List of Infrastructure Projects – State Wise
This Report provides State/UT wise information on infrastructure projects across pre-defined set of parameters and following coverage criteria:
- Government Infrastructure Projects (PPP) that were either under 'Pre-construction Stage', 'Under Construction' or 'Operation and Maintenance Stage' as on April 1, 2011 or 'Awarded' thereafter and with Project Cost >INR 5 crore.
- Government Infrastructure Projects (Traditional Procurement) that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore; and
- Private Sector Projects that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore.
No. of Projects in this Report: | 9243 | Total Project Cost(in Rs Crore): | 6,813,036.84 |
This Report provides State/UT wise information on infrastructure projects across pre-defined set of parameters and following coverage criteria: (All States)
Sl No | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
376 | Setting up of 800 MW Parbati hydel power unit (Stage II) at Kullu# | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Himachal Pradesh | NHPC Limited | Under Construction | 8,398.75 | 11-Sep-2002 | 04-12-2019 |
377 | Setting up of 800 MW Yermarus thermal power station project in Raichur district. | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity generation (grid) | Karnataka | Karnataka Power Corporation Limited | Completed | 12,589.00 | 09-Apr-2010 | 04-12-2019 |
378 | Setting up of mega food park project on 52 acres at Ranchi | Government Infrastructure Projects (Traditional Procurement) | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Jharkhand | Ministry of Food Processing Industries | Completed | 114.74 | 27-Mar-2009 | 04-12-2019 |
379 | Sewage Treatment Plant (Behrampur)# | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Haryana | Haryana Urban Development Authority | Completed | 100.78 | 22-Mar-2012 | 04-12-2019 |
380 | Sewage Treatment Plant (Dhanwapur)# | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Haryana | Haryana Urban Development Authority | Completed | 94.40 | 22-Mar-2012 | 04-12-2019 |
381 | Sewage Treatment Plant (Koyambedu) | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | Completed | 96.57 | 15-Jun-2012 | 04-12-2019 |
382 | Sewage Treatment Plant (Puri) Project# | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Odisha | Odisha Water Supply and Sewerage Board | Completed | 80.45 | Not Available | 04-12-2019 |
383 | Sewerage Scheme (Ambattur Municipality) | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | Completed | 130.91 | 06-May-2010 | 04-12-2019 |
384 | Sewerage Scheme (Chennai) - Improvement | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | Completed | 150.00 | 08-Nov-2013 | 04-12-2019 |
385 | Sewerage Scheme (Gurgaon)*# | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Haryana | Haryana Urban Development Authority | Under Construction | 351.48 | 16-Jan-2013 | 04-12-2019 |
386 | Sewerage Scheme (North Nanded)* | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Maharashtra | Nanded Waghala City Municipal Corporation | Under Construction | 66.78 | Not Available | 04-12-2019 |
387 | Sewerage Scheme (Ranchi) | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Jharkhand | Ranchi Municipal Corporation | Completed | 359.25 | 01-Jan-2015 | 04-12-2019 |
388 | Sewerage Scheme (Tambaram Municipality) | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | Completed | 160.96 | 10-May-2012 | 04-12-2019 |
389 | Sewerage Scheme (Thiruvottiyur) | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu | Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) | Completed | 67.63 | 27-Feb-2009 | 04-12-2019 |
390 | Sewerage Scheme (Varanasi) | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh | Uttar Pradesh Jal Nigam | Under Construction | 329.29 | 16-Nov-2009 | 04-12-2019 |
391 | Sewerage Treatment Plant (Noor Nagar Morti) | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh | Ghaziabad Development Authority | Completed | 78.04 | 21-Oct-2011 | 04-12-2019 |
392 | Singareni Coal Based Power Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity generation (grid) | Telangana | Singareni Collieries Company Limited | Completed | 7,573.31 | 11-Nov-2011 | 04-12-2019 |
