List of Infrastructure Projects – State Wise List of Infrastructure Projects – State Wise

This Report provides State/UT wise information on infrastructure projects across pre-defined set of parameters and following coverage criteria:
  • Government Infrastructure Projects (PPP) that were either under 'Pre-construction Stage', 'Under Construction' or 'Operation and Maintenance Stage' as on April 1, 2011 or 'Awarded' thereafter and with Project Cost >INR 5 crore.
  • Government Infrastructure Projects (Traditional Procurement) that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore; and
  • Private Sector Projects that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore.
Information available as on 06 December 2019
No. of Projects in this Report: 9243 Total Project Cost(in Rs Crore): 6,813,036.84
State selection
Please Select State:
This Report provides State/UT wise information on infrastructure projects across pre-defined set of parameters and following coverage criteria: (All States)
Sl No
1951 Construction of road over bridge on Kohmara-Balaghat road in length of 1.1 km in Gondia district Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Maharashtra Public Works Department, Maharashtra Completed 50.58 31-Mar-2008 09-02-2017
1952 Development of an IT park on 22.9 acres at Airoli in Thane - Phase I Government Infrastructure Projects (Traditional Procurement) Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Maharashtra Capgemini Technology Services India Limited Completed 670.00 21-Nov-2014 09-02-2017
1953 Four laning of Meerut-Karnal road in length of 25 km in Shamli district Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Uttar Pradesh Public Works Department, Uttar Pradesh Completed 137.86 25-Feb-2015 09-02-2017
1954 Four laning of Patna bypass in length of 9.9 km of NH-30 Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Bihar Road Construction Department, Bihar Completed 52.99 25-Jan-2012 09-02-2017
1955 Implementation of 14 MLD sewerage scheme in Rampur - Zone 1 Government Infrastructure Projects (Traditional Procurement) Water Sanitation Sewage collection, treatment and disposal system Uttar Pradesh Uttar Pradesh Jal Nigam Completed 54.55 28-Feb-2014 09-02-2017
1956 Setting up of 1 MMTPA, bulk cement terminal at Mangalore in Dakshina Kannada Government Infrastructure Projects (Traditional Procurement) Social and Commercial Infrastructure Common infrastructure for industrial parks, SEZ Karnataka Ambuja Cements Limited Completed 350.00 23-Jul-2012 09-02-2017
1957 Setting up of 20 MW solar power unit at Bap in Jodhpur under JNNSM Phase-II (Batch I) Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan ACME Gurgaon Power Private Limited Completed 103.60 27-Mar-2014 09-02-2017
1958 Setting up of 28 MW bagasse based power unit at Rajaramnagar in Sangli Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Maharashtra Rajarambapu Patil SSK Limited Completed 140.00 30-Apr-2015 09-02-2017
1959 Upgradation of Ghevra More to G T Road (Singhu Border) Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Delhi (UT) Public Works Department, Delhi Completed 91.21 14-Feb-2014 09-02-2017
1960 Upgradation of Nagapattinam to Kattumavadi section in length of 116.6 km in Chennai Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Tamil Nadu Public Works Department, Tamil Nadu Completed 273.43 10-Feb-2005 09-02-2017
1961 Upgradation of various roads in length of 27.5 km in Chhapra Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Bihar Road Construction Department, Bihar Completed 51.77 03-Jan-2014 09-02-2017
1962 Four laning of Kanpur-Unnao road in length of 12.7 km in Unnao district Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Uttar Pradesh Public Works Department, Uttar Pradesh Completed 102.70 31-Mar-2015 29-01-2017
1963 Implementation of rural electrification works at Palghar division of Kalyan zone Government Infrastructure Projects (Traditional Procurement) Energy Electricity transmission Maharashtra Maharashtra State Electricity Distribution Company Limited Completed 63.32 22-Mar-2013 29-01-2017
1964 Setting up of 10 MW wind power unit at Bhensada & Rajgarh in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Oil India Limited Completed 61.00 31-Jul-2012 29-01-2017
1965 Setting up of 10 MW wind power unit at Dangri in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Manifold Agricrops Private Limited Completed 63.00 25-Jul-2012 29-01-2017
