Projects recommended by the Public Private Partnership Appraisal Committee (PPPAC)
This section contains list of PPP projects recommended by the Public Private Partnership Appraisal Committee (PPPAC) for central sector PPP projects.
S.No | |||||||||
---|---|---|---|---|---|---|---|---|---|
1 | Two laning of Zojila Tunnel of 14.083 km length on NH - 1D in the State of Jammu & Kashmir on BOT annuity basis | Ministry of Road Transport and Highways | Jammu & Kashmir | Roads | 9,090.13 | 05-08-2013 ![]() | 30-08-2016 | Under Construction | Final approval |
2 | Redevelopment of New delhi Railway station | Ministry of Railways | Delhi | Railways | 8,500.00 | 06-10-2008 ![]() | 06-05-2016 | Pre-construction Stage | In-principle approval |
3 | Development of 4th Container at JNPT, Nhava Seva near Mumbai in the State of Maharashtra on DBFOT basis | Ministry of Shipping | Maharashtra | Ports | 7,915.00 | 26-12-2013 ![]() | 30-08-2016 | Under Construction | Final approval |
4 | Development of Fourth Container Terminal at Jawahar Lal Nehru Port Trust | Ministry of Shipping | Maharashtra | Ports | 6,700.00 | 11-11-2009 ![]() | 31-08-2016 | Operation and Maintenance Stage | Final approval |
5 | Delhi - Meerut Expressway and other connecting roads including 6/8 laning of NH-24 from km 0.000 to km 49.23, NH-58 from km 6.800 to km52.528 and NH-235 from km 0.360 to km 8.800 on DBFOT (Toll) basis in the State of Delhi and Uttar Pradesh (Total Lengt | Ministry of Road Transport and Highways | Multiple State | Roads | 6,571.01 | 27-02-2014 ![]() | 29-08-2016 | Under Construction | Final approval |
6 | Development of a Container Terminal at Tuna Tekra in Kandla Port Kutch region in the State of Gujarat on DBFOT basis | Ministry of Shipping | Gujarat | Ports | 5,991.71 | 26-12-2013 ![]() | 30-08-2016 | Pre-construction Stage | Final approval |
7 | Six laning of Kishangarh -Udaipur- Ahmedabad section of NH 79A, NH79, NH 76 and NH 8 under NHDP Phase V, length 555.50 km | Ministry of Road Transport and Highways | Rajasthan | Roads | 5,387.30 | 20-06-2011 ![]() | 06-05-2016 | Under Construction | Final approval |
8 | Eastern Peripheral Expressway (NH No. NE-II) | Ministry of Road Transport and Highways | Haryana | Roads | 4,489.00 | 27-11-2014 ![]() | 29-08-2016 | Under Construction | Final approval |
9 | Development of housing for Central Para Military Forces (CPMF) through BoT (Annuity) mode for 10 clusters (Lot 2) | Ministry of Home Affairs | Multiple State | Housing | 3,818.00 | 14-09-2011 ![]() | 06-05-2016 | Final approval | |
10 | Development of Mega Container at Chennai Port | Ministry of Shipping | Tamil Nadu | Ports | 3,125.00 | 06-01-2010 ![]() | 12-04-2016 | Final approval | |
11 | Deepening and Optimization of Paradip Port Trust (PPT) Inner Harbour Facilities including construction of Western Dock Captive Berths to handle capesize vessels on PPP mode | Ministry of Shipping | Odisha | Ports | 3,025.00 | 30-10-2019 ![]() | 30-10-2019 | - | In-principle approval |
12 | Four laning of Shivpuri - Dewas section of NH3 from km 15.623 to km 566.45 in the State of Madhya Pradesh under NHDP Phase IV on BOT (Toll) basis. | Ministry of Road Transport and Highways | Madhya Pradesh | Roads | 2,815.00 | 25-01-2011 ![]() | 06-05-2016 | Under Construction | Final approval |
13 | Four-Laning of Bhavnagar-Veraval Section of NH-8E in Gujarat under NHDP-IV on BOT (Toll) basis | Ministry of Road Transport and Highways | Odisha | Roads | 2,781.96 | 21-12-2012 ![]() | 31-08-2016 | Terminated | Final approval |
