List of Infrastructure Projects – State Wise
This Report provides State/UT wise information on infrastructure projects across pre-defined set of parameters and following coverage criteria:
- Government Infrastructure Projects (PPP) that were either under 'Pre-construction Stage', 'Under Construction' or 'Operation and Maintenance Stage' as on April 1, 2011 or 'Awarded' thereafter and with Project Cost >INR 5 crore.
- Government Infrastructure Projects (Traditional Procurement) that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore; and
- Private Sector Projects that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore.
No. of Projects in this Report: | 9243 | Total Project Cost(in Rs Crore): | 6,813,036.84 |
This Report provides State/UT wise information on infrastructure projects across pre-defined set of parameters and following coverage criteria: (All States)
Sl No | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
1 | 10 MW Solar Photovoltaic Power (Patan) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Emami Cements Limited | Completed | 60.00 | Not Available | 27-09-2015 |
2 | 10 MW Solar Power (Vadodara) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Sardar Sarovar Narmada Nigam Limited | Completed | 0.00 | Not Available | 27-09-2015 |
3 | 10 MW Solar PV Project in Karnataka - Alpha Infrapop | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | Alfa Infraprop Private Limited | Not Available | 50.27 | 01-Nov-2013 | 27-09-2015 |
4 | 10 MW Solar PV Project in Karnataka - Sun Pharma | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | Sun Pharma Medication Private Limited | Not Available | 50.09 | 01-Nov-2013 | 27-09-2015 |
5 | 10 MW Solar PV Project in Karnataka - ACME | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | Acme Tele Power Limited | Not Available | 54.82 | 01-Nov-2013 | 27-09-2015 |
6 | 10 MW Solar PV Project in Karnataka - Aditya | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | Aditya Medisales Limited | Not Available | 55.00 | 01-Nov-2013 | 27-09-2015 |
7 | 10 MW Solar PV Project in Karnataka - Astonfield | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | Astonfield Renewable Resource Private Limited | Not Available | 64.82 | 01-Nov-2013 | 27-09-2015 |
8 | 10 MW Solar PV Project in Karnataka - Hero Group | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | Hero Group | Not Available | 67.91 | 01-Nov-2013 | 27-09-2015 |
9 | 10 MW Solar PV Project in Karnataka - Lanko Solar | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | Lanco Solar Energy Private Limited | Not Available | 57.36 | 01-Nov-2013 | 27-09-2015 |
10 | 10 MW Solar PV Project in Karnataka - Surana | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | Surana Telecom and Power Limited | Under Construction | 64.73 | 01-Nov-2014 | 27-09-2015 |
11 | 10 MW Solar PV Project in Karnataka - Today Green power | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | Today Green Power Private Limited | Under Construction | 63.18 | 01-Nov-2014 | 27-09-2015 |
12 | 10 MW Solar PV Project in Karnataka - Today Green power Phase II | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | Today Group | Under Construction | 64.09 | 01-Nov-2014 | 27-09-2015 |
13 | 10 MW Solar PV Project in Karnataka - Today Green power Phase III | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | Today Group | Under Construction | 64.73 | 01-Nov-2014 | 27-09-2015 |
14 | 10.2 MW Solar Power (Patan) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Astonfield Solar (Gujarat) Private Limited | Completed | 102.00 | Not Available | 27-09-2015 |
15 | 10.5 MW Wind Power (Kutch) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Beta Wind Farm Private Limited | Completed | 63.00 | Not Available | 27-09-2015 |
16 | 100 MW Solar PV Project in Telangana | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | ReNew Power Ventures Private Limited | Under Construction | 611.82 | 01-Dec-2014 | 27-09-2015 |