1966 Setting up of 10 MW wind power unit at Malusar in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Surya Vidyut Limited Completed 59.00 24-Jul-2012 29-01-2017
1967 Setting up of 10.0 MW solar power unit at Bandapalli in Kadapa district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh New Era Enviro Ventures (Mahbubnagar) Private Limited Completed 58.00 29-Oct-2013 29-01-2017
1968 Setting up of 10.0 MW solar power unit at Basavanahalli in Anantapur district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh Bright Solar Energy Private Limited Completed 62.00 06-Jun-2013 29-01-2017
1969 Setting up of 10.0 MW solar power unit at Kadivella in Kurnool district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh ACME Cleantech Solutions Limited Completed 65.00 31-Oct-2013 29-01-2017
1970 Setting up of 12 MW wind power unit at Bhensada & Rajgarh in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Oil India Limited Completed 72.00 30-Jul-2012 29-01-2017
1971 Setting up of 12 MW wind power unit at Chodiya, Ramsar, Laxmangarh in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Inox Renewables (Jaisalmer) Limited Completed 75.00 15-Jul-2012 29-01-2017
1972 Setting up of 14 MW wind power unit at Dangri & Ramsar in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Surya Vidyut Limited Completed 84.00 14-Mar-2012 29-01-2017
1973 Setting up of 14.7 MW wind power unit at Hadda in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Bindu Vayu Urja Private Limited Completed 88.20 21-Nov-2011 29-01-2017
1974 Setting up of 16.8 MW wind power unit at Devikot, Kehar Fakir Ki Dhani & Amarpura in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Lalpur Wind Energy Private Limited Completed 100.80 30-Oct-2013 29-01-2017
1975 Setting up of 16.8 MW wind power unit at Ola, Malusar & Bahla in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Mytrah Vayu (Indravati) Private Limited Completed 100.80 24-Jan-2015 29-01-2017
1976 Setting up of 18.9 MW wind power unit at Ola, Malusar & Bahla in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Mytrah Vayu (Indravati) Private Limited Completed 113.40 28-Feb-2015 29-01-2017
1977 Setting up of 19.5 MW wind power unit at Loharkhali & Ambirama in Pratapgarh district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Orange Renewable Power Private Limited Completed 117.00 31-Jul-2012 29-01-2017
1978 Setting up of 20 MW wind power unit at Bhensada & Rajgarh in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Welspun Solar Rajasthan Private Limited Completed 124.00 30-Jul-2012 29-01-2017
1979 Setting up of 20 MW wind power unit at Khelana & Sabalpura in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Clean Wind Power (Devgarh) Private Limited Completed 128.00 31-Dec-2014 29-01-2017
1980 Setting up of 20.0 MW solar power unit at Kadivella in Kurnool district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh ACME Cleantech Solutions Limited Completed 125.00 16-Nov-2013 29-01-2017
1981 Setting up of 20.0 MW solar power unit at Puchakayala in Kurnool district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh ACME Cleantech Solutions Limited Completed 120.00 02-Nov-2013 29-01-2017
1982 Setting up of 20.0 MW solar power unit at Rohukurupalli in Kadapa district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh ACME Cleantech Solutions Limited Completed 128.00 13-Dec-2013 29-01-2017
1983 Setting up of 200.0 MW solar power unit at N.P. Kunta solar park in Anantapur district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh NTPC Limited Completed 1,200.00 15-Oct-2013 29-01-2017
1984 Setting up of 21 MW wind power unit at Ranaka Kheda & Khanpur in Pratapgarh district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Tata Power Renewable Energy Limited Completed 126.00 29-Jul-2012 29-01-2017
1985 Setting up of 21.0 MW solar power unit at Tarlupadu in Prakasam district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh ReNew Solar Power Private Limited Completed 126.00 05-Oct-2013 29-01-2017
1986 Setting up of 22.5 MW wind power unit at Talabkheda & Rampuriya in Pratapgarh district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Renew Power Ventures Private Limited Completed 135.00 31-Jul-2014 29-01-2017
1987 Setting up of 24 MW wind power unit in Pratapgarh district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Renew Power Ventures Private Limited Completed 146.00 29-Jul-2014 29-01-2017