14 | Final Approval for Six laning of Bihar/ Jharkhand Border (Chordaha) to Barwa Adda section of NH-2 from Km 249.320 to Km 400.132 | Ministry of Road Transport and Highways | Jharkhand | Roads | 2,768.68 | 15-10-2015 ![]() | 29-08-2016 | Yet to be awarded | Final approval |
15 | Setting Up of Floating Storage and Regasification Unit in Mumbai Harbour on DBFOT Basis | Ministry of Shipping | Maharashtra | Ports | 2,690.00 | 29-12-2015 ![]() | 29-08-2016 | - | Final approval |
16 | Two laning Z-Morh Tunnel section of NH-I on BOT (Annuity) in Sonamarg, Srinagar, Jammu and Kashmir | Ministry of Road Transport and Highways | Jammu & Kashmir | Roads | 2,680.42 | 16-07-2012 ![]() | 06-05-2016 | Under Construction | Final approval |
17 | Six laning of Varanasi-Aurangabad section of NH 2from Km 786.00 to km 978.40 in the State of UP/Bihar under NHDP V on BOT basis | Ministry of Road Transport and Highways | Multiple State | Roads | 2,588.38 | 21-11-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
18 | Four laning of Nagpur Saoner Pandhurna Betul section of NH 69 from km 3.000 to km 59.300 in the state of Maharashtra and km 137.000 to km 257.400 in the state of MP on BOT (Annuity) basis | Ministry of Road Transport and Highways | Maharashtra | Roads | 2,519.62 | 15-03-2010 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
19 | Development of additional liquid bulk terminal at Jawaharlal Nehru Port (JNPT) | Ministry of Shipping | Maharashtra | Ports | 2,496.00 | 27-02-2014 ![]() | 29-08-2016 | - | Final approval |
20 | Four-laning with PSS of Jabalpur-Bhopal section of NH-12 from km 10.400 to km 301.800 under NHDP Phase III on BOT (Toll) basis | Ministry of Road Transport and Highways | Madhya Pradesh | Roads | 2,485.96 | 28-09-2012 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
21 | 4 laning of end of Pandoh bypass to Takoli section of NH 21 from KM 221.305 to 242.00 KM under NHDP IVB in the State of Himachal Pradesh on Hybrid Annuity Mode | Ministry of Road Transport and Highways | Himachal Pradesh | Roads | 2,485.93 | 14-02-2017 ![]() | 01-03-2017 | Yet to be awarded | Final approval |
22 | Four laning of Beawar Pali Pindwara Section of NH 14 from km 0 to km 244.120 in the State of Rajasthan under NHDP Phase III on BOT(Toll) basis | Ministry of Road Transport and Highways | Rajasthan | Roads | 2,388.00 | 06-01-2011 ![]() | 31-08-2016 | Operation and Maintenance Stage | Final approval |
23 | Six laning of Handia- Varanasi from km 713.146 to km 785.544 under NHDP-V | Ministry of Road Transport and Highways | Uttar Pradesh | Roads | 2,356.16 | 27-11-2014 ![]() | 29-08-2016 | Pre-construction Stage | Final approval |
24 | Sx laning of Anandapuram - Pendurthi - Anakapalli section of NH 5 (New NH-16) from KM 681 to KM 731.78 alongwith fourlane connectivity to Visakhapatnam Port Road from KM 0 to KM 12.7 in Andhra Pradesh on Hybrid Annuity Mode | Ministry of Road Transport and Highways | Andhra Pradesh | Roads | 2,355.49 | 22-09-2017 ![]() | 02-10-2017 | - | Final approval |
25 | Six-laning of Aurangabad-Barwa Adda Section of NH-2 from Km 180.000 to 398.750 in the State of Bihar and Jharkhand under NHDP Phase-V on BOT (Toll) basis. | Ministry of Road Transport and Highways | Multiple State | Roads | 2,340.00 | 09-03-2012 ![]() | 06-05-2016 | Terminated | Final approval |
26 | Four laning of Amravati to Chikhli Section of NH-6 from Km 166.00 to Km 360.00 in the state of Maharashtra under NHDP Phase IV | Ministry of Road Transport and Highways | Maharashtra | Roads | 2,288.18 | 10-04-2015 ![]() | 29-08-2016 | Pre-construction Stage | Final approval |
27 | Six Laning of Panipat - Jalandhar Section of NH-1 (291 Km) in Haryana and Punjab. | Ministry of Road Transport and Highways | Punjab | Roads | 2,288.00 | 11-05-2007 ![]() | 06-05-2016 | Under Construction | Final approval |
