPA (Metric Tonne Per Annum) 13,556.11 Transport Ports (excluding captive) Operation and Maintenance Stage Maharashtra Maritime Board (MMB) Maharashtra 01-Oct-2019
924 Multipurpose Cargo Port (Jaigad) Project 18.0 MTPA (Metric Tonne Per Annum) 3,000.00 Transport Ports (excluding captive) Operation and Maintenance Stage Maharashtra Maritime Board (MMB) Maharashtra 01-Oct-2019
925 Multipurpose Cargo Port (Vijaydurg) Project 75.0 MTPA (Metric Tonne Per Annum) 2,275.00 Transport Ports (excluding captive) Operation and Maintenance Stage Maharashtra Maritime Board (MMB) Maharashtra 01-Oct-2019
926 O & M of Rajiv Gandhi Container Terminal & Development, Operation of International Container Terminal 4.0 MTEU 2,118.00 Transport Ports (excluding captive) Operation and Maintenance Stage Cochin Port Trust Kerala 01-Oct-2019
927 Pipavav Greenfield port - phase - I 12.6 MMTPA (million metric tonnes per annum) 731.00 Transport Ports (excluding captive) Operation and Maintenance Stage Gujarat Maritime Board (GMB) Gujarat 01-Oct-2019
928 Second Container Terminal (Chennai) Project 29.5 MTPA (Metric Tonne Per Annum) 783.32 Transport Ports (excluding captive) Operation and Maintenance Stage Chennai Port Trust Tamil Nadu 01-Oct-2019
929 Surendranagar-Pipapav Rail Project 271.0 KM (Kilometer) 373.00 Transport Railway track, tunnel, viaducts, bridges Operation and Maintenance Stage Ministry of Railways Gujarat 01-Oct-2019
930 Upgradation of existing facilities of OB-1, OB-2 at Outer Harbour and WQ-1 Berth at Inner Harbour of Visakhapatnam Port 15.0 MTPA (Metric Tonne Per Annum) 845.41 Transport Ports (excluding captive) Operation and Maintenance Stage Ministry of Shipping Andhra Pradesh 01-Oct-2019
931 Upgradation of Mechanical handling Infrastructure at V.O. Chidambaranar Port Trust (Berths I to VI & IX) 8.72 MMTPA (million metric tonnes per annum) 50.99 Transport Ports (excluding captive) Operation and Maintenance Stage V.O. Chidambaranar Port Trust Tamil Nadu 01-Oct-2019
932 Upgradation Operation and Maintenance of Ludhiana Bus Terminal 70000.0 Passengers 13.47 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Director State Transport / Government of Punjab Punjab 01-Oct-2019
933 Four Laning of Panikoili-Rimuli Section of NH 215 under NHDP Phase III, length 163 km 106.0 KM (Kilometer) 1,648.92 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Odisha 19-Sep-2019
934 Jamb Wind Power Project, Satara district 28.0 MW (Mega Watt) 165.90 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Maharashtra 19-Sep-2019
935 4 laning of Chenani-Nashri section of NH 1A including 9 km long tunnel with parallel escape tunnel on BOT (Annuity) basis 41.0 KM (Kilometer) 2,108.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Jammu & Kashmir 17-Sep-2019
936 4 laning of Qazigund-Banihal Section of NH 1A from 189.35-204.7km including 2 tunnels of 0.69 & 8.45 km length in J&K 15.2 KM (Kilometer) 2,414.00 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Jammu & Kashmir 17-Sep-2019
937 6/4 Laning of Delhi-Haryana Border to Rohtak Section of NH-10 from 29.7-87 km with construction of Bahadurgarh and Rohtak Bypass 63.4 KM (Kilometer) 486.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Haryana 17-Sep-2019
938 Development and Operation of Bikaner to Suratgarh section on NH 11 from km 553.869 to km 173.000 on NH 15 172.4 KM (Kilometer) 501.08 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 17-Sep-2019
939 Development of Four lane of Sidhi to Singrauli section (km 83/4 to km 195/8) of NH 75E on DBFOT (Toll) basis 102.6 KM (Kilometer) 954.43 Transport Roads and bridges Under Construction Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Sep-2019
940 Four laning of Baharampur-Farakka section of NH 34 from km 193 to km 295.700 inWest Bengal on DBFOT basis under NHDP III 101.0 KM (Kilometer) 1,006.53 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) West Bengal 17-Sep-2019
941 Four laning of Cuddapah-Kurnool section (Km 167.750 to km 356.030) of NH 18 Under NHDP Phase III on BOT Basis 188.7 KM (Kilometer) 1,567.31 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Andhra Pradesh 17-Sep-2019
942 Four laning of Nagpur-Saoner-Betul, Section of NH-69 Maharashtra and Madhya Pradesh on DBFOT (Annuity) basis 276.3 KM (Kilometer) 3,515.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 17-Sep-2019
943 Four laning of YSR-Kurnool section in length of 188.3 km on NH-18 under NHDP-III 188.3 KM (Kilometer) 1,585.00 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Andhra Pradesh 17-Sep-2019
944 Four/Six laning of Moradabad-Bareilly section of NH 24 from km 1+C28348 to km 262 inUttar Pradesh on DBFOT basis under NHDP III 114.0 KM (Kilometer) 1,984.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 17-Sep-2019
945 Rehabilitation strengthening and 4 laning of Jammu-Udhampur sec of NH 1A from 15-67km on BOT basis on DBFO pattern 52.0 KM (Kilometer) 1,939.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Jammu & Kashmir 17-Sep-2019
946 Six laning of Pune-Satara section of NH 4 from km 725 to km 865.35 in Maharashtra on BOT (Toll) basis on DBFO pattern 140.3 KM (Kilometer) 1,948.77 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 17-Sep-2019
947 Construction of Four-lane Bhopal By-pass in Madhya Pradesh 52.0 KM (Kilometer) 305.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 16-Sep-2019
948 Four laning of Bangalore Maddur State Highway SH-17 in length of 62.5 km 62.5 KM (Kilometer) 188.00 Transport Roads and bridges Operation and Maintenance Stage Karnataka Road Development Corporation Limited (KRDCL) Karnataka 16-Sep-2019
949 Four Laning of Nelamangala Junction on NH-4 with NH-48 to Devihalli under NHDP phase III A on BOT basis 80.0 KM (Kilometer) 742.07 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Karnataka 16-Sep-2019
950 Four laning of Pune-Sholapur section of NH 9 under NHDP Phase III, length 110.05 km� Package II 110.0 KM (Kilometer) 1,110.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Maharashtra 16-Sep-2019
951 Road Upgradation (Salem-Karur) (NS-2/TN-3) Project 33.4 KM (Kilometer) 205.60 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 16-Sep-2019
952 The Project of LNG Port & Terminal Facility in the Puthuvypeen sea at Cochin Port 5.0 MMTPA (million metric tonnes per annum) 4,182.00 Transport Ports (excluding captive) Operation and Maintenance Stage Cochin Port Trust Kerala 16-Sep-2019
953 100 MLD Sea Water Desalination Plant-Reverse Osmosis 237.0 MLD (Millons Liter per day) 550.00 Water Sanitation Water treatment plants Operation and Maintenance Stage Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) Tamil Nadu 13-Sep-2019
954 Brackish Water Desalination Plant 20.0 MLD (Millons Liter per day) 300.00 Water Sanitation Water treatment plants Operation and Maintenance Stage Rajasthan State Mines and Minerals Limited Rajasthan 13-Sep-2019
955 Bulk Water Supply Project for IIT Bhubaneshwar, NISAR, INFO City and adjoining areas, Bhubaneshwar 70.0 MLD (Millons Liter per day) 187.71 Water Sanitation Water supply pipeline Under Construction Public Health Engineering Organisation, Odisha Odisha 13-Sep-2019
956 Cold Storage Project (Sikar) 2000.0 MT (Metric Tonne ) 17.30 Social and Commercial Infrastructure Cold Chain Operation and Maintenance Stage Rajasthan State Agriculture Marketing Board Rajasthan 13-Sep-2019
957 Construction of multi chamber cold storage having capacity 4000 MT at Bhawani mandi 4000.0 MT (Metric Tonne ) 7.37 Social and Commercial Infrastructure Cold Chain Operation and Maintenance Stage Rajasthan State Agriculture Marketing Board Rajasthan 13-Sep-2019
958 Door to Dump waste disposal Central zone, Ahmedabad Not Available 30.00 Water Sanitation Solid waste management Operation and Maintenance Stage Ahmedabad Municipal Corporation Gujarat 13-Sep-2019
959 Door to Dump waste disposal North zone, Ahmedabad Not Available 34.00 Water Sanitation Solid waste management Operation and Maintenance Stage Ahmedabad Municipal Corporation Gujarat 13-Sep-2019
960 High-Tech Amusement Park (Surat) Project 15.0 Acres 228.77 Social and Commercial Infrastructure Tourism Operation and Maintenance Stage Surat Municipal Corporation Gujarat 13-Sep-2019
961 Implementation of 8.0 MLD water supply and sewerage scheme at Salt Lake 8.0 MLD (Millons Liter per day) 72.00 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Kolkata Metropolitan Development Authority West Bengal 13-Sep-2019
962 Setting up of 50,000 MT modern food silo complex at Bhopal 50000.0 MT (Metric Tonne ) 30.63 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Operation and Maintenance Stage Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) Madhya Pradesh 13-Sep-2019
963 Setting up of 50,000 MT modern food silo complex at Dewas District Village Durgapura 50000.0 MT (Metric Tonne ) 29.43 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Operation and Maintenance Stage Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) Madhya Pradesh 13-Sep-2019
964 Setting up of 50,000 MT modern food silo complex at Harda District Village Bhadawad 50000.0 MT (Metric Tonne ) 28.97 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Operation and Maintenance Stage Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) Madhya Pradesh 13-Sep-2019
965 Setting up of 50,000 MT modern food silo complex at Hoshangabad District Village Junheta Bankhedi 50000.0 MT (Metric Tonne ) 28.82 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Operation and Maintenance Stage Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) Madhya Pradesh 13-Sep-2019
966 Setting up of 50,000 MT modern food silo complex at Indore 50000.0 MT (Metric Tonne ) 30.64 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Operation and Maintenance Stage Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) Madhya Pradesh 13-Sep-2019
967 Setting up of 50,000 MT modern food silo complex at Satna District Village Mohari 50000.0 MT (Metric Tonne ) 28.95 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Operation and Maintenance Stage Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) Madhya Pradesh 13-Sep-2019
968 Setting up of 50,000 MT modern food silo complex at Sehore District Village Murli 50000.0 MT (Metric Tonne ) 30.55 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Operation and Maintenance Stage Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) Madhya Pradesh 13-Sep-2019
969 Setting up of 50,000 MT modern food silo complex at Ujjain District Village Manpur 50000.0 MT (Metric Tonne ) 29.60 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Operation and Maintenance Stage Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) Madhya Pradesh 13-Sep-2019
970 Setting up of 50,000 MT modern food silo complex at Vidisha District Village Patheri Haveli 50000.0 MT (Metric Tonne ) 30.96 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Operation and Maintenance Stage Madhya Pradesh Warehousing and Logistics Corporation (MPWLC) Madhya Pradesh 13-Sep-2019
971 Shivpuri Water Supply Project 60.0 MLD (Millons Liter per day) 80.71 Water Sanitation Water supply pipeline Operation and Maintenance Stage Nagar Palika Parishad Shivpuri Madhya Pradesh 13-Sep-2019
972 Visakhapatnam Industrial Water Supply Project 388.0 MLD (Millons Liter per day) 453.00 Water Sanitation Water treatment plants Operation and Maintenance Stage Andhra Pradesh Industrial Infrastructure Corporation Limited (APIIC) Andhra Pradesh 13-Sep-2019
973 Water Supply Improvement (Mehrauli) Project Not Available 201.00 Water Sanitation Water supply pipeline Operation and Maintenance Stage Delhi Jal Board Delhi (UT) 13-Sep-2019
974 Water Supply Scheme ( Naba Diganta Industrial Township) Not Available 68.01 Water Sanitation Water supply pipeline Operation and Maintenance Stage Kolkata Metropolitan Development Authority West Bengal 13-Sep-2019
975 Water Supply Scheme (Khandwa) - Augmentation Not Available 115.32 Water Sanitation Water supply pipeline Operation and Maintenance Stage Khandwa Municipal Corporation Madhya Pradesh 13-Sep-2019
976 Kantaphod - Nachabhor 39.22 KM (Kilometer) 196.47 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 30-Aug-2019
977 Dedicated Container Terminal at Pipavav Port 1000.0 MMTPA (million metric tonnes per annum) 2,000.00 Transport Ports (excluding captive) Operation and Maintenance Stage Gujarat Maritime Board (GMB) Gujarat 21-Aug-2019
978 Laying of ropeway at Jakhu in Shimla district 600.0 Passengers 40.00 Social and Commercial Infrastructure Tourism Operation and Maintenance Stage Department of Tourism and Civil Aviation, Himachal Pradesh Himachal Pradesh 21-Aug-2019
979 Madivala Commercial Plaza. 6.88 Acres 30.00 Social and Commercial Infrastructure Tourism Operation and Maintenance Stage Bruhat Bangalore Mahanagar Palike Karnataka 21-Aug-2019
980 Solid Waste Management (Rajkot) Not Available 8.67 Water Sanitation Solid waste management Operation and Maintenance Stage Rajkot Municipal Corporation Gujarat 21-Aug-2019
981 4-laning of Muzaffarnagar-Saharanpur Road (SH-59) from Km.0.000 to Km.52.950 on DBFOT toll basis 52.9 KM (Kilometer) 752.88 Transport Roads and bridges Operation and Maintenance Stage Uttar Pradesh State Highways Authority Uttar Pradesh 20-Aug-2019
982 Development of modern food silo for storage of wheat on DBFOT at Whitefield, Bangalore (Karnataka) - Proposed by FPD 25000.0 MT (Metric Tonne ) 28.52 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Under Construction Food Corporation of India Karnataka 20-Aug-2019
983 Four laning with paved shoulder in Bareilly-Almora section of SH 37 in the State of Uttar Pradesh on DBFOT basis 54.0 KM (Kilometer) 604.55 Transport Roads and bridges Operation and Maintenance Stage Uttar Pradesh State Highways Authority Uttar Pradesh 20-Aug-2019
984 Four-laning of Varanasi-Shaktinagar road of SH-5A in UP under DBFOT basis 115.0 KM (Kilometer) 1,757.39 Transport Roads and bridges Operation and Maintenance Stage Uttar Pradesh State Highways Authority Uttar Pradesh 20-Aug-2019
985 Multilevel Parking (Shimla) Project 700.0 ECS 46.11 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Shimla Municipal Corporation Himachal Pradesh 20-Aug-2019
986 Roadways between Madhyakailash-Sholinganallur 22.0 KM (Kilometer) 412.00 Transport Roads and bridges Operation and Maintenance Stage Tamil Nadu Road Development Company Limited Tamil Nadu 20-Aug-2019
987 Solid Waste Management (Sewapura) Project 250.0 TPD (Tonne per day) 26.34 Water Sanitation Solid waste management Operation and Maintenance Stage Jaipur Municipal Corporation Rajasthan 20-Aug-2019
988 "Mohol � Kurul � Mandrup Kamti Project " 33.4 KM (Kilometer) 18.00 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 19-Aug-2019
989 Amusement Park (Kankaria Balvatika) Not Available 32.00 Social and Commercial Infrastructure Tourism Operation and Maintenance Stage Ahmedabad Municipal Corporation Gujarat 19-Aug-2019
990 Bikaner Bypass Project 28.0 KM (Kilometer) 12.02 Transport Roads and bridges Completed Public Works Department, Rajasthan Rajasthan 19-Aug-2019
991 Construction of 2 lane Bridge across Vasista Branch of river Godavari connecting Narsapur of West Godavri District with Sakhinet Not Available 66.57 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation Andhra Pradesh 19-Aug-2019
992 Construction of central bus terminal on 5.1 acres in Vadodara 5.1 Acres 144.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Gujarat State Road Transport Corporation Gujarat 19-Aug-2019
993 Construction of cold storage 6000 MT at KUMS Jodhpur 6000.0 MT (Metric Tonne ) 5.11 Social and Commercial Infrastructure Cold Chain Operation and Maintenance Stage Rajasthan State Agriculture Marketing Board Rajasthan 19-Aug-2019
994 Construction of green field bridge across river Ganga connecting Bakhtiyarpur 50.95 KM (Kilometer) 1,599.57 Transport Roads and bridges Operation and Maintenance Stage Bihar State Road Development Corporation Limited Bihar 19-Aug-2019
995 Construction,O&M of Durg bypass on NH6 in Madhya Pradesh on BOT basis 18.0 KM (Kilometer) 123.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Chhattisgarh 19-Aug-2019
996 Design, engineering, construction, development, finance,O&M Palanpur-Swaroopganj section,NH-14 Gujarat & Rajasthan 76.0 KM (Kilometer) 498.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 19-Aug-2019
997 Design, Engineering, Upgradation, Development, Finance, Operation and Maintenance of Hyderabad-Bangalore section of NH 7 22.1 KM (Kilometer) 747.30 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 19-Aug-2019
998 Design,Engineering,Finance,Construction,O&M,highway project of Bangalore-Nelamangala section of NH:4 from Karnataka on (BOT) 19.5 KM (Kilometer) 718.59 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 19-Aug-2019
999 Development of East Quay-I (EQ-1) berth for handling steam coal in the inner harbour of Visakhapatnam port 6.4 MTPA (Metric Tonne Per Annum) 323.70 Transport Ports (excluding captive) Operation and Maintenance Stage Visakhapatnam Port Trust Andhra Pradesh 19-Aug-2019
1000 Four Laning from Junction of NH-68 with NH-7 near Salem to Junction of NH-68 with NH-45 near Ulundrupet in Tamil Nadu on BOT 136.3 KM (Kilometer) 1,061.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 19-Aug-2019
1001 Four laning of Haryana/Punjab Border to Jind Section of NH-71 from Km 239.000 to Km 307.000 in Haryana on BOT (Toll) basis 69.35 KM (Kilometer) 438.75 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Haryana 19-Aug-2019
1002 Four laning of Pune-Solapur NH-9 road in length of 110 km under NHDP-IIIB (Pkg-I) 110.0 KM (Kilometer) 1,110.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 19-Aug-2019
1003 Four laning of Rewa to MP/UP Border of NH 7 in the State of Madhya Pradesh 89.3 KM (Kilometer) 736.70 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Aug-2019
1004 Four/Six laning of Amritsar-Pathankot Section from KM 6.082 to KM 108.502 of NH 15 Under NHDP Phase III on BOT Basis 102.4 KM (Kilometer) 705.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Punjab 19-Aug-2019
1005 Four/six laning of Reengus-Sikar road in length of 43.9 km on NH-11 under NHDP-III A 43.9 KM (Kilometer) 228.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 19-Aug-2019
1006 Improvement of Dharwad- Ramnagar Stretch 61.75 KM (Kilometer) 237.60 Transport Roads and bridges Operation and Maintenance Stage Karnataka Road Development Corporation Limited (KRDCL) Karnataka 19-Aug-2019
1007 Improvement,O&M including strengthening and widening of existing 2 lane NH 24 (Lucknow - Sitapur section) U.P(BOT) basis 75.0 KM (Kilometer) 450.41 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 19-Aug-2019
1008 Kharpada Bridge Project 1.4 KM (Kilometer) 32.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Maharashtra 19-Aug-2019
1009 Logistics Hub (Pawarkheda) Project 115.0 Acres 138.50 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Operation and Maintenance Stage Madhya Pradesh State Agriculture Marketing Board Madhya Pradesh 19-Aug-2019
1010 Maheshwaram Transmission Limited 236.0 KM (Kilometer) 345.00 Energy Electricity transmission Operation and Maintenance Stage Not Available Telangana 19-Aug-2019
1011 Maintenance of Thane Ghodabunder Road 14.9 KM (Kilometer) 246.28 Transport Roads and bridges Operation and Maintenance Stage Maharashtra State Road Development Corporation Limited (MSRDC) Maharashtra 19-Aug-2019
1012 MIHAN Coal Based Power Project 271.6 MW (Mega Watt) 1,748.00 Energy Electricity generation (grid) Operation and Maintenance Stage Maharashtra Airport Development Company Limited Maharashtra 19-Aug-2019
1013 Mumbai International Airport Project - Modernisation 40.0 MPPA (Million Passenger Per Annum) 12,630.00 Transport Airports Operation and Maintenance Stage Airports Authority of India (AAI) Maharashtra 19-Aug-2019
1014 Operation & maintenance of Badnawar-Thandla road in length of 78.8 Km in Jhabua & Dhar districts 78.8 KM (Kilometer) 44.12 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Aug-2019
1015 Operation & Maintenance of Baran-Shivpuri-Jhansi section in length of 196.1 Km of NH-27 196.1 KM (Kilometer) 19.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 19-Aug-2019
1016 Operation & maintenance of Bela-Govindgarh-Churhat road in length of 56.6 Km in Rewa & Sidhi districts 56.74 KM (Kilometer) 60.85 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Aug-2019
1017 Operation & Maintenance of Borkhedi-Wadner section in length of 57.15 Km of NH-7 57.15 KM (Kilometer) 21.58 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 19-Aug-2019
