List of Infrastructure Projects – State Wise
This Report provides State/UT wise information on infrastructure projects across pre-defined set of parameters and following coverage criteria:
- Government Infrastructure Projects (PPP) that were either under 'Pre-construction Stage', 'Under Construction' or 'Operation and Maintenance Stage' as on April 1, 2011 or 'Awarded' thereafter and with Project Cost >INR 5 crore.
- Government Infrastructure Projects (Traditional Procurement) that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore; and
- Private Sector Projects that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore.
No. of Projects in this Report: | 9243 | Total Project Cost(in Rs Crore): | 6,813,036.84 |
This Report provides State/UT wise information on infrastructure projects across pre-defined set of parameters and following coverage criteria: (All States)
Sl No | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
601 | Laying of 190 CKM Kurukshetra-Jind D/C line in Haryana* | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Haryana | Power Grid Corporation of India Limited | Completed | 5,151.37 | 31-Jul-2014 | 25-11-2019 |
602 | 8 MW Waste Based Power (Haripal) Project* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | West Bengal | Himadri Chemicals and Industries Limited | Completed | 80.00 | Not Available | 21-11-2019 |
603 | Bagasse Based Power (Billari) Project* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttar Pradesh | Rana Sugars Limited | Completed | 100.00 | Not Available | 21-11-2019 |
604 | Bagasse Co-generation (Belwara) Project* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttar Pradesh | Rana Sugars Limited | Completed | 98.17 | 01-Jun-2011 | 21-11-2019 |
605 | Bagasse Power (Kumbhi) Project - Expansion* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttar Pradesh | Balrampur Chini Mills Limited | Completed | 60.00 | Not Available | 21-11-2019 |
606 | Biomass Power (Mathura) Project* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttar Pradesh | Usher Eco Power Limited | Completed | 81.86 | Not Available | 21-11-2019 |
607 | Co-generation Power (Chilwaria) Project - Expansion* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttar Pradesh | Simbhaoli Sugars Limited | Completed | 330.00 | Not Available | 21-11-2019 |
608 | Eastern Region Strengthening Scheme-I* | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Multi State/ Centre | Power Grid Corporation of India Limited | Completed | 197.00 | Not Available | 21-11-2019 |
609 | Hydro Electric Power (Saryu) Project - Stage II* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttarakhand | Uttar Bharat Hydro Power Private Limited | Completed | 70.20 | Not Available | 21-11-2019 |
610 | Hydro Electric Power (Saryu) Project - Stage III* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttarakhand | Uttar Bharat Hydro Power Private Limited | Completed | 68.25 | Not Available | 21-11-2019 |
611 | Setting up of 10 MW biomass based power unit in Birbhum district* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | West Bengal | Techno Electric & Engineering Company Limited | Completed | 50.00 | 30-Aug-2011 | 21-11-2019 |
612 | Setting up of 12.5 MW solar power unit at Khurpia in Udham Singh Nagar district* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttarakhand | Devishi Renewable Energy Private Limited | Completed | 98.00 | 31-Mar-2016 | 21-11-2019 |
613 | Setting up of 20 MW bagasse based power unit at Iqbalpur in Hardwar district* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttarakhand | Lakshmi Sugar Mills Company Limited | Completed | 100.00 | 31-Jan-2011 | 21-11-2019 |
614 | Setting up of 30 MW co-generation power unit at Khamaria Pandit in Lakhimpur Kheri district* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttar Pradesh | Gobind Sugar Mills Limited | Completed | 214.26 | 08-Dec-2014 | 21-11-2019 |
615 | Setting up of 5.5 MW solar power unit at Salboni in Paschim Medinipur district* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | West Bengal | OCL India Limited | Completed | 55.00 | 30-Oct-2015 | 21-11-2019 |
