84th 02.11.2020 Development of Vizhinjam International Multipurpose Seaport Project regarding
83th 18.08.2020 Development of silos of 50,000 MT for storage of wheat at Harduaganj , Aligarh , Uttar Pradesh on DBFOT basis under PPP Mode
82th 25.02.2020 Up-gradation of Two lane plus paved/hard shoulder road project from KM 24.800 of NH-75 (Gwalior - Jhansi Section) to KM 19.000 upto Ghongha village (Dabra - Sighpur road) via Biluia village in the state of Madhya Pradesh on BOT (Toll) basis under PPP mode
81th 02.01.2020 Proposal of Food Corporation of India (FCI) to develop silos of 50,000 MT for storage of wheat at Harduaganj , Aligarh , Uttar Pradesh on DBFOT basis under PPP Mode
80th 15.01.2018 Development, Operation & Maintenance of Ratangarh-Churu Highway project (section of SH-107 from km 0.00 to km 40.993) in the state of Rajasthan on DBFOT Toll Basis under PPP Mode
79th 23.11.2017 Development, O&M of Hanumangarh to Abohar section of SH-7A (up to Punjab border) on DBFOT Toll basis in the state of Rajasthan under PPP Mode.
Development of two laning with granular shoulder from km 1/5 to km 51/4 in Seoni and km 51/4 to km 24/10 in Balaghat of SeoniKatangi section of SH 54 on DBFOT (Toll) basis in the State of MP under PPP mode.
78th 20.07.2017 Development, O&M of Gadoj-Majri to Haryana/ Rajasthan Border and Majri to Neemrana on DBFOT (Toll) Basis under PPP mode.
Construction of three (3) km long three three lane flyover (Elevated Corridor) near Joda town inluding improvement of road stretch of Joda - Bamberi Section between 0 to 4.875 KM. in the District of Kendujhar, Odisha on DBFOT (Toll) Basis under PPP mode
Development of Modern Silos of 50000 MT for storage of Wheat in consuming and distributing area with bulk unloading facility through railway siding at Borivali, Maharashtra on DBFOT basis under PPP mode
Development of Modern Silos of 50000 MT for storage of Wheat in consuming and distributing area with bulk unloading facility through railway siding at Dhamora, Uttar Pradesh on DBFOT basis under PPP mode
77th 16.05.2017 Improvements of Road from Yelahanka to Karnataka/ AP State Border section of SH9 from KM 13.800 to KM 89.417 in the state of Karnataka on DBFOT (Toll) Basis under PPP mode ( four laning of Yelahanka Dodaballapur section and two laning of Dodaballapur- AP border section)
76th 23.01.2017 Development, Operation and Maintenace of Sri Ganganagar - Pacca Saharana Setion of SH 36 in Rajasthan under DBFOT (Toll) Basis
Development of composite logistics hub at Katni, Madhya Pradesh under DBFOT (Toll) Basis
75th 06.12.2016 Two lane plus paved/hard shoulder road project from KM 24.800 of NH-75 (Gwalior - Jhansi Section) to KM 19.000 upto Ghongha village (Dabra - Sighpur road) via Biluia village in the state of Madhya Pradesh on DBFOT Basis under PPP mode
74th 06.10.2016 Development of Sinnar-Nashik section of NH-50 (from kM-177.000 to km 201.350) in the State of Maharashtra with 4- lane on DBFOT [BOT (Toll)] basis under PPP Mode
Development, Operation and Maintenance of Hanumangarh to Abohar section of SH- 7A (up to Punjab border) on Design, Build, Finance, Operate and Transfer (DBFOT) Toll basis under PPP mode
73th 01.09.2016 Development of Food grain Silos at Kaimur and Buxar in Bihar on DBFOT basis under PPP mode
72th 08.07.2016 Two-laning of chomu-Mahla via Renwal, Jobner (SH-8B' SH-19' SH-2C' SHG8A & ODR-02) in the state of Rajasthan on DBFOT basis under PPP mode
71th 17.05.2016 Development, operation and maintenance of Chomu Chandwaji highway project comprising SH-8B from KM 0 to KM 15.450 in the state of Rajasthan on DBFOT Basis under PPP mode
Development of a 400 kV Bikaner Sikar D/C Power Transmission Line for evacuation of power from wind and solar power in Rajasthan on DBFOT under PPP mode
70th 08.04.2016 Development of Road from Ginigere - Gangavathi - sindhanur on SH 23 from Km' 79.00 to Km. 162.00 on (DBFOT) toll basis under PPP mode
Development, operation and maintenance of Chomu Chandwaji highway project comprising SH-8B from KM 0 to KM 15.450 in the state of Rajasthan on DBFOT Basis under PPP mode
Four/Six laning with paved shoulder of Dewas Bypass from KM 0/00 (Ujjain Dewas Junction) on SH-18 to km. 19/800 (Indore Junction) on NH-3 in the state of Madhya Pradesh on DBFOT basis under PPP mode.
69th 22.12.2015 Development of Modern Silos of 50,000 MT for storage of Wheat on DBFOT Basis under PPP mode at Assam
Development of Modern Silos of 50,000 MT for storage of Wheat on DBFOT Basis under PPP mode at Narela, Delhi
Development of Modern Silos of 50,000 MT for storage of Wheat on DBFOT Basis under PPP mode at Sahnewal, Punjab
Delegation of Power to Undersecretary for signing of Tripartite Agreement
68th 23.11.2015 Development of 400 kV Suratgarh-Bikaner Double Circuit twin moose power transmission line project in Rajathan for evacuation of power of Super Critical Thermal Power Plant at Suratgarh on DBFOT Basis under PPP Mode
Development of 400 kV Babai (Jhunjhunu) - Jaipur (North) Double Circuit Twin Moose Power Transmission line with a design capacity to transfer electricity equivelent to 1066 MW and having 2x315 MVA,400/200 KV Grid substation at Jaipur in Rajatshan for evacuation of power of Super Critical Thermal Power Plant at Suratgarh on DBFOT Basis under PPP Mode
Development of modern food silo for storage of wheat on DBFOT at Whitefield, Bangalore (Karnataka)
Development of modern food silo for storage of wheat on DBFOT at Katihar (Bihar)
Development of Silos for storage of wheat on DBFOT basis under PPP mode at Kotkapura, Punjab
Development of Four lane of Satna to Bela section (km 155/0 to km 203.04) of NH 75 on PPP basis following DBFOT (Toll) basis in the State of MP under PPP Mode
Development of Rachi Talcher Paradip gas Pipeline project Change in Alignment
67th 30.09.2015 Development of 400 kV Suratgarh-Bikaner Double Circuit twin moose power transmission line project in Rajathan for evacuation of power of Super Critical Thermal Power Plant at Suratgarh on DBFOT Basis under PPP Mode
Development, Operation & Maintenance of Dungargarh to Rajgarh Section of SH-06 from Km. 71to Km. 231 on DBFOT Basis under PPP mode
66th 31.07.2015 Development & Operation of Bulk Water Supply Project for IIT Bhubaneshwar, NISER, INFO City II and adjoining areas in the state of Odisha under PPP mode
65th 24.07.2015 Development, Operation & Maintenance of Dungargarh to Rajgarh Section of SH-06 from Km. 71to Km. 231 on DBFOT Basis under PPP mode
Development operation & Maintenance of Dadu to chhan section of SH37 rrom Km. 40 to Km. 144 on DBFOT (Toll) Basis under PPP mode
Development, Operation & Maintenance of Mangalana function to Khatu Section of SH-2B from Km.0.0 to Km.52 and Makrana to Parbatsar Section of SH-2D from Km. 0.0 to Km. 22.20 on DBFOT (Toll) Basis under PPP mode
64th 07.04.2015 Development of a 400 KV Bikaner-Sikar D/C power Transmission line project for evacuation of power from wind and. solar power in Rajasthan on Design, Build, Finance, operation and transfer (DBFOT) basis under PPP Mode.
Development & operation (2 lane with PSS) of Nagaur-Bikaner section of SH-89 from km 171.00 to km 267.325(including Nagaur By-Pass from KM 180.50 of NH-65 to KM 171.00 of NH-89) in the State of Rajasthan on BOT (Toll) basis under PPP mode.
Matter pertaining to request of Food Corporation of India for issue of RFQ for identified projects for Development of Food silos at various locations through DBFOT basis prior, to in-principle approval of VGF for information of EI.
