List of Infrastructure Projects – State Wise
This Report provides State/UT wise information on infrastructure projects across pre-defined set of parameters and following coverage criteria:
- Government Infrastructure Projects (PPP) that were either under 'Pre-construction Stage', 'Under Construction' or 'Operation and Maintenance Stage' as on April 1, 2011 or 'Awarded' thereafter and with Project Cost >INR 5 crore.
- Government Infrastructure Projects (Traditional Procurement) that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore; and
- Private Sector Projects that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore.
No. of Projects in this Report: | 9243 | Total Project Cost(in Rs Crore): | 6,813,036.84 |
This Report provides State/UT wise information on infrastructure projects across pre-defined set of parameters and following coverage criteria: (All States)
Sl No | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
1 | Establishment of 2 x 10 MWp SPV power plant at Atam Pahad, South Andaman * | Government Infrastructure Projects (PPP) | Energy | Renewable energy (grid) | Andaman & Nicobar Islands (UT) | Andaman and Nicobar Administration | Pre-construction Stage | 130.76 | 18-Aug-2016 | 09-11-2019 |
2 | Construction of major bridge in length of 1.2 km over Humphrey strait creek in Andaman & Nicobar | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andaman & Nicobar Islands (UT) | National Highways and Infrastructure Development Corporation Limited | Under Construction | 277.17 | 15-Feb-2017 | 25-10-2019 |
3 | Development of 20 MW Power Station at Port Blair * | Government Infrastructure Projects (PPP) | Energy | Renewable energy (grid) | Andaman & Nicobar Islands (UT) | Andaman and Nicobar Administration | Not Available | 0.00 | 20-Nov-1997 | 25-10-2019 |
4 | Establishment of 20 MW DG power plant at Bambooflat, South Andaman District # | Government Infrastructure Projects (PPP) | Energy | Electricity generation (grid) | Andaman & Nicobar Islands (UT) | Andaman and Nicobar Administration | Completed | 74.96 | 20-Nov-1997 | 25-10-2019 |
5 | Establishment of 5 MWp SPV power plant at Garacharama, South Andaman | Government Infrastructure Projects (PPP) | Energy | Renewable energy (grid) | Andaman & Nicobar Islands (UT) | Andaman and Nicobar Administration | Operation and Maintenance Stage | 60.00 | 27-Nov-2009 | 25-10-2019 |
6 | New Integrated Terminal Building at VSI Airport at Portblair.* | Government Infrastructure Projects (Traditional Procurement) | Transport | Airports | Andaman & Nicobar Islands (UT) | Airports Authority of India (AAI) | Under Construction | 400.00 | 01-Sep-2014 | 25-10-2019 |
7 | Two laning of NH-223 (New NH-4) in length of 56 km in Andaman & Nicobar* | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andaman & Nicobar Islands (UT) | National Highways and Infrastructure Development Corporation Limited | Pre-construction Stage | 409.85 | 17-Apr-2017 | 25-10-2019 |
8 | Upgradation of Beonabad-Ferargunj section in length of 26 km | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andaman & Nicobar Islands (UT) | National Highways and Infrastructure Development Corporation Limited | Under Construction | 170.00 | 21-Mar-2017 | 25-10-2019 |
9 | Construction of RCC jetty in length of 1.5 km at Baratang | Government Infrastructure Projects (Traditional Procurement) | Transport | Ports (excluding captive) | Andaman & Nicobar Islands (UT) | Andaman Lakshadweep Harbour Works | Under Construction | 52.15 | 31-Mar-2016 | 05-12-2017 |
10 | Solar Photovoltaic Power (Andaman & Nicobar) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andaman & Nicobar Islands (UT) | NTPC Limited | Completed | 52.09 | 12-Dec-2011 | 27-09-2015 |
11 | Biomass power project at Sattenapalli | Government Infrastructure Projects (PPP) | Energy | Electricity generation (grid) | Andhra Pradesh | Andhra Pradesh Electricity Regulatory Commission | Operation and Maintenance Stage | 26.00 | Not Available | 04-12-2019 |
12 | Bridge (No.1017) Project* | Government Infrastructure Projects (Traditional Procurement) | Transport | Railway track, tunnel, viaducts, bridges | Andhra Pradesh | South Central Railway | Under Construction | 0.00 | Not Available | 04-12-2019 |
13 | Development of 55 acres mega food park at Bhimavaram | Government Infrastructure Projects (Traditional Procurement) | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Andhra Pradesh | Ministry of Food Processing Industries | Completed | 119.12 | 16-Dec-2013 | 04-12-2019 |
14 | Machilipatnam Port Development * # | Government Infrastructure Projects (PPP) | Transport | Ports (excluding captive) | Andhra Pradesh | Department of Ports, Andhra Pradesh | Under Construction | 1,860.00 | 07-Jun-2010 | 04-12-2019 |