1988 Setting up of 25.2 MW wind power unit at Ola, Malusar & Bahla in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Renew Wind Energy (Rajasthan 3) Private Limited Completed 151.20 10-Mar-2015 29-01-2017
1989 Setting up of 26 MW wind power unit at Khodiyasar in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Railway Energy Management Company Limited Completed 156.00 17-Aug-2014 29-01-2017
1990 Setting up of 30 MW wind power unit at Raipur & Gathkad in Pratapgarh district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Green Infra Wind Energy Assets Limited Completed 180.00 21-Jul-2011 29-01-2017
1991 Setting up of 30.0 MW solar power unit at Lomada in Kadapa district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh Welspun Renewables Energy Private Limited Completed 180.00 21-Oct-2013 29-01-2017
1992 Setting up of 32 MW wind power unit at Doojasar & Sialon Ki Bast in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Khandke Wind Energy Private Limited Completed 201.60 30-Apr-2013 29-01-2017
1993 Setting up of 32 MW wind power unit at Ola & Bahala Basti in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Oil India Limited Completed 192.00 17-Jan-2012 29-01-2017
1994 Setting up of 36 MW wind power unit at Chodiya, Ramsar, Laxmangarh in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Inox Renewables (Jaisalmer) Limited Completed 216.00 22-Nov-2011 29-01-2017
1995 Setting up of 39.0 MW solar power unit at Chagi in Kurnool district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh ReNew Solar Power Private Limited Completed 234.00 08-Oct-2013 29-01-2017
1996 Setting up of 50.0 MW solar power unit at Kalipi in Anantapur district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh Aarohi Solar Private Limited Completed 320.00 01-Nov-2013 29-01-2017
1997 Setting up of 50.0 MW solar power unit at N.P. Kunta solar park in Anantapur district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh NTPC Limited Completed 300.00 28-Jan-2014 29-01-2017
1998 Setting up of 50.4 MW wind power unit at Karada, Bheeksar & Punasar in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Renew Wind Energy (Rajasthan 3) Private Limited Completed 302.40 23-Oct-2014 29-01-2017
1999 Setting up of 54 MW wind power unit at Dangri in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Gujarat Fluorochemicals Limited Completed 324.00 30-Jan-2011 29-01-2017
2000 Setting up of 62.9 MW wind power unit at Habur & Mokla in Jaisalmer district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Rajasthan Mytrah Vayu (Indravati) Private Limited Completed 377.40 30-Oct-2014 29-01-2017
2001 Setting up of 70.0 MW solar power unit at Vemulapadu in Kurnool district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh Welspun Renewables Energy Private Limited Completed 420.00 29-Oct-2013 29-01-2017
2002 Upgradation of Jivnathpur-Madhupur road in length of 70.8 km in Chandauli district Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Uttar Pradesh Public Works Department, Uttar Pradesh Completed 179.28 30-Jun-2013 29-01-2017
2003 Upgradation of various roads in length of 174.6 Km in Tumkur district Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Karnataka Public Works, Ports and Inland Water Transport Department, Karnataka Completed 52.18 04-Mar-2014 29-01-2017
2004 Upgradation of various roads in length of 225.1 Km in Belgaum district Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Karnataka Public Works, Ports and Inland Water Transport Department, Karnataka Completed 66.61 26-Dec-2013 29-01-2017
2005 Upgradation of various roads in length of 227.5 Km in Belgaum district Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Karnataka Public Works, Ports and Inland Water Transport Department, Karnataka Completed 52.13 28-Dec-2013 29-01-2017
2006 Upgradation of various roads in length of 247.6 Km in Koppal district Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Karnataka Public Works, Ports and Inland Water Transport Department, Karnataka Completed 51.81 26-Dec-2013 29-01-2017
2007 Implementation of 400/220 kV Grid Substation at Ajmer Government Infrastructure Projects (Traditional Procurement) Energy Electricity transmission Rajasthan Rajasthan Rajya Vidyut Prasaran Nigam Limited Completed 119.40 08-Apr-2009 16-01-2017
2008 Implementation of 400/220 kV Grid Substation at Anta Government Infrastructure Projects (Traditional Procurement) Energy Electricity transmission Rajasthan Rajasthan Rajya Vidyut Prasaran Nigam Limited Completed 387.00 02-Nov-2011 16-01-2017