63th 03.02.2015 Development of a 400 kV Bikaner Sikar D/C Power Transmission Line for evacuation of power from wind and solar power in Rajasthan on DBFOT under PPP mode
Development of 12 Advanced Training Institutes (ATIs) on DBFOT basis in the state of Bihar, Assam , Chattisgarh , Goa, Gujarat , Jharkhand , Karnataka , Kerela , Madhya Pradesh , Odisha, Punjab , Rajasthan
62th 27.01.2015 Four laning of Ajmer to Nagaur section on NH 89 from km 0.000 to km 161.000 in the State of Rajasthan
Setting up of 50,000 MT modern food silo complex at Harda District Village Bhadawad
Setting up of 50,000 MT modern food silo complex at Hoshangabad District Village Junheta Bankhedi
Setting up of 50,000 MT modern food silo complex at Ujjain District Village Manpur
Setting up of 50,000 MT modern food silo complex at Vidisha District Village Patheri Haveli
61th 19.12.2014 Development of a 400 kV Bikaner Sikar D/C Power Transmission Line for evacuation of power from wind and solar power in Rajasthan on DBFOT under PPP mode
Development of Ara end connectivity from KM 116.76 to KM 125 of NH 30 in Bihar on DBFOT Basis under PPP mode
Development of 18 railway over bridges (ROBs) & Limited Height Subways
60th 03.11.2014 Development of a 400 kV Bikaner Sikar D/C Power Transmission Line for evacuation of power from wind and solar power in Rajasthan on DBFOT under PPP mode
Four Laning of Aligarh Mathura Road SH 80 from KM 2.800 to KM 42.260 on DBFOT Toll Basis under PPP Mode in the state of Uttar Pradesh
Four laning of Muzaffarnagar, Sahartanpur Road (SH-59) from KM 0.000 to KM 52.950 on DBFOT Toll Basis under PPP Mode in the state of Uttar Pradesh
59th 29.09.2014 Four lanining of Dewas, Ujjain, Badnagar , Badnawar Road (SH-18) from KM 154.00(Dewas to KM 190.00(Ujjain Town and from KM 0.00 (Ujjain town) to 61.70( Badnawar) on DBFOT Toll Basis under PPP mode in the state of Madhya Pradesh
Four laning of Ujjain Jhalawad (SH -27) from KM 58.40 at Ujjain town to 192.20 near MP/ Rajasthan Border on DBFOT Toll Basis under PPP mode in the state of Madhya Pradesh
Development of 12 Advanced Training Institutes (ATIs) on DBFOT basis in the state of Bihar, Assam , Chattisgarh , Goa, Gujarat , Jharkhand , Karnataka , Kerela , Madhya Pradesh , Odisha, Punjab , Rajasthan
58th 16.09.2014 Four laning with PSS of Sambalpur - Rourkela section of SH-10 from km 4.900 to to km 167.900 (Rourkela) on BOT Toll Basis under PPP mode in the state of Odisha
Four laning of Indore- Ichhapur to MP/ Maharashtra Border section (SH 27) form KM 2.5 to Km 203.740 in the state of Madhya Pradesh on DBFOT Toll Basis under PPP mode
57th 08.08.2014 Vizhinjam International Seaport Limited (VISL): Development of a minor sea port at Vizhinjam on DBFOT basis to handle upto 18000 TEU container ships and rated annual capacity of the port shall be 10 lakh TEUs in the State of Kerala under PPP Mode
56th 21.07.2014 Development of Four lane of Sidhi to Singrauli section (km 83/4 to km 195/8) of NH 75E on DBFOT (Toll) basis the state of Madhya Pradesh on BOT Toll Basis under PPP mode
Proposal from Municipal Corporation of Greater Mumbai (MCGM) for approval of the EI for shortlisting of bidders for Development of Solid Waste Management project in Mumbai in the state of Maharashtra
Proposal from Lonavala Municipal Corporation for Augmentation and Improvement in Distribution System for 24x7 Supply and Reduction of Nonrevenue water through 100 % Metering and O&M of water supply system for Lonavala city on PPP in the state of Maharashtra
55th 19.06.2014 Four laning of Hadapsar- Saswad- Belsar-Phata (SH-64) to Belha-Pabal-Uralikanchan-Jejuri-Nira (SH-6) KM 111.0 to KM 118 in the state of Maharashtra on BOT (Toll) Baiss under PPP mode
Development of two laning with paved shoulders from Bhopal (KM 4.1) to Bearasia (KM 40.80) and two laning of granular side shoulder from Berasia (KM 67) to sironj (Km 0.0) section of SH 23 on BOT (Toll) Basis ) under PPP mode in the state of Madhya Pradesh
Development of four laning of Mangawan –MP/UP Border section on MH 27 from KM 98.2 to KM 46.600 in the state of Madhya Pradesh on BOT (Toll) basis under PPP mode
Development of four laning of Satna Bela Border section of NH 75 from Km 155 to KM 203.04 in state of Madhya Pradesh on BOT (Toll) basis under PPP mode
Vizhinjam International Seaport Limited (VISL): Development of a minor sea port at Vizhinjam on DBFOT basis to handle upto 18000 TEU container ships and rated annual capacity of the port shall be 10 lakh TEUs in the State of Kerala under PPP Mode
54th 02.05.2014 Development of Medical College and an associated Hospital at Gajapati District and Raygada District of Odisha through PPP
Up gradation and O&M of hatgamharia-jagarnathpur-Noamundi- Baraiburu(upto Karo Crossing) section of SH 4 in the state of Jharkhand on BOT basis under PPP mode
53th 03.03.2014 Development of a 400 kV DCDS Sarni (Satpura) - Ashta transmission line project for evacuation of power from 2x250 MW extension units at Satpura Thermal Power Station under DBFOT (Toll).
Two/Laning with PSS of Guna-Ashoknagar-Ishagarh Section of SH-20 on BOT (Toll) basis
Four-laning with PSS of Ara-Mohania, NH section, (NH-30, km 0.00 to km 116/760) length 116 km, in the State of Bihar on BOT (Toll) basis.
Setting up of 50,000 MT modem food silo complex at Bhopal district
Setting up of 50,000 MT modem food silo complex at Indore district
Widening to Two lane with Paved shoulder of road cluster (consisting ofsections of SH 128, SH 118, MOR 14 and SH 103) connecting Narayangaon - Pargaon - Maithan - Shirur - Kanifnath - Nhavara on PPP basis
Four Ianing of Sambalpur - Rourkela section of SH 10 from Km 4.900 to Km 167.900 in the State of Odisha on BOT (toll) basis
52th 03.02.2014 Two-lane with paved shoulder from Sikar to Bikaner and Bikaner Bypass of NH 11 in the State of Rajasthan under DBFOT basis
Two/Four-laning (with part paved-side-shoulders and part soft shoulder) at km 0.0 to km 61.60 of Nelamangala and Chikkaballpura road section on BOT (Toll) basis
Four/Six laning of Malegaon-Manmad-Kopergaon Section of SH 10 from Km. 95.000 to Km 171.130.
Four laning of Nagpur-Umred-Chandrapur from Km. 10.200 to Km 74.00 of MSH - 9 on Build, Operate and Transfer (BOT) basis.
Four-laning of Aurangabad - Ajantha - Fardapur Highway (MSH 8) from Km. 5.000 to Km 104.000 through BOT (Toll) basis.
Four-Jarring of Jalna-Ambad-Vadigodri Section of SH 176 from Km 154.000 to 200.600 on BOT (Toll) basis
Development of 16 ROBs & 14 Limited Height Subways (LHS) on 16 locations of existing Railway Level Crossings on in the state of Madhya Pradesh on Design, Build, Finance, Operate and Transfer (DBFOT) basis
51th 18.12.2013 Four-laning (with paved-side-shoulders) of Bareilly-Almora Section of SH-37 from km 3.50 to km 56.00 in the state of Uttar Pradesh on Design, Build, Finance, Operate and Transfer (DBFOT) toll basis in the state of Uttar Pradesh
Four-laning (with paved­ side-shoulders) of Delhi-Saharanpur Yamunotri Road upto Uttrakhand Border (SH 57), from Delhi (Loni border)-Saharanpur section of SH-57 from km 10.91 to km 217.00 in the State of Uttar Pradesh on DBFOT (Toll) basis.
Four-laning of Varanasi-Shaktinagar road of SH-SA in UP from km 0.0 to km 115.0 in the state of Uttar Pradesh under DBFOT basis.
