- Government Infrastructure Projects (PPP) that were either under 'Pre-construction Stage', 'Under Construction' or 'Operation and Maintenance Stage' as on April 1, 2011 or 'Awarded' thereafter and with Project Cost >INR 5 crore.
- Government Infrastructure Projects (Traditional Procurement) that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore; and
- Private Sector Projects that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore.
No. of Projects in this Report: | 9243 | Total Project Cost(in Rs Crore): | 6,813,036.84 |
This Report provides State/UT wise information on infrastructure projects across pre-defined set of parameters and following coverage criteria: (All States)
Sl No | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
1951 | Construction of road over bridge on Kohmara-Balaghat road in length of 1.1 km in Gondia district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Maharashtra | Public Works Department, Maharashtra | Completed | 50.58 | 31-Mar-2008 | 09-02-2017 |
1952 | Development of an IT park on 22.9 acres at Airoli in Thane - Phase I | Government Infrastructure Projects (Traditional Procurement) | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Maharashtra | Capgemini Technology Services India Limited | Completed | 670.00 | 21-Nov-2014 | 09-02-2017 |
1953 | Four laning of Meerut-Karnal road in length of 25 km in Shamli district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Uttar Pradesh | Public Works Department, Uttar Pradesh | Completed | 137.86 | 25-Feb-2015 | 09-02-2017 |
1954 | Four laning of Patna bypass in length of 9.9 km of NH-30 | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Bihar | Road Construction Department, Bihar | Completed | 52.99 | 25-Jan-2012 | 09-02-2017 |
1955 | Implementation of 14 MLD sewerage scheme in Rampur - Zone 1 | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Sewage collection, treatment and disposal system | Uttar Pradesh | Uttar Pradesh Jal Nigam | Completed | 54.55 | 28-Feb-2014 | 09-02-2017 |
1956 | Setting up of 1 MMTPA, bulk cement terminal at Mangalore in Dakshina Kannada | Government Infrastructure Projects (Traditional Procurement) | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Karnataka | Ambuja Cements Limited | Completed | 350.00 | 23-Jul-2012 | 09-02-2017 |
1957 | Setting up of 20 MW solar power unit at Bap in Jodhpur under JNNSM Phase-II (Batch I) | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | ACME Gurgaon Power Private Limited | Completed | 103.60 | 27-Mar-2014 | 09-02-2017 |
1958 | Setting up of 28 MW bagasse based power unit at Rajaramnagar in Sangli | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Maharashtra | Rajarambapu Patil SSK Limited | Completed | 140.00 | 30-Apr-2015 | 09-02-2017 |
1959 | Upgradation of Ghevra More to G T Road (Singhu Border) | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Delhi (UT) | Public Works Department, Delhi | Completed | 91.21 | 14-Feb-2014 | 09-02-2017 |
1960 | Upgradation of Nagapattinam to Kattumavadi section in length of 116.6 km in Chennai | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Tamil Nadu | Public Works Department, Tamil Nadu | Completed | 273.43 | 10-Feb-2005 | 09-02-2017 |
1961 | Upgradation of various roads in length of 27.5 km in Chhapra | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Bihar | Road Construction Department, Bihar | Completed | 51.77 | 03-Jan-2014 | 09-02-2017 |
1962 | Four laning of Kanpur-Unnao road in length of 12.7 km in Unnao district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Uttar Pradesh | Public Works Department, Uttar Pradesh | Completed | 102.70 | 31-Mar-2015 | 29-01-2017 |
1963 | Implementation of rural electrification works at Palghar division of Kalyan zone | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Maharashtra | Maharashtra State Electricity Distribution Company Limited | Completed | 63.32 | 22-Mar-2013 | 29-01-2017 |
1964 | Setting up of 10 MW wind power unit at Bhensada & Rajgarh in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Oil India Limited | Completed | 61.00 | 31-Jul-2012 | 29-01-2017 |
1965 | Setting up of 10 MW wind power unit at Dangri in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Manifold Agricrops Private Limited | Completed | 63.00 | 25-Jul-2012 | 29-01-2017 |
1966 | Setting up of 10 MW wind power unit at Malusar in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Surya Vidyut Limited | Completed | 59.00 | 24-Jul-2012 | 29-01-2017 |