1018 Operation & maintenance of Budhni-Rehti-Nasrullaganj-Khategaon road in length of 87.6 Km in Sehore & Dewas districts 87.4 KM (Kilometer) 77.45 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Aug-2019
1019 Operation & maintenance of Chennai Bypass in length of 32.60 km. 32.6 KM (Kilometer) 480.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 19-Aug-2019
1020 Operation & maintenance of Edapally-Vytilla-Aroor section of NH-66 17.0 KM (Kilometer) 184.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Kerala 19-Aug-2019
1021 Operation & maintenance of multi chamber cold storages at Udaipur, Bhilwara & Pali districts. 5000.0 MTPA (Metric Tonne Per Annum) 5.64 Social and Commercial Infrastructure Cold Chain Operation and Maintenance Stage Rajasthan State Agriculture Marketing Board Rajasthan 19-Aug-2019
1022 Operation & maintenance of various roads in length of 95 km in Bhopal, Vidihsa & Sehore districts 95.0 KM (Kilometer) 29.20 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Aug-2019
1023 Operation and maintaenance of organic agriculture produces market complex at Sixmile, Khanapara, Guwahati on PPP mode 1.4 Acres 7.70 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Operation and Maintenance Stage Assam State Agricultural Marketing Board Assam 19-Aug-2019
1024 Patan-Tendukheda-Rehli 86.6 KM (Kilometer) 219.62 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Aug-2019
1025 Road Upgradation (Bilaspur-Katghora-Korba-Champa) Project 151.0 KM (Kilometer) 26.53 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Chhattisgarh Chhattisgarh 19-Aug-2019
1026 Road Upgradation (Chinchoti-Kaman-Anjurphata-Mankoli Road) Project 26.4 KM (Kilometer) 120.51 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 19-Aug-2019
1027 Road Upgradation (Kadapa-Pulivendula) KP-03 Project 18.0 KM (Kilometer) 81.32 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation Andhra Pradesh 19-Aug-2019
1028 Road Upgradation (Makhupura-Gujarat State Border) Project 12.0 KM (Kilometer) 11.61 Transport Roads and bridges Completed Public Works Department, Rajasthan Rajasthan 19-Aug-2019
1029 Road Upgradation (Rayalapuram-Gandluru) Project 1.0 KM (Kilometer) 17.70 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation Andhra Pradesh 19-Aug-2019
1030 Road Upgradation (Ro-Ro Point-NH-8 E) Project 14.7 KM (Kilometer) 29.36 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Gujarat Gujarat 19-Aug-2019
1031 Road Upgradation (Salumber-Banswara) Project 93.0 KM (Kilometer) 68.14 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 19-Aug-2019
1032 Road Upgradation Project (Deharda-Ishagarh ) Project 32.93 KM (Kilometer) 50.57 Transport Roads and bridges Under Construction Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Aug-2019
1033 Road Upgradation Project (Mhow-Ghatabillod) Project 27.0 KM (Kilometer) 177.30 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Aug-2019
1034 Road Upgradation Project (Sehore-Ichhawar-Kosmi) Project 50.12 KM (Kilometer) 89.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Aug-2019
1035 Road Upgradation Project (Sijhata-Hinoti-Malgaon-Khamariya-Ater) Project 32.2 KM (Kilometer) 43.56 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Aug-2019
1036 Road Upgradation Project (Sitamau-Basai-Suwasara) Project 34.97 KM (Kilometer) 54.26 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Aug-2019
1037 Two laning of Ujjain Unhel Nagda Jawra Road 95.2 KM (Kilometer) 189.05 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Aug-2019
1038 Two laning with granular shoulder from km 0.00 to km 38.00 of Lakhnadon-Ghansore section of SH 40 on DBFOT (Toll) basis 38.0 KM (Kilometer) 79.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Aug-2019
1039 Upgradation of Bhuj-Nakhtrana road in length of 44.8 Km 45.0 KM (Kilometer) 35.04 Transport Roads and bridges Operation and Maintenance Stage Gujarat State Road Development Corporation Limited (GSRDC) Gujarat 19-Aug-2019
1040 Upgradation of Uchera-Nagod-Singhpur-Kalinjer road in length of 55.6 km in Raisen district 55.56 KM (Kilometer) 115.20 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Aug-2019
1041 Upgradation of Umari-Phoop-Pratappura road in length of 43.39 km in Madhya Pradesh 43.67 KM (Kilometer) 75.29 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Aug-2019
1042 Viramgam Mehsana Gauge (Railway Track) Conversion Project 90.0 KM (Kilometer) 102.22 Transport Railway track, tunnel, viaducts, bridges Operation and Maintenance Stage Western Railway Gujarat 19-Aug-2019
1043 Waste Based Power Unit (Kathonda) 11.50 MW (Mega Watt) 177.96 Energy Renewable energy (grid) Operation and Maintenance Stage Jabalpur Municipal Corporation Madhya Pradesh 19-Aug-2019
1044 Widening of Existing 2 Lane carriageway to 4/6 lane divided carriageway of Bangalore-Hoskate-Mulbagal section of NH-4 on BOT 79.7 KM (Kilometer) 565.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 19-Aug-2019
1045 Augmentation of 200 MLD sewage treatment plant at Bhandewadi in Nagpur district 200.0 MLD (Millons Liter per day) 170.00 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Nagpur Municipal Corporation Maharashtra 16-Aug-2019
1046 Sikka 2 Captive Port Terminals Not Available 3,000.00 Transport Ports (excluding captive) Operation and Maintenance Stage Gujarat Maritime Board (GMB) Gujarat 16-Aug-2019
1047 Widening and strengthening of Wadi Raichur Road 88.0 KM (Kilometer) 82.00 Transport Roads and bridges Operation and Maintenance Stage Karnataka Road Development Corporation Limited (KRDCL) Karnataka 16-Aug-2019
1048 "DEFC",O&M of end of Durg bypass - Chhattisgarh/Maharashtra border sec. NH6 under NHDP 3A on(BOT) basis 82.6 KM (Kilometer) 464.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Chhattisgarh 14-Aug-2019
1049 Dahej LNG Terminal 5.0 MMTPA (million metric tonnes per annum) 2,287.00 Transport Ports (excluding captive) Operation and Maintenance Stage Gujarat Maritime Board (GMB) Gujarat 14-Aug-2019
1050 Design, Engineering, Construction, Development, Finance, O and M near Padalur near Trichy NH-45 Tamil Nadu on (BOT) basis 40.0 KM (Kilometer) 320.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 14-Aug-2019
1051 Four laning of Ahmedabad to Godhra section of NH 59 in the State of Gujarat under NHDP Phase III on DBFOT pattern 117.6 KM (Kilometer) 1,174.36 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 14-Aug-2019
1052 Operation & Maintenance of Kanpur-Lucknow, Lucknow bypass & Lucknow-Ayodhya section in length of 217.4 Km 217.4 KM (Kilometer) 965.56 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 14-Aug-2019
1053 Operation & maintenance of Kolaghat-Haldia section of NH-41 53.0 KM (Kilometer) 622.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) West Bengal 14-Aug-2019
1054 Rehabilitation and upgrading of Forbesganj - Jogbani road 9.25 KM (Kilometer) 322.00 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Bihar 14-Aug-2019
1055 Road Upgradation (Vadodara-Bharuch NH-8) Project 83.3 KM (Kilometer) 1,450.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 14-Aug-2019
1056 Two laning of Jhalawar-Ujjain section in length of 31.0 Km 31.0 KM (Kilometer) 75.88 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 14-Aug-2019
1057 Two laning of Khushkhera-Kasola Chowk in length of 8.5 Km 8.5 KM (Kilometer) 34.50 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 14-Aug-2019
1058 Yamuna Expressway Connecting Greater Noida to Agra 165.0 KM (Kilometer) 14,000.00 Transport Roads and bridges Operation and Maintenance Stage Yamuna Expressway Industrial Development Authority (YEA) Uttar Pradesh 14-Aug-2019
1059 Bhina-Khimalsa-Malthon Road Project 39.4 KM (Kilometer) 67.30 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 13-Aug-2019
1060 Manawar-Singhan-Kukshi 38.23 KM (Kilometer) 96.73 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 13-Aug-2019
1061 Road Upgradation Project (Biaora- Rajasthan) Project 61.0 KM (Kilometer) 221.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 13-Aug-2019
1062 140 MW Solar Photovoltaic Project in Rajasthan 140.0 MW (Mega Watt) 524.86 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Rajasthan 12-Aug-2019
1063 220 MW CCPP Tanir Bavi Barge 220.0 MW (Mega Watt) 1,400.00 Energy Electricity generation (grid) Operation and Maintenance Stage Karnataka Power Transmission Corporation Limited (KPTCL) Karnataka 12-Aug-2019
1064 300 MW Thermal power plant in Chattisgarh 300.0 MW (Mega Watt) 3,828.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Chhattisgarh 12-Aug-2019
1065 Bhesada Renew Wind Energy Project 100.8 MW (Mega Watt) 696.00 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Rajasthan 12-Aug-2019
1066 Dahej SEZ power project 1200.0 MW (Mega Watt) 5,325.39 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Gujarat 12-Aug-2019
1067 Development of Kaman Paygon Bhiwandi road 22.0 KM (Kilometer) 14.40 Transport Roads and bridges Completed Public Works Department, Maharashtra Maharashtra 12-Aug-2019
1068 Devgarh wind power project, Rajsamand district 37.5 MW (Mega Watt) 314.50 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Rajasthan 12-Aug-2019
1069 Four Laning of Pune-Khed section in 29.8 Km under NHDP-III 29.8 KM (Kilometer) 127.60 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 12-Aug-2019
1070 Four Lanning of Panagarh - Palsit Road 64.4 KM (Kilometer) 517.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) West Bengal 12-Aug-2019
1071 Karaikal Port 14.5 MMTPA (million metric tonnes per annum) 2,066.00 Transport Ports (excluding captive) Operation and Maintenance Stage Port Department, Puducherry Puducherry (UT) 12-Aug-2019
1072 Khandke Wind Farm 50.0 MW (Mega Watt) 340.88 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Maharashtra 12-Aug-2019
1073 Lalitpur Power Generation Company Ltd. 1980.0 MW (Mega Watt) 14,306.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Uttar Pradesh 12-Aug-2019
1074 Liquid Cargo Berth (JNPT) Project 6.5 MMTPA (million metric tonnes per annum) 200.00 Transport Ports (excluding captive) Operation and Maintenance Stage Jawaharlal Nehru Port Trust Maharashtra 12-Aug-2019
1075 Mundra Thermal Power Project 4620.0 MW (Mega Watt) 22,001.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Gujarat 12-Aug-2019
1076 Operation & Maintenance of Hyderabad-Bangalore section in length of 251.2 Km 251.2 KM (Kilometer) 48.60 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 12-Aug-2019
1077 Pench IV (Godhani)water treatment plant 115.0 MLD (Millons Liter per day) 25.00 Water Sanitation Water treatment plants Operation and Maintenance Stage Nagpur Municipal Corporation Maharashtra 12-Aug-2019
1078 Prayagraj Power Generation Co. Ltd. - Coal based super-critical thermal power project 1980.0 MW (Mega Watt) 15,537.00 Energy Electricity generation (grid) Operation and Maintenance Stage Prayagraj Power Generation Co. Ltd Uttar Pradesh 12-Aug-2019
1079 Sagar-Damoh Road Project 68.8 KM (Kilometer) 130.30 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 12-Aug-2019
1080 Thermal Power Project in Janjgir-Champa District 1200.0 MW (Mega Watt) 8,464.00 Energy Electricity generation (grid) Operation and Maintenance Stage Athena Chhattisgarh Power Limited�(ACPL) Chhattisgarh 12-Aug-2019
1081 Vemagiri Power Generation Limited 388.0 MW (Mega Watt) 1,150.00 Energy Electricity generation (grid) Operation and Maintenance Stage GMR Vemagiri Power Generation Limited Andhra Pradesh 12-Aug-2019
1082 Vishnu Prayag HEP (400 MW) 400.0 MW (Mega Watt) 1,694.00 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Uttarakhand 12-Aug-2019
1083 "DCDF", O&M of Islam Nagar Nagpur-Hyderabad sec.NH7 Andhra Pradesh NHDP-2 on BOT (Annuity) basis 53.0 KM (Kilometer) 518.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Telangana 09-Aug-2019
1084 Construction of ring road in length of 18 km in Bellary 18.0 KM (Kilometer) 90.00 Transport Roads and bridges Operation and Maintenance Stage Bellary Urban Development Authority (BUDA) Karnataka 09-Aug-2019
1085 Four Laning of following State Highways in Madhya Pradesh : Joura-Nnayagaon 127.8 KM (Kilometer) 730.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Aug-2019
1086 Hydro Electric Power (Barvi) Project 5.0 MW (Mega Watt) 53.00 Energy Renewable energy (grid) Operation and Maintenance Stage Maharashtra Industrial Development Corporation Maharashtra 09-Aug-2019
1087 Implementation of 600 TPD solid waste management in Faridabad 600.0 TPD (Tonne per day) 37.33 Water Sanitation Solid waste management Operation and Maintenance Stage Municipal Corporation of Faridabad Haryana 09-Aug-2019
1088 IT Expressway (Three-lane carriageway) 20.0 KM (Kilometer) 290.00 Transport Roads and bridges Operation and Maintenance Stage Highway Department, Government of Tamil Nadu Tamil Nadu 09-Aug-2019
1089 Nellore-Tada Road 110.5 KM (Kilometer) 511.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 09-Aug-2019
1090 Operation & maintenance of Rajiv Gandhi Sea Link Project 5.0 KM (Kilometer) 11.00 Transport Roads and bridges Operation and Maintenance Stage Maharashtra State Road Development Corporation Limited (MSRDC) Maharashtra 09-Aug-2019
1091 Providing fixing & maintenance of overhead signage & foot bridges on roads of JDA region Not Available 8.20 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Jaipur Development Authority Rajasthan 09-Aug-2019
1092 Road Upgradation Project (Harda-Chhipaner) Project 29.3 KM (Kilometer) 38.60 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 09-Aug-2019
1093 Development of road from NH-63 near Ginigere-Gangavathi to Sindhanur 83.0 KM (Kilometer) 190.16 Transport Roads and bridges Operation and Maintenance Stage Karnataka Road Development Corporation Limited (KRDCL) Karnataka 08-Aug-2019
1094 Two laning of Whaghari- Ribbanpally stretch 141.2 KM (Kilometer) 242.75 Transport Roads and bridges Operation and Maintenance Stage Karnataka Road Development Corporation Limited (KRDCL) Karnataka 08-Aug-2019
1095 4 laning of Ghaghar Bridge(Indo Nepal Border) to Varanasi section from Km 121.8 to Km 298.45 of NH 233 in UP on BOT (Toll) basis 177.652 KM (Kilometer) 2,200.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Uttar Pradesh 06-Aug-2019
1096 Four laning of Muzzafarnagar-Nepali farm section of NH 58 in Uttar Pradesh and Uttrakhand from Nepali to ISBT Dehradun 97.0 KM (Kilometer) 1,251.42 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Multi State/ Centre 06-Aug-2019
1097 Four-laning of Jabalpur- Kanti- Rewa Section of NH-7 from km 242.30 to km 465.50 in MP on BOT (Toll) 65.0 KM (Kilometer) 1,906.83 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Madhya Pradesh 06-Aug-2019
1098 Ichchhapore - Hazira Not Available 16.00 Transport Roads and bridges Operation and Maintenance Stage Roads and Buildings Department, Gujarat Gujarat 06-Aug-2019
1099 Four laning of Kundapur to Suratkal section and Mangalore-Kerala border section of NH 17 on BOT Basis 90.28 KM (Kilometer) 616.00 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Karnataka 31-Jul-2019
1100 Design, Engineering, Finance, Construction, Operation and Maintenance of 4 laning of Bijapur-Hungund section of NH13 on DBFOT 97.0 KM (Kilometer) 1,226.37 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Karnataka 25-Jul-2019
1101 Two /Four laning with PSS of Gadu to Dwaraka section on NH 8E from km 263.000 to km 473.000 inGujarat on DBFOT pattern Not Available 1,528.72 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Gujarat 24-Jul-2019
1102 Two laning with PSS a section, between Kerala Border to Kollegal section of NH-212 inKarnataka on BOT (Toll) basis under NHDP-IV 150.041 KM (Kilometer) 523.49 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Karnataka 24-Jul-2019
1103 Two-laning with PSS section, between Bijapur, Gulbarga, Homnabad section of NH 218 from Km 195 to Km 418 on BOT (Toll) 220.47 KM (Kilometer) 680.73 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Rajasthan 24-Jul-2019
1104 Two/ four laning of Obedullaganj -Shahganj Junction, Budhni- Betul Section of NH 69� under NHDP-IV, length� 121.36 km Not Available 1,152.00 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Madhya Pradesh 24-Jul-2019
1105 Four-laning of Rewa - Sidhi section of NH -75E in the State of Madhya Pradesh 80.6 KM (Kilometer) 627.87 Transport Roads and bridges Under Construction Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 23-Jul-2019
1106 Rehabilitation, strengthening and 4 laning of Ramban to Banihal section of NH 1A in Jammu and Kashmir 32.1 KM (Kilometer) 986.00 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Jammu & Kashmir 23-Jul-2019
1107 Rehabilitation, strengthening and Four laning of Udhampur to Ramban section of NH 1A from km 67 to km 89 & km 130 to km 151 40.07 KM (Kilometer) 971.00 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Jammu & Kashmir 23-Jul-2019
1108 2 laning from 0 to km7.95( Katni Bypass) & 4.6 to 245km of Katni-Shahdol-Anooppur to MP/CG Border section on NH-78 234.0 KM (Kilometer) 811.47 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Madhya Pradesh 22-Jul-2019
1109 Development and Operation of Suratgarh-Sriganganagar section of NH 15 in the State of Rajasthan 78.11 KM (Kilometer) 224.03 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 22-Jul-2019
1110 Four laning of Phagwara-Rupnagar of NH-344A in Punjab on Hybrid Annuity Mode (total 80.82 KM) 80.82 KM (Kilometer) 1,444.00 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Punjab 22-Jul-2019
1111 Two-laning with Paved Side Shoulder (PSS) of Bihta- Mahabalipur-Aurangabad section of SH-2 & NH-98 118.0 KM (Kilometer) 362.00 Transport Roads and bridges Under Construction Bihar State Road Development Corporation Limited Bihar 22-Jul-2019
1112 2 laning with paved shoulder/4 laning of Tamil Nadu/Karnataka Border to Bangalore section of NH-209 on DBFOT (Toll) basis 191.89 KM (Kilometer) 693.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Karnataka 19-Jul-2019
1113 2/4 laning of Vikravandi-Meensuruti Section of NH-45C and 2 laning with PSS from Meensuruti 93.5km to Thanjavur 164.614km 164.22 KM (Kilometer) 1,090.00 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Tamil Nadu 19-Jul-2019
1114 4 laning of Chandikhole-Dubari-Talchar Secton of NH 200, 301.89-428.03km including km 8.5- km 15.75�in Orissa 132.5 KM (Kilometer) 1,273.00 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Odisha 19-Jul-2019
1115 4 laning of Jorhat-Demow section from Km 453 to 534.8 (part of Nagaon-Dirbugah section) of NH 37 in Assam on BOT (Annuity) basis Not Available 562.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Assam 19-Jul-2019
1116 4 laning with PSS of Jodhpur-Pali section of NH-65 and Pali bypass starting from on DBFOT (Toll) basis 70.0 KM (Kilometer) 425.00 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 19-Jul-2019
1117 Construction of Access Controlled Highways from Km. 10/0 to Km. 29/5 of Bangolore section of NH-4 inKarnataka on BOT basis Not Available 380.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Karnataka 19-Jul-2019
1118 Construction of Elevated Six Lane Highway(Flyover) from Km 16(Delhi) to Km 20.5(Haryana) and its approaches on NH2 on BOT basis. 4.4 KM (Kilometer) 570.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 19-Jul-2019
1119 Construction of new bridges and O&M of 4-laned road of the Baleshwar-Kharagpur section of NH60 from 0-119.3 km on BOT (Toll) 119.3 KM (Kilometer) 480.38 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 19-Jul-2019
1120 Design Engineering,Construction,Development, Finance and Operation and maintenance of MP/Maharashtra Border Dhule section of NH3 97.0 KM (Kilometer) 1,420.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 19-Jul-2019
1121 Design, Engineering, Finance, Construction, O&M of 4 laning of Bijapur-Hungund section of NH 13 on DBFOT basis 100.0 KM (Kilometer) 748.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 19-Jul-2019
1122 Four -laning of Orrisa border to Aurang section of NH-6 from km 88 to km 239 in Chattisgarh on DBFOT (Toll) basis 150.0 KM (Kilometer) 1,234.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Chhattisgarh 19-Jul-2019
1123 Four laning of Baihata Chariali to Tejpur Section of NH-52 (Km 0.00 to km 130.00) inAssam under NHDP Phase III on BOT basis. Not Available 1,203.46 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Assam 19-Jul-2019
1124 Four laning of Beawar Pali Pindwara Section of NH 14 from km 0 to km 244.12 in Rajasthan on BOT(Toll) basis� 244.12 KM (Kilometer) 2,388.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 19-Jul-2019
