List of Infrastructure Projects – State Wise List of Infrastructure Projects – State Wise

This Report provides State/UT wise information on infrastructure projects across pre-defined set of parameters and following coverage criteria:
  • Government Infrastructure Projects (PPP) that were either under 'Pre-construction Stage', 'Under Construction' or 'Operation and Maintenance Stage' as on April 1, 2011 or 'Awarded' thereafter and with Project Cost >INR 5 crore.
  • Government Infrastructure Projects (Traditional Procurement) that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore; and
  • Private Sector Projects that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore.
Information available as on 06 December 2019
No. of Projects in this Report: 9242 Total Project Cost(in Rs Crore): 6,813,008.32
State selection
Please Select State:
This Report provides State/UT wise information on infrastructure projects across pre-defined set of parameters and following coverage criteria: (All States)
Sl No
1 Development of Ganga Driveway and Riverfront Development from Digha to Didarganj at Patna on BOT (Toll) basis. Government Infrastructure Projects (PPP) Transport Roads and bridges Bihar Bihar State Road Development Corporation Limited Under Construction 2,234.46 18-Jun-2019 13-11-2019
2 MUTP 3A Government Infrastructure Projects (Traditional Procurement) Transport Railway track, tunnel, viaducts, bridges Maharashtra Mumbai Railway Vikas Corporation Limited Under Construction 33,690.00 01-Mar-2019 08-08-2019
3 Development of Modern Silos for storage of Wheat on DBFOT basis under PPP mode at Borivali, Maharashtra Government Infrastructure Projects (PPP) Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Maharashtra Food Corporation of India Pre-construction Stage 41.52 15-Feb-2019 17-07-2019
4 Development of Modern Silos for storage of Wheat on DBFOT basis under PPP mode at Dhamora, Uttar Pradesh Government Infrastructure Projects (PPP) Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Uttar Pradesh Food Corporation of India Pre-construction Stage 37.86 15-Feb-2019 17-07-2019
5 Setting up of Liquid Cargo Handling Jetty at Shalukkhali, Haldia Dock-II through PPP mode Government Infrastructure Projects (PPP) Transport Ports (excluding captive) West Bengal Kolkata Port Trust Under Construction 172.52 15-Feb-2018 25-11-2019
6 Hydel Power (Bharari) Project Government Infrastructure Projects (PPP) Energy Renewable energy (grid) Himachal Pradesh Directorate of Energy, Himachal Pradesh Pre-construction Stage 41.62 01-Feb-2018 30-10-2019
7 Tamil Nadu solar power project - 709 MW Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Tamil Nadu NLC Limited Completed 3,035.93 24-Jan-2018 29-11-2019
8 Two laning of Zojila Tunnel of 14.083 km length on NH - 1D in the State of Jammu & Kashmir on BOT annuity basis* Government Infrastructure Projects (PPP) Transport Roads and bridges Jammu & Kashmir Ministry of Road Transport and Highways Under Construction 9,090.13 24-Jan-2018 09-11-2019
9 Development of Food grain Silos at Kaimur and Buxer, Bihar on DBFOT basis through PPP mode Government Infrastructure Projects (PPP) Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Bihar Food Corporation of India Pre-construction Stage 65.28 15-Jan-2018 17-07-2019
10 Implementation of water supply scheme in Kurnool* Government Infrastructure Projects (Traditional Procurement) Water Sanitation Water supply pipeline Andhra Pradesh Public Health and Municipal Engineering Department, Andhra Pradesh Under Construction 68.25 07-Dec-2017 27-11-2019
11 Upgradation of Tongra-Maheshbhatan road in length of 21.6 km* Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Jharkhand Road Construction Department, Jharkhand Pre-construction Stage 56.81 01-Nov-2017 25-10-2019
12 Implementation of 20 MLD Sewerage Scheme and allied works at Gangashehar Zone * Government Infrastructure Projects (Traditional Procurement) Water Sanitation Sewage collection, treatment and disposal system Rajasthan Rajasthan Urban Infrastructure Development Project Under Construction 220.00 30-Oct-2017 26-11-2019