17 | 11.2 MW Wind Power (Rajkot) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | CLP Windfarms (India) Pvt. Ltd. | Completed | 67.00 | Not Available | 27-09-2015 |
18 | 12 MW Kolayat Solar Power Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Rajasthan | NVR Infrastructure and Services Private Limited | Completed | 120.00 | Not Available | 27-09-2015 |
19 | 12.7 MW Solar Power (Charanka) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Torrent Solargen Limited | Completed | 120.00 | Not Available | 27-09-2015 |
20 | 13.6 MW Wind Power (Jamnagar) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Lalpur Wind Energy Limited | Completed | 81.00 | Not Available | 27-09-2015 |
21 | 14.4 MW Wind Power (Jamnagar) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Vish Wind Infrastructure LLP | Completed | 86.00 | Not Available | 27-09-2015 |
22 | 15 MW Solar Power (Charanka) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Kindle Engineering and Construction Private Limited | Completed | 150.00 | Not Available | 27-09-2015 |
23 | 15 MW Solar Power (Kutch) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Sunborne Energy Gujarat One Private Limited | Completed | 150.00 | Not Available | 27-09-2015 |
24 | 15 MW Solar PV Project in Telangana | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | First Solar Power India Private Limited | Under Construction | 90.00 | 01-Dec-2014 | 27-09-2015 |
25 | 16.3 MW Solar Power (Charanka) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Torrent Solargen Limited | Completed | 206.00 | Not Available | 27-09-2015 |
26 | 16.7 MW Solar Power (Surendranagar) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Responsive Sutip Limited | Completed | 167.00 | Not Available | 27-09-2015 |
27 | 16.8 MW Wind Power (Jamnagar) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Gujarat Mineral Development Corporation Limited | Completed | 0.00 | Not Available | 27-09-2015 |
28 | 16.8 MW Wind Power (Rajkot) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | CLP Windfarms (India) Pvt. Ltd. | Completed | 100.00 | Not Available | 27-09-2015 |
29 | 18.4 MW Wind Power (Jamnagar) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Tadas Wind Energy Private Limited | Completed | 110.00 | Not Available | 27-09-2015 |
30 | 18.9 MW Wind Power (Jamnagar) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Gujarat Mineral Development Corporation Limited | Completed | 0.00 | Not Available | 27-09-2015 |
31 | 20 MW Solar PV Project in Karnataka | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | Today Green Power Private Limited | Under Construction | 122.00 | 01-Nov-2014 | 27-09-2015 |
32 | 20 MW Solar PV Project in Karnataka - Phase II | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | Today Group | Under Construction | 123.00 | 01-Nov-2014 | 27-09-2015 |
33 | 20 MW Solar PV Project in Telangana | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | Solairedirect Energy India Private Limited | Under Construction | 119.82 | 01-Dec-2014 | 27-09-2015 |
34 | 20 MW Wind Power (Jamnagar & Devbhoomi Dwarka ) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Tadas Wind Energy Private Limited | Completed | 100.00 | Not Available | 27-09-2015 |
35 | 20.1 MW Solar Power (Porbandar) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Hiraco Renewable Energy Private Limited | Completed | 310.80 | Not Available | 27-09-2015 |
36 | 22 MW Solar Power (Charanka) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Torrent Solargen Limited | Completed | 220.00 | Not Available | 27-09-2015 |
37 | 22 MW Wind Power (Kutch) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Powerica Limited | Completed | 160.00 | Not Available | 27-09-2015 |
38 | 25 MW Solar Photovoltaic Power (Surendranagar) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Ujjawala Power Private Limited | Completed | 200.00 | Not Available | 27-09-2015 |
39 | 26 MW Wind Power (Surendranagar) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Surya Vidhyut Limited | Completed | 154.60 | Not Available | 27-09-2015 |
