Projects recommended by the Public Private Partnership Appraisal Committee <a href="/appraisal-and-approval-mechanisms#PPPAC">(PPPAC)</a> Projects recommended by the Public Private Partnership Appraisal Committee (PPPAC)

This section contains list of PPP projects recommended by the Public Private Partnership Appraisal Committee (PPPAC) for central sector PPP projects.

Search
S.No
1 Widening of Existing Two Lane carriageway to Four/Six lane divided carriageway configuration of Bangalore -Hoskate - Mulbagal section of NH-4 in the state of Karnataka under NHDP phase III A on BOT basis Ministry of Road Transport and Highways Karnataka Roads 565.00 01-11-2006
4th PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
2 Widening and Strengthening of Bikaner - Phalodi section of NH - 15 to 4 lane from km 4.200 to km 55.250 and two lane with paved shoulder from km 55.250 ot km 163.500 under NHDP - Phase IV on BOT (Toll) mode in the state of Rajasthan Ministry of Road Transport and Highways Rajasthan Roads 822.90 27-02-2014
63rd PPPAC (Opens New Window)
29-08-2016 Under Construction Final approval
3 Up-gradation of existing facilities of OB-1, OB-2 at Outer Harbour (OH) and WQ-1 Berth at Inner Harbour (IH) of Visakhapatnam Port for handling iron ore cargo on DBFOT basis Ministry of Shipping Andhra Pradesh Ports 845.41 22-02-2013
57th PPPAC (Opens New Window)
30-08-2016 Under Construction Final approval
4 Two/Four laning of NH 12 from km 256.550 to km 346.539 (Kota-Jhalwar section) in the State of Rajasthan under NHDP Phase III on BOT(Toll) basis basis  Ministry of Road Transport and Highways Rajasthan Roads 530.01 06-01-2011
40th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
5 Two/four laning of Birmitrapur to Barkote section of NH 23 under NHDP Phase IV, length 125.615 km Ministry of Road Transport and Highways Odisha Roads 778.15 20-06-2011
44th PPPAC (Opens New Window)
06-05-2016 Terminated Final approval
6 Two/ four laning of Obedullaganj -Shahganj Junction, Budhni- Betul Section of NH 69  under NHDP-IV, length  121.36 km Ministry of Road Transport and Highways Madhya Pradesh Roads 1,152.00 10-08-2011
45th PPPAC (Opens New Window)
13-04-2016 Under Construction Final approval
7 Two-laning with PSS section, between Bijapur, Gulbarga, Homnabad section of NH 218 from Km 195.000 to Km 418.000 in the State of Karnataka on BOT (Toll) Ministry of Road Transport and Highways Karnataka Roads 680.73 28-09-2012
54th PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
8 Two-laning with PSS of Salasar to Haryana border, section of NH-65 from km 154.141 to km 0 and capacity augmentation in 2021 for four laning in the State of Rajasthan under NHDP IV on BOT (Toll) basis Ministry of Road Transport and Highways Rajasthan Roads 530.07 16-07-2012
53rd PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
9 Two-laning with Paved Side Shoulders of Nagaur-Jodhpur section of NH-65 from km 166.26 to km 296.07 in the State of Rajasthan under NH (O) on DBFOT (Toll) basis. Ministry of Road Transport and Highways Rajasthan Roads 439.96 21-12-2012
56th PPPAC (Opens New Window)
30-08-2016 Under Construction Final approval
10 Two laningof Bikaner to Suratgarh section on NH 11 under VGF Scheme, length 172.384 km Ministry of Road Transport and Highways Rajasthan Roads 501.08 10-08-2011
45th PPPAC (Opens New Window)
13-04-2016 Operation and Maintenance Stage Final approval
11 Two laning Z-Morh Tunnel section of NH-I on BOT (Annuity) in Sonamarg, Srinagar, Jammu and Kashmir  Ministry of Road Transport and Highways Jammu & Kashmir Roads 2,680.42 16-07-2012
53rd PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
