S.No | |||||||||
---|---|---|---|---|---|---|---|---|---|
1 | Construction of Deep draught iron ore berth on BOT basis by Paradip Port Trust | Ministry of Shipping | Odisha | Ports | 591.35 | 23-10-2008 ![]() | 08-04-2016 | Under Construction | In-principle approval |
2 | Construction of Deep draught coal berth on BOT basis by Paradip Port Trust | Ministry of Shipping | Odisha | Ports | 479.01 | 23-10-2008 ![]() | 08-04-2016 | Under Construction | In-principle approval |
3 | Development of Eighth Berth as Container Terminal on Build Operate & Transfer (BOT) basis at Tuticorin Port | Ministry of Shipping | Tamil Nadu | Ports | 312.23 | 13-01-2009 ![]() | 12-04-2016 | Under Construction | Final approval |
4 | Design, Engineering, Upgradation, Development, Finance, Operation and Maintenance of Hyderabad-Bangalore section of NH 7 in the state of 12 under NHDP Phase VII | Ministry of Road Transport and Highways | Karnataka | Roads | 747.30 | 27-07-2009 ![]() | 12-04-2016 | Operation and Maintenance Stage | Final approval |
5 | Development of Multipurpose Berth to handle clean cargo including containers on BOT basis at Paradip Port | Ministry of Shipping | Odisha | Ports | 445.51 | 06-01-2010 ![]() | 12-04-2016 | Under Construction | Final approval |
6 | Development of North Cargo Berth II for handling bulk cargo at Tuticorin Port on DBFOT basis | Ministry of Shipping | Tamil Nadu | Ports | 332.16 | 06-01-2010 ![]() | 12-04-2016 | Under Construction | Final approval |
7 | Development of Mega Container at Chennai Port | Ministry of Shipping | Tamil Nadu | Ports | 3,125.00 | 06-01-2010 ![]() | 12-04-2016 | Final approval | |
8 | Two laning with Pave shoulder from Varanasi to Gorakhpur section Km 2 to Km 208 of NH 29 in the State of UP | Ministry of Road Transport and Highways | Uttar Pradesh | Roads | 538.88 | 10-02-2010 ![]() | 12-04-2016 | Under Construction | Final approval |
9 | Two laning with pave shoulder from Aligarh to Kanpur from Km 140.100 to Km 418.760 on NH 91 in the State of UP | Ministry of Road Transport and Highways | Uttar Pradesh | Roads | 723.25 | 10-02-2010 ![]() | 12-04-2016 | - | Final approval |
10 | Two laning with pave shoulder from Bilaspur - Urdawal section Km 3116 to Km 312.400 of 4 on NH 200 | Ministry of Road Transport and Highways | Chhattisgarh | Roads | 494.00 | 10-02-2010 ![]() | 12-04-2016 | - | Final approval |
11 | Four laning of Bhubaneshwar - Puri section of NH 203 in Orissa | Ministry of Road Transport and Highways | Odisha | Roads | 500.29 | 22-02-2010 ![]() | 12-04-2016 | Operation and Maintenance Stage | Final approval |
12 | Four laning of Sambalpur Baragarh of Orissa/Chhatisgarh border section of NH 6 from Km 0 to Km 88 in Orissa | Ministry of Road Transport and Highways | Odisha | Roads | 909.00 | 22-02-2010 ![]() | 13-04-2016 | Operation and Maintenance Stage | Final approval |
13 | Development of Dry Bulk Terminal at Tekra near Tuna on BOT basis | Ministry of Shipping | Gujarat | Ports | 1,140.82 | 15-03-2010 ![]() | 13-04-2016 | Pre-construction Stage | Final approval |
14 | Development of EQ 1 berth by replacement of the existing EQ1 and part of EQ2 berths in the north of the Inner Harbour of Vishakhapatnam Port | Ministry of Shipping | Andhra Pradesh | Ports | 323.18 | 17-08-2010 ![]() | 13-04-2016 | Operation and Maintenance Stage | Final approval |
15 | Development of modernised Police Headquarter Building at Parliament Street, Delhi | Ministry of Home Affairs | Delhi | Housing | 202.00 | 19-04-2011 ![]() | 13-04-2016 | Under Construction | Final approval |
16 | Two/ four laning of Obedullaganj -Shahganj Junction, Budhni- Betul Section of NH 69 under NHDP-IV, length 121.36 km | Ministry of Road Transport and Highways | Madhya Pradesh | Roads | 1,152.00 | 10-08-2011 ![]() | 13-04-2016 | Under Construction | Final approval |
