Projects recommended by the Public Private Partnership Appraisal Committee <a href="/appraisal-and-approval-mechanisms#PPPAC">(PPPAC)</a> Projects recommended by the Public Private Partnership Appraisal Committee (PPPAC)

This section contains list of PPP projects recommended by the Public Private Partnership Appraisal Committee (PPPAC) for central sector PPP projects.

Search
S.No
1 Two laning of Zojila Tunnel of 14.083 km length on NH - 1D in the State of Jammu & Kashmir on BOT annuity basis Ministry of Road Transport and Highways Jammu & Kashmir Roads 9,090.13 05-08-2013
59th PPPAC (Opens New Window)
30-08-2016 Under Construction Final approval
2 Redevelopment of New delhi Railway station Ministry of Railways Delhi Railways 8,500.00 06-10-2008
17th PPPAC (Opens New Window)
06-05-2016 Pre-construction Stage In-principle approval
3 Development of 4th Container at JNPT, Nhava Seva near Mumbai in the State of Maharashtra on DBFOT basis Ministry of Shipping Maharashtra Ports 7,915.00 26-12-2013
61st PPPAC (Opens New Window)
30-08-2016 Under Construction Final approval
4 Development of Fourth Container Terminal at Jawahar Lal Nehru Port Trust Ministry of Shipping Maharashtra Ports 6,700.00 11-11-2009
29th PPPAC (Opens New Window)
31-08-2016 Operation and Maintenance Stage Final approval
5 Delhi - Meerut Expressway and other connecting roads including 6/8 laning of NH-24 from km 0.000 to km 49.23, NH-58 from km 6.800 to km52.528 and  NH-235 from km 0.360 to km 8.800 on DBFOT  (Toll) basis in the State of Delhi and Uttar Pradesh (Total Lengt Ministry of Road Transport and Highways Multiple State Roads 6,571.01 27-02-2014
63rd PPPAC (Opens New Window)
29-08-2016 Under Construction Final approval
6 Development  of a Container Terminal at Tuna Tekra in Kandla Port Kutch region in the State of Gujarat on DBFOT basis Ministry of Shipping Gujarat Ports 5,991.71 26-12-2013
61st PPPAC (Opens New Window)
30-08-2016 Pre-construction Stage Final approval
7 Six laning of Kishangarh -Udaipur- Ahmedabad section of NH 79A, NH79, NH 76 and NH 8 under NHDP Phase V, length 555.50 km Ministry of Road Transport and Highways Rajasthan Roads 5,387.30 20-06-2011
44th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
8 Eastern Peripheral Expressway (NH No. NE-II) Ministry of Road Transport and Highways Haryana Roads 4,489.00 27-11-2014
67th PPPAC (Opens New Window)
29-08-2016 Under Construction Final approval
9 Development of housing for Central Para Military Forces (CPMF) through BoT (Annuity) mode for 10 clusters (Lot 2) Ministry of Home Affairs Multiple State Housing 3,818.00 14-09-2011
46th PPPAC (Opens New Window)
06-05-2016 Final approval
10 Development of Mega Container at Chennai Port Ministry of Shipping Tamil Nadu Ports 3,125.00 06-01-2010
30th PPPAC (Opens New Window)
12-04-2016 Final approval
11 Deepening and Optimization of Paradip Port Trust (PPT) Inner Harbour Facilities including construction of Western Dock Captive Berths to handle capesize vessels on PPP mode Ministry of Shipping Odisha Ports 3,025.00 30-10-2019
90th PPPAC (Opens New Window)
30-10-2019 - In-principle approval
12 Four laning of Shivpuri - Dewas section of NH3 from km 15.623 to km 566.45 in the State of Madhya Pradesh under NHDP Phase IV on BOT (Toll) basis. Ministry of Road Transport and Highways Madhya Pradesh Roads 2,815.00 25-01-2011
41st PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
13 Four-Laning of Bhavnagar-Veraval Section of NH-8E in Gujarat under NHDP-IV on BOT (Toll) basis Ministry of Road Transport and Highways Odisha Roads 2,781.96 21-12-2012
56th PPPAC (Opens New Window)
31-08-2016 Terminated Final approval