12 Two laning with PSS a section, between Kerala Border to Kollegal section of NH-212 in the state of Karnataka on BOT (Toll) basis under NHDP-IV Ministry of Road Transport and Highways Karnataka Roads 523.49 22-02-2013
57th PPPAC (Opens New Window)
30-08-2016 Under Construction Final approval
13 Two laning with paved shoulder  of Jabalpur - Mandala - Chilpi section  from km 3/4 to km 192.400 of NH-12A in the State of Madhya Pradesh on DBFOT basis under NHDP - IV Ministry of Road Transport and Highways Madhya Pradesh Roads 811.74 17-01-2014
62nd PPPAC (Opens New Window)
29-08-2016 Under Construction Final approval
14 Two laning with paved shoulders of Raibarelly-Jaunpur Section of NH-231 from Km 0.000 to Km 166.4 in the state of Uttar Pradesh under NHDP - IV on BoT (Annuity) basis. Ministry of Road Transport and Highways Uttar Pradesh Roads 569.36 17-02-2012
50th PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
15 Two laning with paved shoulders of Nagaur-Bikaner section of NH-89 from km 171/00 to km 267/325 of NH 89 (including bypass at Nagaur from km 180/500 of NH-65 to km 171/00 of NH-89) in the state of Rajasthan under NH (Others) with implementation of the pro Ministry of Road Transport and Highways Rajasthan Roads 378.07 17-02-2012
50th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
16 Two laning with paved shoulders of Jhansi-Khajuraho section of NH 75 from km 1.900 to km 169.950 in the State of UP and MP under NHDP III on BOT (Toll) basis  Ministry of Road Transport and Highways Multiple State Roads 494.00 28-04-2010
35th PPPAC (Opens New Window)
06-05-2016 Pre-construction Stage Final approval
17 Two laning with paved shoulder of Tindivam Krishnagiri section of NH 66 from km 38.150 to km 214 in the state of Tamil Nadu  Ministry of Road Transport and Highways Tamil Nadu Roads 828.26 15-03-2010
34th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
18 Two laning with paved shoulder of Muzaffarpur Sanbarsa section of NH 77 in the State of Bihar Ministry of Road Transport and Highways Bihar Roads 511.54 28-04-2010
35th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
19 Two laning with paved shoulder of Dindigul - Theni and Theni - Kumili in Tamil Nadu under NHDP III  Ministry of Road Transport and Highways Tamil Nadu Roads 501.00 22-02-2010
32nd PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
20 Two laning with paved shoulder from Kozhikode - Muthanga section of NH 212 in Kerala  Ministry of Road Transport and Highways Kerala Roads 365.23 22-02-2010
32th PPPAC (Opens New Window)
28-07-2016 Final approval
21 Two laning with paved shoulder from km 0.000 to km7.950 ( Katni Bypass) & km 4.600 to km 245.000  of Katni -  Shahdol - Anooppur to MP/CG Border section on NH-78 in the State of Madhya Pradesh on DBFOT  Ministry of Road Transport and Highways Madhya Pradesh Roads 811.47 26-12-2013
61st PPPAC (Opens New Window)
30-08-2016 Operation and Maintenance Stage Final approval
22 Two laning with paved shoulder / Four laning of Tamil Nadu / Karnataka Border to Bangalore section of NH-209 from km 266.530 to km 458.52  in the State of Karnataka under NHDP Ph IV on DBFOT (Toll) basis Ministry of Road Transport and Highways Karnataka Roads 693.04 17-01-2014
62nd PPPAC (Opens New Window)
29-08-2016 Operation and Maintenance Stage Final approval
23 Two laning with pave shoulder on Raigarh - Saraipalli from 3.800 to Km 90.460 on NH 216 in the State of Chattisgarh Ministry of Road Transport and Highways Chhattisgarh Roads 189.19 10-02-2010
31st PPPAC (Opens New Window)
31-08-2016 Under Construction Final approval