393 | Singatalur Lift Irrigation Scheme | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka | Karnataka Neeravari Nigam Limited | Under Construction | 63.62 | 19-Sep-1992 | 04-12-2019 |
394 | Singireddypalli Lift Irrigation Scheme * | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Telangana | Telangana State Irrigation Development Corporation Limited | Under Construction | 1,905.00 | 31-Dec-2013 | 04-12-2019 |
395 | Six laning of flyover near Bopal Junction in length of 1.4 km in Ahmedabad | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Gujarat | Ahmedabad Urban Development Authority | Completed | 94.50 | 05-Aug-2014 | 04-12-2019 |
396 | Six laning of link road adjoining NH-24 to NH-58 in Ghaziabad district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Uttar Pradesh | Ghaziabad Development Authority | Completed | 121.79 | 01-Jan-2013 | 04-12-2019 |
397 | Six laning of Vadodara-Surat road in length of 6 km in Vadodara | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Gujarat | National Highways Authority of India (NHAI) | Under Construction | 503.16 | Not Available | 04-12-2019 |
398 | Small Hydel Power (Kachchh Branch Canal) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Sardar Sarovar Narmada Nigam Limited | Under Construction | 230.13 | 27-Aug-2014 | 04-12-2019 |
399 | Small Hydro Electric (Bhoothathankettu) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Kerala | Kerala State Electricity Board | Under Construction | 168.61 | 07-Feb-2014 | 04-12-2019 |
400 | Solar Photovoltaic (Manmunda) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Odisha | Green Energy Development Corporation of Odisha Limited | Completed | 160.00 | 08-Aug-2014 | 04-12-2019 |
401 | Solar Photovoltaic Power (Singrauli) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttar Pradesh | NTPC Limited | Completed | 69.39 | 26-Aug-2014 | 04-12-2019 |
402 | Solar Photovoltaic Power Plant (Vadodara Branch Canal - Chainage 12.43 km to 31.63 km) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Sardar Sarovar Narmada Nigam Limited | Completed | 111.00 | 12-Mar-2015 | 04-12-2019 |
403 | Storm Water Drainage (Coimbatore) Project | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Storm water drainage system | Tamil Nadu | Coimbatore City Municipal Corporation | Completed | 179.35 | 07-Oct-2010 | 04-12-2019 |
404 | Storm Water Drainage (Madurai) Project | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Storm water drainage system | Tamil Nadu | Tamil Nadu Urban Finance and Infrastructure Development Corporation | Under Construction | 251.81 | Not Available | 04-12-2019 |
405 | Strategic Crude Oil Storage (Rajkot) Project - Phase-II* | Government Infrastructure Projects (Traditional Procurement) | Energy | Oil/ Gas/ LNG Storage | Gujarat | Indian Strategic Petroleum Reserves Limited | Under Construction | 1,150.00 | 08-Jun-2016 | 04-12-2019 |
406 | Subarnarekha Multipurpose Barrage Project | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Multi State/ Centre | Water Resources Department, Jharkhand | Under Construction | 6,613.74 | 21-Mar-1977 | 04-12-2019 |
407 | Substation (Atri) & Narendrapur-Mendhasal Transmission Line Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Odisha | Odisha Power Transmission Corporation Limited | Completed | 51.12 | 21-Mar-2013 | 04-12-2019 |
408 | Substation (Chandaka) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Odisha | Odisha Power Transmission Corporation Limited | Completed | 61.82 | 19-Mar-2013 | 04-12-2019 |
409 | Substation (Pratapsasan) & Cuttack-Pratapsasan Transmission Line Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Odisha | Odisha Power Transmission Corporation Limited | Under Construction | 83.26 | 18-Jun-2013 | 04-12-2019 |
410 | Substation (Sadaipur) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | West Bengal | West Bengal State Electricity Transmission Company Limited | Completed | 60.87 | 29-Oct-2014 | 04-12-2019 |
411 | Substation (Srinagar) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Uttarakhand | Power Transmission Corporation of Uttarakhand Limited | Completed | 168.78 | 09-Dec-2009 | 04-12-2019 |
412 | Subways/R-U-Bs (Ankleshwar-Rajpipla) # | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Gujarat | Western Railway | Completed | 58.27 | Not Available | 04-12-2019 |