Four -laning of Muzaffarnagar - Saharanpur Road (SH-59) from Km.0.000 to Km.52.950 on Design, Build, Finance, Operate and Transfer (DBFOT) toll basis in the state of Uttar Pradesh
4-laning of Etah - Sikohabad Road (SH-85) from km 0.000 to km 51.415 on Design, Build, Finance, Operate and Transfer (DBFOT) toll basis in the state of Uttar Pradesh
4-laning of Aligarh - Mathura Road (SH-80) from Km.2.800 to Km.42.260 on Design, Build, Finance, Operate and Transfer (DBFOT) toll basis in the state of Uttar Pradesh
4 laning of Balrampur - Gonda - Jarwal Road (SH-0lA) from Km 146.00 to Km 234.00 on Design, Build, Finance, Operate and Transfer (DBFOT) toll basis in the state of Uttar Pradesh
2/4 laning of Akbarpur-Jaunpur-Mirzapur-Dudhi Road (SH-5) on Design, Build, Finance, Operate and Transfer (DBFOT) toll basis in the state of Uttar Pradesh
4 laning of Sahajahanpur-Hardoi-Lucknow Road (SH- 25) on Design, Build, Finance, Operate and Transfer (DBFOT) toll basis in the state of Uttar Pradesh
2-laning of Tarighat- Bara Road (SH-99) from Krn.0.000 to Km.39.200 on Design, Build, Finance, Operate and Transfer (DBFOT) toll basis in the state of Uttar Pradesh
Two-laning with granular shoulder in Seoni to Katangi section of SH-54 start from Ganesh Chowk Km. 1.5 of SH-26 to Km 51.4 (Seoni distt.) and Km 51.4 or 0.10 to 24.10 (in Balaghat district) on SH-54 (MP­ Maharashtra Border) on BOT (Toll) basis in the state of Madhya Pradesh
Development of 16 ROBs & 14 Limited Height Subways (LHS) on 16 locations of existing Railway Level Crossings on in the state of Madhya Pradesh on Design, Build, Finance, Operate and Transfer (DBFOT) basis in the state of Madhya Pradesh
Two laning of Ujjain-Maksi Road (MOR) from Km. 1.890 at Ujjain town to Km 38.230 near Maksi town on Build, Operate and Transfer (BOT) basis in the state of Madhya Pradesh
Four laning with PSS of Burhanpur Bypass Section from Km. 0.000 to Km. 10.520 of SH-27 in the state of Madhya Pradesh on Design, Build, Finance, Operate and Transfer (DBFOT) basis.
50th 12.11.2013 Four-laning of Varanasi-Shaktinagar road of SH-SA under DBFOT basis. in the state of Uttar Pradesh
Establishment of a Medical College with intake of 100 MBBS students and an associated Hospital with 500 beds as per MCI guidelines in Bolangir in the State of Odisha on Design, Build, Finance, Operate and Transfer (DBFOT) basis.
two/four laning to WaturPhata-Jintur-Aundha-Basmath Road (MSH-2) and Hingoli-Aundha Road (SH-249) on DBFOT basis in the state of Maharashtra
Four-laning of Aurangabad­ Paithan road (SH-30) & 2-lane paved side shoulders (PSS) of Walmi-Waluj pipe line road km 0.00 to Ian 5.20 road on BOT (Toll) in the state of Maharashtra
Four-laning of Ahmednagar¬ Karmala road (SH-141) km 0.00 to km 80.6 road on DBFOT (Toll) in the state of Maharashtra
49th 03.10.2013 Setting up of 50,000 MT mordern food silo complex at 8 locations Viz: Ujjain, Satna, Dewas, Raisen, Sehore, Vidisha and Hoshangabad Districts in Madhya Pradesh under PPP
48th 04.09.2013 Proposal for development of Four-laning of Aurangabad-Paithan road (SH-30) & 2-lane paved side shoulders (PSS) of Walmi-Waluj pipe line road km 0.00 to km 5.20 road on BOT (Toll) in the state of Maharashtra
Proposal for development of Four-laning of AhmednagarKarmala road (SH-141) km 0.00 to km 80.6 road on DBFOT (Toll) in the state of Maharashtra
Proposal for development of Four/Six-laning of Talegaon - Chakan road (SH-55) km 0.00 to km 24.0 road on DBFOT (Toll) in the state of Maharashtra
Setting up of 50,000 MT mordern food silo complex at 8 locations Viz: Ujjain, Satna, Dewas, Raisen, Sehore, Vidisha and Hoshangabad Districts in Madhya Pradesh under PPP
47th 23.07.2013 Development of Bareilly-Almora Section of SH-37 Design, Build, Finance, Operate and Transfer (DBFOT) toll basis in the state of Uttar Pradesh
Four-laning (with paved shoulders) of Delhi-Saharanpur Yamunotri Road upto Uttrakhand Border (SH 57) on DBFOT basis in the state of Uttar Pradesh
Development of a Bulk Water Supply network for satellite towns and other institutions (Khorda and Jatni) and other institutions (such as IIT Bhubaneshwar, NISER, and INFOCITY-II etc.) in and around Bhubaneswar under PPP framework in the state of Odisha
Development of a Residential School covering poor, disadvantaged, SC, ST, minorities and backward class students, each school to be located in the 3 districts of Baripada, Keonjhar and Rayagada/Koraput under PPP framework in the state of Odisha
Development of Tuivai Hydro Electric Project (210 MW)on DBFOT basis in the state of Mizoram
Development of 17 Railway Over Bridges (ROBs) & 15 Limited Height Subways (LHS) on 17 locations of existing Railway Level Crossing in the state of Madhya Pradesh under DBFOT in the state of Madhya Pradesh
Two laning of Ater - Jaitpur Road from Km. 0/10 at Bhind-Ater Junction in Ater Town to Km. 5/5 and construction of High Level Bridge on Chambal River near Jaitpura Village (SH-19) in the state of Madhya Pradesh under DBFOT
Two/Four laning to WaturPhata-Jintur-Aundha-Basmath Road (MSH-2) and Hingoli-Aundha Road (SH-249) on DBFOT basis in the state of Maharashtra
Four-laning to Jalna-Ambad-Vadigodri (SH-176) km 154/00 to200/600 (Total length 46 km) on DBFOT basis in the state of Maharashtra
Four-laning to Aurangabad-Ajintha-Fardapur Highway (MSH 8) km 5/0 to 104/0 (Total length 99 km) on DBFOT basis in the state of Maharashtra
46th 09.04.2013 Hyderabad Metro Rail on DBFOT (Toll) basis
Four-laning (with paved shoulders) of Delhi-Saharanpur Yamunotri Road upto Uttrakhand Border (SH 57) on DBFOT basis in the state of Uttar Pradesh
Two/four laning with paved shoulders, Yelahanka – AP Border Section from km 13.800 to km 89.417 of SH-09 under DBFOT in the state of Karnataka
Development of a Bulk Water Supply network for satellite towns and other institutions (Khorda and Jatni) and other institutions (such as IIT Bhubaneshwar, NISER, and INFOCITY-II etc.) in and around Bhubaneswar under PPP framework in the state of Odisha
Establishment of a Medical College with intake of 100 MBBS students and an associated Hospital with 500 beds as per MCI guidelines in Bolangir in the state of Odisha on Design, Build, Finance, Operate and Transfer (DBFOT) basis.
Development of a Residential School covering poor, disadvantaged, SC, ST, minorities and backward class students, each school to be located in the 3 districts of Baripada, Keonjhar and Rayagada/Koraput under PPP framework.
45th 11.01.2013 Development of 50 Senior Secondary Schools (Classes VI to XII) as 10 projects (each project having 5 schools) covering 10 districts of Rajasthan on DBFMOT basis in the state of Rajasthan
Two laning with granular shoulders of Manawar Singhan-Kukshi section of MDR from Km 0/00 to Km 14.750 in Manawar town & km 23.60 to km 0.00 (Barwani to Kukshi) in the state of Madhya Pradesh on BOT (Toll) in the state of Madhya Pradesh
44th 13.12.2012 Two-laning of Jaipur-Bhilwara section of SH-50 from km 0.0 to km 212 on BOT (Toll) basis in the state of Rajasthan
Development of Tuivai Hydro Electric Project (210 MW) on DBFOT basis in the state of Mizoram
Development of 50 Senior Secondary Schools (Classes VI to XII) as 10 projects in ten districts of Rajasthan on DBFMOT basis.