15 | Mechanism of Coal Handling facilities and upgradation of General Cargo Berth at Outer Harbour of Visakhapatnam Port | Government Infrastructure Projects (PPP) | Transport | Ports (excluding captive) | Andhra Pradesh | Ministry of Shipping | Operation and Maintenance Stage | 640.40 | 10-Jun-2010 | 04-12-2019 |
16 | Pogonda Reservoir Project | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Irrigation and CAD Department, Telangana | Under Construction | 85.51 | 10-Sep-2008 | 04-12-2019 |
17 | Setting Up of 10 MW Solar Power Unit at Visakhapatnam Port Trust * | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | Visakhapatnam Port Trust | Under Construction | 60.00 | 02-Nov-2015 | 04-12-2019 |
18 | Two laning of Rayachoti-Kadapa road in length of 51.3 Km in YSR district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Ministry of Road Transport and Highways | Completed | 198.00 | 20-Nov-2016 | 04-12-2019 |
19 | Water Supply Scheme (Badvel) | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water supply pipeline | Andhra Pradesh | Badvel Municipality | Completed | 88.81 | 30-May-2013 | 04-12-2019 |
20 | Water Supply Scheme (Kothapeta & Ravulapalem) | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water supply pipeline | Andhra Pradesh | Rural Water Supply and Sanitation Department, Andhra Pradesh | Completed | 55.00 | 23-Jan-2014 | 04-12-2019 |
21 | Water Supply Scheme (Urvakonda, Kudair, Vajrakarur & Vidapankal) | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water supply pipeline | Andhra Pradesh | Rural Water Supply and Sanitation Department, Andhra Pradesh | Under Construction | 56.00 | 09-Nov-2013 | 04-12-2019 |
22 | AVR Handri Niva Sujala Shravanthi Project - Phase I | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Water Resources Department, Andhra Pradesh | Completed | 1,571.71 | 25-Feb-2005 | 03-12-2019 |
23 | AVR Handri Niva Sujala Shravanthi Project - Phase II | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Water Resources Department, Andhra Pradesh | Completed | 3,440.21 | 04-Dec-2006 | 03-12-2019 |
24 | Construction of High Level Bridge across Campbell Canal at Bhavanipuram in Krishna district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Roads and Buildings Department, Andhra Pradesh | Completed | 77.50 | 01-Oct-2015 | 03-12-2019 |
25 | Gandikota Lift Irrigation | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Water Resources Department, Andhra Pradesh | Completed | 712.29 | 24-Oct-2004 | 03-12-2019 |
26 | Gandikota Reservoir-CBR Lift System | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Water Resources Department, Andhra Pradesh | Completed | 1,461.17 | 18-May-2007 | 03-12-2019 |
27 | Integrated Power Development Scheme (Krishna, Guntur & Chittoor) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Andhra Pradesh | Southern Power Distribution Company of Andhra Pradesh Limited | Completed | 208.00 | 23-Dec-2015 | 03-12-2019 |
28 | Irrigation (Pulichintala) Project | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Water Resources Department, Andhra Pradesh | Completed | 268.87 | 30-Sep-2004 | 03-12-2019 |
29 | Irrigation (Somasila) Project | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Water Resources Department, Andhra Pradesh | Completed | 177.61 | 25-Mar-2005 | 03-12-2019 |
30 | Irrigation (Telugu Ganga) Project | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Water Resources Department, Andhra Pradesh | Completed | 1,300.35 | 16-Feb-2005 | 03-12-2019 |
31 | Krishna Delta Irrigation Project - Modernisation* | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Water Resources Department, Andhra Pradesh | Under Construction | 1,897.18 | 17-May-2008 | 03-12-2019 |
32 | Road Upgradation (Andhra Pradesh - NH 219) Project * | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Roads and Buildings Department, Andhra Pradesh | Under Construction | 271.45 | 26-Jun-2015 | 03-12-2019 |
33 | Road Upgradation (Atmakur-Nellore) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Roads and Buildings Department, Andhra Pradesh | Completed | 329.57 | 10-Dec-2014 | 03-12-2019 |
34 | Road Upgradation (Davulapally-Markapuram) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Roads and Buildings Department, Andhra Pradesh | Completed | 170.21 | Not Available | 03-12-2019 |
35 | Road Upgradation (Dornala T-Junction-Atmakur) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Roads and Buildings Department, Andhra Pradesh | Completed | 251.55 | 23-Feb-2015 | 03-12-2019 |