1125 Four laning of Hazaribagh-Ranchi stretch of NH33 from Km 40.5 to Km114 including Kujju bypass in Jharkhand on BOT(Annuity) Basis 73.7 KM (Kilometer) 625.07 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Jharkhand 19-Jul-2019
1126 Four laning of Hospet-Chitradurga section of NH-13 from km 299 to km 418.6 in Karnataka on BoT (Toll) basis 120.0 KM (Kilometer) 1,388.00 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Karnataka 19-Jul-2019
1127 Four laning of Lucknow Raebarelly Section of NH-24 B from km 12.700 to km 82.700 on BoT (Annuity) under NHDP Phase-IV B inU.P. 70.0 KM (Kilometer) 635.90 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 19-Jul-2019
1128 Four laning of Nagpur Wainganga Bridge Section of NH 6 from km 498 to km 544.2 in Maharashtra on BOT(Toll) basis� 60.0 KM (Kilometer) 484.19 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 19-Jul-2019
1129 Four laning of PSS of Sangrur - Punjab/Haryana border section of NH - 71 in Punjab on BOT (Toll) basis Not Available 481.59 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Punjab 19-Jul-2019
1130 Four laning of Raiganj-Dalkhola section of NH 34 from km 398 to km 452.700 inWest Bangal on DBFOT basis under NHDP III 54.7 KM (Kilometer) 560.16 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) West Bengal 19-Jul-2019
1131 Four laning of Rampur-Kathgodam section of NH-87 from km 0 to km 88 in UP and Uttarakhand on BoT (Toll) basis 88.0 KM (Kilometer) 790.00 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Uttarakhand 19-Jul-2019
1132 Four-laning of Rajsamand-Bhilwara section of NH-(78, 79 & 8) from km 0 to km 87.250 inRajasthan on BOT (Toll) basis. 87.2 KM (Kilometer) 677.79 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 19-Jul-2019
1133 Four/Six Laning of Jaipur-Tonk-Deoli section of NH 12 from km 18.7 to km 165 (length 148.77 kms) inRajasthan on BOT (Toll) basis 148.9 KM (Kilometer) 1,733.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 19-Jul-2019
1134 Four/Two-laning of Baharagora to Sambalpur Section from km 200.00 to 566.000 Section of NH-6 in Orissa on BOT (Toll) basis 368.2 KM (Kilometer) 1,948.64 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Odisha 19-Jul-2019
1135 Six laning of Belgaum-Dharwad section of NH 4 from Km 515 to km 433 and Km 0 to Km62 in Karnataka under NHDP V on BOT basis 144.0 KM (Kilometer) 637.50 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 19-Jul-2019
1136 Six Laning of Chilkaluripet-Vijayawada, including Guntur bypass and Mangalagiri bypass of Chennai-Vijayawada Section of NH-5 67.7 KM (Kilometer) 572.30 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 19-Jul-2019
1137 Six laning of Samakhiali-Gandhidham section of NH 8A from km 306 to km 362.16 in Gujarat on BOT (Toll) basis on DBFO pattern 56.1 KM (Kilometer) 805.39 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 19-Jul-2019
1138 Six/Four Laning of Zirakpur - Parwanoo section of NH-22 including Pinjore - Kalka - Parwanoo bypass in Punjab, Haryana and HP 28.6 KM (Kilometer) 295.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 19-Jul-2019
1139 Two laning with paved shoulders of Raibarelly-Jaunpur Section of NH-231 from Km 0 to Km 166.4 in UP on BoT (Annuity) basis 166.4 KM (Kilometer) 993.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 19-Jul-2019
1140 Design, Engineering, Construction, Finance and Maintenance of Jaipur Reengus section of NH 11 51.8 KM (Kilometer) 343.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 18-Jul-2019
1141 Development of Hyderabad-Vijayawada section and additional 2 Laning/future 6 Laning of NH 9 in Andhra Pradesh (km 160- km 221.5) 61.5 KM (Kilometer) 492.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 18-Jul-2019
1142 Development of Hyderabad-Vijayawada section and additional 2 Laning/future 6 Laning of NH 9 in Andhra Pradesh (km 40 to km 160) 120.0 KM (Kilometer) 1,740.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 18-Jul-2019
1143 Development of Sinnar-Nashik section of NH-50 (from km 177.0001 to 201.350) with 4-lane through DBFOT (Toll)] basis. 25.31 KM (Kilometer) 312.96 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 18-Jul-2019
1144 Eight laning of Mukarba Chowk to Panipat of NH 1 (DEL-HRY) 72.0 KM (Kilometer) 2,128.72 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Haryana 18-Jul-2019
1145 Four laining of Gomti-Chauraha - Udaipur Section of NH - 8 , km 177.000 to km 260. 10 under NHDP�- IV A on BOT (Toll) Basis 83.0 KM (Kilometer) 1,114.27 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 18-Jul-2019
1146 Four Laning from Trichy city of NH-45 to Dindigul on NH-45 in the state of Tamil Nadu under NHDP Phase III A on BOT basis 88.2 KM (Kilometer) 600.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 18-Jul-2019
1147 Four laning of Amritsar Wagha Boarder Section from Km.455.400 to Km 491.330 of NH-I in the State of Punjab on BOT basis. 35.9 KM (Kilometer) 206.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Punjab 18-Jul-2019
1148 Four laning of Armur-Adloor Yellareddy section of NH7 in the State of Andhra Pradesh 60.0 KM (Kilometer) 491.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Telangana 18-Jul-2019
1149 Four laning of Biora - Dewas section of NH-3 from Km 426.100 to Km 566.450 in the state of Madhya Pradesh under NHDP phase IV 140.4 KM (Kilometer) 1,583.79 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Madhya Pradesh 18-Jul-2019
1150 Four Laning of Devilalli Hassan Section of NH- 48 in the state of Karnataka under NHDP phase III A on BOT basis 79.0 KM (Kilometer) 453.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 18-Jul-2019
1151 Four laning of Hoskate-Dabespet Section on NH-207 in the State of Karnataka under NHDP Phase IV on DBFOT (Toll) basis 80.02 KM (Kilometer) 720.69 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Karnataka 18-Jul-2019
1152 Four laning of Hyderabad-Yadgiri section of NH 202 in the State of Andhra Pradesh under NHDP Phase III on BOT basis 35.6 KM (Kilometer) 514.91 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Telangana 18-Jul-2019
1153 Four laning of Jetput - Somnath Section of NH 80 in the State of Gujarat 123.0 KM (Kilometer) 828.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 18-Jul-2019
1154 Four laning of Kazhakkuttam to Mukkola section in the State of Kerala 26.798 KM (Kilometer) 577.95 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Kerala 18-Jul-2019
1155 Four Laning of Khalghat-MP/ Maharashtra Border section of NH-3 from Km. 84.700 to Km.167.500 in the state of M.P. on BOT basis. 82.8 KM (Kilometer) 549.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Madhya Pradesh 18-Jul-2019
1156 Four laning of Kuttipuram-Edapally section of NH17 in the state of Kerala Not Available 1,157.92 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Kerala 18-Jul-2019
1157 Four laning of Mangwan to� Satna to Bela section of NH 75 under VGF Scheme, length 48.04 km Not Available 320.48 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Madhya Pradesh 18-Jul-2019
1158 Four laning of Patna-Buxar section of NH 30 in the state of Bihar Not Available 1,619.83 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Bihar 18-Jul-2019
1159 Four Laning of Pondicherry to Tindivanam on NH-66 in the state of Tamil Nadu under NHDP Phase III A on BOT basis 38.6 KM (Kilometer) 285.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Puducherry (UT) 18-Jul-2019
1160 Four laning of Rohtak to Bawal Section of NH 71 in the state of Haryana on DBFOT basis under NHDP III 83.6 KM (Kilometer) 669.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Haryana 18-Jul-2019
1161 Four laning of Rohtak to Panipat section of NH 71A from km 0 to km 80.858 in the state of Haryana on BOT basis under NHDP III 80.8 KM (Kilometer) 1,087.83 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Haryana 18-Jul-2019
1162 Four laning of Sambalpur Baragarh of Orissa/Chhatisgarh border section of NH 6 from Km 0 to Km 88 in Orissa� 88.0 KM (Kilometer) 1,142.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Odisha 18-Jul-2019
1163 Four laning of Talegaon - Amravati section of NH 6 in Maharashtra on DBFOT basis 67.8 KM (Kilometer) 610.59 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 18-Jul-2019
1164 Four Laning of Trivandrum, Kerala/ Tamil Nadu border including Trivandrum by-pass (Package I) Not Available 822.41 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Kerala 18-Jul-2019
1165 Four Laning of Walayar to Vadakkancherry Section (Package No.NS-2/BOT/KL-2) 58.0 KM (Kilometer) 901.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Kerala 18-Jul-2019
1166 Four-laning of Bhuban-Dubari-Chandikhole section of NH-200 in Odisha under NHDP-III on DBFOT (Toll) basis. 62.185 KM (Kilometer) 652.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Odisha 18-Jul-2019
1167 Four-laning of Rohtak - Hisar Section of NH-10 connecting to NH-71, in Haryana under NHDP-III on BOT (Toll) basis 98.8 KM (Kilometer) 959.25 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Haryana 18-Jul-2019
1168 Four-laning with PSS of Jabalpur-Bhopal section of NH-12 from km 10.400 to km 301.800 under NHDP Phase III on BOT (Toll) basis 294.21 KM (Kilometer) 2,485.96 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Madhya Pradesh 18-Jul-2019
1169 Mechanisation of WQ-1� Berth in the Inner Harbour of Visakhapatanam� Port for handling Iron Ore on DBFOT Basis 280.0 Meter 275.20 Transport Ports (excluding captive) Under Construction Ministry of Shipping Andhra Pradesh 18-Jul-2019
1170 Six Laning of Chennai-Tada Section of NH-5 (43 Km) in Tamil Nadu 43.4 KM (Kilometer) 353.37 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 18-Jul-2019
1171 Six laning of Dankuni - Baleshwar section of NH 6 in West Bengal� 111.0 KM (Kilometer) 2,034.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways West Bengal 18-Jul-2019
1172 Six Laning of Kishangarh-Ajmer-Beawar Section from KM 364.125 to KM 58.245 of NH 8 on BOT Basis 92.3 KM (Kilometer) 1,712.77 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 18-Jul-2019
1173 Six laning of NH 4 from Tumkur to Chitradurga in Karnataka under NHDP Phase V on BOT (Toll) on DBFO pattern 114.0 KM (Kilometer) 1,200.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 18-Jul-2019
1174 Six laning of NH7 from Hosur to Krishnagiri on NH93 in Tamil Nadu 59.8 KM (Kilometer) 535.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 18-Jul-2019
1175 Six Laning of Pimpalgaon-Nashik-Gonde section of NH-3 in the State of Maharashtra under NHDP Phase IIIA on BOT basis. 60.0 KM (Kilometer) 1,691.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 18-Jul-2019
1176 Six laning of Poonamallee-Walajapet section of NH 4 under NHDP V on BOT(Toll) basis 93.0 KM (Kilometer) 1,548.61 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Tamil Nadu 18-Jul-2019
1177 Six Laning of Surat-Dahisar Section of NH-8 (239 Km) in Gujarat and Maharashtra 239.0 KM (Kilometer) 2,853.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 18-Jul-2019
1178 Two laning of Deali - Kota section of NH 12 on Kota bypass in Rajasthan 83.04 KM (Kilometer) 823.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 18-Jul-2019
1179 Two laning of Purnea-Khagaria section of NH 31 in the State of Bihar under NHDP Phase III on BOT (Annuity) basis� 140.0 KM (Kilometer) 676.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Bihar 18-Jul-2019
1180 Aurangabad Paithan and Baramati-Phaltan-Lonand-Shirwal Road projects 77.9 KM (Kilometer) 355.65 Transport Roads and bridges Under Construction Public Works Department, Maharashtra Maharashtra 17-Jul-2019
1181 Bhind-Mihona-Gopalpur Road project 50.9 KM (Kilometer) 82.10 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1182 Construction of Bridge across river Godavari 4.15 KM (Kilometer) 1,070.00 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation Andhra Pradesh 17-Jul-2019
1183 Construction of new four lane connecting Lebad to Manpur 34.3 KM (Kilometer) 206.53 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1184 Damoh- Jabalpur Road Project 98.5 KM (Kilometer) 249.60 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1185 Development of 400 kV DCDS Sarni (Satpura)-Ashta transmission line project under DBFOT (Toll) 240.0 KM (Kilometer) 282.70 Energy Electricity transmission Operation and Maintenance Stage Madhya Pradesh Power Transmission Company Limited Madhya Pradesh 17-Jul-2019
1186 Development of Food grain Silos at Kaimur and Buxer, Bihar on DBFOT basis through PPP mode 100000.0 MT (Metric Tonne ) 65.28 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Pre-construction Stage Food Corporation of India Bihar 17-Jul-2019
1187 Development of Modern Silos for storage of Wheat on DBFOT basis under PPP mode at Borivali, Maharashtra 50000.0 MT (Metric Tonne ) 41.52 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Pre-construction Stage Food Corporation of India Maharashtra 17-Jul-2019
1188 Development of Modern Silos for storage of Wheat on DBFOT basis under PPP mode at Dhamora, Uttar Pradesh 50000.0 MT (Metric Tonne ) 37.86 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Pre-construction Stage Food Corporation of India Uttar Pradesh 17-Jul-2019
1189 Development of Silos for storage of wheat on DBFOT basis under PPP mode at Kotkapura, Punjab 25000.0 MT (Metric Tonne ) 35.62 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Operation and Maintenance Stage Ministry of Consumer Affairs, Food & Public Distribution, Government of India Punjab 17-Jul-2019
1190 Development of two lane Road of Beawer- Gomti section of NH 8 118.9 KM (Kilometer) 195.00 Transport Roads and bridges Under Construction Ministry of Road Transport and Highways Rajasthan 17-Jul-2019
1191 Development, operation and maintenace of Chomu chandwaji on SH-8B (total 15.4 km) 15.6 KM (Kilometer) 40.00 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 17-Jul-2019
1192 Four Laning of following State Highways in Madhya Pradesh : Bhopal, Devas 143.2 KM (Kilometer) 640.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1193 Four Laning of Halol-Godhra-Shamlaji Road 173.0 KM (Kilometer) 1,422.00 Transport Roads and bridges Operation and Maintenance Stage Gujarat State Road Development Corporation Limited (GSRDC) Gujarat 17-Jul-2019
1194 Four laning of Hyderabad-Karimnagar-Ramagundam Road Project 207.0 KM (Kilometer) 2,209.00 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation Telangana 17-Jul-2019
1195 Four laning of Jam Warora-Chandrapur-Rajura-Asifabad Road section of SH 266 40.0 KM (Kilometer) 228.26 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 17-Jul-2019
1196 Four laning of Lebad-Jaora section of SH 31 in Madhya Pradesh 125.0 KM (Kilometer) 682.50 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1197 Four laning of Manjarsumba-Lokhandi-Sawargaon-Latur Not Available 203.00 Transport Roads and bridges Under Construction Public Works Department, Maharashtra Maharashtra 17-Jul-2019
1198 Four-laning of Ahmedabad � Viramgam - Maliya road 180.0 KM (Kilometer) 1,397.00 Transport Roads and bridges Operation and Maintenance Stage Gujarat State Road Development Corporation Limited (GSRDC) Gujarat 17-Jul-2019
1199 Four-laning of Ahmednagar-Karmala road (SH-141) km 0.00 to km 80.6 road 59.5 KM (Kilometer) 638.20 Transport Roads and bridges Under Construction Public Works Department, Maharashtra Maharashtra 17-Jul-2019
1200 Four-laning of Rajkot-Jamnagar-Vadinar road 131.7 KM (Kilometer) 1,096.00 Transport Roads and bridges Operation and Maintenance Stage Gujarat State Road Development Corporation Limited (GSRDC) Gujarat 17-Jul-2019
1201 Four-laning with paved shoulders of Rewa-Ring Road section from km 229.10 of NH-7 to km 6.2 of SH-9 under DBFOT (Toll) 8.3 KM (Kilometer) 74.20 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1202 HVPNL 400 KV Jhajjar Power Transmission Project in Haryana on DBFOT basis 400.0 KV (Kilo Volt) 444.00 Energy Electricity transmission Operation and Maintenance Stage Haryana Vidyut Prasaran Nigam Limited Haryana 17-Jul-2019
1203 Improvement of Karanji-Chandrapur Road section of MSH - 6 & 7 on DBFOT basis 85.11 KM (Kilometer) 498.77 Transport Roads and bridges Under Construction Public Works Department, Maharashtra Maharashtra 17-Jul-2019
1204 Jam Warora-Chandrapur-Ballarpur-Bamni Road project 64.0 KM (Kilometer) 688.62 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 17-Jul-2019
1205 Providing VGF Funding for Construction of Silo at Changsari, Assam - Proposed by FPD 50000.0 MT (Metric Tonne ) 42.48 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Under Construction Food Corporation of India Assam 17-Jul-2019
1206 Providing VGF Funding for Construction of Silo at Narela, Delhi - Proposed by FPD 50000.0 MT (Metric Tonne ) 41.84 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Pre-construction Stage Food Corporation of India Delhi (UT) 17-Jul-2019
1207 Sehora-Majhgawan 39.85 KM (Kilometer) 92.65 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1208 Strengthening and widening of Sarkhej Bhavanagar highway Not Available 883.04 Transport Roads and bridges Operation and Maintenance Stage Gujarat State Road Development Corporation Limited (GSRDC) Gujarat 17-Jul-2019
1209 Strengthening and Widening of two lane road with paved shoulders of Bhuj - Bachau Section of SH-42 in the State of Gujarat 77.0 KM (Kilometer) 256.94 Transport Roads and bridges Under Construction Gujarat State Road Development Corporation Limited (GSRDC) Gujarat 17-Jul-2019
1210 Strengthening of Chandpur-Alirajpur-Kukshi-Badwani State Highways in Madhya Pradesh 99.1 KM (Kilometer) 144.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1211 Strengthening of Mandsaur-Sitamau Road (Upto Rajasthan Border) State Highway in Madhya Pradesh 44.0 KM (Kilometer) 42.30 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1212 Strengthening of Matkuli-Tamia-Chindwara State Highways in Madhya Pradesh 112.0 KM (Kilometer) 213.30 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1213 Two lane with paved side shoulders of Rawatsar-Nohar-Bhadra section of MDR 18 118.0 KM (Kilometer) 285.10 Transport Roads and bridges Operation and Maintenance Stage Road Infrastructure Development Company of Rajasthan Limited Rajasthan 17-Jul-2019
1214 Two laning of Ashoknagar-Vidisha 35.68 KM (Kilometer) 87.06 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1215 Two laning of Betul-Sarni-Tikadhan-Junnardeo-Parasia section of SH 43 in MP on BOT(Toll) 124.1 KM (Kilometer) 238.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1216 Two laning of Bina-Kurwal-Sironj 56.1 KM (Kilometer) 107.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1217 Two laning of Chomu to Mahla via Renwal Jobner 89.0 KM (Kilometer) 270.00 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 17-Jul-2019
1218 Two laning of Damoh - Katni section of SH-14 with NH-7 at km 366.1 under DBFOT (Toll) 117.93 KM (Kilometer) 272.07 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1219 Two laning of Guna-Ashoknagar-Ishagarh Project (SH 20) on BOT basis 76.15 KM (Kilometer) 105.10 Transport Roads and bridges Under Construction Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1220 Two laning of Jhabua-Jobat-Zeerpanya-Bagh-Kukshi section of SH 39 in MP on BOT(Toll) 92.42 KM (Kilometer) 158.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1221 Two laning of Khandwa-Dehtala-Burhanpur section of SH 50 in MP on BOT (Toll) 127.1 KM (Kilometer) 224.40 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1222 Two laning of Morinda, Kurali, Siswan, H.P. Border Road (MDR-31)on BOT (Toll) 29.7 KM (Kilometer) 78.59 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Punjab Punjab 17-Jul-2019
1223 Two laning of Ratlam-Sailana-Banswada-section (MP - Rajasthan Border) at km 42.6 on SH-39 under DBFOT (Toll) 43.6 KM (Kilometer) 118.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1224 Two laning with granular shoulder from km 0/10 to km 67/10 of Balaghat to Baihar section of SH 26 on DBFOT (Toll) basis 66.7 KM (Kilometer) 122.97 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Jul-2019
1225 Two-laning with paved side shoulder in Northern Kota Bypass 14.65 KM (Kilometer) 136.89 Transport Roads and bridges Under Construction Urban Improvement Trust, Kota Rajasthan 17-Jul-2019
1226 Upgradation of Narnaul to Kotputli- Chala- Sikar-Khud- Losal- Kuchaman State Highway Not Available 357.75 Transport Roads and bridges Operation and Maintenance Stage Rajasthan State Road Development and Construction Corporation Limited Rajasthan 17-Jul-2019