616 | Setting up of 70 MW solar power unit in Mahoba* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttar Pradesh | Hartek Power Private Limited | Completed | 350.00 | 30-Sep-2015 | 21-11-2019 |
617 | Small Hydel Power (Gangani) Project* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttarakhand | Regency Gangani Energy Private Limited | Completed | 81.00 | Not Available | 21-11-2019 |
618 | Solar Photovoltaic Power (Bundelkhand) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttar Pradesh | Essel Clean Energy Private Limited | Completed | 385.00 | Not Available | 21-11-2019 |
619 | Solar Photovoltaic Power (Durgapur) Project* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | West Bengal | Solitaire Industrial Infrastructure Private Limited | Completed | 50.00 | Not Available | 21-11-2019 |
620 | Solar Photovoltaic Power (Mahoba) Project* | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttar Pradesh | Azure Power India Private Limited | Completed | 800.00 | Not Available | 21-11-2019 |
621 | Solar Power (Jalaun) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttar Pradesh | Rays Power Infra Private Limited | Completed | 350.00 | Not Available | 21-11-2019 |
622 | Solar Power (Nagarkurnool) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | Keerthi Estates Private Limited | Completed | 70.00 | 29-Feb-2016 | 21-11-2019 |
623 | Solar Power (Panwari) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttar Pradesh | Jakson Power Private Limited | Completed | 240.00 | 31-Mar-2015 | 21-11-2019 |
624 | Solar Power (Polepally) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | First Solar Power India Private Limited | Completed | 840.00 | 25-Mar-2015 | 21-11-2019 |
625 | Solar Power (Pudukkottai) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Tamil Nadu | Aeon Renewable Energy Solution Private Limited | Completed | 50.00 | 04-Sep-2015 | 21-11-2019 |
626 | Solar Power (Veltoor) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | SE Solar Limited | Completed | 1,000.00 | 13-Jan-2016 | 21-11-2019 |
627 | Wind Power (Mandsaur-100 MW) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Madhya Pradesh | Inox Wind Infrastructure Services Limited | Completed | 500.00 | 29-Oct-2014 | 21-11-2019 |
628 | Wind Power (Pethshivpur) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Maharashtra | Tata Power Company Limited | Completed | 303.00 | Not Available | 21-11-2019 |
629 | Wind Power (Ratlam) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Madhya Pradesh | Choksi Energy and Infrastructure Private Limited | Completed | 195.00 | Not Available | 21-11-2019 |
630 | Wind Power (Tonk Khurd) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Madhya Pradesh | Gamesa Wind Turbines Private Limited | Completed | 1,344.00 | 09-Sep-2015 | 21-11-2019 |
631 | 10 MW Solar PV Project in Telangana - Haldiram | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | Haldiram Snacks Private Limited | Completed | 60.00 | 01-Dec-2014 | 20-11-2019 |
632 | 10 MW Solar PV Project in Telangana - NV VOGT | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | NV Vogt Singapore Pte Limited | Completed | 62.62 | 01-Dec-2014 | 20-11-2019 |
633 | 10 MW Solar PV Project in Telangana - Rays Power | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | Rays Power Infra Private Limited | Completed | 59.55 | 01-Dec-2014 | 20-11-2019 |
634 | 10 MW Solar PV Project in Telangana - Talettutayi | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | Talettutayi Solar Projects Private Limited | Completed | 62.63 | 01-Dec-2014 | 20-11-2019 |
635 | 50 MW Solar PV Project in Telangana - ACME solar | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | Acme Solar Energy Private Limited | Completed | 306.23 | 01-Dec-2014 | 20-11-2019 |
636 | 50.4 MW Wind Power (Jaisalmer) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Orange Renewable Power Private Limited | Completed | 500.00 | Not Available | 20-11-2019 |
637 | Alaknanda Hydel Power Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttarakhand | GMR (Badrinath) Hydro Power Generation Private Limited | Completed | 1,500.00 | 24-Sep-2010 | 20-11-2019 |
638 | Setting up a 15 MW solar based power unit at Bellampally village in Adilabad | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | Tata Power Renewable Energy Limited | Completed | 120.00 | 31-Aug-2016 | 20-11-2019 |