13 Construction of High level bridge connecting Dudhani & Kauncha across Damanganga River* Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Dadra & Nagar Haveli (UT) Public Works Department, Dadra & Nagar Haveli Pre-construction Stage 54.99 26-Oct-2017 25-10-2019
14 Implementation of rural electrification works in Dumka under Integrated Power Development Scheme * Government Infrastructure Projects (Traditional Procurement) Energy Electricity transmission Jharkhand Jharkhand Bijli Vitran Nigam Limited Under Construction 149.40 25-Oct-2017 26-11-2019
15 Uogradation of Bairgachhi Chowk-Bangalakol road in length of 32.0 km* Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Bihar Road Construction Department, Bihar Pre-construction Stage 80.77 17-Oct-2017 25-10-2019
16 Setting up of 200 MW wind based power at Thoothukudi Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Tamil Nadu Solar Energy Corporation of India Completed 1,000.00 16-Oct-2017 04-12-2019
17 Development, O&M of Gadoj-Majri to Haryana/ Rajasthan Border and Majri to Neemrana under DBFOT (Toll) Basis* Government Infrastructure Projects (PPP) Transport Roads and bridges Rajasthan Public Works Department, Rajasthan Pre-construction Stage 88.01 11-Oct-2017 09-11-2019
18 Implementation of 220.0 km Bhusawal water supply scheme* Government Infrastructure Projects (Traditional Procurement) Water Sanitation Water supply pipeline Maharashtra Municipal Council, Bhusawal Pre-construction Stage 84.50 09-Oct-2017 25-10-2019
19 Upgradation of Anooppur-Chechai-Amlai in length of 76.6 km Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Madhya Pradesh Madhya Pradesh Road Development Corporation Limited (MPRDC) Pre-construction Stage 162.83 09-Oct-2017 08-11-2017
20 Upgradation of Ambalappuzha-Thiruvalla road in length of 22.6 km* Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Kerala Kerala Road Fund Board Pre-construction Stage 56.61 07-Oct-2017 25-10-2019
21 Upgradation of various roads in length of 32 km in Araria* Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Bihar Road Construction Department, Bihar Pre-construction Stage 84.00 30-Sep-2017 25-10-2019
22 Setting up a 20 MW solar based power unit at Chittapur in Kalaburagi Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Karnataka Hero Solar Energy Private Limited Under Construction 200.00 28-Sep-2017 08-11-2017
23 Setting up a 20 MW solar based power unit at Gangavati in Koppal Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Karnataka Hero Solar Energy Private Limited Under Construction 200.00 28-Sep-2017 08-11-2017
24 Setting up a 20 MW solar based power unit at Gundlupet in Chamarajanagar Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Karnataka Hero Solar Energy Private Limited Under Construction 200.00 28-Sep-2017 08-11-2017
25 Setting up a 20 MW solar based power unit at Kollegala and Hanur in Chamarajanagar Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Karnataka Hero Solar Energy Private Limited Under Construction 200.00 28-Sep-2017 08-11-2017
26 Setting up a 20 MW solar based power unit at Madhugiri in Tumkuru Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Karnataka Hero Solar Energy Private Limited Under Construction 200.00 28-Sep-2017 08-11-2017
27 Setting up a 20 MW solar based power unit at Shahpur, Yadgir in Kalaburagi Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Karnataka Hero Solar Energy Private Limited Under Construction 200.00 28-Sep-2017 08-11-2017
28 Setting up a 20 MW solar based power unit in Chamarajanagar Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Karnataka Hero Solar Energy Private Limited Under Construction 200.00 28-Sep-2017 08-11-2017
29 Laying of 400 KV Pugalur-Edayarpalayam & Edayarpalayam-Udumalpet D/C line Government Infrastructure Projects (Traditional Procurement) Energy Electricity transmission Multi State/ Centre Power Grid Corporation of India Limited Completed 107.56 27-Sep-2017 04-12-2019