413 | Surfnalla Medium Irrigation Project | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra | Maharashtra Krishna Valley Development Corporation | Under Construction | 145.70 | 26-May-2000 | 04-12-2019 |
414 | Suru Reservoir Scheme | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Jharkhand | Water Resources Department, Jharkhand | Under Construction | 96.35 | 06-Jan-1982 | 04-12-2019 |
415 | Teesta Low Dam-III (4X33=132MW) | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | West Bengal | NHPC Limited | Completed | 1,972.99 | 31-Oct-2003 | 04-12-2019 |
416 | Tertiary Treatment Plant#* | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water treatment plants | Haryana | Haryana Urban Development Authority | Under Construction | 55.51 | 09-Dec-2013 | 04-12-2019 |
417 | Thermal Power (Bhusawal) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity generation (grid) | Maharashtra | Maharashtra State Power Generation Company Limited | Completed | 6,730.00 | 23-Jan-2007 | 04-12-2019 |
418 | Thermal Power (Khaperkheda) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity generation (grid) | Maharashtra | Maharashtra State Power Generation Company Limited | Completed | 3,196.99 | 23-Jan-2007 | 04-12-2019 |
419 | Three laning of Pali-Nadol-Gomati ka Choraha road in length of 107.0 Km | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Rajasthan | Rajasthan State Road Development and Construction Corporation Limited | Completed | 193.95 | 30-Sep-2010 | 04-12-2019 |
420 | Transmission Line (Bhadla-Bikaner) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Rajasthan | Rajasthan Rajya Vidyut Prasaran Nigam Limited | Under Construction | 232.88 | 10-Apr-2013 | 04-12-2019 |
421 | Transmission Line (Gaya-Sonenagar) Project#* | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Bihar | Bihar State Power Transmission Company Limited | Under Construction | 140.00 | Not Available | 04-12-2019 |
422 | Transmission Line (Raghunathpur-Ranchi) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Multi State/ Centre | Damodar Valley Corporation | Completed | 434.90 | 14-May-2008 | 04-12-2019 |
423 | Transmission Line (Raita-Jagdalpur) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Chhattisgarh | Chhattisgarh State Power Transmission Company Limited | Completed | 335.40 | 11-May-2011 | 04-12-2019 |
424 | Transmission Line (Rangia-Salakati) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Assam | Assam Electricity Grid Corporation Limited | Under Construction | 96.96 | 25-Nov-2010 | 04-12-2019 |
425 | Transmission Line (Rasipalayam-Palavadi) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Tamil Nadu | Tamil Nadu Generation and Distribution Corporation Limited | Completed | 542.59 | 04-Oct-2013 | 04-12-2019 |
426 | Transmission Line (Srinagar-Simli) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Uttarakhand | Power Transmission Corporation of Uttarakhand Limited | Completed | 89.51 | 26-Oct-2005 | 04-12-2019 |
427 | Two laning of Chas-Bokaro-Gola-Ramgarh road in length of 78.3 km under NHDP-IV | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Jharkhand | National Highways Authority of India (NHAI) | Under Construction | 341.61 | 31-Dec-2014 | 04-12-2019 |
428 | Two laning of Dumaria-Ranitalab road of SH-69 in length of 154.2 km | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Bihar | Bihar State Road Development Corporation Limited | Completed | 318.75 | 30-Dec-2008 | 04-12-2019 |
429 | Two laning of existing carriageway between Moledanga-Bashbandh in length of 27.4 KM | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | West Bengal | Public Works Department, West Bengal | Completed | 135.94 | 06-May-2015 | 04-12-2019 |
430 | Two laning of Falakata-Pundibari section in length of 26.0 Km | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | West Bengal | Public Works Department, West Bengal | Completed | 64.27 | 18-Mar-2013 | 04-12-2019 |
431 | Two laning of Hunli-Anini road in length of 39.0 Km in Dibang Valley district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Arunachal Pradesh | National Highways and Infrastructure Development Corporation Limited | Completed | 375.08 | 27-Dec-2016 | 04-12-2019 |
432 | Two laning of Kota-Chhabra road in length of 94.5 Km in Kota district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Multi State/ Centre | Rajasthan State Road Development and Construction Corporation Limited | Completed | 289.54 | 26-Apr-2013 | 04-12-2019 |