Two-laning with Paved Side Shoulder (PSS) of BihtaMahabalipur-Aurangabad section of SH-2 & NH-98 (from km 49.4 to km 127.45 of NH-98 & km 2 to km 37.80 of SH-2) under DBFOT (Toll) in the state of Bihar
43th 30.10.2012 Development of International Airport at Khushinagar in Uttar Pradesh on DBFOT basis in the state of Uttar Pradesh
Development of six-lane expressway of Mumbai Trans Harbour Link (MTHL) connecting Sewri on Mumbai island to Nhava on main land on BOT (Toll) basis in the state of Maharashtra
Two-laning with PSS of Northern Kota Bypass starting from km 391/100 of NH-76 To km 11/700 (Existing Level Crossing at SH-33, Kota-Lalsot Mega Highway with link road of 452 m with SH-33) in the State of Rajasthan under NH (O) on DBFOT (Toll) basis
Four-laning of Rewa-Sidhi section of NH-75 E from km. 2.8 to km 83.4 in the State of Madhya Pradesh on DBFOT (Toll) basis
Two-laning with PSS of Nagaur-Jodhpur section of NH65 from km 166.26 to km 296.07 in the State of Rajasthan on DBFOT (Toll) basis
42th 25.09.2012 Two-laning of Khandwa-Dehtalai-Burhanpur section of SH-50 from km 0/500 (at Khandwa) to km 4.730 (at Burhanpur) on BOT (Toll)c in the State of Madhya Pradesh
Two-laning with granular shoulder in Lakhnadon to Ghansore section of SH-40 from km 0 to km 38 on BOT (Toll) in the State of Madhya Pradesh
Two-laning of Jhabua to Jobat from km. 0.0 to km 47.60 and Jobat - Zeerpanya-Bagh-Kukshi section from km. 32.95 to km 63.20 of SH-39 in the State of Madhya Pradesh on BOT (Toll) basis
Two-laning of Rau-Mhow-Jamghat-Mandleshwar section of SH38 from km. 14.78 (old NH-3) to km 0.00 in the state of Madhya Pradesh on BOT (Toll) basis
Two-laning of Sarangpur-Akodia-Shujalpur section of SH-41 from km 0/000 (at Shujalpur) to km 38/600 (at Sarangpur) in the state of Madhya Pradesh on BOT (Toll) basis
Two-laning with granular shoulder in Seoni to Katangi section of SH-54 start from Ganesh Chowk Km. 1.5 of SH-26 to Km 51.4 (Seoni distt.) and Km 51.4 or 0.10 to 24.10 (in Balaghat district) on SH-54 (MP-Maharashtra Border) on BOT (Toll) in the state of Madhya Pradesh.
Four-laning with paved side shoulder in Sampalpur to Rourkela section of SH-10 start from km. 4.900 to km 167.900 on BOT (Toll) basis in the state of Odisha
Two/Four-laning with paved side shoulder in Yelahanka at AP border section from km 13.8 to km 89.417 of SH-9 on BOT (Toll) basis in the state of Karnataka
Two-laning with paved side shoulder in Northern Kota Bypass from km 391.100 of NH-76 to km 11.700 at SH-33 crossing on BOT (Toll) basis in the State of Rajasthan
Six-lane expressway of Mumbai-Trans-Harbour-Link (MTHL) connecting Sewri on Mumbai Island to Nhava on the main land on BOT (Toll) basis
41th 17.07.2012 Two laning with paved shoulders, Gotur-Kagewad sections of SH-44 (km 0.0 to km 3.12), SH-12 (km (171.9 to km 116.60) and SH-53 (km 2.30 to 0.0) under DBFOT basis in the state of Karnataka
Two/ four laning of Chandwad-Manmad-Nandgaon Road section of SH-24 from km 0.000 to km 47.200 and km 0.000 to km 16.900 of SH 16 alongwith construction of Manmad and Nandgaon by-pass under DBFOT.
Construction of two/ four-laning of Nanded-Narsi Road section of SH-6 from km. 264.000 to 307.000 and Narsi-Degloor to State Border section under DBFOT in the state of Maharashtra
Two laning of Shirur-Tajband-Mukhed-Narsi road and 2-lane with PSS Nanded-Narsi Road section of SH-225 on DBFOT (Toll) basis in the state of Maharashtra
Development of 50 Senior Secondary Schools (Classes VI to XII) as 10 projects in five districts of Rajasthan on DBFMOT basis in the state of Rajasthan
40th 11.06.2012 4-laning of Narketpally-Addanki-Medarametla road of SH-2 from km 0.000 to km 212.500 on DBFOT Basis in the state of Andhra Pradesh
4-laning of Hydrebad-Karimnagar-Ramagundam road of SH-1 from km 28.200 to km 235.058 on DBFOT Basis in the state of Andhra Pradesh
Improvement two/ four-laning of Karanji-Wani-GhuggusChandrapur Road section of MSH-6&7 from km. 0/000 to km. 81/000 and from km 0.00 to km 3.000 covering Dhanora Phata to Dhanora on DBFOT Basis in the state of Maharashtra
Construction of two/ four-laning of Nanded-Narsi Road section of SH6 from km. 264.000 to 307.000 and Narsi-Degloor to state border section under DBFOT in the state of Maharashtra
Two-laning with PSS of Tembhurni-Kurduwali-BarshiYedshi-Latur Road section of SH-77 from km 70.20 to km 159.30 under DBFOT in the state of Maharashtra
Two/ four laning of Chandwad-Manmad-Nandgaon Road section of SH-24 from km 0.000 to km 47.200 and km 0.000 to km 16.900 of SH 16 alongwith construction of Manmad and Nandgaon by-pass under DBFOT in the state of Maharashtra
Two laning of Chikkanayakanahalli-Tiptur-Hassan Road Road section of SH-19 & MDR from km 4.500 to km 22.85 of SH-19 and km 0.000 to km 44.110 under DBFOT in the state of Karnataka
Four/Two laning of Jath-Jamboti Road from Km 25.000 to km 101.000 of SH 31 section under DBFOT in the state of Karnataka
Two laning with paved shoulders, Devanahalli (km 0.000) to Kolar (km 49.052) via Vijayapura and Vemgal of SH 96 section under DBFOT in the state of Karnataka
Two laning with paved shoulders, Gotur-Kagewad sections of SH-44 (km 0.0 to km 3.12), SH-12 (km (171.9 to km 116.60) and SH-53 (km 2.30 to 0.0) under DBFOT in the state of Karnataka
Two laning with paved side shoulder Kamalanagar-Gunalli Road (Package 2) via Halburga and Bida from Km 0.00 to km 70.000 of SH 4 and link road of 5 km connecting SH-4 and SH-105 section under DBFOT in the state of Karnataka
Two laning with paved side shoulder Bagepally-BangapetKolar-Chelur stretch (sections of chainage; KGF with Bangarpet from km 0.0 to km 11.40 of SH-95, Bangarpet with Bagepally, km 0.0 to km 106.70 of SH-05 and Chintamani to Bagepalli via Chellur, km 0.0 to km 72.0) under DBFOT in the state of Karnataka
Two laning with paved side shoulder for Tanda-Sri Hargobindpur Amritsar Road (SH-22) from km 0+000 to km 72+147 under DBFOT in the state of Punjab
Two laning with paved side shoulder for Rayya to Khara section from Ch. 420.50 of NH-1 to junction of canal road with NH-15 (Harike Amritsar road) under DBFOT in the state of Punjab
Four laning of Sambalpur-Rourkela Section of SH-10 from Km 4.900 to 167.900 Km (Rourkela) in the State of Odisha under BOT in the state of Odisha
Two-laning with granular shoulders of Ratlam - Sailana - Banswada section from Ratlam city at km 0.00 and ends at Banswada (MPRajasthan Border) at km 42/6 on SH-39 under DBFOT (Toll) in the state of Madhya Pradesh
Two-laning with granular shoulders of Damoh-Katni Section from Teen Gulli Square at Damoh City from Km. 76/8 to Km. 4/8 at Katni Junction of SH-14 with NH--7 at Km 366/1 under DBFOT (Toll) in the state of Madhya Pradesh
Development of a 400 kV DCDS Sarni (Satpura) - Ashta transmission line project for evacuation of power from 2x250 MW extension units at Satpura Thermal Power Station under DBFOT (Toll) in the state of Madhya Pradesh
39th 03.04.2012 Improvement (Two/four-laning) of Nagpur - Bori – Tuljapur Road MSH-3 from km. 112/000 to km. 265/525 in Yavatmal District (Maharashtra) on DBFOT Basis
Construction of Four-laning of Nivali-Jaygad Road section of SH-106 from km. 0/0 to 42/340, in Tal & District Ratnagiri under DBFOT in the state of Maharashtra
Two-laning with PSS of Tembhurni-Kurduwali Barshi Yedshi- Latur Road section of SH-77 from km 70.20 to km 159.30 under DBFOT in the state of Maharashtra
Two-laning with PSS of NagaurJodhpur section of NH -65 from km 166.26 to km 296.07 in the state of Rajasthan under DBFOT (Toll)
Two-laning with granular shoulders of Dhar-Nagda section of SH -31 from km 0.0 to km 22.6 under DBFOT (Toll) in the state of Madhya Pradesh
Four-laning with paved shoulders of Rewa-Ring Road section from km 229.10 of NH-7 to km 6.2 of SH-9 under DBFOT (Toll) in the state of Madhya Pradesh
Two-laning with granular shoulders of Balaghat- Baihar section of SH-26 from km 0.10 to km 67.10 under DBFOT (Toll) in the state of Madhya Pradesh
Two-laning with PSS between Bihta-MahabalipurAurangabad section of SH-2 & NH-98 (from km 49.4 to km 127.45 of NH-98 & km 2 to km 37.80 of SH-2) under DBFOT (Toll) in the state of Bihar
38th 06.03.2012 Four-laning of Jam Warora-Chandrapur-Ballarpur-Bamni Road section of SH 264, TPC Rs. 449.25 crore, Length of 63.60 km, VGF of Rs. 89.85 crore and Concession period of 30 years.
