List of Infrastructure Projects – State Wise
This Report provides State/UT wise information on infrastructure projects across pre-defined set of parameters and following coverage criteria:
- Government Infrastructure Projects (PPP) that were either under 'Pre-construction Stage', 'Under Construction' or 'Operation and Maintenance Stage' as on April 1, 2011 or 'Awarded' thereafter and with Project Cost >INR 5 crore.
- Government Infrastructure Projects (Traditional Procurement) that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore; and
- Private Sector Projects that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore.
No. of Projects in this Report: | 9243 | Total Project Cost(in Rs Crore): | 6,813,036.84 |
This Report provides State/UT wise information on infrastructure projects across pre-defined set of parameters and following coverage criteria: (All States)
Sl No | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
76 | Development of 72 km Mumbai Urban Transport Project (MUTP) Phase II project | Government Infrastructure Projects (Traditional Procurement) | Transport | Railway track, tunnel, viaducts, bridges | Maharashtra | Mumbai Railway Vikas Corporation Limited | Under Construction | 8,087.00 | 31-May-2008 | 04-12-2019 |
77 | Development of an industrial park on 433.2 acres at Kittur in Belagavi#* | Government Infrastructure Projects (Traditional Procurement) | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Karnataka | Karnataka Industrial Area and Development Board | Under Construction | 73.19 | 28-May-2015 | 04-12-2019 |
78 | Development of Kishangarh airport in Ajmer | Government Infrastructure Projects (Traditional Procurement) | Transport | Airports | Rajasthan | Airports Authority of India (AAI) | Completed | 181.00 | 31-Dec-2014 | 04-12-2019 |
79 | Development of monorail of 20 km from Chembur-Wadala-Gadge Maharaj Chowk | Government Infrastructure Projects (Traditional Procurement) | Transport | Urban public transport (except rolling stock) | Maharashtra | Mumbai Metropolitan Region Development Authority (MMRDA) | Under Construction | 2,460.00 | 07-Nov-2008 | 04-12-2019 |
80 | Dhamani Medium Irrigation Project | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra | Maharashtra Krishna Valley Development Corporation | Under Construction | 320.71 | 29-Aug-2000 | 04-12-2019 |
81 | Dhukwan Small Hydro Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttar Pradesh | THDC India Limited | Under Construction | 195.42 | 19-Dec-2013 | 04-12-2019 |
82 | Dongargaon Medium Irrigation Project# | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra | Water Resources Department, Maharashtra | Under Construction | 88.34 | 31-Mar-1996 | 04-12-2019 |
83 | East West Metro Corridor Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Urban public transport (except rolling stock) | West Bengal | Kolkata Metro Rail Corporation Limited | Under Construction | 4,874.58 | 30-Jul-2008 | 04-12-2019 |
84 | Elevated Expressway Corridor (Jehangir Chowk-Rambagh-Natipura) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Jammu & Kashmir | Jammu and Kashmir Economic Reconstruction Agency | Under Construction | 258.32 | 22-Jun-2013 | 04-12-2019 |
85 | Establishment of 230/110 kV Substation at Kinnimangalam in Madurai District | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Tamil Nadu | Tamil Nadu Transmission Corporation Limited | Completed | 56.40 | 19-Aug-2014 | 04-12-2019 |
86 | Establishment of 230/33/11 kV Substation at R.A.Puram in Chennai District | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Tamil Nadu | Tamil Nadu Generation and Distribution Corporation Limited | Under Construction | 56.99 | 24-Jul-2014 | 04-12-2019 |
87 | Establishment of 400 kV GIS Substation at Manali | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Tamil Nadu | Tamil Nadu Generation and Distribution Corporation Limited | Under Construction | 404.65 | 25-Mar-2015 | 04-12-2019 |
88 | Establishment of 400/230-110 kV substation at Sholinganallur in Kancheepuram district | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Tamil Nadu | Tamil Nadu Generation and Distribution Corporation Limited | Completed | 122.21 | 19-Mar-2014 | 04-12-2019 |
89 | Execution of 84.4 km Ahmedabad-Gandhinagar Metro Rail Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Urban public transport (except rolling stock) | Gujarat | Metro Link Express for Gandhinagar Ahmedabad (MEGA) Company Limited | Under Construction | 21,500.00 | 07-Feb-2014 | 04-12-2019 |
90 | Execution of common system with Costal Energen Pvt Ltd & Ind-Barath Power Ltd (LTOA) Generation Project in Tuticorin-B | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Multi State/ Centre | Power Grid Corporation of India Limited | Completed | 2,281.56 | 30-Sep-2011 | 04-12-2019 |