433 | Two laning of Ladnu-Nimbi Jodha-Degna-Merta City section road in length of 140 km under NHDP-IV | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Rajasthan | National Highways Authority of India (NHAI) | Under Construction | 378.46 | 31-Jul-2013 | 04-12-2019 |
434 | Two laning of Pasighat-Pangin road (NH-229) in length of 13.3 Km in East Siang district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Arunachal Pradesh | Public Works Department, Arunachal Pradesh | Completed | 124.03 | 10-Jan-2011 | 04-12-2019 |
435 | Two laning of Pasighat-Pangin road (NH-229) in length of 14.6 Km in East Siang district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Arunachal Pradesh | Public Works Department, Arunachal Pradesh | Completed | 117.58 | 10-Jan-2011 | 04-12-2019 |
436 | Two laning of Pasighat-Singer river section of NH-513 road in length of 19.9 Km in East Siang | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Arunachal Pradesh | Public Works Department, Arunachal Pradesh | Under Construction | 138.84 | 28-Oct-2010 | 04-12-2019 |
437 | Two laning of Rayachoti-Kadapa road in length of 51.3 Km in YSR district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Ministry of Road Transport and Highways | Completed | 198.00 | 20-Nov-2016 | 04-12-2019 |
438 | Two laning of Runnisaidpur-Bishwa road of SH-87 in length of 67.4 km | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Bihar | Bihar State Road Development Corporation Limited | Under Construction | 378.28 | 09-Sep-2013 | 04-12-2019 |
439 | Two laning of Shivganj-Baidrabad road of SH-68 in length of 83.1 km | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Bihar | Bihar State Road Development Corporation Limited | Completed | 174.32 | 15-Jul-2009 | 04-12-2019 |
440 | Two laning Rae Bareilly-Banda section of NH-232 road in length of 133.3 km in Rae Bareilly | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Uttar Pradesh | National Highways Authority of India (NHAI) | Under Construction | 558.77 | 01-Feb-2014 | 04-12-2019 |
441 | Underground Drainage Scheme (Okha)# | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Storm water drainage system | Gujarat | Gujarat Water Supply and Sewerage Board | Under Construction | 80.96 | 30-Nov-2014 | 04-12-2019 |
442 | Underground Sewerage Scheme (Bhiwandi-Nizampur) - Phase I | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Maharashtra | Bhiwandi Nizampur City Municipal Corporation | Completed | 71.80 | 31-May-2010 | 04-12-2019 |
443 | Underground Sewerage Scheme (Chandrapur) | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Maharashtra | Chandrapur City Municipal Corporation | Completed | 94.81 | 24-Aug-2009 | 04-12-2019 |
444 | Underground Sewerage Scheme (Cuddalore) | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu | Tamil Nadu Water Supply and Drainage Board | Completed | 65.14 | 30-Aug-2006 | 04-12-2019 |
445 | Underground Sewerage Scheme (Kulgaon-Badlapur) | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Maharashtra | Kulgaon Badlapur Municipal Council | Completed | 226.43 | 15-Feb-2010 | 04-12-2019 |
446 | Underground Sewerage Scheme (Thoothukudi) | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu | Tamil Nadu Water Supply and Drainage Board | Completed | 95.00 | 31-Oct-2007 | 04-12-2019 |
447 | Underground Sewerage Scheme (Udumalpet) | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Tamil Nadu | Tamil Nadu Water Supply and Drainage Board | Completed | 56.07 | 27-Mar-2013 | 04-12-2019 |
448 | Upgradation of Airport Gate-Duckbunglow More Road in length of 7.2 Km | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | West Bengal | Public Works Department, West Bengal | Completed | 80.90 | 10-Nov-2014 | 04-12-2019 |
449 | Upgradation of Akajan-Likabali-Bame Road in length of 32 km | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Arunachal Pradesh | National Highways and Infrastructure Development Corporation Limited | Under Construction | 263.39 | 22-Jul-2015 | 04-12-2019 |
450 | Upgradation of Baramulla-Gulmarg in length of 39.0 km | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Jammu & Kashmir | National Highways and Infrastructure Development Corporation Limited | Completed | 390.00 | 11-Nov-2016 | 04-12-2019 |