14 Final Approval for Six laning of Bihar/ Jharkhand Border (Chordaha) to Barwa Adda section of NH-2 from Km 249.320 to Km 400.132 Ministry of Road Transport and Highways Jharkhand Roads 2,768.68 15-10-2015
74th PPPAC (Opens New Window)
29-08-2016 Yet to be awarded Final approval
15 Setting Up of Floating Storage and Regasification Unit in Mumbai Harbour on DBFOT Basis Ministry of Shipping Maharashtra Ports 2,690.00 29-12-2015
75th PPPAC (Opens New Window)
29-08-2016 - Final approval
16 Two laning Z-Morh Tunnel section of NH-I on BOT (Annuity) in Sonamarg, Srinagar, Jammu and Kashmir  Ministry of Road Transport and Highways Jammu & Kashmir Roads 2,680.42 16-07-2012
53rd PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
17 Six laning of Varanasi-Aurangabad section of NH 2from Km 786.00 to km 978.40 in the State of UP/Bihar under NHDP V on BOT basis Ministry of Road Transport and Highways Multiple State Roads 2,588.38 21-11-2008
19th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
18 Four laning of Nagpur Saoner Pandhurna Betul section of NH 69 from km 3.000 to km 59.300 in the state of Maharashtra and km 137.000 to km 257.400 in the state of MP on BOT (Annuity) basis  Ministry of Road Transport and Highways Maharashtra Roads 2,519.62 15-03-2010
34th PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
19 Development of additional liquid bulk terminal at Jawaharlal Nehru Port (JNPT)  Ministry of Shipping Maharashtra Ports 2,496.00 27-02-2014
63rd PPPAC (Opens New Window)
29-08-2016 - Final approval
20 Four-laning with PSS of Jabalpur-Bhopal section of NH-12 from km 10.400 to km 301.800 under NHDP Phase III on BOT (Toll) basis Ministry of Road Transport and Highways Madhya Pradesh Roads 2,485.96 28-09-2012
54th PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
21 4 laning of end of Pandoh bypass to Takoli section of NH 21 from KM 221.305 to 242.00 KM under NHDP IVB in the State of Himachal Pradesh on Hybrid Annuity Mode Ministry of Road Transport and Highways Himachal Pradesh Roads 2,485.93 14-02-2017
81st PPPAC (Opens New Window)
01-03-2017 Yet to be awarded Final approval
22 Four laning of Beawar Pali Pindwara Section of NH 14 from km 0 to km 244.120 in the State of Rajasthan under NHDP Phase III on BOT(Toll) basis  Ministry of Road Transport and Highways Rajasthan Roads 2,388.00 06-01-2011
40th PPPAC (Opens New Window)
31-08-2016 Operation and Maintenance Stage Final approval
23 Six laning of Handia- Varanasi from km 713.146 to km 785.544 under NHDP-V Ministry of Road Transport and Highways Uttar Pradesh Roads 2,356.16 27-11-2014
67th PPPAC (Opens New Window)
29-08-2016 Pre-construction Stage Final approval
24 Sx laning of Anandapuram - Pendurthi - Anakapalli section of NH 5 (New NH-16) from KM 681 to KM 731.78 alongwith fourlane connectivity to Visakhapatnam Port Road from KM 0 to KM 12.7 in Andhra Pradesh on Hybrid Annuity Mode Ministry of Road Transport and Highways Andhra Pradesh Roads 2,355.49 22-09-2017
83nd PPPAC (Opens New Window)
02-10-2017 - Final approval
25 Six-laning of Aurangabad-Barwa Adda Section of NH-2 from Km 180.000 to 398.750 in the State of Bihar and Jharkhand under NHDP Phase-V on BOT (Toll) basis. Ministry of Road Transport and Highways Multiple State Roads 2,340.00 09-03-2012
51st PPPAC (Opens New Window)
06-05-2016 Terminated Final approval
26 Four laning of Amravati to Chikhli Section of NH-6 from Km 166.00 to Km 360.00 in the state of Maharashtra under NHDP Phase IV Ministry of Road Transport and Highways Maharashtra Roads 2,288.18 10-04-2015
72nd PPPAC (Opens New Window)
29-08-2016 Pre-construction Stage Final approval