91 | Execution of Eastern Region Strengthening Scheme-V | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Multi State/ Centre | Power Grid Corporation of India Limited | Completed | 1,364.52 | 31-Oct-2013 | 04-12-2019 |
92 | Execution of Southern Region System Strengthening scheme - XIII in Andhra Pradesh & Karnataka* | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Multi State/ Centre | Power Grid Corporation of India Limited | Under Construction | 639.46 | 25-Jan-2012 | 04-12-2019 |
93 | Execution of Southern Region System Strengthening scheme - XXIV in Tamil Nadu & Andhra Pradesh | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Multi State/ Centre | Power Grid Corporation of India Limited | Completed | 1,455.47 | 15-Mar-2016 | 04-12-2019 |
94 | Execution of substation works associated with Maheshwaram Pooling Station in Telangana * | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Telangana | Power Grid Corporation of India Limited | Completed | 550.06 | 31-Mar-2015 | 04-12-2019 |
95 | Execution of transmission system associated with IPPs of Nagapattinam & Cuddalore Area - Package A in Tamil Nadu | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Tamil Nadu | Power Grid Corporation of India Limited | Completed | 1,025.00 | 16-May-2014 | 04-12-2019 |
96 | Execution of transmission system associated with Mauda Stage-II (2x660MW) Generation Projects | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Multi State/ Centre | Power Grid Corporation of India Limited | Completed | 1,575.30 | 30-Sep-2013 | 04-12-2019 |
97 | Execution of transmission system associated with Solapur STPP (2x660MW) Generation Projects-Part A | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Maharashtra | Power Grid Corporation of India Limited | Completed | 63.32 | 30-Oct-2013 | 04-12-2019 |
98 | Execution of transmission system for ultra mega solar park in Tumkur - Phase I | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Multi State/ Centre | Power Grid Corporation of India Limited | Completed | 810.48 | 30-Apr-2016 | 04-12-2019 |
99 | Execution of transmission system in North/West part of Western Region for IPP Generation Projects in Chhattisgarh-E | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Multi State/ Centre | Power Grid Corporation of India Limited | Completed | 1,822.73 | 31-Dec-2011 | 04-12-2019 |
100 | Expansion of Kolkata metro rail in length of 81.0 Km - Phase II | Government Infrastructure Projects (Traditional Procurement) | Transport | Urban public transport (except rolling stock) | West Bengal | Rail Vikas Nigam Limited | Under Construction | 11,000.00 | 21-Oct-2011 | 04-12-2019 |
101 | Flyover & Rail Over Bridge (Vallarpadam) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Kerala | Cochin Port Trust | Completed | 59.97 | 17-Jan-2015 | 04-12-2019 |
102 | Flyover (Amroli Junction-Mansarovar Junction) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Gujarat | Surat Municipal Corporation | Completed | 74.62 | 03-Sep-2015 | 04-12-2019 |
103 | Flyover (Bikram Chowk) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Jammu & Kashmir | Jammu and Kashmir Economic Reconstruction Agency | Completed | 71.85 | 15-May-2013 | 04-12-2019 |
104 | Flyover (Palarivattom) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Kerala | Roads and Bridges Development Corporation of Kerala Limited | Completed | 72.20 | Not Available | 04-12-2019 |
105 | Flyover (Parama-Park Circus) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | West Bengal | Kolkata Metropolitan Development Authority | Completed | 291.66 | 22-Jan-2009 | 04-12-2019 |
106 | Flyover (Patna) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Bihar | Bihar Rajya Pul Nirman Nigam Limited | Completed | 167.85 | 28-Jun-2013 | 04-12-2019 |
107 | Four laning from Dharamtul to Sonapur section (AS-20) of NH-37 in length of 22 km in Marigaon | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Assam | National Highways Authority of India (NHAI) | Under Construction | 148.57 | 30-Apr-2005 | 04-12-2019 |
108 | Four laning of Biswanath Chariali -Gohpur road in length of 57.5 km of NH-52 under SARDP-NE Phase-A | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Assam | National Highways and Infrastructure Development Corporation Limited | Under Construction | 1,307.50 | 06-Apr-2015 | 04-12-2019 |
109 | Four laning of Canacona bypass road in length of 17.7 km at Mashem | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Goa | Public Works Department, Goa | Under Construction | 280.16 | 31-Mar-2015 | 04-12-2019 |
110 | Four laning of Dhavali bypass in length of 4 km on NH-17B | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Goa | Public Works Department, Goa | Completed | 61.38 | 02-Apr-2015 | 04-12-2019 |