40 | 29.9 MW Solar Power (Charanka) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Kindle Engineering and Construction Private Limited | Completed | 290.00 | Not Available | 27-09-2015 |
41 | 30 MW Solar PV Project in Karnataka | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | SunEdison Energy India Private Limited | Under Construction | 186.27 | 01-Nov-2014 | 27-09-2015 |
42 | 30 MW Solar PV Project in Karnataka - Phase II | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | SunEdison Energy India Private Limited | Under Construction | 187.09 | 01-Nov-2014 | 27-09-2015 |
43 | 30 MW Solar PV Project in Karnataka - Phase III | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | SunEdison Energy India Private Limited | Under Construction | 187.91 | 01-Nov-2014 | 27-09-2015 |
44 | 30 MW Solar PV Project in Karnataka - Phase IV | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | SunEdison Energy India Private Limited | Under Construction | 188.73 | 01-Nov-2014 | 27-09-2015 |
45 | 30 MW Solar PV Project in Karnataka - Phase V | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | SunEdison Energy India Private Limited | Under Construction | 190.09 | 01-Nov-2014 | 27-09-2015 |
46 | 30 MW Solar PV Project in Telangana | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | Acme Solar Energy Private Limited | Under Construction | 186.76 | 01-Dec-2014 | 27-09-2015 |
47 | 34.4 MW Wind Power (Jamnagar) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Lalpur Wind Energy Limited | Completed | 200.00 | Not Available | 27-09-2015 |
48 | 40 MW Solar PV Project in Karnataka | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | Azure Power India Private Limited | Under Construction | 252.00 | 01-Nov-2014 | 27-09-2015 |
49 | 40 MW Solar PV Project in Karnataka - Phase II | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | Azure Power India Private Limited | Under Construction | 253.09 | 01-Nov-2014 | 27-09-2015 |
50 | 40 MW Solar PV Project in Telangana | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Telangana | ReNew Power Ventures Private Limited | Under Construction | 247.27 | 01-Dec-2014 | 27-09-2015 |
51 | 5.2 MW Solar Power (Charanka) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Kindle Engineering and Construction Private Limited | Completed | 52.00 | Not Available | 27-09-2015 |
52 | 50 MW Solar PV Project in Karnataka | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Karnataka | Azure Power India Private Limited | Under Construction | 313.18 | 01-Nov-2014 | 27-09-2015 |
53 | 8.4 MW Solar Power (Surendranagar) Project | Government Infrastructure Projects (Traditional Procurement) | Energy | Renewable energy (grid) | Gujarat | Responsive Sutip Limited | Completed | 84.00 | Not Available | 27-09-2015 |
54 | Abohar-Fazilka Railway Line | Government Infrastructure Projects (Traditional Procurement) | Transport | Railway track, tunnel, viaducts, bridges | Punjab | Northern Railway | Completed | 225.45 | Not Available | 27-09-2015 |
55 | Acquisition of 6 Nos. new RTYGCs. | Government Infrastructure Projects (Traditional Procurement) | Transport | Ports (excluding captive) | Maharashtra | Jawaharlal Nehru Port Trust | Under Construction | 59.60 | 27-Jun-2013 | 27-09-2015 |
56 | Adra-Medinapur Railway Electrification | Government Infrastructure Projects (Traditional Procurement) | Transport | Railway track, tunnel, viaducts, bridges | West Bengal | Eastern Railway | Completed | 84.81 | Not Available | 27-09-2015 |
57 | Agra-Shikohabad NH-2 Road Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Uttar Pradesh | National Highways Authority of India (NHAI) | Completed | 328.49 | Not Available | 27-09-2015 |
58 | Ahmedabad-Vadodara Expressway Road Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Gujarat | Ahmedabad-Vadodara Expressway Company Limited | Completed | 766.00 | Not Available | 27-09-2015 |