Four-laning of Jam Warora-Chandrapur-Rajura Asifabad Road section of SH 266, TPC Rs. 223.61 crore, Length of 40 km, VGF of Rs. 44.72 crore and Concession period of 30 years.
Four-laning of Rewa - Sidhi section of NH -75E in the State of Madhya Pradesh, TPC Rs. 627.87 crore, length of 71.563 km, VGF of Rs. 125.57 crore and Concession period of 30 years.
Two-laning with PSS of Nagaur-Jodhpur section of NH -65, TPC Rs. 439.960 crore, Length of 134.64 km, VGF of Rs. 87.99 crore and Concession period of 17.5 years.
Four laning with PSS of Jodhpur-Pali section of NH-65, TPC Rs. 332.70 crore, Length of 71.553 km, VGF of Rs. 66.54 crore and Concession period of 25 years in the state of Rajasthan
Two-laning with PSS between Bihta-Mahabalipur-Aurangabad section of SH-2 & NH-98, TPC Rs. 362 crore, Length of 116.20 km, VGF of Rs. 72.40 crore and Concession period of 20 years in the state of Bihar
Two–laning with paved side shoulders (PSS) of Sindhanur to Lingsugur Road of SH 19 section, TPC of Rs. 189.67 crore, Length of 52 km, VGF of Rs. 37.934 crore and Concession period of 24 years in the state of Karnataka
37th 16.01.2012 Two laning of Whagdhari-Ribbanpally, SH-10 (Maharashtra Border – Andhra Pradesh Border) in the state of Karnataka
Two laning of Dharwad-Ramnagar in the state of Karnataka
Development (four two laning with PSS) of road from Shimoga- Honnalli to Hariharawad-Ramnagar, SH-34 , in the state of Karnataka
Development of two laned with PSS road (SH-20) from Devasgur Chikkasugur Raichur Kalmala to Linsugur, in the state of Karnataka
Development of road from NH-63 near Ginigere-Gangavathi to Sindhanur, in the state of Karnataka
Development of 2-lane with PSS road from , Sindhanur to Lingsugur Road of SH 19 section in the state of Karnataka
Four-laning of Jam Warora-Chandrapur-Ballarpur-Bamni section of SH 264, in the state of Maharashtra
four-laning of Jam Warora-Chandrapur-Rajura-Asifabad Road section of SH 266, , in the state of Maharashtra
Improvement of Nagaur-Bikaner section of NH-89 in the State of Maharashtra
four-laning of Rewa - Sidhi section of NH -75E, in the state of Madhya Pradesh
Two-laning with PSS of Nagaur-Jodhpur section of NH -65 in the state of Rajasthan
Two-laning with PSS of Bihta-Mahabalipur-Aurangabad section of SH-2 & NH-98 in the state of Bihar
Development of 50 Senior Secondary Schools (class VI to XII) as 10 projects in 5 districts of Rajasthan on DBFMOT basis.
36th 01.12.2011 Two laning of Ashoknagar-Vidisha, in the state of Madhya Pradesh
Two laning of Patan-Tendukheda-Rehli in the state of Madhya Pradesh
Two laning of Sehora-Majhgawan in the state of Madhya Pradesh
Two laning of Manawar-Singhan-Kukshi in the state of Madhya Pradesh
fourlaning of Nashik-Sinnar section of NH-50, in the state of Maharashtra
35th 02.12.2011 Two laning of Ashoknagar-Vidisha in the state of Madhya Pradesh
Two laning of Patan-Tendukheda-Rehli in the state of Madhya Pradesh
Two laning of Sehora-Majhgawan in the state of Madhya Pradesh
Two laning of Manawar-Singhan-Kukshi in the state of Madhya Pradesh
Improvement of Whagdhari Ribbanpally road SH 10 in the state of Karnataka
Improvement of Dharwad Ramnagar road SH 34 in the state of Karnataka
Development of road from Shimoga- Honnalli to Harihara, in the state of Karnataka
Development of road (SH-20) from Devasgur-Chikkasugur Raichur Kalmala to Linsugur in the state of Karnataka
Development of road from NH-63 near Ginigere-Gangavathi to Sindhanur in the state of Karnataka
High speed Rail Link (HSRL) to Bengaluru International Airport (BIA) in the state of Karnataka
2-lane with paved shoulder from Sikar to Bikaner and Bikaner Bypass of NH 11 in the
State of Rajasthan under DBFOT basis in the state of Rajasthan
Improvement of Nagpur-Bori-Taljapur Road MSH-3 from Kalamb to Umarkhed in Yavatmal District under BOT basis in the state of Maharashtra
34th 10.08.2011 Four-laning of Varanasi-Shaktinagar road of SH-5A in UP under DBFOT basis in state of Uttar Pradesh
Development of Rajauli-Bakhtiyarpur section of NH31 on BOT basis state of Bihar
Improvement of Whagdhari Ribbanpally road SH10 in state of Karnataka
Improvement of Dharwad Ramnagar road SH 34 in state of Karnataka
High Speed Rail Link (HSRL), Bangalore, in state of Karnataka
2-laning with PSS of Nidampur (from NH-64) to Sullar Gharat to Lehra Ghagga (till NH-71) Road on BOT (Toll) in state of Punjab
4-laning of Manpur-Barnala-Bhatinda section of SH 13 on BOT in state of Punjab
4-laning of Manpur-Jagraon-Rajkot-Abohar section of MDR 51 in state of Punjab
2-laning of Morinda – Kurali – Siswan – H.P. Border Road on BOT Toll in state of Punjab
2-laning with PSS of Batala-Mehta-Beas Road to on MDR-66 Road on BOT (Toll) in state of Punjab
2-laning with PSS of Kotkapura to Muktsar Road to on SH-16 Road on BOT (Toll) in state of Punjab
2-laning of Kapurthala-Nakodar-Phillur Road (MDR-48) on BOT (Toll), in state of Punjab
four-laning of Shikrapur -Nhavra-KedgoanChousla, km 53 to km 81.4 of SH-55, and km 16.8 to km 41.7 of SH-62,
Review of viability gap funding (VGF) projects under the Scheme from the State Government
33th 20.07.2011 Two laning of Basti Mehndawal Tamkuhi road of SH 64. Total Project Cost\ (TPC) Rs 303.05 crore; Length: 166.120 km; VGF sought: Rs. 60.61 crore and Concession Period 30 years in the state of Uttar Pradesh
Four laning of Ajmer to Nagaur section on NH 89 from km 0.000 to km 161.000 in the State of Rajasthan
Four laning of Bikaner to Suratgarh section on NH 11 from km 553.869 to km 173.000 on NH 15 in the State of Rajasthan
Four laning of Chittorgarh-Neemach section of NH 79 and Nimbahera-Pratapgarh section of NH 113 in the State of Rajasthan
Four laning of Suratgarh-Sriganganagar section of NH 15 in the State of Rajasthan
Four laning of Mangwan to MP/UP border section (km 98/2 to km 46/6) of NH 27 in the State of Madhya Pradesh
Four laning of Sidhi to Singrauli section (km 83/4 to km 195/8) of NH 75E in the State of Madhya Pradesh
Four laning of Satna to Bela section (km 155/0 to km 203.04) of NH 75 in the State of Madhya Pradesh
Four laning of Zirakpur to Patiala section of NH 64 from km 0 to km 50.700 in the State of Punjab.