17 | Two laning of Ajmer to Nagaur section on NH 89 under VGF Scheme, length 148.25 km | Ministry of Road Transport and Highways | Rajasthan | Roads | 377.15 | 10-08-2011 ![]() | 13-04-2016 | Under Construction | Final approval |
18 | Two laningof Bikaner to Suratgarh section on NH 11 under VGF Scheme, length 172.384 km | Ministry of Road Transport and Highways | Rajasthan | Roads | 501.08 | 10-08-2011 ![]() | 13-04-2016 | Operation and Maintenance Stage | Final approval |
19 | Two laning of Chittorgarh-Neemach section of NH 79 and Nimbahera-Pratapgarh section of NH 113 under VGF Scheme, length 116.997 km | Ministry of Road Transport and Highways | Madhya Pradesh | Roads | 511.21 | 10-08-2011 ![]() | 13-04-2016 | Operation and Maintenance Stage | Final approval |
20 | Two laning of Suratgarh-Sriganganagar section of NH 15 under VGF Scheme, length 78.10 km | Ministry of Road Transport and Highways | Rajasthan | Roads | 224.03 | 10-08-2011 ![]() | 13-04-2016 | Under Construction | Final approval |
21 | Four laning of Mangwan to MP/UP border section of NH 27 under VGF Scheme, length 52.074 km | Ministry of Road Transport and Highways | Madhya Pradesh | Roads | 381.66 | 10-08-2011 ![]() | 13-04-2016 | Under Construction | Final approval |
22 | Four laning of Sidhi to Singrauli section of NH 75E under VGF Scheme, length 102.60 km | Ministry of Road Transport and Highways | Madhya Pradesh | Roads | 871.15 | 10-08-2011 ![]() | 13-04-2016 | Under Construction | Final approval |
23 | Four laning of Mangwan to Satna to Bela section of NH 75 under VGF Scheme, length 48.04 km | Ministry of Road Transport and Highways | Madhya Pradesh | Roads | 320.48 | 10-08-2011 ![]() | 13-04-2016 | Under Construction | Final approval |
24 | Chandikole - Paradeep Section, km 0.000 to 76.618 of NH - 5A under NHDP V on BOT (Toll) | Ministry of Road Transport and Highways | Odisha | Roads | 1,014.36 | 23-01-2012 ![]() | 13-04-2016 | Under Construction | Final approval |
25 | Six/Four Laning of Delhi - Haryana Border to Rohtak Section of NH-10 from Km 29.70 to Km 87.00 including construction of Bahadurgarh and Rohtak Bypasses in Haryana under NHDP Phase IIIA | Ministry of Road Transport and Highways | Haryana | Roads | 486.00 | 11-10-2006 ![]() | 06-05-2016 | Under Construction | Final approval |
26 | Construction of Access Controlled Highways from Km. 10/0 to Km. 29/5 of Bangolore section of NH-4 in the state of Karnataka on BOT basis | Ministry of Road Transport and Highways | Karnataka | Roads | 380.00 | 01-11-2006 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
27 | Four Laning of Nelamangala Junction on NH-4 with NH-48 to Devihalli in the state of Karnataka under NHDP phase III A on BOT basis | Ministry of Road Transport and Highways | Karnataka | Roads | 441.00 | 01-11-2006 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
28 | Widening of Existing Two Lane carriageway to Four/Six lane divided carriageway configuration of Bangalore -Hoskate - Mulbagal section of NH-4 in the state of Karnataka under NHDP phase III A on BOT basis | Ministry of Road Transport and Highways | Karnataka | Roads | 565.00 | 01-11-2006 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
29 | Four Laning of Devilalli Hassan Section of NH- 48 in the state of Karnataka under NHDP phase III A on BOT basis | Ministry of Road Transport and Highways | Karnataka | Roads | 440.00 | 01-11-2006 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
30 | Four Laning from Junction of NH-68 with NH-7 near Salem to Junction of NH-68 with NH-45 near Ulundrupet in the state of Tamil Nadu under NHDP Phase III A on BOT | Ministry of Road Transport and Highways | Tamil Nadu | Roads | 941.00 | 01-11-2006 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
31 | Four Laning from Trichy city of NH-45 to Dindigul on NH-45 in the state of Tamil Nadu under NHDP Phase III A on BOT basis | Ministry of Road Transport and Highways | Tamil Nadu | Roads | 576.00 | 01-11-2006 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