111 | Four laning of Doraha-Ludhiana-Ferozepur Road (Southern Bypass) in length of 26.9 km Ludhiana district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Punjab | Public Works Department, Chandigarh | Completed | 450.00 | 15-Feb-2010 | 04-12-2019 |
112 | Four laning of Gohpur-Holongi section road in length of 10 km under SARDP-NE Phase-A | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Assam | National Highways and Infrastructure Development Corporation Limited | Under Construction | 270.00 | 31-Jan-2016 | 04-12-2019 |
113 | Four laning of Islampur bypass in length of 10.3 km in North Dinajpur under NHDP-II | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | West Bengal | National Highways Authority of India (NHAI) | Under Construction | 361.15 | 15-Jan-2016 | 04-12-2019 |
114 | Four laning of Itanagar to Holongi section road in length of 19.3 Km of NH-52A (New NH-415) | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Arunachal Pradesh | Public Works Department, Arunachal Pradesh | Completed | 536.70 | 15-Aug-2011 | 04-12-2019 |
115 | Four laning of Kazhakkootam to Mukkola Junction road in length of 26.5 km under NHDP-IIIA | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Kerala | National Highways Authority of India (NHAI) | Under Construction | 1,133.00 | 01-Jun-2015 | 04-12-2019 |
116 | Four laning of Loutolim road in length of 3.8 km | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Goa | Public Works Department, Goa | Under Construction | 184.05 | 31-Jul-2016 | 04-12-2019 |
117 | Four laning of NH-37A Kaliabor-Tiniali-Dolabari road junction in length of 17.3 km | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Assam | National Highways and Infrastructure Development Corporation Limited | Under Construction | 873.91 | 15-Apr-2015 | 04-12-2019 |
118 | Four laning of Silchar-Agartala section in length of 306.0 km | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | West Bengal | National Highways and Infrastructure Development Corporation Limited | Completed | 3,060.00 | 18-Oct-2016 | 04-12-2019 |
119 | Four laning of Takoli-Kullu section in length of 29 Km in Kullu & Mandi districts | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Himachal Pradesh | National Highways Authority of India (NHAI) | Completed | 328.00 | 08-Nov-2016 | 04-12-2019 |
120 | Gagrin Medium Irrigation Project | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Rajasthan | Water Resources Department, Rajasthan | Under Construction | 185.29 | 29-Sep-2007 | 04-12-2019 |
121 | Green Energy Corridors - Inter State Transmission Scheme - Part A | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Multi State/ Centre | Power Grid Corporation of India Limited | Completed | 1,479.30 | 22-Apr-2015 | 04-12-2019 |
122 | Green Energy Corridors - Inter State Transmission Scheme - Part B | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Multi State/ Centre | Power Grid Corporation of India Limited | Completed | 3,705.61 | 24-Apr-2015 | 04-12-2019 |
123 | Green Energy Corridors - Inter State Transmission Scheme - Part D | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Multi State/ Centre | Power Grid Corporation of India Limited | Under Construction | 3,519.59 | 09-Aug-2016 | 04-12-2019 |
124 | Guddada Mallapura Lift Irrigation Project | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka | Karnataka Neeravari Nigam Limited | Under Construction | 115.40 | 22-Sep-2011 | 04-12-2019 |
125 | Gumti Medium Irrigation Project | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Tripura | Public Works Department, Tripura | Completed | 83.95 | 30-Nov-1981 | 04-12-2019 |
126 | Hanamapur Medium Lift Irrigation Scheme | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Karnataka | Krishna Bhagya Jala Nigam Limited | Completed | 277.40 | 09-Nov-2012 | 04-12-2019 |
127 | Haridwar-Laksar DL Railway Line Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Railway track, tunnel, viaducts, bridges | Uttarakhand | Northern Railway | Under Construction | 219.00 | Not Available | 04-12-2019 |
128 | High Level Bridge (Mattewara) Project# | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Punjab | Public Works Department, Chandigarh | Completed | 66.74 | 25-Oct-2011 | 04-12-2019 |
129 | Hindon Elevated Road (Ghaziabad) Project # | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Uttar Pradesh | Ghaziabad Development Authority | Completed | 1,125.00 | 21-Aug-2014 | 04-12-2019 |
130 | Hubli Airport Project - Modernisation#* | Government Infrastructure Projects (Traditional Procurement) | Transport | Airports | Karnataka | Airports Authority of India (AAI) | Under Construction | 141.44 | 16-Nov-2013 | 04-12-2019 |
131 | IB-Meramundali Transmission Line Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Odisha | Odisha Power Transmission Corporation Limited | Completed | 112.37 | 12-Nov-2010 | 04-12-2019 |