1967 | Setting up of 10.0 MW solar power unit at Bandapalli in Kadapa district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | New Era Enviro Ventures (Mahbubnagar) Private Limited | Completed | 58.00 | 29-Oct-2013 | 29-01-2017 |
1968 | Setting up of 10.0 MW solar power unit at Basavanahalli in Anantapur district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | Bright Solar Energy Private Limited | Completed | 62.00 | 06-Jun-2013 | 29-01-2017 |
1969 | Setting up of 10.0 MW solar power unit at Kadivella in Kurnool district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | ACME Cleantech Solutions Limited | Completed | 65.00 | 31-Oct-2013 | 29-01-2017 |
1970 | Setting up of 12 MW wind power unit at Bhensada & Rajgarh in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Oil India Limited | Completed | 72.00 | 30-Jul-2012 | 29-01-2017 |
1971 | Setting up of 12 MW wind power unit at Chodiya, Ramsar, Laxmangarh in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Inox Renewables (Jaisalmer) Limited | Completed | 75.00 | 15-Jul-2012 | 29-01-2017 |
1972 | Setting up of 14 MW wind power unit at Dangri & Ramsar in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Surya Vidyut Limited | Completed | 84.00 | 14-Mar-2012 | 29-01-2017 |
1973 | Setting up of 14.7 MW wind power unit at Hadda in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Bindu Vayu Urja Private Limited | Completed | 88.20 | 21-Nov-2011 | 29-01-2017 |
1974 | Setting up of 16.8 MW wind power unit at Devikot, Kehar Fakir Ki Dhani & Amarpura in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Lalpur Wind Energy Private Limited | Completed | 100.80 | 30-Oct-2013 | 29-01-2017 |
1975 | Setting up of 16.8 MW wind power unit at Ola, Malusar & Bahla in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Mytrah Vayu (Indravati) Private Limited | Completed | 100.80 | 24-Jan-2015 | 29-01-2017 |
1976 | Setting up of 18.9 MW wind power unit at Ola, Malusar & Bahla in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Mytrah Vayu (Indravati) Private Limited | Completed | 113.40 | 28-Feb-2015 | 29-01-2017 |
1977 | Setting up of 19.5 MW wind power unit at Loharkhali & Ambirama in Pratapgarh district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Orange Renewable Power Private Limited | Completed | 117.00 | 31-Jul-2012 | 29-01-2017 |
1978 | Setting up of 20 MW wind power unit at Bhensada & Rajgarh in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Welspun Solar Rajasthan Private Limited | Completed | 124.00 | 30-Jul-2012 | 29-01-2017 |
1979 | Setting up of 20 MW wind power unit at Khelana & Sabalpura in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Clean Wind Power (Devgarh) Private Limited | Completed | 128.00 | 31-Dec-2014 | 29-01-2017 |
1980 | Setting up of 20.0 MW solar power unit at Kadivella in Kurnool district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | ACME Cleantech Solutions Limited | Completed | 125.00 | 16-Nov-2013 | 29-01-2017 |
1981 | Setting up of 20.0 MW solar power unit at Puchakayala in Kurnool district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | ACME Cleantech Solutions Limited | Completed | 120.00 | 02-Nov-2013 | 29-01-2017 |
1982 | Setting up of 20.0 MW solar power unit at Rohukurupalli in Kadapa district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | ACME Cleantech Solutions Limited | Completed | 128.00 | 13-Dec-2013 | 29-01-2017 |
1983 | Setting up of 200.0 MW solar power unit at N.P. Kunta solar park in Anantapur district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | NTPC Limited | Completed | 1,200.00 | 15-Oct-2013 | 29-01-2017 |
1984 | Setting up of 21 MW wind power unit at Ranaka Kheda & Khanpur in Pratapgarh district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Tata Power Renewable Energy Limited | Completed | 126.00 | 29-Jul-2012 | 29-01-2017 |
1985 | Setting up of 21.0 MW solar power unit at Tarlupadu in Prakasam district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | ReNew Solar Power Private Limited | Completed | 126.00 | 05-Oct-2013 | 29-01-2017 |
1986 | Setting up of 22.5 MW wind power unit at Talabkheda & Rampuriya in Pratapgarh district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Renew Power Ventures Private Limited | Completed | 135.00 | 31-Jul-2014 | 29-01-2017 |