Development of Satna-Chitrakoot (SH 11); in the state of Madhya Pradesh
Development of two laning with granular shoulder from km 0/10 to km 67/10 of Balaghat to Baihar section of SH 26 on PPP basis following DBFOT (Toll) basis in the State of Madhya Pradesh
Development of two laning with granular shoulder from km 0.00 to km 38.00 of Lakhnadon-Ghansore section of SH 40 on PPP basis following DBFOT (Toll) basis in the State of Madhya Pradesh
Development of two laning with granular shoulder from km 1/5 to km 51/4 in Seoni and km 51/4 to km 24/10 in Balaghat of SeoniKatangi section of SH 54 on PPP basis following DBFOT (Toll) basis in the State of Madhya Pradesh
Development of Green Field Bridge across River Ganga and its approaches connecting NH 31 near Bakhtiyarpur and NH 28 at Tajpur in the State of Bihar on DBFOT (Toll) basis.
Development Rajauli-Bakhtiyarpur section of NH 31 on PPP basis following DBFOT (Toll) basis in the State of Bihar.
Development of Ganga Driveway and Riverfront Development from Digha to Didarganj at Patna on BOT (Toll) basis in the state of Bihar
Review of viability gap funding (VGF) projects under theScheme from various State Governments( Uttar Pradesh , Madhya Pradesh, Andhra Pradesh , Bihar and Gujarat
32th 04.07.2011 Development of Yamunagar-Ladwa section of SH 6 and Ladwa-Karnal section of SH 7 including Ladwa by pass in the State of Haryana on DBFOT basis in the state of Haryana
Development of two laning with paved shoulders of Road from Nidampur (NH 64) to Sullar Gharat (NH 71) to Lehra Ghagga (Ghaggar Canal Road) from km 0 to km 49 through PPP on DBFOT basis.
Development of two laning with paved shoulders of Road from Manpur Headworks to Barnala-Raikot Road (Bhatinda Canal Road) from km 0.00 to km 47.44 through PPP on DBFOT basis.
Development of two laning with paved shoulders of Road from Manpur Headworks to Jagraon-Raikot Road along Abohar Branch from km 0.00 to km 53.50 through PPP on DBFOT basis in the state of Punjab
Upgradation of Morinda-Kurali-Siswan Road (MDR 31) in the State of Punjab on BOT Toll basis
Upgradation of Batala-Mehta-Beas Road (MDR 66) in the State of Punjab on BOT Toll basis
Upgradation of Kotkapura-Mukatsar Road (SH 16) in the State of Punjab on BOT Toll basis
Upgradation of Kapurthala-Nakodar Phillaur Road (MDR 48) in the State of Punjab on BOT Toll basis.
Review of viability gap funding (VGF) projects under the Scheme from various State Governments
31st 12.05.2011 Proposal from Government of Mizoram for proceeding with short listing of bidders in accordance with Model Request for Qualification (RfQ) document notified by Ministry of Finance for the Tuivai hydroelectric project.
30th 10.05.2011 Four laning with paved shoulders of Bhopal to Biaora section (km 316/10 to km 423.40) of National Highways (NH) 12 in the State of Madhya Pradesh,
Four laning of Rewa to MP/UP Border (km 229/10 to km 140/6) of National Highways 7 in the State of Madhya Pradesh,
Proposal from the State Government of Mizoram (GoM) for grant of in-principle approval for short-listing of bidders in accordance with the Model request for Qualification (RfQ) for the Tuivai Hydro Power project.
Development of Yamunagar-Ladwa section of SH 6 and LadwaKarnal section of SH 7 including Ladwa By-Pass in the state of Haryana
For development of 4 laning of Lucknow-Hardoi-Shahajahanpur road in SH 25 in the State of UP on DBFOT basis In the state of Uttar Pradesh
For development of 4 laning of Meerut-Karnal road in SH 82 in the State of UP on DBFOT basis In the state of Uttar Pradesh
Development of 2 laning with paved shoulders of Road from Nidampur (NH 64) to Sullar Gharat (NH 71) to Lehra Ghagga (Ghaggar Canal Road) in the state of Punjab
Development of 2 laning with paved shoulders of Road from Manpur Headworks to Barnala-Raikot Road (Bhatinda Canal Road) in the state of Punjab
Development of 2 laning with paved shoulders of Road from Manpur Headworks to Jagraon-Raikot Road along Abohar Branch from km 0.00 to km 53.50 through PPP on DBFOT basis. in the state of Punjab
Upgradation of Morinda-Kurali-Siswan Road (MDR 31) in the State of Punjab on BoT (Toll) basis in the state of Punjab
Upgradation of Batala-Mehta-Beas Road (MDR 66) in the State of Punjab on BoT (Toll) basis. in the state of Punjab
Upgradation of Kotkapura-Mukatsar Road (SH 16) in the State of Punjab on BoT (Toll) basis. in the state of Punjab
Upgradation of Kapurthala-Nakodar Phillaur Road (MDR 48) in the State of Punjab on BoT (Toll) basis. in the state of Punjab
Development of road from SH 58 near Chintamani-Tadgai cross to AP Border and Tadgal cross-Govinapalli to AP Boarder in the state of Karnataka
Development of road (SH 20) from Lingsugur-Kalmala to Raichur in the state of Karnataka
Development of road (SH 13) from AP Border near Devsugur Chikkasugur-Raichur-Yergera to Mantralaya bridge. in the state of Karnataka
Development of road from Shimoga-Honnalli to Harihara in the state of Karnataka
Development of road from NH 63 near Ginigere-to Gangavathi to Sindhnoor in the state of Karnataka
29th 16.03.2011 400 KV Jhajjar Power Transmission Project in Haryana, in the state of Haryana
Four laning of Nashik-Niphad-Vaijapur section of SH-30 in the state of Maharashtra
Four laning of Baramati-Phaltan-Sherwal section of SH-70 and SH-10 (in the state of Maharashtra
Four laning of Berala Phata-Chikhali-Amdapur Khamgaon of SH -205 and 173 part II n the state of Maharashtra
Two-laning with paved shoulders from Kotputli to Kuchaman and Daulatpura via Neem ka Thana, Sikar, Losal Road section of SH-37 B, SH-8A, SH-7 and MDR-24 on BOT (Toll) basis in the state of Rajasthan
Two laning with paved shoulders from laning of Chomu to Mahla on BOT (Toll) basis in the state of Rajasthan
Two-laning with paved shoulders of Rawatsar-NoharBhadra section of MDR 18 in the state of Rajasthan
Four-laning of Lucknow-Hardoi-Shahajanpur section in the state of Uttar Pradesh
Four-laning of Meerut-Karnal section of SH-82 in the state of Uttar Pradesh
Two laning of Betul-Sarni-Tikadhan-Junnardeo-Parasia section of SH-43 in the state of Madhya Pradesh on BOT (Toll) basis crore) in the state of Madhya Pradesh