27 Six Laning of Panipat - Jalandhar Section of NH-1 (291 Km) in Haryana and Punjab. Ministry of Road Transport and Highways Punjab Roads 2,288.00 11-05-2007
10th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
28 Four laning with PSS of a section between Ghoshpukur- Falakata-Salsalabari Section of NH 31D in the state of West Bengal on BOT (Toll) basis under NHDP-II. Ministry of Road Transport and Highways West Bengal Roads 2,212.00 22-02-2013
57th PPPAC (Opens New Window)
30-08-2016 Terminated Final approval
29 Six laning of Nidagatta-Mysore section of NH-275 from km 74.20 to km 135.304 in the state of Karnataka on Hybrid Annuity mode (Package-II) Ministry of Road Transport and Highways Karnataka Roads 2,177.80 17-05-2017
82nd PPPAC (Opens New Window)
31-05-2017 Yet to be awarded Final approval
30 Six laning of Chandikhole - Baleshwar section of NH 5 from NH 62.00 and km 199.141 in the state of Orissa Ministry of Road Transport and Highways Odisha Roads 2,176.71 27-11-2014
67th PPPAC (Opens New Window)
29-08-2016 - Final approval
31 Development of Six laning of Chilkaluripet-Nellore section of NH 5 from km 1182.802 to km 1366.547 in the State of Andhra Pradesh under NHDP Phase V on BOT (Toll) project on DBFO pattern Ministry of Road Transport and Highways Andhra Pradesh Roads 2,163.90 21-11-2008
19th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
32 Eight laning of Mukarba Chowk to Panipat of NH 1 (DEL-HRY) Ministry of Road Transport and Highways Haryana Roads 2,128.72 18-02-2015
70th PPPAC (Opens New Window)
29-08-2016 Under Construction Final approval
33 Six laning of Ahmedabad Vadodara Section of NH 8 from km 6.400 to km 108.700 and improvement of Ahmedabad Vadodara Expressway from km 0 to km 93.302 in the State of Gujarat under NHDP Phase V on BOT(Toll) basis  Ministry of Road Transport and Highways Gujarat Roads 2,125.24 06-01-2011
40th PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
34 Four laning of Chenani to Nashri section of NH 1A from km 89 to km 130 including 9 km long tunnel with parallel escape tunnel on BOT (Annuity) basis of Jammu & Kashmir Ministry of Road Transport and Highways Jammu & Kashmir Roads 2,108.00 16-10-2009
28th PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
35 Four/Six laning of Maharashtra/Goa Border Km 475.040 to Panaji-Goa/Karnataka Border km 611 of section NH 17 in the state of Goa to be executed as BOT (Toll) on DBFO pattern under NHDP Phase III Ministry of Road Transport and Highways Goa Roads 2,078.00 09-07-2009
25th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
36 Six Laning of Handia Varanasi Section of NH-2 from KM 713.146 to KM 785.544 in the State of Uttar Pradesh under NHDP Phase V on Hybrid Annuity Mode Ministry of Road Transport and Highways Uttar Pradesh Roads 2,064.99 28-10-2016
80th PPPAC (Opens New Window)
08-11-2016 Pre-construction Stage Final approval
37 Six laning of Dankuni - Baleshwar section of NH 6 in West Bengal  Ministry of Road Transport and Highways West Bengal Roads 2,034.40 22-02-2010
32nd PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
38 Four laning of Chikhali to Fagne Section of NH-6 from Km. 360.000 to Km. 510.000 in the State of Maharashtra on DBFOT Basis under NHDP Phase IV Ministry of Road Transport and Highways Maharashtra Roads 2,005.02 02-02-2016
76th PPPAC (Opens New Window)
29-08-2016 Yet to be awarded Final approval
39 Six laning of Bangalore-Nidagatta section of NH-275 from km 18 to km 74.20 in the state of Karnataka on Hybrid Annuity Mode (Package I) Ministry of Road Transport and Highways Karnataka Roads 1,995.34 17-05-2017
82nd PPPAC (Opens New Window)
31-05-2017 Yet to be awarded Final approval