639 | Setting up of 10 MW solar power unit at Lalitpur | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttar Pradesh | Jakson Power Private Limited | Completed | 85.00 | Not Available | 20-11-2019 |
640 | Setting up of 15 MW solar based power unit at Domagunda | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | Mytrah Energy Limited | Completed | 127.50 | 01-Jun-2017 | 20-11-2019 |
641 | Setting up of 15 MW solar based power unit at Guntipally | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | Mytrah Energy Limited | Completed | 112.50 | 26-Feb-2017 | 20-11-2019 |
642 | Setting up of 20 MW solar power unit at Saltek & Bhamer in Dhule district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Maharashtra | Suzlon Energy Limited | Completed | 140.00 | 10-Mar-2016 | 20-11-2019 |
643 | Setting up of 40 MW solar power unit at Dakor in Jalaun district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttar Pradesh | Azure Power Venus Private Limited | Completed | 320.00 | 08-Sep-2016 | 20-11-2019 |
644 | Setting up of 40 MW solar power unit at Gangakhed in Parbhani district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Maharashtra | Essel Green Energy Private Limited | Completed | 376.00 | 23-Nov-2016 | 20-11-2019 |
645 | Setting up of 40 MW solar power unit at Katol MIDC Area in Nagpur district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Maharashtra | Sepset Constructions Limited | Completed | 280.00 | 10-Mar-2016 | 20-11-2019 |
646 | Setting up of 50 MW solar power unit at Muktainagar in Jalgaon district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Maharashtra | Solar Edge Power and Energy Private Limited | Completed | 427.00 | 23-Nov-2016 | 20-11-2019 |
647 | Setting up of 50 MW solar power unit at Telgaon in Beed district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Maharashtra | AMPL Cleantech Private Limited | Completed | 350.00 | 10-Mar-2016 | 20-11-2019 |
648 | Setting up of 70 MW solar power unit at Bhadla in Jodhpur district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Rising Bhadla 1 Private Limited | Completed | 472.86 | 27-Sep-2016 | 20-11-2019 |
649 | Setting up of 75 MW solar power unit at Vijaypur in Mirzapur district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Uttar Pradesh | Solairedirect Energy India Private Limited | Completed | 525.00 | 09-May-2016 | 20-11-2019 |
650 | Setting up of 8 MW solar power unit at Thimmajipet in Mahbubnagar district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | Mytrah Energy Limited | Completed | 52.00 | 30-Jun-2016 | 20-11-2019 |
651 | Wind Power (Daloda and Piploda) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Madhya Pradesh | Continuum Wind Energy (India) Private Limited | Completed | 1,232.00 | 07-Nov-2014 | 20-11-2019 |
652 | Implementation of Jobner Terminal with a capacity of 91000 KL | Government Infrastructure Projects (Traditional Procurement) | Energy | Oil/ Gas/ LNG Storage | Rajasthan | Bharat Petroleum Corporation Limited | Completed | 137.00 | 18-Apr-2011 | 15-11-2019 |
653 | Laying of Kota-Jobner gas pipeline in length of 210 Km in Kota district | Government Infrastructure Projects (Traditional Procurement) | Energy | Gas pipelines | Rajasthan | Bharat Petroleum Corporation Limited | Completed | 276.27 | 29-Mar-2011 | 15-11-2019 |
654 | Construction of Nimbahera bye-pass # | Government Infrastructure Projects (PPP) | Transport | Roads and bridges | Rajasthan | Public Works Department, Rajasthan | Completed | 31.48 | 02-Sep-2003 | 09-11-2019 |
655 | Construction of Pali Bye pass on Jodhpur - Sumerpur Road # | Government Infrastructure Projects (PPP) | Transport | Roads and bridges | Rajasthan | Public Works Department, Rajasthan | Completed | 30.00 | 09-Jun-2004 | 09-11-2019 |
656 | Road Upgradation (Bar-Bilara-Jodhpur) Project # | Government Infrastructure Projects (PPP) | Transport | Roads and bridges | Rajasthan | Public Works Department, Rajasthan | Completed | 8.93 | 14-Mar-2002 | 09-11-2019 |