24 Two laning with Pave shoulder from Varanasi to Gorakhpur section Km 2 to Km 208 of NH 29 in the State of UP  Ministry of Road Transport and Highways Uttar Pradesh Roads 538.88 10-02-2010
31st PPPAC (Opens New Window)
12-04-2016 Under Construction Final approval
25 Two laning with pave shoulder from Bilaspur - Urdawal section Km 3116 to Km 312.400 of 4 on NH 200 Ministry of Road Transport and Highways Chhattisgarh Roads 494.00 10-02-2010
31st PPPAC (Opens New Window)
12-04-2016 - Final approval
26 Two laning with pave shoulder from Aligarh to Kanpur from Km 140.100 to Km 418.760 on NH 91 in the State of UP  Ministry of Road Transport and Highways Uttar Pradesh Roads 723.25 10-02-2010
31st PPPAC (Opens New Window)
12-04-2016 - Final approval
27 Two laning of Zojila Tunnel of 14.083 km length on NH - 1D in the State of Jammu & Kashmir on BOT annuity basis Ministry of Road Transport and Highways Jammu & Kashmir Roads 9,090.13 05-08-2013
59th PPPAC (Opens New Window)
30-08-2016 Under Construction Final approval
28 Two laning of Suratgarh-Sriganganagar section of NH 15 under VGF Scheme, length 78.10 km Ministry of Road Transport and Highways Rajasthan Roads 224.03 10-08-2011
45th PPPAC (Opens New Window)
13-04-2016 Under Construction Final approval
29 Two laning of Purnea-Khagaria section of NH 31 in the State of Bihar under NHDP Phase III on BOT (Annuity) basis  Ministry of Road Transport and Highways Bihar Roads 676.00 17-08-2010
38th PPPAC (Opens New Window)
31-08-2016 Operation and Maintenance Stage Final approval
30 Two Laning of proposed Shimla Bypass (Kaithalighat to Shimla Section) of NH-22 under NHDP Phase III on Hybrid Annuity Mode Ministry of Road Transport and Highways Himachal Pradesh Roads 1,160.68 02-02-2016
76th PPPAC (Opens New Window)
29-08-2016 Pre-construction Stage Final approval
31 Two laning of Deali - Kota section of NH 12 on Kota bypass in Rajasthan Ministry of Road Transport and Highways Rajasthan Roads 593.38 10-02-2010
31st PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
32 Two laning of Chittorgarh-Neemach section of NH 79 and Nimbahera-Pratapgarh section of NH 113 under VGF Scheme, length 116.997 km Ministry of Road Transport and Highways Madhya Pradesh Roads 511.21 10-08-2011
45th PPPAC (Opens New Window)
13-04-2016 Operation and Maintenance Stage Final approval
33 Two laning of Ajmer to Nagaur section on NH 89 under VGF Scheme, length 148.25 km Ministry of Road Transport and Highways Rajasthan Roads 377.15 10-08-2011
45th PPPAC (Opens New Window)
13-04-2016 Under Construction Final approval
34 Two /  Four laning of section between Madurai to Ramanathapuram  from km  5.000 to km 79. 340 and two lane with paved shoulders from km 79.340 to km 118.795 of NH 49 in Tamil Nadu under NHDP Phase III  on BOT (Toll)  Basis. Ministry of Road Transport and Highways Tamil Nadu Roads 683.00 13-12-2011
48th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
35 Two /Four laning with PSS of Gadu to Dwaraka section on NH 8E from km 263.000 to km 473.000 in the State of Gujarat on DBFOT pattern Ministry of Road Transport and Highways Gujarat Roads 1,528.72 21-05-2013
58th PPPAC (Opens New Window)
30-08-2016 Operation and Maintenance Stage Final approval
36 Two / Fourl laning with paved shoulders  of Sikar - Bikaner Section of NH - 11 (km 340.188 to km 557. 775 via Sikar By - Pass) and Bikaner Bypass (km 553. 869 of NH-11 to km 267.325 of NH-89) in the State of Rajasthan under National Highways (Others)  on  Ministry of Road Transport and Highways Rajasthan Roads 627.54 13-12-2011
48th PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