Two laning of Rau-Mhow-Jamghat-Mandleshwar section of SH-38 from km. 14.78 (old NH-3) to km 0.00 in the state of Madhya Pradesh on BOT (Toll) basis
Two laning of Jhabua-Jobat-Zeerpanya-Bagh-Kukshi section of SH-39 from km. 0.0 to km 63.2 in the state of Madhya Pradesh on BOT (Toll) basis
Two-laning of Damoh-Batiyagarh-Baxwaha-Hirampur section of SH-37 from km. 0.0 to km 69 in the state of Madhya Pradesh on BOT (Toll) basis
Two-laning of Sarangpur-Akodia-Shujalpur section of SH-41in the state of Madhya Pradesh
Two-laning of Khandwa-Dehtala-Burhanpur section of SH-50) in the state of Madhya Pradesh
28th 31.01.2011 Four laning of Berala Phata-ChikhaliAmdapur Khamgaon to join NH 6 in Buldana District in the state of Maharashtra
Four laning (with paved shoulders) of Delhi-Saharanpur Yamunotri Road upto Uttrakhand Boarder (SH 57) on DBFOT basis in the state of Uttar Pradesh
Four laning (with paved shoulders) in Varanasi- Shaktinagar section of SH 5A in the State of Uttar Pradesh on DBFOT basis (117.60Km) basis in the state of Uttar Pradesh
Four laning (with paved shoulders) of Bareilly-Almora section of SH 37 in the State of Uttar Pradesh on DBFOT basis basis in the state of Uttar Pradesh
Development of Betul-Sarni-Tikadhan-Junnardeo-Parasia (SH 43) road in the State of Madhya Pradesh on DBFOT basis
Development of Rau-Mhow-Jamghat-Mandleshwar (SH 38) ) road in the State of Madhya Pradesh on DBFOT
Development of Jhabua-Jobat-Zeerpanya-Bagh –Kukshi (SH 39) road in the State of Madhya Pradesh on DBFOT basis
Development of Damoh-Bhatiyagarh-Baxwaha-Hirapur (SH 37) road in the State of Madhya Pradesh on DBFOT basis
Two laning of section from Chomu to Mahla via Renwal, Jobnet through PPP on DBFOT basis in the state of Rajasthan
Two laning of Kotputli- Kuchamann via Neem ka Thana, Sikar, Lohsal in the state of Rajasthan
27th 19.11.2010 Two-laning of Guna-Ashoknagar-Ishagarh Project (SH-20) on BOT basis in the state of Madhya Pradesh
Two-laning of Bhopal-Bersia-Sironj Project (SH-23) on BOT basis in the state of Madhya Pradesh
Two-laning of section of SH-58) near Chinamani-Tadgal cross to AP Border and Tadgal cross-Vovindapalli to AP Border in the state of Karnataka
Two/Four-laning of section of SH-20 from Lingsugur-Kalmala to Raichur in the state of Karnataka
Two/Four-Ianing of section of SH-23 form AP Border near Devsugur¬ Cikkasugur-Raichur-Yergerqa to Mantralaya Bridge in the state of Karnataka
Two-laning of section of SH-25 from Shimoga-Honnalli to Harihara in the state of Karnataka
Two-laning of section of SH-23 from Ginigere-Gangavathi to Sindhnoor near NH 63 in the state of Karnataka
26th 30.09.2010 Two laning of Bhina-Khimalsa-Malthon (39.42 km) on BOT Basis in the state of Madhya Pradesh
Two laning of Bhind Miltona-Gopalpur (SH 50.86) on BOT Basis in the state of Madhya Pradesh
Two laning of Damoh Jabalpur (SH 98.91 km) on BOT Basis in the state of Madhya Pradesh
Two laning of Sagar Damoh (SH 68.81 km) on BOT Basis in the state of Madhya Pradesh
Two-laning of Guna-Ashoknagar-Ishagarh Project (SH-20) on BOT basis in the state of Madhya Pradesh
Two-laning of Bhopal-Bersia-Sironj Project (SH-23) on BOT basis in the state of Madhya Pradesh
25th 10.10.2010 Two laning of Bhina-Khimalsa-Malthon (39.42 km) on BOT Basis in the state of Madhya Pradesh
Two laning of Bhind Miltona-Gopalpur (SH 50.86) on BOT Basis in the state of Madhya Pradesh
Two laning of Damoh Jabalpur (SH 98.91 km) on BOT Basis (in the state of Madhya Pradesh
Two laning of Sagar Damoh (SH 68.81 km) on BOT Basis in the state of Madhya Pradesh
Development of a two-laned road from Bina Kurvai-Sironj on BOT basis in the state of Madhya Pradesh
Two-laning of Kotputli- Kuchamann via Neem ka Thana, Sikar, Lohsal of SH 37-B, SH-7 and SH7-D (216 km in the state of Rajasthan
Two-laning of Bharatpur –Alwar-Behror-Narnaul road section of SH14 upto Haryana Border ( 71.127 km in the state of Rajasthan
Two laning with hard shoulders of Dudu-Sambhar Road section of SH-2 (26 km in the state of Rajasthan
Two laning from Chomu to Mahla via Renwal, Jobner section on SH8-B, SH-19, SH-2C, SH-8A and DDR 02 (82.087 km in the state of Rajasthan
Kotputli- Kuchamann project via Neem ka Thana, Sikar, Lohsal in the state of Rajasthan
Bharatpur –Alwar-Behror-Narnaul project in the state of Rajasthan
Dudu-Sambhar project in the state of Rajasthan
Chomu to Mahla Project via Renwal, Jobner in the state of Rajasthan
Four laning of Rai Malikpur (Rajasthan Border) – Narnaul-Mahendergarh-Dadri-Bhiwani-Kharak corridor (151 km in the state of Haryana
Proposal for ‘In-principle’ approval from Government of Haryana for four laning of Yamunanagar Ladwa section of SH-6 ( 21.8 km; in the state of Haryana
24th 08.07.2010 Hyderabad Metro Rail Project on DBFOT (Toll) basis
23th 16.04.2010 4 laning of Jalna-Deulgaon Raja-Berala Phata Road of State Highways SH 176 and construction of 4 lane bypass of Deulgaon Raja on BOT (Toll) basis in the state of Maharashtra
2-laning of Nagpur-Bori Tuljapur section of SH 3 on BOT (Toll) basis in the state of Maharashtra
2 -lane of the State Highways 1 between Sawaimadhopur-Bharatpur section on BOT (Toll) basis in the state of Maharashtra
2-lane of the SH 14 between Bharatpur-Alwar-Behror-Nornol section on BOT (Toll) basis in the state of Maharashtra
2-lane of the State Highway 2C and 19 between Jaipur and Nagapur section on BOT (Toll) basis in the state of Maharashtra
2-lane of the Dbadesh-Ramganjmandi-Pipaliya-Bhawanimandi road of SH 9A on DBFOT (Toll) basis in the state of Maharashtra
-lane with hard shoulder of State Highways 2 between Dausa-Dadu section on BOT (Toll) basis in the state of Maharashtra
2-lane with hard shoulder of State Highways 2 between Duda-Sambar section on BOT (Toll) basis in the state of Maharashtra
22th 04.03.2010 HVPNL 400 KV Jhajjar Power Transmission Project in Haryana on DBFOT basis
Development of SH 132 from Bellary city to Chatra Gudi in Karnataka on DBFOT basis.
21th 12.02.2010 Shortlisting of bidders for establishment of new senior secondary schools in Rajasthan in the PPP framework.