28 | Four laning with PSS of a section between Ghoshpukur- Falakata-Salsalabari Section of NH 31D in the state of West Bengal on BOT (Toll) basis under NHDP-II. | Ministry of Road Transport and Highways | West Bengal | Roads | 2,212.00 | 22-02-2013 ![]() | 30-08-2016 | Terminated | Final approval |
29 | Six laning of Nidagatta-Mysore section of NH-275 from km 74.20 to km 135.304 in the state of Karnataka on Hybrid Annuity mode (Package-II) | Ministry of Road Transport and Highways | Karnataka | Roads | 2,177.80 | 17-05-2017 ![]() | 31-05-2017 | Yet to be awarded | Final approval |
30 | Six laning of Chandikhole - Baleshwar section of NH 5 from NH 62.00 and km 199.141 in the state of Orissa | Ministry of Road Transport and Highways | Odisha | Roads | 2,176.71 | 27-11-2014 ![]() | 29-08-2016 | - | Final approval |
31 | Development of Six laning of Chilkaluripet-Nellore section of NH 5 from km 1182.802 to km 1366.547 in the State of Andhra Pradesh under NHDP Phase V on BOT (Toll) project on DBFO pattern | Ministry of Road Transport and Highways | Andhra Pradesh | Roads | 2,163.90 | 21-11-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
32 | Eight laning of Mukarba Chowk to Panipat of NH 1 (DEL-HRY) | Ministry of Road Transport and Highways | Haryana | Roads | 2,128.72 | 18-02-2015 ![]() | 29-08-2016 | Under Construction | Final approval |
33 | Six laning of Ahmedabad Vadodara Section of NH 8 from km 6.400 to km 108.700 and improvement of Ahmedabad Vadodara Expressway from km 0 to km 93.302 in the State of Gujarat under NHDP Phase V on BOT(Toll) basis | Ministry of Road Transport and Highways | Gujarat | Roads | 2,125.24 | 06-01-2011 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
34 | Four laning of Chenani to Nashri section of NH 1A from km 89 to km 130 including 9 km long tunnel with parallel escape tunnel on BOT (Annuity) basis of Jammu & Kashmir | Ministry of Road Transport and Highways | Jammu & Kashmir | Roads | 2,108.00 | 16-10-2009 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
35 | Four/Six laning of Maharashtra/Goa Border Km 475.040 to Panaji-Goa/Karnataka Border km 611 of section NH 17 in the state of Goa to be executed as BOT (Toll) on DBFO pattern under NHDP Phase III | Ministry of Road Transport and Highways | Goa | Roads | 2,078.00 | 09-07-2009 ![]() | 06-05-2016 | Under Construction | Final approval |
36 | Six Laning of Handia Varanasi Section of NH-2 from KM 713.146 to KM 785.544 in the State of Uttar Pradesh under NHDP Phase V on Hybrid Annuity Mode | Ministry of Road Transport and Highways | Uttar Pradesh | Roads | 2,064.99 | 28-10-2016 ![]() | 08-11-2016 | Pre-construction Stage | Final approval |
37 | Six laning of Dankuni - Baleshwar section of NH 6 in West Bengal | Ministry of Road Transport and Highways | West Bengal | Roads | 2,034.40 | 22-02-2010 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
38 | Four laning of Chikhali to Fagne Section of NH-6 from Km. 360.000 to Km. 510.000 in the State of Maharashtra on DBFOT Basis under NHDP Phase IV | Ministry of Road Transport and Highways | Maharashtra | Roads | 2,005.02 | 02-02-2016 ![]() | 29-08-2016 | Yet to be awarded | Final approval |
39 | Six laning of Bangalore-Nidagatta section of NH-275 from km 18 to km 74.20 in the state of Karnataka on Hybrid Annuity Mode (Package I) | Ministry of Road Transport and Highways | Karnataka | Roads | 1,995.34 | 17-05-2017 ![]() | 31-05-2017 | Yet to be awarded | Final approval |