32 | Four Laning of Trichy city Junction with NH-45 B on NH-67 to Karur on NH-67 in the state of Tamil Nadu under NHDP Phase III A on BOT basis | Ministry of Road Transport and Highways | Tamil Nadu | Roads | 516.00 | 01-11-2006 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
33 | Four Laning of Pondicherry to Tindivanam on NH-66 in the state of Tamil Nadu under NHDP Phase III A on BOT basis | Ministry of Road Transport and Highways | Tamil Nadu | Roads | 285.00 | 01-11-2006 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
34 | Six/Four Laning of Zirakpur - Parwanoo section of NH-22 including Pinjore - Kalka - Parwanoo bypass in Punjab, Haryana and Himachal Pradesh under NHDP Phase III A | Ministry of Road Transport and Highways | Himachal Pradesh | Roads | 295.00 | 01-11-2006 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
35 | Construction of Elevated Six Lane Highway (Flyover) from Km.16,100 (In Delhi) to Km.20.500 (Haryana) and its approaches on NH-2 (Delhi Agra Section) on BOT basis. | Ministry of Road Transport and Highways | Uttar Pradesh | Roads | 294.00 | 19-12-2006 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
36 | Four laning of Amritsar Wagha Boarder Section from Km.455.400 to Km 491.330 of NH-I in the State of Punjab on BOT basis. | Ministry of Road Transport and Highways | Punjab | Roads | 205.88 | 16-01-2007 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
37 | Four Laning of Khalghat-MP/ Maharashtra Border section of NH-3 from Km. 84.700 to Km.167.500 in the state of M.P. on BOT basis. | Ministry of Road Transport and Highways | Madhya Pradesh | Roads | 549.00 | 16-01-2007 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
38 | Six Laning of Panipat - Jalandhar Section of NH-1 (291 Km) in Haryana and Punjab. | Ministry of Road Transport and Highways | Punjab | Roads | 2,288.00 | 11-05-2007 ![]() | 06-05-2016 | Under Construction | Final approval |
39 | Six Laning of Chilkaluripet-Vijayawada, including Guntur bypass and Mangalagiri bypass of Chennai-Vijayawada Section of NH-5 in Andhra Pradesh. | Ministry of Road Transport and Highways | Andhra Pradesh | Roads | 572.30 | 11-05-2007 ![]() | 06-05-2016 | Under Construction | Final approval |
40 | Six Laning of Chennai-Tada Section of NH-5 (43 Km) in Tamil Nadu | Ministry of Road Transport and Highways | Tamil Nadu | Roads | 353.37 | 11-05-2007 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
41 | Six Laning of Gurgaon-Kotputli-Jaipur Section of NH-8 in Haryana/Rajasthan on BOT (Toll) basis following by DBFO pattern. | Ministry of Road Transport and Highways | Haryana | Roads | 1,673.70 | 11-05-2007 ![]() | 06-05-2016 | Under Construction | Final approval |
42 | Six Laning of Vadakkancherry to Thrissur Section (Package No.NS-2/BOT/KL-3 | Ministry of Road Transport and Highways | Kerala | Roads | 514.05 | 11-05-2007 ![]() | 06-05-2016 | Under Construction | Final approval |
43 | Four Laning of Jorabat-Barapani section from km. 0 to 61.800 of NH 40 in the state of Meghalaya under SARDP NE Phase A on BOT Annuity basis. | Ministry of Road Transport and Highways | Meghalaya | Roads | 536.00 | 05-11-2007 ![]() | 06-05-2016 | Under Construction | Final approval |
44 | Six Laning of Pimpalgaon-Nashik-Gonde section of NH-3 in the State of Maharashtra under NHDP Phase IIIA on BOT basis. | Ministry of Road Transport and Highways | Maharashtra | Roads | 752.47 | 05-11-2007 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
45 | Design Engineering, Construction, Development, Finance and Operation and maintenance of MP/Maharashtra Border Dhule section of NH 3 | Ministry of Road Transport and Highways | Maharashtra | Roads | 675.00 | 05-11-2007 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