30 Upgradation of Rangwasa-Agra-Girota road in length of 52.4 km Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Madhya Pradesh Madhya Pradesh Road Development Corporation Limited (MPRDC) Pre-construction Stage 98.69 26-Sep-2017 08-11-2017
31 Upgradation of Sanwer-Ajnod-Depalpur road in length of 34.9 km Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Madhya Pradesh Madhya Pradesh Road Development Corporation Limited (MPRDC) Pre-construction Stage 78.66 26-Sep-2017 08-11-2017
32 Upgradation of Chitrangi-Garhwa Road in length of 22.7 km Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Madhya Pradesh Madhya Pradesh Road Development Corporation Limited (MPRDC) Pre-construction Stage 97.29 22-Sep-2017 08-11-2017
33 Laying of 400 kV Raigarh-Pugalur-Madakathara transmission line - Scheme 2 Government Infrastructure Projects (Traditional Procurement) Energy Electricity transmission Tamil Nadu Power Grid Corporation of India Limited Under Construction 1,931.39 20-Sep-2017 25-10-2019
34 Four laning of road over bridge at Suri in length of 1343 meters* Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges West Bengal Public Works Department, West Bengal Pre-construction Stage 127.21 07-Sep-2017 25-10-2019
35 Four laning of road over bridge at Bhimgarh in length of 1621 meters* Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges West Bengal Public Works Department, West Bengal Pre-construction Stage 155.87 06-Sep-2017 25-10-2019
36 Implementation of sewerage scheme in Gwalior * Government Infrastructure Projects (Traditional Procurement) Water Sanitation Sewage collection, treatment and disposal system Madhya Pradesh Gwalior Municipal Corporation Under Construction 350.00 04-Sep-2017 26-11-2019
37 Implementation of water supply scheme in Gwalior* Government Infrastructure Projects (Traditional Procurement) Water Sanitation Sewage collection, treatment and disposal system Madhya Pradesh Gwalior Municipal Corporation Under Construction 214.00 04-Sep-2017 05-11-2019
38 Construction of High Level Bridge at Hajipur-Sankharisahi Road in length of 1239.40 meters * Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Odisha Public Works Department, Odisha Under Construction 54.06 01-Sep-2017 25-11-2019
39 Upgradation of Bidasar-Nokha road in length of 93 km * Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Rajasthan Public Works Department, Rajasthan Under Construction 111.62 24-Aug-2017 25-11-2019
40 Upgradation of Sikar-Ganeri-Jaswantgarh road in length of 75.1 km * Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Rajasthan Public Works Department, Rajasthan Under Construction 140.27 24-Aug-2017 25-11-2019
41 Upgradation of Singhana-Buhana-Haryana border section in length of 34 km * Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Rajasthan Public Works Department, Rajasthan Under Construction 53.99 24-Aug-2017 25-11-2019
42 Upgradation of Saraikela-Kharsawan-Adardih Road (MDR-025) in length of 15.4 km * Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Jharkhand Road Construction Department, Jharkhand Under Construction 102.00 21-Aug-2017 26-11-2019
43 Implementation of 10 MLD sewerage scheme in Burhanpur * Government Infrastructure Projects (Traditional Procurement) Water Sanitation Sewage collection, treatment and disposal system Madhya Pradesh Burhanpur Municipal Corporation Under Construction 82.63 17-Aug-2017 26-11-2019
44 Implementation of 50 MLD sewage treatment plant at Ramana * Government Infrastructure Projects (PPP) Water Sanitation Sewage collection, treatment and disposal system Uttar Pradesh Uttar Pradesh Jal Nigam Pre-construction Stage 156.00 16-Aug-2017 09-11-2019
45 Implementation of rural electrification works in Dehradun under DDUGJY Government Infrastructure Projects (Traditional Procurement) Energy Electricity transmission Uttarakhand Uttarakhand Power Corporation Limited Completed 71.05 11-Aug-2017 04-12-2019