40 | Four laning of Qazigund to Banihal Section of NH 1A from km 189.350 to km 204.700 including 2 tunnels of 0.69 km and km 8.45 length on BOT (Annuity) basis in the State of Jammu and Kashmir | Ministry of Road Transport and Highways | Jammu & Kashmir | Roads | 1,987.00 | 16-10-2009 ![]() | 06-05-2016 | Under Construction | Final approval |
41 | Four-laning of Ghaghar Bridge (Indo Nepal Border) to Varanasi section from Km 121.800 to Km 298.450 of NH 233 in the State of Uttar Pradesh under NHDP IV on BOT (Toll) basis | Ministry of Road Transport and Highways | Uttar Pradesh | Roads | 1,954.29 | 27-02-2014 ![]() | 29-08-2016 | Operation and Maintenance Stage | Final approval |
42 | Four/Two-laning of Baharagora to Sambalpur Section from km 200.00 to 566.000 Section of NH-6 in the State of Orissa under NHDP, IV on BOT (Toll) basis | Ministry of Road Transport and Highways | Odisha | Roads | 1,948.64 | 28-09-2012 ![]() | 28-07-2016 | Operation and Maintenance Stage | Final approval |
43 | Rehabilitation strengthening and 4 laning of Jammu-Udhampur section of NH 1A from Km 15 to km 67 on BOT (Annuity) basis on DBFO pattern in the State of Jammu & Kashmir | Ministry of Road Transport and Highways | Jammu & Kashmir | Roads | 1,939.00 | 16-10-2009 ![]() | 06-05-2016 | Operation and Maintenance Stage | Final approval |
44 | Six laning of Delhi-Agra section of NH 2 from Km 20.500 to Km 199.600 in the States of Haryana/UP under NHDP V on BOT basis | Ministry of Road Transport and Highways | Multiple State | Roads | 1,917.63 | 21-11-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
45 | Four-laning of Jabalpur- Kanti- Rewa Section of NH-7 from km 242.30 to km 465.50 in the State of Madhya Pradesh under NHDP Phase IV on BOT (Toll) | Ministry of Road Transport and Highways | Madhya Pradesh | Roads | 1,906.83 | 19-04-2011 ![]() | 06-05-2016 | Under Construction | Final approval |
46 | Construction of New Link (NH-133B) from Km. 0.000 (Km. 200.87 of Sahibganj Bypass) in Jharkhand to Km. 15.885 (Junction of NH-133B and 131A on Manihanri Bypass) and construction of Manihari Bypass from Km. 0.000 (Junction of NH-133B and 131A on Manihari Bypass) to Km. 6.000 near Naranpur of NH-131A in the State of Bihar including 4 Lane Ganga Bridge on Hybrid Annuity Mode under NH(0thers) | Ministry of Road Transport and Highways | Multiple State | Roads | 1,905.55 | 13-06-2016 ![]() | 31-07-2016 | Yet to be awarded | Final approval |
47 | Construction of New Link (NH-133B) from Km. 0.000 (Km. 200.87 of Sahibganj Bypass) in Jharkhand to Km. 15.885 (Junction of NH-133B and 131A on Manihanri Bypass) and construction of Manihari Bypass from Km. 0.000 (Junction of NH-133B and 131A on Manihari Bypass) to Km. 6.000 near Naranpur of NH-131A in the State of Bihar including 4 Lane Ganga Bridge on Hybrid Annuity Mode under NH(0) funding (Package I) | Ministry of Road Transport and Highways | Multiple State | Roads | 1,905.55 | 22-03-2016 ![]() | 31-07-2016 | Yet to be awarded | Final approval |
48 | Four laning with PSS of Amritsar to Bathinda section of NH - 15 from km 103.000 to km 287.500 in the State of Punjab on BOT (Toll) basis under NHDP - IV | Ministry of Road Transport and Highways | Punjab | Roads | 1,899.00 | 27-02-2014 ![]() | 29-08-2016 | Under Construction | Final approval |
49 | Four laning of fagne to Gujarat-Maharashtra Border section of NH 6 from Km 510.00 to Km 650.79 in the state of Maharashtra under NHDP Phase IV | Ministry of Road Transport and Highways | Maharashtra | Roads | 1,885.74 | 10-04-2015 ![]() | 29-08-2016 | Under Construction | Final approval |