46 | Four laning of Jorhat-Demow section from Km 453 to 534.8 (part of Nagaon-Dirbugah section) of NH 37 in the State of Assam under SARDP-NE Phase A on BOT (Annuity) basis | Ministry of Road Transport and Highways | Assam | Roads | 562.00 | 30-04-2008 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
47 | Four/Six laning of Ghaziabad-Aligarh section of NH 91under NHDP Phase III on BOT Basis. | Ministry of Road Transport and Highways | Uttar Pradesh | Roads | 1,325.30 | 30-04-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
48 | Four/Six laning of Amritsar-Pathankot Section from KM 6.082 to KM 108.502 of NH 15 Under NHDP Phase III on BOT Basis | Ministry of Road Transport and Highways | Punjab | Roads | 704.15 | 30-04-2008 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
49 | Six Laning of Kishangarh-Ajmer-Beawar Section from KM 364.125 to KM 58.245 of NH 8 on BOT Basis | Ministry of Road Transport and Highways | Rajasthan | Roads | 722.24 | 30-04-2008 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
50 | Four laning of Trichy Karaikkudi section of NH-210 (km 10.000 to km 94.000) and Trichy Bypass (ch 109.558 to ch 135.390) in the State of Tamil Nadu under NHDP Phase III on BOT basis. | Ministry of Road Transport and Highways | Tamil Nadu | Roads | 804.04 | 30-04-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
51 | Four laning of Baihata Chariali to Tejpur Section of NH-52 (Km 0.00 to km 130.00) in the State of Assam under NHDP Phase III on BOT basis. | Ministry of Road Transport and Highways | Assam | Roads | 1,203.67 | 30-04-2008 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
52 | Four laning of Tirupati-Tiruthani-Chennai section of NH 205 from km 274.800 to km 341.600 in Andhra Pradesh and km 0 to 59.60 in Tamil Nadu Under NHDP Phase III on BOT Basis | Ministry of Road Transport and Highways | Andhra Pradesh | Roads | 801.80 | 30-04-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
53 | Four laning of Kundapur to Suratkal section ( Km 284 to 358) and Mangalore-Kerala border section (km 375.300 to 376.700 and from Km3.700 to 17.200) of NH 17 Under NHDP Phase III on BOT Basis | Ministry of Road Transport and Highways | Karnataka | Roads | 616.00 | 30-04-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
54 | City side development of Udaipur Airport through PPP | Ministry of Civil Aviation | Rajasthan | Airports | 0.00 | 30-04-2008 ![]() | 06-05-2016 | Pre-construction Stage | In-principle approval |
55 | City side development of Amritsar Airport through PPP | Ministry of Civil Aviation | Punjab | Airports | 0.00 | 30-04-2008 ![]() | 06-05-2016 | Under Construction | In-principle approval |
56 | Four laning of Cuddapah-Kurnool section (Km 167.750 to km 356.030) of NH 18 Under NHDP Phase III on BOT Basis | Ministry of Road Transport and Highways | Andhra Pradesh | Roads | 1,567.31 | 17-06-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
57 | Four laning of Kuttipuram-Edapally section of NH17 in the state of Kerala | Ministry of Road Transport and Highways | Kerala | Roads | 1,157.92 | 04-08-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
58 | Four laning of Patna-Buxar section of NH 30 in the state of Bihar | Ministry of Road Transport and Highways | Bihar | Roads | 1,619.83 | 04-08-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
59 | Four laning of Goa/Karnataka border-Panaji, Goa stretch of NH 4A of Goa | Ministry of Road Transport and Highways | Goa | Roads | 382.46 | 04-08-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
60 | Four laning of MP/Maharashtra border-Nagpur section of NH7 including Kamptee-Kahnan and Nagpur bypass in the State of Maharashtra | Ministry of Road Transport and Highways | Maharashtra | Roads | 1,133.84 | 04-08-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
61 | Four laning elevated road from Chennai Port gate No. 10 to Maduravoyal (NH 4) in the state of Tamil nadu | Ministry of Road Transport and Highways | Tamil Nadu | Roads | 1,345.14 | 04-08-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