20th 14.12.2009 Development of Beawar-Gomti section of NH-8 in Rajasthan
Two laning of Ujjain-Unhel-Nagda-Jaora road in the state of Madhya Pradesh
Two laning of Satna-Chitrakoot road of SH-11, in the state of Madhya Pradesh
Construction of new four lane alignment connecting Lebad to Manpur (SH 31 to NH 3) in the state of Madhya Pradesh
Four laning of Jam Warora-Chandrapur SH-264 Jam to Warora Road in the state of Maharastra
Four Laning of Karanji-Wani-Ghuhhus Chandrapur road in Yavatmal and Chandrapur Distt
Four laning of Nagpur Bori Tuljapur Road MSH 3 in Yavatmal District
Development of SH 132 from Bellary city to Gudi in the state of Karnataka
Construction of green field bridge across river Ganga connecting Bakhtiyarpur in the State of Bihar
19th 12.08.2009 Two/Four laning of Nanded-Narsi Road sector of SH-6 on BOT (Toll) basis in the State of Maharashtra
Two laning of Shirur Tajband-Mukhed-Narsi & 2 laning with paved shoulder of Narsi-Biloli to State Border, sections of SH-225 on BOT (Toll) basis in the State of Maharashtra
Four laning of Akola Washim Hingoli Waranga Phata section of SH-204 on BOT (Toll) basis in the State of Maharashtra
Four-laning of SH 77 – Tembhurni (Km 70/200) to Yedshi Road (159/300) in the State of Maharashtra
Strengthening and widening of Nakhatrana-Dayapar Panandhro Road in the State of Gujarat
18th 02.07.2009 Construction of Bridge across river Godavari in the State of Andhra Pradesh
Two laning of Chikkanayakanahalli-Tiptur Hassan road in the State of Karnataka
Two laning of Dharwad-Ramnagar stretch of SH 34 in the State of Karnataka
Two laning of Whagdhari-Ribbanpally stretch of SH 10 in the State of Karnataka
Four laning of Bagodara-Dhandhuka-Vallabhipur-Bhavnagar Road Project in the State of Gujarat
Construction of Green field bridge across river Ganga connecting Bakhtiyarpur and Shahpur Patori in the state of Bihar
Development of two lane road Bhilwara to Bundi via Mandalgarh and Bijoliya in the state of Rajasthan
Development of two lane Road Jaipur to Bhilwara via Phagi, Malpura, Kekri and Shapura in the state of Rajasthan
Development of two lane Road of Beawer Gomti section of NH 8 on PPP basis following DBFOT pattern in the State of Rajasthan
17th 08.05.2009 Short listing of bidders for High Speed Rail Link (HSRL) Project connecting the city centre to the new Bangalore International Airport (BIA)
16th 02.02.2009 Four laning of Hyderabad-Karimnagar-Ramagundam Road Project in the state of Andhra Pradesh
Four laning of Narketpally-Addanki-Medarametla Road Project Project in the state of Andhra Pradesh
Four laning of Puthalapattu-Naidupet Road Project Project in the state of Andhra Pradesh
Proposal for enhancement in the TPC and VGF support for Design, Construction, Finance, Operation and Maintenance of Major bridge across river Godavari
Bhina-Khimalsa-Malthon Road Project in the state of Madhya Pradesh
Bhind-Miltona-Gopalpur Road Project in the state of Madhya Pradesh
Damoh Jabalpur Road Project in the state of Madhya Pradesh
Sagar Damoh Road Project in the state of Madhya Pradesh
Four Laning of Jalna-Deulgaon Raja-Berala Phata Road including Deulgaon Raja bypass. in the state of Maharashtra
Four Laning of Osmanbad-Latur-Nanded Highway. in the state of Maharashtra
Four laning of Jam Warora-Chandrapur-Ballarpur-Bamni Road
Four laning of Jam Warora-Chandrapur-Ballarpur-Bamni Road in the state of Maharashtra
Four laning of Aurangabad Paithan Highway in the state of in the state of Maharashtra
Four laning of Baramati-Phaltan-Lonand-Shirwal Highway in the state of Maharashtra
Widening of 2 lane road between Ara and Mohania in the state of Bihar
Widening of 2 lane road between Aurangabad and Bhita in the state of Bihar
15th 05.08.2008 Mumbai Metro Rail Project – Corridor II of Phase I (Charkop-Bandra-Mankhurd)
14th 18.06.2008 Four laning of Osmanbad Latur Nanded Highway
Four laning of Jalana Deulgaon Berala Phata Road, including Deulgaon Raja by-pass
Review of Status of proposals granted in principle approval
Review of status of project posed for viability gap funding: Western Freeway sea link project in Mumbai.
13th 10.04.2008 Hyderabad Mass Rapid Transit System Project in the state of Andhra Pradesh
Review of Mumbai Metro Rail Project – Corridor II of Phase I (Charkop-Bandra-Mankhurd)
Strengthening and Widening of two lane road with paved shoulders of Bhuj - Bachau Section of SH-42 in the State of Gujarat.
Improvement to two-lane road with paved shoulders of Nakhatrana-Dayapar-Panandhro road section of comprising of SH42 and MDR in the state of Gujarat
12th 05.03.2008 Four laning of Bhopal Dewas State Highway in the state of Madhya Pradesh
Strengthening of Matkuli-Tamia-Chhindwara Road Project in the state of Madhya Pradesh
Strengthening of Chandpur-Alirajpur-Kukshi-Badwani Road Project in the state of Madhya Pradesh
Strengthening of Mandsaur-Sitamau Road Project in the state of Madhya Pradesh
Draft Concession Agreement for the project: Four laning of Bhopal Bypass Road in the state of Madhya Pradesh
Four laning Indore-Ujjain Road Project in the state of Madhya Pradesh
Construction of second road bridge across river Godavari (revised proposal) in the state of Andhra Pradesh
Improvement in Chikkanya Kanahalli Tiptur Hassan Road in the state of Karnataka
Improvement of Dharwad- Ramnagar Stretch in the state of Karnataka
Two laning of Whaghari- Ribbanpally stretch in the state of Karnataka
Four laning of Ahmedabad Viramgam Maiya Road; Four laning of Rajkot Jamnadar Vadinar; and Halol- Godhara- Shamlaji Road in the state of Gujarat
Proposal under IIPDF Scheme from Government of Gujarat for Development of Transport Nagar at Ahmedabad.
11th 12.09.2007 Review the progress of 23 projects of Madhya Pradesh , Gujarat, Maharashtra, Rajasthan
10th 01.05.2007 Construction of Four-lane Bhopal By-pass in Madhya Pradesh
Four laning of Lebad-Jaora section of SH 31 in Madhya Pradesh
Four laning of Lebad-Jaora section of SH 31 in Madhya Pradesh
9th 08.03.2007 Finalisation of the draft Tripartite Agreement under the VGF Scheme
Mandsaur-Sitamau Road (Upto Rajasthan Border) in the state of Madhya Pradesh
Matkuli-Tamia-Chindwara in the state of Madhya Pradesh
Chandpur-Alirajpur-Kukshi-Badwani in the state of Madhya Pradesh
Four-laning of Bhopal, Devas the state of Madhya Pradesh
Four-laning of Joura-Nnayagaon in the state of Madhya Pradesh
Four laning of Ahmedabad-Viramgam-Maliya State Highway in Gujarat
8th 22.01.2007 Four laning of Manjarsumba-Lokhandi-Sawargaon-Latur in the state of Maharashtra
Four laning of Jalna-Deoulgaonraja-Berala Phata including Deoulgaonraja bypass in the state of Maharashtra
Four laning of Berala Phata-Chikhali-Khamgaon in the state of Maharashtra
Mumbai Metro (Charkop-Bandra-Mankhud corridor)
7th 14.11.2006 Four-laning of Ahmedabad-Viramgam road in Gujarat
Four Laning of Bhopal, Dewas
Four Laning of Jaora-Nayagaon
Four Laning of Lebad Nayagaon
Ro-Ro Ferry services in Gulf of Cambay, Gujarat
Obulavaripalle-Krishnapatnam Rail Line Project – RVNL
6th 10.10.2006 Upgradation of Narnaul to Kotputli- Chala- Sikar-Khud- LosalKuchaman State Highway in the state of Rajasthan
Development of two lane carriageway to Dabadeh to Bhawan Mandi in the state of Rajasthan
Two Lane Carriageway for Jobner to Thanagaji in the state of Rajasthan
Mumbai Metro (Versova – Andheri – Ghatkopar corridor) in the satte of Maharashtra
5th 21.09.2006 Strengthening of Mandsaur-Sitamau Road (Upto Rajasthan Border) State Highway in the state of Madhya Pradesh
Strengthening of Matkuli-Tamia-Chindwara State Highways in the state of Madhya Pradesh
Strengthening of Chandpur-Alirajpur-Kukshi-Badwani State Highways in the state of Madhya Pradesh
Four laning of Osmanabad-Latur-Nanded Road in the state of Maharashtra
Four laning of Nasik-Vaijapur-Aurangabad Road in the state of Maharashtra
Four laning of Halol Godhra-Shamlaji Road in the state of Gujarat
Four laning of Rajkot-Jamnagar-Vadinar Road in the state of Gujarat
4th 22.06.2006 Strengthening of Mandsaur-Sitamau Road (Upto Rajasthan Border) State Highway inMadhya Pradesh
Strengthening of Matkuli-Tamia-Chindwara State Highways in Madhya Pradesh
Strengthening of Chandpur-Alirajpur-Kukshi-Badwani State Highways in Madhya Pradesh
Four laning of the existing two lane Sardar Patel Ring Road around Ahmedabad city.
Upgradation of Sawai Madhopur to Bharatpur State Highway in Rajasthan
Upgradation of Jaipur to Nagaur State Highway in Rajasthan
Upgradation of Jaipur to Bhilwara State Highway, Rajasthan
Upgradation of Bhilwara to Bundi State Highway, Rajasthan
Proposal seeking extension for GIDB
Factoring the debt available from IIFC in project proposals
3rd 17.03.2006 Four Laning of Nasik-Vaijapur-Aurangabad Road;Four Laning of Osmanabad (Yedshi)- Latur- Nanded Road
2nd 17.02.2006 Appraisal mechanism
Four Laning of Halol-Godhra-Shamlaji Road in the state of Gujarat
Four-laning of Rajkot-Jamnagar-Vadinar road in the state of Gujarat
Four-laning of Ahmedabad – Viramgam road in the state of Gujarat
1st 19.12.2005 Meeting to discuss proposals received from GIDB and discussions on appraisal mechanism