37 Two / Four laing of Vikravandi to Meensuruti Section of NH - 45C from km 0 .000 to km 93.500 and two laning with PSS from Meensuruti, km 93.500 to Thanjavur km 164.614 in the State of Tamil Nadu under NHDP - IV  on BOT (Toll) Basis.  Ministry of Road Transport and Highways Tamil Nadu Roads 1,090.00 13-12-2011
48th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
38 To redevelop the Gwalior, Nagpur, Amritsar and Sabarmati Railway stations on PPP mode under which the private developers shall be responsible for redevelopment, construction and maintenance of the stations and also responsible for estate development activities to provide integrated services to passengers Ministry of Railways Multiple State Railways 1,296.00 17-12-2019
91st PPPAC (Opens New Window)
17-12-2019 - In-principle approval
39 Sx laning of Anandapuram - Pendurthi - Anakapalli section of NH 5 (New NH-16) from KM 681 to KM 731.78 alongwith fourlane connectivity to Visakhapatnam Port Road from KM 0 to KM 12.7 in Andhra Pradesh on Hybrid Annuity Mode Ministry of Road Transport and Highways Andhra Pradesh Roads 2,355.49 22-09-2017
83nd PPPAC (Opens New Window)
02-10-2017 - Final approval
40 Srinagar to banihal section of NH 1A from km 187 to km 189.350, km 270.700 to km 286.110 and 187 to 220.700 on DBFOT (Annuity) in the State of Jammu and Kashmir Ministry of Road Transport and Highways Jammu & Kashmir Roads 1,166.00 16-11-2009
28th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
41 Six/Four Laning of Zirakpur - Parwanoo section of NH-22 including Pinjore - Kalka - Parwanoo bypass in Punjab, Haryana and Himachal Pradesh under NHDP Phase III A Ministry of Road Transport and Highways Himachal Pradesh Roads 295.00 01-11-2006
4th PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
42 Six/Four Laning of Delhi - Haryana Border to Rohtak Section of NH-10 from Km 29.70 to Km 87.00 including construction of Bahadurgarh and Rohtak Bypasses in Haryana under NHDP Phase IIIA Ministry of Road Transport and Highways Haryana Roads 486.00 11-10-2006
3rd PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
43 Six/ Eight laning of JNPT Port Road Project ofn Mumbai JNPT Port Road Company  Ltd. (MJPRCL) from km 3.60 to km 27.27  at NH 4B (A1 - E section), km 0.0 to km 4.492 at NH-4B (D-G section), km 5.3 to km 14. 85 on SH-54 and km 0.000 to km 6.200 on Amra Marg Ministry of Road Transport and Highways Maharashtra Roads 1,822.00 21-05-2013
58th PPPAC (Opens New Window)
30-08-2016 Under Construction Final approval
44 Six-laning of Vijayawada-Gundugolanu section of NH-5 section from km 1076.48.00 to km 1022.48 under NHDP Phase V on BOT (Toll) basis: Ministry of Road Transport and Highways Andhra Pradesh Roads 1,684.00 11-11-2011
47th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
45 Six-laning of Gundugolanu - Rajahmundry section of NH-5 from km 1022.494 to km 901.753 in the State of Andhra Pradesh under NHDP Phase V on BOT (Toll) basis. Ministry of Road Transport and Highways Andhra Pradesh Roads 1,617.00 17-02-2012
50th PPPAC (Opens New Window)
06-05-2016 Terminated Final approval
46 Six-laning of Aurangabad-Barwa Adda Section of NH-2 from Km 180.000 to 398.750 in the State of Bihar and Jharkhand under NHDP Phase-V on BOT (Toll) basis. Ministry of Road Transport and Highways Multiple State Roads 2,340.00 09-03-2012
51st PPPAC (Opens New Window)
06-05-2016 Terminated Final approval
47 Six laning of Varanasi-Aurangabad section of NH 2from Km 786.00 to km 978.40 in the State of UP/Bihar under NHDP V on BOT basis Ministry of Road Transport and Highways Multiple State Roads 2,588.38 21-11-2008
19th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