657 | Upgradation of Ujjain-Jhalawad road in length of 134 Km in Shajapur district # | Government Infrastructure Projects (PPP) | Transport | Roads and bridges | Madhya Pradesh | Madhya Pradesh Road Development Corporation Limited (MPRDC) | Completed | 66.70 | 16-Nov-2001 | 09-11-2019 |
658 | Bina-Nagda Transmission Line* | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Multi State/ Centre | Power Grid Corporation of India Limited | Completed | 266.93 | Not Available | 05-11-2019 |
659 | Madurai-Thiruvananthapuram Transmission Line* | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Multi State/ Centre | Power Grid Corporation of India Limited | Completed | 195.97 | Not Available | 05-11-2019 |
660 | Natural Gas Pipeline (Shahdol-Phulpur) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Gas pipelines | Multi State/ Centre | Reliance Gas Pipeline Limited | Completed | 1,302.00 | 15-Jul-2013 | 05-11-2019 |
661 | Pithead Coal Based Power (Sidhi) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity generation (grid) | Madhya Pradesh | Essar Power M P Limited | Completed | 8,000.00 | 31-Jul-2009 | 05-11-2019 |
662 | Setting up of 10 MW solar power unit at Rayachoti in Cuddapah district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | New Era Enviro Ventures (Mahbubnagar) Private Limited | Completed | 66.97 | 11-Jan-2016 | 05-11-2019 |
663 | Setting up of 1320 MW coal based power unit at Krishnapatnam, Muthukur mandal in Nellore | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity generation (grid) | Andhra Pradesh | Sembcorp Gayatri Power Limited | Completed | 9,046.90 | 28-Nov-2013 | 05-11-2019 |
664 | Setting up of 4 MMTPA LNG re-gasification terminal at Jaigarh Port in Ratnagiri | Government Infrastructure Projects (Traditional Procurement) | Energy | Oil/ Gas/ LNG Storage | Maharashtra | H-Energy Gateway Private Limited | Completed | 2,400.00 | 27-Feb-2017 | 05-11-2019 |
665 | Setting up of 46 MW wind power unit at Kandimalayapalli in Kadapa district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | Fujin Wind Parks Private Limited | Completed | 398.64 | 20-Jul-2016 | 05-11-2019 |
666 | Solar Power (Dharmavaram) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | Rain Industries Limited | Completed | 140.00 | 29-Jul-2016 | 05-11-2019 |
667 | Transmission Line (Kameng-Balipara) Project* | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Multi State/ Centre | Power Grid Corporation of India Limited | Completed | 65.00 | 06-Mar-2009 | 05-11-2019 |
668 | Wind Power (Honnura-Palturu) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | Ostro Anantapur Private Limited | Completed | 778.48 | 01-Nov-2015 | 05-11-2019 |
669 | Hydro Electric Power (Kadavi) Project | Government Infrastructure Projects (PPP) | Energy | Renewable energy (grid) | Maharashtra | Water Resources Department, Maharashtra | Completed | 7.20 | 23-Mar-2007 | 01-11-2019 |
670 | Hydro Electric Power (Mukane) Project | Government Infrastructure Projects (PPP) | Energy | Renewable energy (grid) | Maharashtra | Water Resources Department, Maharashtra | Completed | 7.32 | 01-Oct-2010 | 01-11-2019 |
671 | Hydro Electric Power (Temghar) Project | Government Infrastructure Projects (PPP) | Energy | Renewable energy (grid) | Maharashtra | Water Resources Department, Maharashtra | Completed | 26.24 | 25-Jul-2011 | 01-11-2019 |
672 | Gujarat Paguthan Energy Corporation Power Plant Project | Government Infrastructure Projects (PPP) | Energy | Electricity generation (grid) | Gujarat | Gujarat Urja Vikas Nigam Limited | Completed | 2,247.00 | 03-Feb-1994 | 30-10-2019 |
673 | Airport (Jolly Grant) Project - Modernisation* | Government Infrastructure Projects (Traditional Procurement) | Transport | Airports | Uttarakhand | Airports Authority of India (AAI) | Completed | 100.00 | Not Available | 25-10-2019 |
674 | Airport Terminal (Pune) Project - Modernisation | Government Infrastructure Projects (Traditional Procurement) | Transport | Airports | Maharashtra | Airports Authority of India (AAI) | Completed | 113.85 | 02-Dec-2005 | 25-10-2019 |
675 | Amanishah Nallah (Dravyavati River) Project - Rejuvenation | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Rajasthan | Jaipur Development Authority | Completed | 1,676.00 | 18-Mar-2016 | 25-10-2019 |