1227 Construction of 17 km long four lane Laddowal Bypass in Ludhiana district 17.0 KM (Kilometer) 392.00 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Punjab 16-Jul-2019
1228 Four laning of Ajmer to Nagaur section on NH 89 from km 0.000 to km 161.000 in the State of Rajasthan 148.25 KM (Kilometer) 377.15 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 16-Jul-2019
1229 Four Lanning of Hubli-Haveri section in length of 63.4 km 63.4 KM (Kilometer) 262.94 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 16-Jul-2019
1230 Road Upgradation (Kante-Waked) Project 50.9 KM (Kilometer) 805.59 Transport Roads and bridges Pre-construction Stage National Highways Authority of India (NHAI) Maharashtra 16-Jul-2019
1231 Six laning of Ranastalam-Anandpuram section in length of 47 km 47.0 KM (Kilometer) 1,041.62 Transport Roads and bridges Pre-construction Stage National Highways Authority of India (NHAI) Andhra Pradesh 16-Jul-2019
1232 Setting up of 9 MW Balargha small hydel power unit in Kullu district 9.0 MW (Mega Watt) 77.68 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh Himachal Pradesh 23-Jun-2019
1233 Four laning of Ahmednagar-Kopargaon road in length of 55.5 Km 55.5 KM (Kilometer) 234.00 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 22-Jun-2019
1234 Aircel 2012-13 Not Available 669.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1235 Aircel 2013-14 Not Available 502.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1236 Aircel 2014-15 Not Available 5,548.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1237 Aircel 2015-16 Not Available 4,758.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1238 Bharat Broadband Network Limited 2012-13 Not Available 0.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1239 Bharat Broadband Network Limited 2013-14 Not Available 0.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1240 Bharat Broadband Network Limited 2014-15 Not Available 238.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1241 Bharat Broadband Network Limited 2015-16 Not Available 1,048.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1242 Bharat Broadband Network Limited 2016-17 Not Available 4,900.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1243 Bharat Sanchar Nigam Limited 2012-13 Not Available 3,892.73 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1244 Bharat Sanchar Nigam Limited 2013-14 Not Available 7,103.48 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1245 Bharat Sanchar Nigam Limited 2014-15 Not Available 5,446.24 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1246 Bharat Sanchar Nigam Limited 2015-16 Not Available 3,644.53 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1247 Bharat Sanchar Nigam Limited 2016-17 Not Available 4,719.64 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1248 Bharat Sanchar Nigam Limited till 2011-12 Not Available 170,671.16 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1249 Bharti Airtel Limited 2012-13 Not Available 9,657.10 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1250 Bharti Airtel Limited 2013-14 Not Available 4,614.60 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1251 Bharti Airtel Limited 2014-15 Not Available 20,989.70 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1252 Bharti Airtel Limited 2015-16 Not Available 48,446.70 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1253 Bharti Airtel Limited 2016-17 Not Available 1,072.80 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1254 Bharti Airtel Limited investment till 2011-12 Not Available 66,906.80 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1255 Development of Terminal with Four Shore connected berths at Kakinada Port 40.0 MMTPA (million metric tonnes per annum) 1,320.00 Transport Ports (excluding captive) Operation and Maintenance Stage Department of Ports, Andhra Pradesh Andhra Pradesh 21-Jun-2019
1256 Gangavaram Port Project - Phase I 100.0 MTPA (Metric Tonne Per Annum) 1,696.00 Transport Ports (excluding captive) Operation and Maintenance Stage Department of Ports, Andhra Pradesh Andhra Pradesh 21-Jun-2019
1257 Green Field Super Speciality Hospital (Bathinda) 200.0 Beds 87.02 Social and Commercial Infrastructure Health Care Operation and Maintenance Stage Punjab Health Systems Corporation Punjab 21-Jun-2019
1258 IDEA India Limited 2012-13 Not Available 23,933.90 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1259 IDEA India Limited 2013-14 Not Available 4,195.41 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1260 IDEA India Limited 2014-15 Not Available 74,690.06 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1261 IDEA India Limited 2015-16 Not Available 39,007.73 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1262 IDEA India Limited 2016-17 Not Available 19,306.62 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1263 IDEA India Limited till 2011-12 Not Available 36,032.31 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1264 Implementation of 20 MLD sewage treatment plant at Udaipur 20.0 MLD (Millons Liter per day) 20.00 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Udaipur Municipal Corporation Rajasthan 21-Jun-2019
1265 Improvement of Alwar - Bhiwari Road 79.0 KM (Kilometer) 18.62 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 21-Jun-2019
1266 Mahanagar Telephone Nigam Limited 2012-13 Not Available 526.19 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1267 Mahanagar Telephone Nigam Limited 2013-14 Not Available 665.06 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1268 Mahanagar Telephone Nigam Limited 2014-15 Not Available 559.11 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1269 Mahanagar Telephone Nigam Limited 2015-16 Not Available 543.73 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1270 Mahanagar Telephone Nigam Limited 2016-17 Not Available 311.04 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1271 Mahanagar Telephone Nigam Limited till 2011-12 Not Available 30,117.01 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1272 Operation & maintenance of Allahabad bypass in length of 85 Km 85.0 KM (Kilometer) 1,285.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 21-Jun-2019
1273 Operation & maintenance of Garamore to Samakhiyali section in length of 52 km of NH-8A (New NH-27) 52.0 KM (Kilometer) 339.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 21-Jun-2019
1274 Reliance Communication 2012-13 Not Available 1,849.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1275 Reliance Communication 2013-14 Not Available 1,970.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1276 Reliance Communication 2014-15 Not Available 1,413.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1277 Reliance Communication 2015-16 Not Available 2,852.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1278 Reliance Communication 2016-17 Not Available 10,069.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1279 Reliance Communication till 2011-12 Not Available 52,455.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1280 Reliance Jio Infocom Limited 2012-13 Not Available 2,247.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1281 Reliance Jio Infocom Limited 2013-14 Not Available 14,181.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1282 Reliance Jio Infocom Limited 2014-15 Not Available 43,485.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1283 Reliance Jio Infocom Limited 2015-16 Not Available 17,100.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1284 Reliance Jio Infocom Limited 2016-17 Not Available 50,554.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1285 Road Upgradation (Jabalpur-Narsinghpur-Piparia) Project 141.37 KM (Kilometer) 75.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 21-Jun-2019
1286 Road Upgradation Project (Mundi-Punasa-Sulagoan-Sanawad) Project 67.6 KM (Kilometer) 124.80 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 21-Jun-2019
1287 Road Upgradation Project (Sardarpur-Badnawar) Project 35.0 KM (Kilometer) 84.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 21-Jun-2019
1288 Tata Communications 2012-13 Not Available 856.51 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1289 Tata Communications 2013-14 Not Available 430.08 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1290 Tata Communications 2014-15 Not Available 710.29 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1291 Tata Communications 2015-16 Not Available 770.30 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1292 Tata Communications 2016-17 Not Available 1,463.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1293 Tata Communications till 2011-12 Not Available 8,805.93 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1294 Telenor 2012-13 Not Available 4,018.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1295 Telenor 2013-14 Not Available 2,198.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1296 Telenor 2014-15 Not Available 1,363.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1297 Telenor 2015-16 Not Available 750.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1298 Videocon Telecommunications 2012-13 Not Available 427.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1299 Videocon Telecommunications 2013-14 Not Available 11.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1300 Videocon Telecommunications 2014-15 Not Available 14.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1301 Vodafone India Limited 2014-15 Not Available 14,066.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1302 Vodafone India Limited 2015-16 Not Available 34,400.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1303 Vodafone India Limited 2016-17 Not Available 12,756.00 Communication Telecommunication Network and Services Operation and Maintenance Stage Department of Telecom Multi State/ Centre 21-Jun-2019
1304 Centralized Biomedical Waste treatment facility at Gazipur Not Available 6.00 Water Sanitation Solid waste management Operation and Maintenance Stage Government of National Capital Territory of Delhi Delhi (UT) 20-Jun-2019
1305 Green Field Super Speciality Hospital (Mohali) 200.0 Beds 178.82 Social and Commercial Infrastructure Health Care Operation and Maintenance Stage Punjab Health Systems Corporation Punjab 20-Jun-2019
1306 Construction of Karalphata Interchange road 5.0 KM (Kilometer) 531.13 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Maharashtra 19-Jun-2019
1307 Design, construction , development, finance, O & M of NH-7 Madhya Pradesh on BOT (Annuity) basis 49.35 KM (Kilometer) 263.17 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Madhya Pradesh 19-Jun-2019
1308 Design, Construction, Development, Finance, O&M (Kumarpalyam,after Chengapali) on NH47 in the state of Tamil Nadu(BOT) basis 47.0 KM (Kilometer) 421.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 19-Jun-2019
1309 Design,Construction,Development,Finance,O&M,Jadcherla,end ofproposed Kotakata bypass,on NH7 Andhra Pradesh on (BOT) basis 55.42 KM (Kilometer) 373.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 19-Jun-2019
1310 Ind-Barath Energies Thoothukudi Limited (IBETL) - Biomass based power plant 20.0 MW (Mega Watt) 74.70 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Tamil Nadu 19-Jun-2019
1311 Inter laning of Garakota-Rehli-Deori in length of 49.3 km in Sagar district 49.3 KM (Kilometer) 72.98 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Jun-2019
1312 Jegurupadu Combined Cycle Power Plant, Phase II 228.0 MW (Mega Watt) 725.16 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Andhra Pradesh 19-Jun-2019
1313 Konaseema Combined Cycle Power Plant 460.0 MW (Mega Watt) 2,100.00 Energy Electricity transmission Operation and Maintenance Stage AP TRANSMISSION CORPORATION LIMITED Andhra Pradesh 19-Jun-2019
1314 Mathura (State Border) - Bharatpur 65.5 KM (Kilometer) 181.75 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 19-Jun-2019
1315 Operation & maintenance of Agra-Gwalior road of 137 Km 137.0 KM (Kilometer) 196.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 19-Jun-2019
1316 Operation & Maintenance of Ayodhya-Gorakhpur section in length of 114.9 Km of NH-28 114.9 KM (Kilometer) 1,292.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 19-Jun-2019
1317 Operation and maintainance of Anabaru and Arasinagundi Power plants in Chitradurga and Davangere districts of karnataka 29.7 MW (Mega Watt) 210.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Karnataka 19-Jun-2019
1318 Raghu Rama Renewable Energy Limited (RRREL) 18.0 MW (Mega Watt) 57.20 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Tamil Nadu 19-Jun-2019
1319 Road (AP/Karnataka Border & Nandi Hill Crossing NH-7) Project 64.0 KM (Kilometer) 410.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 19-Jun-2019
1320 Road Upgradation (Namakkal-Karur) Project 44.0 KM (Kilometer) 345.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 19-Jun-2019
1321 Road Upgradation Project (Bahari-Hanumana) Project 49.3 KM (Kilometer) 106.70 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Jun-2019
1322 Road Upgradation Project (Betul-Athner) Project 34.5 KM (Kilometer) 45.40 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Jun-2019
1323 Road Upgradation Project (Damoh-Patharia-Garhakota) Project 40.5 KM (Kilometer) 71.88 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Jun-2019
1324 Road Upgradation Project (Mandsaur-Pratapgarh-Rajasthan Border) Project 14.0 KM (Kilometer) 19.45 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Jun-2019
1325 Samal Hydro Electric Project 20.0 MW (Mega Watt) 116.47 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Odisha 19-Jun-2019
1326 Setting up of 12 MW co-generation power unit at sugar mill in Nawanshahr district 12.0 MW (Mega Watt) 60.00 Energy Renewable energy (grid) Operation and Maintenance Stage Punjab State Federation of Co-operative Sugar Mills Limited Punjab 19-Jun-2019
1327 Solar Power Plant, Mainawali minor of Norangdeshar of Hanumangarh Region 2.0 MW (Mega Watt) 26.00 Energy Renewable energy (grid) Operation and Maintenance Stage Rajasthan Renewable Energy Corporation Limited Rajasthan 19-Jun-2019
1328 TN Solar Power Energy Private Limited 23.0 MW (Mega Watt) 206.00 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Tamil Nadu 19-Jun-2019
1329 Tuppadahalli Energy India Private Limited_56MW Windfarm - Tuppadahalli onshore wind farm 56.1 MW (Mega Watt) 368.14 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Karnataka 19-Jun-2019
1330 Two laning of Tikamgarh - Mahrauni 15.7 KM (Kilometer) 29.38 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Jun-2019
1331 Ugradation of Beed - Mundi - Devala - Khutala - Attoot - NVDA road in length of 28.4 km in Bhopal 28.4 KM (Kilometer) 45.35 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Jun-2019
1332 Upgradation of Indore-Edalabad road in length of 203 km 203.0 KM (Kilometer) 124.00 Transport Roads and bridges Completed Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Jun-2019
1333 Upgradation Operation and Maintenance of Kiratpursahib - Una Road 35.72 KM (Kilometer) 41.84 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Punjab Punjab 19-Jun-2019
1334 Vayu Urja Bharat Pvt. Ltd. 120.0 MW (Mega Watt) 299.07 Energy Renewable energy (grid) Operation and Maintenance Stage Andhra Pradesh Southern Power Distribution Company Limited Andhra Pradesh 19-Jun-2019
1335 Ahmednagar-Shirur Road 56.0 KM (Kilometer) 155.57 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 18-Jun-2019
1336 Chennai Bypass Road Project - Phase II 32.22 KM (Kilometer) 480.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 18-Jun-2019
1337 Construction of four lane connecting road at New Mangalore Port 37.0 KM (Kilometer) 168.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 18-Jun-2019
1338 Dadupur Hydel Power Project 6.0 MW (Mega Watt) 49.92 Energy Renewable energy (grid) Operation and Maintenance Stage Uttar�Haryana Bijli�Vitran Nigam Limited Haryana 18-Jun-2019
1339 Municipal Garbage Processing Unit Not Available 15.00 Water Sanitation Solid waste management Operation and Maintenance Stage Department of Health, Chandigarh Chandigarh (UT) 18-Jun-2019
1340 Road Upgradation Project (Sonapipari-Umreth-Monari-Ambah) Project 22.25 KM (Kilometer) 43.73 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 18-Jun-2019
1341 Upgradation Operation and Maintenance of Ferozepur - Fazilka Road 84.4 KM (Kilometer) 105.20 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Punjab Punjab 18-Jun-2019
1342 2- laning with paved shoulder of a Agra-Aligarh section of NH-93 Uttar Pradesh on (DBFOT) basis 79.0 KM (Kilometer) 250.50 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 17-Jun-2019
1343 Construction of four lane connecting road at Cochin Port 256.71 KM (Kilometer) 193.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Kerala 17-Jun-2019
1344 Container Terminal (Kandla) Project 175000.0 TEU (Twenty-foot Equivalent Units) 200.00 Transport Ports (excluding captive) Operation and Maintenance Stage Deendayal Port Trust Gujarat 17-Jun-2019
1345 Crude Oil Handling for Kochi Refineries Ltd 13.5 MMTPA (million metric tonnes per annum) 703.34 Transport Ports (excluding captive) Operation and Maintenance Stage Cochin Port Trust Kerala 17-Jun-2019
1346 Design construction development, finance,O&M,(Kadtal) (Armur) on NH7 (NHDP-2) on (BOT) basis 31.0 KM (Kilometer) 272.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Telangana 17-Jun-2019
1347 Development of Exhibition cum Convention Centre at Sitapur Industrial Area, Jaipur 3.0 Acres 216.65 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Operation and Maintenance Stage Rajasthan State Industrial Development and Investment Corporation Limited Rajasthan 17-Jun-2019
1348 Lakhnadon to MP/MH Border Road Project (NS-I/BOT/MP-3) 57.0 KM (Kilometer) 408.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Madhya Pradesh 17-Jun-2019
1349 Nandigama-Vijayawada Road 35.0 KM (Kilometer) 760.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 17-Jun-2019
1350 Operation & Maintenance of Swaroopganj-Pindwara & Pindwara-Udaipur section in length of 120.0 Km 120.0 KM (Kilometer) 13.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 17-Jun-2019
1351 Road Upgradation (Delhi-Ramgarh-Alwar) Project 34.9 KM (Kilometer) 25.28 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Multi State/ Centre 17-Jun-2019
1352 Road Upgradation (Jhalawar-Indore) Project 20.2 KM (Kilometer) 7.15 Transport Roads and bridges Completed Public Works Department, Rajasthan Multi State/ Centre 17-Jun-2019
1353 Multilevel Parking (Sanjauli) Project 400.0 ECS Not Available Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Shimla Municipal Corporation Himachal Pradesh 14-Jun-2019
1354 Multilevel Parking (Chotta Shimla) Project 250.0 ECS 20.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Shimla Municipal Corporation Himachal Pradesh 14-Jun-2019
1355 Useful Conversion of Solid Waste in Jaipur Not Available 20.00 Water Sanitation Solid waste management Operation and Maintenance Stage Jaipur Municipal Corporation Rajasthan 14-Jun-2019
1356 Construction, O and M of a new 2-lane road NH3 (Guna - bypass section) Madhya Pradesh 12.0 KM (Kilometer) 46.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Madhya Pradesh 13-Jun-2019
1357 Consulting services, O&M of 4-lane divided carriageway facility of Tuni -Ankapalli NH5 Andhra Pradesh on BOT basis 58.9 KM (Kilometer) 295.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 07-Jun-2019
1358 Development of Datia-Dinara road in length of 8.9 km in Datia 8.93 KM (Kilometer) 16.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1359 Development of Sausr-Mohgaon-Mordongri, Sonapipari-Umrethmonari-Umbah & Gadarwara-Tendukheda Roads 83.95 KM (Kilometer) 58.20 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1360 Development of Ujjain - Simhastha bypass on BOT (Toll + Annuity) Basis 14.5 KM (Kilometer) 98.26 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1361 Dewas-Ujjain-Badnagar-Badnawar Road Project 98.3 KM (Kilometer) 49.90 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1362 Improvement, Including Strengthening and Widening of NH-3 Indore-Khalghat section, M.P. on BOT basis. 77.0 KM (Kilometer) 472.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Madhya Pradesh 07-Jun-2019