2009 Laying of 179 CKM Chhabra SCTPS-Anta transmission line Government Infrastructure Projects (Traditional Procurement) Energy Electricity transmission Rajasthan Rajasthan Rajya Vidyut Prasaran Nigam Limited Completed 96.00 06-Dec-2010 16-01-2017
2010 Setting up of 1.5 million tpa strategic crude oil storage at Mangalore in Dakshina Kannada district of Karnataka. Government Infrastructure Projects (Traditional Procurement) Energy Oil/ Gas/ LNG Storage Karnataka Indian Strategic Petroleum Reserves Limited Completed 1,227.00 Not Available 16-01-2017
2011 Three laning of Gotan-Sojat road in length of 96.0 Km Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Rajasthan Rajasthan State Road Development and Construction Corporation Limited Completed 167.45 10-Dec-2010 16-01-2017
2012 Two laning of Salumber-Keer Ki Chowki road in length of 71.0 Km in Udaipur district Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Rajasthan Rajasthan State Road Development and Construction Corporation Limited Completed 163.50 10-Dec-2010 16-01-2017
2013 Construction of Hamirpur bypass in length of 6.4 Km of NH-88 Government Infrastructure Projects (Traditional Procurement) Transport Roads and bridges Himachal Pradesh Public Works Department, Himachal Pradesh Completed 75.00 31-Mar-2010 12-01-2017
2014 Implementation of rural electrification works in Kokrajhar district under RGGVY XIth Plan Government Infrastructure Projects (Traditional Procurement) Energy Electricity transmission Assam Assam Power Distribution Company Limited Completed 67.30 28-Feb-2009 12-01-2017
2015 Laying of Srinagar-Satpulli transmission line in length of 52.4 CKM Government Infrastructure Projects (Traditional Procurement) Energy Electricity transmission Uttarakhand Power Transmission Corporation of Uttarakhand Limited Completed 55.33 16-Aug-2004 12-01-2017
2016 Setting up of 10.5 MW wind power unit at Tirumalayapali in Kadapa district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh Hetero Wind Power Limited Completed 73.50 20-Jan-2014 12-01-2017
2017 Setting up of 10.5 MW wind power unit at Vajrakarur in Anantapur district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh Indian Oil Corporation Limited Completed 73.50 31-Dec-2009 12-01-2017
2018 Setting up of 100 MW wind power unit at Tagguparthi & Beluguppa in Anantapur district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh Energon Power Resources Private Limited Completed 700.00 12-Sep-2012 12-01-2017
2019 Setting up of 12.8 MW wind power unit at Chinnakolumalapalli in Kurnool district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh Danu Wind Parks Private Limited Completed 89.60 08-Mar-2014 12-01-2017
2020 Setting up of 14.7 MW wind power unit at Gandikota in Kadapa district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh Indian Oil Corporation Limited Completed 102.90 04-Nov-2010 12-01-2017
2021 Setting up of 16.0 MW wind power unit at Talaricheruvu in Anantapur district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh ZR Renewable Energy Private Limited Completed 112.00 28-Feb-2014 12-01-2017
2022 Setting up of 16.8 MW wind power unit at Pottipadu & Vajrakarur in Anantapur district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh Mytrah Vayu (Indravathi) Private Limited Completed 117.60 27-Oct-2013 12-01-2017
2023 Setting up of 17.0 MW wind power unit at Gangadevipalli in Kadapa district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh Atria Wind Power Private Limited Completed 119.00 16-Mar-2014 12-01-2017
2024 Setting up of 18.7 MW wind power unit at Molagavalli in Kurnool district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh KCT Renewable Energy Private Limited Completed 130.90 30-Jan-2014 12-01-2017
2025 Setting up of 20.4 MW wind power unit at Molagavalli in Kurnool district Government Infrastructure Projects (Traditional Procurement) Energy Renewable energy (grid) Andhra Pradesh KCT Renewable Energy Private Limited Completed 142.80 15-Jan-2014 12-01-2017
Note: Zero indicates information not available.

These reports are based on data received from relevant Project Authorities and is being updated on a best endeavor basis. Contact project sponsoring authorities to seek additional details.

# - The project may have additional details that are pertinent. Kindly check the 'Any Other Information' field for further details.
* - Updated status for the project is not available.