59 | Airport (Aurangabad) Project - Modernisation | Government Infrastructure Projects (Traditional Procurement) | Transport | Airports | Maharashtra | Airports Authority of India (AAI) | Completed | 74.00 | Not Available | 27-09-2015 |
60 | Airport (Bajpe-Mangalore) Project - Renovation | Government Infrastructure Projects (Traditional Procurement) | Transport | Airports | Karnataka | Airports Authority of India (AAI) | Completed | 147.00 | Not Available | 27-09-2015 |
61 | Airport (Bhopal) Project - Expansion | Government Infrastructure Projects (Traditional Procurement) | Transport | Airports | Madhya Pradesh | Airports Authority of India (AAI) | Under Construction | 120.00 | Not Available | 27-09-2015 |
62 | Airport (Jaisalmer) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Airports | Rajasthan | Airports Authority of India (AAI) | Completed | 88.00 | Not Available | 27-09-2015 |
63 | Airport (Kullu) Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Airports | Himachal Pradesh | Airports Authority of India (AAI) | Under Construction | 0.00 | Not Available | 27-09-2015 |
64 | Airport (Srinagar) Project - Renovation | Government Infrastructure Projects (Traditional Procurement) | Transport | Airports | Jammu & Kashmir | Airports Authority of India (AAI) | Under Construction | 56.00 | Not Available | 27-09-2015 |
65 | Airport (Varanasi) Project - Renovation | Government Infrastructure Projects (Traditional Procurement) | Transport | Airports | Uttar Pradesh | Airports Authority of India (AAI) | Under Construction | 83.00 | Not Available | 27-09-2015 |
66 | Airport Runway (Guwahati) Project - Expansion | Government Infrastructure Projects (Traditional Procurement) | Transport | Airports | Assam | Airports Authority of India (AAI) | Completed | 60.00 | Not Available | 27-09-2015 |
67 | Ajmer-Chittaurgarh-Udaipur GC Railway Line | Government Infrastructure Projects (Traditional Procurement) | Transport | Railway track, tunnel, viaducts, bridges | Rajasthan | North Western Railway | Completed | 549.00 | Not Available | 27-09-2015 |
68 | Ajmer-Pushkar BG Railway Line | Government Infrastructure Projects (Traditional Procurement) | Transport | Railway track, tunnel, viaducts, bridges | Rajasthan | North Western Railway | Completed | 88.40 | Not Available | 27-09-2015 |
69 | Akaltara-Champa Third Railway Line | Government Infrastructure Projects (Traditional Procurement) | Transport | Railway track, tunnel, viaducts, bridges | Chhattisgarh | South East Central Railway | Completed | 60.95 | Not Available | 27-09-2015 |
70 | Allotment of Land on Long Term Lease on Annual Lease Basis at Mappedu near Sriperumbudur on Tender cum Auction basis | Government Infrastructure Projects (Traditional Procurement) | Transport | Ports (excluding captive) | Tamil Nadu | Chennai Port Trust | Under Construction | 100.00 | Not Available | 27-09-2015 |
71 | Ambala-Saharanpur-Moradabad Railway Electrification | Government Infrastructure Projects (Traditional Procurement) | Transport | Railway track, tunnel, viaducts, bridges | Multi State/ Centre | Northern Railway | Completed | 222.08 | Not Available | 27-09-2015 |
72 | Amguri-Tuli GC Railway Line | Government Infrastructure Projects (Traditional Procurement) | Transport | Railway track, tunnel, viaducts, bridges | Multi State/ Centre | Northeast Frontier Railway | Completed | 0.00 | Not Available | 27-09-2015 |
73 | Ankleshwar-Rajpipla GC Railway Line | Government Infrastructure Projects (Traditional Procurement) | Transport | Railway track, tunnel, viaducts, bridges | Gujarat | Western Railway | Completed | 230.00 | Not Available | 27-09-2015 |
74 | Arra-Sasaram Railway Line | Government Infrastructure Projects (Traditional Procurement) | Transport | Railway track, tunnel, viaducts, bridges | Bihar | East Central Railway | Completed | 286.84 | Not Available | 27-09-2015 |
75 | Assam Border-Gairkatta NH-31C Road Project | Government Infrastructure Projects (Traditional Procurement) | Transport | Roads and bridges | Assam | National Highways Authority of India (NHAI) | Completed | 221.82 | 30-Jun-2005 | 27-09-2015 |