1363 Improvement,O&M and strengthening and widening of existing 2 to 4 lane NH1 Jalandhar-Amritsar section Punjab on BOT basis 49.0 KM (Kilometer) 263.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Punjab 07-Jun-2019
1364 Impvt,O&M,strengthening &widening of existing 2 to 4 lane NH22 &(ii )NH21 Ambala-Chandigarh,Haryana &Punjab 35.0 KM (Kilometer) 298.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 07-Jun-2019
1365 Paron-Goras Road (SH-23) 36.48 KM (Kilometer) 102.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1366 Road Upgradation (AB Road-Magarkhedi-Bamari) Project 12.61 KM (Kilometer) 17.31 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1367 Road Upgradation (Alirajpur-Jobat) Project 32.16 KM (Kilometer) 45.31 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1368 Road Upgradation (Ankiya-Barkheda-Dongargaon-Nazirabad) Project 10.4 KM (Kilometer) 14.13 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1369 Road Upgradation (Ashapur-Khalwa-Singhot) Project 42.0 KM (Kilometer) 56.90 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1370 Road Upgradation (Babangaja-Pati-Bokrata) Project 33.31 KM (Kilometer) 46.87 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1371 Road Upgradation (Chirawa-Singhana-Pacheri/Haryana Border) Project 44.8 KM (Kilometer) 44.55 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 07-Jun-2019
1372 Road Upgradation (Gwalior-Bhind up to UP Border) Project 108.0 KM (Kilometer) 314.50 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1373 Road Upgradation (Khandela-Srimadhopur-Reengus-Khatushvaji) Project 50.93 KM (Kilometer) 43.26 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 07-Jun-2019
1374 Road Upgradation (Phoolsagar-Niwas Shalpura) Project 84.0 KM (Kilometer) 156.90 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1375 Road Upgradation (Sheopur-Baroda-Khuwajapur) Project 32.29 KM (Kilometer) 61.80 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1376 Road Upgradation (Tyonda-Ganjbasoda) Project 37.8 KM (Kilometer) 46.03 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1377 Road Upgradation Project (Badwani-Palsood-Sendhawa) Project 56.9 KM (Kilometer) 103.99 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1378 Road Upgradation Project (Gormi-Udotgarh) Project 16.77 KM (Kilometer) 37.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1379 Road Upgradation Project (Panna-Amanganj-Semariya-Gaisabad) Project 58.2 KM (Kilometer) 97.13 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1380 Road Upgradation Project (Semaria-Manikpur) Project 16.36 KM (Kilometer) 34.84 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1381 Road Upgradation Project (Thandla-Limdi-Gujarat Border) Project 31.2 KM (Kilometer) 56.16 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1382 Satna-Maihar-Umaria Road Project 242.7 KM (Kilometer) 53.30 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1383 Second Vivekanand Bridge Tollway Project, Kolkata 6.0 KM (Kilometer) 642.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) West Bengal 07-Jun-2019
1384 Tambaram - Tindivanam Road 93.0 KM (Kilometer) 375.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 07-Jun-2019
1385 Upgradation of Nagda-Gogapur (Mahidpur) road in length of 15 km in Ujjain and Aurangabad 15.0 KM (Kilometer) 40.58 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1386 Upgradation of Tikamgarh-Jatara-Palera-Nowgaon road in length of 76.4 km in Tikamgarh district 76.4 KM (Kilometer) 107.34 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 07-Jun-2019
1387 Widening & Improvement of Dantiwara-Pipar City-Merta City road 26.5 KM (Kilometer) 219.94 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 07-Jun-2019
1388 Development of Dakha-Raikot-Barnala Phase 2 57.9 KM (Kilometer) 78.67 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Punjab Punjab 25-Apr-2019
1389 Four laning of Ropar-Chamkaur Sahib-Neelon-Doraha Road (Sirhind canal) upto NH-1 in length of 54.74 km in Punjab 54.75 KM (Kilometer) 240.00 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Chandigarh Punjab 25-Apr-2019
1390 Road Upgradation of Bhawanigarh-Nabha-Gobindgarh road in length of 55.4 Km in Fatehgarh Sahib district 55.4 KM (Kilometer) 70.25 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Punjab Punjab 25-Apr-2019
1391 Road Upgradation of Patiala-Nabha-Malerkotla Road under Punjab Road Sector of 55.8 km Phase 2 project 55.8 KM (Kilometer) 63.56 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Punjab Punjab 25-Apr-2019
1392 Upgradation Operation and Maintenance of Moga-Kotkapura Road 47.7 KM (Kilometer) 62.09 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Punjab Punjab 25-Apr-2019
1393 Dhaneta - Rakhi - Shahajpur 13.5 KM (Kilometer) 22.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1394 Inter laning of Bamkhalfata-Dogawa-Borawa-Sarvardevla in length of 23.7 km 23.67 KM (Kilometer) 33.60 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1395 Operation & maintenance of Badwah-Dhamnod road in length of 61.9 Km in Dhar district 61.93 KM (Kilometer) 71.31 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1396 Road Upgradation (Dariyapur-Jasaondhi-Maharashtra Border) Project 16.0 KM (Kilometer) 21.20 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1397 Road Upgradation (Intkhedi-Raslakhedi) Project 9.34 KM (Kilometer) 11.52 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1398 Road Upgradation (Jaora-Piplodha-Jalandharkheda-Piploda Sailana) Project 42.27 KM (Kilometer) 60.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1399 Road Upgradation (Kurawar-Eklera Talen) Project 39.22 KM (Kilometer) 49.89 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1400 Road Upgradation (Lateri Anandpur-Bhagawantpur) Project 22.6 KM (Kilometer) 24.47 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1401 Road Upgradation (Mangawan-Baikunthpur) Project 18.8 KM (Kilometer) 26.29 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1402 Road Upgradation (Pondi-Maharajpur-Parasmaniya Road) Project 25.09 KM (Kilometer) 31.42 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1403 Road upgradation of Waraseoni-Lalbarra Road in length of 18.30 km in Balaghat. 18.3 KM (Kilometer) 42.51 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1404 Road Upgradation Project (Bijwad-Kusmaniya-Haran-Deepgaon) Project 75.62 KM (Kilometer) 109.01 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1405 Road Upgradation Project (Datia-Bhander) Project 29.17 KM (Kilometer) 52.80 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1406 Road Upgradation Project (Rehli-Gorjhamar) Project 18.08 KM (Kilometer) 28.27 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1407 Road Upgradation Project (Salsalai-Gulana-Bolai Railway Station Road) Project 19.39 KM (Kilometer) 31.03 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1408 Road Upgradation Project (Soyat-Pidawa) Project 6.25 KM (Kilometer) 8.80 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1409 Upgradation of DevgulgarJod-Arandiyajod road in length of 35 km Shajapur district 35.0 KM (Kilometer) 57.83 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1410 Upgradation of Javad-Khoh road in length of 21.0 km in Neemuch district 21.0 KM (Kilometer) 30.86 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1411 Upgradation of Punasa - Mundi - Singhaji Road in length of 13.3 km. 13.3 KM (Kilometer) 24.50 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 17-Apr-2019
1412 Development of metro link from Delhi Metro Sikanderpur to NH 8 Gurgaon 5.1 KM (Kilometer) 1,088.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Haryana Urban Development Authority Haryana 11-Apr-2019
1413 Road Upgradation (Gurgaon-Faridabad-Ballabhgarh-Sohna) Project 66.2 KM (Kilometer) 779.12 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Haryana Haryana 11-Apr-2019
1414 Hospital (Fatehgarh Sahib) Project 60.0 Beds 5.25 Social and Commercial Infrastructure Health Care Operation and Maintenance Stage Punjab Health Systems Corporation Punjab 04-Apr-2019
1415 Implementation of 70 MLD sewage treatment plant in Jamnagar district 70.0 MLD (Millons Liter per day) 78.00 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Jamnagar Municipal Corporation Gujarat 27-Mar-2019
1416 Bailkhedu - Saraoud 12.69 KM (Kilometer) 24.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Mar-2019
1417 Road Upgradation Project (Guna-Aron-Sironaj) Project 86.76 KM (Kilometer) 190.62 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Mar-2019
1418 Silwali-Sultanganj-Jaisingh Nagar Sagar 76.8 KM (Kilometer) 121.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Mar-2019
1419 Suraiya - Padariya - Dhamni - Singori 13.22 KM (Kilometer) 25.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Mar-2019
1420 Two laning of Satna-Majhgawan 74.132 KM (Kilometer) 121.78 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 19-Mar-2019
1421 Kishangarh Gulabpura NH 79 Project ROB Not Available 16.66 Transport Roads and bridges Completed National Highways Authority of India (NHAI) Maharashtra 28-Jan-2019
1422 Ulundurpet - Padalur (Pkg - VI-B) 93.89 KM (Kilometer) 748.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 28-Jan-2019
1423 Karcham Wangtoo- Abdullapur Transmission Line 223.0 CKM (Circuit Kilo Meter) 1,003.00 Energy Electricity transmission Operation and Maintenance Stage Power Grid Corpn. of India Ltd. Himachal Pradesh 20-Dec-2018
1424 225 MW combined cylce gas turbine power project in Uttarakhand 225.0 MW (Mega Watt) 1,380.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Uttarakhand 17-Dec-2018
1425 Development of Polytechnic at Rahon Not Available 10.00 Social and Commercial Infrastructure Education Operation and Maintenance Stage Department of Technical Education and Industrial Training, Punjab Punjab 17-Dec-2018
1426 Implementation of 237 TPD solid waste management system at Haridwar 237.0 TPD (Tonne per day) 18.56 Water Sanitation Solid waste management Operation and Maintenance Stage Nagar Nigam Haridwar Uttarakhand 17-Dec-2018
1427 Road Upgradation (Jhansi-Lalitpur NS-1/UP-3) Project 49.7 KM (Kilometer) 355.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 17-Dec-2018
1428 Two laning of Alwar-Sikandra section in length of 81.0 Km 81.0 KM (Kilometer) 128.10 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 17-Dec-2018
1429 Two laning of Jhalawar to Jhalawar road in length of 31 Km 31.0 KM (Kilometer) 79.73 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 17-Dec-2018
1430 Two laning of Lalsot-Kota section in length of 195.0 Km 195.0 KM (Kilometer) 303.70 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 17-Dec-2018
1431 Two laning of Phalodi-Ramji Ki Gol section in length of 292.0 Km 292.0 KM (Kilometer) 386.30 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 17-Dec-2018
1432 Widening of 2- 6 lanes divided carriageway including rehabilitation of 2 lanes Jaipur-Kishangarh section of NH8,Rajasthan 90.38 KM (Kilometer) 615.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 17-Dec-2018
1433 Women Polytechnic College (Dausa) Project 5.0 Acres 5.49 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 17-Dec-2018
1434 Engineering College (Abu Road) Project 10.0 Acres 16.40 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 13-Dec-2018
1435 Five Star Hotel at Guwahati 125.0 Rooms 31.08 Social and Commercial Infrastructure Tourism Operation and Maintenance Stage Government of Assam Assam 13-Dec-2018
1436 Gandhidham-Palanpur Railway Project 301.0 KM (Kilometer) 500.00 Transport Railway track, tunnel, viaducts, bridges Operation and Maintenance Stage Ministry of Railways Gujarat 13-Dec-2018
1437 Mega Food Park (Murshidabad) Project 82.0 Acres 132.71 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Operation and Maintenance Stage Ministry of Food Processing Industries West Bengal 13-Dec-2018
1438 Setting up of 110 MW Chuzachen hydel power unit in East Sikkim 110.0 MW (Mega Watt) 1,188.57 Energy Renewable energy (grid) Operation and Maintenance Stage Sikkim Power Development Corporation Limited Sikkim 13-Dec-2018
1439 Technical & Engineering College (Kota Road) Project 10.0 Acres 16.40 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 13-Dec-2018
1440 Women Polytechnic College (Jalore) Project 5.0 Acres 5.49 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 13-Dec-2018
1441 Road Upgradation (Badwah-Katkut ) Project 24.0 KM (Kilometer) 35.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 12-Dec-2018
1442 Sikka Jetty Not Available 87.00 Transport Ports (excluding captive) Operation and Maintenance Stage Gujarat Maritime Board (GMB) Gujarat 12-Dec-2018
1443 Two laning of Baran-Jhalawar section in length of 78.0 Km 78.0 KM (Kilometer) 111.70 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 12-Dec-2018
1444 Women Polytechnic College (Dholpur) Project 5.0 Acres 5.49 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 12-Dec-2018
1445 Design Construction for improvement upgrading to four lanes finance operation and maintenance of Kadapa Pulivendula Road KP01 13.3 KM (Kilometer) 51.95 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation Andhra Pradesh 10-Dec-2018
1446 Operation & Maintenance of Lalitpur-Sagar-Lakhnadon in length of 316.1 Km 316.1 KM (Kilometer) 30.46 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Madhya Pradesh 10-Dec-2018
1447 Road Upgradation (Kataphod-Nachalbor) Project 60.38 KM (Kilometer) 91.00 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 10-Dec-2018
1448 Road Upgradation (Nasirabad-Mangliawas) Project 24.0 KM (Kilometer) 21.52 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 10-Dec-2018
1449 Road Upgradation (Pulivendula-Ambakapalli-Murarichintala) Project 1.0 KM (Kilometer) 26.50 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation Andhra Pradesh 10-Dec-2018
1450 Road Upgradation (Pulivendula-Ramireddypalli-Palagiri) Project 1.0 KM (Kilometer) 36.60 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation Andhra Pradesh 10-Dec-2018
1451 Upgradation of Deesa-Panthawada-Gudari road of 44.1 km 44.32 KM (Kilometer) 89.00 Transport Roads and bridges Operation and Maintenance Stage Gujarat State Road Development Corporation Limited (GSRDC) Gujarat 10-Dec-2018
1452 Design, Construction, Development, Finance, O&M NH-7 (Salem,Kumarpalyam) NH-47,Tamilnadu (BOT) basis 54.0 KM (Kilometer) 502.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 07-Dec-2018
1453 Design. Construction, Development, Finance,O&M,End of proposed Kotakatta bypass,NH-7 Andhra Pradesh,NHDP PH-2 ON BOT basis 75.5 KM (Kilometer) 745.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 07-Dec-2018
1454 Kadloor Yellareddy - Kalkallu - Gundla Pochanpalli on NH - 7 103.0 KM (Kilometer) 546.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 07-Dec-2018
1455 Operation & maintenance of Madurai-Kanyakumari road in length of 243.17 km on NH-7 243.1 KM (Kilometer) 2,309.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 07-Dec-2018
1456 Tuni - Dharmavaram Road 47.0 KM (Kilometer) 231.90 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 07-Dec-2018
1457 Upgradation of four lane Bhandara Road-Maharashtra-Chhattisgarh Border in length of 80 Km 80.0 KM (Kilometer) 528.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 07-Dec-2018
1458 Bay Park Project, Rushikonda, Visakhapatnam Not Available 38.00 Social and Commercial Infrastructure Tourism Operation and Maintenance Stage Not Available Andhra Pradesh 03-Dec-2018
1459 MSW Processing Plant at Khajod Not Available 50.00 Water Sanitation Solid waste management Operation and Maintenance Stage Surat Municipal Corporation Gujarat 03-Dec-2018
1460 4-Laning of Hungund - Hospet Section of NH-13 Karnataka on("DBFOT") basis under NHDP III 99.0 KM (Kilometer) 946.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 30-Nov-2018
1461 6/8 Laning of Road port connectivity JNPT phase II 18.0 KM (Kilometer) 872.00 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Maharashtra 30-Nov-2018
1462 Design, Engineering, Construction, Development, Finance, O & M, near Padailjr NH-45 Tamil Nadu on (BOT) Basis 93.8 KM (Kilometer) 747.56 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 30-Nov-2018
1463 Development of Punjab Institute of Medical Sciences, Jalandhar Not Available 250.00 Social and Commercial Infrastructure Health Care Operation and Maintenance Stage Directorate of Research and Medical Education, Punjab Punjab 30-Nov-2018
1464 Nellore bypass project, National Highway No. 5 17.1 KM (Kilometer) 389.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 30-Nov-2018
1465 Raja Canal wastewater treatment plant 40.0 MLD (Millons Liter per day) 44.80 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Not Available Karnataka 30-Nov-2018
1466 Savitri Mata Mandir Ropeway Project, Pushkar Not Available 9.00 Social and Commercial Infrastructure Tourism Operation and Maintenance Stage Government of Rajasthan Rajasthan 30-Nov-2018
1467 Six/Four-lanning of Bharuch to Surat Section of NH-8 Gujarat on (BOT) basis - package 2 65.0 KM (Kilometer) 1,589.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 30-Nov-2018
1468 Anantapur Wind project 100.0 MW (Mega Watt) 764.59 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Andhra Pradesh 29-Nov-2018
1469 Construction of four lane connecting road at Jawaharlal Nehru Port Phase-I 30.0 KM (Kilometer) 177.12 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 29-Nov-2018
1470 Construction of four lane connecting road at Jawaharlal Nehru Port Phase-II 14.4 KM (Kilometer) 143.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 29-Nov-2018
1471 Design, Construction, Development, Finance,O&M End of Karur Bypass,Dindigul. 78.0 KM (Kilometer) 327.20 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Puducherry (UT) 29-Nov-2018
1472 Gopalpur Port 54.0 MTPA (Metric Tonne Per Annum) 3,500.00 Transport Ports (excluding captive) Operation and Maintenance Stage Department of Commerce and Transport, Odisha Odisha 29-Nov-2018
1473 Hazira Single Point Mooring, Gujarat Not Available 122.00 Transport Ports (excluding captive) Operation and Maintenance Stage Gujarat Maritime Board (GMB) Gujarat 29-Nov-2018
1474 Impvt,O&M,strengthening of existing 2 to 4 lane divided highway NH 58 (Meerut-Muzzafarnagar section)U.P, BOT NHD III 78.31 KM (Kilometer) 534.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 29-Nov-2018
1475 Jasdan Wind Power Project, Rajkot district 25.2 MW (Mega Watt) 143.53 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Gujarat 29-Nov-2018
1476 Jath Wind Energy Plant, Sangli 84.65 MW (Mega Watt) 488.30 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Maharashtra 29-Nov-2018
1477 Kita and Pithodai ki Dhani wind energy project 60.0 MW (Mega Watt) 90.00 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Rajasthan 29-Nov-2018
1478 Liquid Chemical Project at Dahej 2.5 MTPA (Metric Tonne Per Annum) 905.00 Energy Oil/ Gas/ LNG Storage Operation and Maintenance Stage Gujarat Maritime Board (GMB) Gujarat 29-Nov-2018
1479 Magdalla Jetty Not Available 189.00 Transport Ports (excluding captive) Operation and Maintenance Stage Gujarat Maritime Board (GMB) Gujarat 29-Nov-2018
1480 Muldwarka Jetty Not Available 250.00 Transport Ports (excluding captive) Operation and Maintenance Stage Gujarat Maritime Board (GMB) Gujarat 29-Nov-2018
1481 Nephrology and Dialysis unit at Coronation Hospital in Dehradun Not Available 5.40 Social and Commercial Infrastructure Health Care Completed Directorate of Health Services, Uttarakhand Uttarakhand 29-Nov-2018
1482 Nephrology Dialysis unit at Base Hospital in Haldwani Not Available 5.40 Social and Commercial Infrastructure Health Care Completed Directorate of Health Services, Uttarakhand Uttarakhand 29-Nov-2018
1483 Raigarh coal based thermal power project. 1600.0 MW (Mega Watt) 9,415.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Chhattisgarh 29-Nov-2018
1484 Raj West Power Limited - Barmer Power Plant 1080.0 MW (Mega Watt) 4,620.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Rajasthan 29-Nov-2018
1485 Samalpatti Power Project 106.0 MW (Mega Watt) 419.05 Energy Electricity generation (grid) Operation and Maintenance Stage Tamil Nadu Electricity Regulation Commission Tamil Nadu 29-Nov-2018
1486 Tadas Wind ower Project, Dharwad District 50.4 MW (Mega Watt) 279.09 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Karnataka 29-Nov-2018
1487 Thoothukudi coal-based thermal power project phase-II 660.0 MW (Mega Watt) 3,514.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Tamil Nadu 29-Nov-2018