46 Implementation of rural electrification works in Garhwal under DDUGJY Government Infrastructure Projects (Traditional Procurement) Energy Electricity transmission Uttarakhand Uttarakhand Power Corporation Limited Completed 51.32 11-Aug-2017 04-12-2019
47 Implementation of rural electrification works in Haridwar under DDUGJY Government Infrastructure Projects (Traditional Procurement) Energy Electricity transmission Uttarakhand Uttarakhand Power Corporation Limited Completed 124.78 11-Aug-2017 04-12-2019
48 Implementation of rural electrification works in Nainital & Bageshwar under DDUGJY Government Infrastructure Projects (Traditional Procurement) Energy Electricity transmission Uttarakhand Uttarakhand Power Corporation Limited Completed 57.19 11-Aug-2017 04-12-2019
49 Implementation of rural electrification works in Udham Singh Nagar under DDUGJY Government Infrastructure Projects (Traditional Procurement) Energy Electricity transmission Uttarakhand Uttarakhand Power Corporation Limited Completed 149.12 11-Aug-2017 04-12-2019
50 PPP-8:1 No. transmission line of 220 kV and 5 No. 132 kV GSS at various places Government Infrastructure Projects (PPP) Energy Electricity transmission Rajasthan Rajasthan Rajya Vidyut Prasaran Nigam Limited Operation and Maintenance Stage 149.00 11-Aug-2017 01-11-2019
51 Implementation of solid waste management scheme with a capacity of 500 MT at Dum Dum * Government Infrastructure Projects (Traditional Procurement) Water Sanitation Solid waste management West Bengal Kolkata Metropolitan Development Authority Under Construction 55.73 10-Aug-2017 26-11-2019
52 Four laning of Pandoh bypass to Takoli section in length of 20.7 km Government Infrastructure Projects (PPP) Transport Roads and bridges Himachal Pradesh National Highways Authority of India (NHAI) Operation and Maintenance Stage 2,600.00 10-Aug-2017 09-11-2019
53 Doubling of Phulera-Digana railway line in length of 108.7 km Government Infrastructure Projects (Traditional Procurement) Transport Railway track, tunnel, viaducts, bridges Rajasthan North Western Railway Pre-construction Stage 600.00 10-Aug-2017 25-10-2019
54 Implementation of 281 LPCD water supply scheme at Baripada, Sambalpur, Rourkela & Jharsuguda* Government Infrastructure Projects (Traditional Procurement) Water Sanitation Water supply pipeline Odisha Public Health Engineering Department, Odisha Pre-construction Stage 318.00 08-Aug-2017 25-10-2019
55 Development of logistic park at Batasingaram on 40 acres * Government Infrastructure Projects (PPP) Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Telangana Hyderabad Metropolitan Development Authority Pre-construction Stage 35.00 05-Aug-2017 09-11-2019
56 PPP-10:5 No. transmisson line of 132 kV at various places Government Infrastructure Projects (PPP) Energy Electricity transmission Rajasthan Rajasthan Rajya Vidyut Prasaran Nigam Limited Operation and Maintenance Stage 117.70 04-Aug-2017 01-11-2019
57 PPP-9:6 No. transmisson line of 132 kV at various places Government Infrastructure Projects (PPP) Energy Electricity transmission Rajasthan Rajasthan Rajya Vidyut Prasaran Nigam Limited Operation and Maintenance Stage 128.81 04-Aug-2017 01-11-2019
58 Implementation of 35 MLD tertiary sewage treatment plant at Bamroli in Surat * Government Infrastructure Projects (Traditional Procurement) Water Sanitation Sewage collection, treatment and disposal system Gujarat Surat Municipal Corporation Under Construction 95.00 31-Jul-2017 25-11-2019
59 Implementation of 30 MLD Nandyal water supply improvement scheme * Government Infrastructure Projects (Traditional Procurement) Water Sanitation Water supply pipeline Andhra Pradesh Public Health and Municipal Engineering Department, Andhra Pradesh Under Construction 137.34 28-Jul-2017 26-11-2019
60 Augmentation of Water Supply Scheme in Raipur* Government Infrastructure Projects (Traditional Procurement) Water Sanitation Water supply pipeline Chhattisgarh Municipal Corporation, Raipur Pre-construction Stage 163.50 28-Jul-2017 25-10-2019