40 Four laning of Qazigund to Banihal Section of NH 1A from km 189.350 to km 204.700 including 2 tunnels of 0.69 km and km 8.45 length on BOT (Annuity) basis in the State of Jammu and Kashmir Ministry of Road Transport and Highways Jammu & Kashmir Roads 1,987.00 16-10-2009
28th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
41 Four-laning of Ghaghar Bridge (Indo Nepal Border) to Varanasi section from Km 121.800 to Km 298.450 of NH 233 in the State of Uttar Pradesh under NHDP IV on BOT (Toll) basis Ministry of Road Transport and Highways Uttar Pradesh Roads 1,954.29 27-02-2014
63rd PPPAC (Opens New Window)
29-08-2016 Operation and Maintenance Stage Final approval
42 Four/Two-laning of Baharagora to Sambalpur Section from km 200.00 to 566.000 Section of NH-6 in the State of Orissa under NHDP, IV on BOT (Toll) basis Ministry of Road Transport and Highways Odisha Roads 1,948.64 28-09-2012
54th PPPAC (Opens New Window)
28-07-2016 Operation and Maintenance Stage Final approval
43 Rehabilitation strengthening and 4 laning of Jammu-Udhampur section of NH 1A from Km 15 to km 67 on BOT (Annuity) basis on DBFO pattern in the State of Jammu & Kashmir Ministry of Road Transport and Highways Jammu & Kashmir Roads 1,939.00 16-10-2009
28th PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
44 Six laning of Delhi-Agra section of NH 2 from Km 20.500 to Km 199.600 in the States of Haryana/UP under NHDP V on BOT basis Ministry of Road Transport and Highways Multiple State Roads 1,917.63 21-11-2008
19th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
45 Four-laning of Jabalpur- Kanti- Rewa Section of NH-7 from km 242.30 to km 465.50 in the State of Madhya Pradesh under NHDP Phase IV on BOT (Toll) Ministry of Road Transport and Highways Madhya Pradesh Roads 1,906.83 19-04-2011
42nd PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
46 Construction of New Link (NH-133B) from Km. 0.000 (Km. 200.87 of Sahibganj Bypass) in Jharkhand to Km. 15.885 (Junction of NH-133B and 131A on Manihanri Bypass) and construction of Manihari Bypass from Km. 0.000 (Junction of NH-133B and 131A on Manihari Bypass) to Km. 6.000 near Naranpur of NH-131A in the State of Bihar including 4 Lane Ganga Bridge on Hybrid Annuity Mode under NH(0thers) Ministry of Road Transport and Highways Multiple State Roads 1,905.55 13-06-2016
79th PPPAC (Opens New Window)
31-07-2016 Yet to be awarded Final approval
47 Construction of New Link (NH-133B) from Km. 0.000 (Km. 200.87 of Sahibganj Bypass) in Jharkhand to Km. 15.885 (Junction of NH-133B and 131A on Manihanri Bypass) and construction of Manihari Bypass from Km. 0.000 (Junction of NH-133B and 131A on Manihari Bypass) to Km. 6.000 near Naranpur of NH-131A in the State of Bihar including 4 Lane Ganga Bridge on Hybrid Annuity Mode under NH(0) funding (Package I) Ministry of Road Transport and Highways Multiple State Roads 1,905.55 22-03-2016
77th PPPAC (Opens New Window)
31-07-2016 Yet to be awarded Final approval
48 Four laning with PSS of Amritsar to Bathinda section  of NH - 15 from km 103.000 to km 287.500 in the State of Punjab  on BOT (Toll) basis under NHDP - IV  Ministry of Road Transport and Highways Punjab Roads 1,899.00 27-02-2014
63rd PPPAC (Opens New Window)
29-08-2016 Under Construction Final approval
49 Four laning of fagne to Gujarat-Maharashtra Border section of NH 6 from Km 510.00 to Km 650.79 in the state of Maharashtra under NHDP Phase IV Ministry of Road Transport and Highways Maharashtra Roads 1,885.74 10-04-2015
72nd PPPAC (Opens New Window)
29-08-2016 Under Construction Final approval