132 | Implementation of 10 MLD water treatment plant on Maisal Dam | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water treatment plants | Goa | Public Works Department, Goa | Completed | 52.99 | 21-Dec-2010 | 04-12-2019 |
133 | Implementation of 10 MW Bhavani Barrrage hydel power unit-I at Samayapuram | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Tamil Nadu | Tamil Nadu Generation and Distribution Corporation Limited | Completed | 185.81 | 31-Jan-2010 | 04-12-2019 |
134 | Implementation of 1000 MW coal based power unit at Sagardighi | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity generation (grid) | West Bengal | West Bengal Power Development Corporation Limited | Completed | 5,340.00 | 22-Feb-2011 | 04-12-2019 |
135 | Implementation of 120 MW hydel power unit at Vyasi# | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttarakhand | UJVN Limited | Under Construction | 936.23 | 20-Jan-2014 | 04-12-2019 |
136 | Implementation of 121 MLD water supply scheme in Ratangarh-Sujangarh - Phase II | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water supply pipeline | Rajasthan | Public Health Engineering Department, Rajasthan | Completed | 841.15 | 17-Aug-2013 | 04-12-2019 |
137 | Implementation of 13.1 MLD water supply scheme at Simlapal in Bankura | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water supply pipeline | West Bengal | Public Health Engineering Department, West Bengal | Completed | 51.21 | 22-Jan-2013 | 04-12-2019 |
138 | Implementation of 13.5 MW Myntriang small hydel power unit (Stage I & II) | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Assam | Assam Power Generation Corporation Limited (APGCL) | Completed | 145.96 | 04-Feb-2009 | 04-12-2019 |
139 | Implementation of 14.2 MLD combined water supply scheme in Nagapattinam | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water supply pipeline | Tamil Nadu | Tamil Nadu Water Supply and Drainage Board | Completed | 105.70 | 03-Aug-2015 | 04-12-2019 |
140 | Implementation of 14.3 MLD underground piped sewerage in Dhoraji | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Gujarat | Gujarat Water Supply and Sewerage Board | Under Construction | 66.33 | 16-Dec-2013 | 04-12-2019 |
141 | Implementation of 140 MLD sewage treatment plant at Dinapur | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh | Uttar Pradesh Jal Nigam | Completed | 491.77 | 04-Jan-2015 | 04-12-2019 |
142 | Implementation of 147 MLD piped water supply scheme at Habra-Gaighata* | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water supply pipeline | West Bengal | Public Health Engineering Department, West Bengal | Under Construction | 577.72 | 22-Mar-2015 | 04-12-2019 |
143 | Implementation of 15 MLD sewage system for Taleigao, Dona Paula & Caranzalem* | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Goa | Public Works Department, Goa | Completed | 144.25 | 28-Apr-2012 | 04-12-2019 |
144 | Implementation of 15.3 MLD water supply scheme at Bishnupur | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water supply pipeline | West Bengal | Public Health Engineering Department, West Bengal | Completed | 64.17 | 14-May-2013 | 04-12-2019 |
145 | Implementation of 16.2 CBM Shelarwadi minor irrigation scheme at Khed | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Maharashtra | Konkan Irrigation Development Corporation | Under Construction | 121.21 | 30-Nov-2001 | 04-12-2019 |
146 | Implementation of 16.8 MLD piped water supply scheme at Beldanga-I in Murshidabad* | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water supply pipeline | West Bengal | Public Health Engineering Department, West Bengal | Under Construction | 54.21 | 09-Dec-2013 | 04-12-2019 |
147 | Implementation of 17297.4 acres Sonpur medium irrigation scheme in Chhindwara | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Madhya Pradesh | Water Resources Department, Madhya Pradesh | Under Construction | 127.46 | 01-Oct-2012 | 04-12-2019 |
148 | Implementation of 19.3 MLD water supply scheme at Indus in Bankura | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water supply pipeline | West Bengal | Public Health Engineering Department, West Bengal | Completed | 68.36 | 19-Dec-2012 | 04-12-2019 |
149 | Implementation of 220 kV substation at Ghansali | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Uttarakhand | Power Transmission Corporation of Uttarakhand Limited | Under Construction | 140.50 | 06-Nov-2013 | 04-12-2019 |
150 | Implementation of 220 kV substation at Jafarpur in Udham Singh Nagar district | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Uttarakhand | Power Transmission Corporation of Uttarakhand Limited | Under Construction | 74.60 | 15-Apr-2014 | 04-12-2019 |