48 Six Laning of Vadakkancherry to Thrissur Section (Package No.NS-2/BOT/KL-3 Ministry of Road Transport and Highways Kerala Roads 514.05 11-05-2007
10th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
49 Six Laning of Surat-Dahisar Section of NH-8 (239 Km) in Gujarat and Maharashtra Ministry of Road Transport and Highways Maharashtra Roads 1,405.57 11-05-2007
10th PPPAC (Opens New Window)
31-08-2016 Operation and Maintenance Stage Final approval
50 Six laning of Samakhiali-Gandhidham section of NH 8A from km 306 to km 362.16 in the State of Gujarat under NHDP Phase V on BOT (Toll) basis on DBFO pattern Ministry of Road Transport and Highways Gujarat Roads 805.39 09-07-2009
25th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
51 Six laning of Pune-Satara section of NH 4 from km 725 to km 865.35 in the State of Maharashtra under NHDP Phase V on BOT (Toll) basis on DBFO pattern Ministry of Road Transport and Highways Maharashtra Roads 1,724.55 09-07-2009
25th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
52 Six laning of Poonamallee-Walajapet section of NH 4 under NHDP V on BOT(Toll) basis Ministry of Road Transport and Highways Tamil Nadu Roads 1,197.00 02-12-2010
39th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
53 Six Laning of Pimpalgaon-Nashik-Gonde section of NH-3 in the State of Maharashtra under NHDP Phase IIIA on BOT basis. Ministry of Road Transport and Highways Maharashtra Roads 752.47 05-11-2007
13th PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
54 Six Laning of Panipat - Jalandhar Section of NH-1 (291 Km) in Haryana and Punjab. Ministry of Road Transport and Highways Punjab Roads 2,288.00 11-05-2007
10th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
55 Six laning of Nidagatta-Mysore section of NH-275 from km 74.20 to km 135.304 in the state of Karnataka on Hybrid Annuity mode (Package-II) Ministry of Road Transport and Highways Karnataka Roads 2,177.80 17-05-2017
82nd PPPAC (Opens New Window)
31-05-2017 Yet to be awarded Final approval
56 Six laning of NH7 from Hosur to Krishnagiri on NH93 in Tamil Nadu  Ministry of Road Transport and Highways Tamil Nadu Roads 535.00 22-02-2010
32nd PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
57 Six laning of NH 4 from Tumkur to Chitradurga in Karnataka under NHDP Phase V on BOT (Toll) on DBFO pattern Ministry of Road Transport and Highways Karnataka Roads 839.00 16-10-2009
28th PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
58 Six laning of Krishnagiri-Walahjpet section of NH 46 from Km 0 to km 148.30 in the State of Tamil Nadu under NHDP V on BOT basis Ministry of Road Transport and Highways Tamil Nadu Roads 1,489.55 21-11-2008
19th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
59 Six Laning of Kishangarh-Ajmer-Beawar Section from KM 364.125 to KM 58.245 of NH 8 on BOT Basis Ministry of Road Transport and Highways Rajasthan Roads 722.24 30-04-2008
14th PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
60 Six laning of Kishangarh -Udaipur- Ahmedabad section of NH 79A, NH79, NH 76 and NH 8 under NHDP Phase V, length 555.50 km Ministry of Road Transport and Highways Rajasthan Roads 5,387.30 20-06-2011
44th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
61 Six Laning of Kharar to Ludhiana Section of NH - 95 (New NH - 05) from Kharar Km. 10+185 to Samrala Chowk Ludhiana Km. 86+199 in the State of Punjab under NHDP Phase V on Hybrid Annuity Mode Ministry of Road Transport and Highways Punjab Roads 1,388.34 22-03-2016
77th PPPAC (Opens New Window)
31-07-2016 Under Construction Final approval
62 Six laning of Indore-Dewas section of NH 3 from Km 577.55 to km 610.00 and Km 0.00 to Km 12.60 in the State of MP under NHDP V on BOT basis Ministry of Road Transport and Highways Madhya Pradesh Roads 410.00 21-11-2008