1488 4 laning of Vadape to Gonde section in the state of Maharashtra 100.0 KM (Kilometer) 579.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 28-Nov-2018
1489 Cardiac Care Unit at Coronational Hospital in Dehradun 50.0 Beds 17.67 Social and Commercial Infrastructure Health Care Operation and Maintenance Stage Directorate of Health Services, Uttarakhand Uttarakhand 28-Nov-2018
1490 Design, Engineering, Construction, Development, finance of Neelmangala-Tumkur project from NH4 Karnataka 32.5 KM (Kilometer) 155.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 28-Nov-2018
1491 Door to Dump waste disposal South zone, Ahmedabad Not Available 27.00 Water Sanitation Solid waste management Operation and Maintenance Stage Ahmedabad Municipal Corporation Gujarat 28-Nov-2018
1492 Door to Dump waste disposal, West zone, Ahmedabad Not Available 30.00 Water Sanitation Solid waste management Operation and Maintenance Stage Ahmedabad Municipal Corporation Gujarat 28-Nov-2018
1493 Engineering College (Bhunja) Project 10.0 Acres 16.40 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 28-Nov-2018
1494 Engineering College (Dhamotar) Project 10.0 Acres 16.40 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 28-Nov-2018
1495 Engineering College (Kunchaman) Project 10.0 Acres 16.40 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 28-Nov-2018
1496 Engineering College (Mitrapura) Project 10.0 Acres 16.40 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 28-Nov-2018
1497 Engineering College (Sawai Madhopur) Project 10.0 Acres 16.40 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 28-Nov-2018
1498 Engineering College (Tulsi) Project 10.0 Acres 16.40 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 28-Nov-2018
1499 Pali Bypass (Beawar-Bar-Sirohi Road) Project 6.0 KM (Kilometer) 10.25 Transport Roads and bridges Completed Public Works Department, Rajasthan Rajasthan 28-Nov-2018
1500 Polytechnic College (Beawar) Project 5.0 Acres 9.30 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 28-Nov-2018
1501 Polytechnic College (Khetri) Project 5.0 Acres 9.30 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 28-Nov-2018
1502 Polytechnic College (Ratangarh Churu) Project 5.0 Acres 9.30 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 28-Nov-2018
1503 Road Upgradation (Sriganganagar-Padampur-Raisinghnagar-Anupgarh) Project 36.9 KM (Kilometer) 17.57 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 28-Nov-2018
1504 ROB Near GNFC Bharuch, Gujarat Not Available 7.67 Transport Roads and bridges Operation and Maintenance Stage Roads and Buildings Department, Gujarat Gujarat 28-Nov-2018
1505 Technical & Engineering College (Sanjeev Nagar) Project 10.0 Acres 9.30 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 28-Nov-2018
1506 Technical & Engineering College (Simalwada Road) Project 10.0 Acres 16.40 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 28-Nov-2018
1507 Tunnel (Ghat-Ki -Guni) Project 2.8 KM (Kilometer) 150.00 Transport Roads and bridges Operation and Maintenance Stage Jaipur Development Authority Rajasthan 28-Nov-2018
1508 Veena Institute (Karauli) Project 5.0 Acres 5.49 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 28-Nov-2018
1509 Women Polytechnic College (Deeg) Project 5.0 Acres 9.30 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 28-Nov-2018
1510 Women Polytechnic College (Dungarpur) Project 5.0 Acres 5.49 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 28-Nov-2018
1511 Women Polytechnic College (Hanumangarh) Project 5.0 Acres 5.49 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 28-Nov-2018
1512 Women Polytechnic College (Tonk) Project 5.0 Acres 5.49 Social and Commercial Infrastructure Education Operation and Maintenance Stage Directorate of Technical Education, Rajasthan Rajasthan 28-Nov-2018
1513 Operation & maintenance of various roads in length of 99.7 km in Singrauli, Datia & Khargone districts 99.7 KM (Kilometer) 92.51 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 27-Nov-2018
1514 Two laning of Arjunsar-Pallu section in length of 3.8 Km 3.8 KM (Kilometer) 83.93 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 27-Nov-2018
1515 Two laning of Hanumangarh-Kishangarh section in length of 407.0 Km 407.0 KM (Kilometer) 627.20 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 27-Nov-2018
1516 Aarohi Solar Pvt. Ltd, Hindupur (50 MW) 50.0 MW (Mega Watt) 411.86 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Andhra Pradesh 26-Nov-2018
1517 Commercial Complex construction, Rewa 1.29 Acres 20.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Rewa Municipal Corporation Madhya Pradesh 26-Nov-2018
1518 19.5 MW wind energy Plant in Rajasthan 19.5 MW (Mega Watt) 130.42 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Rajasthan 22-Nov-2018
1519 50 MW wind energy Plant in Gujarat 50.0 MW (Mega Watt) 299.06 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Gujarat 22-Nov-2018
1520 ACME Jaisalmer Solar Power Pvt. Ltd 20.0 MW (Mega Watt) 177.35 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Andhra Pradesh 22-Nov-2018
1521 Acme Raipur Solar Power Pvt. Ltd. 30.0 MW (Mega Watt) 207.00 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Chhattisgarh 22-Nov-2018
1522 Adani Abdasa Solar Plant 40.0 MW (Mega Watt) 676.00 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Gujarat 22-Nov-2018
1523 AES Saurashtra Wind Farm 39.2 MW (Mega Watt) 246.80 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Gujarat 22-Nov-2018
1524 Betul Wind Farms Limited 49.5 MW (Mega Watt) 357.46 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Madhya Pradesh 22-Nov-2018
1525 Bhiwadi to Alwar road project 85.0 KM (Kilometer) 330.11 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 22-Nov-2018
1526 Dayanidhi Solar Power Pvt. Ltd, Shantipuram 40.0 MW (Mega Watt) 326.60 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Andhra Pradesh 22-Nov-2018
1527 DJ Energy Pvt Ltd 98.7 MW (Mega Watt) 617.03 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Madhya Pradesh 22-Nov-2018
1528 Gangrel Dam Toe Small Hydro Power Project 1.2 MW (Mega Watt) 7.00 Energy Renewable energy (grid) Operation and Maintenance Stage Chhattisgarh State Renewable Energy Devp Agency Chhattisgarh 22-Nov-2018
1529 GMR Charanka Solar Plant 25MW 25.0 MW (Mega Watt) 412.50 Energy Renewable energy (grid) Operation and Maintenance Stage Gujarat Urja Vikas Nigam Limited Gujarat 22-Nov-2018
1530 Godavari Naukh CSP Solar Plant 50.0 MW (Mega Watt) 790.00 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Rajasthan 22-Nov-2018
1531 Green Infra (Theni) Wind Energy Limited 25.5MW 25.5 MW (Mega Watt) 156.91 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Tamil Nadu 22-Nov-2018
1532 Hanumangarh to Sangaria road project 22.0 KM (Kilometer) 51.40 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 22-Nov-2018
1533 Janardan Wind Energy Private Limited 20.0 MW (Mega Watt) 129.69 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Rajasthan 22-Nov-2018
1534 Jas Infrastructure and Power Limited 1320.0 MW (Mega Watt) 7,413.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Bihar 22-Nov-2018
1535 Koratalaiyar Bridge 0.69 KM (Kilometer) 30.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Tamil Nadu 22-Nov-2018
1536 MEIL Green Power (Anantpur) Limited 50MW CSP 50.0 MW (Mega Watt) 848.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Andhra Pradesh 22-Nov-2018
1537 Nardana ROB 13.0 KM (Kilometer) 34.21 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Maharashtra 22-Nov-2018
1538 Nasirabad ROB 0.03 KM (Kilometer) 10.45 Transport Roads and bridges Completed Ministry of Road Transport and Highways Maharashtra 22-Nov-2018
1539 Niranjana Solar Energy Pvt. Ltd., Pathikonda (20 MW) 20.0 MW (Mega Watt) 164.00 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Andhra Pradesh 22-Nov-2018
1540 R.K. Patni Girls College, Ajmer Not Available 28.71 Social and Commercial Infrastructure Education Operation and Maintenance Stage Government of Rajasthan Rajasthan 22-Nov-2018
1541 Rajasthan Solar Power Plant, Azure 40.0 MW (Mega Watt) 499.22 Energy Renewable energy (grid) Operation and Maintenance Stage NTPC Vidyut Vyapar Nigam Limited Rajasthan 22-Nov-2018
1542 Sewerage water treatment plant 10 MLD STP at Bhilwara 10.0 MLD (Millons Liter per day) 20.00 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Bhilwara Municipal Corporation Rajasthan 22-Nov-2018
1543 VISA Raigarh Power Project Phase I 600.0 MW (Mega Watt) 3,930.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Chhattisgarh 22-Nov-2018
1544 Vishwatma Solar Energy Pvt Ltd. 30.0 MW (Mega Watt) 245.60 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Andhra Pradesh 22-Nov-2018
1545 Widening of Sirohi-Reodar-Mandar-Deesa Road 71.4 KM (Kilometer) 133.79 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 22-Nov-2018
1546 189 MW Thoothukudi thermal power plant 189.0 MW (Mega Watt) 760.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Tamil Nadu 20-Nov-2018
1547 Amravati Thermal Power Project Phase-I 1350.0 MW (Mega Watt) 6,515.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Maharashtra 20-Nov-2018
1548 Anpara C Thermal Power Station 1200.0 MW (Mega Watt) 4,845.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Uttar Pradesh 20-Nov-2018
1549 Charanka Solar Plant 20.0 MW (Mega Watt) 364.00 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Gujarat 20-Nov-2018
1550 CLP Theni Wind farm 99.0 MW (Mega Watt) 300.00 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Tamil Nadu 20-Nov-2018
1551 Coal based thermal power plant at Tuticorin in tamil Nadu 1050.0 MW (Mega Watt) 1,071.00 Energy Electricity generation (grid) Operation and Maintenance Stage Tamil Nadu Generation and Distribution Corporation Limited Tamil Nadu 20-Nov-2018
1552 Dahanu Solar Power Private Limited 40.0 MW (Mega Watt) 650.54 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Rajasthan 20-Nov-2018
1553 Dahisar 20MW Solar Power Plant_PLG Power 20.0 MW (Mega Watt) 340.00 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Gujarat 20-Nov-2018
1554 Dharmshala Hydro Power Limited (DHPL) - Phase I 4.5 MW (Mega Watt) 31.32 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Himachal Pradesh 20-Nov-2018
1555 Dharmshala Hydro Power Limited (DHPL) - Phase II 5.0 MW (Mega Watt) 32.30 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Himachal Pradesh 20-Nov-2018
1556 East Coast Energy Private Limited (ECEPL) - Coal based Thermal Power Plant near Kakarapalli Village 1320.0 MW (Mega Watt) 9,343.15 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Andhra Pradesh 20-Nov-2018
1557 EMCO Energy Limited - Coal based power plant located in Chandrapur 600.0 MW (Mega Watt) 4,250.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Maharashtra 20-Nov-2018
1558 Gautami Combined Cycle Power Plant 469.0 MW (Mega Watt) 1,800.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Andhra Pradesh 20-Nov-2018
1559 GMR Chhattisgarh Energy Private limited (GCEPL) - Coal based power plant located in Raikheda 1370.0 MW (Mega Watt) 11,543.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Chhattisgarh 20-Nov-2018
1560 GMR Rajahmundry Energy Ltd - Gas based combined cycle power project 768.0 MW (Mega Watt) 4,940.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Andhra Pradesh 20-Nov-2018
1561 GVK Power (Goindwal Sahib) Ltd - Thermal power plant located near Goindwal Sahib village 540.0 MW (Mega Watt) 4,573.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Punjab 20-Nov-2018
1562 Ind-Barath Energies Maharashtra Limited (IBEML) - Biomass based power plant located at Nanded 20.0 MW (Mega Watt) 97.40 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Maharashtra 20-Nov-2018
1563 Ind-Barath Thermal Power Limited (IBTPL) - Coal based thermal power plant located at Thoothukudi 300.0 MW (Mega Watt) 1,297.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Tamil Nadu 20-Nov-2018
1564 Ind-Barath Utkal Power Company - Coal based thermal power project located at Jharsuguda 700.0 MW (Mega Watt) 4,001.40 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Odisha 20-Nov-2018
1565 Indiabulls Realtech Ltd (Nasik Thermal Power) - Thermal Power Plant at Sinnar 1350.0 MW (Mega Watt) 7,848.98 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Maharashtra 20-Nov-2018
1566 Jangi wind power project 91.8 MW (Mega Watt) 702.36 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Gujarat 20-Nov-2018
1567 Jangir Champa caol based power project 1200.0 MW (Mega Watt) 688.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Chhattisgarh 20-Nov-2018
1568 Jhabua Power Limited (Madhya Pradesh Power Project Phase I) - Thermal Power Plant 600.0 MW (Mega Watt) 4,194.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Madhya Pradesh 20-Nov-2018
1569 Jhajjar Power Project 1320.0 MW (Mega Watt) 6,116.16 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Haryana 20-Nov-2018
1570 Jindal Tamnar Power Plant Phase I and II 3400.0 MW (Mega Watt) 13,410.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Chhattisgarh 20-Nov-2018
1571 Kamalanga Thermal Power Plant 1050.0 MW (Mega Watt) 6,519.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Odisha 20-Nov-2018
1572 Krishnapatnam Thermal Power Project 540.0 MW (Mega Watt) 2,678.40 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Andhra Pradesh 20-Nov-2018
1573 Lanco Babandh Power Ltd - coal fired thermal power project 1320.0 MW (Mega Watt) 10,430.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Odisha 20-Nov-2018
1574 Mahan I Power Project 1200.0 MW (Mega Watt) 7,173.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Madhya Pradesh 20-Nov-2018
1575 Middle and Lower Kolab Hydro Electric Project 37.0 MW (Mega Watt) 161.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Odisha 20-Nov-2018
1576 Mithapur Solar Power Project 17.0 MW (Mega Watt) 364.99 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Gujarat 20-Nov-2018
1577 Monnet Power Co Ltd - Thermal power plant of IPP of 1050 MW 1050.0 MW (Mega Watt) 9,500.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Odisha 20-Nov-2018
1578 Mundra-Mohindergarh Power Tranmission Line Project 989.0 KM (Kilometer) 3,967.05 Energy Electricity transmission Operation and Maintenance Stage Not Available Haryana 20-Nov-2018
1579 Ravikiran Power project 7.5 MW (Mega Watt) 29.86 Energy Electricity generation (grid) Operation and Maintenance Stage Karnataka Power Transmission Corporation Limited (KPTCL) Karnataka 20-Nov-2018
1580 Rosa Thermal Power Project Phase - II 600.0 MW (Mega Watt) 6.43 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Uttar Pradesh 20-Nov-2018
1581 Salaya Thermal power project phase-I 1200.0 MW (Mega Watt) 4,820.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Gujarat 20-Nov-2018
1582 Satara district wind farm project 49.5 MW (Mega Watt) 91.32 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Maharashtra 20-Nov-2018
1583 Talwandi Sabo Power Limited - coal based supercritical thermal power plant in Mansa 1980.0 MW (Mega Watt) 10,340.23 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Punjab 20-Nov-2018
1584 Torangallu Ext. Power Project 600.0 MW (Mega Watt) 3,300.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Karnataka 20-Nov-2018
1585 Trombay TPS Extension 500.0 MW (Mega Watt) 1,174.00 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Maharashtra 20-Nov-2018
1586 Vidarbha Industries Power Limited - Coal based power near Nagpur in Maharashtra 600.0 MW (Mega Watt) 3,923.98 Energy Electricity generation (grid) Operation and Maintenance Stage Not Available Maharashtra 20-Nov-2018
1587 Warora Solar Power Project 5.0 MW (Mega Watt) 3,598.60 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Rajasthan 20-Nov-2018
1588 Wind Power Project Amuthapuram, Rasta and Muthiampatti belt 111.9 MW (Mega Watt) 832.57 Energy Renewable energy (grid) Operation and Maintenance Stage Not Available Tamil Nadu 20-Nov-2018
1589 Dahanu Thermal Power Station Project, Maharashtra 500.0 MW (Mega Watt) 1,783.00 Energy Electricity generation (grid) Operation and Maintenance Stage Maharashtra Electricity Regulatory Commission Maharashtra 19-Nov-2018
1590 Construction of IT and commercial complex at Rourkela 3.47 Acres 76.90 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Operation and Maintenance Stage Odisha Industrial Infrastructure Development Corporation Odisha 23-Aug-2018
1591 Grain Warehouses (Circuit II) 900000.0 MTPA (Metric Tonne Per Annum) 1,500.00 Social and Commercial Infrastructure Cold Chain Operation and Maintenance Stage Food Corporation of India Multi State/ Centre 23-Aug-2018
1592 Service Provider Agreement for Rajkot BRTS 10.7 KM (Kilometer) 110.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Rajkot Municipal Corporation Gujarat 23-Aug-2018
1593 Construction of four lane Port connectivity to Mormugoa 13.0 KM (Kilometer) 546.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Goa 23-Mar-2018
1594 Design Construction Finance Operation and Maintenance of Four Laning of Kadapa Renigunta Road under PPP 126.13 KM (Kilometer) 609.00 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation Andhra Pradesh 23-Mar-2018
1595 Elevated Highway from Silk board junction to electronic city junction 10.0 KM (Kilometer) 450.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 23-Mar-2018
1596 Multilevel Parkings at & places in Indore Not Available 56.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Indore Municipal Corporation Madhya Pradesh 23-Mar-2018
1597 Upgradation of Roopangarh-Naraina road in length of 35 km 35.0 KM (Kilometer) 62.39 Transport Roads and bridges Under Construction Public Works Department, Rajasthan Rajasthan 23-Mar-2018
1598 Bus Terminal Complex (Thiruvalla) Project Not Available 41.38 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Kerala Transport Development Finance Corporation Limited Kerala 22-Mar-2018
1599 Construction of four lane connecting road at Paradip Port 77.0 KM (Kilometer) 428.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Odisha 22-Mar-2018
1600 "DCF", O&M of 4-lane bridge at river Kosi includes its approaches &guide bund &afflux bund NH57 Bihar 10.6 KM (Kilometer) 418.04 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Bihar 20-Mar-2018
1601 2 laning with paved shoulders of Mokama Munger section of NH-80,Bihar under NHDPIII (DBFOT) Annuity basis 69.2 KM (Kilometer) 352.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Bihar 20-Mar-2018
1602 Design, Engineering, Construction, Development, Finance,O&M Orai-Bhognipur NH-25 Bhognipur-Barah NH-2, U.P. 62.8 KM (Kilometer) 465.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 20-Mar-2018
1603 Design, engineering, finance, construction, O&M of Kurali - Kiratpur sec.NH 21 Punjab NHDP3A (BOT) basis 42.9 KM (Kilometer) 309.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Punjab 20-Mar-2018
1604 Four laning of Nagpur-Kondhali road in length of 40.8 km of NH-6 40.7 KM (Kilometer) 168.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 20-Mar-2018
1605 Improvement of Manglana - Makrana road 21.0 KM (Kilometer) 6.54 Transport Roads and bridges Completed Public Works Department, Rajasthan Rajasthan 20-Mar-2018
1606 Improvement,O&M strengthening of existing 2to4 lane divided highway,Mahua-Jaipur section NH11 Rajasthan BOT NHDP phase IIIA 108.0 KM (Kilometer) 483.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 20-Mar-2018
1607 Kondhali-Talegaon NH-6 Road Project 50.0 KM (Kilometer) 212.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 20-Mar-2018
1608 Krishnagiri-Thopurghat NH-7 Road Project 62.5 KM (Kilometer) 373.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 20-Mar-2018
1609 Mumbai-Pune Expressway Project 111.0 KM (Kilometer) 1,630.00 Transport Roads and bridges Operation and Maintenance Stage Maharashtra State Road Development Corporation Limited (MSRDC) Maharashtra 20-Mar-2018
1610 Panipat Elevated Highway Road 10.0 KM (Kilometer) 422.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Haryana 20-Mar-2018
1611 Road (Maharashtra/AP Border-Islam Nagar NH-7) Project 54.6 KM (Kilometer) 360.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 20-Mar-2018
1612 Road Upgradation (Belgaum-Maharashtra Border NH-4) Project 77.0 KM (Kilometer) 599.49 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 20-Mar-2018
1613 Road Upgradation (Godhra-Gujarat/Madhya Pradesh NH-59) Project 87.2 KM (Kilometer) 786.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 20-Mar-2018
1614 Road Upgradation (Jhansi-Lalitpur) Project 49.3 KM (Kilometer) 312.57 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 20-Mar-2018