50 Four laning with PSS of Aurangabad to Yedshi section on NH 211  from km 100.000 to km 290.200 in the State of Maharashtra on DBFOT pattern Ministry of Road Transport and Highways Maharashtra Roads 1,871.34 21-05-2013
58th PPPAC (Opens New Window)
10-11-2016 Under Construction Final approval
51 Four laning of Chikli to Fagne Section of NH-6 from Km 360.00 to Km 510.00 Ministry of Road Transport and Highways Maharashtra Roads 1,852.50 10-04-2015
72th PPPAC (Opens New Window)
29-08-2016 Final approval
52 Proposal for Operation, Management and Development of Jaipur Airport of Airports Authority of India (AAI) through PPP mode (Cost considered here is Estimated Investment by Cocessionaire) Airports Authority of India Rajasthan Airports 1,838.00 11-12-2018
85th PPPAC (Opens New Window)
19-02-2019 - Final approval
53 Six/ Eight laning of JNPT Port Road Project ofn Mumbai JNPT Port Road Company  Ltd. (MJPRCL) from km 3.60 to km 27.27  at NH 4B (A1 - E section), km 0.0 to km 4.492 at NH-4B (D-G section), km 5.3 to km 14. 85 on SH-54 and km 0.000 to km 6.200 on Amra Marg Ministry of Road Transport and Highways Maharashtra Roads 1,822.00 21-05-2013
58th PPPAC (Opens New Window)
30-08-2016 Under Construction Final approval
54 Four-laning Kiratpur- Ner Chowk Section from  Km 73.20 to Km 186.50 of NH-21 in the State of Himachal Pradesh under NHDP-III on BOT (Toll) basis: Ministry of Road Transport and Highways Himachal Pradesh Roads 1,818.47 11-11-2011
47th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
55 Four laning of Sultanpur-Varanasi Section of NH-56 from km 134.700 to km 271.300 in the State of Uttar Pradesh under NHDP - IV on DBFOT (Toll) basis. Ministry of Road Transport and Highways Uttar Pradesh Roads 1,778.00 27-02-2014
63rd PPPAC (Opens New Window)
29-08-2016 Under Construction Final approval
56 Development of a  Container Terminal at Diamond Harbour near Kolkota Port, in the State of West Bengal on DBFOT basis Ministry of Shipping West Bengal Ports 1,758.50 26-12-2013
61st PPPAC (Opens New Window)
30-08-2016 - Final approval
57 Six laning of Chakeri - Allahabad section of NH 2 (from KM 483.687 KM 628.753) in the State of State of Uttar Pradesh under NHDP Phase V on Hybrid Annuity Mode Ministry of Road Transport and Highways Uttar Pradesh Roads 1,735.20 14-02-2017
81st PPPAC (Opens New Window)
20-03-2017 Yet to be awarded Final approval
58 Six laning of Pune-Satara section of NH 4 from km 725 to km 865.35 in the State of Maharashtra under NHDP Phase V on BOT (Toll) basis on DBFO pattern Ministry of Road Transport and Highways Maharashtra Roads 1,724.55 09-07-2009
25th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
59 Six laning of Barwa-Adda-Panagarh section of NH 2 in the State of Jharkhand and West Bengal under NHDP PhaseV on BOT (Toll) basis Ministry of Road Transport and Highways West Bengal Roads 1,714.00 17-08-2010
38th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
60 Proposal for Operation, Management and Development of Ahmedabad Airport of Airports Authority of India (AAI) through PPP mode (Cost considered here is Estimated Investment by Cocessionaire) Airports Authority of India Gujarat Airports 1,704.00 11-12-2018
85th PPPAC (Opens New Window)
19-02-2019 - Final approval
61 Four laning of Khagaria-Bhaktiarpur section of NH31 in the state of Bihar Ministry of Road Transport and Highways Bihar Roads 1,703.82 04-08-2008
16th PPPAC (Opens New Window)
31-08-2016 Under Construction Final approval
62 Six-laning of Vijayawada-Gundugolanu section of NH-5 section from km 1076.48.00 to km 1022.48 under NHDP Phase V on BOT (Toll) basis: Ministry of Road Transport and Highways Andhra Pradesh Roads 1,684.00 11-11-2011