36 | Road Upgradation (Ibrahimpatnam-Chandragudem-AP/Telangana Border) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Ministry of Road Transport and Highways | Completed | 316.61 | 04-Jan-2016 | 03-12-2019 |
37 | Road Upgradation (Kathipudi-Kakinada Bypass) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Ministry of Road Transport and Highways | Completed | 312.66 | 09-Dec-2015 | 03-12-2019 |
38 | Road Upgradation (Muddanur-Jammalamadugu) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Ministry of Road Transport and Highways | Completed | 144.00 | 23-Feb-2015 | 03-12-2019 |
39 | Road Upgradation (Mydukur-Dornala T-Junction) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Roads and Buildings Department, Andhra Pradesh | Completed | 241.61 | 23-Feb-2015 | 03-12-2019 |
40 | Road Upgradation (Nagarjunasagar-Davulapally) Project * | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Roads and Buildings Department, Andhra Pradesh | Under Construction | 195.45 | 23-May-2014 | 03-12-2019 |
41 | Road Upgradation (Palamaneru-Krishnagiri Border Section) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Ministry of Road Transport and Highways | Completed | 271.45 | 26-Jun-2015 | 03-12-2019 |
42 | Road Upgradation (Raipur-Visakhapatnam) Project* | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Ministry of Road Transport and Highways | Under Construction | 64.00 | 31-Mar-2015 | 03-12-2019 |
43 | Road Upgradation (Vaggampalle-Dornala T-Junction) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Roads and Buildings Department, Andhra Pradesh | Completed | 258.99 | 04-Jun-2014 | 03-12-2019 |
44 | Rural Electrification (Srikakulam-Vizianagaram-Visakhapatnam-East Godavari-West Godavari) DDUGJY | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Andhra Pradesh | Andhra Pradesh Eastern Power Distribution Company Limited | Completed | 120.78 | Not Available | 03-12-2019 |
45 | Setting up of 100 MW solar based power unit at Gani-Sakunala Solar Park in Kurnool district | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | NTPC Limited | Completed | 1,000.00 | 23-Dec-2015 | 03-12-2019 |
46 | Setting up of 500 MW Solar Power Project at Panyam in Kurnool District | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | NTPC Vidyut Vyapar Nigam Limited | Completed | 7,000.00 | 01-Oct-2016 | 03-12-2019 |
47 | Sri Damodaram Sanjeevaiah Coal Based Power Project - Stage-II | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity generation (grid) | Andhra Pradesh | Andhra Pradesh Power Generation Corporation Limited | Completed | 4,276.04 | 15-Dec-2015 | 03-12-2019 |
48 | Srisailam Right Branch Canal Irrigation Project | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Water Resources Department, Andhra Pradesh | Completed | 544.97 | 31-Mar-2005 | 03-12-2019 |
49 | Strengthening of transmission system beyond Vemagiri in Andhra Pradesh | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Andhra Pradesh | Power Grid Corporation of India Limited | Completed | 6,300.00 | 19-Mar-2016 | 03-12-2019 |
50 | Tarakarama Thirtha Sagaram Reservoir Project (Package 1) | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Water Resources Department, Andhra Pradesh | Completed | 130.20 | 24-May-2006 | 03-12-2019 |
51 | Thotapalli Barrage Irrigation Scheme | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Water Resources Department, Andhra Pradesh | Completed | 340.17 | 25-Oct-2004 | 03-12-2019 |
52 | Two laning of Pileru to Rayachoty road from 57.0 km to 108.8 km in Chittoor district | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Roads and Buildings Department, Andhra Pradesh | Completed | 175.03 | 23-Jun-2015 | 03-12-2019 |
53 | Upgradation of Markapuram-Vaggampalle road in length of 95.3 km under NHDP-IV | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Roads and Buildings Department, Andhra Pradesh | Completed | 417.61 | 04-Jun-2014 | 03-12-2019 |
54 | Upgradation of Mudigubba-Ananthapuramu district Border section from 134.0 km to 202.1 km | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Ministry of Road Transport and Highways | Completed | 266.00 | 23-Feb-2015 | 03-12-2019 |
55 | Water Supply Scheme (Kakinada)* | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water supply pipeline | Andhra Pradesh | Kakinada Municipal Corporation | Under Construction | 186.46 | 11-Dec-2013 | 03-12-2019 |
56 | Kurnool Ultra Mega Solar Park | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Andhra Pradesh | Andhra Pradesh Solar Power Corporation | Completed | 10,000.00 | 01-Oct-2015 | 29-11-2019 |