1615 Road Upgradation (Madurai-Tuticorin NH-45B) Project 128.16 KM (Kilometer) 910.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 20-Mar-2018
1616 Road Upgradation(Mulbagal-AP/Karnataka Border) Project 22.1 KM (Kilometer) 154.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 20-Mar-2018
1617 Stretch of N.H.on the existing Durgapur expressway (Dankuni-Palsit section) of NH 2 West Bengal 64.0 KM (Kilometer) 688.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) West Bengal 20-Mar-2018
1618 Two laning of Shillong bypass under SARDP-NE 48.7 KM (Kilometer) 226.11 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Meghalaya 20-Mar-2018
1619 Two laning with paved shoulder of Muzaffarpur-Barauni section of NH-28 in length of 107.4 km under NHDP-IV 107.5 KM (Kilometer) 354.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Bihar 20-Mar-2018
1620 Upgradation of Kanpur-Kabrai section in length of 122.7 km under NHDP-IV A 123.9 KM (Kilometer) 429.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 20-Mar-2018
1621 4 laning Aurangabad - Wadala Road 62.0 KM (Kilometer) 190.00 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 19-Mar-2018
1622 Ahmedabad - Mehsana Road 53.0 KM (Kilometer) 342.24 Transport Roads and bridges Operation and Maintenance Stage Roads and Buildings Department, Gujarat Gujarat 19-Mar-2018
1623 Bypass (Gwalior) Road Project (NS-1/BOT/MP-1) 42.0 KM (Kilometer) 300.93 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Madhya Pradesh 19-Mar-2018
1624 Bypass (Mumbra) Project 5.41 KM (Kilometer) 229.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 19-Mar-2018
1625 Cold Storage Project (Alwar) 4000.0 MT (Metric Tonne ) 17.30 Social and Commercial Infrastructure Cold Chain Operation and Maintenance Stage Rajasthan State Agriculture Marketing Board Rajasthan 19-Mar-2018
1626 Dahej Solid Cargo Terminal 11.0 MMTPA (million metric tonnes per annum) 1,240.00 Transport Ports (excluding captive) Operation and Maintenance Stage Gujarat Maritime Board (GMB) Gujarat 19-Mar-2018
1627 Design, construction, finance, O&M of Gorakhpur bypass on NH-28 in Uttar Pradesh 32.6 KM (Kilometer) 807.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 19-Mar-2018
1628 Four laning of Chittorgarh-Kota section in length of 160.5 Km of NH-27 160.5 KM (Kilometer) 92.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 19-Mar-2018
1629 Improvement,O&M,including strengthening & widening of existing NH - 11 Agra-Bharatpur section,U.P.& Rajasthan 45.0 KM (Kilometer) 195.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 19-Mar-2018
1630 Impvt,O&M,strengthening of 2 to 4-lane divided highway NH11 (Bharatpur-Mahua section) Rajasthan on BOT under NHDP ph-III A 57.0 KM (Kilometer) 300.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 19-Mar-2018
1631 Operation & maintenance of Muzaffarpur-Darbhanga-Purnea road project 277.0 KM (Kilometer) 230.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Bihar 19-Mar-2018
1632 Raichur-Sholapur Transmission Line-1 Project 765.0 KV (Kilo Volt) 440.00 Energy Electricity transmission Operation and Maintenance Stage REC Transmission Projects Company Limited Multi State/ Centre 19-Mar-2018
1633 Road Upgradation (Jalore-Ramseen-Revdar) Project 77.8 KM (Kilometer) 51.75 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 19-Mar-2018
1634 Road Upgradation (Rohat-Jalore) Project 100.0 KM (Kilometer) 56.88 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 19-Mar-2018
1635 Road Upgradation of Hoshiarpur-Tanda in length of 30 Km in Hoshiarpur district 30.0 KM (Kilometer) 30.56 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Punjab Punjab 19-Mar-2018
1636 Thane Bhiwandi Bypass 24.0 KM (Kilometer) 104.00 Transport Roads and bridges Completed Ministry of Road Transport and Highways Maharashtra 19-Mar-2018
1637 Upgradation, operation and Maintenance of Balachaur Dasuya road in length of 105 Km in Hoshiarpur district 104.96 KM (Kilometer) 123.64 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Punjab Punjab 19-Mar-2018
1638 Vadodara-Halol Toll Road 32.0 KM (Kilometer) 160.83 Transport Roads and bridges Operation and Maintenance Stage Roads and Buildings Department, Gujarat Gujarat 19-Mar-2018
1639 Road Upgradation (Laxmangarh-Salasar) Project 19.5 KM (Kilometer) 13.96 Transport Roads and bridges Completed Public Works Department, Rajasthan Rajasthan 22-Dec-2017
1640 Integrated Road Development Project (Nandurbar) 20.7 KM (Kilometer) Not Available Transport Roads and bridges Operation and Maintenance Stage Maharashtra State Road Development Corporation Limited (MSRDC) Maharashtra 21-Dec-2017
1641 Mundra Port (Development of a direct berthing deep-water port) 1800.0 MTPA (Metric Tonne Per Annum) 4,161.00 Transport Ports (excluding captive) Operation and Maintenance Stage Gujarat Maritime Board (GMB) Gujarat 21-Dec-2017
1642 Operation & maintenance of Palanpur-Radhanpur-Samakhyali road 261.0 KM (Kilometer) 178.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 21-Dec-2017
1643 Operation & Maintenance of Trichy bypass to Tovarankurichi section in length of 124.8 Km 124.8 KM (Kilometer) 65.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 21-Dec-2017
1644 4 laning Ahemadnagar - Ghodegaon Road 42.0 KM (Kilometer) 70.00 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 06-Dec-2017
1645 Bridges (Arunachal Pradesh) Project 30.0 KM (Kilometer) 900.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Arunachal Pradesh 06-Dec-2017
1646 Construction of four lane connecting road at Tuticorin Port 47.2 KM (Kilometer) 182.25 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 06-Dec-2017
1647 Construction of four lane connecting road at Vishakhapatnam Port 12.0 KM (Kilometer) 93.79 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 06-Dec-2017
1648 Hyderabad Bangalore section (NS-2/BOT/AP-5) 74.70 KM (Kilometer) 592.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Telangana 06-Dec-2017
1649 Raipur Durg Expressway 26.6 KM (Kilometer) 114.00 Transport Roads and bridges Completed National Highways Authority of India (NHAI) Chhattisgarh 06-Dec-2017
1650 Setting up of 15 MW co-generation power unit at Nakodar Sugar Mill in Jullandhar district 15.0 MW (Mega Watt) 80.00 Energy Renewable energy (grid) Operation and Maintenance Stage Punjab State Federation of Co-operative Sugar Mills Limited Punjab 06-Dec-2017
1651 Development of multi speciality hospital in Jaipur district 220.0 Beds 56.00 Social and Commercial Infrastructure Health Care Operation and Maintenance Stage Medical Education Department, Government of Rajasthan Rajasthan 02-Dec-2017
1652 Four Laning of Bangalore Mysore Road 141.0 KM (Kilometer) 188.00 Transport Roads and bridges Operation and Maintenance Stage Karnataka Road Development Corporation Limited (KRDCL) Karnataka 02-Dec-2017
1653 Hassan-Mangaluru Gauge Conversion Project 183.0 KM (Kilometer) 348.00 Transport Railway track, tunnel, viaducts, bridges Operation and Maintenance Stage Ministry of Railways Karnataka 02-Dec-2017
1654 Hyderabad International Airport Project 40.0 MPPA (Million Passenger Per Annum) 2,920.00 Transport Airports Operation and Maintenance Stage Airports Authority of India (AAI) Telangana 02-Dec-2017
1655 Implementation of solid waste management unit in Kanpur district 1500.0 TPD (Tonne per day) 92.47 Water Sanitation Solid waste management Operation and Maintenance Stage Kanpur Municipal Corporation Uttar Pradesh 02-Dec-2017
1656 Kandla Barge Jetty Project 2.0 MMTPA (million metric tonnes per annum) 30.00 Transport Ports (excluding captive) Operation and Maintenance Stage Deendayal Port Trust Gujarat 02-Dec-2017
1657 Oil Jetty (Vadinar) Project 12.0 MTPA (Metric Tonne Per Annum) 750.00 Transport Ports (excluding captive) Operation and Maintenance Stage Deendayal Port Trust Gujarat 02-Dec-2017
1658 Road (Bangalore-Hosur NH-7) Project 14.38 KM (Kilometer) 110.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 02-Dec-2017
1659 "DCF", Development, O & M of an Engineering College at Tezpur in the state of Assam. 0.03 Acres 0.00 Social and Commercial Infrastructure Education Operation and Maintenance Stage Department of Technical Education, Assam Assam 28-Nov-2017
1660 Upgradation of Jetpur-Gondal sec.of 2-4 lane, Gondal Rajkot bypass 2 to 4 lane(NH8B)Gujarat BOT basis 36.0 KM (Kilometer) 388.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 27-Nov-2017
1661 "DEFC"O&M of Chattisgarh Maharashtra border- Waiganga bridge sec.NH6 Maharashtra NHDP 3A on(BOT) basis 80.0 KM (Kilometer) 535.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 25-Nov-2017
1662 4 laning of Belgaum-Khanapur sec.& 2 laning, Khanapur-Karnataka /Goa border sec. NH-4A Karnataka, NHDP III 81.8 KM (Kilometer) 359.00 Transport Roads and bridges Under Construction National Highways Authority of India (NHAI) Karnataka 25-Nov-2017
1663 Champamati Hydro Power Project, Kokrajhar 4.0 MW (Mega Watt) 35.00 Energy Renewable energy (grid) Operation and Maintenance Stage Bodoland Territorial Council Assam 25-Nov-2017
1664 Integrated Municipal Solid Waste Management Project (IMSWMP) for Coimbatore 600.0 TPD (Tonne per day) 95.22 Water Sanitation Solid waste management Operation and Maintenance Stage Coimbatore City Municipal Corporation Tamil Nadu 25-Nov-2017
1665 Section of NH4A in the state of Goa strengthening of existing 2 lanes on the Satara Kagal section of NH4 Maharashtra 133.0 KM (Kilometer) 660.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 25-Nov-2017
1666 Solid Waste Management (Tambaram-Pallavapuram) Project 300.0 TPD (Tonne per day) 99.00 Water Sanitation Solid waste management Operation and Maintenance Stage Pallavaram Municipality Tamil Nadu 23-Nov-2017
1667 Transmission Line (Vadodara-Dhule-Aurangabad) and (Indore- Bhopal- Jabalpur) Not Available 1,900.00 Energy Electricity transmission Operation and Maintenance Stage Power Finance Corporation Limited Multi State/ Centre 23-Nov-2017
1668 Construction of bypass road at Himmatnagar on SH-9 in length of 8.7 Km 8.7 KM (Kilometer) 7.00 Transport Roads and bridges Operation and Maintenance Stage Gujarat State Road Development Corporation Limited (GSRDC) Gujarat 22-Nov-2017
1669 Implementation of 76 MLD sewage treatment plant at Kasba Bawda in Kolhapur 76.0 MLD (Millons Liter per day) 57.00 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Kolhapur Municipal Corporation Maharashtra 22-Nov-2017
1670 Road Upgradation (Bagodara Wataman Tarapur Vasad Road) Project 101.7 KM (Kilometer) 1,114.40 Transport Roads and bridges Under Construction Gujarat State Road Development Corporation Limited (GSRDC) Gujarat 22-Nov-2017
1671 Thavakkara Bus Station 6.7 Acres 32.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Kannur Municipality Kerala 22-Nov-2017
1672 Tirupur Water Supply 56.0 KM (Kilometer) 1,023.00 Water Sanitation Water supply pipeline Operation and Maintenance Stage Tirupur Local Planning Authority Tamil Nadu 22-Nov-2017
1673 Upgradation of Kim-Mandvi section road in length of 38.0 Km in Surat district 45.0 KM (Kilometer) 21.00 Transport Roads and bridges Operation and Maintenance Stage Gujarat State Road Development Corporation Limited (GSRDC) Gujarat 22-Nov-2017
1674 Road Upgradation Project (Singhana-Chikalda) Project 16.34 KM (Kilometer) 23.43 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 01-Nov-2017
1675 Construction of 2 lane approaches to ROB in lieu of level crossing No 575B on Ballabgarh Sohna Road at Ballabgarh in district Fa Not Available 24.00 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Haryana Haryana 24-Oct-2017
1676 Construction of ROB and its approaches on Delhi Agra Railway line in Faridabad Not Available 6.94 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Haryana Haryana 24-Oct-2017
1677 Road Upgradation (Pune-Nashik) Project 30.0 KM (Kilometer) 127.60 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 24-Oct-2017
1678 Construction of Kelwa Amet Road 18.0 KM (Kilometer) 5.70 Transport Roads and bridges Completed Public Works Department, Rajasthan Rajasthan 17-Oct-2017
1679 Road Upgradation (Jhunjhunu-Udaipurwati-Khandela) Project 71.25 KM (Kilometer) 86.22 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 17-Oct-2017
1680 Road Upgradation (Kota-Jharel-Tather-Sultanpur-Ganeshganj) Project 43.2 KM (Kilometer) 64.56 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 17-Oct-2017
1681 Road Upgradation (Nasirabad-Kekri-Deoli) Project 31.5 KM (Kilometer) 21.40 Transport Roads and bridges Completed Public Works Department, Rajasthan Rajasthan 17-Oct-2017
1682 Upgradation (Strengthening & Renewal) of Udaipur - Salumber - Banswara Road 67.0 KM (Kilometer) 13.57 Transport Roads and bridges Completed Public Works Department, Rajasthan Rajasthan 17-Oct-2017
1683 Widening & Improvement of Kaman-Nand Gaon- Kosi road in length of 50 km 50.0 KM (Kilometer) 35.66 Transport Roads and bridges Completed Public Works Department, Rajasthan Rajasthan 17-Oct-2017
1684 Widening & Strengthening of Sikar - Jhunjunu- Loharu Road 119.7 KM (Kilometer) 49.78 Transport Roads and bridges Completed Public Works Department, Rajasthan Rajasthan 17-Oct-2017
1685 Operation & maintenance of bus terminals capacity of 40000 Passengers in Moga & Shaheed Bhagat Singh Nagar 40000.0 Passengers 6.89 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Punjab State Bus Stand Management Company Limited Punjab 11-Oct-2017
1686 Bamroli Sewage Treatment Plant 100.0 MLD (Millons Liter per day) 29.20 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Surat Municipal Corporation Gujarat 10-Oct-2017
1687 Bawana Industrial Estate-Redevelopment Not Available 57.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Operation and Maintenance Stage Delhi State Industrial and Infrastructure Development Corporation Limited Delhi (UT) 10-Oct-2017
1688 Bhesan Sewage Treatment Plant 100.0 MLD (Millons Liter per day) 15.09 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Surat Municipal Corporation Gujarat 10-Oct-2017
1689 Chennai Outer Ring Road Project - Phase II 30.5 KM (Kilometer) 1,075.00 Transport Roads and bridges Under Construction Tamil Nadu Road Development Company Limited Tamil Nadu 10-Oct-2017
1690 Development of A New Bridge Connecting Mattancherry and Willingdon Island at Cochin 0.7 KM (Kilometer) 27.00 Transport Roads and bridges Operation and Maintenance Stage The Greater Cochin Development Authority (GCDA) Kerala 10-Oct-2017
1691 Narela Industrial Estate-Redevelopment 3000.0 Others 130.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Operation and Maintenance Stage Delhi State Industrial and Infrastructure Development Corporation Limited Delhi (UT) 10-Oct-2017
1692 Pal-palanpor Sewerage Disposal & STP Not Available 34.09 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Surat Municipal Corporation Gujarat 10-Oct-2017
1693 Secondary School Number 4 Vasant Vihar Complex Not Available 29.40 Social and Commercial Infrastructure Education Operation and Maintenance Stage Thane Municipal Corporation Maharashtra 10-Oct-2017
1694 Secondary School Number 5 Kolshet Not Available 13.80 Social and Commercial Infrastructure Education Operation and Maintenance Stage Thane Municipal Corporation Maharashtra 10-Oct-2017
1695 Sewage Treatment Plant-Upgradation (Anjana) 82.5 MLD (Millons Liter per day) 10.98 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Surat Municipal Corporation Gujarat 10-Oct-2017
1696 Sewerage Disposal & STP (Vesu) Not Available 52.90 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Surat Municipal Corporation Gujarat 10-Oct-2017
1697 Bypass (Jaipur) NH-8 Road Project Phase II 34.5 KM (Kilometer) 210.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Rajasthan 03-Oct-2017
1698 Bypass (Moradabad) Road Project 18.0 KM (Kilometer) 103.50 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Uttar Pradesh 03-Oct-2017
1699 HITEC City Cyberabad Hyderabad 158.0 Acres 450.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Operation and Maintenance Stage Andhra Pradesh Industrial Infrastructure Corporation Limited (APIIC) Telangana 03-Oct-2017
1700 Wind Farm (Karnataka) Project 10.5 MW (Mega Watt) 60.00 Energy Renewable energy (grid) Operation and Maintenance Stage National Mineral Development Corporation Limited Karnataka 03-Oct-2017
1701 Salem - Kerala Border section (TN-6) Road 53.5 KM (Kilometer) 469.80 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Kerala 21-Sep-2017
1702 Salem to Kerala border section (TN-7) Road 48.5 KM (Kilometer) 379.80 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 21-Sep-2017
1703 Tindivanam to Ulunderpret on NH-45 Road 72.9 KM (Kilometer) 887.50 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Kerala 21-Sep-2017
1704 Raipur-Aurang NH-6 Road Project 43.4 KM (Kilometer) 190.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Chhattisgarh 20-Sep-2017
1705 Stregthening and Widening of Dharmavaram - Rajahmundry road 53.0 KM (Kilometer) 219.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Andhra Pradesh 20-Sep-2017
1706 Dhule - Pimpalgaon Road 118.0 KM (Kilometer) 556.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Maharashtra 19-Sep-2017
1707 Road Upgradation (Karur-Madurai) (TN-5) Project 53.0 KM (Kilometer) 283.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 19-Sep-2017
1708 400kV double-circuit (Quad) line from Jaigad to Koyna and from Jaigad to Karad 57.0 CKM (Circuit Kilo Meter) 448.00 Energy Electricity transmission Operation and Maintenance Stage Maharashtra State Electricity Distribution Company Limited Maharashtra 18-Sep-2017
1709 Chhayapuri ROB 1.032 Meter 27.06 Transport Roads and bridges Operation and Maintenance Stage Gujarat State Road Development Corporation Limited (GSRDC) Gujarat 18-Sep-2017
1710 Coal Terminal at Ennore Port Sical 10.0 MTPA (Metric Tonne Per Annum) 400.00 Transport Ports (excluding captive) Operation and Maintenance Stage Kamarajar Port Limited Tamil Nadu 18-Sep-2017
1711 Construction of Kundli Manesar Palwal Expressway in length of 135 km in Mansar District 135.0 KM (Kilometer) 2,545.00 Transport Roads and bridges Under Construction Haryana State Industrial and Infrastructure Development Corporation Haryana 18-Sep-2017
1712 Development of Common user Iron Ore Terminal 12.0 MMTPA (million metric tonnes per annum) 351.61 Transport Ports (excluding captive) Operation and Maintenance Stage Kamarajar Port Limited Tamil Nadu 18-Sep-2017
1713 Four lane ROB at Chalthan, Gujarat 4.0 KM (Kilometer) 12.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Gujarat 18-Sep-2017
1714 Road Upgradation (Gadrawada-Tendukhera) Project 32.12 KM (Kilometer) 50.67 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 18-Sep-2017
1715 Transmission Line (Misa-Byrnihat) Project 220.0 KV (Kilo Volt) 145.00 Energy Electricity transmission Operation and Maintenance Stage Byrnihat Transmission Company Limited Multi State/ Centre 18-Sep-2017
1716 Bypass (Neelambur) Project 28.0 KM (Kilometer) 110.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Tamil Nadu 17-Sep-2017
1717 Common Effluent Treatment Plant (Baddi) 25.0 MLD (Millons Liter per day) 86.77 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Department of Industries, Himachal Pradesh Himachal Pradesh 17-Sep-2017
1718 Road Upgradation (Kadapa-Pulivendula) KP-04 Project 21.0 KM (Kilometer) 71.72 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation Andhra Pradesh 17-Sep-2017
1719 Road Upgradation (Pulivendula-Parnapalli) 1.0 KM (Kilometer) 23.94 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation Andhra Pradesh 17-Sep-2017
1720 Road Upgradation of Patiala-Samana-Patran Road in length of 48.6 Km in Patiala district 48.6 KM (Kilometer) 48.10 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Punjab Punjab 13-Sep-2017
1721 Solid Waste Management (Kanpur) Not Available 56.23 Water Sanitation Solid waste management Operation and Maintenance Stage Kanpur Nagar Nigam Uttar Pradesh 11-Sep-2017
1722 Solid Waste Management (Mathura) Not Available 9.92 Water Sanitation Solid waste management Operation and Maintenance Stage Mathura Nagar Nigam Uttar Pradesh 11-Sep-2017
1723 Chennai Outer Ring Road Project -Phase I 29.7 KM (Kilometer) 1,081.40 Transport Roads and bridges Operation and Maintenance Stage Tamil Nadu Road Development Company Limited Tamil Nadu 08-Sep-2017
1724 Mechanisation of HDC Berth No. 2 and 8 Not Available 150.00 Transport Ports (excluding captive) Operation and Maintenance Stage Kolkata Port Trust West Bengal 08-Sep-2017