19th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
63 Six laning of Handia- Varanasi from km 713.146 to km 785.544 under NHDP-V Ministry of Road Transport and Highways Uttar Pradesh Roads 2,356.16 27-11-2014
67th PPPAC (Opens New Window)
29-08-2016 Pre-construction Stage Final approval
64 Six Laning of Handia Varanasi Section of NH-2 from KM 713.146 to KM 785.544 in the State of Uttar Pradesh under NHDP Phase V on Hybrid Annuity Mode Ministry of Road Transport and Highways Uttar Pradesh Roads 2,064.99 28-10-2016
80th PPPAC (Opens New Window)
08-11-2016 Pre-construction Stage Final approval
65 Six Laning of Gurgaon-Kotputli-Jaipur Section of NH-8 in Haryana/Rajasthan on BOT (Toll) basis following by DBFO pattern. Ministry of Road Transport and Highways Haryana Roads 1,673.70 11-05-2007
10th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
66 Six laning of Etawah Chakeri (Kanpur) section of NH 2  under NHDP Phase V, length 160.21 km Ministry of Road Transport and Highways Uttar Pradesh Roads 1,573.00 14-09-2011
46th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
67 Six laning of Delhi-Agra section of NH 2 from Km 20.500 to Km 199.600 in the States of Haryana/UP under NHDP V on BOT basis Ministry of Road Transport and Highways Multiple State Roads 1,917.63 21-11-2008
19th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
68 Six laning of Dankuni - Baleshwar section of NH 6 in West Bengal  Ministry of Road Transport and Highways West Bengal Roads 2,034.40 22-02-2010
32nd PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
69 Six Laning of Chilkaluripet-Vijayawada, including Guntur bypass and Mangalagiri bypass of Chennai-Vijayawada Section of NH-5 in Andhra Pradesh. Ministry of Road Transport and Highways Andhra Pradesh Roads 572.30 11-05-2007
10th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
70 Six Laning of Chennai-Tada Section of NH-5 (43 Km) in Tamil Nadu Ministry of Road Transport and Highways Tamil Nadu Roads 353.37 11-05-2007
10th PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
71 Six laning of Chenagapjalli to Start of Coimbatore bypass section 1 and four laning from end of Coimbatore bypass to TN/Kerala Boarder of NH 47 in the State of Tamil Nadu Ministry of Road Transport and Highways Tamil Nadu Roads 852.74 27-07-2009
26th PPPAC (Opens New Window)
06-05-2016 Operation and Maintenance Stage Final approval
72 Six laning of Chandikol-Jagatpur-Bhubhaneshwar section of NH 5 from Km 413 to 418 and Km 0 to Km 62 in the State of Orissa under NHDP V on BOT basis Ministry of Road Transport and Highways Odisha Roads 951.38 21-11-2008
19th PPPAC (Opens New Window)
06-05-2016 Under Construction Final approval
73 Six laning of Chandikhole - Baleshwar section of NH 5 from NH 62.00 and km 199.141 in the state of Orissa Ministry of Road Transport and Highways Odisha Roads 2,176.71 27-11-2014
67th PPPAC (Opens New Window)
29-08-2016 - Final approval
74 Six laning of Chakeri-Allahabad section of NH-2 from km 483.687 to km 630.0 under NHDP Phase-V on BOT (Toll) basis.  Ministry of Road Transport and Highways Uttar Pradesh Roads 1,661.60 23-12-2014
68th PPPAC (Opens New Window)
29-08-2016 - Final approval
75 Six laning of Chakeri - Allahabad section of NH 2 (from KM 483.687 KM 628.753) in the State of State of Uttar Pradesh under NHDP Phase V on Hybrid Annuity Mode Ministry of Road Transport and Highways Uttar Pradesh Roads 1,735.20 14-02-2017
81st PPPAC (Opens New Window)
20-03-2017 Yet to be awarded Final approval

Disclaimer : Status is being updated on receipt of information from project authorities