57 | Multimodal Logistic Park (Visakhapatnam) | Government Infrastructure Projects (Traditional Procurement) | Social and Commercial Infrastructure | Common infrastructure for industrial parks, SEZ | Andhra Pradesh | Container Corporation of India Limited | Completed | 372.00 | Not Available | 29-11-2019 |
58 | Siddapuram Lift Irrigation Scheme | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Water Resources Department, Andhra Pradesh | Completed | 72.63 | 06-Dec-2007 | 29-11-2019 |
59 | Somasila-Swarnamuki Link Canal Project | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Water Resources Department, Andhra Pradesh | Completed | 336.74 | 18-May-2007 | 29-11-2019 |
60 | Transmission Line (Hindupur-Uravakonda) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Andhra Pradesh | Transmission Corporation of Andhra Pradesh Limited | Completed | 223.67 | 20-Apr-2016 | 29-11-2019 |
61 | Execution of transmission system for ultra mega solar park in Anantapur - Phase II-Part B * | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Andhra Pradesh | Power Grid Corporation of India Limited | Completed | 99.09 | 31-Jan-2016 | 27-11-2019 |
62 | Implementation of Tadipudi lift irrigation scheme on 206.6 acres* | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Water Resources Department, Andhra Pradesh | Under Construction | 467.70 | 04-Oct-2004 | 27-11-2019 |
63 | Implementation of 220 KV substation at Kuppam in Chittoor * | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity transmission | Andhra Pradesh | Transmission Corporation of Andhra Pradesh Limited | Under Construction | 114.79 | 15-Feb-2016 | 27-11-2019 |
64 | Implementation of Peddakopperla lift irrigation scheme at Koilakuntla mandal in Kurnool district* | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Andhra Pradesh State Irrigation Development Corporation Limited | Under Construction | 867.00 | 30-Sep-2013 | 27-11-2019 |
65 | Implementation of Polavaram irrigation on 720000 acres at West Godavari*# | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Water Resources Department, Andhra Pradesh | Under Construction | 20,000.00 | 20-Oct-2004 | 27-11-2019 |
66 | Implementation of Poola Subbaiah-Veligonda irrigation scheme in Prakasam district * | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Irrigation (dams, channels, embankments, etc.) | Andhra Pradesh | Water Resources Department, Andhra Pradesh | Under Construction | 4,477.30 | 20-Aug-2005 | 27-11-2019 |
67 | Implementation of water supply scheme in Kurnool* | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water supply pipeline | Andhra Pradesh | Public Health and Municipal Engineering Department, Andhra Pradesh | Under Construction | 68.25 | 07-Dec-2017 | 27-11-2019 |
68 | Implementation of water supply scheme in Tirupathi* | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water supply pipeline | Andhra Pradesh | Public Health and Municipal Engineering Department, Andhra Pradesh | Under Construction | 93.71 | 16-Jan-2017 | 27-11-2019 |
69 | Setting up of 600 MW Rayalaseema coal power unit 6 (Stage IV) in YSR district * | Government Infrastructure Projects (Traditional Procurement) | Energy | Electricity generation (grid) | Andhra Pradesh | Andhra Pradesh Power Generation Corporation Limited | Under Construction | 3,781.86 | 30-Oct-2010 | 27-11-2019 |
70 | Water Supply Scheme (Kalyandurg, Rayadurg & Uravakonda) - Phase IV* | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water supply pipeline | Andhra Pradesh | Rural Water Supply and Sanitation Department, Andhra Pradesh | Under Construction | 190.00 | 30-Nov-2009 | 27-11-2019 |
71 | Implementation of 30 MLD Nandyal water supply improvement scheme * | Government Infrastructure Projects (Traditional Procurement) | Water Sanitation | Water supply pipeline | Andhra Pradesh | Public Health and Municipal Engineering Department, Andhra Pradesh | Under Construction | 137.34 | 28-Jul-2017 | 26-11-2019 |
72 | R-O-B (Renigunta -Tirupathi) Project* | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | South Central Railway | Under Construction | 57.51 | Not Available | 26-11-2019 |
73 | Road Upgradation (Anantapur-Mudigubba) Project* | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Roads and Buildings Department, Andhra Pradesh | Under Construction | 61.96 | 12-Nov-2014 | 26-11-2019 |
74 | Road Upgradation (AP Boarder to Anantapur) Project* | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Roads and Buildings Department, Andhra Pradesh | Under Construction | 309.01 | 31-Mar-2015 | 26-11-2019 |
75 | Road Upgradation (Bheemunipatnam-Visakhapatnam) Project* | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Andhra Pradesh | Roads and Buildings Department, Andhra Pradesh | Under Construction | 65.00 | 05-Aug-2015 | 26-11-2019 |