50 | Four laning with PSS of Aurangabad to Yedshi section on NH 211 from km 100.000 to km 290.200 in the State of Maharashtra on DBFOT pattern | Ministry of Road Transport and Highways | Maharashtra | Roads | 1,871.34 | 21-05-2013 ![]() | 10-11-2016 | Under Construction | Final approval |
51 | Four laning of Chikli to Fagne Section of NH-6 from Km 360.00 to Km 510.00 | Ministry of Road Transport and Highways | Maharashtra | Roads | 1,852.50 | 10-04-2015 ![]() | 29-08-2016 | Final approval | |
52 | Proposal for Operation, Management and Development of Jaipur Airport of Airports Authority of India (AAI) through PPP mode (Cost considered here is Estimated Investment by Cocessionaire) | Airports Authority of India | Rajasthan | Airports | 1,838.00 | 11-12-2018 ![]() | 19-02-2019 | - | Final approval |
53 | Six/ Eight laning of JNPT Port Road Project ofn Mumbai JNPT Port Road Company Ltd. (MJPRCL) from km 3.60 to km 27.27 at NH 4B (A1 - E section), km 0.0 to km 4.492 at NH-4B (D-G section), km 5.3 to km 14. 85 on SH-54 and km 0.000 to km 6.200 on Amra Marg | Ministry of Road Transport and Highways | Maharashtra | Roads | 1,822.00 | 21-05-2013 ![]() | 30-08-2016 | Under Construction | Final approval |
54 | Four-laning Kiratpur- Ner Chowk Section from Km 73.20 to Km 186.50 of NH-21 in the State of Himachal Pradesh under NHDP-III on BOT (Toll) basis: | Ministry of Road Transport and Highways | Himachal Pradesh | Roads | 1,818.47 | 11-11-2011 ![]() | 06-05-2016 | Under Construction | Final approval |
55 | Four laning of Sultanpur-Varanasi Section of NH-56 from km 134.700 to km 271.300 in the State of Uttar Pradesh under NHDP - IV on DBFOT (Toll) basis. | Ministry of Road Transport and Highways | Uttar Pradesh | Roads | 1,778.00 | 27-02-2014 ![]() | 29-08-2016 | Under Construction | Final approval |
56 | Development of a Container Terminal at Diamond Harbour near Kolkota Port, in the State of West Bengal on DBFOT basis | Ministry of Shipping | West Bengal | Ports | 1,758.50 | 26-12-2013 ![]() | 30-08-2016 | - | Final approval |
57 | Six laning of Chakeri - Allahabad section of NH 2 (from KM 483.687 KM 628.753) in the State of State of Uttar Pradesh under NHDP Phase V on Hybrid Annuity Mode | Ministry of Road Transport and Highways | Uttar Pradesh | Roads | 1,735.20 | 14-02-2017 ![]() | 20-03-2017 | Yet to be awarded | Final approval |
58 | Six laning of Pune-Satara section of NH 4 from km 725 to km 865.35 in the State of Maharashtra under NHDP Phase V on BOT (Toll) basis on DBFO pattern | Ministry of Road Transport and Highways | Maharashtra | Roads | 1,724.55 | 09-07-2009 ![]() | 06-05-2016 | Under Construction | Final approval |
59 | Six laning of Barwa-Adda-Panagarh section of NH 2 in the State of Jharkhand and West Bengal under NHDP PhaseV on BOT (Toll) basis | Ministry of Road Transport and Highways | West Bengal | Roads | 1,714.00 | 17-08-2010 ![]() | 06-05-2016 | Under Construction | Final approval |
60 | Proposal for Operation, Management and Development of Ahmedabad Airport of Airports Authority of India (AAI) through PPP mode (Cost considered here is Estimated Investment by Cocessionaire) | Airports Authority of India | Gujarat | Airports | 1,704.00 | 11-12-2018 ![]() | 19-02-2019 | - | Final approval |
61 | Four laning of Khagaria-Bhaktiarpur section of NH31 in the state of Bihar | Ministry of Road Transport and Highways | Bihar | Roads | 1,703.82 | 04-08-2008 ![]() | 31-08-2016 | Under Construction | Final approval |
62 | Six-laning of Vijayawada-Gundugolanu section of NH-5 section from km 1076.48.00 to km 1022.48 under NHDP Phase V on BOT (Toll) basis: | Ministry of Road Transport and Highways | Andhra Pradesh | Roads | 1,684.00 | 11-11-2011 ![]() | 06-05-2016 | Under Construction | Final approval |