1725 Municipal Solid Waste to Energy in Hyderabad (Hyderabad, Gadamaguda, R.R.District) 1000.0 MW (Mega Watt) 85.00 Water Sanitation Solid waste management Operation and Maintenance Stage Greater Hyderabad Municipal Corporation Telangana 08-Sep-2017
1726 Solid Waste Management (Rajkot) - Upgradation Not Available 41.72 Water Sanitation Solid waste management Operation and Maintenance Stage Rajkot Municipal Corporation Gujarat 08-Sep-2017
1727 Construction of 6 Km long Narmada bridge at Zadeshwar in Bharuch district 6.0 KM (Kilometer) 113.00 Transport Roads and bridges Completed National Highways Authority of India (NHAI) Gujarat 31-Aug-2017
1728 Road Upgradation (Dindigul-Samyanallore) Project 53.05 KM (Kilometer) 415.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Tamil Nadu 30-Aug-2017
1729 Alandur Sewerage Project 24.0 MLD (Millons Liter per day) 33.78 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Alandur Municipality Tamil Nadu 28-Aug-2017
1730 Operation & maintenance of bus terminals capacity of 34000 Passengers in Shri Mukatsar Sahib, Zira and Ferozepur 34000.0 Passengers 5.68 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Punjab State Bus Stand Management Company Limited Punjab 28-Aug-2017
1731 Operation & maintainance of 180 MLD sewage treatment plant at Pirana in Ahmedabad 180.0 MLD (Millons Liter per day) 5.04 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Ahmedabad Municipal Corporation Gujarat 27-Aug-2017
1732 Operation & maintenance of Surathkal-Nantoor section of NH-17 37.0 KM (Kilometer) 25.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Karnataka 27-Aug-2017
1733 Ranchi Ring Road Project (Section III, IV, V & VI) 36.192 KM (Kilometer) 620.10 Transport Roads and bridges Operation and Maintenance Stage Road Construction Department, Jharkhand Jharkhand 27-Aug-2017
1734 Road Upgradation (Pipaliya-Manasa) Project 40.19 KM (Kilometer) 63.21 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 27-Aug-2017
1735 Road Upgradation (Ranchi-Patratu Dam Road) Project 35.118 KM (Kilometer) 263.86 Transport Roads and bridges Operation and Maintenance Stage Road Construction Department, Jharkhand Jharkhand 27-Aug-2017
1736 Road Upgradation (Thane-Bhivandi-Vadpa Road) Project 8.0 KM (Kilometer) 227.63 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 27-Aug-2017
1737 4 laning Pune - Shirur Road 50.0 KM (Kilometer) 105.00 Transport Roads and bridges Completed Public Works Department, Maharashtra Maharashtra 25-Aug-2017
1738 Bridge across Krishna river 1.0 KM (Kilometer) 71.00 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation Andhra Pradesh 25-Aug-2017
1739 Road Upgradation (Kadapa-Pulivendula) KP-02 Project 13.0 KM (Kilometer) 51.95 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation Andhra Pradesh 25-Aug-2017
1740 Road Upgradation (Manor-Wada-Bhivandi Road) Project 64.3 KM (Kilometer) 430.00 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 25-Aug-2017
1741 Road Upgradation (Pune-Solapur) Project 26.0 KM (Kilometer) 88.71 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 25-Aug-2017
1742 Operation & maintenance of Mumbai Entry Points Project Not Available 843.00 Transport Roads and bridges Operation and Maintenance Stage Maharashtra State Road Development Corporation Limited (MSRDC) Maharashtra 24-Jul-2017
1743 Road Upgradation (Chaibasa-Kandra-Chowka Road) Project 68.7 KM (Kilometer) 432.99 Transport Roads and bridges Operation and Maintenance Stage Road Construction Department, Jharkhand Jharkhand 02-Jul-2017
1744 Road Upgradation (Patratu Dam-Ramgarh) Project 27.118 KM (Kilometer) 326.83 Transport Roads and bridges Operation and Maintenance Stage Road Construction Department, Jharkhand Jharkhand 02-Jul-2017
1745 Four laning of Mehsana-Himmatnaga road in length of 61 Km in Gandhinagar district 61.0 KM (Kilometer) 353.25 Transport Roads and bridges Under Construction Roads and Buildings Department, Gujarat Gujarat 07-Jun-2017
1746 Mumbai Metro Line I - Versova-Andheri-Ghatkopar Corridor 11.4 KM (Kilometer) 4,321.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Mumbai Metropolitan Region Development Authority (MMRDA) Maharashtra 07-Jun-2017
1747 R-O-B (Warora) Project 12.0 Meter 32.07 Transport Roads and bridges Operation and Maintenance Stage Maharashtra State Road Development Corporation Limited (MSRDC) Maharashtra 07-Jun-2017
1748 Road Upgradation (Bongulur-Tulkkududa) Project - AP-4 13.0 KM (Kilometer) 359.31 Transport Roads and bridges Operation and Maintenance Stage Hyderabad Growth Corridor Limited Telangana 07-Jun-2017
1749 Road Upgradation (Kollur-Patancheru) Project - AP-2 11.7 KM (Kilometer) 403.55 Transport Roads and bridges Operation and Maintenance Stage Hyderabad Growth Corridor Limited Telangana 07-Jun-2017
1750 Road Upgradation (Narsingi-Kollur) Project - AP-1 12.0 KM (Kilometer) 375.87 Transport Roads and bridges Operation and Maintenance Stage Hyderabad Growth Corridor Limited Telangana 07-Jun-2017
1751 Setting up of 115 MLD of water supply scheme Nagpur Pench IV-Part 2 in Godhni 115.0 MLD (Millons Liter per day) 110.00 Water Sanitation Water supply pipeline Operation and Maintenance Stage Nagpur Municipal Corporation Maharashtra 07-Jun-2017
1752 Solid Waste Management (Aligarh) Project 220.0 TPD (Tonne per day) 34.97 Water Sanitation Solid waste management Operation and Maintenance Stage Uttar Pradesh Jal Nigam Uttar Pradesh 07-Jun-2017
1753 Solid Waste Management (Moradabad) Project 280.0 TPD (Tonne per day) 38.86 Water Sanitation Solid waste management Operation and Maintenance Stage Uttar Pradesh Jal Nigam Uttar Pradesh 07-Jun-2017
1754 Development of railway over bridge in length of 1.5 km at Palanpur-Radhanpur- Samakhyali 1.5 KM (Kilometer) 109.59 Transport Roads and bridges Operation and Maintenance Stage Roads and Buildings Department, Gujarat Gujarat 15-May-2017
1755 Implementation of 100 TPD solid waste management facility unit at Calangute 100.0 TPD (Tonne per day) 145.95 Water Sanitation Solid waste management Operation and Maintenance Stage Goa State Infrastructure Development Corporation Limited Goa 01-May-2017
1756 Road Upgradation (Kotputli-Kuchaman) Project 193.22 KM (Kilometer) 285.36 Transport Roads and bridges Operation and Maintenance Stage Rajasthan State Road Development and Construction Corporation Limited Rajasthan 23-Apr-2017
1757 Integrated Solid Waste Management Guwahati 150.0 TPD (Tonne per day) 102.15 Water Sanitation Solid waste management Operation and Maintenance Stage Guwahati Municipal Corporation Assam 24-Mar-2017
1758 Sechi Hydro Electric Power Project 4.5 MW (Mega Watt) 33.46 Energy Renewable energy (grid) Operation and Maintenance Stage Himachal Pradesh Energy Development Agency Himachal Pradesh 24-Mar-2017
1759 Four lanning of Hadgaon-Waranga-Nanded road in length of 51.9 Km 51.9 KM (Kilometer) 11.50 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 20-Mar-2017
1760 Implementation of municipal solid waste treatment plant at Bardez in North Goa 100.0 Tonnes 148.85 Water Sanitation Solid waste management Operation and Maintenance Stage Goa State Infrastructure Development Corporation Limited Goa 20-Mar-2017
1761 Implementation of waste management facilities at Haldia in Purba Medinipur 200000.0 MTPA (Metric Tonne Per Annum) 54.00 Water Sanitation Solid waste management Operation and Maintenance Stage Haldia Development Authority West Bengal 20-Mar-2017
1762 Development of school on 1.9 acres at Mouza Waddhamna in Nagpur district 1.9 Acres 8.63 Social and Commercial Infrastructure Education Operation and Maintenance Stage Nagpur Municipal Corporation Maharashtra 19-Mar-2017
1763 Construction of railway over bridge on NH-6 at Fekari in Jalgaon district 2.7 KM (Kilometer) 15.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Maharashtra 14-Mar-2017
1764 Operation & maintenance of bus terminal with a capcity of 25000 Passengers in Hoshiarpur 25000.0 Passengers 7.88 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Punjab State Bus Stand Management Company Limited Punjab 13-Mar-2017
1765 Operation & maintenance of bus terminals capacity of 30500 Passengers at Jagraon, Anandpur Sahib & S.A.S Nagar 30500.0 Passengers 5.07 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Punjab State Bus Stand Management Company Limited Punjab 13-Mar-2017
1766 Sanitary Landfills in Bangalore Not Available 30.00 Water Sanitation Solid waste management Operation and Maintenance Stage Bruhat Bengaluru Mahanagara Palike Karnataka 07-Mar-2017
1767 Bus Terminal (Angamaly) Project Not Available 33.42 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Kerala Transport Development Finance Corporation Limited Kerala 26-Feb-2017
1768 East Coast Road between Chennai and Puducherry 113.0 KM (Kilometer) 61.00 Transport Roads and bridges Operation and Maintenance Stage Highway Department, Government of Tamil Nadu Tamil Nadu 26-Feb-2017
1769 Solid Waste Management (Chennai) Not Available 36.48 Water Sanitation Solid waste management Operation and Maintenance Stage Greater Chennai Corporation Tamil Nadu 20-Feb-2017
1770 Two laning of Raigarh-Pathalgaon road in length of 110.2 km in Raigarh 110.2 KM (Kilometer) 601.00 Transport Roads and bridges Under Construction Chhattisgarh Road Development Corporation Chhattisgarh 20-Feb-2017
1771 Construction of major bridge in length of 2.2 km across Pinglai river on Nagpur-Edlabad road of NH-6 2.2 KM (Kilometer) 14.15 Transport Roads and bridges Operation and Maintenance Stage Nagpur Improvement Trust Maharashtra 09-Feb-2017
1772 Hotel Management Institute (Badhkal) Not Available 40.00 Social and Commercial Infrastructure Education Operation and Maintenance Stage Haryana Tourism Corporation Limited Haryana 11-Jan-2017
1773 Operation & maintenance of NH-1A 222.0 KM (Kilometer) 120.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) Multi State/ Centre 11-Jan-2017
1774 Water Sports & FEC at Rajahmundry Not Available 12.00 Social and Commercial Infrastructure Tourism Operation and Maintenance Stage Andhra Pradesh Tourism Development Corporation Limited Andhra Pradesh 11-Jan-2017
1775 Construction of two lane Wainganga bridge in length of 13 Km 13.0 KM (Kilometer) 41.00 Transport Roads and bridges Operation and Maintenance Stage Ministry of Road Transport and Highways Maharashtra 20-Dec-2016
1776 Dispensary Site at Maddilapalem Not Available 26.77 Social and Commercial Infrastructure Health Care Operation and Maintenance Stage Andhra Pradesh State Road Transport Corporation Andhra Pradesh 20-Dec-2016
1777 Road Upgradation (Maliya-Pipaliya Junction) Project 65.0 KM (Kilometer) 108.00 Transport Roads and bridges Operation and Maintenance Stage Roads and Buildings Department, Gujarat Gujarat 20-Dec-2016
1778 Implementation of Nagziri Irrigation scheme with a capacity of 1.8 CBM 1.8 CBM (Million Cubic Meter) 9.50 Water Sanitation Irrigation (dams, channels, embankments, etc.) Operation and Maintenance Stage Tapi Irrigation Development Corporation, Jalgaon Maharashtra 18-Dec-2016
1779 Implementation of solid waste management unit in Fatehpur district 55.0 TPD (Tonne per day) 14.29 Water Sanitation Solid waste management Operation and Maintenance Stage Uttar Pradesh Jal Nigam Uttar Pradesh 18-Dec-2016
1780 Implementation of solid waste management unit in Muzaffarnagar district 120.0 TPD (Tonne per day) 0.00 Water Sanitation Solid waste management Operation and Maintenance Stage Uttar Pradesh Jal Nigam Uttar Pradesh 18-Dec-2016
1781 Four laning of Aurangabad-Jalna road in length of 65.0 Km in Maharashtra 65.0 KM (Kilometer) 274.40 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 06-Dec-2016
1782 Construction of two lane Katni bypass in length of 17.6 km 17.6 KM (Kilometer) 71.00 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Madhya Pradesh Madhya Pradesh 05-Dec-2016
1783 Setting up of 4.5 MW Iruttukkanam small hydel power unit in Idukki district 4.5 MW (Mega Watt) 22.00 Energy Renewable energy (grid) Operation and Maintenance Stage Kerala State Electricity Board Kerala 05-Dec-2016
1784 Setting up of 7 MW Ullunkal small hydel power unit in Pathanamthitta district 7.0 MW (Mega Watt) 49.00 Energy Renewable energy (grid) Operation and Maintenance Stage Kerala State Electricity Board Kerala 05-Dec-2016
1785 Dewas Industrial Water Supply Scheme 128.0 KM (Kilometer) 77.58 Water Sanitation Water supply pipeline Operation and Maintenance Stage Madhya Pradesh State Industrial Development Corporation Limited Madhya Pradesh 21-Nov-2016
1786 O&M and Management of 25 MGD Water Treatment Plant 25.0 MGD (Million Gallon per Day) 45.00 Water Sanitation Water treatment plants Operation and Maintenance Stage Haldia Development Authority West Bengal 21-Nov-2016
1787 Two laning of Nadiad-Madhudha-Kathlal-Kapadwanj-Bayad-Modasa section in length of 108.4 km in Kheda district 108.4 KM (Kilometer) 238.90 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Gujarat Gujarat 07-Nov-2016
1788 Development of Marine Liquid Terminal 3.0 MMTPA (million metric tonnes per annum) 417.00 Transport Ports (excluding captive) Operation and Maintenance Stage Kamarajar Port Limited Tamil Nadu 31-Oct-2016
1789 Road Upgradation (Adityapur-Kandra) Project 15.0 KM (Kilometer) 241.15 Transport Roads and bridges Operation and Maintenance Stage Road Construction Department, Jharkhand Jharkhand 31-Oct-2016
1790 Road Upgradation (Pulivendula-Alavalapadu-Vempalli) Project 1.0 KM (Kilometer) 24.50 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation Andhra Pradesh 31-Oct-2016
1791 Municipal Solid Waste Management (Turbhe) Project 500.0 TPD (Tonne per day) 19.00 Water Sanitation Solid waste management Operation and Maintenance Stage Navi Mumbai Municipal Corporation Maharashtra 26-Oct-2016
1792 Solar Photovoltaic Power (Baramati) Project 50.0 MW (Mega Watt) 373.93 Energy Renewable energy (grid) Operation and Maintenance Stage Maharashtra State Power Generation Company Limited Maharashtra 26-Oct-2016
1793 Road Upgradation (Pedda-Amberpet-Bongulur) Project - AP-3 13.0 KM (Kilometer) 388.25 Transport Roads and bridges Operation and Maintenance Stage Hyderabad Growth Corridor Limited Telangana 03-Oct-2016
1794 Road Upgradation (Tukkuguda-Shamshabad) Project - AP-5 12.6 KM (Kilometer) 332.51 Transport Roads and bridges Operation and Maintenance Stage Hyderabad Growth Corridor Limited Telangana 03-Oct-2016
1795 R-O-B (Nagpur-Katol-Jalakheda) Project 5.6 KM (Kilometer) 46.42 Transport Roads and bridges Operation and Maintenance Stage Maharashtra State Road Development Corporation Limited (MSRDC) Maharashtra 15-Sep-2016
1796 Road Upgradation (Sion-Panvel) Project 24.89 KM (Kilometer) 1,220.00 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 14-Sep-2016
1797 International Animation School Project 2.8 Acres 18.00 Social and Commercial Infrastructure Education Operation and Maintenance Stage Kerala Industrial Infrastructure Development Corporation Limited Kerala 08-Aug-2016
1798 Road Upgradation (Khamgaon Bypass) Project 9.7 KM (Kilometer) 54.03 Transport Roads and bridges Completed Public Works Department, Maharashtra Maharashtra 11-Jul-2016
1799 Sardar Patel Ring Road Project 76.3 KM (Kilometer) 560.00 Transport Roads and bridges Operation and Maintenance Stage Ahmedabad Urban Development Authority Gujarat 04-Jul-2016
1800 Beautification & Development of Tonk road from Ajmeri Gate to Sanganer Flyover Not Available 6.00 Social and Commercial Infrastructure Tourism Operation and Maintenance Stage Jaipur Development Authority Rajasthan 21-Jun-2016
1801 Recreation Park & Swimming Pool (Raipur) Project 19.0 Acres 25.00 Social and Commercial Infrastructure Tourism Operation and Maintenance Stage Raipur Development Authority Chhattisgarh 21-Jun-2016
1802 Aurangabad City Integrated Roads Not Available 167.80 Transport Roads and bridges Under Construction Maharashtra State Road Development Corporation Limited (MSRDC) Maharashtra 18-May-2016
1803 Integrated Disposal Facility (Mysore) Not Available 27.83 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Mysuru City Corporation Karnataka 18-May-2016
1804 Integrated Road Development Project (Baramati) 21.06 KM (Kilometer) 33.57 Transport Roads and bridges Operation and Maintenance Stage Maharashtra State Road Development Corporation Limited (MSRDC) Maharashtra 18-May-2016
1805 Multi Utility Infrastructure Project at Dagapur Not Available 50.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Operation and Maintenance Stage Siliguri Jalpaiguri Development Authority West Bengal 18-May-2016
1806 Municipal Solid Waste Management (Ferozepur) Project 300.0 TPD (Tonne per day) 36.15 Water Sanitation Solid waste management Operation and Maintenance Stage Municipal Council, Ferozepur Punjab 18-May-2016
1807 Nagpur Energy Audit Projects for Water Supply (NAG-008) Not Available 25.04 Water Sanitation Water supply pipeline Operation and Maintenance Stage Nagpur Municipal Corporation Maharashtra 18-May-2016
1808 Nagpur Kanhan Water Supply Scheme-Augmentaion Not Available 82.17 Water Sanitation Water supply pipeline Operation and Maintenance Stage Nagpur Municipal Corporation Maharashtra 18-May-2016
1809 Ranchi Ring Road Project - Section VII 23.0 KM (Kilometer) 587.60 Transport Roads and bridges Under Construction Road Construction Department, Jharkhand Jharkhand 18-May-2016
1810 Road Upgradation (Dehgaon-Bamori) Project 27.50 KM (Kilometer) 36.02 Transport Roads and bridges Operation and Maintenance Stage Madhya Pradesh Road Development Corporation Limited (MPRDC) Madhya Pradesh 18-May-2016
1811 Bridge across river Godavari between Yanam - Edurlanka 1.80 KM (Kilometer) 110.00 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation Andhra Pradesh 17-May-2016
1812 Bhiwandi-Kalyan-Shil Phata Highway Project 21.6 KM (Kilometer) 228.00 Transport Roads and bridges Operation and Maintenance Stage Maharashtra State Road Development Corporation Limited (MSRDC) Maharashtra 26-Feb-2016
1813 Transmission Line (RAPP 7&8 - Shujalpur) Project 200.0 CKM (Circuit Kilo Meter) 310.00 Energy Electricity transmission Operation and Maintenance Stage Power Finance Corporation Limited Multi State/ Centre 05-Jan-2016
1814 Useful Conversion of Solid Waste in Udaipur 150.0 TPD (Tonne per day) 70.00 Water Sanitation Solid waste management Operation and Maintenance Stage Udaipur Municipal Corporation Rajasthan 09-Nov-2015
1815 Indira Gandhi Government Medical College Complex Not Available 275.00 Social and Commercial Infrastructure Health Care Operation and Maintenance Stage Nagpur Municipal Corporation Maharashtra 06-Nov-2015
1816 Consruction of 197 Bus-Q-Shelters in NDMC area Not Available 15.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage New Delhi Municipal Council Delhi (UT) 27-Sep-2015
1817 Delhi-Noida Toll Bridge 0.55525 KM (Kilometer) 408.20 Transport Roads and bridges Operation and Maintenance Stage New Okhla Industrial Development Authority (NOIDA) Delhi (UT) 27-Sep-2015
1818 Development of Bypass Roads for Sandur Town Bellary district Under Direct Tolling System 16.5 KM (Kilometer) 40.00 Transport Roads and bridges Operation and Maintenance Stage Public Works, Ports and Inland Water Transport Department, Karnataka Karnataka 27-Sep-2015
1819 Development of Industrial Park, Gurgaon Not Available 60.00 Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Operation and Maintenance Stage Haryana Urban Development Authority Haryana 27-Sep-2015
1820 Improvement to Putaspanga Bamberi Road Not Available 68.00 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Odisha Odisha 27-Sep-2015
1821 Integrated Solid Waste Management at Koyambedu wholesale market complex 150.0 TPD (Tonne per day) 10.50 Water Sanitation Solid waste management Operation and Maintenance Stage Chennai Metropolitan Development Authority Tamil Nadu 27-Sep-2015
1822 Municipal Solid Waste to Energy in Hyderabad 6.6 MW (Mega Watt) 34.00 Water Sanitation Solid waste management Operation and Maintenance Stage Greater Hyderabad Municipal Corporation Telangana 27-Sep-2015
1823 Road Upgradation (Jalna-Watur) Project 45.3 KM (Kilometer) 100.05 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Maharashtra Maharashtra 27-Sep-2015
1824 Trivandrum City Road Improvement Project 42.37 KM (Kilometer) 347.00 Transport Roads and bridges Operation and Maintenance Stage Kerala Road Fund Board Kerala 27-Sep-2015
1825 Widening & Strengthening of Sri Ganga Nagar - Hanumangarh road 54.5 KM (Kilometer) 16.03 Transport Roads and bridges Operation and Maintenance Stage Public Works Department, Rajasthan Rajasthan 27-Sep-2015