62 | Four laning of Armur-Adloor Yellareddy section of NH7 in the State of Andhra Pradesh | Ministry of Road Transport and Highways | Andhra Pradesh | Roads | 490.50 | 04-08-2008 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
63 | Four laning of Muzzafarnagar-Nepali farm section of NH 58 in the State of Uttar Pradesh and Uttrakhand from Nepali to ISBT Dehradun | Ministry of Road Transport and Highways | Uttar Pradesh | Roads | 1,251.42 | 04-08-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
64 | Four laning of Pune-Sholapur section of NH 9 under NHDP Phase III, length 110.05 km Package II | Ministry of Road Transport and Highways | Maharashtra | Roads | 1,110.00 | 04-08-2008 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
65 | Redevelopment of New delhi Railway station | Ministry of Railways | Delhi | Railways | 8,500.00 | 06-10-2008 ![]() | 06-05-2016 | Pre-construction Stage | In-principle approval |
66 | Six laning of Delhi-Agra section of NH 2 from Km 20.500 to Km 199.600 in the States of Haryana/UP under NHDP V on BOT basis | Ministry of Road Transport and Highways | Multiple State | Roads | 1,917.63 | 21-11-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
67 | Six laning of Belgaum-Dharwad section of NH 4 from Km 515 to km 433 and Km 0 to Km62 in the State of Karnatakaunder NHDP V on BOT basis | Ministry of Road Transport and Highways | Karnataka | Roads | 637.50 | 21-11-2008 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
68 | Six laning of Chandikol-Jagatpur-Bhubhaneshwar section of NH 5 from Km 413 to 418 and Km 0 to Km 62 in the State of Orissa under NHDP V on BOT basis | Ministry of Road Transport and Highways | Odisha | Roads | 951.38 | 21-11-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
69 | Six laning of Krishnagiri-Walahjpet section of NH 46 from Km 0 to km 148.30 in the State of Tamil Nadu under NHDP V on BOT basis | Ministry of Road Transport and Highways | Tamil Nadu | Roads | 1,489.55 | 21-11-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
70 | Six laning of Varanasi-Aurangabad section of NH 2from Km 786.00 to km 978.40 in the State of UP/Bihar under NHDP V on BOT basis | Ministry of Road Transport and Highways | Multiple State | Roads | 2,588.38 | 21-11-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
71 | Six laning of Indore-Dewas section of NH 3 from Km 577.55 to km 610.00 and Km 0.00 to Km 12.60 in the State of MP under NHDP V on BOT basis | Ministry of Road Transport and Highways | Madhya Pradesh | Roads | 410.00 | 21-11-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
72 | Four laning of Cherthalai-Ochira section of NH-47 (Package I) from Km 379.100(Thiruvoor Jn) to Km 465.00 (Ochira) in the State of Kerala under NHDP III on BOT basis. | Ministry of Road Transport and Highways | Kerala | Roads | 1,286.80 | 21-11-2008 ![]() | 06-05-2016 | Terminated | Final approval |
73 | Four laning of Ochira-Thiruvananthapuram section of NH-47 (Package II) from Km 465.000 (Ochira) to Km 551.900 (Kazakuttam jn) in the State of Kerala under NHDP III on BOT basis | Ministry of Road Transport and Highways | Kerala | Roads | 1,240.79 | 21-11-2008 ![]() | 06-05-2016 | Yet to be awarded | Final approval |
74 | Four laning of Vengalam-Kuttipuram section of NH-17 (Package II) from Km 230.00 to Km 318 in the State of Kerala under NHDP III on BOT basis | Ministry of Road Transport and Highways | Kerala | Roads | 1,108.47 | 21-11-2008 ![]() | 06-05-2016 | Terminated | Final approval |
75 | Four laning of Kannur-Vengalam section of NH-17 (Package I) from Km 148.00 to Km 230 in the State of Kerala under NHDP III on BOT basis | Ministry of Road Transport and Highways | Kerala | Roads | 1,143.66 | 21-11-2008 ![]() | 06-05-2016 | Terminated | Final approval |