63 | Six Laning of Gurgaon-Kotputli-Jaipur Section of NH-8 in Haryana/Rajasthan on BOT (Toll) basis following by DBFO pattern. | Ministry of Road Transport and Highways | Haryana | Roads | 1,673.70 | 11-05-2007 ![]() | 06-05-2016 | Under Construction | Final approval |
64 | Proposal for Operation, Management and Development of Lucknow Airport of Airports Authority of India (AAI) through PPP mode (Cost considered here is Estimated Investment by Cocessionaire) | Airports Authority of India | Uttar Pradesh | Airports | 1,673.00 | 11-12-2018 ![]() | 19-02-2019 | - | Final approval |
65 | Six laning of Chakeri-Allahabad section of NH-2 from km 483.687 to km 630.0 under NHDP Phase-V on BOT (Toll) basis. | Ministry of Road Transport and Highways | Uttar Pradesh | Roads | 1,661.60 | 23-12-2014 ![]() | 29-08-2016 | - | Final approval |
66 | Four laning of Goa/Karnataka Boarder to Kundapur section of NH - 17 from km 93.700 to km 283.300 in the state of Karnataka under NHDP -IV pm DBFOT (Toll) | Ministry of Road Transport and Highways | Karnataka | Roads | 1,655.01 | 09-03-2012 ![]() | 06-05-2016 | Under Construction | Final approval |
67 | Six laning of Agra-Etawah Section of NH 2 from Km 199/660 to km 323.525 on BoT (Toll) in the state of Uttar Pradesh under NHDP Phase V. | Ministry of Road Transport and Highways | Uttar Pradesh | Roads | 1,650.20 | 18-02-2015 ![]() | 29-08-2016 | Under Construction | Final approval |
68 | Four Laning of Lucknow Sultanpur Section of NH-56 on Hybrid Annuity Mode | Ministry of Road Transport and Highways | Uttar Pradesh | Roads | 1,638.44 | 02-02-2016 ![]() | 29-08-2016 | Under Construction | Final approval |
69 | Four laning of Patna-Buxar section of NH 30 in the state of Bihar | Ministry of Road Transport and Highways | Bihar | Roads | 1,619.83 | 04-08-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
70 | Six-laning of Gundugolanu - Rajahmundry section of NH-5 from km 1022.494 to km 901.753 in the State of Andhra Pradesh under NHDP Phase V on BOT (Toll) basis. | Ministry of Road Transport and Highways | Andhra Pradesh | Roads | 1,617.00 | 17-02-2012 ![]() | 06-05-2016 | Terminated | Final approval |
71 | Patiala-Sangrur-Barnala-Bathinda section of NH-64 from Km. 50.000 to Km. 209.500 in the state of Punjab (DBFOT) basis under NHDP-IV. | Ministry of Road Transport and Highways | Punjab | Roads | 1,586.35 | 17-02-2012 ![]() | 06-05-2016 | Terminated | Final approval |
72 | Four laning of Biora - Dewas section of NH-3 from Km 426.100 to Km 566.450 in the state of Madhya Pradesh under NHDP phase IV | Ministry of Road Transport and Highways | Madhya Pradesh | Roads | 1,583.79 | 20-03-2015 ![]() | 29-08-2016 | Under Construction | Final approval |
73 | 4 laning of Solapur - Bijapur section of NH 13 from KM 0.00 to KM 110.542 in the State of Maharashtra and Karnataka under NHDP Phase III on DBFO (Toll) basis | Ministry of Road Transport and Highways | Multiple State | Roads | 1,576.79 | 14-02-2017 ![]() | 01-03-2017 | Yet to be awarded | Final approval |
74 | Six laning of Etawah Chakeri (Kanpur) section of NH 2 under NHDP Phase V, length 160.21 km | Ministry of Road Transport and Highways | Uttar Pradesh | Roads | 1,573.00 | 14-09-2011 ![]() | 06-05-2016 | Under Construction | Final approval |
75 | Four laning of Cuddapah-Kurnool section (Km 167.750 to km 356.030) of NH 18 Under NHDP Phase III on BOT Basis | Ministry of Road Transport and Highways | Andhra Pradesh | Roads | 1,567.31 | 17-06-2008 ![]() | 06-05-2016 | Under Construction | Final approval |
Disclaimer : Status is being updated on receipt of information from project authorities