1987 | Setting up of 24 MW wind power unit in Pratapgarh district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Renew Power Ventures Private Limited | Completed | 146.00 | 29-Jul-2014 | 29-01-2017 |
1988 | Setting up of 25.2 MW wind power unit at Ola, Malusar & Bahla in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Renew Wind Energy (Rajasthan 3) Private Limited | Completed | 151.20 | 10-Mar-2015 | 29-01-2017 |
1989 | Setting up of 26 MW wind power unit at Khodiyasar in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Railway Energy Management Company Limited | Completed | 156.00 | 17-Aug-2014 | 29-01-2017 |
1990 | Setting up of 30 MW wind power unit at Raipur & Gathkad in Pratapgarh district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Green Infra Wind Energy Assets Limited | Completed | 180.00 | 21-Jul-2011 | 29-01-2017 |
1991 | Setting up of 30.0 MW solar power unit at Lomada in Kadapa district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | Welspun Renewables Energy Private Limited | Completed | 180.00 | 21-Oct-2013 | 29-01-2017 |
1992 | Setting up of 32 MW wind power unit at Doojasar & Sialon Ki Bast in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Khandke Wind Energy Private Limited | Completed | 201.60 | 30-Apr-2013 | 29-01-2017 |
1993 | Setting up of 32 MW wind power unit at Ola & Bahala Basti in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Oil India Limited | Completed | 192.00 | 17-Jan-2012 | 29-01-2017 |
1994 | Setting up of 36 MW wind power unit at Chodiya, Ramsar, Laxmangarh in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Inox Renewables (Jaisalmer) Limited | Completed | 216.00 | 22-Nov-2011 | 29-01-2017 |
1995 | Setting up of 39.0 MW solar power unit at Chagi in Kurnool district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | ReNew Solar Power Private Limited | Completed | 234.00 | 08-Oct-2013 | 29-01-2017 |
1996 | Setting up of 50.0 MW solar power unit at Kalipi in Anantapur district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | Aarohi Solar Private Limited | Completed | 320.00 | 01-Nov-2013 | 29-01-2017 |
1997 | Setting up of 50.0 MW solar power unit at N.P. Kunta solar park in Anantapur district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | NTPC Limited | Completed | 300.00 | 28-Jan-2014 | 29-01-2017 |
1998 | Setting up of 50.4 MW wind power unit at Karada, Bheeksar & Punasar in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Renew Wind Energy (Rajasthan 3) Private Limited | Completed | 302.40 | 23-Oct-2014 | 29-01-2017 |
1999 | Setting up of 54 MW wind power unit at Dangri in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Gujarat Fluorochemicals Limited | Completed | 324.00 | 30-Jan-2011 | 29-01-2017 |
2000 | Setting up of 62.9 MW wind power unit at Habur & Mokla in Jaisalmer district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | Mytrah Vayu (Indravati) Private Limited | Completed | 377.40 | 30-Oct-2014 | 29-01-2017 |
2001 | Setting up of 70.0 MW solar power unit at Vemulapadu in Kurnool district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | Welspun Renewables Energy Private Limited | Completed | 420.00 | 29-Oct-2013 | 29-01-2017 |
2002 | Upgradation of Jivnathpur-Madhupur road in length of 70.8 km in Chandauli district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Uttar Pradesh | Public Works Department, Uttar Pradesh | Completed | 179.28 | 30-Jun-2013 | 29-01-2017 |
2003 | Upgradation of various roads in length of 174.6 Km in Tumkur district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Karnataka | Public Works, Ports and Inland Water Transport Department, Karnataka | Completed | 52.18 | 04-Mar-2014 | 29-01-2017 |
2004 | Upgradation of various roads in length of 225.1 Km in Belgaum district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Karnataka | Public Works, Ports and Inland Water Transport Department, Karnataka | Completed | 66.61 | 26-Dec-2013 | 29-01-2017 |
2005 | Upgradation of various roads in length of 227.5 Km in Belgaum district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Karnataka | Public Works, Ports and Inland Water Transport Department, Karnataka | Completed | 52.13 | 28-Dec-2013 | 29-01-2017 |
2006 | Upgradation of various roads in length of 247.6 Km in Koppal district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Karnataka | Public Works, Ports and Inland Water Transport Department, Karnataka | Completed | 51.81 | 26-Dec-2013 | 29-01-2017 |