61 Setting up of 220 kV Vaghchipa (new) substation* Government Infrastructure Projects (Traditional Procurement) Energy Electricity transmission Gujarat Power Grid Corporation of India Limited Pre-construction Stage 57.51 28-Jul-2017 25-10-2019
62 Upgradation of road from Bodh Vihar Chowk to ITI in length of 10 km* Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Haryana Municipal Corporation of Faridabad Pre-construction Stage 76.34 23-Jul-2017 25-10-2019
63 Upgradation of Burhanpur-Nepanagar road in length of 32.6 km Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Madhya Pradesh Madhya Pradesh Road Development Corporation Limited (MPRDC) Pre-construction Stage 102.23 22-Jul-2017 08-11-2017
64 Upgradation of Shahpur-Nachankheda & Burhanpur-Nepanagar roads in length of 49.3 km Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Madhya Pradesh Madhya Pradesh Road Development Corporation Limited (MPRDC) Pre-construction Stage 111.78 22-Jul-2017 08-11-2017
65 Development of convention centre at Digha on 5.5 acres of land Government Infrastructure Projects (Traditional Procurement) Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ West Bengal Kolkata Metropolitan Development Authority Completed 70.91 21-Jul-2017 29-11-2019
66 Upgradation of Balotra-Sanderao road in length of 24.7 km * Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Rajasthan Public Works Department, Rajasthan Under Construction 113.31 20-Jul-2017 25-11-2019
67 Construction of four lane road over birdge on Jaipur-Ringus section Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Rajasthan North Western Railway Completed 60.20 19-Jul-2017 04-12-2019
68 Two laning of Ahmadnagar-Baramati-Phaltan section in length of 93.8 km* Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Maharashtra Maharashtra State Road Development Corporation Limited (MSRDC) Pre-construction Stage 647.87 15-Jul-2017 25-10-2019
69 Two laning of Ahmedpur-Kopra-Jamkhed section in length of 55.6 km (Ahmadpur to Pimpla)* Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Maharashtra Maharashtra State Road Development Corporation Limited (MSRDC) Pre-construction Stage 341.88 15-Jul-2017 25-10-2019
70 Two laning of Ahmedpur-Kopra-Jamkhed section in length of 81.7 km (Pimpla to Manjarsumbha)* Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Maharashtra Maharashtra State Road Development Corporation Limited (MSRDC) Pre-construction Stage 455.33 15-Jul-2017 25-10-2019
71 Two laning of Kaij to Kusalam section in length of 60.7 km* Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Maharashtra Maharashtra State Road Development Corporation Limited (MSRDC) Pre-construction Stage 454.38 15-Jul-2017 25-10-2019
72 Two laning of Khamgaon-Mehkar-Pandharpur-Sangola section in length of 34.3 km* Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Maharashtra Maharashtra State Road Development Corporation Limited (MSRDC) Pre-construction Stage 176.45 15-Jul-2017 25-10-2019
73 Two laning of Kurudwadi to Pandharpur section in length of 48.3 km Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Maharashtra Maharashtra State Road Development Corporation Limited (MSRDC) Under Construction 307.63 15-Jul-2017 25-10-2019
74 Two laning of Mantha to Partur section in length of 51.3 km* Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Maharashtra Maharashtra State Road Development Corporation Limited (MSRDC) Pre-construction Stage 399.59 15-Jul-2017 25-10-2019
75 Two laning of Mehekar to Ajispur section in length of 35.8 km* Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Maharashtra Maharashtra State Road Development Corporation Limited (MSRDC) Pre-construction Stage 183.02 15-Jul-2017 25-10-2019
Note: Zero indicates information not available.

These reports are based on data received from relevant Project Authorities and is being updated on a best endeavor basis. Contact project sponsoring authorities to seek additional details.

# - The project may have additional details that are pertinent. Kindly check the 'Any Other Information' field for further details.
* - Updated status for the project is not available.