47th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
63 Six Laning of Gurgaon-Kotputli-Jaipur Section of NH-8 in Haryana/Rajasthan on BOT (Toll) basis following by DBFO pattern. Ministry of Road Transport and Highways Haryana Roads 1,673.70 11-05-2007
10th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
64 Proposal for Operation, Management and Development of Lucknow Airport of Airports Authority of India (AAI) through PPP mode (Cost considered here is Estimated Investment by Cocessionaire) Airports Authority of India Uttar Pradesh Airports 1,673.00 11-12-2018
85th PPPAC (Opens New Window)
19-02-2019 - Final approval
65 Six laning of Chakeri-Allahabad section of NH-2 from km 483.687 to km 630.0 under NHDP Phase-V on BOT (Toll) basis.  Ministry of Road Transport and Highways Uttar Pradesh Roads 1,661.60 23-12-2014
68th PPPAC (Opens New Window)
29-08-2016 - Final approval
66 Four laning of Goa/Karnataka Boarder to Kundapur section of NH - 17 from km 93.700 to km 283.300 in the state of Karnataka under NHDP -IV pm DBFOT (Toll)   Ministry of Road Transport and Highways Karnataka Roads 1,655.01 09-03-2012
51st PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
67 Six laning of Agra-Etawah Section of NH 2 from Km 199/660 to km 323.525 on BoT (Toll) in the state of Uttar Pradesh under NHDP Phase V. Ministry of Road Transport and Highways Uttar Pradesh Roads 1,650.20 18-02-2015
70th PPPAC (Opens New Window)
29-08-2016 Under Construction Final approval
68 Four Laning of Lucknow Sultanpur Section of NH-56 on Hybrid Annuity Mode Ministry of Road Transport and Highways Uttar Pradesh Roads 1,638.44 02-02-2016
76th PPPAC (Opens New Window)
29-08-2016 Under Construction Final approval
69 Four laning of Patna-Buxar section of NH 30 in the state of Bihar Ministry of Road Transport and Highways Bihar Roads 1,619.83 04-08-2008
16th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
70 Six-laning of Gundugolanu - Rajahmundry section of NH-5 from km 1022.494 to km 901.753 in the State of Andhra Pradesh under NHDP Phase V on BOT (Toll) basis. Ministry of Road Transport and Highways Andhra Pradesh Roads 1,617.00 17-02-2012
50th PPPAC (Opens New Window)
06-05-2016 Terminated Final approval
71 Patiala-Sangrur-Barnala-Bathinda section of NH-64 from Km. 50.000 to Km. 209.500 in the state of Punjab (DBFOT) basis under NHDP-IV. Ministry of Road Transport and Highways Punjab Roads 1,586.35 17-02-2012
50th PPPAC (Opens New Window)
06-05-2016 Terminated Final approval
72 Four laning of Biora - Dewas section of NH-3 from Km 426.100 to Km 566.450 in the state of Madhya Pradesh under NHDP phase IV Ministry of Road Transport and Highways Madhya Pradesh Roads 1,583.79 20-03-2015
71st PPPAC (Opens New Window)
29-08-2016 Under Construction Final approval
73 4 laning of Solapur - Bijapur section of NH 13 from KM 0.00 to KM 110.542 in the State of Maharashtra and Karnataka under NHDP Phase III on DBFO (Toll) basis Ministry of Road Transport and Highways Multiple State Roads 1,576.79 14-02-2017
81st PPPAC (Opens New Window)
01-03-2017 Yet to be awarded Final approval
74 Six laning of Etawah Chakeri (Kanpur) section of NH 2  under NHDP Phase V, length 160.21 km Ministry of Road Transport and Highways Uttar Pradesh Roads 1,573.00 14-09-2011
46th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
75 Four laning of Cuddapah-Kurnool section (Km 167.750 to km 356.030) of NH 18 Under NHDP Phase III on BOT Basis Ministry of Road Transport and Highways Andhra Pradesh Roads 1,567.31 17-06-2008
15th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval

Disclaimer : Status is being updated on receipt of information from project authorities