2007 | Implementation of 400/220 kV Grid Substation at Ajmer | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Rajasthan | Rajasthan Rajya Vidyut Prasaran Nigam Limited | Completed | 119.40 | 08-Apr-2009 | 16-01-2017 |
2008 | Implementation of 400/220 kV Grid Substation at Anta | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Rajasthan | Rajasthan Rajya Vidyut Prasaran Nigam Limited | Completed | 387.00 | 02-Nov-2011 | 16-01-2017 |
2009 | Laying of 179 CKM Chhabra SCTPS-Anta transmission line | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Rajasthan | Rajasthan Rajya Vidyut Prasaran Nigam Limited | Completed | 96.00 | 06-Dec-2010 | 16-01-2017 |
2010 | Setting up of 1.5 million tpa strategic crude oil storage at Mangalore in Dakshina Kannada district of Karnataka. | Government Infrastructure Projects (Traditional Procurement) | Energy | Oil/ Gas/ LNG Storage | Karnataka | Indian Strategic Petroleum Reserves Limited | Completed | 1,227.00 | Not Available | 16-01-2017 |
2011 | Three laning of Gotan-Sojat road in length of 96.0 Km | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Rajasthan | Rajasthan State Road Development and Construction Corporation Limited | Completed | 167.45 | 10-Dec-2010 | 16-01-2017 |
2012 | Two laning of Salumber-Keer Ki Chowki road in length of 71.0 Km in Udaipur district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Rajasthan | Rajasthan State Road Development and Construction Corporation Limited | Completed | 163.50 | 10-Dec-2010 | 16-01-2017 |
2013 | Construction of Hamirpur bypass in length of 6.4 Km of NH-88 | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Himachal Pradesh | Public Works Department, Himachal Pradesh | Completed | 75.00 | 31-Mar-2010 | 12-01-2017 |
2014 | Implementation of rural electrification works in Kokrajhar district under RGGVY XIth Plan | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Assam | Assam Power Distribution Company Limited | Completed | 67.30 | 28-Feb-2009 | 12-01-2017 |
2015 | Laying of Srinagar-Satpulli transmission line in length of 52.4 CKM | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Uttarakhand | Power Transmission Corporation of Uttarakhand Limited | Completed | 55.33 | 16-Aug-2004 | 12-01-2017 |
2016 | Setting up of 10.5 MW wind power unit at Tirumalayapali in Kadapa district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | Hetero Wind Power Limited | Completed | 73.50 | 20-Jan-2014 | 12-01-2017 |
2017 | Setting up of 10.5 MW wind power unit at Vajrakarur in Anantapur district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | Indian Oil Corporation Limited | Completed | 73.50 | 31-Dec-2009 | 12-01-2017 |
2018 | Setting up of 100 MW wind power unit at Tagguparthi & Beluguppa in Anantapur district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | Energon Power Resources Private Limited | Completed | 700.00 | 12-Sep-2012 | 12-01-2017 |
2019 | Setting up of 12.8 MW wind power unit at Chinnakolumalapalli in Kurnool district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | Danu Wind Parks Private Limited | Completed | 89.60 | 08-Mar-2014 | 12-01-2017 |
2020 | Setting up of 14.7 MW wind power unit at Gandikota in Kadapa district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | Indian Oil Corporation Limited | Completed | 102.90 | 04-Nov-2010 | 12-01-2017 |
2021 | Setting up of 16.0 MW wind power unit at Talaricheruvu in Anantapur district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | ZR Renewable Energy Private Limited | Completed | 112.00 | 28-Feb-2014 | 12-01-2017 |
2022 | Setting up of 16.8 MW wind power unit at Pottipadu & Vajrakarur in Anantapur district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | Mytrah Vayu (Indravathi) Private Limited | Completed | 117.60 | 27-Oct-2013 | 12-01-2017 |
2023 | Setting up of 17.0 MW wind power unit at Gangadevipalli in Kadapa district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | Atria Wind Power Private Limited | Completed | 119.00 | 16-Mar-2014 | 12-01-2017 |
2024 | Setting up of 18.7 MW wind power unit at Molagavalli in Kurnool district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | KCT Renewable Energy Private Limited | Completed | 130.90 | 30-Jan-2014 | 12-01-2017 |
2025 | Setting up of 20.4 MW wind power unit at Molagavalli in Kurnool district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | KCT Renewable Energy Private Limited | Completed | 142.80 | 15-Jan-2014 | 12-01-2017 |